Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary
February 18, 2021
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone joining us today. This is the conference operator speaking. You're listening to the Pan American Silver conference call and webcast covering audited results for Full Year and Fourth Quarter 2020. Please note that everyone attending is in listen-only mode, and this conference is being recorded. Following the presentation, attendees will have a chance to pose questions. If you'd like to enter the question queue, press star then one on your telephone keypad. If you require assistance at any point during this call, you can signal an operator by pressing star and zero. At this time, I'd like to hand the conference over to Siren Fisekci, VP Investor Relations, who will deliver opening remarks. Please go ahead.
Siren Fisekci
executiveThanks, Operator, and welcome to Pan American Silver's conference call covering the fourth quarter and full year 2020. Those of you from the media and other participants joining us on the line are welcome to take part in listen-only mode. Our results came out following yesterday's market close, and you can find a copy of the news release, the MD&A, and the presentation slides for today's call on our website. Those materials, along with today's call, include certain statements and information that qualify as forward-looking statements and information. We ask that you review the cautionary statements contained in our news release and presentation, along with the risk factors outlined in our most recent Form 40-F and Annual Information Form. At this point I'll hand the call over to Pan American's President and CEO, Michael Steinmann, who will give a brief review of our results. After that, we'll open the line for questions and answers.
Michael Steinmann
executiveThanks for being with us today as we go over the results for the fourth quarter and the full year 2020. We closed out the year with a strong financial quarter. Q4 revenue reached a quarterly record of $430.5 million, helped along by higher precious metal prices. Q4 net earnings came in at $169 million, or $0.80 per share, helped by record quarterly mine operating earnings of $137.2 million. Earnings in Q4 got a boost from recognizing $41 million in deferred tax assets, investment income of $30.7 million, gains on the sale of exploration properties, and gains on fuel and currency hedges. The deferred tax assets recognized relate to extended mine lives at the Timmins and La Arena operations, reflecting our exploration success and our ability to utilize tax attributes. Adjusted earnings in Q4 were $120.5 million, or $0.57 per share. The most significant adjustments were removing $22.2 million related to currency movement that reduced tax expense, the dilution gain relating to our interest in Maverix, and the gain on the sale of exploration properties. Full year 2020 net earnings totaled $176.5 million, or $0.85 per share. Full year 2020 adjusted earnings were $243.4 million, or $1.16 per share. In 2020, our operations generated record cash flow of $462.3 million.
Michael Steinmann
executiveWe paid back in full what had been drawn on our corporate credit facility, and we also doubled the quarterly dividend. By December 31st, 2020, our balances of cash and short-term investments had risen to $279.1 million. It's worth remembering that we delivered these solid financial results even though COVID-19 hit our operations hard, and that includes roughly $75 million in mine care and maintenance costs tied to the COVID-19 related mine suspensions. As we announced earlier, 2020 output came to 17.3 million ounces of silver along with 522,000 ounces of gold, a figure that mainly mirrors the government-mandated suspension of operations in Latin America as well as throughput restrictions at every operation stemming from the COVID-19 pandemic. In 2020, cash costs for the Silver Segment were $7.05, while all-in sustaining costs came to $11.38 per silver ounce sold. Cash costs for the Gold Segment in 2020 were $797, and all-in sustaining costs reached $1,011 per gold ounce sold. Capital expenditures came to roughly $191.7 million. COVID-19 slowed our ability to move certain capital projects forward, so about $50-$60 million of capital spending got pushed into 2021. Assuming COVID-19's impact eases as the year goes on — as our guidance for 2021 issued on January 19th indicates — we expect production in 2021 to rise noticeably compared with 2020.
Michael Steinmann
executiveWhat that means is that output will be weighted toward the latter six months of 2021. On top of that, work to improve ventilation at La Colorada, along with sequencing of the mine and heap leach at Dolores, is going to affect what those operations produce during the first half of 2021. At La Colorada, we're getting the new surface ready for the 345-meter level raises so they can be commissioned in Q2 2021. We're also moving ahead on a number of additional ventilation projects so that ventilation is available for all of our long-term operating and development plans, which includes developing the skarn deposit. Looking at 2021, our expectation is silver output of 22.5 to 24 million ounces, which is an increase of roughly 35% compared with 2020, along with record gold output of 605,000 to 655,000 ounces. We aren't forecasting any output from Escobal while the Guatemalan government moves forward with the ILO 169 consultation. More detail about our 2021 forecast can be found in our MD&A, and it is unchanged from the forecast we gave on January 19th, 2021. Given our guidance assumptions for 2021, we anticipate generating strong levels of free cash flow, particularly in the second half of 2021, based on the production outlook I just described and on the fact that the bulk of our cash taxes get paid in Q1 and Q2.
