executiveGood morning, everyone, and welcome to National Grid's Half Year Results Presentation. I'm Angela Broad, Head of Investor Relations, and it's great to have so many of you joining us on the call today. First off, please can I point you toward the cautionary statement at the front of the pack. As usual, a Q&A will follow the presentation. <<operator_script>> All of today's materials are available on our website. And of course, if you have any further queries after the call, please do feel free to reach out to me or one of the IR team. So with that, I'd now like to hand you over to our CEO, John Pettigrew. John?
John Pettigrew
executiveThank you very much, Angela. Morning, everybody, and thanks for being with us today. As you're aware, these are the final results I'll be presenting, and I will be passing the reins to Zoe, who takes on the Chief Executive role on 17 November. So, ahead of beginning the results presentation, I'd like to hand things over to Zoe for a few remarks.
Zoë Yujnovich
executiveThank you, John, and good morning to all of you. These results today mark a significant milestone for National Grid and for me personally, since I'm now taking over from John. I'd like to pause briefly to acknowledge the extraordinary work he has done across more than a decade in the CEO role. The solid base he is leaving us reflects both his leadership and the commitment of the entire National Grid team. From the day I came on board as CEO Designate on the 1st of September, I've been fortunate to meet a great many colleagues and stakeholders. What has struck me most is how large and how bold our delivery is — reshaping our networks and putting money to work quickly. Our GBP 60 billion of capital investment is more than a figure. It represents a pledge to make our networks fit for the future, so that we can handle the sharp rise in demand now emerging and make sure the millions of households and companies we serve get dependable, clean energy at a cost they can manage. As I take up my post over the next few days, my first priority will be to keep up the pace, remain concentrated on performance, and deliver in a safe and responsible way. I'll do so with a clear-eyed awareness of the difficulties and the thrilling possibilities that lie ahead. In my view, energy firms have a crucial part to play in generating growth and prosperity.
Zoë Yujnovich
executiveI’m determined to make sure National Grid does its part, with an unwavering emphasis on running our operations excellently and being disciplined with capital, as we keep delivering for customers and building value for shareholders. I’m looking forward to getting together with all of you in due course, but at this point I’ll pass things to John and Andy so they can walk you through the results.
John Pettigrew
executiveThanks, Zoe. Now, moving on to the results for our half year. As always, Andy Agg is here with me, and after we've each gone through our presentations, we'll be glad to take your questions. We've had a genuinely positive first half, continuing to build on strong foundations and delivering excellent operational and financial performance. The money we're putting into our networks has never mattered more — it ensures continued resilience, enables economic growth, delivers cleaner energy and meets growing power demand. These are the drivers behind the strong visibility we have in our investment program, with support from our regulators. That in turn gives me enormous confidence in National Grid's capacity to keep delivering a compelling investment proposition, with investment growth of around 10% per annum and underlying earnings per share growth of 6% to 8%, while maintaining a strong balance sheet and delivering an inflation-protected dividend. Before I turn to our performance, I want to highlight three key areas that reinforce my confidence in our ability to deliver on our plans. First, the strong progress we've made in securing the supply chain to deliver record levels of investment. As you know, a big focus over the last 2 years has been securing the supply chain for our largest suite of major projects in the U.K., the accelerated strategic transmission investment, or ASTI.
John Pettigrew
executiveToday, I'm glad to report that we're in a genuinely strong position. All 6 of our Wave 1 projects are already under construction, and work is progressing well. Our GBP 9 billion Great Grid Partnership — covering delivery of the 8 onshore projects within Wave 2 — is now up and running with our 7 strategic partners. We're also making great progress on the remaining 3 Wave 2 offshore projects: we've completed the contracting for Sea Link and announced the preferred suppliers for Eagle 3 and 4, with contracts expected to be signed in the next few months. Once complete, we'll have secured the supply chain for 17 ASTI projects — a significant achievement. As a result, over 3/4 of our GBP 60 billion investment plan is now underpinned by delivery mechanisms, enabling us to ramp up our capital delivery. We've invested over GBP 5 billion in the first half, another record for the group, and we remain on track to deploy over GBP 11 billion of capital investment this year, in line with our guidance. The second area to highlight is the continued momentum we're seeing from both a regulatory and policy perspective. On the regulatory front, we've built on the strong foundations we set last year in the U.S.
John Pettigrew
executiveRoughly 75% of our 5-year investment plan has now been approved through our rate cases. We've also witnessed some notable policy developments. As you're aware, New York State said last year that it will probably fall short of its goal of 70% renewable generation by 2030. Consequently, during the last half we've observed a move toward an all-of-the-above approach in balancing clean energy objectives against affordability and reliability. For instance, in September, after we submitted our long-term gas plan, the PSC released an order backing the proposed Northeast Supply Enhancement, or NESE pipeline. Were it constructed, the capacity this pipeline delivers would meaningfully boost reliability and resilience while also potentially cutting energy costs for New Yorkers by as much as $6 billion. In the U.K., I'll address regulatory developments shortly. On the policy side, though, the government keeps examining various means of supporting quicker infrastructure delivery and speeding up economic growth. That includes their planning reform legislation aimed at large infrastructure projects, which ought to help deliver projects during the 2030s. They've also started consultations, featuring proposals that would let electricity distribution network operators perform straightforward reinforcement work without full planning permission, plus a revised fast track consenting process.
John Pettigrew
executiveShould this be put into practice, it could deliver significant advantages for transmission projects down the line. So clearly, we are witnessing robust regulatory backing for the investments we are making, along with policy advances that will help deliver projects in the future. And thirdly, there are the near-term steps we are taking to underpin load growth in the U.K. We are collaborating with the government and industry, among them U.S. big tech companies, as they look to build out the U.K.'s AI infrastructure, including creating data centers inside AI growth zones, such as the ones recently announced at Blyth and Cobalt Park. These projects amount to tens of billions of pounds of investment in U.K. infrastructure and demonstrate the demand growth we have forecast in our RIIO-T3 business plan, which is built to connect up to 19 gigawatts of additional demand across the 5 years to March 2031, with roughly half of that expected to come from data centers. We are now working hard to enable these connections, including cooperating with the government via the AI Energy Council to help develop more AI growth zones, so that we can deliver the investment required to satisfy rising energy needs. So let me now move on to our financial performance, where we have produced a strong set of results in the first half.
