executiveGood morning, everyone, and welcome to the presentation of our final results for 2025. Thank you very much for making time in your schedules to be with us today. We'll keep the presentation reasonably brief, with a chance for questions afterward. Presenting alongside me today is Marileen Kok, our Financial Director. This marks the first occasion on which Marileen has reported on a full year of financial results for the group in her capacity as Financial Director. A special word of thanks goes to Marileen, to the finance department, and also to the rest of the amazing Pan African team for the excellent work done in putting these results together. Should you need detail not covered in today's presentation, you are welcome to refer to our SENS and RNS announcements and to the supplementary information available on the Pan African website. Please take note of the disclaimers and the information on forward-looking statements on Slides #2 and 3. Looking back over the last year, I believe Pan African has made excellent progress with our strategy of positioning ourselves as a safe and sustainable, high-margin and long-life gold producer with very attractive future prospects. Not many gold producers can successfully commission 2 new transformational projects within the space of 12 months.
Jacobus Loots
executiveSure — one of the standout items from the past year was getting MTR into production sooner than planned and under budget. Once the expansion now in progress is finished, that asset will have a life of nearly 20 years, turning out roughly 60,000 ounces each year at an all-in sustaining cost that ranks among the best globally, with room for additional near-term growth. We also finished buying Tennant Mines in Australia — an asset located in a Tier 1 jurisdiction — and then worked alongside the existing Australian management team to bring that project in on budget and on schedule. And we're happy to say today that Tennant's gold plant at Nobles hit steady-state throughput measured in tonnes in July, right after year-end. Turning to our other surface assets, we've now wrapped up the project extending the life of the BTRP at Barberton by a further 6 years, using tailings sources only. At our underground operations, we completed a successful restructuring of the Barberton underground, which is expected to save roughly ZAR 200 million in the coming financial year. Consort at Barberton is now cash flow positive as well, generating about 10,000 ounces per annum. Financial year 2025 also brought a series of records. We posted record half year production in the second half of the financial year.
Jacobus Loots
executiveWe're reporting record profits and record headline earnings per share. We're proposing record dividends for shareholders to approve at the upcoming Annual General Meeting. Measured in U.S. dollars, our proposed dividend has risen by almost 80% year-on-year. And at prevailing gold prices, we expect to be degeared from a net debt perspective before the end of the 2026 financial year. During the second half of the financial year, we repaid almost $80 million of debt, which shows the cash flow generating ability of our portfolio. I believe Pan African is now incredibly well positioned to capitalize on current gold prices and our increasing production profile. And I look forward to sharing some thoughts and further detail on many of our initiatives and plans in the following slides. On Slide #4, an overview of the presentation. We'll start with Pan African's health and safety performance, which is obviously critical in our business, and then provide an overview of the group and our operating environment, some key features from the last year, including our new operations at MTR and Tennant Mines with detail on asset performance as well as our cost and capital outlook. We'll then spend a couple of minutes on ESG before allowing Marileen the opportunity to highlight elements of the group's financial performance for the year.
Jacobus Loots
executiveAfter that, the presentation wraps up by laying out the areas of focus for the coming year. Moving on to Slide #6, which covers how we've done on safety and our path toward zero harm. Our attention remains on safety programs and interventions, and on keeping up a record that leads the industry. We also have several safety milestones from the reporting period worth celebrating. In particular, I want to highlight what our surface business accomplished, with every one of our operations recording 0 lost time and reportable injuries across the year. At MTR, construction was completed with roughly 1.8 million man hours worked and just 1 lost time injury. Turning to safety at the underground operations, we sadly had 2 fatal accidents — one at Evander in December of last year, and the other at Barberton Sheba in June, following more than 10 years without a fatality at Sheba. We are also grieved to report a fatal fall of ground accident at Evander after year-end. Once more, we offer our condolences to the families, friends and colleagues of our deceased colleagues. I am committed to doing everything in our power to keep our people and operations safe. All stakeholders, though, must collaborate if we are to achieve our aim of a zero harm workplace.
