Thank you for holding, and welcome to the March 2025 Quarterly Results Call for Paladin Energy Limited. <<operator_script>> At this point I'll turn the conference over to the CEO, Mr. Ian Purdy. Please go ahead.

Ian Purdy

executive
#2

Thanks to all of you for being on our third quarter conference call. Joining me are Paul Hemburrow, our Chief Operating Officer; Anna Sudlow, our Chief Financial Officer; and Alex Rybak, our Chief Commercial Officer. First, I'd like to acknowledge the difficulties we encountered in the quarter — specifically, the major rain event in Namibia and the ongoing volatility and uncertainty in equity markets worldwide. Even with those difficulties, the reports released today demonstrate substantial progress in Namibia and Canada across a broad range of activities, which shows we are entirely dedicated to achieving strong results. You're all aware of the major weather event that hit the Langer Heinrich Mine in March. Paul will walk you through the excellent recovery work that has been finished, but I wanted to use this chance to recognize the team at Langer Heinrich. I was in Namibia alongside the team while they were recovering from the flooding. Their response and rapid, safe recovery program does them all great credit. What's even more extraordinary, though, is that some of our employees and their families were personally affected by the floods, and yet they showed up for work, putting the mine's recovery first despite everything happening at home.

Ian Purdy

executive
#3

In Canada, we've seen some significant strides toward generating value from the PLS project, including 2 Mutual Benefit Agreements signed with First Nations during the quarter. You'll also have noticed in the quarterly that the practical integration of our Paladin and Fission teams is largely complete, so we can fully focus on delivering results for our shareholders. Thanks again for attending our call. I'll now hand over to Paul to run you through the operational highlights for the quarter.

Paul Hemburrow

executive
#4

Thanks, Ian, and good morning, everyone. It's a pleasure to have this chance today to walk you through Paladin's quarterly results and, especially, the operational highlights. During the quarter, Paladin achieved a broad set of milestones, among them the highest quarterly production so far at the Langer Heinrich Mine, which is part of the operational ramp-up now under way. Quarterly sales came to 872,000 pounds at an average realized price of $69.90 per pound. We began initial mining activities, and I'll cover those in more detail shortly. In Canada, the Canadian government granted us an exemption from the Non-Resident Ownership Policy for PLS, and, as Ian mentioned, we signed Mutual Benefits Agreements with 2 First Nations groups. Lastly, unrestricted cash and short-term investments stood at $127.8 million as at 31 March 2025, with undrawn debt facilities of USD 50 million, and the first scheduled term loan repayments were completed. To be more specific on Namibia, I'd like to update you from Langer Heinrich. Langer Heinrich produced 745,000 pounds of uranium during the quarter, a 17% increase on the previous quarter's production, bringing total production to over 2 million pounds in the financial year-to-date. That result came despite the one in 50-year rain event that struck Langer Heinrich and surrounding areas, and I'm very proud of the team's efforts.

Paul Hemburrow

executive
#5

Nothing matters more to us than keeping our people safe, and I'm glad to say that no one was hurt in the flooding event or during the recovery work. In the quarter, we had no significant safety events and no reportable environmental incidents. As you know, the rain brought a range of disruptions, among them suspension of operations, saturation of the existing stockpiles, and effects on the processing plant chemistry. Local access roads and civil infrastructure also sustained damage from the widespread rainfall. And as Ian said earlier, the communities and our employees felt the impact. We had planned to speed up mining by opening the G3A segment of the G-pit, which had been partially mined in the past. Floating in the G3A has delayed the start of the mining ramp-up. G2A, an adjacent pit with less historical development, was not flooded, and we selected it as our alternative pit to begin mining. The G-pit will eventually become one single open pit. All approvals for mining activities are in place. The haul roads and infrastructure between the G-pit and the ROM have been refurbished and are now fully operational. We've succeeded in mobilizing a significant amount of equipment to site, and we have begun recruiting operators and started their training.

