North American Construction Group Ltd. (NOA) Earnings Call Transcript & Summary

November 5, 2026

Toronto Stock Exchange CA Energy Energy Equipment and Services earnings 39 min

Earnings Call Speaker Segments

Jason Veenstra

executive
#1

Thanks, Ray, and good morning, everyone. I'll begin today's call with a quick run through the financials, then hand things over to Barry for his operational and forward-looking remarks, and as usual we'll wrap up with Q&A. On slide four, we posted steady EBITDA of CAD 100 million for the third quarter on total revenue of CAD 438 million, which came in CAD 47 million above the third quarter a year ago. IMC, acquired in the second quarter, added CAD 74 million in revenue and accounted for that increase versus last year. With IMC excluded, Australia delivered 5% organic growth in the quarter on commissioned growth assets. In Canada, like-for-like growth came in above 20%, powered by substantially better mechanical availability and strong demand in the oil sands area. Year to date, we've produced solid combined revenue of CAD 1.3 billion, in line with expectations, which let us raise our full-year revenue guidance to a midpoint of CAD 1.75 billion. On the top line, the business is beating expectations when it comes to generating revenue. Unfortunately, during the quarter we also recorded a sizable life-to-date project adjustment tied to Fargo, and I'll go through the details on slide six. Moving to slide five, Australia's gross profit margin was 11.9%, down from the 14% recorded in Q2 and below the 15%-20% range we anticipate for that region. Roughly CAD 15 million of additional cost stemmed from two primary developments. At our biggest site in Queensland, about CAD 10 million went toward extra parts and labor, aimed at both raising and maintaining equipment availability. At our largest operation in Western Australia, a pit wall collapse created a range of operational inefficiencies because of how it affected total mine output, and it also forced reconstruction work on haul roads and left them inaccessible. In Canada, gross profit margin reached 10.5%, matching expectations and marking a healthy gain over the 7% recorded in Q2, driven by disciplined project execution, stronger maintenance capability, reduced repair costs, and ongoing fleet efficiency initiatives. Turning to slide six, third-quarter EBITDA matched the prior year, though EBIT declined because depreciation rose alongside higher revenue. Depreciation represented 16% of combined revenue, somewhat above the 15% midpoint of our expected range, largely due to MacKellar component depreciation. On G&A, after excluding Fargo and acquisition effects, direct adjusted administrative costs totaled CAD 20 million, equal to 4.6% of combined revenue, which is in line with our 5% targeted threshold and shows operating leverage and discipline on stronger revenue. Overall, adjusted EPS came to CAD 0.25 for the quarter. Interest expense rose to CAD 21.3 million from CAD 15.3 million a year earlier, reflecting the financing of our strategic expansion in Australia. Net debt remained consistent at $1.1 billion. Regarding the Fargo project impact I brought up earlier, our joint venture executive committee provided a revised forecast in early October. Total project cost rose 9% in that forecast, and the knock-on effect for us amounted to about CAD 50 million on earnings before tax. On the financial side, you'll see that reflected as a CAD 30 million rise in G&A along with a CAD 20 million equity loss charge. That project now sits in a contract loss position, so the entire loss has to be recorded at 100%. Physical completion is nearly upon us, and the estimate we've received isn't expected to come down any further. We've added that loss back for adjusted purposes because this type of project is considered non-core in nature, and as we've noted previously, moving forward we'll only enter arrangements where we hold operational control, consistent with the other joint ventures in which we're partners. If you turn to slide seven, the business generated CAD 52 million in operating cash flow before working capital, supported by EBITDA performance net of cash interest. Free cash flow was an outflow of CAD 28 million, reflecting the intentional capital spending investment in Canada and roughly a CAD 24 million impact from changes in working capital balances across our core businesses. Now slide eight. Net debt remained consistent at CAD 1.1 billion. The trailing 12 net debt leverage we're reporting stands at 3.0 times, though that number doesn't yet capture a full 12 months of IMC EBITDA. Looking at the Q3 run rate, our leverage ratio comes in at 2.8 times, and we plan to bring that down as we go forward. Slide nine gives some context on the structure of our debt. Over the near and medium term, our focus is on paying down debt through free cash flow generation, and across that period most of our debt carries fixed rates, so posted interest rate movements don't affect it; beyond that, the bulk of our maturities fall in 2029 and later, which gives us the stability and flexibility we need during this phase following a stretch of significant growth. With those brief remarks on the financials, I'll pass the call to Barry.

