Orezone Gold Corporation (ORE) Earnings Call Transcript & Summary

August 10, 2023

Toronto Stock Exchange CA Materials Metals and Mining earnings 30 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, everyone, and thanks for holding. I’m Feathery, and I’ll be serving as the conference operator for today. Right now, I’d like to extend a welcome to all of you on behalf of Orezone’s Second Quarter 2023 Conference Call and Webcast. Every line has been muted so that background noise won’t interfere. Once the speakers have finished their remarks, we’ll open things up for a question-and-answer session. <<operator_script>>. At this point, I’ll hand the conference over to Patrick Downey, President and CEO. Please go ahead.

Patrick Downey

executive
#2

Thanks for joining us on the Orezone Gold Q2 results conference call. Alongside me is Peter Tam, our Chief Financial Officer, and he'll take you through the detailed financial and operating numbers later on in the presentation. We'll begin with the forward-looking statements, and I'd encourage everyone to read them. On health and safety, our record has been very, very strong and it remains that way. 10.1 million — pardon me, 9 million hours worked with no LTI; in Q2 of this year we recorded zero LTIs while more than a million person hours were worked during the quarter. That's a fantastic achievement for a young team and a milestone the group truly deserves. Moving to the quarter, the operational and financial highlights: gold production came in at 35,482 ounces, gold sales at 33,608 ounces, with an all-in sustaining cost of $1,109 per ounce. Our plant ran 7% above nameplate. Cash at quarter end stood at $32.3 million. We also repaid more than $19 million of principal senior loans. In addition, we moved forward on all growth initiatives, among them our expansion study, our grid power connection, and the next stages of our resettlement action plan. I'll go into these in greater detail later in the presentation.

Patrick Downey

executive
#3

At this point I'll pass things over to Peter Tam. Peter?

Peter Tam

executive
#4

Thank you, Patrick. Turning to the financial and operating highlights. Following a strong first quarter of the year, we delivered another profitable quarter in the second quarter. During the second quarter, we produced $35,482 gold ounces and sold $33,608 gold ounces, with a realized gold price of $1,970 per ounce. Cash cost came in at $924 per ounce, while all-in sustaining costs were $1,109 per ounce, giving a cash margin per ounce gold of $861, or 44%. The company's gold sales remain unhedged. Revenue was $66.4 million, with earnings from mine operations of $27.5 million after deducting costs of sales of $38.9 million. Pre-tax income was $19.7 million and income tax expense was $6.7 million, resulting in net income of $13 million. Net income attributed to Orezone shareholders was $11.4 million after deduction for non-controlling interests of $1.6 million. Basic and diluted earnings per share attributable to Orezone shareholders were $0.03 per share. With respect to cash flows, operating cash flow before working capital changes was $25.2 million and after working capital was $20.2 million. Cash flow use in investing activities included our growth projects for the grid power connection, and resettlement construction and compensation totaled $12.4 million. This resulted in free cash flow of $8 million for the quarter.

Peter Tam

executive
#5

During the year's first six months, we produced 76,783 gold ounces, and gold sales came in just a few ounces under that figure, at 76,747 ounces. We realized an average gold price of $1,926 per ounce, with cash costs of $854 per ounce and all-in sustaining costs of $1,006 per ounce. Mine operations earnings reached $67.2 million, and net income was $38.6 million. Basic earnings per share attributable to Orezone shareholders came to $0.10. Cash totaled $32.3 million as of June 30, following $19.1 million in principal repayments on the course bank senior loans during the second quarter. Moving to Slide six, I'll cover production and unit costs. At the mines, we moved 5.1 million tonnes in the second quarter at a waste-to-ore ratio of 1.64. Ore processed amounted to 1.4 million tonnes, still above nameplate performance though somewhat below the first quarter, as we carried out maintenance for the mill re-line and sizer shaft change-outs. The average head grade was 0.87 grams per tonne gold, and process recovery was 91.1%, which again yielded 35,482 ounces of gold production. Head grades declined modestly versus Q1 as the company drew down its stockpile of higher grade ore built up during construction.