Paul Hemburrow

executive
#6

On site, our equipment includes three 6015 Caterpillar excavators, eighteen Komatsu 785 rigid dump trucks, four Sandvik Di605 (sic) Di650i blast hole drill rigs, plus a variety of ancillary equipment. That naturally comes on top of the fleet we already have at the stockpile handling the reclaim. Once our drill and blast equipment was mobilized to site, we were able to blast G2A pit in April, and we've begun hauling material to the ROM and the crushers. That marked our first blast in almost a decade, and it was carried out successfully and safely. It's a very -- it's a fantastic milestone for the company, and I'm really pleased about the efforts that the team made to make this happen. Also in Namibia, we're maintaining our focus on the community and are supporting various local initiatives, including donating an ambulance to the local hospital, providing equipment to support the police in keeping our people safe in our community and the provision of IT equipment, enabling upskilling of school children and job seekers. I'll just provide a quick overview of progress at Paladin Canada. We've had a range of achievements post acquisition of Fission Uranium Corp. that have enhanced the future of the PLS project.

Paul Hemburrow

executive
#7

Also worth noting, in February we signed those 2 agreements that benefit both sides with the Buffalo River Dene Nation and the Clearwater River Dene Nation, so that developing the PLS project brings shared economic and social benefits to the local community. In addition, in March Paladin received an exemption from Canada's Non-Resident Ownership Policy for PLS, granted by the Canadian Minister for Energy and Natural Resources. The winter drilling programs at both the PLS and Michelin projects came along nicely during the quarter, and we'll use those results to inform and guide future drilling activities at both locations. I've had a chance to spend some time in Saskatchewan and at the Michelin Project, and the teamwork on those projects has really impressed me, especially their commitment to achieving results over the winter period. So to summarise and just recap, although we faced serious challenges at Langer Heinrich, we made really good progress on recovering the operation. We've kept overall recovery rates high and are mobilizing equipment to site. We got our first blast away and look forward to getting on with mining this quarter. In Canada, we continue to make progress on environmental approvals at PLS as we prepare for the exploration programs at both Michelin and PLS.

Paul Hemburrow

executive
#8

With that, I'll turn things over to Ian. Appreciate it, Ian.

Ian Purdy

executive
#9

Thanks, Paul. As you’ve heard, we achieved quite solid progress this quarter even with a few difficulties. We’re eager to keep increasing output as mining begins at Langer Heinrich, and we’re also eager to move the approval processes forward at PLS. At this point I’d like to invite questions from everyone.

Operator

operator
#10

We'll now take our first question, and it's from Alistair Rankin at RBC Capital Markets.

Alistair Rankin

analyst
#11

Ian, Anna, Paul, and Alex — congratulations on delivering such strong results even with the difficult conditions. My first question concerns the G2A pit. What timeline, or roughly what timeline, do you have for blending that material together with the existing stockpile material and the processing circuit?

Paul Hemburrow

executive
#12

Yes, and thanks for asking, Alistair. That pit was blasted back in April, and we've begun moving the material through to the crushers and into the ROM. What we're seeing so far looks encouraging. So we're carrying on with building out our blend strategy. The key point with that blend strategy is that a fair amount of wet material sits on the stockpile. The material we mine gives us coarse, dry feed. What we anticipate as the effect is better settling, especially in the CCDs, and that ought to deliver a lift in throughput. So that work is now underway. We'll keep refining the blend strategy over the present quarter.

Alistair Rankin

analyst
#13

All right, that's clear. Just a bit more on the G-pit. If you look at the technical report that came out in June of last year, it states there are roughly 900,000 tonnes of high-grade material at 819 ppm. With that in mind, what sort of upside to the grade are you targeting by blending that material with the stockpile material?

Paul Hemburrow

executive
#14

Yes. Alistair, our long-term plan hasn’t changed. As for the life-of-mine grade, we expect it to align with what we had in the prior mine plan. So every pit we have at Langer Heinrich contains a spread of grades. G-pit, naturally, is the same in that respect. A portion of it is classified as high grade. Most of it is medium grade. And naturally, some low-grade material exists too. What we’re seeking to do, then, is optimize the mine plan so we get a consistent feed grade and optimize what it costs to load and haul that material to the crushers. So our expectation is — across the life of mine — to hold that target grade, as we reported earlier.

Operator

operator
#15

Cameron Taylor from Bank of America has the next question.

Cameron Taylor

analyst
#16

Appreciate the solid results, as Alistair noted. Regarding the extraction from the G-pits — I recall from the technical report that the H and J-pits carried the higher grade and were slated for mining first. So why is G-pit mining happening now? Is cost the driver? What sort of strategy explains why those pits have been targeted — or why you've chosen those pits to start with?

