Orion Group Holdings, Inc. (ORN) Q4 FY2025 Earnings Call Transcript & Summary
March 4, 2026
Earnings Call Speaker Segments
Operator
OperatorGood morning, and welcome to the Orion Group Holdings Full Year 2025 Financial Results Conference Call. [Operator Instructions] Please note, this event is being recorded. I would now like to turn the conference over to Margaret Boyce, Investor Relations for Orion. Please go ahead.
Margaret Boyce
AttendeesThank you, operator, and thank you all for joining us today to discuss Orion Group Holdings Full Year 2025 Financial Results. We issued our earnings release after the market last night. It is available in the Investor Relations section of our website at oriongroupholdingsinc.com. I'm here today with Travis Boone, Chief Executive Officer of Orion; and Alison Vasquez, Chief Financial Officer. On today's call, management will provide prepared remarks, and then we will open up the call for your questions. Before we begin, I'd like to remind you that today's comments will include forward-looking statements under the federal securities laws. Forward-looking statements are identified by words such as will, be, intend, believe, expect, anticipate or other comparable words and phrases. Statements that are not historical facts are forward-looking statements. Our actual financial condition and results of operations may vary materially from those contemplated by such forward-looking statements. Discussion of the factors that could cause our results to differ materially from these forward-looking statements are contained in our SEC filings, including our reports on Form 10-Q and 10-K. With that, I'll turn the call over to Travis. Travis, please go ahead.
Travis Boone
ExecutivesThank you, Margaret, and good morning, everyone. Thank you for joining us today to discuss our 2025 results and 2026 guidance. Before we begin, I want to acknowledge the ongoing conflict involving Iran and the Middle East. We extend our sincere appreciation to the men and women bravely serving our country. We recognize the situation remains very fluid, and we are actively monitoring developments and evaluating any potential impacts on our business and markets. Now on to my prepared remarks. 2025 was a year of strong operational execution and meaningful advancement of Orion's long-term strategic priorities. We drove both top and bottom line growth and generated good free cash flow. Across the organization, our team delivered with predictable excellence, executing projects safely and profitably, strengthening our balance sheet and taking important strategic steps that position our company for continued growth ahead. Over the past several years, we have been very clear about what we set out to do: improve execution, strengthen margins, professionalize the organization and build a platform capable of capturing the significant opportunities across mission-critical marine infrastructure, defense and concrete construction. In 2025, we translated that strategy into results. Importantly, we took decisive, strategic actions that advanced our long-term growth plan. In December, we closed a new $120 million senior credit facility that improves our liquidity, lowers our cost of capital and provides flexibility to support both organic growth and accretive acquisitions. We also purchased the derrick barge in December to further increase capacity and execution flexibility. As many of you are aware, we've been on the hunt for a large Jones Act derrick barge that will enable our team to pursue a broader range of marine and defense-related work. The barge is currently undergoing some refurbishments, and we expect to deploy it into our operations later this year. Last month, we completed the acquisition of J.E. McAmis. The transaction greatly enhances our marine platform, particularly in complex jetty and breakwater construction where McAmis has deep, proven expertise. Their strong Pacific footprint, experienced workforce and high-quality equipment fleet expand our ability to execute large, technically demanding projects. Integration is well underway, and we're very encouraged by the strong cultural alignment and the collaboration we're seeing across the combined organization and contracts awarded to McAmis over the last several weeks. In 2025, we consolidated our Houston footprint into our new headquarters office, implemented a modern project management platform, favorably settled multiple litigation matters and monetized nonstrategic real estate. Collectively, these deliberate actions improve our readiness for the next wave of large-scale mission-critical marine and concrete infrastructure opportunities and reflect tangible progress for our strategic plan. While most aspects of our performance met or exceeded expectations in 2025, backlog was the one area where results were not as we anticipated, even though our win rate in 2025 improved over 2024. For the year, we booked just over $763 million in new contracts and change orders across the company, which represented a 0.9x book-to-bill. Customer decisions moved to the right primarily due to tariff-related uncertainty in the private sector at the beginning of the year, followed by the prolonged U.S. government shutdown later in the year, which delayed public sector bidding and awards. Importantly, we believe this is only a timing issue with the work simply moving to the right as opposed to going away. We remain confident in our strong demand outlook, which is supported by the tailwinds we are experiencing across our markets. In addition, recent developments in the Middle East may accelerate government action to approve additional defense funding. We remain bullish on our backlog trajectory and long-term growth outlook with a vibrant growing pipeline that is currently at $23 billion, which includes the J.E. McAmis pipeline of $1.4 billion. Our marine opportunity pipeline increased $3 billion or 21% sequentially to over $19.4 billion as of December 31. This does not include the McAmis acquisition, which we closed on in February. This growth reflects building demand and urgency across both public and private sector