Northern Star Resources Limited (NST) Earnings Call Transcript & Summary

August 19, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 45 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for holding, and welcome to Northern Star's FY '26 financial results call. <<operator_script>> At this point I'll turn the conference over to Mr. Stuart Tonkin, Managing Director and CEO. Go ahead, please.

Stuart Tonkin

executive
#2

Good morning, and thank you for being with us on today's call. Since this will be my final market call, I'll say a few words about my time at Northern Star Resources and then pass things to Ryan Gurner, who will walk through the highlights for the financial year and the outlook for FY '27. The recent trading period has given us plenty to focus on. But for those who have been with me on this journey over the past 13 years, it has been an incredible ride, and we had some real fun along the way. In that period, annual gold production has risen twentyfold. We've seen a 30x uplift in share price from $0.70. Across the 13 years, gold resources have grown 40 times to 89 million ounces, and market capitalization has climbed 100x from $300 million to over $30 billion. As a true demonstration of any healthy business, we give back. To date, we have returned $3.3 billion to shareholders through dividends and share buybacks. During my tenure, I have watched the team grow from a humble single asset with 250 jobs to now a global portfolio employing over 10,000 people with decades of future ahead. This is something which I am extremely proud of.

Stuart Tonkin

executive
#3

Being part of this kind of achievement is something you don't come across often, and I want to extend enormous credit to the many fantastic individuals I've been fortunate enough to work with through the difficult times as well as the good ones. This is the group that will keep delivering results going forward. What counts, and what genuinely sets us apart, is their tireless commitment — 24/7, 365 days a year. The star core values are solid, and our people are the real drivers of value creation; they've done the heavy lifting to build Northern Star into the great company it is today. Without question, we've created an outstanding platform that is fully positioned to succeed in the very near term. Northern Star will keep producing meaningful value for shareholders, and working with such a remarkable team makes me proud. At this point I'd like to pass things over to our highly capable Deputy CEO, Ryan Gurner, who will walk through the FY '26 highlights and the FY '27 outlook.

Ryan Gurner

executive
#4

Thanks, Stu, and good morning, everyone. I'd like to extend a welcome as well to Steve McClare, our Chief Technical Officer, who is with us today and will speak to a few of the slides. So welcome, Steve. I'm happy now to walk you through the financial results for the year ended 30 June '26 and our outlook for next year -- or this year, rather. From here on I'll be referencing the slides in the results presentation pack. If we turn to Page 4, FY '26 marked a period of major investment and transition for Northern Star, as we finished Stage 1 of the mill expansion at KCGM. Although the business encountered operational challenges during the year, the portfolio's underlying strength was still clear in the financial results. The group delivered $4.3 billion of underlying EBITDA, a rise of 22% on the prior year, which converted into $2.9 billion of cash earnings. Importantly, even though FY '26 was the peak investment phase of the KCGM mill expansion, the business still produced $190 million of underlying free cash flow. Today, the Board has declared a fully franked dividend of $0.30 per share, taking total FY '26 dividends to $0.55 per share.

Ryan Gurner

executive
#5

Also, over the course of the year, the company repurchased $129 million under its $500 million on-market buyback program. As we head into FY '27, commissioning is underway at the KCGM expansion, which signals our shift away from a heavy investment phase toward one centered on operational delivery and realizing value. With an investment-grade balance sheet and financial flexibility behind it, the business is well placed to start reaping the rewards of this transformational investment. Moving to Slide 5. Our balance sheet continues to be a major strength. We closed the year holding $1.2 billion in cash and bullion, with gearing, leverage and liquidity metrics all sitting comfortably inside our financial targets. Our financial position is further bolstered by access to flexible long-term funding, and we still hold 3 investment-grade credit ratings. That speaks to both the quality of our asset portfolio and the longevity of our production profile, all of it situated in Tier 1 jurisdictions. We head into FY '27 with a well-funded business, a strong balance sheet and the flexibility to advance our organic growth pipeline while keeping capital allocation discipline in place. Let's move to Slide 6 now. Our approach to capital management is unchanged. And as I mentioned earlier, the Board has declared a fully franked final dividend of $0.30 per share, taking the total FY '26 dividend to $0.55 per share.