Paul Hemburrow

executive
#17

Yes. Thanks, Cam. As you may remember, we had initially intended to start mining in July. What we've since done is make a fairly serious effort to pull that mining forward. To speed up mining, we've focused on the G-pits, largely because some work has already been carried out there in the past. G3A, the pit that flooded, had in fact already been blasted. Had it not flooded, we likely could have been loading and hauling from it quite soon. G2A sits right next to it, and we're changing the sequence, mainly since that lets us ramp up faster ahead of July. The other route, from July onward, would involve stripping and clearing topsoil, getting our blast heads ready, blasting, and removing overburden. So this was a really good way for us to speed up the mining program.

Cameron Taylor

analyst
#18

All right, that helps. And roughly — at what point do we restart the plant? What run rate are we currently operating at, production-wise? In other words, has the bounce-back happened as fast as you thought it would, considering how much rain there's been? And if that guidance of 3 million to 3.6 million pounds were still on the table, could it be hit by the close of this financial year?

Paul Hemburrow

executive
#19

Thanks, Cam. On the plant side, the rain event caused some disruption there, and a bit of that carried over into early April. At this point the plant has fully recovered. There's still a small amount of work ahead of us to achieve a lift in overall recovery. For the quarter, though, it stayed within our target levels. I expect us to keep that momentum going in the current quarter. So yes, I feel that the results from early April will continue through the quarter. And I'm expecting an uplift this quarter versus the last one.

Cameron Taylor

analyst
#20

So there's a quarter-over-quarter uplift. Okay, that's helpful. And maybe just one final question I can fit in. Considering how much rain you've had—obviously unprecedented, a one-in-how-many-thousand-years event—have you made any improvements to keep this flooding from happening again, mainly on the haul roads and access roads? Is there anything you can improve there to ensure that future rain events are less disruptive?

Paul Hemburrow

executive
#21

Yes. Thanks, Cam. Actually, before we opened, we carried out a hydrology study covering the entire site, and we'd already installed a substantial amount of bonding throughout the site. We built floodways. And during the rain event, what happened was that we could channel the huge volume of water into the tailings facility and into J-pit as well. At the eastern end of the mine, where the G-pit is located, we experienced some inflows from the South that exceeded what that study had anticipated. What we do know, though, is that our flood mitigation mostly worked and did send the water flows where we intended them to go. There's likely some additional work and a few lessons from this flood event, especially at the eastern end of the pit, particularly around those G-pits. That work has already begun as part of the recovery efforts to refurbish the road network and the bonding at that end of the plant.

Operator

operator
#22

The following question is from James Bullen at CGS.

James Bullen

analyst
#23

I have just one quick question. Operations have returned to normal, and you've started mining again. What's preventing you from putting out guidance at this point?

Ian Purdy

executive
#24

I’ll take that question. Nothing is preventing us from issuing guidance. But given the issues we had with guidance this year, what we want is to be fully certain—when we put guidance out—that we can meet or beat it, since that is always the ultimate goal. So this year, as we’ve said, we plan to give guidance at the end of August. Several factors will be finished by then. First, we will have completed our full zero-based budgeting process, the comprehensive process corporates carry out each year. It produces an internal view of what we believe the results could be. That process has started and will continue over the next couple of months, as it does for all corporates. Second, James, we are still in ramp-up. I know the market wants us to get past ramp-up, but it is a two-year ramp-up, correct? So the new element we have just added to our operation is mining feed. We now want to observe the mining feed results over several months and gain a real understanding of our mining productivity, our mining costs, and the effect not only on grade but also on throughput, as Paul said, that we expect.

Ian Purdy

executive
#25

That process is going to play out across the coming months, and I'm genuinely pleased that the team has already begun introducing mining feed. So you take that track record, you take the budgeting process, and when you look at August, we'll have some truly solid figures to share with the market. And let's also remember that we have a fantastic project in Canada, the PLS project. We're reviewing our time lines, and we're reviewing our priorities when it comes to approvals and advancing that project. We also have a substantial amount of work underway on that front. So we're feeling very confident that in late August, we'll bring some excellent numbers to the market that we can stand behind. But most importantly, James, we'll have empirical track record that backs up our ramp-up assumptions as we go forward.

