OKEA ASA (OKEA) Earnings Call Transcript & Summary
July 17, 2024
Earnings Call Speaker Segments
Svein Liknes
executiveGood morning, everyone. My name is Svein Liknes, and I serve as the CEO of OKEA. Welcome to this presentation covering OKEA's second quarter results. As always, Birte Norheim, our CFO, is here alongside me. I'll begin by walking you through our operational status, and after that she will cover the financial section. Then I'll return for a brief summary before we move into the Q&A session afterward. <<operator_script>> The headline for the second quarter of 2024 at OKEA is that we've delivered solid operational performance across our assets — those we operate ourselves as well as those operated by partners. I'll go into greater detail on each asset a bit later. That performance produced output of 38,400 barrels of oil equivalent per day. As you can see, that figure also sits in the high range of our guidance. So we've chosen to narrow the guided range from 35,000 to 40,000, taking it instead to 36,000 to 40,000, reflecting the performance we've now observed in both Q1 and Q2. Draugen continues to perform very strongly. We did experience some production upsets on Brage involving the gas cooler, which forced an unplanned one-week shutdown on Brage, but operations there are now back up and running again.
Svein Liknes
executiveBeyond that, we've brought some wells online at Brage, and those have pretty much offset the volumes we lost from that fault on the cooler. Across the assets our partners operate, output has held steady. We did experience a planned maintenance shutdown at Statfjord, which is finished now. It ran longer than the original schedule as well, but since Statfjord Alpha came back on stream, we've also observed better performance from it. And overall, everyone is seeing a broadly positive trend in how Statfjord is performing. I'll come back to that a bit later. Turning to our development projects, the Bestla PDO was handed in during April this year, so it's now moving along well. We also have the power from shore project, which is coming along in line with the plan too. The work at Draugen got started — well, it actually began last year, but it was sanctioned right before Christmas, and there's full activity at present, along with a full platform tied to the power from shore project, which we're carrying out for Draugen, and also for the Njord asset, the neighboring asset to Draugen. On the financial side, EBITDA came in at NOK 1.6 billion, and net profit for OKEA was NOK 87 million.
Svein Liknes
executiveWe recorded an impairment tied to Statfjord and Yme amounting to NOK 267 million, though Birte will walk you through more of the specifics on that later. In addition, we bolstered our liquidity during the quarter by issuing the NOK 125 million senior secured bond OKEA05. As for the key operational figures for the quarter, the safety trend, as you can see, is positive. We're observing a downward trend both in the serious incident frequency shown here and in the total recordable incident frequency. So a downward trend is what we're seeing there, and that matters enormously to us. If our operations can't be conducted safely, then basically you can't stay in business. On production, you can see here that we fell from 42,100 last quarter to 38.4 kboepd, though that also reflects a correction of just above 1,100 barrels that was booked in Q1, coming from Q4 of last year. So the decline isn't that large. Production expense remains at roughly NOK 200 per barrel, and production efficiency stands at 89%, mainly impacted by the greater shutdown on Statfjord Alpha, as well as the 1-week production outage we had to take on Brage, but even so, we know our aim is to be in the 90s, yet it's still a solid performance on production efficiency.
Svein Liknes
executiveOur priorities remain operational excellence—that's the focus. Capital discipline has to be there, and we're working on unlocking value, which I believe we showed this quarter as well. On this graph, you can see a solid distribution of production across our assets. Between Q1 and Q2, there's a drop on Draugen, but as I said, that comes from some corrections we made on Draugen in Q1, though we're seeing decline across all the assets we had, mainly because of both planned and unplanned shutdowns. On the bottom graph, you can see we have high production efficiency. As I mentioned, we saw a drop from 89% to 85% in the Statfjord area between Q1 and Q2, but that's predominantly because of the outage on Statfjord Alpha, which was planned—though of course, the extension of the revision, or the TAR, wasn't planned for. You also see a drop on Brage from 96% to 89%, which again relates to the 1 week I just mentioned for the gas cooler repair work we had to do during the quarter.
