We appreciate everyone being on the line. I'm the conference operator. We're glad to have you join us for Pan American Silver's conference call on the results of the first quarter of 2020. <<operator_script>> Also, this call is being recorded. <<operator_script>> At this point, I'll hand things over to Siren Fisekci, VP, Investor Relations. The floor is yours.

Siren Fisekci

executive
#2

Thanks, operator, and hello everyone — welcome to Pan American Silver's First Quarter 2020 Conference Call. Our results came out following yesterday's market close, and you can find the news release, MD&A and presentation slides for today's call on our website. In a few moments, I'll hand things over to Pan American's President and CEO, Michael Steinmann, who will give a brief review of our results. After that, we'll open the line for questions and answers. With us for the Q&A portion are Pan American's Chief Operating Officer, Steve Busby; Chief Financial Officer, Rob Doyle; Senior VP, Technical Services and Process Optimization, Martin Wafforn; and VP of Business Development and Geology, Chris Emerson. I'd like to remind everyone that our news release and certain statements and information in this call constitute forward-looking statements and information. Please review the cautionary statements included in our news release and presentation as well as the risk factors described in our most recent Form 40-F and annual Information Form. Media and other participants on the call are invited to participate in listen-only mode. I will now turn the call over to Michael.

Michael Steinmann

executive
#3

Thanks, everyone, for being here today as we go over the results for our first quarter. Q1, of course, has been defined by the COVID-19 pandemic, which has touched lives and businesses across the globe. All of us are working jointly to halt the virus's spread, and I imagine quite a few of you are on this call from a remote work location. I hope that you and those close to you are in good health and doing well. COVID-19 has hit the mining sector hard and continues to do so, especially companies with operations in Latin America. Pan American quickly mobilized its crisis response team to handle the extremely fluid and disruptive cascade of events tied to COVID-19. The health and safety of our employees and communities is always the top priority. To stop an outbreak of the virus at our sites, we put in place health and safety protocols aligned with those advised by local health authorities, best management practices and the World Health Organization at all our operating sites and corporate offices. Where feasible, we set up remote work arrangements for employees and contractors. At sites that were not subject to suspensions, we voluntarily cut throughput to improve physical distancing among our personnel. Beyond our existing community programs, we are helping our local communities by donating food and hygiene supplies and by providing access to health care.

Michael Steinmann

executive
#4

As we mentioned earlier, Pan American halted regular operations at its mines across Mexico, Peru, Argentina and Bolivia during the latter portion of March 2020, in order to comply with compulsory national quarantines put in place because of the COVID-19 pandemic. At the open pit mines, limited output has carried on through the circulation of process solutions on the heap leach pads. In addition, the Timmins West and Bell Creek gold mines in Canada kept running at 90% of throughput capacity. Thanks to that, we came close to reaching our anticipated consolidated gold production for the quarter. Silver output in Q1, though, was hit mainly by the shutdown of the polymetallic silver mines in Peru, Huaron and Morococha, and La Colorada's silver production was also affected by ore grades below plan tied to the ventilation problem, along with reduced throughput stemming from COVID-19 measures to increase physical distancing. The ventilation problem at La Colorada involves a failure of one of the primary ventilation raises in the eastern high-grade portion of the mine. This made it necessary to adjust our mine sequencing toward low-grade ores while we pushed ahead with efforts to replace the failed ventilation raise. We have managed to keep up that work throughout the COVID-19 restrictions.

Michael Steinmann

executive
#5

On the primary ventilation circuit, the work in progress involves new raises being bored from surface down to the 345 and 528 levels. Because weak rock zones caused the earlier failure, grouting is being used to pre-support the area ahead of raise boring. An interim ventilation fix should be finished in Q2 2020, and the long-term infrastructure is expected to be complete in the first half of 2021. Those deep eastern ventilation constraints have likewise capped how much underground drilling we can do on our exciting skarn deposit, which means more directional drilling from surface rigs is needed to define the large deep mineral resource. That approach has proven quite effective and efficient. Even so, we curtailed this surface exploration work during the COVID-19 operational suspension, yet we remain on track for a resource update alongside our annual reserve and resource estimates in mid-2020. Despite the impact of COVID-19-related disruptions, our operations generated $114.1 million of net cash flow, mine operating earnings of $50.1 million and free cash flow of $63.8 million in Q1. Earnings in the quarter, however, were impacted by several unusual items, resulting in a net loss of $77.2 million or $0.37 basic loss per share.