Michael Steinmann
executiveWith our credit facility now completely paid off, we think the smartest thing to do with free cash flow is put it into projects offering appealing returns over the long term—such as the La Colorada skarn discovery or other exploration efforts. Finding success through exploration near existing sites has consistently been a key driver of value for us. Our record is strong when it comes to replacing reserves and prolonging mine lives across many operations, particularly La Colorada, Timmins, and La Arena. Our portfolio holds outstanding silver growth assets. Turning to the Navidad Project, officials in Chubut, Argentina, have put forward changes to the mining law that would allow open pit mining in specified areas of the province. That legal amendment has not yet been voted on by the provincial legislature. We genuinely believe that mining activity which is properly permitted and regulated, carried out with sustainable practices, would be good for the province and for the people of Chubut. Over at Escobal, the Ministry of Energy and Mines in Guatemala and the Xinka Parliament have reached agreement to start pre-consultation meetings in April 2021. Respecting the Xinka people's right to consultation, as ILO 169 requires, makes this a significant step. We anticipate the process will take time, and no timeline for restarting the mine can be provided at this point.
Michael Steinmann
executiveDevelopment of our world-class La Colorada skarn deposit is moving forward, and we look forward to sharing a preliminary economic assessment at the close of this year. With that, I'd like to open up the call for questions.
Operator
operatorWe're going to start the Q&A portion now. If you'd like to get into the question queue, just hit star followed by one on your phone's keypad. A tone will play to confirm your request was received. Should you be on a speakerphone, lift your handset first before you press any keys. And if you want to pull your question, press star then two. We'll take a brief pause while callers line up. Our first question is from Tyler Langton at JPMorgan. Go ahead, please.
Tyler Langton
analystMorning, and thank you for taking my question. So, first, on the guidance, I realize it's kind of predicated on the effects of COVID diminishing as the year goes on, with Q1 matching Q4 and then Q2 at roughly 75%. I know it's still early in the year, but so far in Q1, is the impact in Q1 roughly comparable to Q4, and do you have any sense of how things might shape up as we head into Q2?
Michael Steinmann
executiveAt this point I can't really tell which wave we're in anymore—whether it's the second one or whether many places are heading into a third. In Peru and Mexico, and plenty of other countries worldwide, the waves look strong. That's what we're basing our assumption on. Naturally, we can't predict what will unfold over the course of the year, though fortunately we're also seeing that where countries have already reached a fairly high percentage, vaccination campaigns are genuinely, genuinely making a difference and pushing those numbers down. So we're quite optimistic that as the year progresses and those campaigns roll out, we'll begin to move past this. At the moment in Q1, though, not many programs are up and running. Some vaccination has gotten underway in Latin America. So we'll watch how that develops. Still, yes, I'd say Q1, just as we assumed in our budget, will look similar to Q4 of last year.
Tyler Langton
analystAll right, that helps. And then in the release, you mentioned something about inflationary pressure affecting costs, particularly on the gold side at Shahuindo and La Arena. Could you speak to what you're seeing there, and whether those higher costs — if they persist — pose a risk to cost guidance in that area, or whether you see risk at any of the other operations?
Michael Steinmann
executiveSure — on costs broadly, I'll hand it over to Steve in a moment. Naturally, in any particular year, or in most years, there will be a gap between where we finish the year and what we guide for the following year. That comes down simply to the fact that in our budget we must assume certain metal prices for the year ahead that are either lower than, or the same as, what we just went through in the prior year. What I mean is, we can't input costs higher than those we've just seen, since our costs are driven by byproduct credits, which automatically push our costs up in guidance, always somewhat at the start of the year. And that will even out over the course of the year depending on where metal prices move. Should metal prices rise, then of course we get more byproduct credits, and the reverse applies. But certainly, we do see some pressure, I'd say particularly on the salary side. So I'll turn it over to Steve to comment on that.
Steven Busby
executiveHi Tyler, Steve here. So overall, for 2021 we projected inflation at nominally 3%-5%. As Michael mentioned, we're experiencing wage pressures. We typically conduct collective bargaining negotiations with every one of our sites, and the busiest months fall between March, April, May, and June, with many of those agreements applying retroactively to January 1st. So we can't say precisely where they'll land, but our forecast sits in that range. Another point I'd mention is that we've been encountering quite elevated ocean freight expenses for materials we bring in. We've witnessed fairly steep increases there. And then there are energy costs, naturally, with oil prices climbing, which usually ties directly to what we pay for our energy components too. One more thing I'd flag regarding Shahuindo, La Arena, and Dolores, all of which are open pits, is to keep an eye on waste movement and strip ratios. In the mine planning, for example, the Dolores strip ratio will come down 32% compared with where it stood in 2020, while Shahuindo and La Arena are each rising 19% and 33% respectively. That's simply a matter of mine plan sequencing. We extended life at La Arena.
Steven Busby
executiveWe brought life into Shahuindo. As we move into those waste zones and strip down to reach that ore, a somewhat higher strip ratio comes along with it. So that's another point worth paying attention to.
Michael Steinmann
executiveThat covers my final remark about costs. With any luck, as the pandemic keeps fading over the course of the year — let's hold onto that hope — we'll likely, or at least hopefully, incur fewer expenses tied directly to COVID for things like testing and quarantining. As we mentioned, I believe care and maintenance came in around the $75 million mark, and direct pandemic costs were in roughly the $17 million-$20 million range. So, as I said, we'll watch how that develops through the year, but those items should clearly bring some cost reduction.