clients, and we're pleased with the 2026 funding for the Department of War Pacific operations. Across our operating regions, we have a healthy volume of opportunities expected to be awarded throughout the year for clients spanning the U.S. Navy, the Coast Guard, regional port authorities, state Departments of Transportation and private energy and chemical clients. Moving on to concrete, where our opportunity pipeline grew to over $2.4 billion at the end of 2025. Over the last several years, our team has built a strong and expanding position in data centers and the mission-critical construction market. The team produced good bookings throughout 2025, increasing year-over-year backlog by 10% with recent awards spanning data centers and other commercial structures. Our expansion into Florida and Arizona is paying dividends, fueled by a growing project pipeline and solid execution. I'd like to drill down into our data center work, a real highlight in our concrete business that is improving literally by the day. I spent a good amount of time with the team last week, and let me tell you they are killing it. Today, our data center count stands at 46 projects, either completed or in progress across Texas, Iowa and Arizona. We're seeing a shift toward larger campus-style developments for which execution and schedule certainty reigns supreme, and our team has earned an outstanding reputation as a reliable delivery partner on mission-critical programs. In addition to construction of the buildings and foundations, we are increasingly engaging with key clients earlier to address constructability concerns and to implement targeted design improvements. To support these strategies, we've recently expanded into site civil and earthwork to strengthen execution certainty for our clients and also to broaden Orion's scope of services. We expect to see data centers contribute even more significantly to our concrete business this year with some large opportunities developing in our markets. In closing, as I reflect on the year, I'm excited about the deliberate execution of our strategic priorities, buoyed by building momentum in our key end markets. With a $23 billion pipeline, inclusive of McAmis, a healthy balance sheet and the best client-centered execution team in the business, we have an excellent runway for 2026 and beyond. With that, I'll turn the call over to Alison to talk through our financial results and our 2026 guidance. Alison?
Alison Vasquez
ExecutivesThanks, Travis. We were pleased with the financial and operational progress we delivered this year, reflecting disciplined execution across the organization and continued focus on profitable growth, cash generation and balance sheet health. For the full year 2025, revenue increased to $852 million, operating income to $15 million, adjusted EBITDA to $45 million and adjusted EPS to $0.25 per share. I am also very pleased to report that we generated full year operating cash flow of $28 million and free cash flow of $14 million. Across all metrics, these results were a notable improvement over last year. From a segment perspective, in 2025, Marine delivered $545 million of revenue, a 4.5% annual growth and more than doubled its adjusted EBITDA to $56 million for the year. This represents a 10% adjusted EBITDA margin compared to about 5% in 2024. The improvement in adjusted EBITDA was driven by favorable revenue mix, excellent execution, favorable equipment utilization and positive project closeouts. For reference, Marine's contribution adjusted EBITDA margin for the year was 15%. In 2025, Concrete revenues increased 12% annually to $307 million and Concrete reported an $11 million loss in adjusted EBITDA. The reported adjusted EBITDA loss is primarily attributable to the impact of corporate allocations in 2025 and favorable project closeout benefits in 2024 that did not reoccur in this year. Concrete's contribution adjusted EBITDA margin for the year, excluding corporate, was 4.5%. To provide increased transparency on segment operating margins, we plan to update our reportable segments beginning in the first quarter of 2026. Specifically, we plan to break out corporate expenses separately as a nonoperating segment and will no longer allocate those costs to Marine and Concrete for external reporting purposes. This change is intended to increase transparency of our operating segment's results. Moving on to the balance sheet. As many of you are well aware, late in the fourth quarter, we entered into a 5-year $120 million credit agreement with UMB Bank. This facility meaningfully improves our liquidity, reduces borrowing costs, extends maturity by 2 years and positions the balance sheet to fund future investments. It includes a $60 million revolving line of credit, a $20 million equipment term loan facility and a $40 million M&A term loan. It also includes an additional $25 million uncommitted accordion to fund future growth. The UMB facility refinanced and replaced our previous $88 million credit agreement, which was scheduled to mature in May of 2028. Borrowings under the UMB credit facility bear interest at a rate of SOFR plus 2.5% to 3%, a 40% reduction in our borrowing costs compared to the prior credit agreement. A big shout out to our treasury and legal teams for getting this across the line. In connection with this refinancing, we paid off our $23 million term loan and ended the year with net debt of just about $6 million. I would like to point out that subsequent to year-end in February, we increased our senior borrowings by $47 million to fund the McAmis acquisition. I'll wrap up with our guidance update for 2026. We're very pleased to provide our full year 2026 guidance as follows: revenue in the range of $900 million to $950 million, a 9% increase from 2025 at the midpoint; adjusted EBITDA in the range of $54 million to $58 million, a 24% increase from 2025 at the midpoint; adjusted EPS in the range of $0.36 to $0.42, a 56% increase from 2025 at the midpoint; and capital expenditures in the range of $25 million to $35 million, consistent with last year. That's it for me. Back to you, Travis.
