NovaGold Resources Inc. (NG) Earnings Call Transcript & Summary
April 1, 2021
Earnings Call Speaker Segments
Operator
operatorAppreciation for holding on. This is the conference operator speaking. We welcome you to the NovaGold conference call and webcast covering financial results for the first quarter of 2021. Please note that everyone attending is in listen-only mode, and this conference is being recorded. Following the presentation, attendees will have a chance to pose questions. <<operator_script>> At this point I'd like to hand the conference over to Melanie Hennessey, Vice President, Corporate Communications. You may proceed.
Mélanie Hennessey
executiveThank you, Operator. Good morning to all of you. We're glad you could be with us as we discuss NovaGold's financial results for the first quarter of 2021 and share an update on the Donlin Gold project. Joining us on today's call are Dr. Thomas Kaplan, NovaGold's Chairman; Greg Lang, our President and CEO; and David Ottewell, our Vice President and CFO. Once the webcast concludes, we'll take questions by phone and by text. I'd like to remind everyone listening on the webcast and the call that, as noted on slide three, statements made today may include forward-looking information, including projections and goals, which likely carry risk described in our various EDGAR and SEDAR filings as well as the forward-looking disclaimers contained in this presentation. It's now my pleasure to hand the presentation over to our President and CEO, Greg Lang. Greg?
Greg Lang
executiveThank you, Melanie, and good morning to all of you. As you can see on slide four, our Donlin Gold project sits in the western portion of Alaska. Donlin operates as a 50-50 joint venture with Barrick Gold. Mining has long played a key role in Alaska's economy, and with oil prices and tourism declining, it is growing even more significant for state revenues. The map shows six producing mines plus many exploration and development projects across the state. When it comes to scale, quality, and exploration potential, Donlin Gold's characteristics far surpass those of any other gold development project on the horizon. Combine that with our long-standing partnerships with native corporations, exponential leverage to rising gold, a strong cash position, key federal and state permits already in hand, an experienced management team and Board, and supportive long-term shareholders, and NovaGold stands in a league of their own. Slide five highlights the 2021 achievements: in March, NovaGold and Barrick jointly released the remaining assay drill results from the 85-hole program we completed last year, which produced higher drilled grade thicknesses than previous modeling had predicted and has improved interpretation of gold mineralization controls. These results have strengthened our confidence in the recent geologic modeling concepts and confirmed multiple high-grade extensions in both the intrusives and sedimentary rocks, and really importantly, many of this near surface.
Greg Lang
executiveOn the permitting side, back in November 2020, Alaska put out an additional public notice and comment period regarding the water rights applications tied to the mine site and the transportation facilities. That comment period wrapped up in December 2020. These water rights cover local surface water sources as well as groundwater, which would be used for process water, dust suppression, fire control, and other mining activities. Then in March 2021, with support from Donlin Gold, Alaska opened a second public notice period, and that one closed on March 26th. We expect the Department of Natural Resources to come out with final decisions on those water rights applications during the first half of 2021. Donlin Gold, working alongside its native partners, keeps backing the State of Alaska in moving forward the other permits and certificates the project requires. On slide 6, the image displays the top 10 intervals from the 2020 drill program, along with core hole locations at both the ACMA and Lewis deposits. Together with Barrick, we released the final batch of assay results last week. The program came to more than 23,000 meters in total and succeeded in boosting our confidence in the modeling concepts, and it was the biggest program at Donlin in more than 12 years. The results came in above expectations, with higher grades across narrower intervals, mainly in the sedimentary rocks. The program has sharpened our geologic interpretations.
Greg Lang
executiveWe also plan additional confirmation and high-grade extension drilling in 2021, to further test the continuity of the ore body and its structural controls, and to collect geotechnical and geometallurgical data for analysis. As noted on slide seven, federal permits are in hand, and we have also obtained additional key state permits and approvals, while we continue to make progress on the remaining state permits. Three primary state permitting areas remain outstanding, and none of them sits on the critical path for the project's development. The division of oil and gas has reconsidered its decision on the State Right-of-Way agreement and on lease authorization for the gas pipeline; under the reconsideration, Alaska issued a revised comment document to gather additional public input. That document further describes how Alaska is taking into account prior public input solicited during the Right-of-Way review, primarily regarding how cumulative impacts are addressed in the decision. The comment period ended in November 2020, and we expect Alaska to reissue the Right-of-Way agreement and lease authorizations in the first half of 2021. In addition, Alaska published an initial notice period for comment on the water right applications and on transportation facilities. Water rights are key for the mining activities. Alaska introduced a second public notice period, which closed last week.
