Nuvoco Vistas Corporation Limited (NUVOCO) Earnings Call Transcript & Summary
October 23, 2026
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, good day, and welcome to the Q2 FY '27 Earnings Conference Call hosted by Nuvoco Vistas Corporation Limited. [Operator Instructions] I now hand the conference over to Mr. Bishnu Sharma, Head of Investor Relations from Nuvoco. Thank you, and over to you.
Bishnu Sharma
executiveThank you, so good afternoon, everyone, and a warm welcome to the Nuvoco Vistas earnings conference call for the quarter ended September 30, 2026. Before we begin just wanted to state what we have achieved over the past decade. So this year, we have completed 10 years in the cement business. what began in 2014 with a single manufacturing operation at Nimbol with a 2.3 million tonnes of cement capacity as evolved into a diversified building materials company spending cement, diaspora and modern building materials. October 2015 marked a defining inflection point with the completion of the acquisition of [ LaPorte ]. This was posed by the acquisition of [indiscernible] cement in 2020 during the COVID-19 period, which also opened a new phase of growth. The growth engine was further strengthened with the acquisition of [ Katra ] Cement Limited. Today, Nuvoco has diversified manufacturing presence across the East, North and West and is well posed to reach 35 million tonnes of cement capacity by FY '28, representing nearly 15x growth over the past decade. The journey reflects the commitment of our teams and continued trust on our customers, channel partners and shareholders. Looking ahead, the journey continues, and we have multiple options for growth, including [indiscernible] and in the North. At the same time, we continue to build up strange limestone resources, which will give us the raw material security to support sustained growth over the long term. Before we open the floor for questions, I'd like to take you through the key developments of the quarter and how the business performed. Let me begin with the operating environment, which was challenging committed contract, which towards the end of Q1 and the beginning of Q2 are to be certainly escalated once again. This later sharp jump in the input prices, including the [ brent ], coal, granule, gypsum, et cetera. [ Pecore ] [indiscernible] the previous peak we witnessed between March and April. The [indiscernible] was not limited to the global front, domestically intense and erratic rainfall, stripping the east broad thermal coal inventory type several power plants across the country to critical levels. As a result, who supply was prioritized for the power sector. A confidence of this was also reduced availability, which disrupted the supply chain and also led to the third in robustic price of e-auction cold trend of -- this is also being presented in our investor presentation. On the demand side, all into demand grew during the quarter, but regional trends varied. The monsoon disrupted construction activity portability in the East on regions with relatively lower end costs saw better demand. On the other hand, prices did not improve in line with expectations. In short, it was a challenging quarter. Despite these macro challenges, the company delivered a resilient performance. Volumes grew by 9% Y-o-Y. Revenue increased by approximately 14% and EBITDA revised 11% on a Y-o-Y basis. Outstanding levers of premisal [indiscernible] supported this [indiscernible]. [ Premisal ] have reached a historic high of 45%, where is a mix remained at 75%. On the project progress on [ Badami ], 2 million tonnes grinding unit at Lima demand plant in Surat was commissioned during the quarter. That can not only strengthen [ Lugo's ] manufacturing and distribution presence in Western India, but will enable this company to release much needed capacity at Rajasthan for the northern market. At Kutch, project activities are progressing as planned, with phased office license plan from Q3 FY '27. The construction of uncemented at [ Viranna ], which will be equipped with a dedicated rail siding is also on track. It will serve as a strategic distribution hub to deepen [ Lugo's ] presence and expand its reach across the Gujarat market. During the quarter, the company also executed agreement with [ Dmax ] for a 46.4 megawatt of wind solar-hybrid renewable energy project in Rajasthan. Once operational, the project is expected to generate approximately 100 million units of renewable list annually and deliver long-term cost certainty by reducing dependence on conventional power sources. Thereby, strengthen the company's energy needs and improving long-term cost as incessant. As we enter the upcoming quarters, we expect demand to remain healthy as small sum conditions has recited in most reasons. The company remains focused on delivering growth, and we'll continue to be watched through of the geopolitical developments. With that, I'd like to open the floor for questions. Operator, please go ahead.
Operator
operator[Operator Instructions] The first question from the line of Navin Sahadeo from ICICI Securities.