Tyler Langton
analystExcellent. I really appreciate that.
Operator
operatorOur following question is from Justin Stevens at PI Financial. The line is yours.
Justin Stevens
analystHey everyone, I’ve got a couple of questions, mostly for Steve. First, I’m wondering if you could give us a rough ballpark for what grade change percentage we should expect at La Colorada once that new raise is commissioned — at least as a step between H1 and H2?
Steven Busby
executiveHi Justin, thanks. Overall, across the full year, we're aiming to reach roughly 330 or 335 grams per ton of silver. In 2020, our average was about 310, 308. So I think the picture will resemble what we saw with COVID. Early on we'll be sitting at that 308, and then you'll see it climb through Q2, Q3, and Q4, averaging out for the year at 335.
Justin Stevens
analystUnderstood. Yes, I’m able to corroborate those figures at that point. That helps quite a bit. And for the most part, this will mainly affect grade, correct? In my view, you won’t have much difficulty keeping the mill supplied using somewhat lower-grade material until that ventilation issue is resolved, right?
Steven Busby
executiveIt does influence the tonnage we can pull from the mine, since it constrains how we can deploy equipment underground. There's a required ratio we must keep between equipment and the ventilation flow rates available to us. So to some degree it affects throughput too. As a result, throughput will be lower in the first part of the year and then rise as the year goes on.
Tyler Langton
analystUnderstood. Great. That helps a lot, and could you briefly update us on what's happening at Dolores, especially regarding the underground and the pulp agglomeration?
Steven Busby
executiveSure, both are performing nicely. The underground is operating in that 80%-90% range we saw during Q4. Given the COVID effects, that's the sort of impact we're observing. The open pit is running nearer to its full design capacity, and thanks to the mine sequencing, as I said before, there's considerably less waste to move this year, which eases some of that pressure. The pulp agglomeration plant has been performing well, near the 5,500 tons per day, 5,300 tons per day average rates. That's been going fine. In the mine plan we do see a low grade at the start of the year because of mine sequencing, with higher grades toward the end. There's also some heap leach sequencing under way that's slower in the first part of the year, high up on the heaps, then moving out later in the year. We'll achieve better, faster extractions, so to speak.
Tyler Langton
analystUnderstood. No, that sounds great. All right, thank you very much.
Steven Busby
executiveAppreciate it.
Michael Steinmann
executiveI appreciate that.
Operator
operatorOur following question is from Li Hua at Scotiabank. Your line is open.
Li Hua Guo
analystHello, everyone, and thanks for taking my question. I'd like to ask about the investment income you reported for 2020. As I understand it, that figure comes to roughly $60 million, with half of it showing up in Q4. Please correct me if I have this wrong, but my understanding is that the unrealized part of that investment income hasn't been removed from your adjusted earnings. If that's right, could you perhaps give some guidance on how the gains break down across the securities involved?
Robert Doyle
executiveSure. Good morning. This is Rob Doyle speaking. You're right about that. In our adjusted earnings, no adjustments are made for investment income. We always keep it included within our core earnings. That gain you mentioned — the 63 for the year — comes entirely from mark-to-markets on our strategic positions, mostly in New Pacific, Peru, along with various other investment positions we hold. So essentially all of it is mark-to-market and unrealized.
Steven Busby
executiveTo provide a bit more context here, naturally, the rationale behind our having investments—particularly the bigger ones such as New Pacific—is that projects of that type appeal to us. Clearly, we favor fresh discoveries, significant silver finds in jurisdictions where we already operate. Here, that jurisdiction is Bolivia. That fits within our business model; our role involves helping those assets grow through our investment and financing, since there are two approaches available. We can, plainly, conduct our own exploration—and we have enjoyed considerable success doing so as well—but when other companies make discoveries and we assist in financing them, that opens up far more chances for us to explore and examine deposits. Thus, making investments of this sort in potentially large silver discoveries is genuinely central to what we do.
Robert Doyle
executiveLi, perhaps I can just add one further point. It's worth noting that our investment in our stake in Maverix isn't part of that. We treat Maverix as an associate, so we don't mark-to-market our sizable holding in Maverix. That applies only to short-term investments.
Li Hua Guo
analystAll right, that's great — thank you, Rob.
Operator
operatorOur following question is from John Tumazos at John Tumazos Very Independent Research. You may proceed.
John Tumazos
analystThanks a lot for taking my question. Just to recap, the first consultation in the restarted process would come this April. Do you have any sense of how many consultations, months, or years it could take? Argentina wasn't mentioned by you, with all those lockdowns there. My assumption is that nothing has occurred or restarted in the Chubut process. And regarding the net cash position, could you confirm if you remain a seller of any Tahoe properties, acquisition assets, or other pieces, and what the investment priorities would be beyond La Colorada?
Michael Steinmann
executiveAll right, John, let me check whether I can recall every one of those questions.
John Tumazos
analystApologies for all the attention.