Jacobus Loots
executiveSlide #8. We think Pan African presents a compelling investment case. Our portfolio is well diversified, consisting of producing gold assets across 2 jurisdictions that come with excellent mining pedigrees. Our operating base is stable and high margin, and it produces highly attractive cash flows. Over the coming year, we expect output to rise by nearly 40% or more, mainly as MTR and Tennant mines ramp up. Our assets have long lives, and the group holds an enormous reserve and resource base that supports additional expansion and development. We have demonstrated a proven record of delivering projects, allocating capital excellently, and paying a sector-leading dividend. On top of that, we can leverage the current portfolio to capture further attractive growth. At this point, there is no need for us to purchase costly assets at elevated valuations. Slide #9. I suppose the proof lies in the pudding, or in this case, in the numbers. Someone who invested in Pan African in 2009, when the group took its current form, would have seen that investment grow roughly 38-fold. The gold price also rose by an attractive factor of about 4x. Over that same period, you would also have collected an attractive dividend, which lifts returns on Pan African stock even further. Earlier this week, we announced our intention to move to the main market in London.
Jacobus Loots
executiveGiven the scale of the group and what lies ahead, our current AIM listing no longer fits us. Slide #10. We've assembled a distinctive collection of surface remining and underground assets. With MTR and Tennant Mines now added, we have 3 large mining complexes in South Africa plus 1 in Australia, and all of them feed into the substantial rise in gold production we're forecasting for the coming year. Surface operations bring unit costs down and convert legacy liabilities into profits, while the underground mines give us long mine lives, solid investment returns thanks to a large sunk capital base, and appealing optionality too — optionality we keep realizing in a prudent, thoughtful way, always focused on how best to allocate capital. Slide #11. We've now completed the shift of the business toward long-life, low-cost surface remining assets. Looking ahead, roughly 60% of production should come from surface, and the majority of earnings as well. As I mentioned, few gold miners can claim the fully funded production growth we'll achieve over the next year, with a portfolio that's also well diversified. Slide #12 gives a little more detail on the assets we currently hold.
Jacobus Loots
executiveWhat's really helpful, I think, is that every one of our operations now has an extended life, and the shortest of those is the BTRP at 6 years, which is still a fair stretch. Compared with the sector, plenty of producers are seeing their asset lives run down or having to put in significant capital for future production — that isn't the situation at Pan African. There's no need for us to go out and acquire additional assets in order to sustain and grow output. Slide #13, our operating environment. We keep looking for ways to make our business less vulnerable to negative external effects in South Africa. We've now had an extended stretch with no load shedding at all. Our renewable energy footprint is expanding quickly. Our mining rights are long dated, and at most operations we have multiyear wage agreements in place. Pan African's track record shows that we can operate and grow in South Africa, and do so very successfully. Our experienced Australian team will ensure the same success in that jurisdiction. The Northern Territory government has struck us as very welcoming and supportive of our operation. It's a great place to do business, and we look forward to expanding our business there. If we then move on to key production cost and financial features from the year past on Slide 15.
Jacobus Loots
executiveFor the year, we turned out slightly less than 200,000 ounces of gold, which is 6% higher than the previous year. During the second half of the financial year, we achieved record production, largely driven by MTR. Looking ahead to the next financial year, our guidance sits at 275,000 ounces or above, with output weighted toward the second half of that year as MTR's expansion wraps up, Tennant Mines begins mining higher grades from open pits, and we become firmly established in Evander's very high-grade 24 Level B-Line. Our final all-in sustaining cost for FY '25 came in at $1,600 per ounce, a touch above our earlier guidance range of $1,525 to $1,575 per ounce. The main drivers behind the AISC, or all-in sustaining costs, overshoot were a hedging loss of $30 per ounce and a rand-dollar exchange rate that was 2% stronger than what we had forecast in our guidance. Importantly, the group is completely unhedged from the 1st of July of this year. For the next financial year, with full years of production from MTR and Tennant Mines and increased output from Evander 8 Shaft, we can expect unit costs to decline in real terms. We anticipate an all-in sustaining cost per ounce of between $1,525 to $1,575. We further expect to be net debt free in the next year at prevailing gold prices.
Jacobus Loots
executiveEven with the $32 million hit from the hedges, we still achieved record profits and headline earnings in FY '25. And lastly, in spite of all that growth and reinvestment of capital, we've been able to keep up our sector-leading dividends to shareholders. At the upcoming Annual General Meeting, we'll be proposing a record dividend for approval. Slide 16 ought to be an interesting one for investors, showing how well we've expanded margins over recent years, and that leaves out any meaningful contribution from MTR and Tennant Mines as well as the full effect of the record gold prices currently prevailing. Slide #18. I think it's fair to say Pan African has a record second to none when it comes to conceptualizing, constructing and operating tailings retreatment projects. These long-life assets are now the cornerstone of our business. And I believe there's further room for us to grow in this space, which should be very attractive to our investors. If we then move on to more detail on performance per operation, beginning with Elikhulu on Slide #19. Clearly a flagship asset for the group, with just under 9 years of production remaining, producing at under $1,100 per ounce. Gold production stayed stable, as expected, for the year.
