Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary

May 13, 2021

Toronto Stock Exchange CA Materials Metals and Mining earnings 59 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone holding on. I’m the conference operator, and I’d like to welcome you to Pan American Silver’s First Quarter 2021 Results Conference Call and Webcast. <<operator_script>> This call is being recorded. <<operator_script>> At this point, I’ll hand the conference over to Siren Fisekci, Vice President of Investor Relations. Ms. Fisekci, please go ahead.

Siren Fisekci

executive
#2

Thank you, operator, and welcome, everyone, to Pan American Silver's First Quarter 2021 Conference Call. Media and other participants on the call are invited to participate in listen-only mode. We released our results after yesterday's market close and a copy of the news release, MD&A and presentation slides for today's call are available on our website. That material on today's call contains certain statements and information that constitute forward-looking statements and information. Please review the cautionary statements included in our news release and presentation as well as the risk factors described in our most recent Form 40-F and Annual Information Form. I will now turn the call over to Pan American's President and CEO, Michael Steinmann, who will provide a brief review of our results. We will then open the call to questions and answers.

Michael Steinmann

executive
#3

Thanks for being with us today as we go over the results for the first quarter. Operationally, it was a tough quarter, and that clearly carried through to our financial results. At La Colorada, we're moving forward on a number of ventilation projects so we can supply ventilation for our longer-term operating and development plans, including developing the skarn deposit and getting back into the highest grade areas of the mine. In Q1, while we were commissioning the new raise from surface down to the 345 meter level, the bottom 42 meters of that raise got blocked. We're working to get around that blockage by drifting in from a nearby ramp and doing additional raise boring. We expect that work to wrap up late in Q3, which should lead to better grades, throughput rates and mine sequencing late in 2021. On top of that, most of the zinc and lead concentrate we produced at La Colorada in Q1 wasn't shipped until after the quarter closed, which pushed back base metal and silver sales. That inventory buildup came from an extended negotiation with a domestic transport contractor, where we chose to hold back transport of concentrate until we could reach mutually agreeable terms. It also came from transitioning to our new 2021 lead smelter customers based in Europe. Concentrate shipments picked up again in early April 2021, and our site inventory levels are back to normal, with all of the concentrate withheld from Q1 2021 now shipped.

Michael Steinmann

executive
#4

The sales that were delayed from the inventory build will be sold over the coming 2 quarters. At La Colorada in Q1, all-in sustaining costs were heavily distorted by the ventilation blockage combined with the postponed shipping of concentrate production, and those costs will be lower for the rest of the year now that the accumulated Q1 content rate stocks have been shipped. A temporary inventory buildup also happened at Dolores because ore was stockpiled in preparation for the rainy season, which stops us from mining the high-grade ores at the bottom of the open pit. In addition, lead sequencing constraints at the current stage of pad construction caused a buildup of in-pad inventory, pushing some production later into the year. Altogether, the inventory buildups at La Colorada and Dolores and Shahuindo produced a $39.9 million buildup at cost and inventories, and that led to revenue of $368.1 million for the quarter. Operating cash flow came in at $29.9 million, reflecting both the effect of inventory build on working capital and $61.3 million of cash taxes paid during the quarter, since our tax payments are typically weighted to the first quarter of the year. We posted a net loss of $7.6 million, or $0.04 per share, in Q1, which included a $39 million noncash mark-to-market loss on some of our short-term investments, mostly in New Pacific Metals, the owner of the large Silver Sand project in Bolivia.

Michael Steinmann

executive
#5

Once you adjust for that $39 million investment loss, adjusted earnings came in at $37.4 million, or $0.18 per share. It's probably worth noting that short-term investments at the close of Q1 carried a market value of $72.9 million — well above the $20.4 million cost base — and that New Pacific Metals' share price has recovered substantially since Q1. Our financial position is still solid, with $206.4 million in cash and short-term investments. The $500 million line of credit we hold remains undrawn. The Board approved a quarterly dividend of $0.07 per common share, which is unchanged from last quarter. Consolidated silver production for Q1 totaled 4.6 million ounces, held back by the ventilation issues at La Colorada, mine sequencing, the inventory buildup at Dolores and Shahuindo, and production that came in below expectations at Manantial Espejo. Although the COVID-19 pandemic keeps constraining throughput rates at our underground operations, its effect has been outsized in certain jurisdictions. Argentina is one of those, where restrictions on interprovincial travel have cut workforce deployments for our Manantial Espejo operations more than we had anticipated. Silver segment cash cost for Q1 was $12.30, and all-in sustaining costs were $16.99 per silver ounce sold. Those costs were heavily affected by the lower number of ounces sold, driven by the inventory buildup and reduced production at La Colorada and Manantial Espejo.