Michael Steinmann
executiveAll right. We're merely a party to it—we aren't operating it—so the schedule isn't ours to control. That means I can't say how many meetings will be needed or what duration it will take. Only time will reveal that. Still, we're clearly glad to see that following the understandable COVID-related delay, this has resumed, so to speak, with meetings. As we're aware, COVID hit every nation on earth extremely hard, and every country has been—and continues to be—very focused, naturally, on keeping its people safe and ensuring sufficient hospital beds and treatment options exist for the population. In Chubut, as I mentioned in my text, a change to the law has been put forward and debated, as we know, and plenty of information circulated about that in Chubut, yet the legislator has not voted on it so far. Once more, I have no date for when that could occur, or whether it will. So we'll simply need patience and to await it. That said, discussions are certainly underway regarding what's termed zonification, under which the law would essentially designate certain areas within the province that could potentially permit open pit mining, along with other areas where it would not.
Michael Steinmann
executiveLet me just clarify one thing, because there's a lot of information floating around out there: even if that law gets approved, it doesn't mean direct approval of the Navidad Project — instead, it would let us actually apply for permits, right? What this law is meant to do is basically establish the foundation for actually applying for mining permits in certain areas of the province. It is not an approval of any particular project. On the divestments you asked about, I think — look, we're very, very happy with our gold assets on the Tahoe side, well, we're very happy with any gold assets we hold and the silver assets too. But as you know, we've been very successful with exploration at La Arena and Timmins especially, where we've already added many years of additional production, so the situation looks quite a bit different than when we made the purchase and closed the purchase, and actually, for example, at La Arena, we assumed back then that 2021 would be the final year of production from the oxides. And it looks like now we have at least another three years, so 2024. And we're still exploring and drilling, and we're still finding very interesting intercepts.
Michael Steinmann
executiveAnd just so you know, I believe we applied something like $1,350 to $1,400 gold for those reserves. So this isn't merely a mirror of stronger gold prices. I believe it's a fairly conservative gold price that we applied for a short-term asset for the reserves. But obviously, this is an opportune moment to shed some of our smaller assets. We said that earlier, and we'll keep at it. We have plenty of smaller assets that came to us across the last — let's say 15, 20 years — through numerous acquisitions. And certainly, we'll look to shed some of them during this year or next year, depending on what demand looks like for those assets. Those are assets too small for us to build, but obviously they could be interesting for a smaller company to do something with. And then I think there was another question, the fourth one, John, and I forgot about that one. Sorry, what was it?
John Tumazos
analystBeyond La Colorada Skarn, where do capital expenditures or investment priorities sit?
Michael Steinmann
executiveAlright, yes. As I've consistently put it, there are these three buckets, correct? I've always said that we should repay our debt, put money into high-quality projects, and give cash back to shareholders, most likely through dividends. I believe we did very well last year in accomplishing all of those things. We paid off every bit of our debt, $275 million, during a really tough year last year with the COVID impact — that's pretty strong. We actually doubled our dividend. We raised it two times, and altogether it amounted to a doubling of our dividend over the year. And that bucket remains. Naturally, we want to return cash to our shareholders. We've paid a dividend without interruption since 2010, and we've actually returned, as of today — I think apart from the payment that's coming in March, we've returned almost $500 million of cash to our shareholders, a bit of cash through share buyback, but mostly dividends. That certainly will keep going. We don't need to pay back any line of credit or debt at this moment, our bank debt. We will definitely take another hard look at the dividends as the year moves along. As I've always said, the best return for you as a shareholder is investment in high-quality, high-return projects.
Michael Steinmann
executiveLa Colorada is clearly getting a lot of attention. As you're aware, this is a project and investment spanning multiple years, and right now we're taking it first to a PEA level and then pushing it further along. That's going to need capital — not a huge number this year, but as we move into the following years, the figure will obviously rise, with a lot of underground development and surface infrastructure for that project. On the exploration side, we're very active. At other projects, we're exploring a few new ones around Timmins. As I mentioned, we're exploring around Shahuindo and La Arena, where we've had real success. I count those as well as the addition of high-quality projects and use of capital. Of course, each time we expand the reserve at these big open pits, it will require more heap leach space and more stripping, which you'll see reflected in our sustaining capital needs.
John Tumazos
analystWith copper at $4, are you warming up to those La Arena copper-gold sulfides at all?
Michael Steinmann
executiveLa Arena Sulfides—or La Arena II, as people call it—has always appealed to me; it's a copper-gold project. As a project, I've consistently been drawn to it, yet my view remains that it likely isn't the appropriate asset for Pan American Silver. It's a very large copper porphyry and an ideal fit for a major base metal producer. So it remains out there and available, and clearly interest keeps growing given today's copper prices. At present we're truly concentrated on the oxides, and as I mentioned, we've already added a good number of years of production there.
John Tumazos
analystI appreciate that.
Michael Steinmann
executiveThanks, John.
Operator
operatorOur following question is from Cosmos Chiu at CIBC. You have the floor.
