Northstar Clean Technologies Inc. (ROOF) Earnings Call Transcript & Summary

September 10, 2025

TSX Venture Exchange CA Industrials Commercial Services and Supplies earnings 41 min

Earnings Call Speaker Segments

Aidan Mills

executive
#1

All right, good afternoon, everyone, and thanks for joining us for Northstar Clean Technologies’ Second Quarter 2025 Financial Results and Corporate Update. As you all are aware, I’m Aidan Mills, President and CEO of Northstar. With me today is Greg Phaenuf, our VP of Corporate Development and CFO. Before I get started, I want to remind everyone that remarks on this call may include forward-looking statements. Such statements rest on management’s present expectations and assumptions and carry certain risks and uncertainties. Actual outcomes could differ materially from those described in these forward-looking statements, and for a discussion of these risks, please see our SEDAR filings. The second slide here provides a more detailed description of this. Okay. As usual, a question-and-answer session will follow the presentation. Trenton Kwan from Kin is going to assist us with that, moderating the Q&A session and asking the questions today. And as before, just enter the questions in the Q&A box at the bottom of your screen, and Trenton will review those to ask and — pick out things to ask us as we go forward. The YouTube — the presentation will be on YouTube tomorrow, and we’ll take this Q2 presentation and upload it on to the website, replacing the Q1, and that will be done for tomorrow as well.

Aidan Mills

executive
#2

Alright, that covers the administrative side. Let's move on and take a quick look at what's on the agenda for today. We'll obviously go through the financials — Greg will handle that portion. From Calgary, I'll provide an update, naturally tied to the press release we put out this morning. I'll also discuss what comes next for Calgary and bring you up to speed on our expansion plans. One thing I think matters a great deal about this presentation is the themes — we'll be touching on them throughout, and I'll wrap them up at the end. The key theme, though, is that strong momentum is building for Northstar. Our first commercial facility has been built, commissioned, and is beginning to ramp up. We've turned out high-quality products, and we've also achieved a technical development and innovation, clearly, through the pellets we made as well. Attention now is on reaching the ERA production target, while not losing sight of the upcoming facilities and building a solid financial framework to underpin that growth and expansion. And finally — this is somewhat personal, of course — as of the 1st of September this year, I'll have been with Northstar for 4 years.

Aidan Mills

executive
#3

And my aim is to keep hitting the milestones the same way we have since I joined the company. That's kind of the theme for what we'll cover today, and I'll pass it to Greg to discuss the financials.

Greg Phaenuf

executive
#4

Thanks, Aiden. Good afternoon, everyone. The second quarter of 2025 meant another 90 days of getting ready for full operations. As you know, no product revenues were generated during the quarter aside from a collection of waste shingles from IKO, one of our suppliers, which have been securely stored at a nearby offsite location to be processed once commercial operations begin. As far as the numbers are concerned, comprehensive loss for the period equaled $3.1 million compared to $1.4 million for the comparable prior period as the company increased full-time equivalent personnel and incurred other noncapital costs associated in preparation for operations. In addition, a noncash expense of $367,000 was recognized for the quarter, which was $721,000 for the 6 months relating to the fair value remeasurement of the “CVW” royalty debenture, which is essentially Northstar picking, otherwise known as payment in kind, the interest due in adding that to the principal of the debenture and continuing efforts to preserve working capital. As the debenture commenced in September 2024, these fair value adjustments did not occur in the comparable prior periods. As far as CapEx is concerned, CapEx decreased to $1.9 million for the quarter compared to $4.1 million in the prior period as the construction of the Calgary and Power facility was completed after Q2, near completion at the end of Q2, as Aidan had mentioned.