Travis Boone
ExecutivesThank you, Alison. We are very proud of what we accomplished in 2025, and we view this year as a bridge, not a destination. Over the past 12 months, our operations team executed projects safely while growing revenues and adjusted EBITDA. Meanwhile, our corporate team sold the East West Jones property, restructured our credit facility, purchased the derrick barge and acquired J.E. McAmis. None of this progress would have been possible without the hard work, dedication and commitment of our people, and I want to thank them for their outstanding efforts. With a strong operating platform, expanded capabilities and favorable market tailwinds, we're excited about the opportunities ahead and believe Orion is well positioned as we look to capture more work and continue to execute for our employees, clients and shareholders in 2026 and beyond. We'd now like to open up the call for your questions.
Operator
Operator[Operator Instructions] And the first question will come from Tomo Sano with JPMorgan.
Tomohiko Sano
AnalystsIn Q4, you talked about some of the delay of the revenue recognition for awarded projects. And could you talk about the impact to your reported sales and margins in Q4? And could you specify which segments or projects experiences that delays and quantify the revenue and margin impact in 2026, please?
Alison Vasquez
ExecutivesSure, Tomo. I'll start and Travis, if you want to add in. But from a 2024 perspective or from a Q4 perspective, the fourth quarter came in generally in line with what we expected. We didn't see a lot of softness in the quarter and generally kind of in line with what we were targeting and in line with the guidance that we had set out for the full year. I'll say that things do typically in Construction, they will move around a bit in terms of just timing and cadence. And you probably saw some of that in terms of just margin profiles for the individual segments. But from an overall perspective, things came in, in line, including from a corporate perspective. Does that answer your question, Tomo?
Travis Boone
ExecutivesThere were a few -- there were some opportunities that slid out of Q4 that we were pursuing, but that's not on the -- that's on the -- more on the kind of...
Alison Vasquez
ExecutivesPipeline.
Travis Boone
ExecutivesPipeline side of things.
Tomohiko Sano
AnalystsYes. So could I double-click on your commentary about the margins, Alison, if you could talk about the 2026 outlook by segment in terms of the margin expansions from 2025 to 2026?
Alison Vasquez
ExecutivesSure. I'd be happy to. We are continuing to expect that we will have modest margin expansion across the business, both from the favorable impacts of blending McAmis into the Marine business. As you probably will recall, McAmis operates at a meaningfully higher margins than the rest of Orion. So we are expecting to see some favorable blend associated with that acquisition and the incorporation of their results. And then from a concrete perspective, we do expect that concrete will deliver margins in the mid-single digits. For the year in 2025, concrete delivered margins of right around 4.5%. And we do expect to nudge that up in 2026, just as a function of some favorable demand signals that we're seeing in terms of the work that we're bidding on, the work that we are winning and bringing into backlog as well as just continued growth and scale, which benefits our concrete business pretty meaningfully.
Tomohiko Sano
AnalystsIf I may squeeze one more on the data center, Travis, you talked about data centers. Could you quantify the impact in 2026 in terms of the revenue compositions as well as some competitive advantages in data center projects for Orion, please?