Jacobus Loots
executiveWe’re expecting another year with production above 50,000 ounces and, in the current gold price environment, clearly very strong cash flow generation. Over the last year, the asset produced $80 million of EBITDA. Importantly, Phases 3 and 4 of the Kinross tailings facility — the final expansion — were delivered on budget and on schedule. We’re also constructing the Winkelhaak pump station now, ahead of when it’s required. That will allow us to feed material from both Leslie/Bracken and Winkelhaak starting in FY 2027. On Slide #20, the BTRP — another sterling performance from our first gold tailings retreatment plant, commissioned in 2013, and the lowest-cost gold producer in the group. As previously flagged, very exciting news for the BTRP is that we have extended this operation’s life from surface remining only to 6 years. The capital requirements for this new initiative were also relatively modest — some $4 million for a new pump station. BTRP will therefore continue to be an integral part of Pan African’s tailings retreatment story for many more years. I’m also pleased to report that the new Bramber remining infrastructure will be delivered before the end of September this year — again, on budget and ahead of schedule.
Jacobus Loots
executiveTurning to MTR on Slide 21. That plant was commissioned in October of last year — ahead of schedule, and roughly $8 million under the upfront capital budget. Construction of the entire plant and infrastructure took about 14 months, which again demonstrates Pan African's capacity to secure, conceptualize, fund, and ultimately deliver world-class mining projects. By December, we were already running more than 10% above the plant's nameplate capacity. Given the current gold price environment, payback on that $130 million initial investment ought to come in around 2 years, with a project life of nearly 20 years once the Soweto reserves are included. All-in sustaining costs ran high through ramp-up. Looking ahead, we expect them to decline to under $1,200 per ounce over the coming year and then to ease further beyond that. We are currently expanding the MTR operation toward 60,000 ounces of annual production. That expansion remains on schedule and ought to wrap up early in the 2026 calendar year. Moving to Slide 22, the Soweto cluster comprises over 130 million tonnes of tailings, with a mineral reserve exceeding 500,000 ounces of recoverable gold. Our view is that the gold reserves at the Soweto cluster are sufficient to support a stand-alone operation, processing roughly 1 million tonnes per month across an approximately 10-year life of mine.
Jacobus Loots
executiveBy the close of this month, we will have finished determining whether this option is feasible. Since we already have a presence in that area, there is clearly room as well to consolidate tailings facilities that we do not currently own. Turning to Slide 23, the socioeconomic and environmental advantages of this project are something we simply cannot praise enough. Rehabilitation is being carried out concurrently. We are lifting up nearby communities, offering economic and employment opportunities that are badly needed, and collaborating with law enforcement to wipe out illegal mining. Slide #25. Given the jurisdiction, I believe the purchase of Tennant Mines surprised most of our shareholders. Even so, before we finalized that acquisition, over a year had gone into evaluating the assets and cooperating closely with the management team. Regarding putting capital to work for growth, the investment in Tennant Mines satisfied every criterion Pan African sets, and these brief points deserve emphasis. The project carried notably low construction risk in a Tier 1 jurisdiction, along with a fast return on the investment. We obtained a dominant position within the gold field and constructed the biggest processing facility ever to run there. Exploration potential in the area is highly exciting, and an experienced local management team is taking ownership of delivering the project.
Jacobus Loots
executiveIt's rare to get the chance to buy an asset such as this and bring it into commission 6 months afterward. Slide 27. We're happy to say the processing plant at Tennant Mines, Nobles, is now fully commissioned, with production for the coming year projected at 46,000 to 50,000 ounces at an all-in sustaining cost of slightly under $1,600 per ounce. Slide 28. As mentioned before, the Tennant Creek gold field holds some highly exciting potential. Slide #31, the Evander underground. As previously noted, a disappointing result for the year. The hold-up in commissioning the sub-vertical shaft for wasting hit us hard. Fortunately, that project is now fully complete. The new infrastructure essentially doubles our wasting capacity, with fewer unwieldy conveyors, lower unit costs and a higher mine call factor. For the next financial year we're guiding 46,000 to 50,000 ounces of production, with further increases in later years. All-in sustaining unit costs will clearly come down in line with the production ramp-up. Moving to Slide 32, covering Fairview, our flagship underground operation within the Barberton Mines complex. We would have done somewhat better were it not for multiple Eskom transformer failures in November, which we estimate cost us over 2,000 ounces of production.