Greg Phaenuf

executive
#5

Actually, during the quarter the company said construction was finished and got $3.9 million from Emissions Reduction Alberta as Milestone 2 under the contribution agreement for that big step. Aidan, as noted, will cover operations shortly. Looking at working capital, the company ended the quarter with a $1.7 million deficit. But $1.5 million of that comes from 2 tranches of convertible debentures issued earlier, due in the next 12 months, whose conversion strike price sits below the current share price — that is, in the money. More on that shortly. Also, after the quarter closed, the company brought in $3.6 million through an oversubscribed nonbrokered unit private placement. That refilled the treasury and gives the bridge to fund the business until it reaches operational cash flow. We also expect additional milestone payments under the ERA grant before year-end to strengthen working capital reserves. For the accountant types in the audience, starting in the second quarter the company began accounting for inventory. That's a new accounting convention for the company and will keep going from here as we shift to operational status. The inventory is mostly made up of collecting, sorting and processing shingles delivered to site.

Greg Phaenuf

executive
#6

Additional information is available in our Q2 2025 financial statements. As mentioned earlier, it's worth noting that we've seen a steady flow of both convertible debentures and share purchase warrants being exercised across the past several quarters. Specifically during Q2, $150,000 of convertible debentures were converted in the quarter, while 730,000 warrants got exercised in that same quarter, which brought another $150,000 into the company's treasury. After the quarter ended, we've kept seeing these conversions and have no reason to expect anything different, given where the current share price sits and our expectation of continued share price appreciation as we build out the business. As conversions and exercises keep happening, we'd expect the capital structure to become less complex. With that, I'll hand it over to Aidan for an operational update.

Aidan Mills

executive
#7

Thanks, Greg. That's great. So then let's discuss our main accomplishments and near-term goals. This slide summarizes what I'll cover in much greater depth over the next few slides. But again, one theme here ties back to what I opened with: this keeps showing our strong record of execution. The patent is a very good illustration of how we've safeguarded the business through several patents, in both the U.S. and Canada. And that's clearly very important for the technology and the technology backing for the business. On funding — I've shown this slide before, and we don't have it in this pack — but we have, since I joined 4 years ago, raised $58 million. And out of that $58 million, including the figure Greg mentioned, $30 million is nondilutive. And you can see from recent quarters our funding partners — ERA, BDC, et cetera — stepping up with support, and long-term partners like CVW and TAMKO, who obviously see the potential to bring EDC in as a funding partner for the U.S. So when you consider those names and consider the backing for this company, these are sophisticated funders who know good businesses.

Aidan Mills

executive
#8

So it's fantastic to have them with us. And the final point—and naturally the most significant—is that when you examine what comes out of the facility (and I'll get into this in greater depth shortly), as a shareholder you can review these accomplishments and see that this technology genuinely delivers. Keep in mind that we took asphalt produced at Delta, and using that asphalt, the Pilot plant—and with it, the R&D team proved—you could make shingles. That was step one in showing the technology delivers, and at this point we've shown it at our first commercial facility. So it's a rather massive milestone when we consider where the business stands. Alright. Now let's turn to Calgary. The 2025 deliverables were quite straightforward. There were 4. First, construct the plant, clearly. Second, commission the facility one unit at a time, all the way through. Third, concentrate on what product emerged from the back end of the facility. The reason I can state with real confidence that the technology delivers is that the product emerging from the back end of this facility—and we'll cover it in greater depth later—beats Delta, exceeds what we expected, and that shows we have a technological answer producing high-quality product.

Aidan Mills

executive
#9

And then the fourth item involved scaling up output, which I’ll address when we get to the planned objectives. All right. So where do things stand? In this morning’s PR, we laid out that this facility can now produce high-quality asphalt from both manufactured waste and tariff shingles. As we also noted this morning, independent lab analysis backs up that claim. Now the Delta oil, as I mentioned, was — the R&D demonstrated it was circular. This asphalt is considerably superior to that oil. And that, together with the lab results, leads us to believe it will deliver better performance for our customers. The big technological step today, of course, was what we announced — pellets. So the Northstar facility is now able to make 2 product types. First, of course, hot oil for local distribution inside a certain radius, and now solid asphalt pellets. Of course, this brings major transport potential. This is one of my added remarks. We have some industry partners on this call who are very interested. So I won’t be giving any details about our preferred transportation option, et cetera, for the pellets. But clearly, we expect that solid, high-quality asphalt pellets offer a wide range of market access options.