John Pettigrew
executiveIf you look at it on an underlying basis — so that leaves out timing effects and exceptional items — operating profit rose 13% to GBP 2.3 billion, which mirrors higher regulatory revenues across our U.S. and U.K. electricity transmission businesses. That robust operating performance pushed underlying earnings per share up 6% to 29.8p. As you've heard already, the business invested a record GBP 5.1 billion, which is up 12% year-on-year at constant currency. Consistent with the policy, the Board has declared an interim dividend of 16.35p per share. Now moving to reliability and safety. I'm glad to report that reliability stayed strong across our U.K. and U.S. networks during the first half of the year. Looking toward winter, we are well prepared, with winter readiness plans in place. The NESO recently published its winter outlook report for the U.K., forecasting electricity margins of around 10%, the highest since 2019. In the U.S., while we expect adequate electricity margins, gas availability during the coldest days of winter remains a focus, particularly in extreme weather events, so our teams will work closely with upstream suppliers to mitigate any risks. Also, in July, the NESO published its report investigating the outage that followed the fire at our North Hyde substation, and we are working closely with the government, NESO, Ofgem and industry to take the report's recommendations forward.
John Pettigrew
executiveSafety continues to be a key priority throughout our operations, as it always has been. Over the past 6 months, our lost time injury frequency rate came in at 0.09, which is within the target set for the group. We keep working to foster a culture of safety excellence, which includes, for instance, finding new approaches to strengthen our safety protocols, like using digital job briefs to improve how hazards are recognized in the field. Turning now to how the group performed operationally, beginning with Electricity Distribution. Capital investment rose 17% to GBP 756 million, driven by more asset replacement and load-related reinforcement work. I'm happy to report that we have now achieved more than GBP 100 million in synergy savings, 6 months ahead of schedule following the U.K. Electricity Distribution acquisition in 2021. Those synergies came about through smarter procurement, operational efficiencies at our shared sites and integrating support functions across the group. In October, we also saw Ofgem publish its sector-specific methodology consultation for RIIO-ED3, which builds on the foundations of the T3 framework. We welcome the fact that Ofgem has directed networks to use a long-term planning horizon. That will ensure delivery of the next price control also accounts for investment drivers in the decades ahead, including load growth, asset health, resilience and renewable generation.
John Pettigrew
executiveOn connections reform, we've likewise been making solid headway — that includes getting flexible offers ready for customers who are likely to lock in a queue position. That lets those customers move their projects forward before a formal offer arrives, which means quicker hookups for renewables and low-carbon technologies. Last, we keep expanding our distribution system operator capabilities, and we've launched the demand turner flexibility market, which rewards higher demand as an alternative to cutting back generation. Turning to U.K. Electricity Transmission: capital investment there rose 31%, reaching GBP 1.7 billion, and that covers building new substations to serve load growth as well as advances on our GBP 1 billion London Power Tunnels project, where we have now energized the first 2.5 kilometers at Hurst substation and Crayford. We've also worked hard to find creative ways of growing system capacity. One example: we started work on a new substation at Uxbridge Moor in West London featuring an innovative design that will cut its footprint by 70% and do away with SF6, a potent greenhouse gas. More than a dozen new data centers will be served by this substation, and it should deliver 1.8 gigawatts of new capacity — the equivalent of powering a mid-sized city. We've also applied that approach to procurement frameworks through our strategic infrastructure business — in July, for instance, we signed an GBP 8 billion electricity transmission partnership with 7 regional partners to deliver substation infrastructure across the U.K.
John Pettigrew
executiveOn the transmission network side. Now, policy. We're collaborating intensively with NESO and our customers to help connections reform move forward. As soon as NESO releases the revised queue, we'll clearly understand how the particular projects that are needed will be sequenced, and at that point we can direct our efforts toward hitting those connection dates quickly. Regarding regulation, Ofgem issued its draft determination for the RIIO-T3 framework in early July, and our response came out in late August. That response set out adjustments we consider necessary to the baseline return as well as the incentive framework, so that high-performing networks can earn an overall return that is globally competitive. We've additionally put forward several refinements aimed at streamlining our funding mechanisms, letting us recover the efficient cost of our investments, and moving projects along at the pace our stakeholders expect. Naturally, we've engaged extensively with Ofgem across every level of the organization in advance of the final determination, which is anticipated in early December. And we expect a decision to be taken in late February or early March, after the license drafting process. Now on to strategic infrastructure. As you've heard, we've been focused on ramping up delivery of the Wave 1 ASTI projects, while at the same time making sure we secure the supply chain and the relevant consents for Wave 2.
John Pettigrew
executiveTo give you specifics on the Wave 1 projects, our progress includes the offshore EGL 1 and 2 projects, where cable manufacturing and site works for the southern converter stations are moving forward; the onshore Yorkshire Green upgrade project, where the final one of 8 200-ton transformers has now arrived; and the North London Reinforcement project, where we completed reconductoring 3 circuits and installed more than 190 kilometers of cable. This year we also finished 4 public consultations, among them the submission of 2 major development consent order applications, Sea Link and Norwich to Tilbury, and the Planning Inspectorate has now accepted both submissions — a major milestone. On the regulatory side, we keep engaging with Ofgem to find a resolution to our request for a delay event on the EGL 1 project, and we are encouraged by the discussions so far. We expect a final decision from these negotiations within the next few months. Turning to the U.S., beginning with New York, we've continued to make strong progress across our operations. Capital investment reached GBP 1.6 billion, up 5%, driven by an increase in mains replacement expenditure. In addition, we've continued to make strong progress on our $4 billion upstate upgrade, including our Smart Path Connect transmission project, where our segment is on track to be ready to energize at the end of the year.
