Hello, everyone, and thanks for joining us today. I'm Loren Hanson, responsible for Investor Relations at Otter Tail. Yesterday evening, we posted our results for the first quarter of 2021. You can find the full earnings release and the slides that go with this call on our site, ottertail.com. Later today, a replay of this call will be accessible on our website as well. Joining me are Chuck MacFarlane, who serves as President and CEO of Otter Tail Corporation, along with Kevin Moug, our Senior Vice President and Chief Financial Officer. Before getting started, please keep in mind that forward-looking statements will be part of this call. As Slide 2 indicates, such statements reflect how we currently judge or view what lies ahead; risks and uncertainties surround them, and actual outcomes could differ materially, so we caution you against relying too heavily on any of them. Additional details about our forward-looking statements appear in the documents we file with the Securities and Exchange Commission, and we urge you to look those over. Otter Tail Corporation undertakes no obligation to update or revise these forward-looking statements as a result of new information, future events, developments, or anything else. To kick things off, I'll hand the call to Otter Tail Corporation's President and CEO, Mr. Chuck MacFarlane.

Charles MacFarlane

executive
#2

Thanks, Loren. Hello, everybody, and welcome to our 2021 first-quarter earnings call. Otter Tail Corporation is still helping every community we serve through joint actions aimed at slowing COVID-19 transmission. Our continuity strategies prioritize the well-being of both our workforce and the areas where we operate, and they're built to support ongoing dependability of electric service and top-level operational performance throughout our businesses. We stay committed to careful health and safety measures, guided by guidance from the CDC, local health agencies, and orders issued by state and municipal authorities. Right now, 10% of our staff are still working off-site; we keep watching this evolving situation and its effects on the economy along with our electric and manufacturing operations. Please turn to Slide 4 as I start discussing Q1 results. We made $0.73 per share during the quarter, up 22% from the $0.60 per share recorded in Q1 of 2020. That gain came mostly from exceptional performance in our Plastics segment. Kevin will go into more depth about our financial results during his remarks, but a quick summary of Q1 outcomes shows electric segment earnings per share rose $0.02, mainly because of recovery from the now-operational Merricourt wind farm and approved interim rates taking effect January 1 alongside Otter Tail Power's Minnesota general rate case filing. Partly offsetting that were unfavorable weather and lower C&I sales tied to COVID. Earnings per share for our Manufacturing segment went up $0.01. BTD keeps experiencing recovering sales across most of its end markets as large OEMs restock inventories that the pandemic had drained. Our Plastics segment delivered a record quarter, with earnings per share climbing $0.08. Slightly greater pipe sales volumes, higher PVC pipe prices, and better operating margins drove that result. As Slide 5 shows, we're now positioned to hit or beat our initial yearly EPS guidance each year starting in 2016, with an anticipated 9.8% EPS compound annual growth rate across the 2016 to 2021 period; we keep expanding Otter Tail Power by investing capital in generation, transmission, and technology initiatives. Turning to Slide 11, Merricourt Wind Energy Center finished construction and started commercial operation at the close of 2020. That facility produces sufficient power for over 65,000 homes. Costing $260 million, it stands as the biggest capital project in the company's history. Now Slide 12. Following years of planning plus 2 years of building and testing, Astoria Station has joined the Mid-continent independent system operator, or MISO, energy market, which lets MISO dispatch the unit economically. This $152 million investment pairs with our wind generation by offering a dependable backup for when wind isn't blowing, and it provides versatile operating choices along with minimal emissions. Astoria Station delivers 240 megawatts of capacity that can be dispatched, while the Hoot Lake plant offers 140 megawatts — and carbon emissions are projected to drop 85% from what the historic Hoot Lake plant