Svein Liknes
executiveNow for a operational update across all the assets. Let me begin with Draugen, which we operate. Another quarter of very strong, reliable performance. We're pursuing initiatives to safeguard integrity and keep production stable at Draugen going forward. As you'll recall from our previous reporting, we now hold an approval allowing production at Draugen through 2040. So clearly, work is needed now to make sure Draugen is positioned to produce safely all the way to that date. The power-from-shore project is progressing as planned. Offshore work has begun, and we're currently planning the cable installation, with onshore work also set to kick off right after summer. At the Brage asset, we experienced a production upset tied to the gas cooler, which has been fixed and output has been brought back. We brought the second Talisker well into commercial production, and additional wells are scheduled for the latter half of 2024, including the Fensfjord well, which is due in Q3 and is being drilled right now. We submitted the PDO for the Bestla project. Bestla has gotten off to a very good start, the project team is now in place, and we're well along in cooperation with our main contractors on that project.
Svein Liknes
executiveIt's the identical project crew—not only our in-house people but the outside contractors too—that in fact brought the Hasselmus project to Draugen across the line, and that one was a big win for us. Over in the Statfjord area, a scheduled shutdown at Statfjord ran longer than planned, as I said earlier. Production efficiency is getting better across the board, not only at Statfjord Alpha but at Bravo and Charlie too, which is encouraging to watch. And right now we're engaging very actively inside the license alongside Equinor and also Var Energi to relaunch and refresh the drilling plans aimed at future value potential in that area—which begins with pinpointing targets, drilling them, and that's what we'll be trying to chart out between now and August so we get an approval and can kick off that project and truly unlock the value at Statfjord. As for Ivar Aasen, operations stayed very stable through the quarter. Hans has been brought onstream as well, and we're now, once again, maturing the IOR, or infill oil recovery, project for 2026 together with the drilling campaign that gets underway then. At Duva and Nova, water injection at the Nova field is still running.
Svein Liknes
executiveSo at the moment we're making plans to drill an additional well on Nova during the second half. And we're also observing certain integrity problems with the valve in Nova's water injection system. As a result, output from Nova has been curtailed at present because of insufficient water injection. Turning to the Gjoa field, we experienced some problems in the quarter, or in the prior quarter as well, involving the E1 production well, and those were fixed, so it is back to producing normally now. We are likewise examining the Greater Area surrounding Gjoa, since Gjoa is a prospect for a number of tie-ins nearby, and we are collaborating closely with the operator to determine how the field's lifetime can be extended and how Gjoa can serve as a highly productive host in the area for additional tie-backs. Production efficiency at Yme has been rising, as the graph we showed earlier indicates. Right now we are drilling the C3 infill well, which is set to get underway early in Q3 of this year. And once more, we are pursuing further infill targets within the Beta template, work that is currently in progress across the asset, so that we secure more resource potential and also achieve reductions at Yme going forward.
Svein Liknes
executiveSo these are the development projects we have, the largest ones. Obviously, we also have plenty of infill drilling and other CapEx projects on both — particularly on Brage and Statfjord — but these are the 2 main development projects. We have power from shore for Draugen, which is positioning Draugen for the future. We need to cut emissions. Once production is electrified from 2027, we will be reducing CO2 emissions by 95%. We are also reducing emissions by 200,000 cubic meters per day — no, tonnes, I mean, per day — and we are also increasing gas export capacity, since we are not using that gas for power generation. We can now actually sell that gas, and it also boosts production efficiency and reliability. Electrified assets are more reliable and have higher production efficiency compared with gas-powered assets. So for the time ahead, this is a project that contributes a great deal positively to the asset. The second project is the Bestla development, for which we submitted the PDO earlier this quarter. 24 million barrels of oil equivalent, which is recoverable, tie it into Brage, and this will actually add 10,000 barrels of oil in — to net to OKEA when it comes into production in 2027.
Svein Liknes
executiveThis is a solid project, with breakeven at roughly $40 per BOE, and the overall CapEx budget for it comes to about NOK 6 billion. But once more, this fits into our strategy of finding resources near the assets we run, so that we end up with an asset that delivers high production efficiency and serves as a dependable host—and then we can tie in these projects, which are located right in that area. So I'd say Bestla development stands as a really strong example of the extra resources OKEA will produce, and it also demonstrates that this portion of our strategy is working. With that said, I'll pass things to Birte, who will walk you through the financials for the quarter, and after that I'll return with a brief summary.