Navin Sahadeo
analystYes. Good afternoon, everyone. So I have two questions, but I have more on the cost front. So I'm referring to your Slide 11 wherein we are highlighting at core price is going up to almost $187. And more importantly, the premiums in Coal India across all the subsidiaries more than doubling or going much higher in some cases. So my first question is, what was our average fuel cost in Q2? I live in Q1, we were given a number of [ INR 1.52 per tonne ], so against that, what was the cost in Q2? And at the current spot rates that we are all worried about, which is $187 and the premiums on long what will that transpire to on spot rates? I understand inventory comes with the lag. But just to get an impact on our upper end of the spectrum.
Bishnu Sharma
executiveOkay. Thanks. I guess, first of all, again, I just want to probably inform the tenth analyst, you have no book. So literally [indiscernible] of the company from a single plant, we're now plants and to opening. And I think we are committed to growing this business and contributing to the growth of the country's infrastructure and housing requirements in the many decades going forward. And we are similarly poised to be a significant player in this category in the coming years. So the [indiscernible] question, you had asked what has been our fuel costs from Q1 to Q2? So when we did the Q1 earnings call, I had mentioned our fuel cost in Q1 came at INR 1.52 per tonne [indiscernible], translating to INR 1,005 per tonne energy cost for the company. And what's happened in Q2 is this INR 1.52 and [indiscernible] all the way up to INR 1.59. And we came with a chemist energy cost of 1,080 per tonne, technically close to about INR 80 increase in power and fuel cost for the company in Q1. As I also mentioned, as we mentioned in the investor presentation about the pet coke prices as we speak and also what could be the [indiscernible] prices going forward. Currently, [indiscernible] prices spot prices available at $190. And the current view is going forward, it may even cross $200 per tonne. If you have to translate the 180 and 187 and 200 excess of $20 per tonne. The [indiscernible] per million tonne will at 180, and the pure mix is no co usage is blended whatever fuel we use AFR, domestic coal, open market on pet coal. Our per million call cost in Q3 will come to INR 1.8 million as against INR 1.59 million in Q2. So there is an increase of INR 0.21 per million cans in the fuel, which will come in Q3 versus Q2. and that would translate to approximately 70 to 80 decrease in energy cost in Q3 versus Q2. As we speak, we also have to cover fuel for Q4. But one of the good things which our teams have done us, we have gone and bought we've been continuously buying erred coke in the last few months at MCP as well so that we have adequate pet coal coverage for the company in Q3 at this range of 1.8, otherwise, if we expect to buy at $187 or $180, this $180, we already crossed INR 250 better. And if pet coal prices are to go to $215, the cost will go to INR 3 per million. Can it be a phenomenal increase but we are in a pretty comfortable position. All this quarter, we have had petcoke, which petcoke of fuel, which will come the increase of about INR 78 per tonne. Whatever fuel, which you're booking for Q4, again, we have covered for the month of January until middle of February. High-cost petcoke will come and get us sometime in March. So the full impact of the $200 per tonne petcoke come and it only in March next year. So we are adequately covered for this 3 months and also a month and half in Q4. So to sum up, Q1, rupees per million cans was 1.52%. Q2, it came at 1.59%, [indiscernible] INR 90, Q3 it will come at 1.8%, [indiscernible] energy cost will be INR 70 to 80 more than Q2.
Navin Sahadeo
analystJust a clarification that this 1.8 that you are mentioning also factored in the surge in premiums for Coal India, coal and all of that, right?
Bishnu Sharma
executiveYes. Look, coal comes in premiumness rent [indiscernible] has also come up with options for domestic coal. So what the curve which has shown is the option rates which are currently trending, and auction came up for 5 lakh tonnes, about 2 weeks over not on the prices were negated. But however, we are doing many spot buying and inventory have inventory coverage and also some of the linkage crores which we have, which was a little bit of a challenge to procure in Q2 because of the reasons of powerplant needs for coal, things are slightly easing in the eastern front and a couple of the coal mines, which we have run linkage coal, we expect to get coal from middle of -- early part of November onwards. All this would be a very conservative local coal and managing the petcoke and domestic coal mix as well as duration use of AFR, 1.8 is a number which we will get in Q3 versus Q2.