John Pettigrew
executiveTurning to our Climate Leadership and Community Protection Act — the CLCPA — Phase 1 and 2 projects, we expect the initial round of permit approvals to come at the end of the calendar year. On the regulatory and policy side, beyond the PSC order concerning the NESE pipeline and the green light for the Niagara Mohawk joint proposal, we are also involved in the draft New York State Energy Plan. Issued earlier this year, that plan sets out long-term strategies for meeting New York's energy needs. It stresses how important infrastructure investment is and acknowledges the lasting role the gas network plays in keeping reliability, affordability and security of supply. When it is finalized later this year, the plan will shape future regulatory decisions and utility planning throughout the state. In New England, capital investment rose by 23% to GBP 1 billion, reflecting greater spend on asset condition and system capacity across both electricity transmission and distribution, 220,000 smart meter installations and the continued rollout of our fault location, isolation, and service restoration program. We have also secured partners for our strategic procurement framework, which will underpin more than $3 billion of contracts over the next 5 years. And lastly, on regulation and policy, we have agreed roughly $600 million of allowances under the Electric Sector Modernization Plan, focused largely on electric vehicle highway charging and IT infrastructure.
John Pettigrew
executiveWe're also continuing to collaborate with the governor's office in order to move the Energy Affordability Bill forward. Now turning to National Grid Ventures. Capital investment came to GBP 69 million, which supported asset refurbishment throughout our Interconnector and U.S. Generation portfolios. On the operational side, we've enjoyed a strong 6 months, with availability across our Interconnector fleet at 90% and our Generation fleet reaching 96% reliability. In addition, we've moved the Propel transmission project ahead through our Transco joint venture, and EPC contracts there are now being developed. When finished, that project will assist in delivering power from Long Island to the Bronx in New York City and Westchester County. We've also simplified our portfolio, having finished the sale of National Renewables in May and having announced the sale of Grain LNG in August. With every regulatory approval now in hand, we anticipate completion within the coming weeks. So I'll pause there and pass things to Andy, who will take you through the numbers before I return to discuss our priorities for the second half. Andy?
Andrew Agg
executiveThank you, John, and good morning, everyone. I want to point out that, as we normally do, our underlying results are shown before timing, U.K. deferred tax and exceptional items, and the dual results are given at constant exchange rates unless otherwise stated. So let me begin with how we performed overall across the first half. We turned in strong results, with underlying operating profit on a continuing basis of GBP 2.3 billion, up 13% compared with the prior year, mainly driven by higher regulated revenues in U.K. electricity transmission reflecting growth in the asset base, along with higher revenues in our U.S. regulated businesses following recent rate cases, partly offset by last year's sale of the electricity system operator. Strong operating profit growth, partly offset by higher finance costs and a full half-year impact from the rights issue shares, has produced a 6% rise in earnings per share to 29.8p. We've kept making good progress on our capital program, with investment from continuing operations reaching GBP 5.1 billion, another record level, and up 12% year-over-year. Consistent with our policy, the Board has declared an interim dividend of 16.35p per share, which represents 35% of last year's full year dividend. Let me now turn to our business segments, beginning with U.K.
Andrew Agg
executiveOn Electricity Distribution, underlying operating profit came in at GBP 551 million. That's GBP 22 million lower than a year earlier, as revenues fell on headwinds from Ofgem's real price effect mechanism — those more than offset the gains from revenue indexation, recovery of higher totex allowances and higher depreciation. During the period, we got past our cumulative 3-year target of GBP 100 million in synergy benefits by FY '26, 6 months early, by leveraging greater buying power, capturing savings from integrating support functions and working more efficiently at joint transmission and distribution sites throughout the U.K. Capital investment for the half year was GBP 756 million, which is GBP 109 million more than the prior period, mainly because of higher asset replacement and refurbishment plus greater load-related network reinforcement. Turning to our U.K. Electricity Transmission business, underlying operating profit reached GBP 846 million, an increase of GBP 122 million versus the prior period. A strong first half was driven by higher allowed revenues, partly offset by higher depreciation. Capital investment there was GBP 1.7 billion, 31% above the prior period. That reflects our continuing spend on substation build-out, along with the substantial step-up in investments on our ASTI projects and ASTI enabling works.
Andrew Agg
executiveTurning to the U.S. now. Underlying operating profit in New York came in at GBP 443 million, which is GBP 167 million above the previous year. The driver was higher net revenue, reflecting business growth as we upgrade and reinforce our networks, plus the recovery of costs that had previously gone unremunerated after the recent rate case updates. That was partly offset by increased depreciation, reflecting a larger asset base, and by higher costs, including property taxes and environmental provisions. Capital investment totaled GBP 1.6 billion. That figure was GBP 82 million above the prior year, driven by a further step-up in the pace of mains replacement activity under our downstate gas rate case and by increased spend on smart meters, partly offset by lower costs on Smart Path Connect as we near completion of this project. In New England, underlying operating profit was GBP 292 million, GBP 65 million above the prior period, following higher revenues reflecting our growing asset base and improved incentive performance, partly offset by higher depreciation and other investment-related costs as we ramp up the capital program. Capital investment was GBP 958 million, GBP 178 million above the prior year. This was driven by increased asset condition and system capacity investments and smart meter installations, partly offset by reduced mains replacement work.
Andrew Agg
executiveNow turning to National Grid Ventures, where the underlying contribution came in at GBP 227 million, including joint ventures. The GBP 19 million rise versus the prior year was mainly driven by the benefit of depreciation having stopped at Grain LNG after it was classified as held-for-sale. That accounting treatment for Grain, together with the sale of National Grid Renewables, brought capital investment down to GBP 69 million. Our other activities posted an operating loss of GBP 27 million, which is GBP 11 million below the prior period, mainly because of lower insurance costs and the absence of fair value losses in the National Grid Partners portfolio this time around. Moving on to financing costs and tax. Net finance costs stood at GBP 678 million, up 4% on the prior year, reflecting higher average net debt and the effect of higher inflation on indexed linked debt. The underlying effective tax rate before joint ventures was 11.3%, which is 60 basis points below the prior year, chiefly thanks to the benefit of higher capital allowances in our U.K. regulated businesses and a shift in the profit mix. Underlying earnings reached GBP 1.5 billion, up 16%, with earnings per share of 29.8p. On cash flow, cash generated from continuing operations was GBP 3.6 billion, up 35% versus the prior year.