Jacobus Loots
executiveAt Fairview, we keep taking the majority of our ore out of the MRC and Rossiter ore bodies, and development toward the 263 Platform remains firmly on track. Work to rehabilitate the existing ramp infrastructure from 38 Level downward is likewise moving ahead on schedule. That decline will carry personnel and materials to the working faces in the 3 Shaft section, and it will further ease logistical strain on 3 Shaft, which will then be used primarily for rock wasting while logistics improve. The smaller underground operations at Barberton appear on Slide 33. On consort, rehabilitation of the PC Shaft pillar is finished, and that now lets our contractor restart mining in the high-grade 41 to 45 Level mining sections. Further development continues at the MMR and the PC Shaft to reach mineral reserve blocks, giving us more ground to mine. I'm pleased that the operation turned cash flow positive in the second half of the financial year, to the tune of roughly ZAR 50 million, and is sustainable at those levels. As for our Sheba Mine, we have completed the restructuring successfully and expect better production in the year ahead, with meaningful cost savings on our labor bill.
Jacobus Loots
executiveIf you go to Slide 35, that's where we address all-in sustaining costs. At an all-in sustaining cost of $1,425 per ounce, 85% of our portfolio produced, and that figure was affected by reduced underground output, a few once-off items I mentioned earlier, and the stronger rand-U.S. dollar exchange rate. Slide 36 shows that our cost performance remains very much in line with, or better than, the global sector average, with most producers having faced significant cost pressures over the last couple of years. As I said earlier in the presentation, the next financial year should bring further improvements, with full years of production from MTR and Tennant Mines and higher output from the Evander underground. Moving to Slide 38, group capital projects. We keep investing in our assets and in growth. For FY 2026, sustaining capital is fairly subdued when it comes to growth. We are, however, putting increased cash flow margins to work in fast-tracking development at Nobles, the Winkelhaak pump station at Elikhulu and, obviously, the expansion of MTR. ESG is on Slide 40. We remain very proud of what we have achieved on this front, particularly regarding progress with renewable energy, water retreatment and social projects. We truly do make a positive difference where we operate.
Jacobus Loots
executiveExpanding a bit more on the renewable energy road map shown on Slide 41: our goal is 15% renewable energy by 2027. At this point I'll pass things over to Marileen, who will walk through the financial results for the year.
Marileen Kok
executiveThanks, Cobus. It's a real thrill to walk you through the full year results today — my first time doing so in the Financial Director role. For the presentation, amounts and percentages have been rounded. Starting on Slide 43, you'll see how the 36% rise in the average U.S. dollar gold price received, together with higher gold production, lifted revenue for the year ended 30 June 2025. Revenue rose 45% to $540 million compared with the prior financial year. That revenue growth also drove a 60% increase in adjusted EBITDA and a 78% increase in earnings, to $142 million. Headline earnings climbed 47% to $117 million. The $28 million gain on bargain purchase stemming from the Tennant Mines acquisition is excluded from headline earnings, and that's the main reason for the gap between earnings and headline earnings. Earnings per share and headline earnings per share rose 73% and 42%, respectively. Over the financial year, just over 105,000 ounces — 53% of gold sales — were committed under the hedging transactions and so missed out on the spot gold price, which produced an opportunity cost of $26 million from the synthetic forward transaction and a hedge loss of $5.8 million from the zero-cost collar transactions.
Marileen Kok
executiveThe hedging was done to ensure we had the money needed to build the MTR operation in full. As of July 1, 2025, the group carries no hedges at all and stands to gain from the record-high gold prices currently in the market. Our production costs and all-in sustaining costs took a hit of roughly 3% because the rand strengthened against the U.S. dollar relative to the prior financial year. As I noted earlier, the realized hedging losses dragged the all-in sustaining cost up by 2%, which works out to $30 per ounce. The increases beyond inflation come mainly from electricity, mining contracts, and processing costs, reagents included. Unit production costs were also pushed higher by lower output stemming from the delayed commissioning of the vent shaft hoisting project at Evander underground, given how large the operation's fixed cost base is. Operating cash flows rose by more than 70% to USD 155 million, driven mostly by the gold price climbing over the period along with disciplined cost control, which let us capture strong margins. CapEx for the year came to $158 million (sic) $168 million, and that pushed net debt up 41% to $151 million versus June 2024.