Greg Lang
executiveWe expect final decisions on the water right applications to come out during the first half of 2021. When it comes to the Dam Safety certifications process, that's a multiyear commitment involving collecting more geologic information so the final engineering work on the tailings facilities and water retention structures can move forward, going from a feasibility level to a final construction package, and that package is needed for the project's Dam Safety certification. That field work gets going again later this year. We're proud to report that the 2020 drill program wrapped up safely and successfully, and that was accomplished with zero COVID cases at the project site. Over the past year, policies went into place aimed at lowering risk and making sure every employee and contractor stayed safe and well. Alaska ranks among the leading states for COVID-19 vaccination availability, and Governor Dunleavy announced earlier in March that shots are now open to anyone 16 and older. A big share of the credit for how well the vaccination program has gone in the Y-K region belongs to the leadership of the Yukon Kuskokwim Health Corporation and native health partners, who traveled to remote communities for home visits, drew on the extensive medical clinics, and even set up vaccinations outside of grocery stores.
Greg Lang
executiveAt Donlin Gold, strict safety protocols and on-site assistance enabled us to run four rigs without incident during last summer’s program, and close coordination with our Native partners and tribal groups across the Y-K region proved essential to a productive field season. We will adhere to the same protocol set in place last year for the 2021 field season. Donlin Gold remains dedicated to addressing what our community partners need, and first quarter community engagement highlights appear on slide nine. Together with TKC, the village of Crooked Creek and then the Paiute tribe, Donlin once more served as lead sponsor of a project to build and maintain the upper portions of an ice road on the Kuskokwim River. Donlin additionally supplied technical data to assist the road builder, such as aerial photographs and ice measurements. This enhances safety and access for residents of these remote locations to nearby communities. When it was finished in February, the ice road stretched nearly 200 miles. In January, a fire destroyed the water purification plant in the village of Tuluksak, producing a health and safety emergency for that community. Donlin collaborated closely with their tribal administrator and tribal council to determine how Donlin could help most effectively and coordinate efforts.
Greg Lang
executiveDonlin, along with a number of other community organizations and companies, came forward to help with water and supplies that were badly needed. As of today, Donlin has signed Friendship Agreements with 6 villages in the Y-K region, which put the existing engagement practices with nearby communities into a formal framework. Those agreements build on the long-term relationships we had already firmly established with these communities and speak to particular community needs like water, sewer, and landfill projects, along with other social programs. We back our native partners Turista and TKC and the mandates they hold under the 1971 Alaska Native Claims Act, as shown on slide 10. We are assisting them in developing their land so the region and all of their stakeholders gain economically. Donlin is lucky to have partnerships with Turista and TKC, the holders of the mineral and surface rights, that have stood the test of time. A key feature that sets this project apart from other mining assets in Alaska is its location on private land that is specifically designated for mining activities. With Alaska's lengthy mining history and skilled workforce, Donlin Gold provides the prospect of a future with well-paying year-round jobs and training for young people, allowing them to live nearer to home. Roughly 80% of our local workforce on the drill program were Alaska natives, and we take pride in delivering substantial economic and social benefits to the Y-K region, and we are grateful for the long-term support and commitment to the project and to its continued success.
Greg Lang
executiveFor 25 years now, Donlin Gold has collaborated closely with Turista and TKC, as well as with other community representatives, to address their needs and concerns effectively. Slide 11 shows quotes from the leadership of our Native corporation partners. These partnerships, together with the activities and programs we carry out jointly, demonstrate our dedication to developing the Donlin Gold project sustainably and responsibly, for the benefit of all stakeholders. With that, I'll hand the call over to our Chief Financial Officer, David Ottewell. Dave?