Ryan Gurner

executive
#6

That works out to a 27% payout of cash earnings, with roughly $785 million coming back to shareholders over the year via fully franked dividends. On top of that, we finished $121 million of the $500 million on-market share buyback program. Turning to Slide 7, which shows all 3 production centers producing strong margins and contributing meaningfully to group earnings. At the group level, FY '26 underlying EBITDA margin came in at 56%, with underlying EBITDA above $2,700 per ounce, which speaks to the strength of the gold price environment. Kalgoorlie posted a particularly strong result, hitting a 64% EBITDA margin, and Pogo kept up its improvement trajectory with a 60% EBITDA margin. Yandal achieved a 47% EBITDA margin and added approximately $1 billion of EBITDA during the year. Though those margins trailed Kalgoorlie and Pogo, we're still focused on driving further improvement there. Importantly, Yandal continues to be a significant contributor to the group, generating over $300 million in net mine cash flow during the year. I'd like to note that a reconciliation of statutory impact to underlying EBITDA and cash earnings appears in the appendix of this presentation on Slide 18. And Slide 17 sets out abnormal items to reconcile from statutory profit to underlying NPAT. Moving to Slide 8 now, which highlights our continued improvement in returns and earnings per share.

Ryan Gurner

executive
#7

In FY '26, return on capital employed rose 18%, with ROCE climbing to 13.4%, and underlying earnings per share grew 5% to $1.24 per share. Underlying EBITDA was also up 25% year-on-year, reaching $2.7 billion. What matters is that we delivered these gains in a year marked by major operational transition and investment, including Stage 1 commissioning of the KCGM mill expansion. As KCGM moves out of commissioning and into steady-state operations, that asset will play a growing role in driving earnings, free cash flow and shareholder returns. Moving to Page 9 of the slide deck, we published our FY '26 reporting suite today, which gives a thorough picture of our safety, environmental, social and governance performance. Those documents set out how we approach responsible business practices and the progress we made in FY '26. I'd encourage you to read them together with the annual report. Now to Slide 10. Group production is forecast at 1.5 million to 1.65 million ounces for FY '27. Output is expected to be weighted toward the second half of FY '27, reflecting planned major shutdowns in the September quarter and commissioning at KCGM. We'll go into more detail on KCGM on the slides ahead. Jundee's operational review is finished, and the results have been folded into an updated medium-term mine plan that rationalizes the operating footprint and optimizes the mining sequence.

Ryan Gurner

executive
#8

For FY '27, we're forecasting all-in sustaining cost of $3,050 to $3,450 per ounce, and we expect cost per ounce to improve as the year goes on. This guidance takes into account roughly 5% inflation across the portfolio, higher royalties tied to the gold price, along with higher assumed oil prices, drawdown of stockpiles at Karasudam, Jundee and KCGM, and sustaining capital of approximately $850 million to $915 million, primarily comprising underground development and associated ventilation, power and pumping infrastructure. I'd also like to highlight that Bannockburn at our Thunderbox operation is now in commercial production. That means stripping costs and the associated equipment costs now sit within sustaining capital at that production center, which is about $85 million to $95 million for FY '27. For FY '27, total group capital investment, including sustaining capital, growth capital and the Hey project, is forecast at $2.6 billion to $2.9 billion. While contingency has been incorporated into the capital plan, our proportion of capital expenditure remains discretionary, which provides flexibility to optimize expenditure in line with operating performance and capital allocation priorities. FY '27 growth capital of $1.5 billion to $1.77 billion comprises operational growth capital of the Kalgoorlie, Yandal and Pogo production centers and KCGM mill expansion and readiness.