Cosmos Chiu
analystHello, and thank you, Michael, Steve, Rob, Siren, and the team. It's really good to see the $0.07 per share dividend and such a robust balance sheet here. Perhaps my first question concerns Dolores. As you noted in your 2021 guidance, gold grades will be higher and silver grades somewhat lower because of mine sequencing. Could you remind me how long we'll remain in this zone of higher-grade gold and lower-grade silver? And then, once more, as you go deeper, does the gold grade rise in every area, or is this just one particular area that we're looking at?
Steven Busby
executiveHello there, Cosmos — this is Steve speaking.
Cosmos Chiu
analystHello there, Steve.
Steven Busby
executiveIt's definitely a pleasant area down at the base of that pit, that's for sure. We've spent years waiting to reach it. Down at the bottom, the gold grades—we're seeing spots where we're mining big tonnages at one and a half, two, two and a half grams gold. Quite good, though silver is really low in those areas. This year we're projecting under 20 grams per ton silver, compared with as much as 30, even 40 grams higher up in the deposit. That high-grade gold zone, the lower section of this pit that we've been stripping since acquiring the asset in 2012, is a large zone, and we'll likely be working in it for another two and a half years. Realistically, at Dolores we'll be mining that zone for the remainder of the mine life. However, the tonnage does begin to decline once we get through that first few benches. Toward the end, things get quite tight at the bottom of the pit. I'd still recommend revisiting the 43 to 101. It provides a good picture of how that looks. It's a bit out of sequence.
Steven Busby
executiveWe're running slightly behind where that sequence sat between 43 and 101, yet it still gives a solid picture of how the grades perform from this point through the remainder of the mine's life.
Michael Steinmann
executiveCosmos, that's the reason, obviously, and just to remind everybody on the call why we shifted the Dolores asset out of our Silver group Segment when we consider the cost and production into our Gold Segment, simply because the gold output from this point until the end of that asset is going to exceed the silver output. So it's definitely something that's here to remain, and that's why we transferred it over to the Gold Segment, which makes it somewhat tougher to compare apples to apples on the cost side. But if you look mine to mine, obviously, you still get the true picture.
Cosmos Chiu
analystMichael, following up on that, I'd say it'll sit within the Gold Segment for the foreseeable future — not only in 2021 but past that too.
Michael Steinmann
executiveYeah, once it reaches end of life, we won't revert that.
Cosmos Chiu
analystUnderstood. Perhaps we can return to Dolores and pick up on the underground topic — I believe it has been some time since I last inquired about the underground. When I asked previously, the figure was moving from 1,000 tons per day to 1,500 tons per day. How is that progressing at present? Where do you stand as of now? And is it also encountering some of that high-grade gold, lower-grade silver, or is it located in a different area?
Steven Busby
executiveRight, we’re not at 1,500 tons a day yet. COVID disrupted that ramp-up, along with all the complications from 2020 and the suspensions and so on. So at this point we’re still running roughly 1,000 to 1,200 tons per day. We don’t really plan to push that, because we don’t want to bring more people to the site right now, again, given the COVID constraints and risks there. So for the remainder of the year, we’ll probably remain at that kind of rate. The grades underground are somewhat different. There’s a bit more silver. On average it’s—it’s kind of funny. Underground, we sort of view it on a gold equivalent basis. It’ll average around two and a half grams gold equivalent, but the split is about 60% gold and 40% silver. It’s in a different area. Right now it isn’t directly beneath the pit. It’s more adjacent and downstrike.
Cosmos Chiu
analystAlright, thanks, Steve. Perhaps pivoting slightly here—Manantial Espejo, and as you discussed more generally, Michael, regarding COVID-19 effects. One item you mentioned previously about Manantial Espejo involved labor, plus the limitations on labor stemming from the country's northern region. I suppose, once more, it could be premature right now, but you're anticipating 2021 output above 2020 partly because some of those constraints ease in 2021. How is that progressing thus far? And I guess it's somewhat more intricate at present, simply because you now have three mining areas featuring differing grades, with higher grades originating from COSE and Joaquin. On that point, could you remind us what contribution arrives in terms of tonnage from each of those assets that you incorporated into your 2021 guidance?
Michael Steinmann
executiveOkay, I'll begin with Argentina and then pass things to Steve or Martin for the tonnage details. But you're correct. The complication is clearly still present, and we're only roughly six weeks into the year, so nothing much has shifted on that front. And that is what we built into our budget. So when you look at the budget and the figures for the year, I think that's where we're tracking right now. As I mentioned, it's very early days, and we'll see how things play out. But we did obviously budget for that complication, and it's one component of our plan that is improving as the year goes on and another reason why our production is weighted more toward the back half in 2021. So we're assuming that it gets better through the year. You're absolutely right. This involves Manantial itself, along with COSE and Joaquin to high-grade underground operations that truck the material to our plant in Manantial, so plenty of complications during COVID, as you can imagine, with many moving parts involved.