Birte Norheim
executiveThanks, Svein. Before we get into the specifics of the financial results, let me begin with a quick summary of the financing work we wrapped up in the quarter. During May, we issued a $125 million senior secured bond carrying a 4-year maturity and a fixed coupon of 9.125%. Demand for that bond issue was strong in the market, and at final pricing it was more than twice oversubscribed. The bond, known as the OKEA05 bond, comes due in 2028, which falls after the planned startup of the Bestla project and the power from shore project. That means only the OKEA04 bond matures before our 2 most capital-intensive projects are completed. In connection with the new bond issue, the tap option available under the OKEA04 bond was swapped for a tap option on the longer-dated OKEA05. The tap's size is unchanged at $125 million. As part of the financing process, we also upsized the revolving credit facility, taking it from $25 million to $37.5 million, which gives us extra financial flexibility at a relatively low cost. Taken together, these steps have bolstered liquidity and improved flexibility as we enter the most CapEx-intensive stretch for our 2 development projects.
Birte Norheim
executiveNow let's go through the quarter's financial numbers. Our output came in at 38,400 barrels of oil equivalent per day. That decline in production stemmed chiefly from a prior-period adjustment to volumes from Hasselmus of roughly 1,100 barrels per day, which was booked in the quarter before. On top of that, a 60-day turnaround at Statfjord A wrapped up during this quarter. We sold 33,300 barrels of oil equivalents per day, and after the sizable overlift last quarter of about 4,500 barrels per day, we're carrying a substantial underlift this quarter of roughly 5,100 barrels per day. Lifted volumes track both production and lifting schedules, and over time they'll align with what we produce. Although there were some intra-quarter fluctuations, average realized oil prices have stayed fairly steady across recent quarters. The average realized price for liquids in the second quarter was just under $80 per barrel. Gas market prices have likewise been fairly stable on recent quarter-on-quarter averages. That said, OKEA's realized prices have gotten a boost from hedging gains. This second quarter is no exception, with the realized natural gas price of $65.7 including a gain on fixed price contracts amounting to $10.5 per barrel.
Birte Norheim
executiveSelling volume combined with realized prices produced total petroleum revenue of NOK 2.442 billion. The chart on the left shows OKEA's crude liftings across the last 5 quarters, along with average market prices indicated by the red dots. The reduced lifted volume this quarter stemmed largely from the underlift position discussed earlier. The chart on the right sets out the gap between the quarter's average Brent market price of $84.8 per barrel and OKEA's average realized liquids price of $79.7 per barrel. A $3.7 NGL discount and a negative timing effect of $2.3 were partly offset by positive non-price adjustments from prior periods plus a quality premium on OKEA oil. In this chart, we show gas volumes sold over the last 5 quarters and the observable average market prices for NBP during that same period, shown as the red dots. The recent production increase from Hasselmus and Statfjord is partly offset this quarter by planned maintenance and natural decline. Now moving to the profit and loss statement. We posted operating income of NOK 2.584 billion, made up of petroleum revenue of NOK 2.442 billion and other operating income of NOK 142 million.
Birte Norheim
executiveOther operating income was mostly made up of tariff income at Gjoa and Statfjord totaling NOK 76 million, along with a NOK 60 million reduction in the fair value of the contingent considerations, which came about because forward prices for crude oil fell during the quarter. Production expenses came in at NOK 879 million, equivalent to NOK 229 per barrel. That higher per-barrel production expense stemmed chiefly from a high level of activity across several assets, together with production that was somewhat lower. As Svein noted, we booked a net impairment of NOK 267 million during the quarter. Of that, NOK 121 million is tied to impairment of technical goodwill at Statfjord, largely because of risking applied to less matured projects. The remaining NOK 144 million concerns the Yme asset and is driven by lower forward prices for crude oil. As a reminder, let me repeat that since both Statfjord and Yme are carried at fair value, any unfavorable shifts in macro conditions or in asset performance will lead to additional impairments down the road. When it comes to Yme, any positive adjustments that materialize will bring about a reversal of earlier impairments. Let me also repeat that technical goodwill comes about as an offset to deferred tax within a purchase price allocation. And instead of being depreciated like a fixed asset, technical goodwill is rather subject to impairment testing each quarter.