Peter Tam

executive
#6

Recovery came in slightly lower, and as the mine gets deeper at a particular pit, Bombore is starting to hit more transition ore. Unit cash cost at the mine site reached $20.91 per tonne, up 10% quarter-over-quarter versus Q1 costs of $18.95 per tonne. The increase stems primarily from higher maintenance expenses, reduced throughput, and larger unit consumption of lying grinding media and power as a result of processing more transition ore this quarter. I'll now turn things back over to Patrick.

Patrick Downey

executive
#7

Thanks, Peter. So, a small update regarding our guidance. Our all-in sustaining costs have been revised modestly upwards. This has really been due to some lower gold production and head grades. Also, higher budgeted fuel prices and budgeted fuel prices, our fuel price in Burkina is significantly higher than other West African countries. And we have not seen any change in that. Also, our ForEx and our government royalties as we've done our budgets 1700 gold being above that is another 1% royalty on top of that, so that added to our a little to our guidance. Our gold production is expected to be the lower end of guidance, which is mainly due to unaccounted historical artisanal depletion, which were really a contract in Q2. I'll go through that a little bit in the next slide and I'll show some detail there. And we're really setting the foundation for the future we reduced our debt by $33 million in two quarters, that's quite a significant achievement. Sorry, by $28 million, we have $33 million budgeted for 2023. Our RAP progress is proceeding to allow us to access the remainder of the mining permit including the southern oxides and the hard rock for the next part of the expansion and upgrade power will connection will materially reduce our life of mine power costs going forward.

Patrick Downey

executive
#8

Alright, just a bit on the proof of historical artisanal work — we really see most of that in the H1 pit area, which is the highest-grade pit on the project. Now, past 40 meters of depth in that pit, there’s less sign of it, but you can see this is something we hadn’t factored in going forward for that area. So it did have an impact on our production during that period. The model is solid, I can tell you that, and a third party reviewed it — no way she’s expected me as we move forward here — so really this was a depletion in a high-grade area within one particular pit. On to our expansions — current, sorry. Growth projects are the 130 KV power supply project; we’re tying into the national grid with a switching station right there. A 19 kilometer transmission line and an on-site substation with stepped-on transformers. All major procurement has now been awarded. Deliveries are ongoing. Contractors are in the field, established, and progressing well. At the substation, more concrete is being poured. Our foundations are going in for a power line; we expect to start power line erection in late August, and we’re trending on schedule and on budget.

Patrick Downey

executive
#9

And that's going to bring our asset down quite a bit as we move forward. Our Phase II RAP, which matters a great deal to the company's growth as well. All of us — the contracts went to local bidders. We put in a real, deliberate effort to source this kind of work locally. We've got more than 1200 structures that need to be built. It got held up because of sacred community rituals at the site. Our owner's team and contractors — plus additional contractors — have not yet been put in place. And in this photo you can see the progress we made across June and July. So we truly got the bulk of the progress done in that window, and we're expecting things to speed up and local construction to ramp for the remainder of the year. Moving to the expansion study, which really represents the company's future and the next major value driver — it remains on track to wrap up in late Q3 2023. The resource estimates are finished now, the mining pit optimizations are finished, and design work is underway. Mine scheduling should get going in mid-August. Our metallurgical test work is finished, and that's been a very strong positive for us — you can see the expansion's layout right there in this photograph.

Patrick Downey

executive
#10

We've finished the process and infrastructure design, and the costing work is far along and nearly done; we anticipate the initial version of the capital cost within the next few weeks. We've got firm bids in hand for the SAG mill, and the price matches what we expected. That mill is the long lead item and sits on the critical path. And telling stories is simply an extension of what we do today. But every one of the people geotag programs is finished, and the design work is finished now as well. So it's a straightforward circuit. In the original 2019 feasibility study, we had output of roughly 134,000 ounces annually over the initial 10 years. Our target now is more than 250,000 ounces each year. As a duplicate CIO, precisely the same as our view in 2022. On the CapEx per annual time process, my expectation is it lands at about 50% of what a typical CapEx project would show. That means our return on invested capital should rank among the best in the business. There's considerably more exploration too — we've generated many targets from the drilling carried out in 2022. So we have additional targets to drill and room for future growth.

Patrick Downey

executive
#11

So really, for Bombore, this is just the following phase of growth, as we see it. That's all for Q2, then. Thanks for tuning in, and I'll pass it along for any questions.