Travis Boone
ExecutivesI'm not sure if I'm ready to point to the fence yet on what -- where we're going to land with data centers. As Alison just mentioned, we are seeing a large amount of opportunities that are lining up well with our capabilities and relationships and all of that. We've got -- we did start -- as I mentioned, we've started doing site civil work on some of these data centers, which has been very well received, and we're doing well with that work. So I think that will expand and continue. And I think we're going to keep seeing just a large amount of data center work happening. I mean we're -- right now, it's 40% of our concrete business is data centers. I expect that to probably go up a little in the next year.
Operator
OperatorThe next question will come from Aaron Spychalla with Craig-Hallum.
Aaron Spychalla
AnalystsMaybe first for me, just on the pipeline, can you talk a little bit more about that? It sounds like the expansion pretty broad-based. Any thoughts on kind of time line conversion to orders? I know you've had a slide that kind of has laid out timing potential there. And then just maybe talk about the kind of market and margins you're seeing quotes and kind of backlog-wise.
Travis Boone
ExecutivesYes. So the pipeline has expanded. Some of that's been because things have slid, right? So it's kind of it's building, but there's also some things sliding, which makes it look like it's getting even more big. But it's -- we've got quite a few near-term opportunities in 2026 that are $100 million-plus projects, more -- let's say, more than a dozen very real opportunities that are over $100 million in size, which are -- gives us a lot of confidence even though our backlog is down. We're one job away, one project win away from the backlog being in good shape. So we're not worried. We're bidding projects in the real near term here that we feel good about. So we're not -- I know maybe some concern about backlog. But from our -- in our minds, we're nowhere near getting worried. We're in good shape. We have all the opportunities in front of us. And like I said, we're one win away from being just fine on the backlog with -- for our Marine business. And our Concrete business backlog, our pipeline is growing and looking really strong. As you may recall, our Concrete backlog -- or Concrete pipeline, excuse me, is -- it's typically fairly small because there's a lot of book and burn and it's private sector opportunities, which are not super visible long in advance. So we're excited to see the Concrete pipeline creeping up as well as the Marine pipeline continuing to expand. And then we added in McAmis that makes it even -- gives us even more opportunities to pursue.
Aaron Spychalla
AnalystsAnd then outside of McAmis, on margins kind of in the -- as you're going to bid projects, is that still -- how is that looking?
Travis Boone
ExecutivesOn the McAmis side of things, nothing has changed as far as margins, bid margins and things like that. They're going to continue pursuing projects as they have and...
Alison Vasquez
ExecutivesIn the rest of the business...
Travis Boone
ExecutivesIn the rest of the business, things are looking good. No -- we're not seeing any like downturns or anything like that, in fact, I would say more the opposite in several of our markets.
Aaron Spychalla
AnalystsGood. Good. And then maybe second, on the data center side of things, you kind of talked about an expansion site in civil and earthwork. Any thoughts high level what that means for maybe average project size or how quickly these projects can continue to turn with that dynamic?
Travis Boone
ExecutivesI'm probably not going to give too much information just for competitive reasons. But I think it's -- it depends on where the data center is and how much infrastructure and dirt work and things like that need to be put in before the concrete and foundations happen. But there's -- there can be fairly significant amounts of work that goes into that. And it gives us something else to sell to our customers. And as many of them are kind of shifting to campus -- bigger campuses, sometimes those get to be much larger, right? They still do these data centers, and we've talked about this before, but they don't -- even though it may be a really large data center, they kind of go a little piece at a time. And it's literally -- here's one little piece and another little piece and another little piece and they need to look back 6 months later, and it's -- you've done a ton of work over a period of time. So it's -- these things turn in from a $500,000 task order and next thing, you've done $50 million worth of work a little out of time so -- well, a little out of time, but very quick.
Alison Vasquez
ExecutivesYes. And I think the other important thing there is as our team -- because our team has such a high level of credibility in this really critical aspect -- on the critical path of these projects in terms of just the building infrastructure, the infrastructure to support all the really important internal things. But because our team is -- has such credibility in that area, we are being engaged earlier in terms of, just as Travis mentioned in the call, some of the constructability, some of the concerns, some of the things that we have seen over the now 46 and counting data centers and campuses that we've worked on and incorporating those lessons for our clients, our clients are seeing that as a really valuable level of expertise that we bring to the table, which means that ultimately, we do become a trusted partner in this aspect of the building and the construction. So it's a pretty exciting time. I mean, really, my hats off to that team who've built very, very strong relationships with a number of the key players.