David Ottewell
executiveThanks, Greg. On slide 12, we show how operations performed in the first quarter. Our net loss came in at $8 million, which is $1.4 million more than the same quarter a year ago. That was mainly because of increased G&P expense and because we finished the assays from the 2020 drill program at Donlin. Interest rates came down, so we earned less interest income on cash and term deposits and incurred less interest expense on the Barrick note. Slide 13 covers first quarter cash flows. We spent $7.7 million during the quarter, a bit below the prior year quarter. Greater G&A spending and government funding were offset by a decrease in withholding taxes paid on vested PSUs. The company chose not to pay withholding taxes on shares issued to the CEO and CFO so that we could preserve cash. Turning to slide 14, our treasury remains strong. We finished the first quarter with $114.2 million in cash and term deposits, and we also have $75 million coming from Newmont in July this year plus another $25 million in July 2023. We still expect to spend between $31 million and $35 million in 2021, which includes $18 million to $22 million to fund our share of Donlin and $13 million for corporate G&A costs.
David Ottewell
executiveSo with that said, Greg, I'll hand the call back to you now.
Greg Lang
executiveThanks, Dave. On slide 15, if you compare Donlin's resources against those of 15 other big gold projects across the Americas, you'll see Donlin ranks largest in its category, with reserves nearly four times the average. A project holding federal permits and starting out with close to 40 million ounces of gold, located in a jurisdiction where the rule of law isn't anything new, is virtually unheard of. Grade is another defining feature of any mineral deposit. Deposits with richer grades give you resilience across multiple commodity cycles, which is essential if a great mining operation is going to be developed successfully. On slide 16, you can see that at 2.25 grams, Donlin's grade is double the worldwide average for large open pit deposits. Global gold production is falling at most of the majors, and at the same time average grades have kept rising over the past decade. Only a handful of mines worldwide produced more than 1 million ounces in 2020. Donlin would join rare company — as currently envisioned, the project would average 1.1 million ounces per year across its entire life, as slide 17 shows.
Greg Lang
executiveFor those investing over the long haul, there’s extra worth derived from our mine, which has a lifespan spanning multiple decades. If you examine other comparable mining operations worldwide—whether already producing or still in development—Donlin would be ranked among the top operations we are producing today. Slide 18 displays several of the biggest producing mines across the globe along with the largest development-stage projects. Just one development project combines global scale with a desirable mining jurisdiction, and merely a handful of operations produced 1 million ounces, which further illustrates that projects such as Donlin are scarce and are needed to replenish the industry’s diminishing reserves. As slide 19 shows, the ACMA and Lewis pits take up only 3 kilometers of an 8 kilometer mineralized belt. When the timing is right, based on the known areas of mineralization, future exploration potential exists to significantly expand their current resource along strike and at depth. Slide 20 represents the life of mine diagram for a project like Donlin as one of the largest open pit development projects. Following years of exploration and resource enhancement, technical studies, environmental studies and the receipt of our federal record of decision and key state permits, Donlin Gold has been substantially derisked and methodically and carefully brought up the value chain.
Greg Lang
executiveThis gives us a strong base to move this exceptional deposit ahead. The time we put in early to develop it and to proceed in a responsible, sustainable manner is essential for the project to succeed. We think investors who remain patient will be rewarded. During 2021, we'll fold the results of the drill program into the geologic model. We'll carry out further confirmation and extension drilling so that we can build on the information recently gathered regarding the continuity and structural controls of the higher grade mineralization we hit. After that, our focus will turn to collaborating with our partner on updating the feasibility study, subject to formal approval by the Donlin Gold Board. NovaGold is grateful for the ongoing support and engagement of our shareholders, including Paulson & Co., Fidelity Investments, BlackRock, new shareholders the Saudi Public Investment Fund, First Eagle, EXOR, and Van Eck, as noted on slide 21. That is particularly notable in the midst of a global pandemic. The strong relationships we have with every — everyone from our retail shareholders to our institutional shareholders have grown deeper, and we are very thankful. To sum up, NovaGold's 50% ownership at Donlin as a Tier 1 and a Tier 1 jurisdiction, and a pure gold play on a unique project that we believe, when viewed for its rare combination of attributes in terms of size, grade, potential and partnerships, is a win-win scenario for all of our stakeholders.
Greg Lang
executiveAlso, as an open company that has reliably executed its strategy, with a solid treasury that got even stronger thanks to extra funds from Newmont in July, we will supply enough funding until we reach a construction decision on Donlin. Both our key federal permits and our state permits are secured and moving forward, and we have a proven track record of constructing and running large mines. Thank you for listening today. Operator, at this point we will open the line for questions from the attendees.