produced. Back in September of 2020, we announced the Hoot Lake Solar project, a $60 million investment you can see on Slide 13. It's a 49 megawatt project, and we intend to build it on land we already owned plus newly purchased property surrounding the Hoot Lake plant in Fergus Falls, Minnesota. Each year, Hoot Lake Solar will produce enough energy to serve roughly 10,000 homes. Once we retire the Hoot Lake coal plant in 2021, this project gives us a rare chance to reuse the existing Hoot Lake transmission interconnection, as well as the substation and plant land. In March, Fergus Falls accepted the Environmental Assessment Worksheet. The city additionally gave the green light to our annexation request covering project property we hold in adjoining townships; we expect to file our conditional use permit request in the second quarter. Safe harbor equipment is already secured, and at this point we anticipate finishing the project in 2023. On top of that, the Minnesota Public Utilities Commission granted our request to authorize 100% of Hoot Lake Solar's output to be allocated for Minnesota customers' use, and 100% of our investment in Hoot Lake Solar to qualify for future cost recovery from Minnesota customers through our renewable resource cost recovery rider; our Minnesota general rate case was filed on November 2, 2020, as Slide 15 shows. The previous Minnesota rate review we filed came in 2016. Putting cleaner energy generation in place is the main reason behind this request, since we're aiming to have Astoria Station included in base rates in Minnesota. Our most recent IRP approved this project, which has been earning AFUDC throughout construction. Beyond that, our new customer information system — designed to improve the customer experience by giving customers greater access and more options regarding their energy use and services — served as another reason for this request. Acknowledging the pandemic's ongoing economic toll on customers, and after hearing from commission staff, we chose to cut our interim rate request by roughly half, down to $6.9 million, or 3.2%. That move went hand in hand with expected lower depreciation expense tied to extending the lives of our wind assets from 25 to 35 years; in December, the commission gave its approval to our interim request starting January 2021. On Friday, April 30, we submitted a substantial reduction to our original request, folding in those lower depreciation rates the commission approved, lower borrowing rates, lower pension and benefit costs, and other refinements that came up during the discovery phase of the case. The revised request stands at $8.2 million, a 3.8% increase, compared with the original ask of $14.5 million, or 6.8%. We expect a decision in late 2021 or early 2022. Despite this increase, Otter Tail Power residential customers will still enjoy some of the lowest rates anywhere in the country. Slide 16 shows that between 2020 and 2025, the utility's rate base should expand at a yearly pace of 5% amid a supportive regulatory backdrop, and that will serve as a major engine behind future earnings growth. As we point out on Slide 19, our upcoming Minnesota integrated resource plan gets filed in September 2021. That plan is going to pinpoint the resource mix that delivers the best cost-effectiveness while dependably serving what customers require over the coming 15 years. Even though Minnesota mandates this filing, we put together a strategy covering our integrated system and likewise submitted a plan with the North Dakota and South Dakota regulatory commissions. The Minnesota PUC requires the plan to address North Dakota Regional Haze compliance. Back in June 2016, we submitted our prior integrated resource plan, which won approval in April 2017. We anticipate that the refreshed IRP together with MISO regional transmission plans currently being developed will boost our long-term rate base growth forecast in a positive way. In April, FERC released a supplemental notice of proposed rulemaking, or NOPR, concerning transmission incentives. Within that supplemental note, FERC trains its attention on the ROE adder available to electric utilities that become members of transmission organizations. Under FERC's notice, the proposal is to sunset that ROE adder 3 years after the point when a utility hands over control of its transmission assets to the regional transmission organization. At present, this incentive lifts our base FERC ROE by 0.5%.