Operator
Operator[Operator Instructions] The next question will come from Gerry Sweeney with ROTH Capital.
Gerard Sweeney
AnalystsJust a couple of follow-up questions maybe. But just looking at the marine side, obviously, the pipeline is growing. You said some of the projects pushed to the right per se. But are you hearing anything or do you have any anecdotal commentary on maybe when some of these projects may come to fruition? Obviously, they're quite large, complicated. We've had a government shutdown and then we have escalating conflict in the Middle East. But all that said and done, I'm just curious as to maybe some of the anecdotal items that you're hearing on those opportunities.
Travis Boone
ExecutivesSo I mean, we're bidding one of them. We're bidding a nice project this week. There are things moving forward now. I guess it's -- there's not like a theme, if you will, of the different reasons that they've moved. Some of them moved for different things. But they are just shifting to the right. They're not -- it's not a never-ending shift to the right. They are actually coming to roost at some point, like the one I just mentioned that was originally supposed to be last year, and we're finally bidding it this week. So there are projects that are coming through. We're bidding quite a few jobs in the next 6 months, pretty nice ones, along with the normal kind of run-of-the-mill projects that we always go after. But I don't know if I answered your question, but...
Gerard Sweeney
AnalystsYes, sorry, go ahead.
Alison Vasquez
ExecutivesWell, I'd just add, Gerry, that as we look at the pipeline, the pipeline does continue to be very robust. We continue to have our good line of sight into $8 billion, $8.5 billion of opportunities that we expect to be awarded in 2026. And that's pretty normal. We have seen some clients really engage in a more meaningful way, which to us signals that some moves are likely going -- or some decisions are likely going to be made in the near term. But as we think about the pipeline, it stacks up to be probably about a 40-60 split in terms of what's going to -- for the 2026, what we have visibility into of what will be awarded in the first half versus the second half, which is pretty normal, just given in the federal government, there's usually a spike in the third quarter. And so yes, there are a good number of opportunities that we have both that we are working on bidding on. And then a lot of times, we will talk about the number of opportunities that we have provided all information on that we are just awaiting award from the client. And that number continues to sit at right around $1 billion. So to us, that's a little bit higher than normative, but it's been consistently at that $1 billion mark throughout 2025 and continues to be around $1 billion now. So that might just be the new norm in terms of when Travis talked about holding the pipeline a little longer, we do continue to see that number just stay right around $1 billion. But we are seeing some awards, some clients like moving and being more active.
Gerard Sweeney
AnalystsGot you. And at some point, that $1 billion kind of breaks loose, which is positive, obviously, right?
Travis Boone
ExecutivesThat's right.
Operator
OperatorThe next question will come from Alex Rygiel with Texas Capital.
Alexander Rygiel
AnalystsTravis, your historical win rate on bids sort of is in that mid-teens range. Is there any reason to believe that historical win rate will be any different going forward?
Travis Boone
ExecutivesNo, we saw that win rate kind of between -- from '24 to '25, it ticked up. Even though our backlog was down, our win rate was up. So it tells you that things were sliding. But we -- so we are -- we have seen it head in the right direction, just a little bit, 1% or 2%. And I don't expect it to change much. I mean it might continue to go up a little, but I don't expect it to be any large jump up or down on the win rate. We kind of like to be in that, let's say, 15% to 20% win rate sort of range, and that's where we are and feel pretty good about where we are.
Alexander Rygiel
AnalystsAnd then as it relates to your adjusted EBITDA guidance of $54 million to $58 million, can you bridge that delta from the $45 million you just reported and help us to understand sort of what's organic versus inorganic? And as it relates to sort of the organic, kind of how that's broken out by segment?
