Hi, everyone, and welcome to OKEA's Fourth Quarter Result Presentation here in Oslo. Welcome to those of you here in Oslo, and also to everyone watching and following the webcast online. I'm Ståle Myhre, VP, Investor Relations at OKEA. Please, come in. Joining me today to present our results are our CEO, Erik Haugane; our SVP, Accounting and Controlling, Kjersti Hovdal; and SVP Operations, Tor Bjerkestrand. After the presentation, we'll have a Q&A session. For those of you following online, you can also post questions on the webcast. Okay, Erik?

Erik Haugane

executive
#2

Yes. Thanks, and welcome. Last year was not just extremely important — it was a year of major change for OKEA. That was the year we went from a group of 40 people to 200, and from being a company with plenty of ambition to do development and production to actually becoming one of the very few field-operating companies in Norway. And the most important thing: we set out 1 year ago that we needed to show prudent, good, efficient, cost-efficient and technically efficient operations on Draugen. That's also why Tor Bjerkestrand will handle most of this presentation, to show you what we've actually done there and how, through that — through the last year — we've basically been qualifying ourselves to be in the premier league of oil companies in Norway. But we — first, which is very important, is the first zero: work every day, every hour to make sure management and the workers are very aware of the risk that exists within this industry, and that we actually work in a way where we, on behalf of the Norwegian government and the Norwegian people, produce oil in a very secure manner.

Erik Haugane

executive
#3

We're genuinely happy with that outcome, though it won't happen on its own, and we need to keep pushing improvements in that area. Over the course of the year, we averaged just about 19,000 barrels per day. And our cash flow is solid, above NOK 2 billion. That sort of shows how big the company is. The highlights were operational more than financial — Kjersti will walk you through the numbers — but the key points are that we also refinanced OKEA01, our first bond, USD 120 million. What also matters about that bond is its great flexibility regarding how we refinance the company going forward. During the fourth quarter — a quarter of the USD 2 billion USD 500 million we made in Q4 — our profit from operating activities came to NOK 55 million, and cash flow from operations in the quarter was NOK 238 million. On new opportunities gained through our 2019 work: the annual licensing round for 2019, awarded in January, brought us 5 new licenses, every one of them in areas we've designated as key — hubs, so to speak, for OKEA.

Erik Haugane

executive
#4

So we're not out there exploring or doing a lot of cutting. So we're not gathering a bunch of licenses to sit on the shelf, but rather in mature areas, where we know discoveries exist. In at least one of these, there's a discovery that we hope we can also develop pretty quickly. So that's the overall picture of what we've done in 2019. I'll come back at the end of the presentation with the outlook. So what we plan to do going forward -- but most of our key objectives for the first year is that we actually in such a short time -- if you compare it to other companies, you'll see both 2 and 3 years before they actually are up at full speed as operators, we managed that through 2019. So with that, I hand the word to Tor, who is the head of operations at OKEA. Please, Tor?

Tor Bjerkestrand

executive
#5

Thanks, Erik. Hello everyone, including all of you watching the live stream. I'll walk you through the operational results for the fourth quarter, and I'll also share a bit of the OKEA story — from the acquisition of Gjøa and Draugen from Shell through to what we are today. I'm in charge of the operated assets. That means Draugen — since we're an operating company, we operate Draugen. Then there are licenses where we're not the operator. That's the nonoperated side, which for us is Gjøa and Ivar Aasen. So in quarter 4, production came in somewhat lower, mainly owing to a well at Draugen where a safety valve downhole isn't working the way it should, so we had to shut it in. That's a regulatory matter. And it's — yes, so it was shut in during the fourth quarter. Second, gas from Gjøa and a number of other fields travels via the SEGAL system to the U.K., and on the U.K. side they had issues with receiving that gas, which then impacts production. And second, at Gjøa we had a technical problem with a compressor. So that was another reason behind it.