Operator
operatorThanks. <<operator_script>> Lucas Pipes from B. Riley Securities has our first question. Go right ahead.
Lucas Pipes
analystHello there, and good morning to all of you. Greg, I was hoping to dig a bit deeper into the updated feasibility study, and in particular, could you possibly share some detail at this stage regarding timing? After that, I may have one or two additional follow-ups. Thank you.
Greg Lang
executiveOkay. Good morning, Lucas, and thanks for being on the call. On timing, over the coming few months we'll clearly be integrating the assays into our geologic model, and we're planning a modest follow-up program targeting a few of the very high-grade zones we've hit, some of which are honestly outstanding results. So we'll be running that drill program within the next few months. At the same time, we'll be looking at numerous elements of the project alongside our partner — tailings management, flow sheets, water controls, and so forth. That technical work, then, will give the owners the foundation to set out the criteria for the project we're advancing, in terms of scale, throughput, and so forth. So that's going to — the work — the tradeoff studies will carry us through to September, and at that point we'd decide whether to launch a new feasibility study, a process we expect to take roughly a year.
Lucas Pipes
analystThanks — that’s really useful, and I appreciate the detail. It may be a little early to ask this, though you did mention it briefly a moment ago: when it comes to the main points that would be looked at again and a refreshed feasibility study, where do you think the market should be watching for the most important updates? Thank you.
Greg Lang
executiveThe main thing we'll be giving you once we start a feasibility study, I believe, is the overall approach to this project. As I think most of you know, we've been looking at a range of staged development options aimed at lowering how much capital is needed up front. So one piece of the work we'll be doing over the coming few months, as the geologic models get updated, involves deciding the final throughput we want to aim for in Stage 1, along with other important elements of the project — the gas pipeline, third-party participation and so forth. Our aim is to settle all of those matters for good, and after that we'll begin the new study.
Lucas Pipes
analystThat's really useful. Greg and the team, we truly appreciate all those specifics. Wishing you the best going forward. I'll hand it back now.
Greg Lang
executiveAlright, thanks Lucas.
Operator
operatorJohn Tumazos from John Tumazos Very Independent Research is up next with a question. Go right ahead.
John Tumazos
analystThanks a lot. By what point will the 2020 drill program wrap up, along with every result — and do those results look promising enough that another drilling campaign could be launched to follow up on them ahead of the updated feasibility study?
Greg Lang
executiveOkay, good morning, John. Together with Barrick, we've put out every assay result from the 85 holes we finished last year, and the results are quite compelling. Something you'll notice in what we reported is that we had zones of 10-plus grams located roughly 3 meters beneath surface. So much of what we plan for this year is clearly aimed at following up those high-grade intervals close to surface that would be mined early on in the project's life. That is going to be the program's main focus. And I would say — we drilled 85 holes last year. I doubt this year's program will be as extensive. But we're working alongside Barrick to lock in the drill hole locations, and we expect to get started at some point later in April. The camp is open at this point, and we're mobilizing food and supplies so we're ready to start drilling.
John Tumazos
analystIs it your view that the emphasis on refreshing the feasibility study is strong enough that, even if some excellent new results come in, there won't be a third drilling campaign — you'll simply halt and proceed with the feasibility study — or is it still too soon to decide that?
Greg Lang
executiveJohn, in my view, the work we carried out last year was the largest drilling campaign in more than 12 years, and combined with what we plan for this year, I believe that will bring the drill programs at and around the ACMA and Lewis deposits to a close, putting us in position to move ahead with the new feasibility study. More drilling will still be needed — geotechnical drilling, hydrological water wells and similar work — but as for the drilling meant to define the ore body, I expect it will be mostly finished this season.
John Tumazos
analystAppreciate it, and best of luck to everyone.
Greg Lang
executiveThanks, John.
Mélanie Hennessey
executiveThere's a question that's come in via text, and I'll read it aloud: considering how much drilling has taken place at Donlin, what did the most recent result show, and what do those results mean for where the project goes from here?