Michael Steinmann

executive
#6

Because ventilation at La Colorada has been delayed, and because we expect workforce deployment at Manantial Espejo to remain short for an extended period, our 2021 silver production forecast now sits at a range of 20.5 million to 22 million ounces, down from the original guidance of 22.5 million to 24 million ounces. Along the same lines, our estimate for silver segment cash cost rose to a range of $9.60 to $11.60 per ounce, and all-in sustaining costs rose to $14.25 to $15.75 per ounce, versus prior guidance of $8.50 to $10 and $12.50 to $14, respectively. Consolidated gold production for Q1 came to 137,600 ounces. At Timmins, we cut mining rates roughly 10% under plan for the quarter in order to deal with geotechnical conditions in a section of the Bell Creek mine that we discussed last quarter, while we pushed development forward in the lower level, which will allow mining rates to climb back to normal around midyear. At Shahuindo, output was affected by fewer tonnes placed, along with lower grades and extraction rates, as a result of mine sequencing into a new area of the pit that has more fine grained host rock with a higher clay content. We stockpiled roughly 335,000 tons of this fine grain material, equal to about 11% of the ordinary mine during Q1, and it will be blended with courser ores to be mined later in the year for placement on the heaps.

Michael Steinmann

executive
#7

At Dolores, better gold grades from mine sequencing were partly canceled out by the inventory buildup we mentioned earlier, and that pushed some production out into later in 2021. Every one of these matters is temporary, and we still anticipate gold output rates climbing steadily through the rest of the year. Cash costs for the gold segment came to $846 in Q1, while all-in sustaining costs were $1,058 for each call ounce sold. With the throughput gains we expect at Timmins and Shahuindo over the balance of the year, we are keeping our 2021 annual gold production guidance at 605,000 to 655,000 ounces, along with estimated gold segment cash cost and AIS cost of $825 to $925 per ounce and $1,135 to $1,250 per ounce, respectively. That includes a $15 million cut in sustaining capital expenditure, bringing it to a range of $230 million to $245 million, because certain expenditures at Shahuindo have been deferred in timing. We still expect throughput rates and production to improve in 2021, assuming the COVID-19 impact fades over the year, ventilation gets better at La Colorada thanks to our ongoing ventilation projects, coarser ores are mined at Shahuindo so they can be blended with the fine grained stockpile ores, and lower mining levels are opened at the Bell Creek mine in Timmins.

Michael Steinmann

executive
#8

With that sizable tax payment now behind us and metal prices holding strong, we expect to produce robust cash flow that will be weighted toward the latter part of the year. Yesterday we also put out a news release concerning the current project at La Colorada, in which we shared some impressive drill results from the 65,000 meter infill and expansion drilling program. We're moving this current project forward with the goal of a preliminary economic assessment technical report, or PEA, by the end of 2021. Beyond the surface and underground infill diamond drilling, we're starting geotechnical ventilation backfill, geochemistry and hydrogeological fill evaluations, together with mine, plant and infrastructure design studies. Metallurgical testing keeps showing favorable flotation results, and expansion of baseline environmental data collecting is underway. We have already filed permit applications for certain site infrastructure projects that will help move this current project past the PEA and, in some cases, will at the same time benefit the existing La Colorada mine operations. These take in projects such as camp expansions, access road upgrades, potential underground access ramp and shaft excavation entrances, ventilation systems and mine cooling to address the naturally increasing rock temperatures with that. At Escobal, the start of the pre-consultation meetings has been pushed from April 2021 to May '21 owing to the rise of COVID-19 cases in Guatemala and the resulting government decree to restrict gatherings and movement.

Michael Steinmann

executive
#9

Pan American Silver has received an invitation to take part in the process, and that process is being led by Guatemala's Ministry of Energy and Mines. We anticipate a consultation that is inclusive, one that honors the Xinka people's right to consultation under the principle of good faith, mutual respect, and transparency, free from pressure or conditioning by any parties. Before we proceed to the Q&A portion, I want to note that last week we published our 2020 sustainability report. This year's report takes into account the TCFD and SASB reporting frameworks. For anyone interested in learning more about our commitment to sustainable mining practices, the report can be found on our website. With that, I would like to open the line for questions.

Operator

operator
#10

<<operator_script>> The initial question comes from Tyler Langton at JPMorgan.