Barry Palmer

executive
#2

Thanks, Jason, and good morning, everyone. As Jason just described, our Q3 results show both the growth happening across our platform — combined revenue hit a record level for the third quarter — and the work still needed to turn that growth into more consistent earnings. Our Australian platform has become broader, and IMC kept expanding during Q3. Our focus is on converting that activity into improved margins and stronger cash generation, because operational challenges in Australia weighed on the quarter. We also saw our Canadian fleet begin to build momentum, with better mechanical availability and utilization. New contracts in Northern Canada and stronger equipment demand in the oil sands stood out as a true Q3 highlight. The Fargo project was a major drag on the quarter — completion delays, schedule impacts, rework, and last-minute escalations in cost to complete all played a part, and the result was a financial loss. The good news is that this project is now in its final stages of completion, and it's not the kind of thing we'll be repeating going forward. If you'll turn to slide 11. As we look ahead, the opportunity in front of us remains significant; our priorities for the rest of the year are laid out on slide 12. Our focus is on execution and on delivering the operating improvements that underpin our fourth quarter expectations. Safety comes first, as it always does. In every operation, our objective stays the same: everyone gets home safe. In Australia, we keep refining the makeup of our workforce, building on gains we made recently. Following substantial expansion in Queensland, we are likewise reducing discretionary operating costs while fully preserving customer requirements; in Western Australia, our focus is on integrating IMC and commissioning its expanded fleet to support the work ahead; in the oil sands, improved mechanical availability and fleet reliability remain central to our operating plan and to our capacity to capitalize on the growing momentum we see in the region. We are also getting ready for an orderly CEO transition, with continuity in our strategy, customer relationships, and capital allocation. These priorities are practical, and our teams are focused on carrying them through into day-to-day performance. Turning to slide 13 now. Three strategic building blocks form the core of what we're aiming to achieve for growth. The first is growing our tier 1 contractor platform in Australia. The second is winning infrastructure awards in Northern Canada. And the third is growing our mining services across Canada and the U.S. At all 23 of our global operating sites, we take the same approach. We put our people and equipment in places where our capabilities give us an edge, we deliver for the customer, and we earn the chance to take on more work. Growth generates value when we execute well and earn a suitable return on the capital we commit. Now slide 14. Australia is still our biggest growth opportunity, and an $8.2 billion bid pipeline there underscores just how much work lies ahead. Between Q1 2024 and Q3 2026, revenue grew at a compound annual rate of 36%. As of September 30, the Australian platform carried contractual backlog of roughly CAD 2.6 billion, along with a bid pipeline worth AUD 8.2 billion. Adding MacKellar and IMC gives us the scale and capabilities to go after larger, wider scopes across both Eastern and Western Australia. Those companies also widen our exposure to copper, gold, lithium, iron ore and nickel, and deepen our involvement in projects with lower capital unit rates. That opportunity sits on a substantial market, including roughly AUD 280 billion of public infrastructure spending and an AUD 240 billion major project pipeline across the next five years. Our incoming CEO brings deep mining experience in Australia and internationally, which will help us build on this position. Also strengthening our leadership in Australia, MacKellar's incoming Managing Director arrives with substantial market expertise and relationships. Priority one is improving operating performance as the platform grows. Workforce efficiency, cost containment, and IMC's continuing ramp-up are central to what we expect in a stronger fourth quarter. We need to show that the scale we've built can deliver more dependable margins and cash returns. Moving to slide 15. In Northern Canada, Nuna keeps proving the value of executing an initial scope well to win follow-on work. Earlier work completed successfully in Ontario earned us an additional award, extending our time on that site from Q4 of 2026 through much of the second quarter of 2027. Nuna also secured a multi-year contract extension at a Nunavut project, along with new work in the Yukon. Partnerships with Indigenous communities remain essential to this business. A new collaboration agreement with a Yukon community supports training, jobs, and business opportunities, and it builds on the relationships Nuna has already developed across the region; Nuna holds over 250 heavy equipment assets and a CAD 4.6 billion pipeline, and it is also pursuing larger infrastructure possibilities; among these are dedicated subcontractor roles on teams