Andrew Agg
executiveThe rise reflects better profitability in both the U.K. and U.S., along with favorable working capital movements. Overall, net debt rose by GBP 1.5 billion, reaching GBP 41.8 billion during the period, as robust cash inflows from operations and GBP 1.5 billion in proceeds from the National Grid Renewable sale helped offset ongoing growth in capital investment. For the full year, we anticipate net debt will rise by roughly GBP 1 billion versus the half year, including proceeds from the Grain sale and assuming a USD 1.35 exchange rate. As John mentioned earlier, we've kept making substantial progress on capital delivery, securing the supply chain and pushing forward our regulatory and policy agenda. As I outlined before, our plans were built to be resilient across a range of interest and exchange rate outcomes, and I stay confident in our capacity to deliver in line with our 5-year framework. Moving to forward guidance, we've included detailed full-year guidance in our results statement as usual. Given strong performance across the first half, we expect underlying EPS to be modestly higher than our May guidance. The impact of a weaker U.S.
Andrew Agg
executiveThat dollar figure, along with a modestly larger share count from scrip take-up, should be outweighed by better operating results in the regulated operations and somewhat reduced financing expenses. With that said, I'll turn things back over to John.
John Pettigrew
executiveThanks very much, Andy. Before we open it up for Q&A, I'd like to use these last few minutes to lay out what we're focused on for the rest of the year, even as we keep investing throughout our networks. We start in the U.S., in New York, where several items are on our list — among them continuing to work with the state on its energy plan, helping shape a road map that strikes a balance among decarbonization, affordability and reliability. We're also carrying on our work with Williams in our capacity as the sole offtaker of the NESE pipeline, as they pursue the regulatory approvals they expect to obtain later this year, and getting ready for our downstate New York Gas filing, which is due to be submitted next spring — making sure we can keep investing in safety and reliability, meet customer needs and manage affordability. In Massachusetts, what's on our list includes submitting our gas distribution rate case, now slated for January so that we have more time to engage with new stakeholders and put forward measures consistent with evolving state policy goals, along with working with the state on its Affordability Bill and producing our Climate Compliance Plan, which is a key enabler of the cleaner energy transition. Moving to the U.K., in Electricity Transmission our priorities couldn't be clearer: to work with Ofgem on delivering a RIIO-T3 framework that lets high-performing networks earn an overall return that is globally competitive, plus mechanisms that let us deliver at the scale and pace required.
John Pettigrew
executiveWe're working with the AI Energy Council as part of efforts to collaborate across the energy and tech industries, and to build on the good progress we've made ramping up construction across our Wave 1 ASTI projects, while also engaging closely with stakeholders and communities as we progress our development consent orders. In Electricity Distribution, our key priority is preparing our response to the RIIO-ED3 sector-specific methodology consultation ahead of Ofgem's decision expected in the spring. And in National Grid Ventures, we have 2 key priorities: developing and winning new competitive transmission opportunities in the U.S., including an ISO-led opportunity in New England, and closing the sale of Grain LNG, completing our announced divestments. Now, before we take your questions, as this is my last results presentation, I want to reflect briefly on the journey I've been privileged to be part of over the past 10 years. It's been a truly transformative decade for National Grid. When I presented my first set of results back in 2016, the business looked very different, with the majority of our operations in gas. Today, we're over 3/4 electric, a fundamental shift that reflects the successful portfolio repositioning that has enabled us to pivot towards growth and a geographical footprint that is more balanced across the U.K.
John Pettigrew
executive— and in the U.S. As an organization, I'm incredibly proud of the way we've responded to our customers' needs by delivering extraordinary organic growth. We've deployed capital investment at nearly 3x the level of 2016, and this year the regulated asset base is expected to grow by over 10%, compared with just 4% a decade ago. Our business is incredibly strong, which gives me huge confidence in National Grid's ability to keep delivering a compelling investment proposition. Beyond the numbers, I'm very proud to be handing over an organization where our values and the critical role we play for our customers are the driving force behind our ambitions. Zoe is the right person to lead National Grid into this next chapter, and I know she will find the clarity of our mission and the scale of the opportunities ahead to be a source of strength in the years to come. So let me stop there and give you the opportunity to ask Andy and me any questions.
John Pettigrew
executiveRight, we have plenty of questions, so I’ll begin with Pavan at JPMorgan, and then once Pavan is done, I might turn to Sarah at Morgan Stanley for her question. So, Pavan, please go ahead with your question.
Pavan Mahbubani
analystJohn, I wanted to say congratulations on what you've achieved while leading the company, and best wishes for whatever comes next after National Grid. So, 2 questions from me, please. First, on T3 expectations. Could you add some detail about your conversations with Ofgem, especially regarding certain data points that came out earlier this year from the U.K. water CMA provisional determinations? And regarding Sizewell, do you expect any upward pressure on the return on equity? My second question concerns net debt. Andy, the full-year net debt guidance appears improved versus May, even after factoring in disposal proceeds. You mentioned the working capital effect during your remarks. I was hoping you might elaborate on what is driving that? And is it a kind of <<inaudible>> that ought to carry on in future years? I'm simply trying to understand the basis.
John Pettigrew
executiveThanks, Pavan. I'll take one question first, and then pass things to Andy for question 2. And thanks for the kind words. On RIIO-T3, if I bring you back to how we responded to the draft determination, we told Ofgem very clearly in that response that there were 2 fundamental areas we wanted to concentrate on going from the draft determination to the final determination. The first of those was the overall investable framework, and the second was how workable the regulatory framework is. On the investment framework itself, you'll have noticed in our draft determination that we argued our view that the overall return has to be comparable to what we would see internationally. So, taking what was in the draft determination as the basis, we made the case that in our view the base return ought to be higher. I think, given what we've seen in the provisional CMA decision on water and things like Sizewell, that reinforces some of the arguments we've put forward. We also said, as part of the financial package, that we needed far more detail on the incentives, and that has been an area of focus ever since we gave that response on the draft determination with Ofgem, at every level of the organization.