Birte Norheim
executiveSince technical goodwill isn’t appreciated and Statfjord is carried at fair value, then all else being equal, additional impairments of technical goodwill should be expected as volumes get produced. Turning to exploration and operating expense, that came to NOK 243 million and included SG&A expense of NOK 33 million plus exploration expense of NOK 210 million. The greater exploration expense resulted from expensing NOK 168 million of previously capitalized costs on Calypso. Net financial expense was NOK 23 million and was mostly tied to net interest expense of NOK 33 million and accretion on net removal obligations of NOK 34 million. That was partly offset by a net currency gain of NOK 49 million after the kroner strengthened somewhat against the U.S. dollar. Tax expense came to NOK 526 million, taking net profit to NOK 87 million. The 86% tax rate was above the 78% expected, largely because impairments of goodwill are not tax-deductible and financial items are deductible at a lower tax rate. Turning to the balance sheet, goodwill was NOK 1.9 billion, with NOK 635 million of that relating to remaining technical goodwill at Statfjord. Cash and cash equivalents were NOK 3.2 billion.
Birte Norheim
executiveThe cash increase largely came from issuing the OKEA05 bond. With that new bond in place, interest-bearing bond loans rose as well, reaching NOK 2.6 billion. Other interest-bearing liabilities totaling NOK 472 million are tied to the financial lease on the Inspire rig at the Yme field. Income tax payable sits at NOK 1.6 billion, which is the tax due for the first half of 2024. Also keep in mind that asset retirement obligations of NOK 9.4 billion are partly offset by NOK 4.2 billion in asset retirement receivables from Shell, Equinor and Wintershall Dea. Operations generated cash of slightly more than NOK 2.1 billion. The NOK 1.4 billion in taxes paid covers the final 2 installments for 2023. The NOK 882 million spent on investment activities was mostly connected to the Draugen electrification project along with production drilling at Brage and in the Statfjord area. Net proceeds from issuing the OKEA05 bond came to NOK 1.3 billion, and we close the quarter with a cash balance just under NOK 3.2 billion. Lastly, a few guidance updates. After finishing the first half of the year with operations performing as expected, we are narrowing production guidance somewhat by raising the low end to 36,000 from 35,000 barrels of oil equivalent per day, giving a revised range of 36,000 to 40,000 barrels per day.
Birte Norheim
executiveWe're also tightening our CapEx guidance by bringing the upper end down from NOK 3.7 billion to NOK 3.6 billion, so the range now stands at a revised NOK 3.2 billion to NOK 3.6 billion, with roughly 1/3 of that CapEx tied to infill and production drilling at Statfjord and Brage, which pays back considerably faster than the development projects. That's everything from me at this point, and I'll hand things back to you, Svein, for some closing remarks. Thank you.
Svein Liknes
executiveThanks, Birte. So, to sum up Q2, our assets have continued to produce strongly at 38,400 barrels of oil equivalent per day. Draugen keeps delivering steady output, and Hasselmus is adding volume to that asset, and we're also making progress on the power from shore project, which is what enables Draugen to keep producing until 2040. On Statfjord, we're seeing better production efficiency. That's a long-term effort, but we're collaborating closely with both Equinor and EFlux and also with Var in the license, both to extend the field's lifetime and to lift production efficiency at Statfjord, as well as to find new resources. We did submit the PDO for Bestla, which is a very important piece of our strategy for developing resources in areas neighboring our assets, and once it comes on production in 2027 it will add 10,000 barrel of oil equivalents to Brage and to -- well, to OKEA, the net portion to OKEA. And we've strengthened our liquidity position through issuing the OKEA05 bond. So that, I think, is Q2 in a nutshell, and I hope to see as many of you as possible in the Q&A session that will begin right after this.