chasing a port and road project and defense infrastructure, plus a four-way partnership advancing a northern corridor opportunity. All of these remain pursuits, with procurement, government, and First Nations processes still to come. Our job is to position the business prudently and keep earning customer confidence by delivering on execution. Turning to slide 16. In the oil sands, longer haul distances and broader customer requirements continue to support equipment demand. In Q3, Canadian utilization climbed 30% versus a year earlier. Our top priority is turning that higher activity level into improved operating margins by ensuring dependable fleet performance, equipment availability, and disciplined project execution. The plan we are following still centers on our extensive multi-life heavy equipment assets, with well-defined goals for maintenance and operations. As availability improves, schedule risk declines and we can meet visible demand more effectively. We will remain selective in the work we take on and the investments we make, letting returns drive those choices. Our heavy equipment maintenance and services segment is expanding now. A recently signed five-year contract valued at CAD 135 million creates additional near-term service opportunities, and it calls for only roughly CAD 5 million of modest growth capital to field 25 on-highway units plus support equipment that will work alongside the fleet already in place. That's a good illustration of how we can grow by layering on capabilities without a corresponding increase in capital requirements. Moving to slide 17. Our bid pipeline totals more than CAD 15 billion, with approximately CAD 4.5 billion of that in active tender and procurement, and it includes an $8.2 billion bid pipeline of opportunities we are tracking closely. These opportunities cover 14 resource categories, giving us a wide range of potential work across the markets we serve. A pipeline of this scale provides options. We focus on converting bids where scope aligns with our expertise, risks are well understood, and expected returns clear our hurdles — winning every opportunity isn't necessary. Discipline will remain our approach as projects progress through awarding. On slide 18, I'm delighted to welcome Brad Rogers, who becomes President and Chief Executive Officer and a Director effective December 1st. Brad brings more than 30 years of experience across mining services, infrastructure, and finance, including time as CEO of Jupiter Mines and BBis Industries. He is also a chartered accountant and previously served as a CFO, bringing deep commercial and corporate development expertise. I know Brad is very keen to get started in his new role. The priorities he has set out build on the platform already in place: pursuing North American growth opportunities, making operational excellence part of daily performance, and maximizing value from our Australian investment. Success will be measured by contract awards and backlog conversion, fleet availability, margins, cash conversion, and returns on invested capital. The objective is simple — generate more cash to pay down debt and support total shareholder returns. Through this transition, our focus is on sustaining operating momentum and delivering continuity for customers and teams. On slide 19, we turn to the outlook. Full-year guidance is anchored in contractual backlog of about CAD 3.2 billion as of September 30th. Consolidated revenue is now expected to land between CAD 1.7 billion and CAD 1.8 billion, a midpoint of CAD 1.75 billion, versus the CAD 1.7 billion midpoint previously. Adjusted EBITDA guidance now falls within a narrower range of CAD 370 million to CAD 400 million, with the midpoint declining from CAD 400 million to CAD 385 million. That shift reflects operational challenges faced in the third quarter, although we still anticipate a strong fourth quarter. Delivering on this forecast hinges on the operating improvements we discussed earlier today. Revenue and adjusted EBITDA are central to our revised guidance, as we regard them as the clearest window into how the business is performing and executing. Reliable free cash flow forecasting is hard, given that customer receipts and project spending arrive at irregular intervals. Keeping a tight grip on how we manage cash remains a key focus for us, and cash flow is going to keep showing up in the results we report each quarter. The main catalysts are in Australia: we expect that IMC work in Western Australia will continue ramping up, and that margins there will get back to their historical levels. In the oil sands, we're looking forward to a busy winter season, supported by improved utilization, an optimized fleet, and additional project scopes. At Nuna, a bigger fleet in Nunavut ought to bring an uplift in the fourth quarter. As we bring the year to a close, our priorities are plain. Executing safely, raising margins, and converting growth across our platform into cash flow and enduring shareholder value is our responsibility. And with an $8.2 billion bid pipeline in view, that focus matters all the more. That wraps up our presentation for the third quarter. We're now glad to take your questions.