John Pettigrew
executiveBeyond the financial framework, we also mentioned that a framework which could actually be delivered was needed too. And what we specifically meant by that is this: considering how large the CapEx we have to deliver is, we need to be capable of making decisions fast and then moving nimbly through the process — especially regarding the point when Ofgem sets the allowances and actually agrees the projects are needed, so that it aligns with the development framework for the projects. So as you can imagine, with 4 weeks to go, that has been the focus. A lot of dialogue continues, but that dialogue stays within those 2 broad categories. With that, I'll hand over to Andy.
Andrew Agg
executivePavan, thank you. So if you recall, at year-end we were guiding toward net debt rising by roughly GBP 6 billion, though that figure came before factoring in any proceeds from transactions, as you mentioned. Once you factor in the 2 disposals along with the FX movement we've observed, the net difference is fairly small relative to the approximately GBP 1.5 billion increase we're now guiding to once all of that is taken into account. That modest gap reflects a mix of somewhat higher scrip uptake over the summer and, as you noted, a bit of working capital, but it's quite small when viewed against our balance sheet. So I wouldn't characterize it as a meaningful, lasting shift.
John Pettigrew
executiveAppreciate it, Andy. So should I bring in Sarah from Morgan Stanley next, and then maybe Mark Freshney from UBS following that. Sarah?
Sarah Lester
analystTo start, Zoe, a really warm welcome. Hearing another Australian accent is always a pleasure. And John, many thanks again to you, with every good wish for whatever comes next. I have 2 questions, if I may. Both concern U.K. Electricity Distribution. First, then, on ED operational RoRE performance: I was wondering whether you could give any additional color on how that is tracking versus this year's 50 basis points guide? Then, looking ahead, is there anything you can clearly add regarding that pathway back to the 100 basis points? And then, quickly, a little more on last month's SSMC for ED. I completely appreciate it is very early days, but I wondered if you could add a bit more on your thinking, please. Was there anything in the document that surprised you, or is it mostly, as you already mentioned, mainly just building on what we have already seen through the ET process?
John Pettigrew
executiveThanks, Sarah. On ED's operational performance, I'd say it's tracking very much where we expected to be at the half year. As you saw in the results, the real price effects we discussed in May are still affecting us, but performance is improving this year. So we're on track, and we're guiding towards 50 basis points of outperformance this year. And we still believe we'll get closer to 100 basis points by the end of ED2. So that's very consistent with what we said in May, and the first 6 months' performance sort of reinforces it. On the sector-specific methodology consultation, I'd say it's — well, it's very broad, which I think is a good thing at this stage. It's very much in line with our expectations. We were particularly pleased, I think, to see Ofgem set out that they intend to take a very long-term strategic view of distribution going forward across multiple price control periods, and that ED3 will be set in that context. I think we're also pleased to see that in the document, they talked about the need for investment in distribution to stay ahead of customers' needs.
John Pettigrew
executiveWith EV and heat pump adoption on the rise, among other things, we're glad to see that. Its messaging came through very consistently regarding the necessity of an investable proposition, and likewise that incentives supporting areas such as innovation would matter. So on the whole, I'd say it lined up with what we expected. It's quite wide-ranging, and I believe it has provided us a landscape in which we can respond fairly sensibly in time for the spring decision. Okay. So let me turn to Mark at UBS, and then perhaps following Mark, we can go to Dominic from Barclays. So, Mark?
Mark Freshney
analystJohn, congratulations, and I’m eager to see what you take on next. Two questions from me. First, when you look back at the past 2 or 3 Ofgem price controls, do you believe Ofgem provided you with enough allowance—sufficient for you to carry out all the maintenance you would have wanted to complete? Second, on infrastructure more broadly: National Grid has been at the heart of capital delivery in the U.K. during a period when there wasn’t much of it about. Obviously, the government has made it clear that capital investment in the U.K. will not be cut. We’re going to keep going. What do you think the U.K. needs to do so all of this CapEx gets done—not only in your area, but across the whole piece?
John Pettigrew
executiveThanks, Mark. So regarding the context of those last 2 or 3 price controls and whether we've had adequate allowances — I think the direct answer is yes. Looking at the outcomes, which is arguably the thing that matters most, we've kept delivering world-class reliability at 99.69, as you know I cite fairly regularly. But beyond that, if I take a wider view and consider how many unplanned outages occur on our network — meaning unexpected asset failures — comparing today with 10 years ago, there are actually roughly half as many now. So the network's overall health comes across as quite resilient and strong. And so, I believe we've had enough maintenance CapEx to carry out the work required. Naturally, as we head toward T3, that dialogue with Ofgem continues as we approach the FD. But certainly looking back, I think we have a network that is reliable and resilient. And from what the data shows, it appears to be in a strong position. On infrastructure and the wider question — for me, the important point, Mark, is that there's bipartisan acknowledgment that investing in infrastructure is a key enabler of economic growth in the U.K.
John Pettigrew
executiveTo make that happen efficiently, stable and predictable fiscal and regulatory frameworks matter a great deal, and that's an area where we're putting our attention. I think we'd still like to see additional progress on the planning regime in the U.K. The planning legislation is moving through, and I believe it will streamline the process. But I do think there's more opportunity to do more so that infrastructure can be built more efficiently and more quickly to enable that economic growth. So for me, I think those are 2 things that are really important. Okay. Let me move on to Dominic. And then perhaps after Dominic, we could do Ahmed at Jefferies. So Dominic, do you want to ask your question?
Dominic Nash
analystThanks, John, for roughly a decade in the CEO seat, and I believe around 30-ish years at Grid, and also a warm welcome to Zoe in the role — wishing her all the best going forward. I have two questions, please. First, there's obviously a U.K. government focus on affordability in some form. And within that, I think the Select Committee last week raised network windfalls once more. And I think Ofgem has now sort of been made a consultant on this, starting at the beginning of 2026. So maybe you could update us on whether that Select Committee recommendation will shift Ofgem's point of view regarding network windfalls? And second, on the GBP 35 billion of totex that you had in your draft for RIIO-T3, there's obviously a lot of uncertainty surrounding that. I think NESO is publishing a new connection regime shortly. And I was hoping you could give us color on what you actually expect to be in it — like what's going to change? And how much clarity will that actually bring to the totex number that gets published in the FD on how much of that could already be secured?