Svein Liknes
executiveThanks a lot.
Operator
operator<<operator_script>> Our first question comes from Teodor Nilsen, who is calling in from SP1 Markets.
Teodor Nilsen
analystI have three questions for you. The first concerns the Draugen electrification project. It seems to be moving forward as planned, but could you give some detail on the breakeven power price, the return on investment, or anything else related to how profitable that project is? My second question is about Statfjord. Svein, you said there have been some improvements there — should we read that as meaning we ought to expect all of your production in the third quarter relative to the second quarter of this year? And my last question concerns dividends. I fully understand that no dividends will be paid this year, but for 2025 I assume we should count on dividend payments resuming. The question is: on what basis will those dividends be paid — a percentage of income, of cash flow, or some other metric? Any detail at all on the 2025 dividends would be helpful.
Birte Norheim
executiveYes. Thanks, Teodor. Thanks for those questions. We've written down the 3 questions, and perhaps I'll handle the first one and the last one, while Svein takes the one about Statfjord. So regarding Draugen power from shore, I'd describe that as a fairly marginal project, though its true worth lies, of course, in the ESG benefits and in the greater robustness of Draugen's long-term potential, since it will both boost gas exports from the asset and lower OpEx over the long term. You may also have noticed that we have secured the bulk of the power usage anticipated during the first few years. So we don't provide guidance on the breakeven power price, but I believe we have reduced the risk from power price movements by locking in prices. And when it comes to dividends, yes, our capital allocation principles are unchanged from before, namely a healthy balance sheet first and foremost, and then balancing direct distributions to shareholders with growth. And as you know, we are also bound by the restrictions under the bond terms of 50% of net profit after tax. So what I can say at this point is that dividends remain a priority for OKEA, and the Board intends to come back with a plan once we are able to resume dividend payments under these restrictions.
Svein Liknes
executiveYes. And regarding the improvements at Statfjord, we've had a very lengthy shutdown, or turnaround, on Statfjord Alpha by now, but positive results have also come from the most recent wells drilled. So what we're doing at Statfjord is this: we aren't providing guidance on production for the upcoming quarter as part of that, since that sits within our overall guidance, but what the asset team is working on is maturing an updated plan — an updated drilling plan built on updated drilling targets, plus an updated drainage strategy for the reservoir in that asset. That's something we'll take through the final terms in August within the license, and it will then feed into the approval processes and the budgeting as we move into Q3 and Q4. So I'll need to come back to that, but what's promising to see is that production efficiency is rising in the Statfjord area, and we're also getting more positive results from the latest wells that have been drilled. How this matures is something we'll need to return to in later quarters.
Operator
operatorOur following question comes from Roald Hartvigsen, who is on the line with Clarksons Securities.
Roald Hartvigsen
analystSadly, we have to bring up the impairments yet again. On the main 8 quarters, this marks impairment number 7. On Statfjord, it is the third consecutive one. Clearly, the causes behind each impairment differ across the various quarters, but as we stated in last week's trading update, this most recent one on Statfjord stems from risking, or changed risking, of projects in the future. I realize there are limits on what you can and wish to say in public, but when you make adjustments like these through risking of future projects on Statfjord, the market is plainly eager to understand what you are seeing that makes such adjustments appropriate. So any specifics you could share on that would be welcome. Also, it would be appreciated if you could address the remaining book values relating in particular to Yme.
Birte Norheim
executiveYes. Thanks, Roald. Yes, once again impairments are the topic, though last quarter we recorded a reversal of an impairment on Yme. This quarter brings a new impairment, and that stems entirely from shifts in forward crude oil prices. With Statfjord, the situation differs somewhat. As you're aware, Statfjord is an enormous asset. It holds substantial potential that we keep working to unlock. The license partners right now are progressing through numerous improvement initiatives that we expect will deliver value to the asset over time. The adjustments made this quarter do not reflect a change in asset strategy. We still firmly believe we can capture additional value from Statfjord, though certain plans involve pursuing less mature opportunities, which we have risked accordingly and thereby also lowered the technical goodwill remaining on the balance sheet. I want to stress that this does not mean the value potential is below what we assumed earlier. Rather, it reflects a more conservative approach to risking the less mature profile, I would say.