Adam Thalhimer

analyst
#3

Morning, everyone. Appreciate you taking our questions. Barry, I just wanted to mention that working with you through this interim stretch has been a pleasure. We were hoping you could give us a bit more detail on slide 17. That's a fairly substantial bump — a CAD 900 million rise in the pipeline. The overall opportunity climbed by a couple billion dollars. Could you just tell us where that strength is coming from?

Jason Veenstra

executive
#4

Thanks, Adam. Jason here, and I'll field that one. Sure — the bid pipeline looks very strong to us, same as you're seeing, with most of it coming out of Australia, plus solid momentum in the oil sands as well.

Barry Palmer

executive
#5

Yeah, I'd like to add to that too, Adam. I mean, the oil sands offer every kind of opportunity. I mean, our fleet is becoming fully occupied with the work ahead of us, and we expect great things there. There are all sorts of reclamation programs. There are pit expansions, greater demand for overburden movement. Yeah, I mean, we simply view that as a great spot. Following on Jason's point about Australia, there are some large projects we're examining with some current customers and new customers too, in both the east and the west, which give us excellent opportunity going forward.

Adam Thalhimer

analyst
#6

It seems as though there's sufficient there that we could potentially push toward a record backlog over the next few quarters. Would you say that's accurate?

Barry Palmer

executive
#7

Yes, I'd agree with that.

Jason Veenstra

executive
#8

Absolutely.

Adam Thalhimer

analyst
#9

Just quickly on Australia — the problems you faced during the quarter, I'm trying to gauge how far those are now under control, and with the gross margin preferred range of 15%-20%, can you return to that in Q4, or does that only happen in 2027?

Barry Palmer

executive
#10

Yeah, so the higher cost, obviously, that came at one of our major sites in Australia, in Queensland. What it amounts to is a set of maintenance expenses pulled forward into the period that will probably carry over to the end of the year; these are component replacements, defect elimination across a large fleet at our biggest site there, and that is what pushed those costs up. We expect that to probably continue through the end of the year, and after that, we ought to have caught up on it, and things should settle back so our margins return to where they should be.

Jason Veenstra

executive
#11

To clear that up, Adam, what the guidance implies on our side is roughly 13.5% by Q4, which then sets us up to return to the 15%-20% range in 2027, at the point when we give guidance for 2027.

Adam Thalhimer

analyst
#12

All right, that's great. And given that you have that figure, could you share what it was for Canada in Q4?

Jason Veenstra

executive
#13

Yes, that comes in at 12%.

Adam Thalhimer

analyst
#14

Good. Fine. Alright, I'll hand things over now. Appreciate it, everyone.

Barry Palmer

executive
#15

Thank you, Adam.

Yuri Lynk

analyst
#16

Hey there, good morning, guys.

Barry Palmer

executive
#17

Morning, Yuri.

Yuri Lynk

analyst
#18

I just wanted to follow up on what was said regarding lowering our debt, and to try to get a sense of how dedicated you are to bringing that debt down. How is management approaching the balance between some of these growth opportunities, which probably need some growth capital in order to pursue them, and the stated goal of paying down debt?

Jason Veenstra

executive
#19

Yeah, Yuri, I can handle that question. We are completely committed. Based on the statements we've made in a few of the slides here, the conviction on debt reduction is clear. When it comes to the bid pipeline, since we no longer need to invest in platforms in G&A, it's all incremental, and our top threshold when evaluating opportunities now is the impact they have on debt leverage. So, the criteria is under 2.0 times, and we therefore believe we can achieve debt reduction by leveraging our platforms across the three key regions — Western and Eastern Australia and Canada — and then at the same time steering free cash flow toward debt. So, the goal remains to get into the low twos, and to reach 2.0 in the medium term.

Yuri Lynk

analyst
#20

All right, that helps. I get that Nuna's pipeline is getting better, but the reality is we're facing a situation where the Fargo revenues have rolled off. How should we think about the puts and takes on revenue over the coming couple of quarters, since that's a sizable chunk of revenue coming off and it hasn't been replaced yet?

Jason Veenstra

executive
#21

Yes. So barring a big win — and we're bidding on some three pretty large wins in Nuna that would be step changes back to Côté-level revenues out of Nuna — we see roughly a 10% year-over-year revenue increase in 2027, and similar type increases in the other three regions. So we'll be giving 2027 guidance with Brad in the coming months, but absent step change wins, I'd expect us organically to be up about 10% year-over-year in revenue.

Yuri Lynk

analyst
#22

That's only on—

Jason Veenstra

executive
#23

That figure leaves out the Fargo effect. It reflects organic wins along with the ramp-up we're still seeing in Australia and the year-over-year benefit we're getting from that.