Tyler Langton

analyst
#11

I suppose to begin with the effect of COVID at La Colorada and Manantial, I mean, is — just attempting to gauge whether matters have, say, deteriorated relative to the prior quarter. And then I realize, with your guidance, you kind of mentioned it rested on the easing of COVID-related restrictions. Is it a case where, by year-end, there are — you basically have no restrictions left? I'm just trying to gauge what degree of restrictions you perhaps still anticipate continuing through the end of the year.

Michael Steinmann

executive
#12

Yes, Tyler, this is Michael. Naturally, when we put our budget together at the start of the year, we more or less expected a straight-line gain of roughly 25% each quarter. We already understood that we can't know precisely how the pandemic will play out and how that unfolds. It appears that in certain of our operations, the Q1 effect was larger than we had anticipated, though that doesn't mean it won't become significantly faster and better by the end of the year. Right now I simply don't know where things are headed. It's probably worth noting here, Tyler, that the impact really shows up in the underground operations rather than in our open pit. However, since the bulk of our silver comes from our underground mine and mines, particularly La Colorada and Manantial Espejo, the effect on silver is considerably larger than the effect on gold production. So that's truly the primary reason for it. But at the local level, if you look at it, most countries where we operate have what they refer to as a traffic light system, or a system under which they examine regionally how the outbreaks are moving around. And then regional restrictions get put in place automatically.

Michael Steinmann

executive
#13

It's no longer the case that we're seeing nationwide shutdowns, but restrictions do exist that at times create more difficulty in one location compared with another, and things really shift somewhat depending on where the pandemic is showing higher case counts in each nation or in each area within a nation. Still, yes, it's very important to note that the effect is really mostly concentrated at the underground operations. That said, vaccines are now being distributed more quickly following a slower beginning, as happened in many countries around the world, and I believe that will speed up over the course of the year and will make the situation better. As for Q1, though, as I mentioned, likely a somewhat larger impact than we had anticipated, particularly at La Colorada and Manantial. Steve, perhaps you'd like to add something?

Steven Busby

executive
#14

Yes. And just to piggyback on that, Tyler — it's Steve here. Down at Manantial Espejo, the effect has hit us harder than we anticipated, because, like Michael mentioned, the rules on travel between provinces mean our folks have to go through quarantine and testing, both on the way into the province — since a lot of them come from elsewhere — and again when they head out. So shift schedules get stretched considerably, and the number of people we're able to actually have on site to carry out the mining is quite constrained. As a result, we're simply short of the full crew we had counted on. We knew there would be some impact, but it turned out to be worse. In Argentina, when we consider the outbreak there, it's been pretty severe in the South, and our view is that this will persist for some time yet. That's the reason we made an adjustment in that case. Over at La Colorada, we observed something of a spike in cases during Q1, likely peaking at some point in early to mid-March, and it now appears to be easing there. So as we move forward there, we're more hopeful that, following Q1 at La Colorada, we're now past the peak of the curve.

Tyler Langton

analyst
#15

Alright, that's quite useful. Now, as a follow-up regarding the ventilation blockage at La Colorada: how should production costs appear in Q2 and Q3 relative to — I'm not sure whether Q1 felt the full effect. Then, I believe you mentioned it won't be fixed by Q3 — should production return to normal by then? And does this affect any of the longer-term gains you anticipated from the ventilation system?

Steven Busby

executive
#16

Yes, this is Steve. As we said, we anticipate finishing the bypass of the raise blockage that happened in Q1 by the conclusion of Q3. Right away, we'll install the ventilation fan that was already being put in place when the sloughing and blockage took place. So that should move along pretty fast. Once that's done, it will open up that East area. Until we have it opened, we're quite constrained on how much diesel equipment we can operate in the mine, because of ventilation limits, especially in that East high-grade zone. So at the moment, we expect to be limited to roughly 1,500 to 1,600 tonnes per day of mining rates at La Colorada until the ventilation is fixed. Then by the end of the year, we'll be back to the 2,200-2,400 tonnes a day we typically saw when ventilation is working properly. And since we're not in that high-grade zone, our grades are lower during this restricted period as well. We're probably at 275 to 300 gram silver head grades. And once again, when that ventilation opens up and we get back into that East high-grade zone, we expect grades to return closer to normal, toward reserve grades of the 300-330 gram type head grades.

Operator

operator
#17

Cosmos Chiu from CIBC has the next question.

