We appreciate everyone being on the line. I'm the conference operator, and I'd like to welcome you to Pan American Silver's conference call on the results for the third quarter of 2020. <<operator_script>> This call is being recorded. <<operator_script>> At this point I'll hand things over to Siren Fisekci, who serves as Vice President, Investor Relations. Ms. Fisekci, the floor is yours.

Siren Fisekci

executive
#2

Thanks, operator, and good day to all of you joining Pan American Silver's Third Quarter 2020 Conference Call. <<operator_script>> Our results came out following yesterday's market close, and you can find a copy of the news release, MD&A and presentation slides for today's call on our website. The material in today's call includes certain statements and information that constitute forward-looking statements and information. Please review the cautionary statements included in our news release and presentation as well as the risk factors described in our most recent Form 40-F and Annual Information Form. I'll now hand the call over to Pan American's President and CEO, Michael Steinmann, who will give a brief review of our results. After that, we will open the call to questions and answers.

Michael Steinmann

executive
#3

We appreciate everyone being on the call today to go over the results for our third quarter. For Q3, net earnings came to $65.3 million, or $0.31 per share, with revenue of roughly $300 million for the period. The revenue figure was affected by reduced volumes of metals sold, though this was partly offset by robust realized prices for gold and silver. During Q3, we turned out 4.1 million ounces of silver along with 116,900 ounces of gold. As anticipated, we saw a $79.6 million (sic) $79.8 million build in inventories in Q3, and roughly $25 million of that came in the form of dore and finished inventories. Because of the timing of shipments, revenue tied to those dore inventories was not booked in Q3 and will show up in revenue in the ordinary course. The rest of the inventory increases came mainly from replenishing the heap leach operations at Dolores, Shahuindo and La Arena. As we said before, inventories had been reduced during the mine suspensions earlier in the year, by the equivalent of about 30,000 ounces of gold and 0.5 million ounce of silver, and those have been replenished during Q3. In addition, silver production was affected by COVID-related delays to the ventilation work at La Colorada. The first of 2 ventilation raises at La Colorada has been completed and commissioning is underway now, which will let us get back into the high-grade areas of the mine.

Michael Steinmann

executive
#4

Third-quarter results got a boost from low costs. In the silver segment, cash costs came in at $7.14, while all-in sustaining costs stood at $6.01 for each silver ounce sold. All-in sustaining costs were lowered by $5.96 per ounce thanks to net realizable value inventory adjustments, driven largely by higher precious metal prices for the heap leach pad inventory at the Dolores mine. For gold, cash costs were $793 and all-in sustaining costs were $1,057 per gold ounce sold. Net earnings of $65.3 million encompassed $27.1 million in mine care and maintenance costs along with $13.1 million of investment income, chiefly tied to the fair value adjustment on our interest in New Pacific Metals. Adjusted earnings came to $72.1 million, or $0.34 per share, and exclude $20.5 million of care and maintenance costs linked mainly to the COVID-19-related suspensions at Huaron and Morococha in Q3. Operations generated $114.9 million in cash, more than enough to cover sustaining capital, dividends and taxes and to make repayments on our line of credit. Consistent with our capital allocation priorities, we keep bringing bank debt down. In Q3 we repaid $110 million on our credit facility, plus another $30 million in October. As of today, only $60 million is drawn on the credit facility, and our goal is to have it fully repaid by the end of this year.

Michael Steinmann

executive
#5

At September 30, cash and short-term investments stood at $231.6 million. Our remaining free cash flow priorities include putting money into high-return projects and returning cash via dividends. Yesterday, the Board approved raising the quarterly dividend by 40%, bringing it to $0.07 per common share. That marks the second dividend increase in 2020, backed by the robust cash flow our operations have produced. Results in Q3 reflect COVID-19's impact. Still, conditions have gotten much better than earlier in the year, when the majority of our operations were shut down for stretches of time. Across Q3, every one of our mines except Huaron and Morococha ran at reduced capacities to accommodate COVID-19-related protocols. By the end of Q3, Huaron and Morococha had been brought back into operation. Operations in Argentina took a particularly heavy hit from COVID-19 and severe winter weather, yet we managed to finish final development of the COSE project and started processing high-grade ore from COSE alongside ore from the Joaquin mine at our Manantial Espejo plant. We have an intensive COVID-19 screening process and measures in place to protect our workforce's health and safety throughout this pandemic. Additionally, vulnerable individuals are not allowed to return to work at this time.