Jeremy Hoy

analyst
#12

Hi, thanks for taking my question. I suppose we'll begin with the changeover to the power grid. With the complete quarters of operation you've now had, could you offer us a rough sense of the expected savings on power per ounce? That's for when Bombore makes the switch to grid power at the end of the year.

Patrick Downey

executive
#13

Yes, thanks, Jeremy. Well, I believe we did put that into operation — let me just check the figure, 76,000, over a yearly span, given what diesel costs us at present compared with what grid electricity would be, it comes to roughly 20 to 22 million in savings each year. So across Q1 and Q2, that would be approximately a $150,000 reduction, a $150 per ounce reduction, and all in sustaining. So going forward, I would expect you'd be looking at roughly that range of $100 to $150 per ounce in savings on all-in sustaining costs per ounce. So that's fairly clear, Jeremy.

Jeremy Hoy

analyst
#14

Absolutely, yes. Thanks for that. Moving on to my next question, which is about exploration. So even with the near-term emphasis on improving the Phase II expansion, what does the company intend to do when it comes to exploration and going forward? I do remember that there was possibly a new geological understanding coming out regarding a unit tied to potentially higher grades.

Patrick Downey

executive
#15

Right, so we're bringing in a third party, I believe it's next month, to go over all of the results. We have a number of targets, Jeremy, but what we're going to do is review the overall structural setting of the deposit — the structural picture as a whole. What we're seeing now is that this unit is showing up throughout the entire length of the deposit. And we really had thought it was only limited to the southern end. That's no longer the case. In particular, we had it in P8/P9, and we've now had it at Maga Hill, which sits right up at the north. So we really want to work out where all of this connects together — it's wide open, and the size of it, as I can tell you, means there's further exploration to be done there. The last hole we drilled, the most northern hole, was 12 meters at four grams just below surface. So it's a pretty exciting exploration project. But it's also really about how it ties into the rest of the overall structural setting. And we want some fresh eyes, and not to look at it the way we do when we're identifying some of those targets. Some of them are easy targets to identify. What we're really trying to work out, on a bigger and broader sense, is what this means for the deposit.

Jeremy Hoy

analyst
#16

All right, excellent. Well, I’m eager to watch how that narrative develops in my view. That’s all from my side—I’ll return it to the operator.

Operator

operator
#17

The next person in the queue is Ron Stewart from IA Capital Markets. Your line is now open.

Ron Stewart

analyst
#18

Morning, Patty. Morning, team. Nice work this quarter—you’re clearly executing well. Patti, could you give us a bit of color on what’s happening in Niger and whether that is affecting—or whether it has any effect at all on—the situation in Burkina Faso? There’s a lot of noise, obviously, and it’s likely weighing on the market and on market sentiment toward things—any impact at all.

Patrick Downey

executive
#19

We have certainly not observed that. Everything is calm in our location. There is nothing—we also have an office in Ouagadougou, and nothing is happening there either. I believe plenty of diplomatic talks are taking place behind the scenes. We have heard and understand that a president is going to be appointed, and that person will be a non-military individual. So we suspect something is underway there. Obviously, there is chatter surrounding it for us. I mean, this is West Africa, we are present in the region, and we simply have to wait and observe how it concludes. But nothing we are doing is being affected. As far as I am aware, there have been zero delays to equipment deliveries, supplies, et cetera, on the project at all, or in the country.

Ron Stewart

analyst
#20

All right, that's fine. It's roughly what I figured. Still, there's a fair amount of noise, no question. As for the project, I did note that tank retention time will fall to roughly 24 hours in order to achieve the recovery. What retention time applies at present in the oxide you're running today—is it likewise 24 hours, or…?

Patrick Downey

executive
#21

It's the same surrogate as Ron, and it runs 24 hours; leaching does begin a bit ahead of that, yet the kinetics are fairly quick, so it'll be exactly the same retention — and we'll essentially have one additional tank, since we're duplicating the circuit. So that's 4.4 million tons of — we placed the tons, and we'll have capacity for that if the mill performs better than planned. And really, where that came from: originally we had 42 hours, which was obviously a larger lead circuit with more tanks and more equipment, but adding oxygen into the tanks cut that down and sped up the kinetics. So that's a big saving for us. So all the equipment — the agitators, the tanks, the pump, the steel work at the top of the tank — is an exact replica of what we installed in 2022.