Michael Steinmann

executive
#6

That loss includes a tax expense of $52.7 million, which came from local currencies weakening against the U.S. dollar on deferred tax liabilities. It also includes a noncash investment loss of $28.3 million, mostly from unrealized mark-to-market adjustments on our interest in New Pacific Metals Corp., $16 million in care and maintenance, and an $8.8 million loss on commodity and foreign currency contracts. When we adjust for many of these noncash items, the result was a net loss of $7.6 million, or a loss of $0.04 per share. Importantly, we do not adjust for the noncash investment loss, which represents about $0.13 per share. We finished the quarter with cash and cash equivalents of $147.8 million, up $27.3 million from December 31, 2019, even with the large cash tax payment of $36.5 million, a $15 million repayment on our credit facility, and the increase to the dividend to $0.05 per share last quarter. Please keep in mind that a large portion of our annual taxes are paid in Q1. Our short-term investments fell by $26.4 million in Q1, due primarily to mark-to-market value declines in our New Pacific shareholdings, which is now fully recovered. At the end of Q1, we had total debt, excluding lease liabilities, of $260 million. We also maintained our quarterly dividend of $0.05 per common share.

Michael Steinmann

executive
#7

Even though our finances are solid enough to navigate the present business climate, considerable uncertainty about how the COVID-19 pandemic will unfold remains something we must contend with. In April, as a precaution, we pulled $80 million from the credit facility to bolster liquidity further, and at present we have no plans to put those funds to use. That came after earlier moves to cut spending, including company-wide expenditure controls introduced in mid-March, postponement of selected capital and exploration outlays, and lower pay for senior management and Board members. A small crew is carrying out care and maintenance work across all our suspended operations, and our demobilized employees stay on standby, ready to be redeployed once government restrictions are lifted and we conclude that the sanitary and health protocols needed to restart operations safely are in place. In the meantime, we are watching our essential supply availability and delivery logistics closely, and so far these have gone largely uninterrupted. Operations will restart in a phased, careful manner in line with health care guidelines and government decrees in every country where we operate, and this could take several weeks. We anticipate a gradual return of activity, with adjustments made to allow for greater physical distancing and with suitable protocols established to safeguard the health and safety of our workforce and communities.

Michael Steinmann

executive
#8

At this time, we have zero confirmed COVID-19 cases across any Pan American Silver site or office. Because of how uncertain the ramp-up to normal operations in Q1 looks, we pulled our 2020 guidance. As soon as we gain enough clarity, we plan to issue revised guidance. Now I'll walk through where each of our operating jurisdictions stands today. Please bear in mind that this reflects the situation as of today, and things are shifting fast and hard to forecast. In Mexico, the health emergency now runs through May 30. That said, the newest decree carries a provision that could allow nonessential activities, mining included, to restart from May 18 onward, provided the municipality has few or no active COVID-19 cases. Both of our operations sit in municipalities that currently have very few cases or none at all. We are putting plans in motion that could see our Mexican mines restart initially at reduced capacity, subject to local authorizations and acceptance. In Argentina, after the national quarantine halted our operations in March, the federal government later designated mining as an essential business on April 3. Right now we are bringing the Manantial Espejo operation back up at reduced underground mining rates and redeploying personnel to restart the COSE and Joaquin operations.