Michael Steinmann

executive
#6

So that means our workforce is smaller right now, and operations aren't running at full capacity. Over at La Colorada, we ran into delays when upgrading the ventilation circuits in the deep, high-grade Candelaria East section of the mine. During Q3, we finished the underground ventilation raise going from the 345 to 528 level, and the underground booster fan is set to go in early next week. That ought to let us boost output from that high-grade part of the mine. The bigger ventilation raise from surface, which is meant to handle our ventilation needs over the long term, should be finished and running at full capacity by mid-2021. Since this ventilation work was delayed, along with the related limits on the higher-grade ores at La Colorada and lower underground mining rates at our Argentina operations, we cut our consolidated silver production estimate for the full year to a range of 18 million to 19 million ounces, with output pushed forward. Our forecast for gold production stays at 525,000 to 575,000 ounces for 2020. We expect gold production to rise in Q4, since replenishment of inventories on our heaps wrapped up in Q3. We do anticipate gold production from our Timmins operation in Q4 to be similar, as we keep working on geotechnical conditions at the Bell Creek mine, where we've found wide zones of new resources next to reserves.

Michael Steinmann

executive
#7

Adapting to these wider ore extensions is going to call for changes in both the mining method and our ground support standards. Our operating cost forecast is also being kept as is. For the silver segment, we expect cash costs of $6.2 to $7.7 per ounce, with all-in sustaining costs of $10.5 to $12.50 per ounce. In the gold segment, cash costs should land between $800 and $860 per ounce, and all-in sustaining costs between $1,050 and $1,125 per ounce. Our projection for annual capital expenditures has been cut by roughly $15 million. Under the revised forecast, 2020 would see $175 million to $180 million in sustaining capital and $20 million to $21 million in project capital. Those reductions stem from deferring certain capital investments. Moving on to growth catalysts, we currently have 3 surface drill rigs exploring at the La Colorada skarn discovery, and we expect to finish around 33,000 meters this year. That is roughly 75% of the 44,000 meters originally budgeted for 2020 prior to the COVID-19 disruptions. In the meantime, work continues on advancing the project baseline along with engineering and metallurgical studies. The Escobal mine stays in care and maintenance while the ILO 169 consultation process, led by Guatemala's Ministry of Energy and Mines, is pending.

Michael Steinmann

executive
#8

Authorities have been grappling with the COVID-19 pandemic, and no date for the consultation to begin has been communicated to us. With 2020 now in its last month, our operations have settled down, inventories at our heap leach mines have been restocked, and the first of 2 ventilation raises at La Colorada is close to being finished. Our financial standing has grown stronger still thanks to a sizable decrease in that. This positions Pan American favorably for the rest of 2020 and as we head into 2021. With that said, I'd now like to invite questions from the call.

Operator

operator
#9

<<operator_script>> The initial question comes from Cosmos Chiu at CIBC.

Cosmos Chiu

analyst
#10

Let me start with La Colorada, if that's alright. It's encouraging that the first ventilation raise shaft is nearly finished. Would you be able to remind us about the higher-grade zone at Candelaria East — what grade level are we actually discussing there? And after you return to that higher-grade zone — obviously, you achieved roughly 300 grams per tonne on the silver side. Could you return to where you stood, for instance, last year? If my memory serves me, you achieved around 370 grams per tonne from La Colorada. What grade level are we discussing?

Steven Busby

executive
#11

Yes. Cosmos, Steve here. Yes, indeed. To begin with, I want to make it clear that the raise bore as such — the actual physical raise bore — has been finished. Shotcrete has been applied to it. Support is fully in place. At this point we are just wrapping up putting the fan in on the lower level. As a matter of fact, they fired up that fan a couple of days back and are now commissioning it. So we are truly moments away from a substantial boost in airflow reaching that area. You may remember, since a lot of us have walked down through that sulfide ore zone in lower Candelaria East, we always travel down along the drifts. We always paint the grades on the drift walls. And if you think back to our tour, you'll see those multi-kilo intercepts across the faces in those areas. So this is genuinely — what we call it internally is our jewel box — but these grades are genuinely remarkable. I mean, it is literally 1, 2, 3, at times even higher kilos, with meaningful lead and zinc contained in it. So for us this zone matters a great deal when it comes to averaging out the overall grade. So compared with last year's grade, the 370 type, we also need to bear in mind that when we look at our reserves, the new reserves in June, I believe that when you examine the sulfides there, they come in somewhat lower.