Yuri Lynk

analyst
#24

All right. Glad to know that. All right. Appreciate it, everyone.

Jason Veenstra

executive
#25

Thank you, Yuri.

Sean Jack

analyst
#26

Morning, guys.

Jason Veenstra

executive
#27

Morning, Sean.

Sean Jack

analyst
#28

I want to explore a little further the maintenance overage with the Queensland client. What I'm wondering is whether you plan to potentially restructure the contract terms there, or maybe return to the client and change how things are managed, purely to see if we can somewhat lower the odds of anything like this happening again later — or are you pretty much locked in by your commitments?

Jason Veenstra

executive
#29

No, that's a reasonable point, Sean. Yes, absolutely, we're looking into that, considering how we can, I mean, iron out that sort of issue more effectively. I mean, with the new Managing Director coming to us via MacKellar, his main job will be exactly that. Clearly, our biggest client is where this cost increase is hitting us, and also the way we do business with them; so yes, that's definitely on our radar and something we're currently putting a plan together for. We have also narrowed adjusted EBITDA guidance to $370 million to $400 million, lowering the midpoint from $400 million to $385 million.

Sean Jack

analyst
#30

Okay, perfect. That's useful context. Then just regarding Canada — and I apologize if the deck already covers this — could you give us some sense of, theoretically, where Canada utilization stands right now, and potentially, based on what you're seeing, where utilization rates might return to?

Jason Veenstra

executive
#31

Yeah. As things stand, I'd say we're around that 55% range. Obviously, we'd like to get — our aspiration is to reach 70. That's what we're focused on with our fleet, in terms of concentrating on that physical availability and making sure our units are ready to run and utilized to the fullest. So yeah, that's really where we're aiming to get to, but right now we're around that 55 range.

Sean Jack

analyst
#32

All right, that's everything from my side, folks. Appreciate it.

Jason Veenstra

executive
#33

Thank you, Sean.

Barry Palmer

executive
#34

Thank you, Sean.

John Gibson

analyst
#35

Good morning, everyone. Appreciate you taking my questions. Most of them have already been covered. I just had a handful of follow-ups. I'm curious — you usually issue 2027 guidance, as I recall, near the end of the year. Will that still happen this year, or are you still sort of pulling all the pieces together, particularly given your strong bid pipeline, or might guidance come early next year?

Jason Veenstra

executive
#36

Well, since Brad begins on December 1, that role is clearly going to be blown through. I'd expect it potentially early in 2027, John.

John Gibson

analyst
#37

All right, thanks. Would you be able to elaborate a bit on a few of the infrastructure projects in Canada beyond the oil sands that you're pursuing — perhaps the end markets, the geographies, things along those lines? Thanks.

Jason Veenstra

executive
#38

Yeah, well, they're kind of spread out everywhere. Ring of Fire is one we're really focused on, up in the Mackenzie Valley area. Yeah, they basically run from coast to coast across Canada.

John Gibson

analyst
#39

Okay, everyone. Many thanks. I'll hand it back over to you now.

Jason Veenstra

executive
#40

Thank you.

Tim Monachello

analyst
#41

Hey, good morning.

Jason Veenstra

executive
#42

Morning, Tim.

Tim Monachello

analyst
#43

Just a quick question about the backlog. There was a fairly significant drop versus the prior quarter. Looking at the financials, it appears roughly CAD 775 million was removed from backlog, and that figure exceeded the total revenue estimate. A contract in Western Australia was taken off the board in the slide deck. So is there some rescoping or elimination of contracts between Q3 and Q2?

Barry Palmer

executive
#44

Yes, clearly the one project that came off in IMC is one we had been hoping to secure, and then we didn't secure it, so it has come off there. There are others we hope will take its place, obviously; but yes, that was the big blow in Australia.

Jason Veenstra

executive
#45

Regarding the backlog, Tim, there was a single contract where we reached an early mutual decision to exit, and we reflected that in backlog. The conditions at the mine site simply differed from what had initially been expected, and the parties just agreed to part ways. That largely explains the mismatch you're noticing there.

Tim Monachello

analyst
#46

Understood. All right. Capital spending so far this year in Q3 came in above what I had anticipated. Could you give me some rough bounds on where you figure total capital spending for 2026 will end up, and what your thinking is for 2027?