Operator
operator[Operator Instructions] We'll take our next question from the line of Pinakin from HSBC.
Pinakin Parekh
analystJust continuing from the first question. So the energy cost will be around INR 70 to INR 80 per tonne higher Q-on-Q, but you should have benefits of higher volumes, operating deleverage, maybe some cost deflation in packaging. So overall, how do you see cost trend in Q3 versus Q2?
Bishnu Sharma
executiveOkay. I think I'll just give you a complete picture because I can't give peace because number of such questions will come. So I'll try and answer the entire cost questions that can come in one [indiscernible]. First of all, with the cost line in Q2 versus Q1, came up with the following negative number. One is adverse numbers, even. Power and fuel cost was expensive in Q2 or Q1 by close to about INR 19. Raw material, which is constitutes [indiscernible] system, think flat as well as in our case because of shutdowns in northern kills hapless is in [indiscernible]. We also had to do some open market purchase of clinker. That came as a negative of about INR 60. Packing back in Q2 versus Q1, it increased in granular prices early part came at about INR 10. So net-net, we have cost inflation versus close to INR 180, INR 190. In comparison to that, in Q2, I just talk about the cost line Power and fuel will come at a debt of INR 70 to INR 80 more than Q2. Raw materials, I think all our shutdowns have done and then rate availability has also improved in the last 2 weeks. And hence, the raw material costs in Q3 versus Q2 will be negligible of INR 10. So that should not be a major stuff unless , we have to get some imported mineral disruptor from Oman. So that would be only and others and then I think land players. It will be small markets maybe INR 10 is what I'm kind of looking at. The one thing which will come slightly, again, cascading effect in Q3 versus backing at volumes coming in and with LPP back consumption going up and also granule prices in the market have got upward revised prices in the last 1 month. here, I'm looking at a INR 20 increase in per tonne of cement through packing back stuff. And in Q2, we had a busbar that will come back in Q3, that should be negative INR 10. Net-net, I'm looking at a cost inflation of Q3 versus Q2, about INR 100 crores to INR 120. And how do we plan to kind of offset all of it because most important thing is -- while I will say what are the costs up. But as you mentioned, the fixed cost leverage, which was the case in Q2 will become almost 0 or a positive in Q3 because our volumes will increase when compared to some benefit of fixed cost. But the most important thing is the agenda price increase, which we are impacted on. Our price increase, our realization increase will be based on reverse which was the case in Q2. It was a in Q1, and it's going to be the case in Q3 as well. The first thing I want to inform the call is we have taken a price increase somewhat after 15th of September, where non-rate prices went up about INR 10, INR 20, INR 25 more in north, trade at correction of INR 5 to INR 7 in the North market in the second half of September. But in October, we already have INR 20 price increase in non-radiated and also another INR 20 price increase in trade prices in the average INR 20 price increase should totally decrease the cost increase and we'll have a benefit in realization in Q3 versus.
Operator
operatorNext question is from the line of Siddharth Mehrotra from Kotak Securities.
Siddharth Mehrotra
analystDuring the fact that our rep planted now operationally, could you just tell us what is the capacity utilization level of this plant right now? And what sort of run rate do you agitate maybe 1 or 2 quarters down the line?
Bishnu Sharma
executiveIt's a little bit of remate for me to say capacity utilization of Surat because the baby has started working, right? We are very proud that we commissioned the plant in Q2 and September the volumes are getting into the market. As we speak, [ SA ] was milestone day for us where we turned out the 3,500 tonnes of cement on single day is the highest civil production and the capacity of close about 5,500 tonnes per day. We've done 3,600 sites, obviously, all of it will go market. But as I mentioned in my previous call, our target is in Q4 of this year, we will get into a 2 million tonne annualized volume in Gujarat. We have currently about 1.5 million are annualized. So excess volume will be available in the market in Q4. And since such grinding will not be available in Q4, all the incremental 0.5 million annualized volume will come from sure branding unit only in [ Vistas ], so I'm looking at close to about 50%, 60% capacity utilization in Q4 of this year and next year, we reached 70% [indiscernible].
Siddharth Mehrotra
analystJust a clarification question. 5 MTPA run rate in 4Q from the Surat plant. Did I hear that correctly?
Bishnu Sharma
executiveYes.