Aidan Mills

executive
#10

I do want to spend a moment on pellet quality. Within the shingle recycling sector, it matters that pellet-based options exist. So some operators partly separate the tiles and turn them into pellets. Those technologies are still being developed. They're under review, and so on. But the end product has not been pelletized by them. The oil's quality is not altered by our technology. It simply takes the hot oil arriving at the back end of the facility — with the high-quality specs our lab results have shown — and pelletizes it. So, this may be a somewhat self-indulgent 10,000-foot reflection on my part, but this is precisely what I joined Northstar to accomplish. When I came to Northstar 4 years ago, my vision was this technology's applicability across the entire continent. So the ability for us to deliver product city by city. And as we've said, 16.5 million tonnes, 400 facilities at 40,000 tonnes a day, 200 facilities at 80,000 tonnes a day — that was my vision. But now, from every Northstar facility, we have the potential to actually deliver a global commodity.

Aidan Mills

executive
#11

When I think back to my earlier career as a buyer, originator, and trader of hydrocarbons — in my previous positions as Head of Strategic Origination at BP and MD of Commodity Sales at Goldman — having access to a global commodity like this would have been outstanding. So it's fantastic to be sitting here with our hands on a potential global commodity. As you leave this call today, that's what I believe we've just delivered. Okay. So what comes next? I've set out the objectives going forward here. Objective number one is obviously to deliver the Emissions Reduction Alberta milestone. As a reminder, Emissions Reduction Alberta has kind of 4 milestones. Number one, engineering, of course, is done; number two, construction, as Greg mentioned, that was in the first half of the year; number three, commissioning; and number four, operations. And the commissioning milestone isn't simply a commissioning milestone, i.e., everything works. The first part of it is, yes, all systems must be installed, calibrated, and operating. That's a commissioning milestone. But the second part of that milestone is operational. And that operational target is 80 tonnes per day coming through the plant — obviously going to the front end of the plant.

Aidan Mills

executive
#12

Our goal, then, is to have that delivered before the year is out. Objective #2 is obviously to raise the facility from that 80 tonnes a day to its full capacity. As I've framed it, that means full capacity on a single shift. The facility's design capacity, as you're aware, is 15 tonnes an hour multiplied by 10 hours a day — which gives 150 tonnes a day. Objective three is getting feedstock secured so we can shift to 24/7 operation, and that's the point where we can basically bring on the night shift and double output. Here again, the aim isn't to spend more capital. It's entirely dependent on feedstock. So securing the feedstock is our job. Adding any capital is not. The sole thing we really have to do is put on one more shift. And then ongoing — I put an ongoing objective in here since this is the transition to the next slide. We've consistently spoken about continuous improvement, and the lessons from engineering, construction, commissioning and operations need to be integrated into the design of the next facilities. As you can imagine, this is facility number one. That's a theme we've discussed throughout this whole presentation.

Aidan Mills

executive
#13

With this first facility, the lessons we’re gaining are enormous, naturally, throughout every one of those areas — engineering, construction, commissioning, and operations. And it truly matters that we fold them into the following design, just as I’ve previously discussed regarding continuous improvement: whenever we build Plant 5, Plant 6 has to be superior. And whenever we build Plant 15, Plant 16 has to be superior. So the largest effect we can achieve through continuous improvement is applying what the first facility taught us to the next 2. We believe that will be fairly substantial. All right. So now let’s discuss the expansion choices. So — Hamilton, so both expansion choices are progressing well. So in Hamilton, we are finalizing the detailed site layout together with HOPA. So as you know, we hold the parcel of land that has been roughly designated for HOPA development. And so what we’re doing now, given the utility works currently underway, is actually finalizing the precise 4-acre plot, because doing that requires the exact boundaries so we can begin the permitting process. We have completed the initial stage of permitting.