Steven Busby

executive
#12

I doubt we're going to be looking at those kinds of grades. What we're seeing as we plan ahead is somewhat more tonnes and somewhat lower grade—perhaps grades in the 340, 350 range. And that's what we anticipate returning to once we open up that area.

Cosmos Chiu

analyst
#13

Absolutely. Then, Steve, perhaps a quick follow-up on that. Clearly, there's a larger ventilation shaft you'll be installing for the longer-term gain. With everything you've learned from COVID-19 and the delays that affected the first ventilation shaft, do you have any worries about possible delays and the delivery of that second ventilation shaft? And related to that, with the first one already in place, even if the second is somewhat delayed, would that affect your ongoing access to some of those higher-grade sections, or not?

Steven Busby

executive
#14

The second raise we're talking about is a surface-to-345-meter-level raise beneath the surface, and it's moving forward now under our COVID protocols. We did hit some delays there, much like what happened with the lower raise bore, but at this point it's running at full scale. Right now we're actually drilling the pilot hole for the raise bore. The ground has been fully grouted. The foundation for the raise bore machine has been fully cemented. The raise bore machine is set up and is in fact boring the pilot hole. And knock on wood, things are going well so far, that ground looks very solid, and that raise bore — in fact this morning, I can tell you, we're already down 100 meters on that 345-meter raise. So we're making really good progress on that. We're quite excited about it. When that — it's scheduled to finish, again, we'll shotcrete it once we're done. We'll see how the ground looks and shotcrete that and get the ventilation system all connected and running and sealed. And that will happen in the first part of next year. So that's on track. We don't expect any further delays there. All of the crews are going through our COVID protocols as they enter the sites.

Steven Busby

executive
#15

And on that front, everything is going great, as far as we're concerned.

Michael Steinmann

executive
#16

To follow up on that, Cosmos, regarding the final portion of your question: if that raise is genuinely one piece of our long-term ventilation circuit until this one wraps up. As you're aware, we utilize the internal raise along with the ramp. So it isn't really — it's not essential for next year whether the main raise happens somewhat earlier or later. But clearly it will matter when you consider the long-term large development at La Colorada, including the skarn.

Cosmos Chiu

analyst
#17

Sure. Let’s shift direction a bit, since we’re discussing rock—I won’t call it competency, but rock conditions at this site. Regarding Bell Creek, you said additional ground support could be needed and that you’re reviewing other approaches as mining goes deeper. Could you remind me of the throughput you were aiming for? What throughput is Bell Creek achieving at present? Then, with what appear to be larger stopes at depth, what level can you reach? And where would you want to be?

Steven Busby

executive
#18

Right, and the positive side of this is that in the deeper portions of Bell Creek — we’re roughly 1,120 meters below surface, so more than a kilometer down — the ore bodies are starting to open up and get wider. We’re seeing certain zones that could be 20 meters plus in some of the stopes, which is much larger than anything encountered in the upper areas. As we open up that ground — and again, we’re quite deep in the deposit — we’re encountering some stress that wasn’t present higher up. And with the greater width, we do need to adjust our ground support systems, perhaps change our mining method toward more transverse-type entries into these zones. And we were actually taking a very close look at the sublevel situations, because as ground stress has risen, the critical areas show up at the sublevels when you get to those sublevel sills. So we’re reviewing all of that, assessing what the best approach is given the changes in the deposit itself relative to the ground and the stresses we’re observing. As we drill long holes, we’re seeing some shifting and squeezing of the holes, which is causing delays in some of the long-haul production in that area.

Steven Busby

executive
#19

And it's a good — great area, a good, thick, wide zone. But bear in mind, Bell Creek accounts for roughly 40% of our total capacity in the Timmins area. The remaining 60% comes from Timmins West, and a fair amount of that 40% production rate originates above this 1,120 zone. So it probably represents something, I'd guess, around 20% of total throughput. So next year, we'll have our forecast that factors all this in. But we're feeling pretty good about it. Overall, it's really good news. We're seeing more reserves there. We've seen it expand at depth. So we see the ability to get more out of Bell Creek. Maybe relieve some of the pressure on Timmins West and some of that Gap 144 zone. So next year, we'll have a good forecast that shows that. And it's just about getting through this hump of changing the mining method and the ground support system at this point. It's not a big impact, but it is a bit of an impact compared with where we thought we'd be.