Charles MacFarlane

executive
#3

If FERC's final rule eliminates the RTO incentive, we estimate that ongoing EPS would be reduced by up to $0.02 starting in 2022. The Biden Administration's infrastructure proposal calls for spending about $2 trillion across this decade. Electric grid resilience, the electric vehicle market and energy efficiency are among the infrastructure upgrades that plan emphasizes, and it repeats the administration's call for the electric sector to reach net 0 carbon emissions by 2035. The plan also backs a 10-year extension paired with a phase-down for clean energy generation and storage, production tax credits and investment tax credits, and it raises the possibility of direct pay instead of relying on tax credits. We're continuing to monitor what's coming out of FERC as well as the infrastructure plan. Turning now to our Manufacturing segment: BTD, our contract metal fabricator, is still seeing stronger sales and greater demand throughout the majority of its end markets, since large OEMs are restocking inventories that had been drawn down. Right now, the difficulty they're dealing with is getting enough people on staff to match that higher demand. Across the industry, the need for manufacturing workers has gone up, while the ongoing effects of COVID-19 have shrunk the pool of applicants. Beyond that, steel prices have climbed past any level seen before, driven by robust demand and tight supply, since mills have been slow to bounce back from the capacity cuts they made in 2020 because of COVID. Even though we can hand off higher material expenses to the customer through BTD, getting product out the door might still disrupt output at certain OEM manufacturers. Our Plastics segment keeps delivering solid performance, helped by a PVC pipe market that's tight because of limits on PVC resin supply, which has pushed PVC pipe pricing up considerably. Those resin shortages trace back to unusually cold February conditions that hit the Gulf Coast area, leading multiple resin suppliers to declare force majeure. Supply of resin is still constrained given heavy demand, since PVC resin facilities have yet to return to full operating capacity. We anticipate these PVC resin supply limitations will carry over into the second quarter, yet both of our PVC businesses stay nimble and dependable when it comes to on-time deliveries. As we look forward, we'll keep pushing innovation while upgrading the power grid, improving what customers experience, and moving toward a future of cleaner energy. Our estimate is that by 2023, roughly 35% of the energy our customers get will come from renewable sources. Then by 2025, we expect carbon emissions to sit 50% under 2005 levels, and we'll do this while residential rates stay among the lowest anywhere in the country. Investors are increasingly worried about businesses that pull more than 25% of revenues from thermal coal, so it's good to point out that Otter Tail Corporation sits well beneath that line when it comes to the share of revenue tied to coal assets. In 2020, coal assets accounted for 12% of consolidated revenues. At this point, I'll hand things over to Kevin so he can walk us through the financial side.