Steven Busby
executiveSure, perhaps I should begin, and afterward I'll hand things over to Martin to explain a bit more about the distribution. But there's one point I'd really like to make, Cosmos — something quite interesting: COSE is our smallest tonnage, and we deliberately keep it small because milling that ore is somewhat difficult. We had a unique opportunity at Manantial Espejo, with the massive tonnage of low grade plus the high grade coming from the underground at Manantial and the high grade from Joaquin. That entire blend is amenable to accepting more COSE ore. Processing COSE on its own would be very difficult. It must be blended, since it consumes so much oxygen through the plant. So actually we're achieving better extraction rates than we anticipated, but given its high grade, we have to keep that production grade out of COSE fairly low. Martin, perhaps you could give a distribution of that.
Martin Wafforn
executiveYeah, hello there, Cosmos.
Cosmos Chiu
analystHello there, Martin.
Martin Wafforn
executiveOkay, so to start with, the operations in Argentina took a pretty heavy hit from the coronavirus and the shutdown we experienced near the end of the year there. But with COSE, generally speaking, the goal for this year is to reach that 80 to 100 tons a day kind of range. That's roughly where we've been operating, and then ramping up as we move a bit further into the year. Joaquin is more than that. If I remember correctly, our target for this year is to get to roughly 400 tons a day. That's about the most we can manage. And then we still have some leftover production from the Manantial underground coming in again at that kind of Joaquin-style production range. The rest of the plant's capacity gets used up by the stockpiles we still have — the low-grade stockpiles that were created when we mined the pit.
Cosmos Chiu
analystThanks, Martin. I’d like to ask something about the financials. Michael, you mentioned earlier that certain input costs are going up, yet at the same time you’re getting stronger byproduct credits from the base metals. You referred to the assumption you used being $3.36 per pound for copper, and right now copper is close to $4 an ounce, or $4 a pound. So my question is: what is your hedging approach for things like diesel and the other fuels? And would you also think about hedging a portion of your byproduct credits so as to lock in some of those possible gains? Could you perhaps provide a little more detail?
Michael Steinmann
executiveRight, and then I’ll hand things over to Rob. But first, on the hedging strategy — to be clear, we have no hedges at all on precious metals, so nothing on silver or gold. We do have hedges on certain base metals, and Rob can walk you through some specifics. We also hedge a few currencies in countries where those currencies matter a great deal to us — mainly the Peruvian Sol, Mexican Peso, and Canadian Dollar. We’re hedging some diesel fuel as well, and we’ve actually been quite successful with that, using hedges we put in place last year. That’s essentially it. So, as I said, we are completely unhedged on precious metals. Rob, could you share some details on the base metals, please?
Robert Doyle
executiveYes, absolutely. Michael hit on the bulk of it there, Cosmos. We do have a few modest base metal programs running, and the full details on those are actually in the MD&A, so I'd point you there. If you'd like a detailed breakdown of the positions, I'm happy to get that to you. But the key point is that our focus really is only on the currencies and the byproduct credits. Precious metals are simply not something we do, and that won't change.
Michael Steinmann
executiveAs a quick reminder for everybody, we do examine revenue. Clearly, that figure hinges on base metal prices, though my estimate is that roughly 12%-15%, or 14%, of revenue is currently derived from base metals.
Cosmos Chiu
analystSo on that point, Rob and Michael, would you think about adding to those base metal hedges? As you mentioned, Rob, right now they're pretty modest.
Robert Doyle
executiveYes, they are. With base metals, there are always some technicalities involved in hedging, since we produce those metals as concentrates. That brings in the nuances of concentrate terms along with various tax effects. So as a rule, you won't generally see us hedge beyond 50% to a maximum of 60% of our payable production at any given point.
Cosmos Chiu
analystAbsolutely, and perhaps this is the final question, returning once more to the financial aspect. Michael, you noted during your opening comments that certain tax payments tend to be somewhat uneven. If my recollection is right — and I believe you said this too — a significant portion falls in Q1 and Q2. Would you remind me what share of that full-year annual tax payment will be made during Q1 and Q2? Clearly there is an effect on cash flow, as I can see. But could you also remind me whether income statement expenses are affected as well?
Robert Doyle
executiveAbsolutely, Cosmos, I’m happy to address that. To be clear, there’s no effect on the income statement. Naturally, we would accrue for any tax expense during the period. As a result, we don’t anticipate any uneven treatment on the income statement. Where cash flow is concerned, certainly, it’s simply the timing of payments. Generally, in the countries where we do business, we make catch-up payments tied to the prior year’s income tax generated in March of each year, March and April. So if you review our balance sheet, under current liabilities you’ll find roughly $54 million of income taxes payable. We therefore expect the majority of that to be paid in the first quarter. Usually, more than half of our total tax payments for the year arrive in that first period of the year. After that, it levels out, and it really consists only of installment payments, which we make on each of our operations.
Cosmos Chiu
analystRight. And if my memory serves me, this figure would land higher in the current year, since silver prices have climbed and therefore a catch-up is required. The true-up comes in somewhat above the typical level. Would that be accurate? Is that the way it operates?
Robert Doyle
executiveThat is precisely how it functions, so we naturally made installment payments during 2020, but since our income tax came in much higher than the prior year thanks to the strong economic performance, we do have this catch-up payment. So there is always that one-year lag in our tax payments, and occasionally we do receive a refund when we've overpaid our installments, but naturally, this year it will be a catch-up payment.