John Pettigrew
executiveThanks, Dominic. Regarding the Select Committee last week — actually, that's an issue that's already been examined. Just to be clear, the work we've carried out shows that we certainly haven't received any windfall profits. The analysis you were referring to at the Select Committee, I think, was a snapshot comparing expected inflation with actual inflation. But when you look at it over the medium to long term, it's very clear that no windfall profit exists. So I think that was the debate taking place there. Ofgem, as you know, has already examined this issue and has concluded that reopening it is not in consumers' interest. So from that perspective — and I think Ofgem actually responded to the consultation by sending word missing in source they've already looked at it as well. So the consultation you mentioned, up next spring, actually, I don't believe it has anything to do with windfall profit. I actually think it concerns the way network charges are allocated through the standing charge for suppliers. And I think that's what Ofgem are looking at, rather than the windfall profit.
John Pettigrew
executiveRegarding the GBP 35 billion totex figure you mentioned — to clarify, when we filed the business plan for RIIO-T3, we stated that across that 5-year period we could invest as much as GBP 35 billion, essentially depending on how fast connections materialize. That GBP 35 billion breaks down into a baseline CapEx portion, covering traditional reliability, resilience, and asset health plus the projects where we had absolute certainty, and then a substantial CapEx amount tied to the pace at which connections come forward. What we anticipate in the coming period is that new connection offers will be issued to those customers in protected clusters — meaning they hold planning consent and have begun construction — for connections in '27 and '28, in January next year. For the 2030 group, offers go out in Q2, and for those past 2030, in Q3. So I think next year will bring a lifting of the mist regarding exactly which connections get delivered within the RIIO-T3 period. We largely know where the primary spines of investment sit; the connections reform process will let us pinpoint which substations, in which locations, will receive investment.
John Pettigrew
executiveI think we'll have a clearer picture as we go through next year, but that's going to take some time. All right. So I'll go next to Ahmed at Jefferies, and then to Harry at BNP. So, Ahmed?
Ahmed Farman
analystThanks as well from my end, and a warm welcome to Zoe in her new role. John, I have a few questions, and maybe we can start with the T3 process. In your answer to the DD, you also mentioned workability, simplifying the funding framework, and reopening decision-making. Could you give us a sense of where the debate stands on that? And are you confident that the improvements you're after can be achieved? Another subject that has been in the press and among stakeholders, I think, is the budget for AR7 auctions being out, with some debate over whether it is sufficient to deliver the government's offshore wind targets. I just want to understand a bit better how sensitive the transmission CapEx plan is to hitting offshore wind development targets in the U.K., whether T3, OT, or over the more medium term. And finally, one for Andy. Andy, could you give us a little more on the drivers behind the upgrade, the modest upgrade as you call it, for the FY '26 outlook?
Ahmed Farman
analystYou brought up improved performance in regulated businesses. I'd really like to get a better understanding of that.
John Pettigrew
executiveThanks, Ahmed. To begin with the first question about workability — this was among the areas we concentrated on in responding to the draft determination. In simple terms, as I mentioned in reply to Dominic's answer, a fair amount of the CapEx will get agreed as we progress through the price control period. So once big projects are defined, we then have to go through an agreement process with Ofgem — the pre-engineering, then Ofgem confirming it's the right project to take forward, and finally agreeing the allowances. And what matters a great deal to us is that those regulatory decisions line up and fit with the project development time scale, so we don't end up either spending ahead of receiving Ofgem's approval that it's the right project and/or having to wait for clarity on what the allowances are. So it's really about how workable the framework is and ensuring we have a good drumbeat with Ofgem that lets us deliver a significant level of CapEx at speed and at pace. So that has been — a lot of discussions have taken place since the draft determination at the working level to make sure we've got the right framework.
John Pettigrew
executiveNaturally, we'll be watching to see if we've secured the correct location for the FD come the start of December. Regarding AR7 and the offshore wind auction, I think I'll return to our May comments, just to remind everyone that, to a considerable degree, we're fairly insensitive to whatever transpires in those offshore wind auctions, since Ofgem has already decided that for the ASTI projects we carry a license obligation to deliver them, and that progressing those projects is in consumers' interest, sort of regardless of what the time scales happen to be. That's partly due, of course, to an expectation that it will not only facilitate the flow of increased energy across the network but also cut what is expected to be a significant rise in constrained costs of around GBP 12 billion. So we don't perceive a huge amount of sensitivity between our GBP 60 billion 5-year plan and AR7. And then finally, on question 3, I'll turn to Andy.
Andrew Agg
executiveThanks, Ahmed. Regarding the guidance, I believe we mentioned that compared with where we started the year, two headwinds have clearly emerged. The first comes from currency movement. As a result, for the rest of the year we are now guiding at 1.35, which, as you know, represents a modest headwind. The second is a somewhat higher scrip uptake, and that creates some EPS dilution for the full year. However, stronger operating performance across the group more than makes up for it. I would not single out any individual business unit. It comes from across our regulated businesses. All of this means that, looking toward the full year, we are in a net or modest upgrade position relative to our original guidance.
John Pettigrew
executiveThanks, Andy. Next I’ll take Harry from BNP, and after that James from Deutsche. So, Harry, please go ahead with your question.
Harry Wyburd
analystI'll join in the congratulations and best wishes, and hello to Zoe as well. So, two questions from me, please. The first concerns the U.S. You've just seen a whole series of Democrat election victories, and the New York mayoral race was dominated by affordability and the cost of living. I think you've said quite plainly before that in America you're insulated from this argument, since regulation happens at state level and so on. But suppose there were a federal push to restrain energy prices in the U.S. before the midterms — where do you believe the pain would land? And I keep clearly in mind that when that occurred in Europe in 2022, it hurt across a broad range of business models, though less so in networks. So I'd be keen just to grasp how you think, or where the axe might possibly fall, if energy prices truly became a major, major political issue in the U.S. The second one is about T3. So, looking at your consensus around the time the draft determinations were published, there's a notable uptick in expectations for FY '27, which, I think, all of us watching the fast money numbers and the Ofgem models have concluded might give your revenue a lift for next year.