Cosmos Chiu

analyst
#20

Absolutely. And perhaps one final question, maybe directed at you, Michael. It's certainly good to see the dividend has been raised. However, when it comes to dividend yield, comparing where you stand now with the prior dividend payout, we aren't at that same level yet. You've clearly discussed how sustainable the dividend is. Is there some target you're aiming to reach? And how does that align with your capital allocation approach, more or less?

Michael Steinmann

executive
#21

Yes. Absolutely, Cosmos. Look, I believe my message on how we allocate capital has been quite consistent over the past 2 years: first came repaying what we owe; then investing in projects of high quality that are very accretive; and then giving dividends back to shareholders. Those are essentially the 3 buckets we consider. As you saw in Q3, we repaid a significant portion of the debt on our line of credit. Today, that figure stands at $60 million. If conditions remain unchanged, our expectation is to have it fully repaid by the end of the year. That essentially checks off one of the buckets in our capital allocation. The reason is that we — as you know, I very much like, and we like, having a balance sheet that is strong, as strong as it can be, since that gives us considerable flexibility. And leaving our line of credit undrawn provides us with plenty of flexibility for whatever may come later in the year ahead, including developing the La Colorada skarn, which leads me to the next bucket: projects that are high quality and highly accretive. And starting next year, you'll see more capital deployed at La Colorada. Naturally, since we're currently doing infill drilling and have begun significantly more work on metallurgy and engineering — work aimed at determining which direction we'll take with that deposit.

Michael Steinmann

executive
#22

So the moment had come for us to raise the dividend paid to shareholders, since financially speaking we enjoyed a really robust year—yes, COVID affected us, as it did everyone around the globe, but our financial results were very strong. That makes this the second hike this year. The February increase, I believe, came in at roughly 43% or 47%, and now we have another 40% bump. Assuming nothing changes, we'll stick with the same approach to capital allocation. Each quarter, the Board will review our free cash flow and decide where to deploy the money. Clearly, next year there will be nothing left to pay on the line of credit. So the two big buckets will be accretive projects and returning capital to shareholders.

Operator

operator
#23

<<operator_script>> Our following question comes from Mark Mihaljevic at RBC Capital Markets.

Mark Mihaljevic

analyst
#24

I suppose Cosmos touched on several of these points, but let me return to La Colorada. I just wanted to get a sense of what kind of timeline we should anticipate before you're truly back into those higher grades. Is all of that development already in place, so it's simply a matter of putting the tools back in and getting people back in there? Or should we expect a somewhat longer ramp-up, since you'll need to carry out additional development?

Steven Busby

executive
#25

Yes, Mark, this is Steve. We have some development work to do there. We're a little behind on development. But as soon as we get back in there and begin mining, it will see a fairly market increase, and then it will ramp up from there. But I think we're talking within a quarter or 2 — it's going to ramp up fairly quickly because it is a small area. It is a very high-grade area. It doesn't require a significant amount of development, but we do have something to do there. So Q4 will be an improvement. Q1 into Q2 will be back to normal.

Mark Mihaljevic

analyst
#26

All right, that's great. If you could give us a bit more detail on what precisely drove those delays, that would help. Was it partly constraints on bringing personnel in? Did you run into difficulties securing some of the skilled labor you required? Or was there something involving — or did ground conditions also play a part? Naturally, at La Colorada there's always worry about ensuring everything stays intact, correct? So perhaps a little more detail on what truly sits at the root of the delay, beyond simply what we'd term the COVID effect?

Steven Busby

executive
#27

Absolutely, Mark. First off, I want to note that from a ground-condition perspective, there were no problems at all. We had actually completed the raise early on in this quarter, and it remained stable the entire period. The main difficulty was simply not having enough workers on site to perform the work, get through the protocols, and clear our screening to reach the location. Those were our largest obstacles. We also encountered a few minor issues with delivery of certain materials we required. We needed some cable to run down to the lower level to power up the fan. Shipment of that cable was delayed somewhat as well. But as I said, we did receive the cable, and we did start the fan a couple of days ago, so everything remains on track. So the largest obstacle was really just mobilizing personnel. And at this point we're on a fairly solid schedule. We're monitoring it very closely. But on these projects, we're achieving fairly solid mobilization for each shift now.