Siddharth Mehrotra
analystOkay. But our capacity is to MTPA implies almost 100% decreased -- but I have to upsell it to the market. So it's still kind of those phenomena people all have to introduce my product in Western Maharashtra, which will happen. And that's -- I was anyway I would have mentioned about this going forward as well.
Bishnu Sharma
executiveLinker will come from plug only by end of Q3. So since that time, I have to get linker from rest of [indiscernible] the place it becomes a excellent proposition. So we really have to -- we are not kind of going aggressive in the market. But once such units start manufacturing, that's when lines will be the key availability of will be there, and we will go benefit. 0.5%, it is incremental 0.5% already 1.5% selling in us. And even that 1.5%, which is time selling in Gujarat, will also come from card and the rest of all the capacity which gets released from my Rajasthan plant will be yet to fuel-wise growth in North India. So the season will peak in Q3 and Q4 in North India. And in a not that sooner sold of condition then. Hence, my entire state would have got impacted based on capacity and availability. So either capacities of close to about 1 million tonnes of cement and not from Q4 onwards. So that volume will be used to sell in a look at it both ways, how much incremental sale get in not and how much incremental sale I get out of so in Gujarat. Overall, we are looking at as a company from the current run rate of million animated toner and anal volume, we were 2 million tonnes in Q4 this year.
Siddharth Mehrotra
analystUnderstood, sir. Secondly, sir, on the lease debottlenecking projects. It seems that it's not a primary focus for us at least this year. So could you maybe tell us what sort of time lines you're looking at in terms of different projects?
Bishnu Sharma
executiveYes. One of the things which should have covered later in the Q&A. In the previous call on the call before I mentioned that we would -- our CapEx spend for this year will be close to about INR 900-odd crores. And then the year next week we about INR 500-odd crores constrain bulk of the money is going to go into cutting. But what we have realized is our teams, project teams in Gujarat are doing a fantastic job in bringing up the debt. So I'm kind of front-ending some of the expenditure for [ Tatura and Veranda bulking terminal ]. This year itself. And in H1 of this year as against the [indiscernible] plan of about INR 450 crores, INR 460 crores of CapEx spend, we have spent about INR 780 crores. And the balance 5 months put together, we are looking at a INR 1,200 crore CapEx in the company out of INR 1,000 crores we [ Badra ], INR 50 crores for [ Vidacare ] balance for the running operation. So it will be front-ending the CapEx and the balance CapEx for [ Badra ] will happen next year to complete the project. In the [ Bain ], we took a conscious call to slightly delay the east expansion from Q1, Q2 FY '28. So it is timing and the sequencing issue. However, very much it is there. right now in FY '26 H1, I don't need any additional capacity each to feed the market. Hence, we have taken a conscious call to prioritize [ Badarpur ] and slightly more in east by 6 to 8 months just to manage the cash flow and the bandwidth for the company to focus on [indiscernible]. Because that is going to be a big figure agenda for the company. [indiscernible] invested quite a bit of money to as we as the company and rebuild the factories.
Operator
operatorNext question is from the line of Shravan Shah from Dolat Capital.
Shravan Shah
analystSo sir, this year, as you said, the [indiscernible] CapEx will be there for next year FY '28, will it be a kind of a INR 650 crores, INR 700 crores kind of CapEx.
Bishnu Sharma
executiveSo let me just give the detail. FY '27, H1, we ended up spending INR 780 crores. And balance months, we will do about INR 420 crores. And FY '27 full year, we will spend INR 100 crores. And next year, we are looking at INR 800 to INR 900 crores as a CapEx outlay, including -- which includes about INR 800 crores for cut [ Surana ] as debottlenecking as well as the CapEx for the existing plant. So I'm looking at INR 200 crores this year, anywhere between 800 to 900 net year. Net-net 2 years put together, we're looking at range of 2,000, 2,100.
Shravan Shah
analystOkay. Okay. Got it. Second, sir, you had clearly articulated in terms of the INR 100 to INR 120 kind of [indiscernible] increase in cost in third quarter and in terms of the pricing, INR 20-odd kind of a price increase likely to be there in the third quarter. So net-net kind of we are looking at INR 738 kind of a if the prices remains the same and the cost remains the same kind of a Q-o-Q improvement in the profitability.