Kevin Moug

executive
#4

Okay, thank you, Chuck, and good morning to all of you. Our first quarter was remarkably strong, with consolidated revenues rising 11.5% and net earnings climbing 25%. The main factor behind this was the superb results from our Plastics segment. We also saw earnings growth from quarter to quarter in both our Electric and Manufacturing segments. Now, if you would turn to Slide 25, I'll walk through our first quarter results. Net earnings for the Electric segment went up by $1.4 million. You can find all the factors affecting the Electric segment's quarter-over-quarter earnings covered in the release, but the important ones include a $2.3 million rise in new net retail revenues tied to the interim rate increase in Minnesota that took effect January 1 of 2021, connected to the Minnesota rate case filed last November. We had higher conservation rider revenues from recovering greater CIP program spending in Minnesota and South Dakota, plus greater rider revenues in North Dakota from recovering Merricourt operating expenses and returns on more investment in the project, along with an increase in rider revenues in North Dakota and South Dakota for recovery of Astoria and transmission project costs. There are also greater transmission service revenues from recovery of interconnected generators in MISO transmission tariffs. Lower retail revenues from commercial and industrial customers, because of the ongoing effects of COVID-19, offset these items. COVID had no effect on revenues during the first quarter of 2020. We also saw lower retail revenues from milder weather quarter-over-quarter. Weather hurt quarter-over-quarter results by $0.02 a share. Operating expenses rose because the Merricourt wind farm became commercially operational at the beginning of the year, plus greater CIP expenditures, which are being recovered through rate riders in Minnesota and South Dakota. There was higher depreciation and property tax expense from recent capital additions, greater interest expense from the new long-term debt issuances in 2020, and a reduction in other income from discontinuing AFUDC on the Minnesota share of Astoria Station construction costs. That's because the project is now being recovered in Minnesota interim rates. Decreased plant maintenance and operating expenses, along with a drop in bad debt expense from better customer collections during the quarter, partly offset these items. And income taxes got a favorable boost mainly from PTC credits earned on Merricourt in the first quarter. Net earnings for the Manufacturing segment rose $500,000, driven by higher parts revenues at BTD from increases in material costs that were passed on to customers and improved sales volumes and pricing, driven by greater sales to recreational vehicle, agricultural, lawn and garden and construction end markets. Scrap revenues were mostly higher from increases in scrap metal pricing as well as greater scrap volumes; and cost of goods sold were higher from increased sales volumes and greater material costs passed on to customers, along with higher labor-related costs and slightly greater operating expenses. At T.O. Turning to Plastics, net earnings rose slightly quarter over quarter. Higher prices for pipe and a small uptick in volume lifted our Plastics segment earnings by $3.7 million. Those pipe prices stemmed partly from constraints on PVC resin supply tied to resin plant shutdowns, feedstock shortages linked to the unusually cold weather along the Gulf Coast region of the United States, ongoing substantial worldwide demand for PVC resin, and tight pipe inventory nationwide. Corporate costs, net of tax, fell $500,000, largely because values rose on our corporate-owned life insurance and captive insurance investments that were realized during the quarter; we keep generating robust cash flows and hold suitable liquidity levels under our credit facilities to fund our business operations. Our present liquidity position under our 2 credit agreements appears on Slide 24, and those facilities remain in place through October 31 of 2024. Turning to Slide 27; we are lifting our 2021 overall diluted earnings per share guidance range to $2.47 to $2.62. The midpoint of the updated 2021 earnings per share guidance range of $2.55 a share represents an approximate 9% growth rate off 2020 diluted earnings per share of $2.34. Expected performance in our Plastics segment is driving this in large part. The main reasons for the downward revision to the Electric segment guidance from our original 2021 guidance are unfavorable weather during the quarter, which hurt first quarter earnings by $0.04 versus normal. We assume normal weather for the rest of the year. We expect commercial and industrial revenues to be lower given the continuing effects from COVID-19. Self-funded interconnection projects are now anticipated to be at a lower level, producing a lower level of earnings than first expected because of FERC delays in the approval process and lower MISO revenues stemming from lower revenue requirements. Even with the reduction in the Electric segment guidance, we still expect Electric segment earnings in 2021 to top 2020 earnings, driven by the Merricourt and Astoria projects being commercially operational and our $405 million total investment in these projects being fully reflected in rate base. Both projects have recovery mechanisms in all 3 of our jurisdictions, partly offset by higher O&M, depreciation and property tax expense tied to these investments and increased expense from debt issuances in 2020. Additionally, regarding the impact of the Minnesota rate case filed in November of 2020, the Minnesota Public Utilities Commission has approved an interim rate increase of 3.2% or $6.9 million. These items are partly offset by higher nonlabor O&M expenses connected to planned outages at Big Stone plant and increased post-retirement expense related to a decrease in the discount rate and the long-term rate of return on plant assets. We are keeping our original 2021 earnings guidance for our Manufacturing segment and still expect net income to be higher than 2020. The projection here reflects an anticipated sales lift at BTD, largely tied to end markets getting better as customers keep replenishing inventory to cover shortfalls the pandemic caused. Higher scrap metal prices should also push scrap revenues upward. COVID has reduced steel mill capacity, which has led to problems with product availability. Demand is outpacing what mills can handle, and that has raised worries about whether we can secure enough steel to satisfy customer needs, while also keeping steel prices above where they've historically sat. Our efforts to raise staffing levels continue so we can match demand, and we're dealing with reduced productivity plus rising expedited freight expenses. At T.O. Plastics, we anticipate greater earnings, primarily from higher sales into horticultural and life science end markets. For 2021, the Manufacturing segment backlog stands at roughly $201 million, versus $127 million during the same period last year; we are lifting the 2021 guidance for our Plastics segment above the initial figure and now anticipate net earnings exceeding those of 2020. PVC pipe sales prices during the first quarter came in above expectations, and we anticipate those prices staying elevated through the remainder of the year.