Mark Mihaljevic

analyst
#28

All right, that's very useful. So if we stay on the subject of some of the COVID effects, would you say you feel confident about the protocols currently in place, enough that you can steer clear of the difficulties you experienced during Q3 in Peru? Do you believe sufficient adjustments have been made? Clearly, no setup will ever be flawless, and everybody continues to grapple with this. Still, do you think — or rather — have any modifications been made to the protocols? And how confident are you — or what sort of effect do you anticipate those will deliver?

Steven Busby

executive
#29

Absolutely, Mark — that's a really good question. First of all, I'd say we have a lot of confidence in our protocols and our ability to screen. And when we look at it, we can break the chain of transmission. We can confidently put a stop to any kind of major outbreak at our site. We're very confident about that. Where the uncertainty comes in is how many of our workforce actually make it through the screen, and that hinges on the outbreaks in the region in and around our mine sites. We keep a very close watch on that. But if an epidemic outbreak is happening in and around our mine site, we'll see a significant drop-off in individuals who don't pass our screening systems, and we won't be able to deploy them to the site. In those cases where contagion is occurring, our ability to predict how many people will arrive for each shift is very low. That's where our uncertainty lies. I'd say today, what we generally see in South America is that we're kind of over the hump of the curve in the regions around our mines. And we're seeing caseloads, for the most part, starting to back off a little bit. So as we look forward, we're optimistic that we're over the worst part of that curve and things will get better — but really, workforce mobilization is where the uncertainty lies for us.

Steven Busby

executive
#30

This isn't about any uncertainty regarding a worry over an outbreak at the site.

Mark Mihaljevic

analyst
#31

All right, that's great — really useful. So then, I suppose my question is — well, we don't typically probe too much on this — but regarding Manantial: could you share a bit of detail on how you're viewing that asset as we move ahead? Given that there are now 3 mining areas, and clearly the grades vary quite a bit across the deposits, can you give us some sense of where you'd expect that to land over the coming 12 to 24 months?

Steven Busby

executive
#32

Yes, Mark, I can respond to that. To start, on the grade side, we're extremely happy with what we're observing at the COSE Joaquin and also at the Manantial underground mining faces. At COSE during Q3, silver grades came in above 1,200 grams, with gold running in the 20 to 23 gram per tonne range. Those are very good grades. At Joaquin, silver was above 550 grams. So we're certainly getting the grades we're after. The problem there, as we discussed regarding Peru, is how many workers we can actually deploy. Specifically, we're talking about underground miners. As we've said before, most of our underground miners come from the northern part of the country. Given the epidemic in the country — the pandemic there — there are plenty of restrictions on movement between provinces, and workers must undergo lengthy quarantining and travel limitations that seriously affect our logistics for bringing people to and from the site. So the biggest bottleneck we face right now, as I mentioned, is deploying our workforce. And Manantial is by far the hardest hit by this, owing to the logistical complications involved in bringing people in.

Steven Busby

executive
#33

So once more, on Argentina—even though there have been a lot of outbreaks there recently, on the whole we remain hopeful that conditions will get better as the company heads into the coming summer months, though that region is the toughest one for us. We sort of expect underground production rates in the range of 50%, 60%, 70%. The mill will continue operating at full capacity, since we make up the difference with low-grade stockpiles left over from the old open-pit operations. That's why we're eager to upgrade the tonnes coming from underground so we can lift the grades. And really, our constraint stems from how we deploy that workforce. It also looks likely that this will be hampered for the next couple of quarters, at any rate.

Mark Mihaljevic

analyst
#34

All right.

Steven Busby

executive
#35

I’ll also note that this has already been included in our updated forecast and was part of why we lowered the silver.

Operator

operator
#36

<<operator_script>> Next up, we have a question from Dalton Baretto at Canaccord Genuity.

Dalton Baretto

analyst
#37

I have a couple of questions regarding Guatemala. Michael, could you describe what your team is doing on the ground near Escobal to assist the communities with the COVID-19 situation?