Ryan Gurner

executive
#9

Between $200 million and $250 million is earmarked for the heavy project, mainly covering continuing engineering design, NPI works, and commitments on long lead items. For FY '27, exploration spending is projected at $230 million to $250 million, with the investment concentrated on KCGM and Pogo Hemi to back resource growth and extend mine life. Steve will address that shortly. For FY '21, depreciation and amortization is expected to come in at $1,000 to $1,200 per ounce. The effective tax rate is anticipated at 30% to 32%, and for FY '27, cash tax payments are projected at $450 million to $550 million on current assumptions, which include roughly $300 million to $350 million in cash tax benefits tied to the Hemi project acquisition. Moving to Slide 11. We are guiding KCGM production of 550,000 to 650,000 ounces for FY '27. That guidance range mirrors a balanced evaluation of ramp-up expectations and the risks involved through the early commissioning stages. It has been shaped by early commissioning data along with Northern Star's proven operational planning, technical review, and risk assessment process, backed by external benchmarking and an independent technical assessment. The range additionally accounts for downside scenarios involving ramp-up performance, variability in stockpile grade, and recovery performance once Stage 2 is complete.

Ryan Gurner

executive
#10

KCGM is expected to produce between 3.5 million and 4 million tonnes of underground ore each year, while open pit mining continues at Golden Pike North. For KCGM, we forecast operational growth capital in the range of $895 million to $945 million, mainly tied to the Fimiston South cutback and the related mining fleet spending that supports a targeted material movement of 60 million to 65 million tonnes this year. That covers underground development and infrastructure at Fimiston underground in Mt Charlotte, along with the flat equipment costs that support mining activities across the underground operations, mid-life refurbishments of the open pit fleet tied to the Fimiston South cutback, processing capital works, and capital drilling to underpin future resource and reserve growth. We have combined the mill expansion project and the readiness projects, with FY '27 forecast expenditure of $350 million to $470 million. This consists of the KCGM mill expansion project at $150 million to $210 million to complete Stage 2 and consolidate Gigi processing into a single hub. The capital outlook also includes additional contingency as a prudent measure, reflecting the remaining construction, commissioning, and transition activities ahead. For KCGM tailings facilities, we are guiding $100 million to $120 million to complete the final stage of the project, and for KCGM Power infrastructure, $100 million to $140 million for the new seal power station and renewable-ready transmission infrastructure.

Ryan Gurner

executive
#11

At this point, I'll pass things over to Steve McClare so he can walk us through the growth projects. Many thanks, Steve.

Steven McClare

executive
#12

Thanks, Ryan. Now on Slide 12, I'll go over what we expect for KCGM — our biggest asset — in FY '27. The expansion to 27 million tonnes per annum of processing capacity has entered the commissioning stage and is still running on schedule. Commissioning is fully underway; after that comes handover of the project to operations, with ramp-up taking a measured approach across the first half of FY '27. The current plant should keep operating until August, then it gets tied into the expanded facility in September. Stage 2 is still on track for completion in the late first half of FY '27 and should bring further benefits via better recoveries and by removing the need to haul concentrate between KCGM and Gigi. Importantly, FY '26 was the peak capital investment period for this expansion. As commissioning proceeds and we set operating parameters through FY '27, our attention moves away from construction and execution toward operational performance, generating cash flow and returns. Moving to Slide 13, the Hemi project. Hemi is a high-quality gold project located in a Tier 1 jurisdiction, with mineral resources of 13.2 million ounces and ore reserves of 5.5 million ounces. Permitting at state and federal level is moving forward, with secondary approvals needed before early works can begin.

Steven McClare

executive
#13

The managed aquifer recharge trial is now in progress and moving ahead as planned. Our present emphasis is on advancing the engineering and design work for the processing plant and the nonprocess infrastructure, along with additional work on sequencing and on refreshing the feasibility assumptions. We are aiming for FID in late FY '27, contingent on the necessary external and internal approvals, with an expected construction period of roughly 2.5 years after FID. As a result, FY '27 spending is centered on moving the project toward FID while preserving flexibility regarding both the timing and the amount of investment. If you turn to Slide 14. Exploration continues to be a significant driver of long-term value creation for Northern Star. Through FY '26, we keep growing and upgrading our mineral resource and ore reserve base. As of 31 March 2026, we held 88.9 million ounces of mineral resources and 28.4 million ounces of ore reserves, which underpin a reserve-backed production profile exceeding 10 years. Resource growth came from across the portfolio, with meaningful contributions from Kalgoorlie, Pogo and Hemi. Importantly, we keep adding resources at attractive rates, with the cost of resource additions averaging $23 per ounce during the year. Exploration remains a high-value investment within the portfolio, extending mine lives, increasing reserve flexibility and generating future growth opportunities.