Michael Steinmann

executive
#9

Regarding Bolivia, we're getting ready right now to restart the San Vicente operation there, after the government gave authorization for mining activities to begin again on May 7, 2020. Turning to Peru, talks are moving forward with government officials about resuming large-scale open pit mining operations — those above 5,000 tonnes per day — at reduced capacities, and that could allow La Arena and Shahuindo to restart potentially on May 11, 2020. In Canada, the Timmins mines are still running at 90% of throughput capacity with reduced staffing and strict health and safety protocols. Our Escobal operation in Guatemala stays in care and maintenance, as the mines environmental management plan requires. Guatemala's government declared a state of calamity on March 5. Then on April 29, it extended that by another 30 days, putting restrictions on travel, movement within the country and meetings, and suspending all nonessential activities. Given these circumstances, we don't expect any progress on the ILO 169 consultation process. Our teams and in-country management have impressed me enormously with how they've safely handled the extraordinary crisis this pandemic presents, while remaining sensitive to the health and well-being concerns of employees, their families and communities.

Michael Steinmann

executive
#10

That's precisely why I'm confident we'll get through this short-term disruption successfully and get back to the productive operations we enjoyed before. I'm just as impressed and truly moved by the heroic work of our frontline health care workers, who are battling this global pandemic every day. Before I finish, I need to touch on our remarkable La Colorada skarn discovery. During Q1, we carried on with exploration drilling and early engineering work on the skarn until those activities were halted in April. No new drill results have been released this quarter, since we couldn't process all the samples because of the COVID-19 suspensions. Even so, we still expect to deliver an updated resource estimate for the skarn alongside our June 30 reserve and resource updates, which will come out with our Q2 results in August. We'll keep moving forward on the early engineering and possible project layout design work through this year. More details and a short video about this exciting discovery are available on our website. With that, I'd like to open the line for questions. One note — we're joining this call from different locations, so please bear with me if I route questions to the appropriate member of our management team.

Operator

operator
#11

<<operator_script>> Our first question comes from Chris Thompson at PI Financial.

Chris Thompson

analyst
#12

I have just a few brief questions. Clearly, it was a tough quarter at La Colorada, with some changes being implemented, I believe, because of ventilation problems there. Could you perhaps take us through the — I suppose how ought we to view this in terms of near-term output? I am considering, for instance, tonnes processed and grade. What should we expect for Q2 and Q3?

Steven Busby

executive
#13

Yes. Chris, this is Steve Busby. Essentially, the main raise we're focused on at the moment runs from the 345 level down to the 528. We're installing what we refer to as an interim raise, and it ought to be finished within the next — by the end of June, and that should bring us back to mining high grade at rates probably near what we had prior to losing the main ventilation raise above the 345. Roughly speaking, in round numbers, around 1/4 of our production is generated by this deep sulfide zone that's high grade. And the grade here is extremely high. We fondly refer to it as our jewel box. So having restricted output there certainly affects our grades. So I'd say, going into Q3, we anticipate that if this lower raise succeeds, we'll return to the rates we experienced previously. But I think it's worth noting that because of the ground conditions — which we've always dealt with, we've always had problems with the ground at La Colorada, it's fairly fractured and broken ground — we made the decision to adopt this new technology that's available, proven technology that other mines in Mexico have used, of pre-grouting the pillar of material before we pull a big raise bore there.

Steven Busby

executive
#14

Those are raise bores with a 3.1 meter diameter intended for our ventilation requirements over the long term. In light of what occurred here and the fact that we lost one raise bore, we are actually turning this to our advantage. With this new design, it incorporates some longer-term concepts, since this will be a highly durable infrastructure project for the site over the long term. It will actually help provide support even as we move into the skarn, because the skarn is kind of adjacent on that eastern edge of the mine. So over the long term, this not only perhaps delivers enhanced production from that high-grade east zone but also gives us access to understand the skarn even better yet. So there are some — it is a pretty positive thing overall. It is just a temporary disruption for this first kind of 6 months in 2020.

Chris Thompson

analyst
#15

Alright, so let's move along here, Dolores. I'd like to hear how things stand with the underground operations at that site, and could you also update us on the agglomeration part of the mine?