Greg Lang
executiveWell, I think that’s — over the years there has been a great deal of drilling at Donlin. I think we’re now getting close to some 1,500 holes, primarily core holes, and the new results trace back a few years to our recognition that, as we examined this stage of development with smaller equipment, we advanced the hypothesis that the higher grade intrusive structures, which still hold the lion’s share of the gold, were thick enough and continuous enough that these structures could be mined separately, so the aim of this program is to have a smaller, higher grade project in the initial stage. And clearly some of the results — multiple intercepts of 10-plus grams, 30 grams, 40 grams and good thick intervals. These really back our view that we can mine the high-grade separately and enhance the mill feed, and have a smaller project, which still has a very significant production profile.
Operator
operatorOur next question is from David Lasenky — I'm not sure I caught that — a private investor. Go ahead, please.
Analyst
analystMorning, everyone. I have just a few questions. Given that the 2020 drilling and assay program has now finished, do you anticipate that this work will increase proven reserves?
Greg Lang
executiveThey would — obviously the results came in above what we had expected, and we're folding that data into the geologic model for that area. I never like to get out ahead of any modeling work and prefer to let the work speak for itself. That said, I'm quite positive about the outcome, and really the basis for that is that across the Board we hit higher grades, though the higher-grade intervals were thinner, and overall there was an increase in grade thickness compared with what we had modeled before. So certainly a very positive sign as to how much of that ultimately turns into reserves. We don't know, which is why we're doing the update, but certainly some excellent results that can only improve our understanding of the ore body.
Analyst
analystAnd then the last thing I'd ask is this: has any royalty trust expressed interest in providing financing down the road — outfits such as Franco-Nevada or Silver Wheaton, or similar companies?
Greg Lang
executiveSure, there's definitely interest from streaming and royalty companies, and they do keep an eye on what we're doing. I'd say what we're focused on at the moment is finishing up the new geological model and moving ahead with the feasibility study. When it comes to financing options, there are plenty available to consider, and streaming is among them. Personally, I'd prefer to handle as much of the financing as possible through debt or other instruments that aren't open ended. But the main focus right now is the feasibility study, and once we've made more progress on that, we'll shift our attention to the financing option.
Analyst
analystHonestly, that's just my own view, but I believe the longer you hold off, the more you'll gain when it comes to the royalty trust, since I expect gold to reach $2,500 by year-end and $3,000 by the end of next year — so that's simply my personal take, and thank you for…
Greg Lang
executiveWell, I appreciate that…
Analyst
analyst… responding to the questions.
Greg Lang
executiveThanks, David. We share that same view, and when it comes to the gold price, we're bullish too.
Operator
operatorThat brings the Q&A portion to a close. Greg Lang, I'll hand the conference back to you for any closing comments you'd like to make.
Greg Lang
executiveWell, everyone, thanks for making time to hear the latest on what we've been doing. Dr. Kaplan, would you like to offer any final comments?
Thomas Kaplan
executiveThanks, Greg. Can you hear me okay? I'd just wrap up by noting that the results speak for themselves. From when we began delivering assays through to the final 30% from tip to tail, they beat what we expected. And as someone who has worked in mining for nearly 30 years now, I can count on one hand the occasions when the largest and most aggressive drill program any project has seen in the past 10 or 12 years has produced the sort of upside surprises that the Donlin drilling gave Barrick and us. What you're seeing, I think, is that Donlin is, as we've said many times, the gift that keeps on giving. I should point out that right now we're focused only on that gold which would sit in the mine plan, the first phase of the mine plan. The 3 kilometers drilled amount to just 3 kilometers of the 8 kilometers of mineralization. There are deep targets, deep high-grade targets, laterally across the whole mineralized belt, and that 8 kilometers is itself just 5% of the land package.
Thomas Kaplan
executiveThis is a forward-looking statement, so take it for what it is. But those of you familiar with me know my track record was built through the drill bit, and I'm never content if rigs aren't turning somewhere. What I can tell you is this: I feel very strongly — and this feeling has only been reinforced over the last year — that the next Donlin could very well be a Donlin. And my expectation is that you're going to see enormous value unlocked for Barrick shareholders, as well as NovaGold shareholders, from Donlin. In my mind, it is the new Nevada. It is the new Carlin. And like Nevada, it sits in the safest jurisdiction in the world, which comes at a premium. Donlin really is something that checks the boxes on so many levels. In an era of asset scarcity, Donlin ranks right up there with the very best in the world, but it's simply located in the best part of the world, and to me that is the definition of a way to make a killing in mining. So those are my comments, which is why I just stood aside to see if anyone wants to talk about the macros.