Harry Wyburd
analystWhat's your level of comfort there? If we simply use the draft determination figures—obviously, December will bring more, and the picture could change—but based only on what the draft contains, do you believe we on the sell side are being sufficiently conservative collectively? And do you see a rational basis for EPS being higher next year thanks to the past money?
John Pettigrew
executiveThanks, Harry. I'll handle the first question myself, and then I'll have Andy take the second one. I'll probably also give a somewhat wider response on the specifics, which is this: first of all, we're keenly aware of the affordability discussion, and not only in the U.S. and the U.K. So we always factor that in very heavily whenever we consider price controls and rate cases in the U.K. and the U.S. As for the Mayor election, just to give that some context, for New York City, they're our biggest customer for the downstate gas business. We interact with them a tremendous amount, especially on the construction programs, since quite often, where the city is doing work, we have to relocate our pipelines, for instance. So they're a key stakeholder. And as with any key stakeholder, we'll engage with them to make sure we understand how we're working together, but also what their aspirations are around — and we understand that affordability is a big issue. But in the end, for National Grid, matters such as our CapEx plans and affordability sit at the state level. And as you saw last year, we were very successful in reaching agreement with the regulator at the state level on a 3-year plan for NIMO of $5.6 billion, which will carry us right through to 2028.
John Pettigrew
executiveWhen you think about how state and federal roles interact—take utility rates, for instance—clearly the federal side has no jurisdiction there at present. So my sense is that the affordability discussion would remain at the state level. We have to keep that firmly in mind. And the way National Grid handles it is this: whenever we plan a rate case—and we'll be doing exactly that with KEDLI and KEDNY over the next few months—we start by reaching out to every one of our key stakeholders to learn what they expect, what they're looking for from National Grid, and how that fits within the affordability envelope. Quite often, that ends up shaping the capital plan we submit as part of the rate case. We also devote considerable time to thinking about our vulnerable customers. You may recall that in our NIMO rate case, for instance, we earmarked $290 million to assist the most vulnerable customers. And naturally, we're constantly working to improve the efficiency of the business through innovation too, so we can find more efficient ways to deliver what customers need from us. So for all of those reasons, that's what we'll keep doing.
John Pettigrew
executiveWe'll work with stakeholders and give very careful thought to how that rate case fits within what's affordable. From the federal side, I think I'd look back at what we've observed across the past 12 months — and one of the main areas of focus in New York, for instance, has been the question of how you tackle wholesale prices — and you'd have noticed that the PSC has signaled its support for the NESE pipeline. According to the analysis we carried out on the NESE pipeline, it not only enhances resilience and reliability in New York, but it also raises the volume of supply by roughly 14% and could deliver about $6 billion in benefit for New Yorkers. So I think there's an interplay between the federal government, once you get into matters such as transmission pipelines, and the states that I expect will remain a focus as we go forward. Andy?
Andrew Agg
executiveHarry, thanks for asking. So obviously this morning, you'll have picked up that we have reaffirmed the guidance for our 5-year frame out through '29. And you'll recall that when we first put that guidance out there, it was deliberately built to be resilient across a variety of different outcomes too. So I think that's important to keep in mind. And clearly, at this point, as John has said to you a couple of times now, we're focused on collaborating with Ofgem to make sure we land on a suitable final determination. And obviously, that's the moment that will settle whether any further guidance is provided, and that's when we would do it. Another thing I'd just note, of course, at this stage, is that one of the subjects we discuss with Ofgem is how any revenue increases are profiled and the way they land across the 5 years of the price control. So that's another piece that will feed into what we'll be examining.
John Pettigrew
executiveI'll move next to James from Deutsche, and then after that maybe we can go to Deepa at Bernstein.
James Brand
analystIt's James Brand from Deutsche. And congratulations to John as well as to Zoe, and best of luck going forward. There are 2 questions I have. The first concerns demand. So you mentioned that you were sort of positioning yourselves so as to be ready to hook up as much as 19 gigawatts of extra demand. Clearly, that would be enormous, especially if the whole lot were heat demand. What is your realistic sort of expectation for the demand growth we could see across the next 5 years? I know there are, like, a great many data center connection requests, but how much do you reckon can realistically be expected to be added on the data center side? Perhaps that's a hard question to answer, but any thoughts on it would be really interesting. And the second question returns once more to the energy affordability debate in the U.K. So clearly, the noise surrounding that has risen fairly substantially. How do you see your own positioning when it comes to that debate? I suppose, potentially fairly well protected, given that you'll have the transmission price control locked in quite soon, and one could argue that the investments are cutting curtailment costs fairly substantially.
James Brand
analystBut over the longer term, does this pose somewhat of a risk for you? And if you were going to offer any recommendations or ways to split electricity bills in the U.K., given that we have pretty much the most expensive electricity bills in the developed world, what would you recommend?
John Pettigrew
executiveThanks, James. I'll begin with the question about demand. A bit of background first, since much of the demand — much of the enthusiasm — stems from the possible hookup of data centers. As things stand, roughly 2.6% of all the demand we see in the U.K. is accounted for by data centers. You might have noticed that NESO publishes its future energy scenarios, and it was forecasting that this share could rise to roughly 9% by 2035. What we've observed across the last 12 months is a fairly significant surge in requests to connect to the transmission network, driven by data centers and generative AI. So in our RIIO-T3 plans, we're assuming demand growth of approximately 19 gigawatts, and we'll build the network out to accommodate that. I believe that equates to roughly 4% demand growth per annum. And roughly half of that is assumed to come from data center demand. That assumption is supported by the connection agreements signed within the RIIO-T3 time frame. So I think we're comfortable that we have a reasonably good handle on how demand will behave over the next 5 years or so, and a reasonably good handle on what's expected when it comes to growth in data center demand and where it will connect.