Steven McClare

executive
#14

Every extra ounce of reserves makes the long-term production outlook stronger and raises what the current infrastructure and operating platform are worth. At this point I'll pass things to Ryan, who will finish the last slide of the formal presentation.

Ryan Gurner

executive
#15

Thanks, Steve. Yes. So if we turn to Slide 15, that slide sums up the investment case along with the main themes that will shape the company over the next 3 years. FY '26 was a major year of investment and transition for Northern Star, and as we move into FY '27 and beyond, our attention is shifting more and more toward seizing the benefits of those investments and working to lift the performance of the portfolio. All of these things together give Northern Star a strong platform over the medium term. The investments we've made in recent years, especially at KCGM, have laid the groundwork for better operating performance, and the focus now is on delivery ramp-up and on realizing the returns from that investment. And look, before we get to Q&A, I think I'd just like to say a few words about Stu, since this is his final call with Northern Star. Stu, I'd really just like to acknowledge the remarkable contribution you've made to this company. And on behalf of all of our employees, thank you for the leadership, the vision and the commitment you've brought to Northern Star over more than a decade. Under your leadership, Northern Star has grown from a single asset Australian gold producer into a globally recognized gold company, delivering significant value for shareholders.

Ryan Gurner

executive
#16

Serving with you has, for me personally, been a privilege. I appreciate your trust, your support, and your friendship. Over the years I have gained a great deal from you, and I am thankful for the chance you gave me. Everyone here at Northern Star wishes you and the family all the very best going forward. With that said, I would like to return the floor to Mel for the Q&A. Thank you.

Operator

operator
#17

<<operator_script>> Our initial question is from Levi Spry at UBS.

Levi Spry

analyst
#18

Perhaps one more thing for Steve regarding how things are ramping up at KCGM. Thanks for providing that additional detail. What is the expectation, though, about when you will be able to give us a further update on the ramp-up, I suppose? What do you need to see? And could you remind us how the power requirements, or the power point you are constructing, might fit into that?

Steven McClare

executive
#19

Thanks for that question, Lee. I’ve just given an update on where things stand right now. Essentially, we’re inside the project carrying out the start-up as far as ore commissioning goes, and when we move into September and hand that over to operations, the project team will stay on in a support capacity, but operations will take the lead. So right now the operations group is on site backing up the project, and those roles simply flip. Everything in Stage 1 is tracking to plan, and we expect the tie-over of the Fimiston SAG mill into that circuit to happen in September. On power, we actually have a solid connection, and we also hold exclusive rights to the joint venture Parkeston facility, which is a 110-megawatt power station, and together that supplies power to KCGM. Over the longer term, building the thermal power project actually improves efficiency and, I guess, provides modern, rapid power support to KCGM, and that will simply transition. Once that is free — once it’s built, Parkeston becomes free and can take on other roles.

Levi Spry

analyst
#20

All right, then — so that doesn't put any limit on the ramp-up?

Steven McClare

executive
#21

No, not in the slightest.

Levi Spry

analyst
#22

All right. Staying on the guidance topic, regarding Jundee, Thunderbox, and Cosm, what is actually baked into the FY '27 guidance issued today? Is that how those assets will look moving forward, or for all 3 assets — clearly, growth capital at Yandal has come down quite a bit, even after setting aside some amount for Banker — is that the plan for all 3 assets going forward?

Ryan Gurner

executive
#23

Thanks, Levi. Look, obviously we have not provided medium-term guidance and we won't — and at this stage we're not giving any. Obviously, a new CEO is coming in. He'll have his own view. And I guess as a business we'll work through that, and we intend to return to the market later with medium-term guidance. So for now, beyond FY '27, I can't give you anything.

Operator

operator
#24

The following question is from Hugo Nicolaci at Goldman Sachs.

Hugo Nicolaci

analyst
#25

Once more, Stu, congratulations on the tenure. To follow up first, perhaps, on what Levi asked. You mentioned in the release that John's operational review has wrapped up, and that you've folded those findings into a revised medium-term mine plan. Could you walk us through a few of the conclusions that emerged from that review and what has actually been built into that future plan? And should we broadly take the FY '27 commentary on production and costs as what applies going forward from that?