Tor Bjerkestrand

executive
#6

There aren't really potential well issues — these are technical problems. As for Draugen, where we serve as operator, the fourth quarter came in slightly below expectations due to that well. However, on operational efficiency, we're reporting 95% availability, or uptime, at Draugen for the fourth quarter, and that offsets part of the loss from that well — and that figure is very high for Draugen. During the same period, we also wrapped up Skumnisse and Infill Ø, the 2 wells we drilled, and they were plugged and abandoned, with plenty of results emerging from those logs following the drilling. We're examining how to bring the well back, and we plan an intervention in Q2. I'll bring up Hasselmus here — a small gas field found quite a number of years ago, near Draugen, within the license, and it's essentially a gas tank. The volumes are well-defined. Development is relatively straightforward, but at OKEA we've made it commercially attractive. And now we're moving past — we passed DG2 at OKEA and the Board, I believe, gave approval to that development yesterday.

Tor Bjerkestrand

executive
#7

So that will now go for license approval, and after that we'll launch that project as the first tieback within OKEA. It's a fantastic project. . We're also examining other prospects near Draugen. I'll return to that a little later, since it's interesting just how much oil remains in that area. The 2019 story is quite interesting, because when OKEA acquired Draugen, the license — the entire Draugen concept — was about harvesting. The idea was to extract the resources already in place and then keep things running. Turning that into development mode is a significant change. What that means is you begin to invest, to search for assets and then develop them for additional volumes, and additional volumes produce a longer lifetime. So the first thing we did was establish, together with Petoro and Neptune in the license, the agreement of 2035 and how to reach it. Then we had to build the organization so it could move faster, since we lacked budget plans for development. So within a couple of months, we had agreed drilling targets. We secured a rig, and we carried out the drilling.

Tor Bjerkestrand

executive
#8

So that took 8, 9 months to complete. And when you compare it with other drilling campaigns, I'd say that's a pretty strong outcome — and there were no serious incidents or spills on that side of things. If you move on to the — I should also note that the ambition for the license, for OKEA, and for Draugen is to keep Draugen producing until 2040. And we're getting close to demonstrating that such a concept is feasible. Looking at the operations themselves, beyond the drilling performance, we've had 88% availability throughout the year, and that figure — I think I can now call it production efficiency, since it's the same thing. It answers how many days out of the year the facility is up and running. That's a fairly high number. And if you review Draugen's history, only 1 year in the last 10 has been better than that. So in moving from the previous operator to OKEA, we've both sustained and enhanced operational efficiency, and that has been instrumental in safeguarding the production, and then the value, and then the earnings. Being an operator involves a fairly complex organizational structure. It isn't something you can build in just a day, a week, or a month — it takes years and years of experience, which now resides within OKEA's organization, which today operates Draugen and is able to take on more.

Tor Bjerkestrand

executive
#9

Another key aspect for an operating company is project execution, and as 2019 began, we had 2 major projects underway. A substantial portion of the oil piping aboard Draugen needed replacing, and that was completed on the record schedule. From shut-in to resuming production, with 190 meters of piping swapped out, I believe it took 10 days, with no incidents and on budget. Other projects have also been carried out over the year, and we delivered those per plan with no incidents. Turning to emissions at Draugen, there are releases to air and releases to water, and we have multiple projects in progress addressing both. One example is the flare. A flare is always present, there purely for protection during a shutdown — you must dispose of the gas, and it goes to the flare — and we have a project in progress to close the flare, which represents roughly 1 megawatt of energy reduction. We also have projects in progress aimed at boosting compressor efficiency, and since these are large machines, any gains you make deliver substantial reductions.

Tor Bjerkestrand

executive
#10

Naturally, the major shift for every offshore facility is power from shore, and I'd say we're now ahead of the competition when it comes to evaluating the capability for power from shore, for holding a bunk in area, and for Draugen specifically. So we're doing a pre-DG1 review of that. Quite interesting, and given that we now can tap water power — hydropower and wind power in trentalogue — using that energy is a genuine option. The fourth item I'll cover is digitalization and the projects we have underway. And I'll highlight in particular one — or I could start with the drilling campaign, where for the first time ever we live streamed the information the driller has offshore on our website. And geologists worldwide were watching this stream, because then you could actually see, second by second, what was happening 1,600 meters down at the drill end. Being able to do that was quite a change, but ultimately we made it happen, and I believe data sharing matters a great deal in our industry, and doing so on that drilling campaign changed how we do it.