Kevin Moug

executive
#5

Suppliers of resin keep pushing raw material prices higher, responding to market conditions that include availability, restrictions tied to feedstock supplies for resin, and a robust export market where resin prices exceed those in the domestic market. For 2021, pounds of pipes sold are still anticipated to come in below 2020 levels. Meanwhile, our corporate costs, net of tax, should be consistent with 2020. Higher employee benefit costs and probable contributions to Otter Tail Corporation's foundation are behind this. We had a really solid first quarter and couldn't be happier about it. When you add in the updated forecast we've given for the remaining months of the year, we're now set up to land within our refreshed EPS target of $2.47 to $2.62 per share. For the utility side, a few things are doing the heavy lifting to get us to that 2021 guidance: the money we're putting into the Merricourt and Astoria Capital projects is now entirely captured in rate base, and we also got a favorable result in the Minnesota rate case. Regarding BTD, several factors will primarily propel results. First, there's ongoing rebound in the markets they serve as the pandemic eases, since buyers want their plants running at full tilt to replenish thin inventories. Second, they need adequate workforce numbers to make the most of the capacity they already have. Third, enhancements in how they operate and in efficiency at every site should push return on sales margins and invested capital even higher. We continue monitoring the danger that reduced mill capacity poses — it has caused problems with product availability — and how that may shape operations through the remainder of the year. Now for our Plastics segment: PVC resin facilities remain below full operation after what the February winter storms did. We still anticipate that supply limitations will last until the second quarter wraps up. Although those limitations gave a boost to what we delivered in the first quarter, we have to keep in mind the harm they might do to what we're able to produce and to margins from operations across the back half of 2021. Even with those hurdles, this segment is set up well to post yet another outstanding year when it comes to earnings, returns on invested capital and cash flows. Looking further out, the electric utility will turn in dependable results, and there will be chances to put money into rate base across the coming 5 years, which makes it possible for revenues, earnings and cash flows to rise. Roughly 75% of our total earnings should come from the Electric business. Over the long term, we'll also see organic growth coming from the Manufacturing and Plastics segments. Over time, those 2 segments should contribute roughly 25% of our earnings. Our long-term expectation is a total shareholder return of 8% to 10%, made up of the 5% to 7% compounded annual growth rate in earnings per share we anticipate plus our current dividend yield. Going forward, we would expect the dividend to grow in line with earnings per share growth, while keeping a dividend payout ratio of 60% to 70%. The diversified nature of our operations keeps working to our advantage, and we're still in a position to finance the growth opportunities in the utility's rate base through our solid balance sheet, plenty of liquidity backing our businesses, and robust investment-grade corporate credit ratings. At this point, we're prepared to take your questions.

Chris Ellinghaus

analyst
#6

Could you spend a moment on the FERC holdups you brought up when discussing the Electric segment and the MISO projects?

Charles MacFarlane

executive
#7

Absolutely. Chris, Chuck here. We've been carrying out quite a few of the self-fund arrangements, and with those, essentially a generator — usually wind — whether it's an adjacent utility or an IPP, asks for interconnection, and we perform upgrades on our transmission system so they can hook up. After that, we get that money back across 20 years from the customer seeking interconnection. Roughly $50 million in upgrades have been completed by us, and there's a set of projects known as interim projects, sort of — several different FERC orders applied to them; and these interim projects are generally around 5 years old. They're already constructed and operating. Those are being looked at for reclassification into this type of category where recovery happens across 20 years, rather than at completion, when the interconnection customer paid us the entire amount. So the rulings on those have slipped, and we don't expect to receive them in 2021. However, they concern projects — roughly $9 million in projects that are operating, where the interconnection customer paid us in full, we'd give that back, and then a 20-year schedule would be established; those are the 4 or 5 projects that are — are not — have not been taken up, or we don't expect an order from FERC this year.

Chris Ellinghaus

analyst
#8

Chuck, you brought up the Biden infrastructure plan. Which parts stand out to you? The piece regarding PTCs strikes me as somewhat intriguing. But which components of that proposal capture your interest when it comes to your own chances?

Charles MacFarlane

executive
#9

You mentioned the extension of PTCs or ITCs, I believe. While we're running our present integrated resource plan for a September '21 filing, should PTCs get extended for wind or solar, new solar or new wind, across 10 years, that would affect, in my view, how much renewables turn out to be cost-effective in that plant. That, I'd say, is the largest rollout. We do have EV infrastructure plans that the Minnesota Commission has reviewed and approved; it's basically around 11 large or tier 3 chargers plus roughly an equal number of tier 2 ones distributed across our Minnesota service territory. Still, the biggest items, I'd argue, would be the tax credit along with any carbon reduction requirement.

Chris Ellinghaus

analyst
#10

under the Biden plan, might the substitute programs prove useful for your tax appetite?

Charles MacFarlane

executive
#11

the direct payment option that stands in for the tax credit? Indeed.