Cosmos Chiu
analystPerfect, I appreciate it. That covers everything I wanted to ask. Thanks again.
Michael Steinmann
executiveAppreciate that, Cosmos.
Operator
operatorRyan Thompson from BMO has the next question. Go right ahead.
Ryan Thompson
analystHi everyone. I believe my questions have kind of been covered already, but perhaps I'll just pose a few brief follow-ups. The first is likely directed at Rob, though it concerns the subject of investment gains and mark-to-market — clearly, that introduces some volatility into your earnings. Are you considering any adjustment to that down the line, or are you content to more or less keep with the approach you used last year?
Robert Doyle
executiveHi, Ryan. Yeah, there's debate about it inside the company. We've consistently chosen not to adjust it out. As we mentioned, we regard it as belonging to our core business. I think our audit committee always reviews that policy, so it could change as we move into 2021. But right now, I mean, it's clearly disclosed, so anyone can make whatever adjustments they feel are appropriate.
Ryan Thompson
analystAlright, that's useful. Perhaps we change topics and pick up on the sulfide porphyry question at La Arena — could you simply explain whether that porphyry lies beneath the existing pit or rather sits off to one side? If somebody came in and, let's say, bought that project, would they essentially have to hold off until oxide mining wraps up? And I know you mentioned the life has been extended past the 2021 timeframe you initially envisioned. So if you could just weigh in on what that might potentially look like or how a deal there could potentially be put together.
Michael Steinmann
executiveRight. It's a really big porphyry that lies beneath it and alongside it. Naturally, it's far, far bigger than the oxide part of the deposit. So, answering your question, yeah, no, you can't be mining the porphyry and the oxide simultaneously. That wouldn't happen in any case, though, since constructing a porphyry copper mine of that scale is going to involve a good many years of engineering work, permitting, and preparation. And although they've been highly successful at La Arena when it comes to adding oxides, that will eventually come to an end. And when it does end, as I said, I believe the sulfide copper porphyry component would be better off in the hands of a large base metal company at the point when the handover takes place, and who gets paid for which portion of the oxide — I mean, that's simply all part of the negotiation. I don't really see that making the situation complicated. But right now, as I mentioned, there's plenty of time for us to mine the oxide and to mine the extra oxide that we're discovering. And there will be plenty of time for someone to come in and begin working on engineering and permitting for the sulfides.
Ryan Thompson
analystAlright. Yeah, that helps. Then perhaps just a final item from my side — shifting back, I suppose, to the New Pacific Investment matter and what you're doing in Bolivia and at San Vicente. Bolivia has seen a change of government. Could you share whatever remarks you're able to about that government change and whether it has affected San Vicente in any way, along with the relationships there in Bolivia?
Michael Steinmann
executiveLook, we've been operating in Bolivia since 1995, and we're very happy doing so. San Vicente has contributed a great deal to our silver output and continues to do so. That's why we're keen to examine additional projects in Bolivia and why we made our investment in New Pacific. With the new government, I see no reason to change that. For us, it has been a good jurisdiction in which to work.
Ryan Thompson
analystAll right. That covers everything on my end. I really appreciate the update, everyone.
Michael Steinmann
executiveI appreciate it.
Operator
operatorAs a reminder, if you'd like to ask something, hit star followed by one. Our next question is from Lawson Winder at Bank of America Securities. Your line is open.
Lawson Winder
analystThanks, Operator, and hello, everyone. I hope all of you are doing well. I have just a couple of follow-ups for me. So first, regarding the La Colorada Skarn, in your release, you talked about the cooling installations and the heat that's being generated underground there. I'd just be curious to know, is the heat that's being generated there just from the high concentration of sulfide in the rock, or are there other geological features that are causing that?
Christopher Lemon
executiveYeah. Hi, Lawson. This is Chris. Yeah. So, as you’re aware, we have drilled and continue to drill deep into that skarn zone over on the east side, with the vein located higher up. Yes, we’ve entered a porphyry. Groundwater is present there and it has a thermal gradient, naturally. So in that sense, it isn’t really geological. Yes, there are systems and hydro systems that are introducing heat. Clearly, you’re getting heat from the operations as they stand today. But when it comes to the sulfide content, is that what’s generating that heat? Not really.
Steven Busby
executiveI'd also like to mention, Lawson, that with the refrigeration plant — because of that temperature gradient — we're fairly confident that as we get into the skarn, cooling is going to be required. Right now, as Chris mentioned, we occasionally come across zones of hot water. We can pump it out, we can ventilate it, and over time we can cool that area down. So we see an opportunity, if we're able to bring that refrigeration plant in early, to gain more speed in reaching areas that are hot today. Even though we don't strictly need it — we could probably get by without it — it will benefit the current operation. That's the reason we're pushing that project ahead somewhat.
Lawson Winder
analystMy guess is that this likewise forms part of the groundwork for a final development decision.
Steven Busby
executiveThat’s right. Yes.
Lawson Winder
analystThanks for that. And Steve, you brought up the strip ratios at La Arena and Shahuindo — I may have them reversed, but my recollection is you cited 19% and 33%, in that order. Could you possibly share what those strip ratios are projected to be for 2021?