Jason Veenstra

executive
#47

For 2026, across all-in CapEx, we're anticipating a range of CAD 225 million to CAD 230 million. For 2027, I'd say we see it being quite close to depreciation. Our depreciation run rate sits at 15%, 16% of combined revenue — that's where I'd expect it to be. As you pointed out, in Canada we made a very deliberate choice to really back the fleet as we head into a very busy winter season and what we believe will be very busy years ahead. For CapEx, Q3 will be the high watermark of the year.

Tim Monachello

analyst
#48

Understood. So just to pin down what you said about the CapEx range, am I right that it leaves out lease finance CapEx?

Jason Veenstra

executive
#49

No, lease finance additions are in there. That figure isn't in front of me right now, but we treat it as part of the normal run rate. When we take something on through a lease, it goes into our sustained CapEx, so that is included.

Tim Monachello

analyst
#50

All right. Building on what Yuri said, if you consider reducing leverage and how much growth exists across your opportunity set, and you think about putting capital to work in some of those growth areas, is there a ceiling where you'd say, "We won't go beyond X in 2027?" Or does that simply depend on the cash flows these projects will generate, or the cash flows you expect?

Jason Veenstra

executive
#51

No, it really comes down to the ratios. Clearly, the bigger the opportunity, the greater the effect it can have on our objectives. We haven't set a maximum for our business development teams to pursue. It's more a question of the ratio and how predictable the EBITDA is that the opportunity brings. Again, as we told Yuri, our focus really is on that ratio and what it can do for our business. We want to build on the platforms we already have, and for that, if the scale is larger, the math simply works out better.

Tim Monachello

analyst
#52

Alright. Could you speak a bit about the shift in demand you're observing in the oil sands, and what you expect for oil sands growth in 2027 compared with 2026?

Barry Palmer

executive
#53

Yeah, I think if you caught what Suncor released, it's clear there's a lot of enthusiasm and capital spending coming; we've noticed this since early in the year, when they're looking at simply raising throughput at the plant, and as they mentioned, their haul roads, or their haul lengths, keep getting longer; so that simply translates into greater demand for overburden to be moved plus the capital projects that support the mine. We're seeing that. It has been continuous, and we're going to maximize it by ensuring our fleet is fully available, ready to be put to work and to bid and win these opportunities. We expect more of the same heading into the new year. 2027 looks like a great year based on everything we're hearing from our clients in the oil sands. Blue skies lie ahead for opportunities for us.

Tim Monachello

analyst
#54

Understood. So when you consider expansion in the oil sands and putting more capital to work there—given that returns have been somewhat beneath your thresholds lately in that area, and given that you still have MSAs in place that effectively set pricing—how do you, maybe you could speak a bit about the strategic efforts you're undertaking to lift returns within this kind of constrained pricing setting, or perhaps you're actually seeing pricing improve at the margin.

Barry Palmer

executive
#55

Yes, so the first thing I'd note is that we wouldn't consider adding further units into the oil sands unless we were able to sign something longer term. We have no interest in spending a lot of capital and bringing fleet into the oil sands, only to find ourselves two years later hunting for places to deploy that equipment. In my view, the way we strengthen our position in the oil sands is by pursuing more unit rate work, where the better we perform, the more the margin rises, and that's something we control. That's roughly how we see it: you take on more risk, but we also understand the scope, and we believe we can likely do better than we would under straightforward time and material arrangements; that's where we see the growth and the margin opportunities.

Tim Monachello

analyst
#56

All right, thanks — I'll go ahead and send that back to you.

Barry Palmer

executive
#57

Thank you.

Barry Palmer

executive
#58

Thanks, Ray. This is the last call I'll be on as President and CEO, and I feel a lot of pride in what our team has been able to build and in what North American Construction Group has become during the nearly 45 years I've spent with the company. I'm confident when I say that our existing executive team, with Brad Rogers coming in as President and CEO, is leaving the company in good hands. Our teams are still focused and keep executing with discipline, growing with discipline, and making sure everyone gets home safe. Thanks again, everyone, for being with us today.

Operator

operator
#59

Thank you. That brings us to the end of this North American Construction Group conference call covering the quarter that closed on September 30.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete North American Construction Group Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to North American Construction Group Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in North American Construction Group Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.