Ryan Gurner

executive
#26

Thanks, Hugo. Yeah, so let me begin by simply stating that I believe everyone here would concur that Jundee has been a tremendous asset for NeltonStaff across more than a decade. That said, you've observed during this shorter timeframe that we've confronted a significant decline along with growing development demands needed to deliver the same profile, against a sector backdrop — at least — of escalating costs. So yes, we addressed that. Ultimately we scaled back the operating model of the footprint so as to keep, I suppose, a more stable and consistent production profile, concentrating on the core, or the zones, at Jundee. And we have, I suppose, right-sized or cut equipment and personnel from the plan in order to slow activity and concentrate on quality. So what you'll likely witness this year, FY '27, is that in the back half, we need to make a modest bit of investment, but we're going to see somewhat higher grade during that back half. Thus H1 is a setup half — setting up the development to deliver those higher ore sources in half 2.

Hugo Nicolaci

analyst
#27

Understood — that's useful. Now, turning to Hemi, my understanding is that the conditions attached to your federal approval are expected to arrive today. Has anything in the process up to this point given you reason to believe you won't secure all of your primary and secondary approvals by the end of 2026? And does the CapEx guidance of $200 million to $250 million for this year that you've provided presume that those early works at site are able to begin in the second half on the strength of that?

Executive

executive
#28

Hugo, in response to that, the reality is that the approvals aren't something we control. They'll be granted once the government completes them. As things stand, that is proceeding as scheduled. Those figures satisfy us, and at present approvals aren't a limiting factor. -- in fact consistent with the Fed. The early works we've mentioned involve small items such as camps and similar things, which we're able to handle as soon as approvals come through at that moment. So there are no limitations, and we're on track for that close of the financial year.

Operator

operator
#29

The following question is from Kate McCutcheon of Bank of America.

Kate McCutcheon

analyst
#30

Stu, all the best in whatever comes next <<inaudible>>. Appreciate the time you’ve given us over the years. On the KCGM guidance for the FY, we have production expectations for underground—could you give us some color on the range you’re assuming for mill throughput and head grade, especially how we should think about how long you expect to keep beating the low-grade stockpiles? And then, Ryan, is any of that cost capitalized, or does it all go to OpEx at the time you’re aware of?

Ryan Gurner

executive
#31

Yes. Thanks, Kate. Look, I won't provide a throughput figure for what we're anticipating, since there's clearly a range. And I think in my commentary, I sort of talked about how we've considered that using industry benchmarks, an external assessment, and our own views. We've taken into account delays in RA. We've taken into account grade, lower grade with the -- in relation to the stockpile. So when we've arrived at, I guess, the range, all those factors played a part, and of course, we have very early data from our commissioning, which Steve sort of mentioned. So that's what has shaped the view there. You see that I've highlighted our underground outlook in terms of tonnages, that 3.5 million to 4 million tonnes. And then, of course, primary ore from the pit will be feeding it. So hopefully, that's enough Kate, to sort of formulate those views. On your question about capital OpEx, yes, so probably as sort of Steve was saying, we've obviously begun that 3 seek -- C3 commissioning, which is all commissioning now and looking to tie in, in September. So over that period, some of the costs associated with running the plant will be capitalized.

Ryan Gurner

executive
#32

Those expenses covered items such as electricity, water, and certain reagents—not every reagent, but a portion of them—and then the biggest expense is likely the operations staff while we commission. I don't anticipate that being a big figure. It could come to roughly $10 million, perhaps $15 million at most, but our guidance and contingencies for FY '27 account for that.

Kate McCutcheon

analyst
#33

Alright, let me return to June for a moment — apologies, I'm somewhat puzzled at this point. So we now have the updated mine plan.

Dan Morgan

analyst
#34

Yet our output has stayed level compared with a year earlier. So does that imply we're running a better margin? It certainly appears as though margins are stronger under a mine plan with reduced output ahead? Or does that only take effect afterward. I'm simply attempting to grasp what the new maintenance guidance and the review actually signify.