Steven Busby
executiveAbsolutely. At Shahuindo, the situation is reversed. Shahuindo has risen 19%, going from 1.0 to 1.2. La Arena has climbed 33%, moving from 2.1 to 2.8, when you compare 2020 actual against the 2021 plan.
Lawson Winder
analystAlright, you also said the strip ratio at Dolores dropped by 18%. What has it fallen to?
Steven Busby
executiveIt fell 32%, going from 3.8 in 2020 down to 2.9 in 2021.
Lawson Winder
analystAll right, that's great. I also wanted to ask about the current reserve at La Arena. Are any of the satellite pits included in it? What I mean is, if you recall the Rio Alto days, they were discovering quite a bit of mineralization in the satellite pits surrounding the main pit. I simply wasn't certain whether any of those had been incorporated into the current reserve and/or resource statement.
Martin Wafforn
executiveHey Lawson, Martin calling. No, they haven't — it's only La Arena that's involved.
Lawson Winder
analystChris, does that fall anywhere within the scope of what you're exploring?
Christopher Lemon
executiveSo when we made the Tahoe acquisition, we of course reviewed the exploration portfolio. Sure, there are a number of targets located around La Arena, but at this time they aren't a target for us.
Lawson Winder
analystSo if there's any potential upside, you'd expect it to land in or around the pit that's already there — is that a fair way to put it?
Christopher Lemon
executiveYes, that is right. I mean, the bulk of the exploration drilling that has taken place has occurred within the pit. And it is really those central structures, those feeder veins that have risen up. And that is where we are achieving a certain level of success.
Michael Steinmann
executiveNaturally, everyone was concentrating on extending the mine's life right away. Like I mentioned, at the start, when we bought the asset, the intention was for 2021 to be the final year of production. So attention went to expanding the life straight away, which of course happens within the pit.
Lawson Winder
analystAlright, that's great. Then just one last question about some of what I'd call the non-core assets. I know several questions have already come up on these, but one that hasn't been directly addressed yet is Shalipayco. Where does that stand at the moment? I mean, are you at Nexa looking at potentially developing it? Is it an asset Pan American might be interested in participating in? Or does Pan American still view that as a non-core asset that would hopefully be sold at some point?
Michael Steinmann
executiveRight. So for Shalipayco’s development pipeline, you should really be checking Nexa’s publications and press releases on that. I’ve noticed people mention Shalipayco, naturally, among their projects. We actually hold a 25% carried interest through to production. So it’s a large zinc deposit. No, we aren’t planning to. There’s no need for us to put in money, since it’s a free carry all the way into commercial production. But we’re very glad to have it. It began as one of our exploration projects. Nexa optioned it quite a few years back and put in a great deal of work—excellent work—on that deposit. And that’s the current status. They stepped in, are essentially running things, and serve as the operator. And as I mentioned, we’ll continue to hold our 25% carried interest.
Lawson Winder
analystExcellent. I really appreciate it.
Steven Busby
executiveNo problem, Lawson. I get that technical studies on that project are still ongoing. And yeah, I think, like Mike said, checking their website and so on will give you a bit more detail.
Lawson Winder
analystYes, that's great. Thanks to all of you for the responses today, and best wishes.
Operator
operatorThat wraps up the Q&A portion. Now I'd like to hand the conference back to Michael Steinmann for any closing remarks.
Michael Steinmann
executiveThank you, Operator. And thanks to all of you for joining us. That's all the time we have for this call. But please, if you have further questions or new ones come up, as always, don't hesitate to contact IR, email Siren, and they'll be glad to respond to those questions in due course. Just a few remarks about the silver market as I wrap up here. You've likely seen some of the releases issued on February 10th by the Silver Institute discussing an outlook for silver in 2011. I think that's really important, aside from, obviously, silver's use as an inflation hedge or a store of value or whatever you'd like to call it — silver is a very, very important industrial metal, particularly as the world moves toward clean energy or greater clean energy production and electrification. Silver, much like copper, is a very essential metal to have. The Silver Institute forecasts probably a 10%-11% increase this year on the industrial side of silver. That makes a lot of sense. We have a different administration in the U.S., with a lot of focus on clean energy. There will be a lot of production and installation of solar panels, as I would assume, and electric cars will also consume quite a bit more silver than combustion engine cars.
Michael Steinmann
executiveAlso, please watch that as well. And like I mentioned, silver always has these two aspects. One is, naturally, the investment or financial-asset angle, but the industrial angle — which accounts for over 50% of silver usage, purely on the industrial side — that excludes jewelry and so forth, is expanding quickly and, naturally, will expand further as the world emerges from this pandemic and hopefully returns to normal as vaccinations are rolled out. With that said, we'll end our call here. Thank you all for joining us. And we look forward to updating you again in May regarding our Q1 2021. Have a good day.
Operator
operatorThat wraps up the conference call for today. Your lines can be disconnected now. We appreciate you joining us, and we hope the rest of your day is a pleasant one.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.