Bishnu Sharma
executiveYes, I will answer it in a restate what I said. One is the cost numbers, which I indicated, by in large, we are fairly close to the actual numbers that happen because we have adequate fuel stocks and rest of the contracts for all line up is the kind of cost inflation I'm looking at Q3, we were well into October 20, and then there is a kind of outlook for the last 2 months, price increases, which we have taken in the -- in October 1 as well as the year September price increase in some markets and early October -- mid-October price increases in each market. This kind of numbers, I'm assuming will stick because post Diwali demand will open up, and there will be sufficient pull in the market, and I'm hoping the prices, price corrections, which we have done will stay put in the balance to anemic. So if the price correction stay hot and the cost more or less certain, it's INR 100 crore to INR 120 crores, there will be an improvement in the overall profitability.
Shravan Shah
analystGreat. Lastly, sir, on the net debt front, though it has increased to INR 5,000 INR 1,600-odd crores, so how we now find and there are slightly -- in terms of the CapEx has also increased for this year. So how do we see this update for this year and maybe next year, what's the broader on that?
Bishnu Sharma
executiveSo I will very clearly say that as a management, have been in this call few years now. Our stated position has been comfortable anywhere between INR 3,500 crores to INR 4,000 crores. And our commitment is to find a way to get the net debt about 2x EBITDA. And you would remember recall when we did the [indiscernible] company's net tended already best 3,500, and that's when we made the next biggest big investment, and that is how the overall tech for the company in March went to about INR 4,500-odd crores. As we speak, in this September end, we have crossed largely this INR 500-odd crores has happened due to two reasons. One is I mentioned in my call about the backlog stocking and the overall cost of petcoke has also increased and hence it is value impact as a volume impact, which is resulted in a working capital increase of close to INR 200 crores for the company. In addition to that, CapEx spend, as I mentioned, as against INR 900 crores, I will as against INR 450 crores in H1 ended about INR 780 crores. These two combinations have taken debt of INR 5,000. When we come to H2, my working capital believe to happen. Number two, my cash flows will increase because of higher volumes and was an H2 always collection and because various other schemes run in the market, my overall cash generation will improve in H2. With the increase in business activity, tax generation and CapEx, which I assume INR 480 will be slightly INR 500 less in the next 4 months and also the working capital our net debt should be cutting in the same range as what it was March last year by end of this year. And inning [ Garanti ] the short to medium term, which is 4 to 6 quarters, our net debt is always over between 2 to 2.5x. And once [ Badra ] volumes get absorbed in the market and we scale up adjustment, our net debt numbers will go back to our committed number of less than 2 tax EBITDA.
Operator
operatorNext question is from the line of Tejas Pradhan from Citigroup.
Tejas Pradhan
analystOn the cost base just a clarification, you mentioned that from third quarter...
Bishnu Sharma
executiveYou want to speak on the handset, if you can see...
Tejas Pradhan
analystIs this better?
Bishnu Sharma
executiveYes it is better.
Tejas Pradhan
analystYes. So on the cost bit, you mentioned that third quarter, it would be on a per KL basis 1.8. And so the same number for the fourth quarter because your current purchases, you said will hit in March, right? So considering that, what would be that per key can cost number for fourth quarter?
Bishnu Sharma
executiveThat will be it a very long-term guidance, and I would refrain from making such long-term guidance because we will -- as I mentioned, in the lea few minutes ago, I said January and mid-February, we're already covered with [ Invita ] the high-cost coal will come only in mid-February until March. If we have to step by net country that I'm looking at also increase of about INR 78 in Q4 versus Q3 in our scale scenario.
Tejas Pradhan
analystUnderstood. Understood. And so in the second quarter, was there any additional cost that we should consider for the [ Surat ] grinding unit because volume must not have been significant, right?
Bishnu Sharma
executiveSo Q2 commissioning happen in the last week of September. Hence, I don't think we should consider any additional costs. But certainly, in Q3, there will be some costs of solace will come, which will be interest charge depreciation will also come. So really, we are looking at close for INR 30 crores, INR 40 crores, which will come, but the volumes also come stable and it. Some of it is going to be below the EBITDA line or [indiscernible] EBITDA line. So net-net, it is not going to dramatically change the overall consumer the panes.