Ryan Gurner

executive
#35

Right. So this year we’ll see a decrease in primary ore, with low-grade stockpiles making up the difference. That’s the approach for this year. As I mentioned, development work is going to happen during the first half so that we can reach higher-grade material in the second half. The emphasis will therefore be on better-quality sources — meaning lower tonnage but ore of higher quality.

Operator

operator
#36

Daniel Morgan from Barrenjoey has the next question for you.

Dan Morgan

analyst
#37

Since these are probably all quick questions — and Stegiven, you're departing while Suresh arrives in October — could the team perhaps describe how this guidance was assembled? In other words, was it the same process as in prior years, with the same error bars and contingency built in? And then, second, who is accountable for this guidance? Is this where every ExCo member will be judged against it?

Stuart Tonkin

executive
#38

Thanks, Dan. Over to Ryan. We’re done with the rapid-fire questions. All fine.

Ryan Gurner

executive
#39

Thanks, Dan, for that question — it's a good one. Look, to put it really simply, we built our outlook through our established budget, our operational planning and our technical review process, and it's been shaped by demonstrated performance. And when it comes to KCGM, as I said in my remarks earlier, it's also being informed by industry benchmarks — so ramp-up curves and an independent assessment of the plant. And then we've rightsized it, or we've stress tested it against other factors like slow ramp-up and grade profile. We've looked at delay to our recovery expectation on Stage 2. So we've done all of those things. And ultimately, as a management team, yes, we are accountable for.

Dan Morgan

analyst
#40

Alright. Regarding the <<inaudible>>, your guidance is 150,000 to 160,000 ounces for FY '27, and then you mention Queener and Twin Peaks arriving from '28. So does that mean FY '28 production should only rise slightly compared with '27 levels, given those new ore sources are coming in? Is that the right way to interpret it?

Ryan Gurner

executive
#41

I mean, look, like every project in that region, they don't come out of the gate at full tilt. So the ramp-up will be gradual. But what I'd say is that those two projects exist to add to the ore feed source at Carosue Dam. Tina is a 2 million tonne, 3,000-plus underground operation sitting very close to the mill. So for us it's going to be a really nice small project at 300,000 ounces. So yes, it will be a solid additional ore source for Carosue Dam.

Dan Morgan

analyst
#42

And then, Ryan, staying on a few of these financial points. Just regarding ASC on the Asia guidance, sorry — is there a meaningful noncash charge flowing through for the different stockpiles, especially KCGM, through FY '27? Just wondering, obviously we have the ACE guidance you've provided, but there could be a sizable margin stockpile charge sitting inside that, which is noncash. Could you just unpick that?

Ryan Gurner

executive
#43

Yes, Dan, that's a good point. I think it's something that quarter will address and go ahead and does this work. But really, I'd probably say for KCGM, no; I mean, for Jundee and CDO, yes, because they'll be drawing down, yes, feed, and that will carry a noncash cost. So from a margin standpoint — sorry, from a cash flow standpoint, it won't matter. With regard to KCGM, what I'm actually expecting is probably neutral to maybe even a modest inventory buildup. And the reason is — it's going to depend on how ore sources reach the mill and direct tip and how much goes in. But what I think you'll find is that we will draw down the — we'll drill down and we have 1 million tonnes of high-grade material there that we'll draw down, and that will carry a charge. Costs generally, right, across the business, are increasing in the sector. So that means our inventory costs are rising, whether we like it or not, with oil, people's costs, capital, all those things. So that will probably offset it. But then, just to remind everyone, the stockpiles actually carry no cash costs.

Ryan Gurner

executive
#44

So those arrive at no cost. There will be a noncash P&L charge since we acquired them. Yet in reality, those stockpiles come in at a cash cost of 0. The cause of our inventory buildup during this year that just ended is, clearly, that we were constrained at the mill. So we've carried that 1 million-ton on the stockpile. But at the same time, we're stockpiling lower-grade material as well, right? So we're building that balance sheet up, while at present we will, obviously, be drawing it down. But those original stockpiles carry no cash value.

Operator

operator
#45

Matthew Frydman of MST Financial has the next question.