Ron Stewart

analyst
#22

Got it. And you've noticed — I noticed that you're looking to bump the throughput to about 10.1 million tonnes per annum, is that just optimizing the entire circuit, collectively?

Patrick Downey

executive
#23

That's simply leveraging the present throughput passing through the oxide. Radiation is present in the oxide, yet it isn't truly a factor for the 5.7 loans in this case, and we don't anticipate it dropping under that level. As a result, we can supply it using those oxides. That's our plan going forward. Then there's the 4.4 figure on the hard rock. Naturally, we're hoping the hard drive, similar to every other plant across West Africa, achieves 5% to 10% higher throughput as well, but time will tell — we'll reach that point once we've built them.

Ron Stewart

analyst
#24

Well, listen, thanks a lot. Keep up the great work you're doing. And congratulations on the quarter. Let's hope things calm down for you.

Operator

operator
#25

Don Blyth from Paradigm Capital has the next question. Your line is open.

Don Blyth

analyst
#26

Thanks. Patty, congratulations on a reasonably solid quarter — a few start-up bugs, but nothing too significant. Regarding that unexpected artisanal depletion, first, my assumption is that it's entirely historical, from before development began, and that the site is secure. You aren't dealing with any current problems on the artisanal side, are you?

Patrick Downey

executive
#27

That's right. Yes. Look, there's absolutely nothing active at present. And we actually — when we relocated all the artisanal miners off, they moved and built a village somewhere else, and so on. But yes, all of this is historic. We had charted a fair amount of the artisanal workings that we believed existed from the time we arrived on the site. Clearly, there was more, because obviously more had been happening before we got there. And it really sits in 1 high-grade zone run. It's — we don't really have courts on the products that are barren of gold, but it appears to be right along that course where they were mining. And it came as quite a shock to us that all of a sudden this wood started coming out of the mill while mining, and we realized we weren't getting the proper reconciliation on the grade. But we've now mapped all of that, and we're fairly comfortable where we are, but it is absolutely historical. It's not going forward. There are <<inaudible>> there.

Don Blyth

analyst
#28

And regarding any kind of incentive — how far down they may have gone — you mentioned that the lower benches are displaying reduced artisanal depletion <<inaudible>>.

Patrick Downey

executive
#29

It looks like we're at roughly 40 meters, based on our benchmarking, and we're now at the bottom. We aren't seeing that as often now as we did when we first began descending into that particular zone, which goes by the name H1. So the rabbit warrant they had established in that area really isn't present below a 40-meter level on average.

Don Blyth

analyst
#30

Great. And regarding the grid power, where does that electricity ultimately come from? Might there be any increases in cost? Or do you have pricing that's sort of locked in? And for other operations, how reliable has that grid power been?

Patrick Downey

executive
#31

Yes. The Burkina side has secured their pricing. It comes from hydro, and Burkina adds a solar component that they've constructed and connected into the network — in fact, two solar plants, hooked to two separate grids, and they'll be linked to the Nigerian grid over the next few years. So it's going to be an extremely dependable supply. Who else is connected to it? Well, for Burkina, you'd be looking at Hyundai, Wanyana Yaramoko, and Mane. Take Hyundai as an example — you'll notice the total cost per tonne at the processing plant, which is the place where it really shows, hasn't actually shifted at Hyundai across the years, roughly $11 and change per — sorry, dollars per tonne, purely because it's connected to that system and not to the others. If you were running on diesel, you'd certainly see that expense rising. And it's highly dependable. We've spoken with the other users of this. We've completed a thorough analysis of it alongside an outside firm that installed all of these connections, called ECG, and reliability is very strong, in the 98% to 99% range.

Patrick Downey

executive
#32

After we connect it to the Nigeria grid, reliability would be essentially 100%.

Don Blyth

analyst
#33

Great. I bet you're eager for that. And I have to say I was impressed — that's a bigger saving than I had expected.