Tor Bjerkestrand

executive
#11

I want to touch briefly on what we're doing jointly with ABB. Offshore at an installation, there's a control system — one where hundreds, thousands of instruments are logging data at any given time. That data has been somewhat of a protected source, used for particular programs and particular activities. What we've now done — and I really should stream the live screen for you, but I can't, since it's a presentation — this is a snapshot, and we're able to build pictures like this one, displaying all of that data on your mobile. And for anyone who understands how that data gets collected and transported, they know this is a major change. It's such a major change that if you visit Hewlett Packard in Houston, you'll see this screen in their showroom, and unlike others, we will share this data as well. So through sharing it, you're connecting to the real-time data gathered by the instrumentation offshore. Okay. That was the 2019 story — a fantastic year for the organization and for all of us. I'd just like to show you how the license works. Draugen license has 3 partners: Petoro, Neptune and OKEA.

Tor Bjerkestrand

executive
#12

That license is essentially the board of Draugen reserves along with the values, and you have to have a pretty clear strategy for developing it. It's not — it isn't something you approach week by week, month by month, or even across a single year; you must look ahead, and we are looking ahead toward our vision 2040 Plus. So this is not merely an OKEA vision and a dream. It's Petoro, Neptune, and OKEA together in the Draugen license declaring that our vision is 2040 Plus. And how do we achieve that? These are the value drivers underlying how you take such a license forward. And we update this annually. In fact, that update is happening right now as we speak. We're spending 2 days at present with the license partners, working this out for the next — for the second time. Here, you can see the shift from a harvest mode into development mode. I'll highlight a couple of elements here. Ultimate recovery, 70%. Versus the existing plan, we're talking about 30, 40 million barrels. There's still plenty of value in the Draugen reservoir. The challenge lies in how to extract it. By purchasing new technology, by purchasing new approaches to viewing the reservoir, we expect — we have an ambition — to reach 70% recovery.

Tor Bjerkestrand

executive
#13

We're actually discussing a 75% recovery rate, which would mean an additional 40 million barrels. Those are ambitions. Those are the kinds of plans we want to pursue and actually achieve. Our focus is near-field exploration — we carried out drilling at Skumnisse, and right now we're evaluating other nearby prospects. And naturally, given the field life extending to 2035 and 2040, Draugen can now serve as a hub, meaning discoveries close by could be routed there if they require that kind of infrastructure. Yes. I'd also say that uptime, plus the capacity to keep the facility operating each and every day, consistently year after year, is our single most important job, since it's simple to fixate on the volumes ahead of you that still need to be found and the new oil. But looking after and protecting the production we already have comes down to availability, and through that, we're able to deliver the volumes. Let me just note that we've received the January figures for Draugen — 97% availability, on budget, zero incidents during January — and we'll keep at it. That's what we're aiming for. So I'm eager to board the flight back to Kjersti this afternoon, sit down with the license, and review the update we'll be working through today and tomorrow, and even push those ambitions further.

Tor Bjerkestrand

executive
#14

And then just lastly, a brief comment on Gjøa, where we’re a partner rather than the operator. And as I mentioned, the causes of the reduced output were the SEGAL Export System and the U.K. side, where we weren’t able to take the gas, along with the gas export compressor, which experienced a technical problem and had to be replaced. Yes. P1 is an interesting project for us. First oil comes in quarter 1 next year, on schedule, it’s being managed well by the operator, and we look forward to seeing it completed. So thank you.