Chris Ellinghaus

analyst
#12

Alright. When it comes to PVC, this is honestly a pretty puzzling stretch. Demand for construction materials is huge, but resin supply is still tight. How should we view the back half of the year? And how should we view supply-demand dynamics, especially since — presumably, other regions are experiencing comparable construction demand; so when those plants return to full capacity, will a portion of that go toward exports? That means there could still be some supply-demand imbalances remaining in the U.S. How should we view this in the bigger picture? And if supply constraints persisted for a good chunk of 2021, does that create a backlog of demand for 2022 that points to a strong 2022 pipe market too?

Kevin Moug

executive
#13

That was a long question, Chris.

Chris Ellinghaus

analyst
#14

There are quite a few components in that.

Kevin Moug

executive
#15

All right, we'll handle it — whatever we overlooked, we'll circle back to. When it comes to whether there will still be — once the plants are running again, will a significant portion of this still head to export? Yes is the answer to that. The export market is still anticipated to stay robust and keep generating that imbalance or difficulty for domestic PVC capacity. At present, what we're seeing — hearing is that by the end of the quarter, the plants ought to be fully operational again. Our current expectation is that shipments of resin to the plants will return to levels we'd regard as more typical. So to the degree — and our worry is this: the supply constraint has lasted longer than we'd initially anticipated. Consequently, to the extent the plants don't return to normal capacity — the resin plants — that creates pressure on the back half of the year. As for your question about whether, if supplies stay — if resin supplies stay tight throughout this year, that creates pressure on 2022 for projects? My view is that it does. To the extent we can't return to normal, I believe that will begin pushing projects into 2022, should there not be sufficient supply — sufficient resin supply — to produce the PVC pipe needed for those projects. At this moment, the announced resin price increases are — I believe $0.04 for May and $0.03 for June, so by the conclusion of the second quarter, we're anticipating $0.74 a pound for resin. In Q3, no announced resin price changes have come to our attention. It's possible that still occurs, though perhaps later in the quarter. Whether that addresses every one of your questions, Chris, I can't say, but shoot back if it didn't.

Chris Ellinghaus

analyst
#16

Honestly, there are still a million unknowns that would factor into any calculation of what the market for PVC pipe pricing could end up looking like. So, despite the possibility of price hikes on PVC resin, it appears construction material demand is strong enough that companies can pass along higher costs through their pricing. Given that, how would you think through pipe prices and margins in this really robust demand environment for the back half of the year and going into 2022? The conditions you're describing seem to point toward resin prices possibly sustaining elevated margins.

Kevin Moug

executive
#17

I'd agree with that, Chris. What we're observing right now — clearly, during Q1 we had increased PVC pipe sales prices, which were pushed by worries about supply being constrained. As I mentioned, resin prices should land near $0.74 by the close of Q2; and here in Q2 we keep seeing solid sales prices. Even with certain limitations in place, those projects still have to get finished and delivered. And usually, the PVC pipe expense for these projects doesn't make up a big share of the total construction cost for them; because of that, sales prices have climbed far beyond the increase in resin prices. My view is that as we move through the remainder of the year, if that shortage persists because facilities aren't running at full capacity, we'd definitely anticipate sales prices remaining firm for the rest of the year. Naturally, we're about to enter Q3, which invariably brings in the hurricane factor and whatever effects storms might have on this situation too. And naturally, we won't learn how that plays out until Q3 arrives and we see what the weather conditions turn out to be. The item we're monitoring and trying to protect ourselves against — we've spent enough time in this industry to understand that circumstances can shift fast. And if resin supply does return to typical levels, with ample material on hand, that might lead to margin erosion for us during the back half of the year, since if that raw material availability exists, there could be downward pressure on sales prices, and we'd expect to see some margin erosion as we move into the back half of the year.

Chris Ellinghaus

analyst
#18

Essentially, what you're describing is a situation that isn't straightforward?

Kevin Moug

executive
#19

That's right. And my sense is that we will — as we examine this, what we anticipate is substantially improved visibility by the close of Q2, after we observe how things unfold regarding whether those petrochemical facilities return to full operation the way they anticipate.

Chris Ellinghaus

analyst
#20

All right, one final item. You brought up the foundation within corporate and other segments. Is it fair for us to take it that the $0.04 adjustment to the guidance applies — is earmarked for that component on its own?