Operator
operatorWe'll take our next question from the line of [ Swatika ] from Nomura.
Unknown Analyst
analystSir, my first question is that in the first half...
Bishnu Sharma
executiveWould you mind speaking slightly louder.
Unknown Analyst
analystYes, yes, sure. Is it audible now?
Bishnu Sharma
executiveYes. Please go ahead.
Unknown Analyst
analystYes. So we have seen that the volume growth in the first half has been strong for the industry. Now that given the varied monsoon trends, how do you see the rural demand shaping up in the upcoming quarters. That's my first question. And also for the FY '28.
Bishnu Sharma
executiveI'm sorry the question you are asking, what will happen to demand in H2 this year you're asking again?
Unknown Analyst
analystHow do you see the demand trends for rural retail? .
Bishnu Sharma
executiveI still believe that 1 year of excess monsoon or 1 year of drought doesn't spoil the over industry outlook. So if I have to kind of agree you at the last 10, 15 years of how the industry has performed the because I've done a little bit of work to see. What happens to demand variation based on drought condition or extended multiple commission. My influence is, if we are back to back here where things go wrong, either in monsoon or in drought, there the demand gets impacted through kind of number. That's what the historical data say. But I'm assuming that doesn't happen next year. And also certainly, even though costs have gone up we look at the growth in India is still coming at 7.8% and fair about of growth is happening in infrastructure and on some monsoon ends and the cases the construction activity will pick up speed going forward. And also coincidentally matches with the cement cycle from December to June. And I'm pretty optimistic that demand for the industry would be in the range of 7% to 8% maybe it could be 1% erode a little bit more. But technology has multiple countries and multiple regions have got different growth rates. But if we put a branded growth for India, I'm really looking at about 8% industry growth in H2.
Unknown Analyst
analystUnderstood, sir. Sir, my second question is on [ Madrag ] assets. So maybe too early to ask, but if you could guide us what would be the EBITDA per ton on these assets and how much time would it being pulling these assets to Nuvoco's standard cost?
Bishnu Sharma
executiveOkay. So I will answer this question in two ways. One will be a little bit of a tale when we made the acquisition and we looked at the market and the opportunity which we have and the value we are paying for us and the cost of refurbishing asset. And looking at the very real estate growth slow can get in a Western Maharashtra. We are looking at a EBITDA Gujarat matching the North EBITDA in year 3, and that should be calling with low cost blended EBITDA at a country level. In year operations, assuming FY '26 is the first year, we're looking at FY '28 is Jan the full assets will be straightened and the market can be fully develop and EBITDA for 10 of [ Barra ] will match that beta per tonne of now on year 3. But that subject to two things. One is how is that model and we developed based on the prevailing cost structure and prevailing prices in the market. That has undergone a little bit of a change, but I'm assuming all this cost inflation, which has happened due to a vendor items, will be offset by price increases in the coming quarters. So in a same state of next 2 to 3 years, cost inflation will be absorbed by the price increase. What will logo brings to the table, I explained in the last call, we are uniquely positioned in Gujarat with the bulk terminal very close to Ahmedabad [indiscernible] unit and the solar branding unit and the movement from cash to soar moment from gas to solar, I think our costs will be under control, and certainly in year 3, which will be FY '29 maybe FY '28, Q4 and then on to 1Q FY '29. Gujarat and Western Maharashtra EBITDA per ton should match no [indiscernible].
Operator
operatorNext question is from the line of Parth Bhavsar from Investec. Parth your line is unmuted, please go ahead with your question. Since there is no response. We'll move on to the next question from [ Joti ] from [ Ashika ].
Unknown Analyst
analystThank you so much. Good evening, and a great set of numbers. I only have one question is what is the reason behind the interest expenses, apparently this quarter has actually come down. Do we see the same trend? Or is it very specific to this quarter? And what has resulted in the reduction of the interest cost why the interest rate...
Bishnu Sharma
executive[indiscernible] is your last kind of broke up? Can you just repeat the question one time, please?
Unknown Analyst
analystI was asking...
Bishnu Sharma
executive[indiscernible] but the part of your question it. So it is what is the reason for the -- would you repeat the question please?