Michael Steinmann

executive
#38

Absolutely. And clearly, one aspect involves the identical procedures we implement worldwide. Guatemala, similar to numerous other nations, has suffered severely from this. There are a few points. For instance, we possess an approved environmental management plan, which forms part of our care and maintenance. And naturally, we finish that plan that has been — it is verified. It forms part of our care and maintenance. It is part of what we must do, and that continues. We also have pre-existing community commitments that we are honoring there. And beyond that, we clearly received many appeals for assistance and support regarding COVID from communities surrounding the mine that we are responding to. And that is not just in Guatemala, but that is, naturally, globally, as you might expect. You observed there, in the press release, what we are undertaking in numerous locations around our operations. And so that is identical everywhere, and it is not — certainly in Guatemala. So individuals approach us, they submit requests to us and we examine them and respond to them appropriately.

Dalton Baretto

analyst
#39

Alright. So with all the work you’ve been doing in that area, have you seen any shift in how your team is received or viewed by the communities versus before the pandemic?

Michael Steinmann

executive
#40

The period before the pandemic?

Dalton Baretto

analyst
#41

Relative to how things were received before the pandemic, are you seeing any shift in how the community perceives your company or your team?

Michael Steinmann

executive
#42

Not really. What I mean is — the shift came more from the fact that, since we clearly assumed control once the deal had been completed, the pandemic has, naturally, had an enormous effect on everyone in Guatemala and all over the globe. And like I mentioned, the key thing was to respond to requests and, clearly, to follow all the regulations and limits that nations impose — with quarantines and transport and constraints on movement, and so on. So that is what we are abiding by, naturally. So I believe at this point, everyone remains quite concentrated on the pandemic. As you can tell, Latin America has suffered severely, Guatemala included. And we observe, as Steve mentioned, numerous nations emerging from that initial wave. I am not certain yet what that implies. Naturally, I am no pandemic expert. We observe waves returning during the winter months here in North America and Europe. So I am not certain whether the same will occur in Latin America or whether vaccines will be obtainable prior to that. Only time will reveal. But I believe currently, plenty of people are genuinely absorbed and occupied with the pandemic, are concerned about the economic consequences for their lives, not just in Latin America but around the world.

Dalton Baretto

analyst
#43

All right. Along those lines, several Latin American nations — Peru being one instance — are considering carrying out that ILO 169 process, or the consulta previa process, in a virtual format rather than face to face, for reasons that are obvious. So is Guatemala even thinking about that? Or has it been placed entirely on the back burner at this point?

Michael Steinmann

executive
#44

Okay, regarding ILO 169 — that process is administered by the government. In fact, it’s the Ministry of Mines of Guatemala that administers it, and Pan American has no role in running it, so I’m unable to say with any precision how things will unfold. That call isn’t ours to make. Naturally, we’ll show up and supply information whenever it’s appropriate and we’re asked to. So honestly, I don’t have a real answer for you on that. And I’m aware that people are still holding meetings — you probably have meetings too, and so do we. Some of them happen in person, others take place virtually, so it truly hinges on how each government chooses to handle the pandemic and, in particular, the ILO 169 consultation.

Dalton Baretto

analyst
#45

Okay, and the last question from me is about Argentina — with the way things stand right now, the country’s fiscal position and, as you mentioned, the economic effects of COVID-19, is there any movement in Chubut?

Michael Steinmann

executive
#46

Yes. So, in Argentina — which I think is really the main area of focus for us, and probably, as Steve mentioned, the country that's been hit hardest at the moment as far as we can see — the number of cases keeps rising, and there are plenty of restrictions on movement between provinces. So right now, each province is essentially shut off. There are a few ways to move people around. As Steve said, that makes it complicated for us to relocate — or more complicated for us to relocate people from the north to the south and the other way around, given the restrictions and quarantines, and the same holds true for Chubut. So I think — at least as far as I know — that there are plenty of restrictions in place there. The legislature isn't in session at the moment, and I'm not sure when they'll resume. But of course, like Argentina as a whole and, as I mentioned, the whole region has been hit very hard economically by this pandemic.

Operator

operator
#47

That wraps up the question-and-answer portion. At this point I'll hand the call back to Michael Steinmann, who may have some closing comments.

Michael Steinmann

executive
#48

Yes, thanks, operator, and thanks to all of you for joining this Q3 update. I'm looking forward to bringing you a full-year update in February. Until then, take care and all the best. Thank you.

Operator

operator
#49

That wraps up the conference call for today. Your lines can be disconnected now. We appreciate you joining us, and we hope the rest of your day goes well.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.