Kevin Moug

executive
#21

Chris, it's partly earmarked for that. Still, since we raised the guidance thanks to the strong performance, we're likewise seeing that some of it comes from incentive costs within our incentive plans too.

Brian Russo

analyst
#22

I want to add a quick follow-up regarding Plastics and the very strong results you posted in Q1, plus the higher outlook you gave. During that quarter, would it be accurate to say that PVC prices climbed more quickly than your resin prices because of supply limitations, and that this pushed operating margins up well beyond the usual low-teens run rate?

Charles MacFarlane

executive
#23

Yes, you could say that.

Brian Russo

analyst
#24

Also, when we examine — this marks, I believe, the second consecutive year, correct, in which you've enjoyed favorable conditions, I suppose, within the Plastics segment; and I suppose circumstances could reverse; but have we entered, let's say, a fresh PVC landscape in which you can not just hold onto margins, but also grow them in a lasting way across the coming, let's say, 2 years even with supply limitations or depleting resin inventory? Consequently, your cost of goods sold is going to rise as you perhaps hinted during the latter half of the year?

Kevin Moug

executive
#25

Yes. Have we entered a fresh realm? What I mean is, we — I believe we've been stating here, Brian, across the past couple — 3 years that we consider typical earnings for this business to fall somewhere within that $20 million to $25 million range in that. Well, here we are; we're raising guidance quite substantially from our initial starting point. And once more, it's being propelled by a limitation or market element that I believe we can anticipate. What I mean is, these winter weather conditions and just how cold it got and the necessity of shutting down the plants, what I mean is, we definitely didn't anticipate witnessing that. And what I mean is, your prior remark regarding sales prices beginning to climb more quickly than the announced resin price hikes is entirely accurate. It's — we — folks require the pipe, and they've been prepared to pay the price as prices have been climbing to obtain the product for the — their projects. Now is — the margins we observe currently, are those the margins we anticipate throughout the coming couple of years? I believe at present we'd respond, no, we wouldn't anticipate witnessing such margins throughout the coming 2 years since we would anticipate market forces to return to being more aligned where, once the resin plants possess the supply or they're functioning and they have their complete supply, we'd begin to anticipate returning to somewhat more typical spreads of sales prices over the resin prices.

Brian Russo

analyst
#26

Understood. That's logical. Now let's shift over to Manufacturing, and BTD in particular — you kept the February guidance unchanged. I'm curious, because since February, a few of your bigger end market customers have raised both their sales and earnings outlooks, while also noting supply constraints in that part of the business and higher steel prices, which you pass through. So I'm wondering, are there additional assumptions? What assumption regarding sales growth at BTD is baked into the updated guidance, which hasn't changed?

Kevin Moug

executive
#27

Brian, there is some sales growth built into it. But here's what we're seeing — the steel availability problems that exist. And then naturally, we're facing labor challenges, since we let a number of employees go in last year's second quarter, and now it's hard to bring people back. So our productivity is suffering because we don't have the proper staffing level. And then, with this product availability problem on the steel side, our expedited freight costs have risen, so that's been eating into our margin too. And so even though we managed to pass through the steel price, and we have seen some price increases, those have been offset by the labor productivity and this expedited freight. And as we consider the guidance and hold it where it stands, in spite of the strong first quarter performance, we're staying cautious given the effect that labor and expedited freight costs are currently having on the business.

Brian Russo

analyst
#28

All right, understood. Now, moving over to the electric utility side — I believe the EPS guidance range came down by about 9% or 10%. You said $0.04 of that was weather, as I recall. Could you walk through the remaining $0.06, meaning how much is C&I versus those MISO projects that got pushed back?

Kevin Moug

executive
#29

Absolutely. So the C&I piece is roughly $0.02, in my view. FERC approval delays account for $0.01 to $0.02. And the remainder would basically be the softer MISO revenues.

Brian Russo

analyst
#30

All right, and one final item. I appreciate the detail you provided on the FERC NOPR. Could you help us understand what portion of your total rate base falls within FERC's authority?

Charles MacFarlane

executive
#31

Brian, it's Chuck here. Regarding the overall figure governed by FERC — most of our transmission assets are actually regulated at the state level. My estimate would put it around...