John Pettigrew
executiveYou've probably seen that National Grid is collaborating with the government via the AI Council to pinpoint the optimal U.K. sites for those data centers — based on where fair access capacity exists today or where connection timelines would be shorter than elsewhere, which matters a lot when determining data center locations. Regarding energy affordability, I think when we take a step back from where we sit, yes, we do see the transmission component of the charge rising as we roll out all these ASTI projects and the RIIO-T3 CapEx. But in fact, measured against the expected constrained cost, net-net, it comes out as a reduction. So in a sense, our pressing ahead with the investment is highly beneficial for consumers, because it ultimately lowers their cost. That said, we're very mindful that affordability is a major issue, which is why in our business plan we explained why incentives around innovation matter for driving efficiency and indeed why we also propose an efficiency measure. So we're very mindful of it. We're very conscious that this is a difficult period for customers. But when it comes to the transmission element of the bill, I'd say we're highly focused on making sure we can deliver the infrastructure that relieves those constrained costs, which produce a net-net reduction.
John Pettigrew
executiveLet's go to Deepa, and after that we'll hear from Marcin at BofA. So, Deepa, would you like to go ahead with your question?
Deepa Venkateswaran
analystJohn, before anything else, many thanks for everything you've done over all these years, and best wishes for whatever comes next. Zoe, a warm welcome to you. I have 2 questions. The first concerns the RIIO-T3 draft. What's your view of the risk reward on the incentives? I'm not asking about the financial returns — those are very clear, and you want them above the current level. But as matters stand at this moment, how do you see the risk reward, and how near does that get to the roughly 200 bps you'd require to move closer to that 10% overall nominal return? And from what you've discussed with Ofgem so far, what's your impression — are they heading the right way and factoring your feedback in? That's my first question. Now the second one. I spotted that you're examining U.S. transmission opportunities. I believe this was something people discussed quite a while ago. Yet nothing ever came of it. So has anything shifted in the U.S. transmission landscape that's prompting you to revisit it? And once more, what size could this opportunity reach?
John Pettigrew
executiveThanks, Deepa. I suppose I'll frame the innovation discussion around the incentives framework, since I believe that's really important for helping me arrive at an overall return that we think is appropriate given the scale of investment ahead. So actually, the work we've been doing alongside Ofgem has centered on sort of 4 key incentives. One is being incentivized to make connection capacity that customers want available in a timely fashion. Secondly, it's about delivering the major projects as quickly as possible and being incentivized against that in the same way as we are for the ASTI projects. Thirdly is looking at how we can reduce the cost constraints in our role as the transmission operator working with the system operator. And we've done some of that in the existing price control, and we think there's opportunity for more of that as we move forward. And then thirdly -- sorry, fourthly, it's the incentives as well. So we've been having conversations with Ofgem about that to really find a framework that ideally allows us to look for opportunities to extend new technologies onto the network in a way that will reduce cost for customers. So if I give you an example, so dynamic ratings is a good example that we've started to deploy in our transmission business in the U.K.
John Pettigrew
executiveThis is fresh technology. It lets you transmit additional power along existing lines rather than constructing new ones, and in our view those kinds of incentives matter a great deal if we are to arrive at the complete package that succeeds. Still, we view those 4 incentives as one package, and innovation sits at the heart of it. On the U.S. opportunities, as you may remember, back when we sharpened the strategy in May last year, we noted that our attention would centre on transmission, covering both regulated and competitive, and that we did perceive chances for transmission in the U.S. That is why our National Grid Ventures team has been examining it. I mentioned in this morning's speech that one specific prospect coming up involves a transmission line that could run from Maine down into New England, which would help lower costs for New England customers, and the ISO is running a solicitation on it. So we are treating that as a project. Clearly it sits in a region we know very well and understand with real clarity. And clearly, we hold strong capabilities through National Grid Ventures. So we are indeed seeing solicitations for competitive transmission in the U.S.
John Pettigrew
executiveAnd within our National Grid Ventures unit, we're examining those closely. As we've previously stated, we'll only move them ahead if we reach a view that we're reasonably placed to secure them and achieve reasonable returns—but that one sits specifically on the near-term horizon right now. Just checking who remains. So Marcin, let's turn to you next, since I believe that's the final question I have.
Marcin Wojtal
analystWell done on the results, and best of luck going forward. I'd like to return to the subject you mentioned of possible new opportunities in U.S. transmission. Might that turn out to be significant when it comes to investments and CapEx, and presumably it would sit on top of the GBP 60 billion guidance you already have? So could you give us a sense of how relevant that opportunity might be? And my second question is just about hybrid bonds. As far as I can tell, we haven't really seen any hybrid issuance. Does that remain part of your financing toolkit?
John Pettigrew
executiveI believe Andy is able to handle those.
Andrew Agg
executiveThank you, Marcin. Turning to the transmission opportunities, as John mentioned, we are at an early stage in examining those. So we will need to wait and see whether and how they might expand going forward. But let me remind you that if you look back at the financing strategy we laid out in detail at the time of the equity raise 18 months ago, we were very clear that in cases where we identify incremental opportunities, especially within our Ventures business, that could take us past GBP 60 billion, we would need to find ways of funding those through the Ventures business too — through potential partnering, other forms of off-balance sheet finance, and other routes, et cetera. That is to say, it would not affect our delivery or our use of the equity proceeds to support the GBP 60 billion. And that is still absolutely the case today. On hybrids, you are correct. And again, when we made our financing strategy announcements 18 months ago, we were very clear that we would not expect to issue any hybrid for several years. That also remains the case. Hybrids continue to be a very useful potential tool for us. We have a great deal of unused hybrid capacity.
Andrew Agg
executiveRight now, there's nothing lined up for the near term, as you'd probably expect, but down the road it stays available as a tool we can use in the right way if we decide that's the appropriate move.
John Pettigrew
executiveThanks, Andy. So I have no more questions. Let me finish up by saying, I suppose, that a summary of our half year results shows good operational and financial performance across the last 6 months. I think we're very well positioned for the second half. And hopefully, what you've taken away from today's presentation is that we're very much on track to deliver the GBP 60 billion over the 5 years, 18 months in. This is my last results presentation. I'd like to say I'm just incredibly proud of the organization, what it's achieved over the last decade, but I'm also delighted to be handing over to Zoe who I think is going to be an incredible CEO. So thank you, everybody, for joining us today, and I'll see some of you very soon.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete National Grid plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to National Grid plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in National Grid plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.