Birte Norheim
executiveRegarding the remaining book value on Yme — we don't actually disclose book values on a per-asset basis. So yes, I don't believe it's appropriate for me to comment on that, Roald.
Operator
operator<<operator_script>> We'll now take our following question from <<inaudible>>'s line.
Analyst
analystI have four questions for you. First, if I look at Page 15 of your creditor presentation and your forward production profile, it seems you expect output to fall to about 30,000 barrels a day before the 2 projects start up in 2027, and then to return to approximately 35,000 barrels a day once those 2 new projects are online. Is that right? My second question concerns Draugen. Beyond extending the asset's life and the ESG benefit of the electrification project, as I understand it you will also be freeing up natural gas that is presently consumed on the platform for exports — could you give a rough indication of how many barrels or equivalent per day you will be able to export as a result of releasing it? And my third question is about taxes. It appears that for 2024 your tax bill — in cash paid terms — will be approximately NOK 3.5 billion. When I model your 2024 production and CapEx, I expect the tax bill to fall quite substantially for 2025, to roughly NOK 2-ish billion. Is that the case?
Birte Norheim
executiveThanks, Diego. So we'll take a shot at each of those. My understanding is that your first question was about the credit presentation from April. You're right that we gave an indicative forward-looking production figure in it, but as a rule we don't provide guidance on long-term production. So I'd stress that it's indicative. And it also doesn't factor in the work we genuinely perform daily to arrest the client and to mature new volumes organically around our existing assets. As for the electrification question on Draugen, the extra gas export net to OKEA will come to roughly 500, 600 barrels equivalent per day, net to OKEA. And on taxes, yes, what you say is more or less correct, and that obviously reflects the 3 installments we've now made in the first half of 2024, which relate to the remaining tax for 2023. And as you correctly point out, and as we've also guided, the tax payments estimated now for the next 6 months come to about half of what the previous installments were. So roughly NOK 349 million per installment, which is payable now in the second half of the year.
Analyst
analystApologies for cutting in, but that response applies to 2024. Considering your output — since your production guidance for the remainder of the year, along with the really elevated CapEx you're incurring this year compared with earlier years — would I be right to assume that cash paid in 2025 will come in much lower, near roughly the NOK 2 billion level?
Birte Norheim
executiveOur best estimate right now is that each of the 6 installments will come to NOK 349 million. So obviously, that depends on realized prices and other aspects, but it will be significantly — our current estimate is significantly lower than the tax we paid for 2023.
Operator
operatorSince nothing further has come in from callers, I’ll return the discussion to the presenters.
Birte Norheim
executiveThanks. And I notice Daag Hennar has asked a question regarding when OKEA will be in a position to pay dividends once more. I believe we already addressed that in the questions from Teodor. And I can see that Diego's questions appear again here, so I won't repeat those. Then Nicholas Jansen asks a question about the trend of switching toward renewable, no-fossil energy sources. How long do you expect demand for OKEA's products to keep increasing? Do you view higher taxes or a ban on oil as a possible risk?
Svein Liknes
executiveYeah, I suppose that's a pretty broad question, but if you look at the energy mix out there, we're moving toward more renewables, yet demand for non-renewables has never been higher than it is today. So the transition is going to happen, but it will genuinely take a long time, and I think—particularly our position on the Norwegian Continental Shelf as an energy provider to Europe, and I can also point to the long-term contracts that were just signed—I think that makes us a very critical energy provider for a long time ahead. So we still believe oil and gas will form a very important part of that mix. We continue to believe Norway and the Norwegian Continental Shelf will play a very important role in it, but we're also working very hard to make sure we do this as sustainably as possible with the smallest footprint possible—which is also why we're electrifying some of our operations on assets that were produced until 2040.