James Bullen

analyst
#26

That's really useful. And clearly, after the rain event there's been some speculation in the market about whether you can fulfill all your contracts and whether that's possible without going into the spot market. Given how fast you've recovered on the production side, how do you feel about your position?

Ian Purdy

executive
#27

Alex, would you like to take that question?

Alex Rybak

executive
#28

Yes. Thanks, James. Look, we — first of all, every delivery commitment we have has been met so far. And as we've mentioned before, there are several mechanisms available for handling deliveries going forward. So obviously, when we initially put our contract book together, we did so with the principle of expecting the expected, and we've kept significant uncommitted volumes within our portfolio. We also currently have significant flex up and flex down provisions in our books that we can exercise. And finally, we have relevant contract protection mechanisms in place to deal with weather events like this. So all of our customers have been notified about the weather event. Our customers have been very supportive and flexible. A number of them have offered to delay deliveries if that's needed. So we're working very constructively with our customers, and we have a number of levers in our book to manage our future deliveries, James.

Operator

operator
#29

The next question is from Shannon Sinha with Morgan Stanley.

Shannon Sinha

analyst
#30

Ian, Paul, and Alex, congratulations on a solid quarter. I wanted to ask about recoveries. They were pretty strong this quarter too. What should we expect from recoveries once we begin processing more of the saturated ore materials?

Paul Hemburrow

executive
#31

Yeah. Thanks, Shannon. So, recovery rates are in fact already inside the 85 to 90 target range we've set. As with any operation, our plan is to keep optimizing and look for chances to improve. But right now the emphasis is really on refining that blend strategy. It's about getting efficiency from our mining fleet. It's about processing the stockpile material, and — but we'll keep working on those recoveries. Still, they sit well within the range we expect. And it isn't our biggest focus at the moment.

Shannon Sinha

analyst
#32

All right. I just wanted to confirm that once you begin processing the saturated ore, those recoveries won’t change, and we won’t end up seeing lower recoveries come through?

Paul Hemburrow

executive
#33

No, no, that won't be altering that at all, no.

Shannon Sinha

analyst
#34

Okay. Great. Then perhaps I could just ask one question about PLS. So I noticed that those 2 agreements have been signed there. Which other kinds of indigenous nation agreements still need signing there in order for the project to move forward?

Ian Purdy

executive
#35

Yes. There's still some additional work for us to complete there. The 2 agreements that we signed mattered enormously to us. And I believe it represents a validation of the recognition and backing for Paladin ownership. Naturally, with the new company arriving, a new ownership structure, the First Nation parties are quite eager to grasp who we are, how we go about business and what will be different under that new ownership structure. We're genuinely delighted that we could collaborate with those 2 parties to make clear the fact that, first, Paladin owning this asset is in fact beneficial for everybody and beneficial when it comes to advancing the asset. Second, we're a solid owner and a solid neighbor. And we sincerely strive to collaborate with our nearby communities for lasting benefits for all. We highlighted our track record in Namibia. We made our introductions. We sat down together in person. And crucially, we have a very robust local Fission team that receives our complete backing. So I'd say those 2 signings amount to a really meaningful acknowledgment and an endorsement of the favorable Paladin influence and ownership of that asset. There are additional parties with whom we are holding discussions.

Ian Purdy

executive
#36

Fission’s ties with every party go back nearly 20 years, and we’ll keep working to secure the remaining approvals we require. A major priority at present is that we are quite far along with our environmental approval — our provisional environmental approval. And we hope to see that arrive in the second half of this year. So matters are progressing very well. We’re pushing ahead. And we have an excellent team on the ground that is closely linked with the nearby communities.

Operator

operator
#37

Regan Burrows of Bell Potter Securities is up next with a question.

Regan Burrows

analyst
#38

Starting with a question, maybe directed at Alex, regarding the contracted backlog. For fiscal 2026, could you provide additional detail on how much has already been signed?

Alex Rybak

executive
#39

Yes, Regan. In the presentation we included a little extra detail on the contract book, since I believe folks were keen to get a clearer picture of it. We've taken that on board. So you'll see that we have 22 — approximately 22 million pounds contracted across '25 to '30. For clear commercial reasons, we obviously don't break that down year by year. But what we have disclosed is the total volume of contracts across the coming 6 years. And we've also disclosed our pricing-related mechanisms, which run at roughly a 60-40 split — market-related versus base escalator. So I think that gives people some information to model our portfolio in a better-informed way, Regan.