Aidan Mills

executive
#14

We've completed the initial stage by holding discussions with the Ontario Ministry. That stage pinpointed precisely which permits are required. So now we possess the roster — these are the permits — and work on them can begin once HOPA and we have settled the boundary. And just as we managed to do very successfully in Calgary, we have by now pinpointed several funding possibilities at the federal and provincial levels. As you'll recall, these are nondilutive — the ERA we frequently mention brought in over $7 million via that identical approach — and those efforts are now underway. Naturally, we won't disclose further specifics regarding which funds we've applied to or the amounts involved. But a number of funds have been identified. We have also begun engaging locally with Hamilton, at both the city level and the community level. Regarding U.S. #1, we have now identified the state, the city and the preferred location for our facility. The permitting process is now completely clear to us. Working alongside the permitting authorities in that state, we know precisely what steps to take once the site is finalized. Negotiations on feedstock have also begun.

Aidan Mills

executive
#15

Naturally, we'd expect to receive the TAMKO manufactured shingles out of their Frederick facility. But naturally, we have now started feedstock negotiations regarding tariffs. So those are underway and continuing. And the same applies to the offtake. So TAMKO is clearly the majority offtaker, but we have also talked about offtake with other parties as well. And interestingly, at both the federal level and the provincial level, there are nondilutive funding options accessible for this location too, which is great. So let's discuss expansion financing. So look, the feedback we have frequently received is that we have a complicated balance sheet and there's -- it isn't simple, like what are you doing to simplify it, et cetera. And I know that's always good when it's nice and simple, but -- and all of these options, as Greg looks at them, these are complicated. They are more sophisticated and they are not simple. But from my perspective as the leader of this business, it offers massive flexibility and great optionality. And the other thing is, as you can see from what we have done from a nondilutive perspective, I think it also offers massive equity shareholder value because there are a number of pots of funding that we can source that will not have an effect on the equity.

Aidan Mills

executive
#16

When we think about this, we really look at 2 buckets. At the asset level, of course, I just mentioned government funding and, of course, project debt. EDC is a really good example of the project debt. We have been — there is market interest for project equity at the project level. And of course, we have the funding partners in CVW with potential royalty options on an <<inaudible>> level. At the corporate level, strategic equity and strategic debt. Now those will depend, of course, on delivery from Calgary. So we have to have a track record of being able to deliver an operating facility, and that's critical. And then the last one is a market raise. So just to be clear, this is a market raise for growth capital. This is all about what does the capital for the new facilities look like? What does the time line for that facilities look like? What does the capital spend profile look like? And what is the goal seek for all of the categories above before we determine what that market raise is? So the only thing that you will see us do as part of this development, and again, look, we have ruthless focus in Calgary, but this is — we have to continue, of course, the next facility development.

Aidan Mills

executive
#17

From a financing angle, the only visible step is that we'll file an AIF, which lets us establish a shelf. That filing will happen during Q4. The purpose is to give us the complete range of optionality when you consider this expansion financing meant to support growth funding. Another point I'd make regarding both of these facilities: I've spoken externally with strategic funders, at both the equity and the debt level, and we've revised our attractiveness metrics for sites going forward. Originally, when I discussed market attractiveness and how we assessed it, we evaluated it on a matrix of tipping fee against asphalt price. We examined every location, every city, where that could be appealing. The third element we added — and this is essentially what you need to get onto the page — is whether we can run the facility 24/7. In other words, can we operate this facility at a rate of 80,000 tonnes a year. And the reason this matters for both of these 2 facilities is that each can support 80,000 tonnes, and the permitting process we are submitting will be for 80,000 tonnes.

Aidan Mills

executive
#18

Now, when we consider the other items on our list, the one additional point that didn’t appear on the summary slide is that our portfolio development work continues. We aren’t halting with Hamilton and US #1. Under the 3 criteria we now use—can we operate 24/7, what is the asphalt price, and what is the tipping fee—we keep building out the portfolio. For me, the 24/7 driver comes down entirely to the value created when a plant is added. Look, based on what we disclosed in our slide deck, a 24/7 operation should, in theory, produce <<inaudible>> math, as I always put it, $10 million of EBITDA per plant. Apply a reasonable waste-to-value multiple of 10, and that implies we ought to be adding $100 million per facility. When I joined 4 years ago, I said this had the potential to become a $1 billion company, and today we have a very clear path to what that looks like. So developing the portfolio, along with the expansion options and securing both Hamilton and US #1, is pretty critical. So let’s—so in summary—I mean, I’m going to tell you again what I told you already, of course.