Steven Busby

executive
#16

Yes. Before the operating suspension there, Chris, I'll begin with the pulp agglomeration plant, which was performing very well. All our filter plants are now operating at full capacity, and we were consistently achieving more than 5,500 tonnes a day through that plant. So things look pretty good at the pulp agglomeration plant. Underground, we're at roughly this 1,000 tonne a day rate, and we're trying to open up additional stopes to the west side of that mine -- or, sorry, to the north side of that mine, which would take us up to that 1,500 tonne a day. So that will probably happen toward the latter part of the year. But I think the big thing at Dolores that we saw during Q1 was kind of residual from Q4 last year, and we have a lot of solution inventory given the size of these pads that we are working through. And toward the end of Q1, we really started to see that production rate finally starting to come up through all that dilution that we took on in the wet season of last year in 2019. So unfortunately, with the suspension, I mean the pads keep producing. So that's good there.

Steven Busby

executive
#17

However, we lacked — we must place additional ore onto that pad throughout 2020 so we can hit what we believe that setup can achieve during this year. The signs are certainly encouraging. The pulp agglomeration plant is operating smoothly. It provides a substantial lift when high-grade production begins, which is happening as we mine into it at present. Still, at this moment our priority is restoring that operation to full function at the earliest opportunity, as soon as the restrictions permit us to do so.

Chris Thompson

analyst
#18

Okay, and last thing, Steve, on La Arena — I’m noticing that the tonnes mined and loaded fell versus Q4. I get that Q4 was an exceptional quarter for that mine. I’m a bit disappointed by the limited tonnes, I suppose, that were mined and loaded in Q1. Do you have anything to say about that?

Steven Busby

executive
#19

Yes. I mean, Chris, it really comes down to the character of the stripping that has to happen, and to when we expose ore—once we're in ore, since it's all run of mine, every tonne we dig goes straight to the process plant that same minute. So we knew at the close of Q4 that we had reached the pit's bottom. We're in solid ore now. You get a large amount of ore released over a short span, but we've gone back to what we refer to as Phase 8 of the pit, if you like, laying that back. As a result, the ore that the mine plan releases is fairly constrained. That's why we said all along, even when we put out our La Arena production forecast for this year, that it would be weighted to the back half, exactly as in 2019. Look back at 2019 and it's nearly a mirror image of the situation now, and we will be in high-grade ore. Once more, after the interruption caused by the COVID suspension, we'll be in high-grade ore by the end of that stretch. Another thing I find quite interesting at La Arena is that we do see some possible opportunities to extend part of the resource at the pit's bottom and alongside what is currently our final Phase 8 pit design.

Steven Busby

executive
#20

We're eager to do some additional exploration drilling at that property, which is currently suspended as well. But once we're back in there, we believe we can conduct some exploration in a few highly prospective areas that could result in a modest increase in the life of that asset. So we're quite excited about it, especially given these gold prices.

Michael Steinmann

executive
#21

I want to add one more point here, which I touched on earlier in the call. Naturally, even though the heap leach operations we run are currently on standby, we’re still leaching on our leach pads. We’re still circulating the solution and recovering gold at La Arena and Shahuindo. At Dolores, we recover gold and silver. Just bear in mind that once we restart, there will be some working capital needs, because obviously we’ll have to replenish the inventory that we’re drawing out of the heap leach now. That drops considerably lower. With silver at Dolores, as everyone knows, the leach curve there is very flat, and on the gold side it’s a bit quicker.

Operator

operator
#22

<<operator_script>> Our following question comes from John Tumazos at John Tumazos Very Independent Research.

John Tumazos

analyst
#23

About the drilling at La Colorada or elsewhere that, I suppose, would need to pause the moment the government imposes a lockdown — can you still keep your QA/QC protocols going, or basically safeguard the samples, and have everything properly handled and 43-101 compliant throughout the lockdown?