Thomas Kaplan
executiveMy remarks are just this: the folks involved in the Donlin story have watched us over the decades—ever since Greg joined the Board as CEO and I came alongside him as Chairman—and every promise we made has been kept. Each commitment has been honored. And we achieved that without making compromises. We did it without taking shortcuts. We went about it in a manner that has only gained the company more allies, both in industry and, at least as significantly—more significantly—with our native corporation partners. I believe our shareholders have plenty to be proud of. I have been part of this story for 12 years, and I can tell you I am more enthusiastic today than I have ever been. What I feel when I look at those drill results is the exact opposite of deal fatigue. If it were up to me, well, I would keep five to 10 drill rigs on this target permanently, just as I do with other privately owned assets. We will get there. I have a sense that as jurisdictional risk moves to the forefront, as gold prices climb, and as shareholders want to see things actually being built.
Thomas Kaplan
executiveDonlin is going to sit right at the top of anyone's list. There is not a shred of doubt in my mind — none whatsoever — that in a gold bull market, NovaGold, as a pure play on the new Nevada, will hit absolutely record highs. Of that I am certain. And I'm equally certain that once Barrick shareholders grasp that, inside the Barrick portfolio, they can hold a Tier 1 asset without shelling out for costly acquisitions, I believe one or two phases will be turning out more than a million ounces annually. Nothing else on earth compares, except perhaps Polyus Sukhoi Log, which I like to call the analog as a joke, since, as you know, it sits on the other side of the straits. We believe we're on the correct side of those straits. But the truth is that Mother Nature has handed us an extraordinary story in Donlin. And it sits in a location where shareholders — should you wish to visit — can fold whale watching or fishing into the trip, and more importantly, it belongs to the category I've increasingly taken to calling the good night's sleep story, meaning that when you go to bed at night and wake up in the morning, what you believed you owned is still yours.
Thomas Kaplan
executiveSo what you have here is a federally permitted, very large deposit, and the kinds of negative surprises that typically arise in mining have been entirely <<inaudible>> with Donlin. As some of our long-standing shareholders are aware, we've referred to this as the tortoise and the hare story. Folks would say, yeah, yeah, yeah, well, that's going to take years, and our view was, what, this is Aesop's Fable and we're going to win the race. I can tell you how many projects that people believed would get built either dropped away due to technical problems or social problems or just plain political risk. We've got none of those. On the technical side we keep getting better and better. On the social side we have the finest partners imaginable. And when it comes to political risk, I know the developing world as well as anybody in mining and I'm telling you, you want to be somewhere that the rule of law isn't a novelty and where property rights actually mean something and where you've got exploration upside and leverage in a jurisdiction where, when you want to ring the cash register, you'll be permitted to keep the fruits of your leverage.
Thomas Kaplan
executiveThat is truly what this comes down to. And if my read is correct — and if it turned out I was wrong, I would put NovaGold into play and shift toward something that brought me greater joy, whether through leverage or safety or whatever it might be — that simply does not exist. Donlin stands apart when you consider its attributes: the size, the grade, the production profile, the mine life, the cost structure that comes from the grade, the exploration potential, which is arguably the finest in the gold space, perhaps Sukhoi Log, I am not certain. But I can tell you those drill results would have ranked as the best drill results at any major mining company, any major mining company. And so I have no doubt that once silver and gold strengthen again, NovaGold will be viewed as the go-to stock in the development space, and we have just attached a high-grade exclamation mark to this thesis. So from an investor standpoint, for someone who is 90%, 95% on the investors — on the institutional investor side of the table — it really does not get better than this. I love cats, and this is catnip. Brother, Greg, back to you my friend.
Greg Lang
executiveThanks, Tom, and thanks once more to all of you for being on the call. We'll keep you posted and we're looking forward to the next quarter. Take care, everybody. Stay safe.
Thomas Kaplan
executiveI appreciate that.
Operator
operatorThat brings us to the end of the conference call for today. Your lines can now be disconnected. We appreciate your participation, and we hope the rest of your day is a pleasant one.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NovaGold Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to NovaGold Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NovaGold Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.