Aidan Mills

executive
#19

But look, first off, we've constructed and brought online our inaugural commercial plant. And the team takes enormous pride in having accomplished that, and I'm extremely proud of what they've delivered and proud that we can sit on this call 4 years later and say we truly pulled it off. I think the second thing we've achieved is that we're now making high-quality asphalt from both of the potential feedstocks for this technology. We've brought in pelletization technology that I believe gives our facilities the potential to make a commodity for the global market. We now maintain a relentless focus on ramping up the facility. We keep developing the expansion sites, and obviously we're building this flexible financial portfolio to support the company, shareholders and that expansion. And look, lastly, as I said earlier, in the 4 years I've been here, which has been a real honor, we've hit every milestone we discussed. And that is absolutely going to continue as we move forward from this massive inflection point for Northstar to drive the business ahead. So, Trenton that's my <<inaudible>>. It's over to you for the questions.

Trenton Kwan

analyst
#20

Let me merge a few of these questions and put them in my own words. Thanks to all of you for sending them in. So when you walked through the production schedule during the presentation, it seems like our timeline for reaching full production has moved somewhat. Could you say something about that, please?

Aidan Mills

executive
#21

Absolutely. I wouldn’t describe it as shifting — I’d describe it as delays, definitely. It’s a bit different from the delay I’d have pictured 4 years ago, when I might have said — when I believed the first facility was producing — but focusing specifically on the Calgary project and we began — when construction got underway around the middle of last year, while we were carrying out site works and so on. So at a high level, I’d say we’re likely about a quarter behind. But I also want to give some context around that. So look, when I — and a few examples. The first job I ever had as an engineer at BP was at a linear low-density polyethylene plant in Grangemouth. It was a first of its kind and probably took 6 months to a year longer to reach operation than the original plan called for. When I came to the U.S., again as Head of Origination for BP for the oil business, Thunder Horse — the offshore platform that was later renamed Mad Dog — was 20 months behind its commissioning date.

Aidan Mills

executive
#22

So then we get to Alberta, and everyone is aware of what occurred with Northwest's upgrade and The Trans Mountain Pipeline. And clearly, coming into MEG, along with the Christina Lake Train 1 being pushed back. So honestly, when I look at it, a one-quarter delay for a brand-new technology, to me, is a delay. It is frustrating. But honestly, I think that is actually fairly decent, since the key point is that we have hit the milestones needed to reach this stage. They have slipped, yet we have still hit the milestones. And if we were on this call and faced a major problem with either -- whether it was construction or commissioning, or if we had an issue with the product emerging at the back end of the plant, then we would have a serious problem. A quarter of a delay, in my view, is a delay. But across the entire journey of this business, it is comparatively insignificant. And I would add that -- one thing I reflected on -- when I was considering examples of delays was Husky. So when we first were at -- Husky brought out those roughly 10,000 barrel a day SAGD facilities that got spread throughout the heavy oil.

Aidan Mills

executive
#23

The initial facility came in behind schedule and above the projected cost. Yet since it wasn't the sole unit of its kind, we enhanced how capital was deployed and how quickly we delivered afterward. So here's the genuinely positive takeaway for shareholders today: the ongoing improvement I mentioned before will be a consistent theme across this company. We ought to keep building facility after facility after facility after facility. Investors therefore need not fret over how that first plant performed, because honestly this is just one of roughly 200, or whatever that figure happens to be—and that's precisely where the lessons learned pay off. So relax, consider that this technology is proven, they're now increasing toward full operation, and we'll gain insights from that stage as well. Those then get folded into subsequent facilities—which will be #2 and #3 out of 100 plants, or whatever that count turns out to be.

Trenton Kwan

analyst
#24

Great. Thanks, Aidan. Moving on to the next question. Now that Calgary is fully complete, how should investors view the company from here on out?