Regan Burrows

analyst
#40

All right. And maybe just building on that point — the original FY '25 guidance had us at about 93% of production at the midpoint being sold under the sales contracts. I get that there's likely some flexibility with CNNC in those figures. But just to get a handle on FY '26, how much flexibility exists in the contract book? And how does that line up against your ramp-up profile at this stage?

Alex Rybak

executive
#41

Yes. So there is actually a fair degree of flexibility available to us, largely because the bulk of it stems from the CNNC offtake, which covers 25% of production. So given that, as I mentioned, this is one of the tools that lets us adjust deliveries either upward or downward. There are other mechanisms too. Naturally, we are holding talks with our customers. We have also kept some volumes uncommitted within our portfolio. So taking all of that together, we are quite confident in our ability to handle deliveries going forward. As I noted, our discussions with customers have been very constructive. They are strongly supportive, and we keep working alongside them on deliveries in the future.

Regan Burrows

analyst
#42

Alright. And maybe just one additional question regarding the stockpile. At present, how much would you say is available for processing, on a percentage basis, say? And across the next roughly 3 to 6 months, that mix of fresh ore versus stockpile ore — what sort of proportion of those 2 is going into the plant?

Paul Hemburrow

executive
#43

Yes. Thanks, Regan. What we’ll do is work that out based on what delivers the best optimized throughput rates and grade. So right now, early this quarter, we’ve been mining onto the stockpile — onto the ROM, rather — and direct feed to crusher. And we’re currently working on what that blend strategy looks like. That’s going to determine how long it takes us to move through the stockpiled ore. But fundamentally, it will be based on throughput and grade optimization.

Regan Burrows

analyst
#44

All right. And I suppose there's nothing to say about what's, I guess, that share which is saturated and can't be used right now? It's too difficult to determine, or...

Paul Hemburrow

executive
#45

Typically, whenever we pull material from that stockpile, we move it onto the fingers, and it's at the finger that blending takes place. We separate material according to grade as well as handleability. So as material comes forward from the stockpile and from the mine, we can then figure out the optimal combination of dry stockpile material, sticky stockpile material, and coarse mine material to deliver the best throughput for us. So as time goes on, we'll build up that understanding, test a variety of options, and determine the blend strategy that works best for us going forward.

Operator

operator
#46

We'll take our next question from Daniel Roden at Jefferies.

Daniel Roden

analyst
#47

Congrats on the quarter. I just wanted to get a sense of — I guess, before the weather events — what were the operating rates of production at Langer Heinrich, kind of before all of the disruptions?

Paul Hemburrow

executive
#48

Yes. Well, thank you for asking that, Daniel. The initial weather incident happened on the 7th, and a second one came afterward that same month, on the 19th. It was quite early in March, yet we were genuinely tracking toward a fairly solid month. Those results were fairly encouraging, though it lasted just one week. Around the middle to the latter part of the month, we contended with difficult conditions — slick roadways, water, standing water near the infrastructure. Then toward the end, we began bouncing back at a decent pace. So discussing those run rates is rather tricky. What I can tell you is that thus far this quarter, performance appears comparatively robust. My expectation, therefore, is that we sustain that momentum across this quarter. Our attention will be on the blend strategy, optimizing our grade. And we anticipate that momentum will produce stronger results this quarter compared with last.

Daniel Roden

analyst
#49

Right. Yeah. No, I was only hoping to gauge how smoothly the plant is running — anything that hints at how well it might perform once things get back to normal. And what about the exit rates for the quarter? Could you put, say, a quantifiable figure on where the plant stands today?

Paul Hemburrow

executive
#50

Overall production for the quarter came in with a 17% increase. That's a good outcome. As I mentioned briefly before, our April results are really centered on bringing in that mining material. We're receiving ample dry, coarse material. The blend strategy appears to be moving along fairly well. We now have quite a few weeks of that material running through the plant. We understand it takes roughly that 50-day mark for the material to be processed. We anticipate seeing some gains in settling rates in the CCDs. So it's -- we still have some distance to go to ensure we understand how that material will actually behave as it moves through the plant. At present we are keeping our overall recovery rates inside the target range. So we've just got to continue working toward raising our mining productivity, concentrating on throughput and optimizing the grade as we proceed through the G-pits. My expectation is that we'll sustain that momentum throughout this quarter. And we'll see what happens when the quarter ends.