Matthew Frydman

analyst
#46

To start, could I ask about the year-on-year increase when it comes to sustaining capital spend? You've provided a fair amount of detail there on how it breaks down across certain projects. Looking through that, a number of those appear to be one-off capital or maintenance-type projects. But at a high level, I suppose, how much of that spending run rate in FY '27 is now effectively baked in as sustaining capital? If you look at it on a dollar-per-ounce basis, it comes to roughly $550 an ounce. So going forward, is that the correct figure?

Ryan Gurner

executive
#47

Yes. That's a good question, Matt, and I appreciate it. Well, the first thing I'd mention is that this profile includes some contingency. Yes, there is some — again, that lumpiness. I remember last year, if you recall, we discussed mid-life or midlife rebuilds at KCGM. Well, those are now roughly 20,000 hours, and on some of that equipment, up to 30,000 hours. So those have a tendency to come and go. There is absolutely, I would say, lumpy capital around processing and what we need to do there. And then, of course, I think the real outlier here is the deferred stripping at Bangun — the reality is that we have to bring that into our cost, because we're 10% into the ore body, and that's what the rule sort of guides us toward bringing them into. So I'd probably say that, from a Yandal perspective, their actual total cost — if you just look at total cost last year versus what we guided, it's actually the same. It's just this bring-forward in relation to stripping. But there are some additional processing costs in both the Yandal region. And then there's some lumpiness at KCGM.

Ryan Gurner

executive
#48

And in the same way, Matt, I would note that a portion of this capital spending involves some discretion. If I recall, our guidance last year was $750 million, and we ultimately came in at roughly $650 million. That shows we can prioritize the capital the business genuinely needs while deferring spending that isn't tied to macro performance and business performance.

Matthew Frydman

analyst
#49

Yeah, understood — that helps. In that same spirit, then, looking at Slide 11 and how KCGM is broken out there: clearly you're pointing to some continuing work when it comes to growth capital across a few of those projects. Would it be reasonable to once more kind of project that same pace of activity on those projects out past FY '27? Is that roughly what you're aiming to signal? And on the flip side, clearly the new expansion and readiness projects plus the mill expansion CapEx itself, presumably that drops away quite substantially by FY '28. Is that a fair read?

Ryan Gurner

executive
#50

Yes. Yes, Matt. So I suppose it was great seeing you out at KCGM. You're aware of the amount of waste we've had to shift on that southern section of the pit. So we're guiding 60 million to 65 million tonnes of movement there. So that will carry on. And our goal of reaching 8 million tonnes from the underground will carry on as well. So that accounts for most of that investment. So yes, I think that's fair. As for readiness, definitely, tails were completed this year, and the project will be completed this year. I think a very small amount could potentially slip into the '28 year for the thermal, but there's almost -- yes, not much past that.

Matthew Frydman

analyst
#51

That's genuinely useful. And then perhaps just one final thing — if I turn to the KCGM production guidance and what the ramp-up outlook looks like, well, obviously you've already covered a couple of questions on that, and you've described how you've really stress tested those figures, and how you've thought about Airbus when it comes to that ramp up, examining ramp-up curves and all of that. I mean, stepping back for a moment, you have a new mill that gets hooked up in a month's time, and it will more than double your capacity. And your guidance says you'll produce slightly more this year than you did last year. So I suppose what I'm asking is where Steve and his team see the genuine opportunities to perhaps outperform what you're guiding to when it comes to the ramp-up. What opportunities exist to kind of beat those expectations? And which work programs are you attempting to put in place over the coming 3 months to try to outperform those figures?

Ryan Gurner

executive
#52

Thanks, Matt. I'll pass it over to Steve. Still, from where I sit, what I'd say is — you go through it, Matt. It's phenomenal, though it hasn't been demonstrated yet. So I think we'll just stay cautious on that before we set anything, but I'll turn it over to Steve, who maybe can speak to some of it.

Steven McClare

executive
#53

When it comes to the guidance we've put out here, Matthew, we've essentially hit the milestone across all commissioning work so far. That has given us the confidence to publish the FY '27 figures. From that point, our aim is to keep building up history and a data set, and then apply it in a disciplined way going forward. So we don't want to comment beyond FY '27. What we have here is a highly cautious evaluation, and we'll continue to update the market as things move along.