Kjersti Hovdal

executive
#15

Thanks, Tor. I'll walk you through the financial highlights for this quarter. Tor has already noted that oil and gas volumes declined this quarter, and the primary causes were the production problems on Gjøa involving the turbine replacement and the SEGAL restrictions, along with the shut-in well D2 on Draugen. Sold volumes fell by 17%. On Draugen, we lifted identical volumes in the third and fourth quarters, but the sales reduction here came about because of lower production on Gjøa. In addition, we entered the quarter carrying an overlift position on NGL at Gjøa, which meant we had earlier lifted more than our proportional share in the license. That position was therefore neutralized during the fourth quarter, which led to reduced sales. Realized prices rose, for both liquids and gas. Thus a mix of volumes and prices produced revenues of NOK 534 million in the fourth quarter. A few further details on our income statement. I've already covered the revenues feeding into operating income, but I'll also address production expenses and exploration expenses, financial items and taxes. Production expenses came in somewhat above the average, since we performed some well maintenance work on 3 of the wells on Draugen during the fourth quarter.

Kjersti Hovdal

executive
#16

On exploration expenses: we had already expensed the Skumnisse costs incurred through the third quarter, but drilling carried on into the fourth quarter, so the remaining portions were expensed in that fourth quarter. The same situation applied to the Kathryn well close to Yme. We also incurred seismic costs tied to future opportunities in the area south of Grevling and in the Draugen area as well, while costs for field evaluation relate mainly to Grevling and Storskrymten. Turning to the financial side, we held a favorable FX position at quarter-end, which produced an FX gain. We also completed the refinancing, replacing the OKEA01 bond with OKEA03, and that generated financial expenses that were expensed. Profit before tax for the full year came to NOK 419 million. Taxes finished at NOK 491 million and comprise 2 elements. One is taxes payable, which amounts to NOK 430 million, and the other component is changes in deferred tax. So as a starting point, we normally expect 78% taxes. However, because we had more than NOK 100 million of impairment that is nontax deductible, that pushed the relative tax percentage above 78%, and on top of that we receive an uplift on the CapEx investments we make.

Kjersti Hovdal

executive
#17

And then, when it comes to the financial items, some of them are allocated partly to the offshore tax regime, which means that costs — in total, the tax percentage should come to 117% for OKEA across the whole year. On cash flow, we saw very strong cash flow from the company's operating activities. So before deducting taxes, we generated NOK 2.3 billion, and we paid 172 in taxes, both tied to 2018 and prepayments for 2019, and we had investments of 847 related to Yme and the P1 project on Gjøa, plus some CapEx projects on Draugen. We had the share issue last summer as part of the IPO process, from which we received NOK 283 million. And as mentioned, we repaid the bond OKEA01 and refinanced with OKEA03, which caused repayment and additional net proceeds this quarter. And finally, we paid interest of NOK 232 million. So we ended the year at close to a cash position of NOK 1.7 billion. So that was the summary of the financials. So over to Erik for outlook and concluding remarks.

Erik Haugane

executive
#18

Thank you. Beyond what we’ve already discussed, we have 3 development projects we’re involved in. One of them is Yme, and that one is operated by Repsol. An offshore campaign is underway right now to get ready for hooking up Maersk Inspirer so production can begin. OKEA Solution has put forward a revised plan for finishing the onshore modifications, and we have confidence that a reputable company and a reputable yard have actually managed to do that. Based on our own inspections and the operator’s forecasts, the work is moving along very well at the moment in action, and we trust they have managed to finish all onshore modification and leave the yard in second quarter. The operator will come back with an exact estimate of first oil, but the ongoing work offshore is intended to mitigate any time delay in the hook-up process. So we expect production start-up during the summer 2020. With respect to Gjøa, another ongoing project, which is also quite significant. It gives more than 2,000 barrels a day to net to OKEA, is the P1 Gjøa project. There, we can report good progress from Neptune. And there will be 2 more wells, production wells drilled later this year, and the plan is an early start-up production in early new year.