Aidan Mills

executive
#25

I mean, I touched on this earlier today. Calgary is finished, but it isn't operating yet. So that remains an intense priority for us. Next, obviously, we've got the 2 development facilities. And we have the financial structure in place that lets those move forward. As I mentioned, developing the portfolio was one objective that didn't make it onto the slides. In building out that portfolio, I think we likely need to be strong — very strong — across 3 areas. The first is the ability to construct and run plants. I mentioned the internal goal there of 3 plants each year. And I believe we can build the in-house resources needed to achieve that. The second piece, I'd say, is business development. We have people growing the portfolio, growing the pipeline of plants, but that has to include permitting know-how and site selection know-how — everything required to reach the stage we're at in Hamilton, where our 4-acre plot is laid out precisely, and we've spoken with local residents and with the Ontario Ministry of the Environment and so on. That expertise has to be developed within this business.

Aidan Mills

executive
#26

I believe we now see the whole picture today, though not when it comes to something like 3 or 5 plants annually. Then the final piece, I'd say, is the financial framework. And clearly, having Greg with us is a real advantage. And while we do discuss how complex our balance sheet is, and the fact that I'm adding more innovative financing options just about every day, the ability to optimize that portfolio, I think, rests very safely with us now that Greg has joined the organization. So as he grows his team, those are the 3 areas I believe we need to focus on as we move out of this year and into the next, and as we discuss how the portfolio develops.

Trenton Kwan

analyst
#27

Moving to the next question, which is a bit more about process at the Calgary site. Are there any issues with the system at present? At a high level, how have things been running?

Aidan Mills

executive
#28

I mean, sure, those exist. We’re bringing up the first plant of its kind, after all. So you pick up lessons in engineering, you pick up lessons in construction, you pick up lessons in commissioning, and more will come once it’s operating. Still, if big problems were present, we wouldn’t be turning out major high-quality asphalt behind the facility. That’s the thing people ought to keep their eyes on.

Trenton Kwan

analyst
#29

Great. Building on that, what lessons have come out of bringing Calgary into production? And when you look at sites ahead, where do you expect to see gains in lead times and efficiency?

Aidan Mills

executive
#30

What I mean is that we anticipate a substantial boost in capital efficiency, along with substantially shorter lead times when it comes to commissioning. A really solid illustration would be that at the moment you commission a new unit — a brand-new one, with input and output from it — you don't yet have that unit's set points. So you don't know how to set pressure, level, temperature, flow, et cetera. Commissioning is precisely about that. That's the way you come to learn your unit. So imagine one of our units in Calgary, which right now, as we ramp up, is now running — beginning to run full time. And picture us about 9 months down the road, when we have exactly the same unit in Hamilton. We know the set points. We literally know how to enter the set points to run that unit. So the time efficiency, the length of time it will take us to construct and to reach operation — we believe there are significant efficiencies there. And look, I could go into every single element of this — engineering, construction, building, commissioning — we have lessons learned from pretty much every unit regarding where the improvements are going to be.

Aidan Mills

executive
#31

I mean, we've probably got a spreadsheet with 100 lines on it covering things to improve. And it may not be — it isn't anything major apart from — sorry, some of those could be major, but it might be something like, hey, when you climb the ladder for this system, put the pump on the left side rather than the right. Because in fact the access to — nobody has ever built one of these before, so the access to that vessel is much better if you put it on the left instead of the right. Easy to do, costs nothing, but you know what, it helps with maintenance access. So the amount of detail and sophistication this team has shown in spotting that is enormous, but that's exactly what continuous improvement means. I know it's a bit of a rambling answer, as usual, but...

Trenton Kwan

analyst
#32

To put it briefly, you'd describe upcoming sites as quicker, less expensive, and improved. Is that a fair way to put it?

Aidan Mills

executive
#33

That’s a solid recap.

Trenton Kwan

analyst
#34

Yes, on the topic of upcoming locations, what's the current plan for the site in Delta, BC?

Aidan Mills

executive
#35

I mean, clearly, we did secure that lease extension, so the lease runs for 15 years. We figure that one will be nearly the first to come up in the next batch of 3. And honestly, that whole thing really comes down to the feedstock and offtake discussions.

Greg Phaenuf

executive
#36

Would you like to say something about the pellets? Pellets also has an <<inaudible>>, right?