Matthew Frydman

analyst
#54

All right, understood. Thank you, Stu, and congratulations on 13 successful years with Northern Star.

Operator

operator
#55

The following question is from Adam Baker at Macquarie.

Adam Baker

analyst
#56

Wishing you well in whatever comes next, Stu. One question on recoveries at KCGM. I’m thinking about that ramp-up window, when the mill is mostly processing lower-grade material. And before the Gigi facility is integrated, could you give us some kind of benchmark for what recovery we should expect during this ramp-up period?

Stuart Tonkin

executive
#57

Sure, Matt — I can offer some color on that. As designed, the plant delivers an uplift of 1% to 2%, which is what we've put over the longer-term average, but that depends on Stage 2 kicking in during that phase. In the interim period, we'll be feeding material to Gigi while also producing at a constant rate, and we won't get that uplift in materials. So if you look at our status quo in our history, it's business as usual, and we only get the uplift once we've successfully commissioned Stage 2.

Adam Baker

analyst
#58

So there's no shift at all to that 82%, 83% recovery you'd been seeing in earlier quarters, before the integration and the Gigi facility. And I suppose the one major difference there is the low-grade feed that's now running through the plant. So I'm just wondering whether recoveries take a hit from mainly putting lower-grade material through the plant?

Steven McClare

executive
#59

Right, not the figures you put forward, since that hinges on the grade being fed, the source, and the properties. So on the whole, I'd characterize the number as likely somewhat below the one you cited. Still, that's roughly what we'd normally anticipate prior to realizing the gain from the capital.

Dan Morgan

analyst
#60

Great. I’m not sure who’d like to handle this one. But yes, I suppose, regarding any and Aquifer recharge trials, and just considering EPA recommendations, one of those recommendations involves returning the obstructed water to the Aquifer. Is that a common practice across the industry? And I guess, do you foresee any risk in doing this going forward, Hemi?

Steven McClare

executive
#61

Yeah. It's actually a fairly standard approach — in fact, I'd call it a really solid practice when you're handling water at an open pit operation. So what we do is take that water — and the trial is progressing quite well. We're moving it roughly 7 kilometers via pumping and putting it straight back into the very same aquifer. Then, gradually, across many years, it can come back to the mine. So there's nothing new or unique about what we're doing, but we simply have to test the parameters of the actual ore body and the flow inside the system.

Operator

operator
#62

<<operator_script>> Our following question is from Jonathon Sharp at JPMorgan.

Jonathon Sharp

analyst
#63

One more thing on the KCGM ramp-up. I'm just trying to get a handle on how it shapes up quarter by quarter. Should we assume a steady climb through Q1, Q2, Q3 and Q4, or starting from Q1 — I'm aware you'll be running the old mill alongside for a period of time. So some clarity there would be great.

Stuart Tonkin

executive
#64

It’ll track typical sector norms. It begins unevenly at first, then gets adjusted and refined. We figure out how to operate it. And as time passes—we’ve mentioned this previously—we expect a 2-year ramp-up before reaching that 27 million tonne denominator. So when you consider those sector standards, we don’t anticipate anything unlike KCGM.

Jonathon Sharp

analyst
#65

Right, yes — I’d just point out that you’re operating the old mill concurrently for a certain stretch of time. Does that alter anything?

Stuart Tonkin

executive
#66

What we're doing today is basically what we've done for years, and in September we'll switch over to the new.

Jonathon Sharp

analyst
#67

All right, for the second question — since there's an external reason behind the wider strategic review, has the Board's view shifted in any way regarding what the ideal portfolio for Northern Star ought to be across the coming 3 to 5 years?

Ryan Gurner

executive
#68

Well, no, Jonathon — I mean, we constantly assess how well our assets line up strategically inside the portfolio. So, and you've seen that we've been active on that front before. So nothing's different.

Operator

operator
#69

That brings us to the end of the question-and-answer session. I'll turn things back over to Ryan now for some closing comments.

Ryan Gurner

executive
#70

We appreciate you being on the call today. Thank you for your interest in our company on such a busy day. Thanks to Stu, and thanks to everyone, and have a great day.

Operator

operator
#71

That brings today’s conference to a close. Thanks for joining us. You can go ahead and disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.