Alison Vasquez
ExecutivesSure. I'll give some high-level commentary. I would say that -- we are always gearing the business towards what we view as good organic growth. So that is like, first and foremost, really what we are doing to position the company is to invest in organic growth. Organic growth in 2026 is good. I would say it's probably just in terms of stepping back, I'd say it's in the kind of upper single to low double-digit growth rate from an organic perspective, just because of some of the opportunities that we see moving a bit to the right, specifically in the Marine business. I do think that Concrete will grow very favorably in 2026. We have signals that, that is happening, and that is real. But for Marine, those opportunities, they just take time to get through the pipeline to get through the -- all of the machine associated with bringing those opportunities to market by our client and then ultimately getting those things awarded. So some of those things that we expected we would see in '26 have moved a bit to the right. That being said, we do expect that our Marine business will continue to grow in 2026. Will it be at the dynamic growth rates that we are anticipating with some of the many things that are coming to market in '26 and '27? Probably you'll see that I would expect over the midterm, but that is not today built into our 2026 guidance. What I will say is I'll say that also from a McAmis perspective, that we have good line of sight into what we expect McAmis will deliver, which is right in line with kind of what we set out in the call back in February. They come with a very highly qualified, very reputable, very credible group of people. It's a phenomenal team. It's a phenomenal leadership organization there. So we're very excited about bringing them into the portfolio. And we're also very excited about some of the projects that they have won just recently. So they continue to perform. They continue to perform well, and we look forward to just bringing them into more of our opportunities and our projects to make our pursuit teams even stronger as we look ahead.
Alexander Rygiel
AnalystsVery helpful. And then the outlook for backlog near term, I kind of get a sense here that it's probably flattish to maybe trending a little bit down in the first quarter and the second quarter, but you expect a strong rebound in the third and fourth quarter. Is that a fair conclusion to come to?
Alison Vasquez
ExecutivesTo tell just from a backlog perspective, like we are working -- we are gearing the organization around a really a book-to-bill that is greater than 1. So I mean that is our objective. Our objective is to always be booking more backlog than we are burning. And so like with that in mind, I mean, it's hard from a quarter-to-quarter perspective to predict what backlog is, and it does kind of move around just based on how we burn, like how operational cadence of the project and then like what gets awarded within the quarter. But from a full year perspective, we do expect that to meaningfully deliver good bookings, which ultimately will serve to elevate our backlog balances. I'll also say that from a concrete perspective and really from a dredging perspective as well, like those 2 businesses have a very quick book-to-burn. And so they may have phenomenal years, but you may not see a lot of that manifested in the backlog at quarter end or at year-end just because of the amount of book and burn projects that they get awarded. But are we targeting elevated backlog through the year? Yes, that is absolutely a goal, and we'll track that really through kind of the book-to-bill and kind of how the organization is delivering on that.
Operator
OperatorThe next question will come from Liam Burke with B. Riley Securities.
Liam Burke
AnalystsTravis, you talked about closing on the derrick in late 2025. How quickly -- it's a fairly significant commitment, capital commitment. How quickly do you anticipate that investment turning into some sort of measurable return?
Travis Boone
ExecutivesWe'll get it -- as I mentioned, we've got some work being done on it for the next, I don't know, 6 -- let's say, 6 to 8 months. And once it's kind of in the condition and ready to go, we'll have it -- we'll get it busy and get it operational or get it working somewhere in our business. As far as payback on it, we -- I think we got a pretty good price on it. So I don't think it's going to be a long time to get kind of return on the investment.
Liam Burke
AnalystsGreat. And on the M&A front, the McAmis was opportunistic. Obviously, you don't have a pipeline of opportunistic acquisitions, but what does the acquisition pipeline look like for you?
Travis Boone
ExecutivesIt's a pretty active market out there at the moment. Lots of different things happening in the -- I don't know, it seems like it's not just -- it's across the board. It seems like acquisitions are -- have really gotten pretty strong across all sectors. I'm seeing it kind of all over the place, lots of different acquisitions and activity happening. I mean we saw Great Lakes just recently get acquired and go private and just lots of things happening out there that will give us -- potentially give us opportunities to do more in the next year or so.
Operator
OperatorThis concludes our question-and-answer session. I would like to turn the conference back over to Travis Boone for any closing remarks.
Travis Boone
ExecutivesThank you all for joining us today. We look forward to talking to you again soon.
Operator
OperatorThe conference has now concluded. Thank you for attending today's presentation. You may now disconnect.
This call discussed
For developers and AI pipelines
Programmatic access to Orion Group Holdings, Inc. earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.