Patrick Downey

executive
#34

Yes. Diesel prices in Burkina have stayed really elevated. I believe we're at roughly $1.90 per liter. Across the region, it's about $1.27. So Mali, Cultivar and so on. We thought it would settle down later in the year, or over the course of it, but that didn't happen, and it hit our ASX hard — we had forecast a lower cost, and that forecast didn't pan out. That piece is genuinely beyond our control. It also left our power costs higher than what we had budgeted to produce at. Naturally, we're in a dispute with the parties who were originally meant to supply that power, and this higher cost — what we're paying now this year compared with what we ought to have paid for power this year — will form part of our arbitration dispute.

Operator

operator
#35

Eileen Clark from Retire is on the line with another question for us. Please go ahead — you're connected.

Analyst

analyst
#36

I'm pretty happy with how the second quarter turned out. I'm just curious about the royalties — those royalties rise alongside the gold price, so what happens if gold goes above $2,000, and where do the royalties stand at the moment?

Patrick Downey

executive
#37

Right, so the royalty gets capped once the gold price goes above $1,700. For 2023, our production and cost planning used a $1,700 gold price, and at that level we assumed the royalty would top out at 5%.

Peter Tam

executive
#38

Regarding Burkina Faso, the royalty on gold production or sales tops out at 5%, and we have already hit that ceiling. Clearly, with gold prices trading above $1,300 — and we saw realized gold prices in the quarter above $1,900 — we are paying the maximum royalty. Beyond that 5%, an additional 1% local development tax applies. So all told, on the top line there, the royalty effectively comes to 6%.

Patrick Downey

executive
#39

So that's the cap. But the royalty grows larger as the gold price rises.

Peter Tam

executive
#40

Well, the larger the royalty check gets as the dollar figure rises. So from our standpoint, when it comes to the guidance on all-in sustaining cost, we had set $1,700 as the budgeted gold price for 2023, and clearly we're well above that for year-to-date. That obviously means the dollar amount of royalty costs has come in higher than we budgeted for, and that clearly affects the all-in sustaining cost we've reported so far this year.

Analyst

analyst
#41

All right. And your expectation is that the government won't raise the royalties once they go past $2,000, given how much money they need.

Patrick Downey

executive
#42

No, we don’t. Of course, we keep an eye on the fact that Chimera <<inaudible>> mines, and that operation is quite active within the country-monitoring effort, but so far we haven’t observed any indication that this is taking place.

Analyst

analyst
#43

All right, and for my last question: so from what I gather, we should expect fourth quarter profits to come in lower, and that's because of the earlier Orezone mining plus the diesel price. Is that right?

Patrick Downey

executive
#44

My sense is that Q3 will probably be our weakest quarter — that's the rainy season, clearly — and then we build back up in Q4. So on a quarter-by-quarter basis, you can interpret it however you like, but I think we're fairly confident about the full year overall. So that's really the mine plan, and you operate according to your mine plan. So typically you're mining the upper section of the ore body during Q3, since you've got rain entering the pit, so you don't want to be at the pit bottom — you can get back into the pit bottoms once you've pumped them out in Q4. So it's all part of the mine plan.

Analyst

analyst
#45

And how do you expect the grade to trend from here?

Patrick Downey

executive
#46

I think if things go well, we'd probably land around what we said we'd generally average, less a bit of artisanal depletion. Then we get back into the South in Q — sorry, in 2024, which lets us get back to the higher grade at the southern end of the project in 2024. And then in 2025, we have the hard rock expansion, which obviously gives our grade a significant uptick.

Alina Clark

analyst
#47

Thanks a lot. I’m really happy with how things are progressing going forward.

Operator

operator
#48

That brings us to the end of the question-and-answer session. Mr. Downey, the floor is yours again.

Patrick Downey

executive
#49

Thanks so much, and I appreciate all of you joining today's call. Clearly, we're eager about several important catalyst events coming up in 2023. The publication of our expansion study, which we see as a significant catalyst for the company. Naturally, we're anticipating the structural review of the project and our direction on exploration targets, plus linking up to the grid, which plays a big role in bringing down our all-in sustaining costs ahead. So the rest of 2023 and into 2024 ought to be quite exciting.

Operator

operator
#50

That brings us to the end of today's conference call, everyone. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Orezone Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Orezone Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Orezone Gold Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.