Daniel Roden

analyst
#51

All right, perhaps we can shift direction somewhat. Delivery of the mining equipment during the March quarter was one of the problems. Could you say something about how that has advanced up to now, I suppose? For instance, is all of the gear now on site, or are deliveries still ongoing?

Paul Hemburrow

executive
#52

Yes. So at this point, most of the mining equipment has arrived on site over the past couple of weeks. The key piece of equipment we actually have is more 6015 excavators, additional 150-tonne excavators, Caterpillar, the brand-new machine. So we had some delays getting those across the border, particularly as a consequence of the Rehoboth Bridge issue. They found their way through Botswana and then into Namibia, which is really positive. We've had 18 Komatsu 785 rigid dump trucks delivered. So that gives us sufficient capacity to commence G-pit mining. It's a longer haul, obviously, than stockpile but not as long as potentially H-pit. So sufficient capacity there. Now we've got half a dozen new dozers, a couple of Komatsu 275s, a couple of 4 Caterpillar DARs. We have some ancillary equipment, water bowsers, fuel trucks, service trucks, lighting plants. And we've got the existing 10 Volvo ADT 60s that we have on the stockpile reclaim. So we've got sufficient capacity to commence mining. And then in the longer term, later this calendar year, we'll have the additional fleet arrive to ramp up full capacity.

Daniel Roden

analyst
#53

All right. All right. Yes. So it sounds like you said you've shifted over to the G2A pit, but G3A appears to be coming along nicely with its dewatering. So I was hoping to get a sense of when you'd be in a position, and whether you'd be able to speed up both pits simultaneously. Do you have sufficient fleet to manage that? And I suppose, since your saturated stockpiles can't be fed on their own, you need to blend them with your ore. So being able to accelerate those, I'd imagine, would be quite advantageous for both pits being extracted.

Paul Hemburrow

executive
#54

Correct, Daniel. At G3A, dewatering of the pit is mostly done. There's a fine slurry of sorts resting at the bottom, and we have to push that material out and clean the pit floor, after which we should be in decent shape to begin mining there. Timing on that is something I'd rather not forecast. So our emphasis will be on drilling and blasting, with additional capacity at G2A. Eventually, though, at some stage — be it G2A, G3A or G3B — those pits merge into the bigger G-pit. Our intention is to carry out the mining schedule so that G-pit becomes fully operational.

Daniel Roden

analyst
#55

All right, and perhaps one final question from my side, maybe directed at Alex. Could you give us a brief update on the uranium market and share how you're viewing things? Clearly, with what's happening right now regarding U.S. tariffs and shifting supply chains? I suppose, from Paladin's point of view, what are you observing?

Alex Rybak

executive
#56

Absolutely, Daniel. Two weeks back I was in Montreal for the WNFC, sitting down with all our utility customers, the converters and the enrichers. From where I sit, the timing of this conference is quite fascinating given all that is happening in the industry. On one side, everyone recognizes the uranium shortage that exists today and keeps growing year after year. On the other side, people have gotten distracted by some significant geopolitical shifts, shortages in conversion and enrichment, and more recently the tariffs. So it is very much top of mind. I believe many utilities felt a sigh of relief once uranium was exempted. Quite a few market participants were attempting to figure out what that meant — especially utilities, since they are usually the ones absorbing that cost. And many utilities were trying to grasp what it would imply. But now that things have been clarified and uranium is exempt, they are once again reviewing their procurement strategies. Over the past 2 weeks, I have observed 2 RFPs issued by a U.S. utility and a European utility, interestingly enough, with supply beginning in '26, which is actually rather unusual, because they have left that — as you can see, they have left it somewhat late.

Alex Rybak

executive
#57

However, talks continue with a large number of our customers. As the latest volumes indicate, utilities are signing contracts. Clearly, contracting is still under replacement level. Yet the market remains quite healthy. The term price is staying at $80 a pound, which from my perspective is again a fairly healthy level. So broadly speaking, I view the market as quite positive, and we expect activity in the market to begin coming back to the fundamental contracting level. And hopefully, spot prices will mirror that too.