Unknown Analyst
analystWhat is the reason for the reduction in the interest expense? And do we expect this to continue in the sequent quarter despite increasing interest rates. .
Bishnu Sharma
executiveSo Joti, as you asked the question. So basically, what can mentioned something that the commercial operations or started some time in the last week of September. So ordinating call as per the [indiscernible] accounting standard has been capitalized. As these operations pick up, there will be definitely impact of the interest cost that will be there clearly visible the pain as going forward quarter-on-quarter. And despite that, there will be a district charge that also will be coming up.
Unknown Analyst
analystOkay. So this means this is very specific to the store, we will see impact of interest expense and depreciation going forward, right?
Bishnu Sharma
executiveYes, around [indiscernible] one the [indiscernible].
Operator
operatorNext question is from the line of Shravan Shah from Dolat Capital.
Shravan Shah
analystA couple of data points for this quarter. Lead distance, on will say and cement.
Bishnu Sharma
executiveOkay. Our road and rail shares rock solid at 64, 36. Q1 and Q2 numbers are almost same. So 64 road and 36 rate. A little bit of weakness or a distance has gone up about 4 kilometers or 328 [indiscernible] 332. And in terms of blended fuel cost in Q2 is at 1.5, which are maintained, all of which coal comes at 1.4 cement, petcoke came at close to 2% and AFR at 0.95%. And fuel mix coal at 66%, petcoke at 27%. In fact, last fall, I mentioned that one of the big initiatives of the company were [indiscernible] in petcoke. So we hung on to the same petcoke numbers in Q2 is Q1, we still operate at 27% petcoke. [indiscernible] at 6%. This will increase in Q3 because resin will be up and running after shutdown and us will go up. So in specific [indiscernible] for '27, [indiscernible].
Shravan Shah
analystAnd the blended cement at would be 82-odd percent?
Bishnu Sharma
executiveOkay. Blended -- so blending -- regular cement ratios at 83% as a 82% last time. ratio came at 1.75% in Q2 to 1.73% in Q1. 3 years has [indiscernible] mentioned, we came at a 45% premium, which is the highest ever in the history of the company. I think that's an agenda which we have been pursuing and then we'll continue to pursue the agenda going forward as well. Very happy to report our [ Gerard ] microfiber and content owner, both brands have become 1 million tonne brand. In fact, in the entire industry, if there's a premium product in the shortest possible time of less than 18 months, 18 from 0 to 1 million, it's control. I think that's something which we are very proud of.
Shravan Shah
analystLastly, for Gujarat 41.6% for net, so one on a reported basis. So for full year, will it -- how one can look at and when it will be kind of from FY '28.
Bishnu Sharma
executiveCan you repeat the question.
Shravan Shah
analystOur tax rate for 1 [indiscernible] was 41.6% on a reported basis, the tax divided by PBT. So for full year...
Bishnu Sharma
executiveSo we are evaluating the transition of tax from the overage to retinitis still being evaluated, and we'll take a finance call before the end of this [indiscernible]. You were seeing the fact impact you had in the 21% because in the new act, the MAT that has been paid in not allowed to be set up, and that's reason why at had for 25% in the normal [indiscernible]. By the time we reach end of this year, we'll have a good fix on we will [indiscernible]. It's a timing when will be more the question, I think in the next 3 to 4 months with an addition which regime will go in and the implication of tax we'll share with you at the time.
Operator
operatorNext question is from the line of Siddharth Mehrotra from Kotak Securities.
Siddharth Mehrotra
analystSir [indiscernible].
Operator
operatorSir your audio is not very clear. Can you use the handset mode, please? .
Siddharth Mehrotra
analystIs it better now?
Operator
operatorYes.
Siddharth Mehrotra
analystSir, I just wanted to say a couple of our players are highlighted that there were very strong gains in the east reason could you just give us a sense of what was the growth -- regional growth in east season versus in the north at?
Bishnu Sharma
executiveI think in terms of guidance of regional growth, we be, I wouldn't be able to share in the form what is the regional growth I think the different dynamics were. Suffice to say, east and [indiscernible] and tetanus heavy in certain states. So there was a little bit of a sluggishness in demand in East in Q2, but that will go way up function after the casual season. But net-net, if you see, I think some months, we have gone ahead and need some month we've gone ahead in North. North has been pretty robust in Q2 in terms of volume growth. then we could get the benefit of growth in on. Overall, I guess, going forward, we still look at anywhere between 8%, 9% lender between Northwest and East for us.