Marileen Kok
executiveMost of the capex went toward finishing and commissioning the MTR and Tennant Mines operations, plus the Evander underground 24 to 25 Level project. Slide 44 shows how well the group can generate cash flows at prevailing gold prices. With gold at current prices, the group should be fully degeared on a net debt basis before the 2026 financial year-end. The expected debt redemption profile is well in excess of the contractual requirements. Group net debt peaked in December 2024 at $229 million, when the MTR project was completed and the Tennant Mines project finance came onto the group's balance sheet from the effective date of the acquisition. Over the last 6 months of the current financial year, the group cut net debt by approximately $80 million, or 35%, to $151 million, which clearly demonstrates the cash flow generation potential of our current operations. The green loan facility dedicated to funding the group's renewable energy projects was also settled in full by the 30th of June 2025. The net debt-to-equity ratio of approximately 20% as at 30 June 2025 obviously leaves us with very significant headroom. The group's debt facilities currently consist of a revolving credit facility, the term loan for the MTR project and the listed corporate bonds in South Africa, combined with the funding facilities for the Australian operations from the Northern Territory government and a private financial institution.
Marileen Kok
executiveThe term loan doesn't come due until June 2029, yet it will be paid off significantly ahead of that maturity date. As for the contractual debt redemptions tied to the debt facilities, those are relatively modest across the coming 12 months, made up mainly of the quarterly repayments under the MTR term loan facility and the Tennant Mines facility, the monthly repayments owed to the Northern Territory government, and the maturity of the Par SO1 listed bond along with the RCF redemption in June 2026. The RCF facility is undrawn at present, and the group will begin the refinancing process for it in the near future. In all likelihood the RCF will be extended once more, as has happened previously, since it forms a key part of our core working capital finance facilities. Slide 45 sets out the group's historical dividend payments and those proposed. The proposed record dividend stands at ZAR 0.37 per share, producing a gross dividend distribution of ZAR 864 million, or roughly $49 million at the closing exchange rate for the 2025 financial year. This proposed dividend represents an increase over the prior financial year's dividend of 68% in rand terms and 77% in U.S. dollar terms. The proposed dividend for the 2025 financial year, taken together with the share buyback program announced, will produce a payout ratio of approximately 38% of cash flow as defined by the dividend policy.
Marileen Kok
executiveAt the AGM in November 2025, shareholders will be asked to approve the dividend. This dividend offers shareholders an appealing return while making sure the group retains sufficient available liquidity to fund operations, along with additional renewable energy initiatives coming up in the near future. Thank you. I'll now return the floor to Cobus so he can wrap up today's presentation.
Jacobus Loots
executiveThanks a lot, Marileen. To wrap up on Slide 47 and drive home a few important points. We've got tailwinds now from the highest gold price ever recorded, and the group carries no hedge at all. Even if gold prices come in a bit lower and despite our record dividend, the group ought to have net debt degeared before the 2026 financial year is over. We've just commissioned and ramped up what is arguably the most successful gold tailings retreatment project in South Africa's history, coming in under budget and ahead of schedule, and we'll expand this operation further in the near term. Our Elikhulu, MTR and BTRP operations are doing really well and producing fantastic returns and cash flows, and they'll keep doing so for many more years. Tennant was acquired with very limited dilution for shareholders, under 6% of our market cap at the time. We're now producing from this asset in a Tier 1 jurisdiction within 6 months of acquiring it, having built the largest processing plant ever to operate in this gold field by a factor of 3. We're growing gold production very materially in the year ahead, with 60% of our production ounces coming from surface. Consort Mine has turned a corner, and Fairview will keep ticking along as it has for many years.
Jacobus Loots
executiveOnce the subvertical hoisting shaft is finished, Evander Mines is going to do a lot better. Obviously, in the current climate, the group is producing very substantial cash flows right now. I want to give shareholders the assurance that, as we always have, we'll stay extremely prudent when it comes to allocating capital and making investment decisions. Our record is outstanding when it comes to delivering sector-leading shareholder returns, both on an absolute basis and per share, and we won't compromise on that metric. Thank you so much for your time this morning. We're looking forward to carrying on mining for a future and broadening our horizons over the coming year. I think we'll begin by taking any questions from the conference call.
Operator
operatorRichard Hatch from Berenberg has a question.
Richard Hatch
analystTo start, on the CapEx guidance for '26: I believe the market had it at $71 million, while you're steering toward $146 million. I understand part of that reflects, as you mentioned, elevated gold prices prompting you to pull some projects forward. Still, could you give us additional detail on what's pushing CapEx above what the market anticipated? And when we look ahead to 2027, on a purely directional basis, how should we think about the group's CapEx profile as it currently stands? That's my first question.