Ian Purdy

executive
#58

This is Ian speaking, folks, just a quick note for everybody. We still have a good number of questions remaining, and time is rather tight. I'd like to ask each of you to limit yourselves to a single question. We're more than glad to continue the discussion after this call individually, one on one. Many thanks.

Operator

operator
#59

The following question is from Milan Tomic with JPMorgan.

Milan Tomic

analyst
#60

I just have a question about production over the coming year. Is it still fair for us to assume that it broadly tracks what the EFS laid out, specifically regarding, I suppose, the mill throughput rates? Is that roughly comparable to what the study outlined? Or have we become somewhat more conservative on that going forward?

Ian Purdy

executive
#61

Appreciate the question. We’ll — actually, let’s walk through the process we laid out. Let’s complete our budget. Let’s get mining operational. And we’re aiming to give that guidance late in August.

Operator

operator
#62

Glyn Lawcock with Barrenjoey has the next question.

Glyn Lawcock

analyst
#63

Could I just get some clarification on that? In today's release, you mentioned that some problems remain with getting the chemistry stabilized, even though processing operations are back up. What exactly does that mean? It sounds as though recoveries have returned to normal, so I'd just like to understand what that refers to. And when you describe strong results for the June quarter, does that mean strong production, throughput, recoveries, or all of those?

Paul Hemburrow

executive
#64

Yes. Thanks, Glyn. Regarding process chemistry, in March during the flooding event we saw a couple of impacts. To be specific, we faced some difficulties getting people access to site. We had difficulties getting people into the processing facility. And there were gaps in the feed going to the plant. We had an influx of freshwater into the tailings facility. What that meant is that when we recovered that water back into process water, we didn't necessarily have all of the reagents that you'd normally recover out of the tailings. When we put that back into the process, it means we didn't have the right chemistry because of the lack of reagents in tailings. And it took us a little bit of time to recover from that. We saw a bit of a dip in overall recoveries as we sought to rebalance. In addition, we've seen some impact from that loss of feed carry over into April as well. So as that sort of slug of no feed moved through the plant, we've had a few challenges rebalancing the circuit. That now has largely been resolved, and we're seeing recovery rates back to normal. Regarding expectations around strong results, I think Ian's probably given a view on guidance and when we'll be releasing that.

Paul Hemburrow

executive
#65

Even so, I expect that to keep boosting productivity across our mining fleet. We'll keep refining the blend approach, and that ought to give us better throughput rates as well as better grade, since grade will fall more under our control during the next quarter.

Glyn Lawcock

analyst
#66

All right. So with roughly a third of the quarter behind us, is it your expectation that June quarter production will come in at least matching, or even exceeding, the March quarter? Is that what you're anticipating?

Ian Purdy

executive
#67

Yes, Glyn, this is Ian. We won't be offering highly detailed guidance. What I can tell you, though, is that we are in ramp-up. Our end goal, therefore, is improvement each quarter until steady state is reached. That is what we push for. And we're genuinely pleased to have delivered that improvement in this quarter in spite of the rain event. So if our ramp-up goes entirely to plan, we will target quarter-on-quarter gains, and we regard that as a solid outcome. Naturally, ramp-ups don't follow a straight line. Unforeseen events arise that you cannot predict or control. So each quarter, our focus will be on quarter-on-quarter improvement. We'll handle whatever is beyond our control as well as we can, and we'll keep reporting to the market. That said, that's the framework under which we're operating. And once we reach August, we believe we'll be able to supply that annual framework information the market is clearly seeking.

Operator

operator
#68

The next question is from Dim Ariyasinghe at UBS.

Dim Ariyasinghe

analyst
#69

Nice job on the quarter. Maybe back to the contract book for a moment. I realize you'd prefer—or rather, you have to—stay a bit vague on volumes for calendar year '25 and calendar year '26, I'd assume. But could you explain the reason? You've shared quite a few data points with us. Over the life of mine, I believe you're at roughly 50% contracted. In the past you've said the earlier years sit above that level. Still, I can't tell if it's 70% contracted or 75% contracted. It also seems like there are several get-outs, or some flexibility. Could you help us better understand what these commitments actually are, just for this year and CY '26, please? Some figures around that would be great. And honestly, I just don't get why, when you've provided essentially every other data point, we can't have those.