Birte Norheim
executiveAll right. Next, we’ve got 2 questions from Russell Seronokia. For the exploration wells you plan to drill this year at Arkenstone and Mistral, what do you hope to find? Where are they located, and what resource potential do they hold? The second question concerns the new Ofelia, Gjoa North and Cerisa project: are you referring to a possible tie-in to Gjoa? Longboat and DNO are among the companies that have voiced frustration over how slowly these cluster developments are moving. Why are you confident about your new project?
Svein Liknes
executiveYeah, regarding your first question, we're quite enthusiastic about the Arkenstone and Mistral wells, both of which will be spudded later this year. Those are exploration wells. Arkenstone sits further north in the Norwegian Sea, whereas Mistral lies closer to infrastructure that already exists. So the two are somewhat different in that respect. On resource potential, we need to revisit that, but these are wells the operator Equinor will drill. So we very much look forward to being part of those 2. And as for the Greater Area — Ofelia, Gjoa North and Cerisa — we continue to view them as candidates for tie-in to Gjoa. Gjoa has served as a very good host for OKEA to be involved with too. So I'd say Gjoa and the infrastructure already there at Gjoa are well suited to producing those resources as well. As for further remarks about how these developments are progressing, I won't comment on that, but we're quite confident that as we mature additional resources and can also examine joint developments, this will benefit all the parties involved and will push exploration — no, development costs further down.
Svein Liknes
executiveOur view remains that these are going to be developed toward Gjoa.
Birte Norheim
executiveAll right, next we have a few questions from Sander Nilsen. First, how should we think about third-quarter production now that the second Talisker well is coming on-stream? What gross flow rate do you expect from that new well, and how will it affect the existing production well? Second, is there any planned maintenance in Q3 that's significant? Also, could you elaborate on the rationale behind the expense in Calypso — what's the main driver there? And last, with your balance sheet currently strong and M&A rooted in your business model, might we see another M&A this year?
Svein Liknes
executiveYes, I suppose I can take this one first, and perhaps Birte can come in on question number 3, but regarding Brage production, what we should keep in mind is that it will rise, obviously, though we aren't guiding well by well on how that plays out. That falls within the overall production guidance OKEA is issuing. So what matters for us is that we keep maturing resources into reserves and bringing them into production on Brage. That's the success case for Brage and also the case we're trying to replicate in the Statfjord area. So it will increase. As for maintenance in Q3 that is of significance, we do have some — Karsto shutting down for 3 weeks. So we do have some gas export that will cease during those 3 weeks to Karsto, both for Brage and for Draugen and also from Ivar Aasen, and all of these are scheduled for the third quarter. Those are the major maintenance activities that we have. When it comes to the expensing of the Calypso, Birte, maybe you can <<inaudible>> and I'll jump in on the M&A afterwards.
Birte Norheim
executiveYeah, I can speak to that. Essentially, what we're seeing is that based on the volumes at Calypso by itself, the project doesn't meet our investment criteria. That said, there's work happening on licenses nearby that could make the project viable over a longer horizon as a joint development effort. But given what's on the table at this moment, the project fails to meet our investment criteria, so we currently have no plans to keep developing Calypso, and as a result, we're expensing it.
Svein Liknes
executiveYes. And on M&A, obviously we can't get into specifics, but inorganic growth matters a great deal to us, and as a company we're still sticking with our growth strategy. We've decided to be the top mid- to late-life operator on the Norwegian Continental Shelf, and that segment there is only going to grow. That's the reason we set out on this path. Still, any inorganic move has to align with our strategy, and we need to make sure we spot further value in these assets and can release it, so they fit our strategy and we can genuinely perform better than what's been achieved on them so far. So growth remains our focus, M&A included, and inorganic growth is a key piece of it.
Birte Norheim
executiveAll right. Next up is a question from Rou Magronovic, asking what OKEA will concentrate on in order to bring down OpEx costs across both operated and non-operated assets when it comes to late-life operations excellence?