Siddharth Mehrotra
analystUnderstood, sir. And just to, sir, conform the pricing you were seeing has gone up by around 20 in October versus average prices last quarter. Is that correct?
Bishnu Sharma
executiveYes.
Operator
operatorNext question is from the line of Parth Bhavsar from Investec.
Parth Bhavsar
analystI just had one question related to [ SURA ] operations. So since we don't have clinker supply currently, so where are we procuring a clinker from? And what would be the landed cost? And how would it change once we get supplied from December onwards?
Bishnu Sharma
executiveYes. I get it as part of the plan is neoprene we sequenced soon to start first and touch the quantum of work was much more than it was the first of the block than 12 months we could commission the plant and commercialize it, that's a solar I mean since it was a call that we will move linker from our sector cluster into [indiscernible]. But a little bit of a issue we had because of the overall rate on availability we ended up moving clinker -- less clinker from subtier into sooner, and then we had to do a little bit of a clinker purchase, which I mentioned and move clinker from not unit to Surat. So a little bit of a mix and match has happened. At least in August, September and first week of October, so I can give -- I can -- obviously, we know what has been the landed cost of clinker in Surat. But I guess that's a conscious call to bring extensive clinker into Surat. But by end of this year, such will happen. And once cut happens, I guess, the income will come either through JD route. By the way, we use to inform that we already run trial runs of my items from Kutch into [ Hazira ] and we have successfully learned how to manage the jetty operations. And as we speak, we are doing the dredging of [ Jenrin Kashan ] by first week of December, we'll have operational jetting. So we should have -- once the clinker line starts in December, in Q4 of this year, we should be moving paper through the road based from Kutch into such is the cheapest form of like movement from Kutch to Surat. Once that starts, if we may Kutch the enter in Surat, then we don't have to bring high cost came from as [indiscernible] Surat. The providing rates, all of us know the ex factory rates of clinker, which is being sold by any cement companies is pretty high in a about INR 3,600 crores, INR 3,000 per tonne on at right cost, obviously, is much higher and not an economical model. Since we have to -- we started a plant and we have to run at this part of the start-up strategy that first few months we will run with people from [indiscernible]. So sir, there would be some dent because of this in Q3 as well and then some improvement in Q4. So what would be the debt delta from Q3 to Q4?
Unknown Executive
executiveCan you reach out to [ Bishnu ] and then he will give [indiscernible] to you?
Parth Bhavsar
analystYes, I'll do that.
Unknown Executive
executiveSo to give you all the men because right now, I have multiple sources as later coming from sector get linked from Chetan plant also. I also bought linker in Q2. So all these assumptions, we change currently, we are looking at some battering of clinker for Q3. So all these variables are at right now. So for me to give one number will not be right in this call, reach out to Bishnu and he'll give you a basis on the project of this calculation.
Operator
operatorThank you. As there are no further questions from the participants. I now hand the conference over to Mr. Bishnu Sharma for closing comments. Over to you.
Bishnu Sharma
executiveThank you all for your participation. Before we conclude, I'd like to leave with few closing remarks. Quarter-over-quarter, we have been delivering consistent results despite a challenges, and this quarter was no exception. Our continued focus has been on the three levers of premise, geo optimize and office and [indiscernible]. As we move forward, we remain committed to mining our on and creating sustainable value for our [indiscernible]. Growth into remains firm at with the cut projects progressing a span and the [indiscernible] are expected to further enhance our logistics capability. We are confident in the resilience of the business and strategic initiatives are underway to navigate the poring operating environment. Invitations team will remain available to address any further clarity on [indiscernible]. Thank you once again for your time and interest in the company. We look forward to engaging with you in our upcoming interests. Thank you all.
Operator
operatorThank you, members of the management team. On behalf of Nuvoco Vistas Corporation Limited, that concludes this conference. Thank you all for joining us, and you may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Nuvoco Vistas Corporation Limited transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Nuvoco Vistas Corporation Limited earnings transcripts and 261,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nuvoco Vistas Corporation Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.