Ian Purdy

executive
#70

Yes, this is Ian speaking. That's a solid question, and a reasonable one too. Let me lay it out plainly. It comes down to commercial sensitivity. Competition in the uranium market is intense. Absolute confidentiality is what our customers require, and we are up against other producers in a marketplace where the volumes available and the pricing available serve as a key lever for getting the best result out of your contract negotiations. Given that commercial sensitivity, then, we won't be offering that degree of granularity. I'd also point out that other companies in a similar position don't offer that granularity either. So regrettably, the commercial uranium market is the reason. If it were possible to give it to the market, clearly we would. We can't because of that commercial sensitivity. What we do is make all the appropriate disclosures and supply the metrics that let the market build a sensible model of our results year-on-year. Alex has said that our contract book stands in good shape with metal deliveries. The conversations we're having with our customers are genuinely constructive. We have plenty of mechanisms for controlling unders and overs. Our customer cohort is a really supportive one. You have the total pounds. And I think we're in really good shape. The next piece of the jigsaw will come when we provide our August guidance.

Ian Purdy

executive
#71

We will, without question, share the realized price we anticipate for the year across the different sensitivities once again. However, given those commercial sensitivities at this point, I'm afraid we won't be providing that granular a level of detail.

Dim Ariyasinghe

analyst
#72

Right, but we're not talking about a granular level here. It's really just one — yes, you have got 12 offtakes. Could you give us a percentage figure, or a volume? I don't believe that reveals too much. If anything, the more you've contracted, the better that is for your negotiations, I would guess, right? Or is that not how one should think about it?

Ian Purdy

executive
#73

Honestly, the answer here is pretty straightforward, and in August we'll give the proper corporate guidance — same as we did a year ago — covering realized price and what we expect revenue to look like. So the details we're putting out to the market are consistent with what our peers are doing and fit this market. So let us have the time to go through the budgeting process and get the mining operational, and later in August we'll come out with that corporate guidance. And at this point, I'd say what we've shared is what the market has available to it.

Operator

operator
#74

Matt Hope of Ord Minnett is up next with a question.

Matthew Hope

analyst
#75

Nice work on the numbers. I wanted to ask about tailings capacity. From what I understand, you sent floodwater into that area and presumably pumped it over to pit G3A. Do you have enough tailings capacity? Or do you need to speed up building a new tailings facility?

Paul Hemburrow

executive
#76

Matt, thanks for asking. We have ample tailings capacity. And one benefit of what we did is that we're able to recover the vast majority of that water. Now, not much fine material traveled along with it. So it didn't really — and it won't have any meaningful effect on that tailings capacity. For a mine like this, having an ongoing program of building new tailings capacity is completely normal. Our biggest capital project right now is a tailings dam. It's in great shape. And we expect that project to be finished in the next — in this current quarter, actually. So tailings capacity is not a problem for us.

Operator

operator
#77

The following question is from Branko Skocic at E&P.

Branko Skocic

analyst
#78

Unit costs came in looking appealing given the weather. So I just wanted to get a sense, I suppose, of how durable that $41 per pound figure is, and maybe even more to the point, what your outlook is on all-in sustaining costs in the near term, please.

Anna Sudlow

executive
#79

Absolutely, and thanks for raising that. Well, naturally, the production costs we saw this quarter mirror the larger output volumes. As Paul mentioned, we're starting up mining operations. So we'd anticipate a certain rise in expenses as we go through that initial ramp-up phase. Exactly how that translates into cost per pound produced will, in the end, hinge on the output volumes achieved during the quarter. So it's likely a bit soon to give a firm answer. We're fairly pleased with where the cash margin sits right now, between our production cost and the average realized price. So I'd say there's decent headroom for improvement there, and we'll see how the quarterly results come in.

Ian Purdy

executive
#80

Alright, thank you all. We’ve run slightly past our allotted time. Many thanks for joining us today. Should you have any additional questions, please contact Paula right after this call, and we’ll get back to you on all of those today. So thank you very much, and we look forward to updating you next quarter.

Operator

operator
#81

That brings today's conference to a close. We appreciate everyone for joining in. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Paladin Energy Ltd transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Paladin Energy Ltd earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Paladin Energy Ltd or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.