Erik Haugane

executive
#19

On Grevling and Storskrymten — the latter run by OKEA — we've brought that project far enough along that what was a deeply negative-value proposition at the time we acquired it now carries positive value. We aren't entirely happy with just how positive it is, and you've probably seen that we brought in a new Senior Vice President for development, Knut Gjertsen, who joins us from Equinor and is a highly respected figure in the Norwegian industry. Part of his remit will be to go through the entire Grevling development and check whether our estimates hold up, and whether further improvements might be found. Then too, within the Grevling strategy, the same partners hold interests in 2 wildcats located just south of Grevling, and naturally, extra reserves flowing into that development would transform the picture entirely. So the outcome of that drilling campaign will, of course, weigh heavily on Grevling's economics. As I mentioned, we've pursued licenses in a fairly selective manner. We applied for 5 licenses in the licensing round and received 5, and as the map shows, every one of them sits near licenses we already hold — and near fields that we have.

Erik Haugane

executive
#20

One item I want to highlight that matters a great deal to us involves Equinor — Equninor serving as operator — situated just to the northwest of Draugen, where a gas discovery already exists. And we feel quite confident that once we bring Hasselmus into development, which as you can see sits just north of Draugen, the gap to that somewhat smaller gas find — that license is positioned so that all of a sudden it turns economic once more. It essentially builds on the investment made previously. So naturally, we are preparing the Hasselmus development in a way that makes it simple to tie another pipe into that system, and the volumes being discussed here are likewise uncomplicated for Draugen to take in. The Hasselmus discovery is headed toward what is called a DG2 decision in the license at this moment. And what makes that significant is that it delivers energy to Draugen — since we lack enough gas going forward to operate the turbines there — while also providing us with rather substantial oil export capacity through the pipelines that already exist from Draugen. So we will keep applying for licenses during the licensing rounds. We will examine every kind — all the wells, all the discoveries that have been made, which are somewhat underestimated, and so on.

Erik Haugane

executive
#21

OKEA will also have applications coming in this autumn. So ultimately, looking ahead, as Tor said earlier, the first priority is squeezing the most value out of what you already own in your portfolio — especially Draugen — and boosting recovery. As you know, it's an extremely good reservoir, the kind of hydro <<inaudible>> type of reservoir, a huge pile of sandstone. And we see it producing extremely well, and we believe it's absolutely achievable. Draugen still holds 500 million barrels. So the key question is how much of that we can get out. And as Tor said, extracting another 100 million barrels from Draugen is absolutely within reach. The 2 wells we drilled mattered enormously. They delivered a lot of value in terms of letting us now remodel and build a fresh reservoir model for Draugen. Some of the information we got there surprised us, and it's now built into the new model so we truly understand what happens in Draugen and also nearby. Regarding next year, largely due to a delay at Yme, we expect to produce almost 6 million barrels of oil across the year, which is somewhat lower than what we perhaps expected half a year ago.

Erik Haugane

executive
#22

We also have a biannual maintenance project underway at Draugen this year. Still, our financial flexibility is solid. Cash flow is very strong for us. My understanding is the estimate suggests we could end up paying NOK 1 billion in tax next year — sorry, this year. So I suppose that provides some relief. We're also happy with how the OKEA03 bond is structured, since it gives the company considerably more flexibility for financing future projects as well. I've already noted that we'll be a partner in 2 wells south of Grevling and also 1 well on Gjøa, on top of the production wells currently underway in the P1 project at Gjøa. But growing the company organically isn't enough — we want OKEA to become significantly bigger than it is today. And naturally, we are actively chasing M&A opportunities that we identify on the Norwegian shelf. In our view, the dynamics observed over the last few years will simply keep going, with restructuring and companies exiting. And as one of the few — this is our main asset — we rank among the very, very few field operators possessing field operating competence on the Norwegian shelf, which Equinor, of course, completely dominates, and that is something we intend to capitalize on going forward when it comes to M&A opportunities.

Erik Haugane

executive
#23

That brings our presentation to an end.

Ståle Myhre

executive
#24

All right, Erik, thanks. Now let’s shift into the Q&A portion. So go ahead and raise your hand, and — okay, Teodor?

Teodor Nilsen

analyst
#25

Teodor Nilsen from Sparebank Markets here. To start with, regarding the 2020 production guidance, what amount of contribution from Yme have you factored in?