Jacobus Loots
executiveThanks, Richard. Yeah, so on that point — in the current gold price setting, we've made the choice to pull a fair amount of capital forward. The biggest one is the Winkelhaak pump station at Elikhulu, roughly $20 million. What that does is give us flexibility across the remaining — let's say 8 years of life at Elikhulu once this year wraps up. After that, capital there will be pretty limited. So we're accelerating it. Second, as you'd expect, there's the MTR expansion, which will be finished by January, February at the latest — a sizable ticket item. Then we've got the TCMG capital as well, which is mainly growth capital. And finally, at Evander underground, some capital got carried over from last year, plus there's a good amount of development taking place at 24 to 25 Levels. So obviously, with this gold price and how low our operating costs are, we can manage spending that capital, still lift the dividend by nearly 80%, and still anticipate being degeared by the close of FY '26.
Jacobus Loots
executiveWhen we look at guidance for the group's sustaining capital, that figure comes to $50 million.
Marileen Kok
executiveSomewhere in the range of $40 million to $50 million.
Jacobus Loots
executiveLet's say roughly $50 million for sustaining capital. Obviously, if we're able to keep expanding the business while doing that in a way that produces returns, we now have considerable flexibility when it comes to deploying capital and delivering attractive returns.
Richard Hatch
analystAll right. So as we move into '27, we ought to see that shift further in the direction of $40 million to $50 million. Is that how we should be thinking about it?
Jacobus Loots
executiveOkay, so you could roughly characterize it as $50 million of sustaining, and on top of that there will still be some growth capital — though it's very well justified. What you'd have picked up in the write-up is that a project such as Warrego in Australia is doing drilling, and some of the intersections are returning 5% — 5 grams a tonne gold, plus copper anywhere between 2% and 10%. Those are the kind of growth projects that look very attractive. So yes, your sustaining CapEx at Barberton will carry on just as it has, and there isn't much sustaining capital to be spent at Elikhulu or MTR. You're going to see capital declining on the Evander underground now that we've sort of moved into 25 Level. And then TCMG base case capital — which takes in both sustaining and growth — would be on the order of about...
Marileen Kok
executiveSomewhere between $5 million and $10 million.
Jacobus Loots
executiveOn sustaining capital, let's say $5 million — let's call it $10 million <<inaudible>>.
Richard Hatch
analystAll right, that's useful. Then the second point concerns the Soweto cluster specifically. I know a feasibility study is due on that within roughly the coming month. How ought we to view the final investment decision for that project? And once more on growth: is it additive to MTR, or is it a life extension? How are you — where do things stand — what's the current thinking there?
Jacobus Loots
executiveRichard, yes, it obviously hinges on the feasibility study. If we do decide to construct an additional plant, I mean, that will require sizable capital. I don't want to put numbers out there. But again, at this gold price or even a lower gold price, just given the attractiveness of these projects, you can expect, again, a 2-, 3-year payback on a capital number. But I think as a base case, I mean, MTR obviously has been a fantastic success. So we started 50,000 ounces. We now are in the process for fairly limited capital expanding to 60,000 ounces. I mean what Soweto at the very least will give us is additional feedstock, and we can look to ramp up, say, to 1.2 million, 1.3 million tonnes, just the existing plant. That means you're going to have attractive growth, another, call it, 15,000 ounces out of MTR and that operational growth on that basis for 15 years. So I mean, I guess those are the options. Do we go big bang on Soweto? Obviously, the sort of -- there are risks, but it's something that we've done many times successfully. But a base case, I think shareholders can look forward to further expansions at limited capital, generating very attractive returns.
Richard Hatch
analystAll right, apologies — just a single follow-up question on that. Regarding the balance of probabilities, is the thinking that it will lean more toward, as you put it, incremental plant feed that lifts you to that 1.2 million to 1.3 million and raises volumes to closer to 75,000 ounces annually, instead of — to borrow your phrasing — a big bang CapEx figure? In other words, something more incremental yet with a longer life and very, very high margins, rather than perhaps a somewhat shorter life but still a very low-cost operation carrying a high CapEx number.
Jacobus Loots
executiveYeah. Look, I mean, it's too soon to get ahead of ourselves on what actions we'll take. But I mean, when you consider how we've handled capital allocation historically, I don't think there's any reason for worry. I don't want to tell shareholders they can count on growth reaching, say, 1.2 million, 1.3 million, but that's the logical step for us as a base case.
Operator
operatorRight now, there aren't any additional questions coming in from the phone lines.