Kevin Moug

executive
#32

About 10%.

Charles MacFarlane

executive
#33

10%.

Brian Russo

analyst
#34

That's the reason the sensitivity, I suppose, looks manageable if there's a 50 basis point move? Right. Okay. Great.

Charles MacFarlane

executive
#35

Brian, FERC accounts for 10% of revenue.

Chris Ellinghaus

analyst
#36

My apologies, I hit that mute button once more. Still, I'd like to push on this topic a bit further, since it matters a great deal. Regarding Q1, if you can, could you break out how much of that favorable margin behavior stems from the resin supply limitation as opposed to the truly remarkable surge we've observed in construction demand? My thinking is that in certain other markets, construction material pricing has gone through the roof, and both prices and margins have performed well there too. So, setting aside the resin problems, would we still have witnessed a very robust PVC pipe market along with strong pricing?

Kevin Moug

executive
#37

My sense is that a solid quarter would have occurred regardless; absent those constraint problems, it simply wouldn't have reached the same level, Chris, since our volumes were essentially unchanged from one quarter to the next.

Chris Ellinghaus

analyst
#38

Sure, you faced limitations as well. So to what extent — is it possible to separate what portion of those unchanged volumes stemmed from the resin shortage? What additional output would have been achievable absent those limitations?

Charles MacFarlane

executive
#39

In the first quarter, not a great deal.

Kevin Moug

executive
#40

There wasn't a lot going on during Q1.

Chris Ellinghaus

analyst
#41

All right. So — I suppose the question that comes up is whether demand may have shifted to some degree. Given what's happened across recent years, do the patterns we saw in the first quarter make you rethink that $20 million to $25 million figure, the one you've sort of anticipated a typical trend would eventually settle into? With everything you've observed over, let's say, 5 years, has that range moved at all in your thinking?

Kevin Moug

executive
#42

In response to that, Chris, I'd put it this way: we're taking another look at it.

Chris Ellinghaus

analyst
#43

All right. I'd like to ask Chuck whether he's — whether he has any doubts regarding how well this company can predict what that range is going to be. That said, I suppose once we reach the end of the year, I'll check with him on whether the person chiefly responsible for forecasting PVC dynamics ought to make a few tweaks.

Charles MacFarlane

executive
#44

Chris, we're going to dig into that. What I'd say is, my sense is this is a strange market we're sitting in. Right now, if you examine any construction material out there, none of them is behaving according to a typical pattern. So — and my feeling is plenty of folks would have been quite happy to be long, say, lumber or a similar product in that space; we'll take a look at it. I really do believe we need to examine the overall resin supply across the globe. Export pressure has grown, and Kevin brought that up, and going back through history that's also been true — just the fact that the U.S. can turn out resin from natural gas rather than the feedstocks used in other regions of the world has kept applying pressure on the export market for this resin, the resin made in the U.S.

Chris Ellinghaus

analyst
#45

Understood. So, as Kevin mentioned, by the close of Q2 you'll have a clearer picture once supply gets somewhat back to normal, but the same forces at work in plenty of other nations look a lot like what we're encountering in construction materials; so at that stage, will you be able to gauge how much additional resin supply is being diverted toward overseas markets?

Kevin Moug

executive
#46

Yes, Chris, we'll provide updates on that.

Chris Ellinghaus

analyst
#47

All right. That's quite an intriguing group of formulas when it comes to the PVC market.

Charles MacFarlane

executive
#48

We appreciate your questions and your interest in Otter Tail Corporation. As we keep executing on opportunities to grow our rate base and improve efficiency at the utility, along with a focus on operational and commercial performance and our manufacturing platform, our confidence remains firm in our capacity to deliver long-term shareholder value. Given how strongly we performed in the first quarter and our revised outlook for the rest of the year, we are increasing our 2021 diluted earnings per share to $2.47 to $2.62, up from the guidance we previously provided of $2.39 to $2.54. Thanks for being on our call. We appreciate your interest in Otter Tail Corporation, and we look forward to speaking with you next quarter.

Operator

operator
#49

This concludes today's conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Otter Tail Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Otter Tail Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Otter Tail Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.