Aidan Mills

executive
#37

Yeah. So Greg asked whether I wanted to talk about pellets. If you look at global access for our product and consider where the Delta facility sits — roughly 5 kilometers from the Tsawwassen facility, which is the major Canadian export point to Asia — then shipping hot oil out of there would clearly be difficult given how far it has to travel, while exporting pellets from that location could be a tremendous fit. So yes, that's one of the business development items we're thinking about.

Trenton Kwan

analyst
#38

Good. On the subject of product, technically and from what customers tell you, what sort of response has there been to the product that’s arriving from the back end?

Aidan Mills

executive
#39

Well, I mean, on this call there are quite a few customers as well as quite a few competitors. So from a technical standpoint regarding the product, I won't be offering any feedback.

Trenton Kwan

analyst
#40

That sounds good. More broadly, what other technical factors should we be thinking about for the business as we move ahead?

Aidan Mills

executive
#41

I believe that covers everything, correct? So it's about ongoing enhancement—taking lessons from what occurred at Calgary and the categories we discussed, then putting those into practice. And the following 2 won't be flawless either, so we'll need to keep improving continuously for Plant 3 and Plant 4 and Plant 7 and Plant 10. Continuous improvement is therefore embedded in the DNA of this business. Since if you intend to build—if you intend to construct 100 Northstar facilities, then continuous improvement matters. And that, as I mentioned before, the technical capability to build and operate is among the key strengths we possess today, but one we must develop ourselves from an organizational standpoint to ensure we can deploy it as we move forward.

Trenton Kwan

analyst
#42

Finally, and not least importantly, there's a finance-related question for Greg. Greg, could you take us through what the margin profile looks like on tipping fees?

Greg Phaenuf

executive
#43

On tipping fees, I suppose there are 2 ways to look at it. Building on what I said at a high level about the accounting convention, it's an accounting convention, but it's also economical. So economically speaking, tipping fees drop straight to the bottom line. That's our view of it. There really aren't any costs tied to tipping. The fact that we have inventory recorded, to me that goes to the matching principle of accounting, in the sense that we have costs we're incurring to move product. Eventually, once operations are running, that becomes more of a cost of goods sold caption, which is encapsulated in our numbers and will be recorded on our website in terms of margins. So I don't really see a netback per se on tipping fees. When I look at the overall margins of the business, we don't -- certainly, we have assumptions on our pricing. We're not forecasting. Forecasting fundamentals isn't our business. There are pricing contracts that, for competitive reasons, we don't disclose, that are tied to commodity prices. But from a netback perspective, the margins are healthy. It results in very accretive IRRs as it relates and refers back to short paybacks, all the things that make this business, based on Aidan's comments, once we have multiple plants, it just generates cash and becomes self-funding.

Trenton Kwan

analyst
#44

Great. That wraps up the question-and-answer portion. Should anything else come to mind, you're welcome to email us at ROOF@kincommunications.com. So with that, I'll hand things back to Aidan for his closing comments.

Aidan Mills

executive
#45

Alright, thanks for the questions. I think that sort of sums up where we stand. Like I mentioned before, our themes are — I believe we're in a really strong position. The PR today showed that the technology works the way I described — I thought it did when we were at Delta, and I said then that I believed this technology was deployable. I think we've now demonstrated that the product coming out the back end of our first commercial facility is of excellent quality. So I find that quite exciting. I think it's the perfect platform for us now to — I don't want to stop taking questions, but really to get back and concentrate on this ramp-up. I've used the phrase ruthless focus, and that's exactly what we have. We have to deliver that for the market, but also for — clearly, for the fundamentals of this business. And we expect that to be finished by the end of the year, and we're hoping that will be the final PR anyone has to read about ROOF, because at that point, we'll be fully operational. And essentially, it all comes down to how quickly we can deploy this technology across North America and how many additional tonnes of this global commodity we can actually deliver.

Aidan Mills

executive
#46

I appreciate you giving me a few minutes today.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northstar Clean Technologies Inc. transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northstar Clean Technologies Inc. earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northstar Clean Technologies Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.