Jacobus Loots
executiveShould we move on to the questions that came in by email?
Executive
executiveThanks. A handful of questions came in through the webcast. The first is from Martin Creamer of Mining Weekly. Martin asks: in what ways, direct or indirect, could a London main board listing benefit South Africa economically and in other respects?
Jacobus Loots
executiveMarileen and the teams have put in tremendous effort to bring this process to the point it's at now. For us, it's the next logical move. Given our market cap and production level, I think we've outgrown AIM. And it will open the door to a broader investor base. I think the London market would be quite receptive to another sizable gold counter being listed. It gives us scale when it comes to indexation.
Marileen Kok
executiveRegarding indexation — yes.
Jacobus Loots
executiveSo yeah, there are a number of benefits when you look at it from that angle.
Executive
executiveThanks. We have a question coming in from Mark Bentley at Share Society. I was troubled to see reports of the 3 recent fatalities. What was the main cause — was it safety protocol breaches, equipment failures, or geophysical activity?
Jacobus Loots
executiveMark, yes, it's deeply saddening for us too and really tough. So let me begin by saying that, honestly, our surface business has performed exceptionally well. I mean, we essentially transitioned and finished an entire year of output without any lost time or reportable injuries across all our surface assets. Industry-leading when it comes to underground safety records. That said, having fatal accidents is still not acceptable. We -- once more, every one of the corrective steps is laid out in detail in our SENS, RNS announcements. We're lucky in that we don't experience major seismicity. So geotechnical problems aren't the issue. The fatalities differed greatly in nature. And what it comes down to for us is that, as a group, we can do better and we will. But it isn't just us. I mean we require buy-in from every stakeholder. And that means all our employees must comply with policies and procedures, along with our unions and every other stakeholder who is involved, and that's the central message.
Executive
executiveArnold van Graan from Nedbank has a question. Nice work on these results. From a strategy and growth standpoint, what comes next? At this gold price, can you acquire additional assets at value?
Jacobus Loots
executiveArnold, I believe our history on deploying capital speaks well again. We're extremely lucky in that none of our assets are nearing the end of their operating life at any point soon. We can keep expanding through our own efforts. We've discussed MTR. Elikhulu will provide steady output for another 9 years, though we'd prefer additional expansion at Barberton. At present, most of that expansion is being financed at Evander 8 Shaft. Australia, of course, holds strong potential. And that's essentially been our guiding principle through the years. We avoid costly transactions. Our approach is highly cautious. And for this year in particular, the main emphasis will largely be on securing the expansion we've already funded and watching those gains materialize in output figures, expenses and, in the end, cash flows.
Executive
executiveThanks, Cobus. This is Mark Bentley once more, calling in from Share Society. At the half-year point in FY '25, '26, are you thinking about an interim dividend payout?
Jacobus Loots
executiveMark, let me begin by noting that the balance sheet clearly offers substantial flexibility at this point. We're already paying a dividend that's very appealing — sector-leading, I'd say that's a fair description. Compared with last year, that dividend represents a rise of nearly 80%, and this comes even after all the capital we've devoted to growth during the past 12 months. That said, we're always examining options for giving more capital back to shareholders and making our story more appealing. So at this stage, we certainly wouldn't want to rule out an interim dividend. And we consistently weigh cash returns against buybacks and against reinvesting in our portfolio, followed by growth. I believe we'll keep successfully striking a balance across all of those requirements.
Executive
executiveAppreciate that, Cobus. Herbert from Absa sent us 2 questions tied to CapEx. The first one, I believe, we've already addressed. Looking ahead 3 to 5 years, how should we frame CapEx? What's the minimum baseline for sustaining CapEx? Then the second part, I think, is: what CapEx would be needed to develop TCMG so the volumes come through over the next 5 years?
Jacobus Loots
executiveRegarding the group's sustaining capital, we've provided guidance of roughly $50 million at this point. For TCMG, the baseline figure comes in at around $40 million to $50 million, though that does hinge on growth.
Marileen Kok
executiveAlso, regarding how many open pits there are and how quickly we develop, we do move into underground operations.
Jacobus Loots
executiveRight. So basically, Australia holds a highly appealing business for us, and the money we put in will produce fairly strong returns. And as I said, something like the Warrego project alone is capable of supporting a fairly sizable operation as time goes on. So those are the possibilities we're examining when it comes to TCMG.
Executive
executiveAlright, one more CapEx question — this comes from Lebo over at Truffle. If you do decide to build a stand-alone plant for the Soweto cluster, would it be fair to assume the same amount as Mogale?