Michael Steinmann

executive
#24

Yes, John, of course. However, I'll hand that over to Chris Emerson so he can provide further specifics. Chris, would you handle that?

Christopher Emerson

executive
#25

Sure, Mike. John, yes. No, of course — QA/QC is clearly a really critical piece of the control and assurance framework for all our exploration drilling and so on. And certainly, if we — we've put a lot of that on hold, as Mike mentioned, through March. Everything we're shutting down. So every sample that's been drilled sits in locked areas. Whatever happens at the mine site goes through the usual QA/QC at the mines, since we handle a lot of things in-house for the resource and reserves, which is just the routine infill and exploration drilling at the mine sites. And really, the only exploration project of significance is the La Colorada skarn, which of course gets shipped out to external, but that's all done under lock and key with all the protocols applied.

John Tumazos

analyst
#26

And that outside independent contractor wasn’t pulled away by a call from his spouse telling him to come home, leaving you stuck.

Christopher Emerson

executive
#27

No, no. And really, at least where La Colorada is concerned, we received a certain quantity of batches, and in fact we've held some back and not delivered them to the labs. All of them sit locked up, and everything is secure.

John Tumazos

analyst
#28

Michael, given the stoppages that have already happened, do you figure there's a chance the second quarter could reach 100,000 ounces of gold along with 4 million ounces of silver?

Michael Steinmann

executive
#29

John, I don't have figures available at this point for Q2. As you can imagine, the situation remains highly fluid, with conditions shifting daily. I noted earlier that startups in every country will follow a step-by-step, phased approach — much like the reopening that began just yesterday in British Columbia and that we're seeing in Europe and the U.S. — and clearly similar stages are unfolding around the globe. So we still lack the full details on how swiftly we can ramp up and what tonnage we can reach, John. Unfortunately, no forecast exists yet for the quarter. Broadly speaking, the fact that we haven't issued new guidance stems from that same reason. Nobody knows how this pandemic will play out at this moment — no one worldwide, including us. So speculating on our side about the production profile would make no sense. Once we gain greater clarity, we will of course provide fresh guidance regarding production costs and capital.

John Tumazos

analyst
#30

Are there any sites that are running as usual?

Steven Busby

executive
#31

John, it's Steve Busby here. I'd describe Timmins as being fairly near to normal. What I mean is, at the capacities we have now, we're guiding 10% lower. But the truth is that figure sits 10% beneath the level we had anticipated, since, as you'll recall, we were carrying out a modest expansion at that operation during this year. What has actually occurred is more that COVID-19 impacts have delayed some of the equipment we ordered. As a result, our expandability is moving out by a few months compared with where we initially had it. So on balance, I would say -- my inclination would be to say that, when you consider Timmins and reflect on the earlier quarters, we are fairly near to those sorts of rates. The only difference is that it isn't at the expanded rate we had been forecasting for this year. Beyond that, apart from the heap leaches, which keep producing from the inventories, all of the other 8 operations have been suspended.

Michael Steinmann

executive
#32

Broadly speaking, there simply isn’t any normal anywhere on the planet at this moment. I’m handling all marketing from a distance. Our entire team works from home. And clearly, wherever we operate, we must observe social distancing. That’s the situation for now. I’m confident we’ll move past it, and things will return completely to the way they were previously, John.

Operator

operator
#33

That wraps up the Q&A portion. Michael Steinmann, I'll hand things back to you for any closing comments.

Michael Steinmann

executive
#34

Thanks, everyone. These are certainly difficult days for the globe. It is truly a circumstance unlike anything any of us have encountered during our lifetimes. Even so, this too shall pass. The world will come through it, and we go -- we will discover an answer and keep moving forward. Fortunately, Pan Am is an extremely robust organization, and I look forward to bringing you a Q2 update in August. Till then, remain healthy and safe. Thank you.

Operator

operator
#35

That wraps up the conference call for today. You’re free to disconnect your lines now. Thanks for joining us, and we hope the rest of your day goes well.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.