Erik Haugane

executive
#26

That's lower than you'd expect.

Teodor Nilsen

analyst
#27

Did you put anything at all into Q3?

Erik Haugane

executive
#28

No. That's what we've been estimating, though we certainly anticipate production getting underway in Q3.

Teodor Nilsen

analyst
#29

Alright. Moving to the second question about Grevling. From what I understand, those 2 exploration wells in the south matter a great deal for the economics. Suppose no discoveries are made there at all — is Grevling commercial on a stand-alone basis now, without any discoveries?

Erik Haugane

executive
#30

The way we look at it right now, Grevling stands on its own commercially, yet the risk embedded in the P50 sets has been inherited, and that is certainly a commercial project. With smaller projects such as Grevling, though, we are talking about under 50 million barrels, and much hinges on how the lease for the production unit and so forth is structured. Even so, the P90 for that well — that sort of — at the uncertainty level, the highly certain portion of what we hold, at the oil prices we use, comes out as a negative value. It is likewise a philosophical matter, but would you put another NOK 500 million to NOK 1 billion into a test production just to learn whether it is worth pursuing, given that Grevling holds 200 million barrels of oil? So the recovery rate is quite low under the way we intend to produce it. And then — but you could discover, well, there is more than we believed, so we can actually go ahead and develop it, but by then that money is gone. So we will return to how the economics on Grevling can be improved so that it turns profitable even at the low scenario reserves we have.

Erik Haugane

executive
#31

We're engaged with Halliburton on this, and Knut will also be tasked with really digging into some of the cost estimates and the uncertainties around the development in that respect.

Teodor Nilsen

analyst
#32

All right, and that wraps up with one last item from my side. Erik, you brought up M&A earlier. Could you give us a quick take on how you're seeing the M&A landscape for NCS at this point, and going forward, will your emphasis be on the M side, the A side, or both?

Erik Haugane

executive
#33

Yeah, certainly, we examine both, though acquiring assets isn’t simple or easy. Sellers of assets — you don’t receive anything at no cost. So essentially nobody is offering a distressed asset. Still, we believe the late-life field market — Draugen, for instance, along with other fields — is a market that interests OKEA. And then, naturally, you’ve got ongoing production, which is also simpler to finance than going in and purchasing an asset outright. But we consider every kind of opportunity on the shelf. Clearly, certain deals, as you’re aware, are too large for us. So a few we don’t even examine.

Halvor Nygard

analyst
#34

Halvor Nygård from SEB here. Coming back to Yme for a moment: how confident are you in the targeted summer 2020 start-up date? And what sort of time frame do you see from sail-away — which Maersk says would involve refurbishment work being carried out in late Q2? So the lead time from sail-away through to start-up, including hook-up and commissioning, and also bearing in mind — and noting — that Maersk says it expects only a limited EBITDA contribution from Maersk Inspirer in 2020.

Erik Haugane

executive
#35

Naturally, Maersk doesn’t receive payment until we’ve completed a set number of hours. That’s why they have to take their own precautions. The initial schedule for the hook-up process called for 3 months of work. But with the rig now out there—which is in fact there to remove the plugs and get things ready—a great deal of work has already been accomplished. So the operator has said that we’re offsetting much of the time that was meant to be handled by Maersk Inspirer—yet no revised plan has been turned in to the license, since it hasn’t been fully settled how much offshore work will actually be finished before Maersk Inspirer departs the yard. What we’ve therefore been concentrating on within the partnership, within the license, is finalizing the execution work now so the rig can leave before summer, allowing us to benefit from the summer seasons for the hook-up work. But the operator will come back with how many weeks the actual hook-up process is planned to take. And we have no information on that, other than that it is expected to be significantly less than 3 months, which was the plan when the PDO was submitted.

Ståle Myhre

executive
#36

Are there any more questions? Nope. So thanks, everyone, for being with us, and...

Erik Haugane

executive
#37

All right. Thanks a lot, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete OKEA ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to OKEA ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in OKEA ASA or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.