Jacobus Loots
executiveLebo, if we go with a stand-alone plant, it will likely be more. And why is that? Well, the plant would have roughly the same throughput. And obviously there have been some inflationary adjustments since we built MTR. But then we would have to construct a new tailings facility. With MTR, we benefited in the first years from using the waste <<inaudible>> pit. So that becomes an extra capital item. And then second, the pumping infrastructure — roughly 15-odd kilometers of pumping and piping — which MTR didn't have. So expect a bigger capital bill. But again, at this gold price, or even a lower one, that kind of capital should pay back in, say, around 3 years. But again, we realize that if we do take on Soweto, it's a big bang number, as I said. And at the very least, we'd like to think shareholders can count on some production growth at limited capital if we simply expand the MTR facility.
Executive
executiveThanks. Arnold has another question. Did the illegal mining issues at Barberton cause you any production losses?
Jacobus Loots
executiveIllegal mining, as we've pointed out, is a major problem for us. And once more, I want to congratulate our security team on all their work keeping our people and assets protected, which we'll keep doing. We lose production constantly, and unfortunately it's theft by our own employees and also by illegal miners. So we need cooperation from all stakeholders and role players, the police included, and we collaborate very effectively with the police at a national level. So thank you for that. And yes, definitely, it also shows, I suppose, the potential that remains after 140 years of mining that you have so many illegals underground. But without a doubt, there's a great deal of gold theft, and we're always working on ways to reduce that problem.
Executive
executiveThanks, Cobus. Bruce Williamson from Integral Asset Management has another Barberton question. Could you shed some light on the Rossiter Reef methodology, along with how much dilution is reduced and how much higher the grades are?
Jacobus Loots
executiveYes. So Bruce, as with every ore body at Barberton, sadly these aren't the simplest ore bodies to comprehend and then mine. They aren't tabular. I mean, as you're aware, they're kind of undulating. But Rossiter has been a pretty good benefit for us when it comes to topping up production from the MRC. So we have 3 sort of lines into Rossiter, we keep mining it, we keep exploring. So it probably gives us roughly 20% of Fairview's -- 20%, 25% of Fairview gold right now. So -- but I think it's exciting. I mean, there's more work to be done. And hopefully, over time, we can prove up a bigger ore body at Rossiter. The problem at Barberton isn't the quality of the ore bodies. It truly is the infrastructure after 140 years of mining. I mean, nobody ever expected we'd be mining at these depths for so long. So that's why we get to keep reinvesting and investing in infrastructure and optimization.
Executive
executiveThanks. Lebo from Truffle has another question. What do you think about special dividends?
Jacobus Loots
executiveOkay, so Lebo, we did have a lengthy discussion about that — well, maybe not lengthy, but it's definitely something we looked at. On special dividends, though, I'd say the dividend we're proposing right now sits at a level we can sustain pretty comfortably. And like we've mentioned, it comes down to balancing growth, reinvestment, and giving cash back to shareholders. From that angle, I really do believe we're highly competitive. As things stand, there isn't really any request or expectation out there to pursue a special one. Our dividend level, I think, is quite attractive.
Executive
executiveThanks, Cobus. I think we can wrap up with another question about the London listing, this one from Ryan Seaborne at 36ONE Asset Management. Ryan says congratulations on the great results. He asks whether you'll be running a roadshow before the main board listing, and what the expected listing date is.
Marileen Kok
executiveThanks, Ryan. We're in the middle of everything that has to be filed with the FCA — all the required submissions. On the timeline as it stands, we'd expect the listing process to wrap up at some point in October. We're starting a roadshow now, after our results. So we'll look at whether there's any appetite for another roadshow ahead of admission in October.
Jacobus Loots
executiveYeah, based on the guidance, our aim is to get that process wrapped up by the end of December.
Executive
executiveThat's the last question that came in, or rather a comment. Could you please formalize the 3-year CapEx guidance, given the strong pipeline of projects?
Jacobus Loots
executiveAbsolutely — that’s something we can look into giving more clarity on, no problem. That said, I think the upside is that, clearly, we can quite comfortably fund the capital levels needed to sustain and grow. And as we’ve mentioned, any growth capital would come in and raise production and lift the returns to the business and to shareholders.
Executive
executiveThanks. That brings us to the end of the questions from the webcast.
Jacobus Loots
executiveThanks to everyone for being with us today.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Pan African Resources PLC transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Pan African Resources PLC earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan African Resources PLC or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.