Svein Liknes
executiveYes. Well, I can bring that up. And clearly, with OpEx, at times you need to spend additional OpEx in order to actually pull more volumes out of the ground, though that is a more commercial solution. So the picture is complex. But as we've said before, what we're trying to focus on as an operator is that we are extremely focused on which activities add value in our value chain when it comes to operating these assets, but at times we have to spend that cash, obviously, and then -- we'll call it investments. So there isn't any single item that I can point to on what we're focusing on. What matters for us is to drive production efficiency up. We need a solid and good-performing platform to produce the resource that we have. And then we need to focus on ensuring that we are only executing the activities that actually lead to maintaining a reliable operations with high production efficiency. So I think this is something we've achieved on the assets where we are operator now, and this is also experiences and learnings that we have that we're also sharing openly with other operators where we are partner in the same segment of mid- to late-life assets.
Birte Norheim
executiveAll right, and next we have a question coming from a private investor. How would you characterize political risk on the NCS at present? Would you call it stable? And do you view OKEA as a partner when it comes to developing nuclear power in the future?
Svein Liknes
executiveWe actually find that the NCS is a fairly steady setting to operate in, relative to other continental shelves. Also in Norway, oil and gas is a hugely significant component of the country's total industry and revenue. So our view is that this will keep going. Therefore, we don't look at the NCS as an unstable environment in that sense. Building out nuclear power in the future isn't something OKEA's strategy includes as things stand today. As a company, our focus is on producing oil and gas. That's our strength, and that's the path we'll stay on.
Birte Norheim
executiveAll right, and next we’ve got a question from David Mirsal. What’s the present outlook for Yme over the coming 12 months? Is there any plan for more drilling — exploration or development?
Svein Liknes
executiveYeah. Regarding Yme, as we also said in the presentation, the outlook is that we're finishing a well right now that will come on stream in Q3, and we're examining and working to mature additional infill targets in the Beta formation on Yme. So keeping production efficiency high, completing the well we've already begun, and maturing more wells in the Yme asset — that's the focus for the next 12 months.
Birte Norheim
executiveAlright, and next up we have a question that came in from a private investor. They're asking if you could point to a few of the biggest technological breakthroughs in oil production that are going to benefit OKEA and its partners on Statfjord. Would that be fluids, robots, tie-backs, or something else along those lines?
Svein Liknes
executiveI mean, for an oil and gas company, value really comes from what's underground. So any advances in technology—whether that's seismic, data interpretation, or big data processes—that keep getting better are clearly tech that helps us find more resources beneath the surface. And after that, technology that supports efficient drilling operations is obviously very important too. So I'd point to data analysis for locating new resources, but also drilling technology that can help with things like geological steering—those are very important technologies, though I'd say the most critical part is mainly in the subsurface domain.
Birte Norheim
executiveAll right. I believe that covers every question, unless someone has something new to raise on this call?
Operator
operatorThere aren't any questions on this call, no.
Svein Liknes
executiveAlright. That brings the Q2 presentation and Q&A from OKEA to a close. If there are any questions, please...
Operator
operatorOh, and there's a quick question coming in from Yuko Carla on the phone.
Analyst
analystOne more question, if I may. On the infills at Brage and Statfjord — you're putting a fair amount of money there this year. From your guidance, I figure it comes to roughly NOK 1.1 billion to NOK 1.2 billion. Two quick things. First, could you give us some breakdown of how much goes to each of those fields? And second, given this level of spending <<inaudible>>, do you expect you'll have to keep carrying that into next year? Or is it really just very high in 2024?
Birte Norheim
executiveYeah, that shifts somewhat over time. What I can tell you is that so far this year, roughly one-third of those costs tie to Brage, while two-thirds tie to Statfjord. And we expect activity to stay at a high level going forward on both of these assets as well. We don't provide guidance past the current year, but both assets depend on new volumes coming through additional infill and production drilling. As for giving a specific figure, we don't go beyond the current year.
Svein Liknes
executiveIf that was the final question, then thanks to everyone for joining the presentation and the Q&A session as well. So I wish all of you a pleasant summer, and I look forward to seeing you all again on the other side. And should any questions come up between now and then, please don't hesitate to reach out to us. We'll still be available to answer any queries you may have. So thank you very much.
Birte Norheim
executiveThanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete OKEA ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to OKEA ASA earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in OKEA ASA or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.