Cosmos Chiu

analyst
#18

Sure, Q1 was difficult, though it does appear that conditions should improve during the back half of the year. Perhaps my first question also concerns La Colorada. Could you expand a little on what occurred regarding the sloughing of the raise wall there? Was it simply more fractured and fragmented than you had anticipated? Have you repaired that section as of yet? Have you applied shotcrete to the part that was sloughing yet? And then, I suppose, as you mentioned, you are attempting to go around the area that is plugged. So will you raise bore through that section and then, sort of, shotcrete that section immediately? Could you perhaps elaborate a bit on how you plan to fix it?

Steven Busby

executive
#19

Okay, Cosmos — Steve here. And perhaps to give everyone a bit of background: two of the primary ventilation raises at La Colorada, which were close to 10 years old, had eroded, had sloughed, and had become blocked between 2018 and the final one in late 2019. At that point, our ventilation capacity was constrained, and so was our ability to mine in that eastern high-grade lower Candelaria zone. So we began an extensive effort examining alternatives for how those ventilation raises could be replaced. And we arrived at this approach that had been implemented in many mines in Mexico — preconditioning the ground where the raise would go with grouting — and we started an extensive grouting program lasting 6 months beginning in March of 2020. And between the grouting and the ground foundation preparation for the raise boring, that work carried us through to October of 2020. And it looked pretty solid. We were quite pleased with how that grouting program turned out. And in fact, we managed to successfully complete the raise bore quite quickly from November to mid-January. We had that 3.1 meter diameter raise bore pulled through that pre-grouted ground quite successfully. It went quite smoothly.

Steven Busby

executive
#20

So right away, we began applying shotcrete to that raise, using a robotic shotcrete unit that we lower down into the hole. Things were going well for us. Then all at once, the walls of this hole started sloughing. I should point out that this ground is extremely, extremely difficult. It's a volcanic dacite material. What we think is going on is that there are some clay zones inside that material, and the grout simply isn't absorbed by it. It simply doesn't maintain the grout's stability. So we began noticing some sloughing coming off the walls. In a couple of cases, that sloughing actually damaged and destroyed the robotic shotcrete machine. We had to pull it out, rebuild it, and put it back in. So from January through late March we spent the time grouting, and during that grouting period, part of the sloughing came down and plugged the bottom of the raise. We made the decision to leave it plugged so that we could finish the grouting and halt that sloughing. And that is indeed what we've seen. As of today, the sloughing has quieted down. We haven't seen any further sloughing. We're very pleased with the grouting on that raise. It's solidifying.

Steven Busby

executive
#21

So we moved in during late March to start opening the bottom of that area. Between March and April, we devoted a fair amount of time to attempting to drill out that plug from the side. Naturally, you don't want anyone positioned underneath it. So we were drilling and shooting it from the side. Then, by the end of April, we concluded that this approach was essentially futile. We weren't going to remove it that way. We then decided to cross-cut from a nearby ramp up toward the top of the plug, which sits 42 meters above the bottom of the raise. That's what we're doing right now. Once we reach the top of that plug, we'll construct a raise bore chamber situated to the side of the existing raise bore, and it will function as a bypass raise running from that point 42 meters up down to the bottom. And as I mentioned, completing that project will take us through the end of Q3, and at that point we'll have a full ventilation circuit on that eastern side.

Cosmos Chiu

analyst
#22

Certainly. So regarding that particular financing round—my understanding is it's one of three ventilation raises you were looking to put together. Does this now delay the schedule for the remaining ones? Is this the first or the second of those vent raises that you've finished? And does that shift the timing on the others?

Steven Busby

executive
#23

Yes. That's a good question, Cosmos. This is actually number two. The first one went from the 345 level down to the 528 level. It was the second stage in that area. That one is done. It's a raise hosted in limestone rock. So we don't face nearly the problems in limestone that we do in the dacite. So that one got completed. We're pretty pleased. It's functional once we get this upper stage repaired. So this is the second one. For the third one, we're putting it in over at what we call Veta tres, Veta 3, and we're pre-grouting that ground right now to run a raise bore there. And that ground is quite challenging. In the grouting program, we're seeing real challenges that we're facing there. We're not certain whether we'll be able to grout that ground successfully or not. And because of that, we're beginning to consider an alternative raise that takes us even further to the East, which is our most favorable ground from a mining perspective. It's also the most broken-up ground, which is probably by nature, that's why it's broken up. It's very mineralized. So we're going to go further east. And we're actually looking at a number of alternative technologies for that raise.

Steven Busby

executive
#24

Honestly, though, we are giving real thought to a standard concrete-lined blind shaft dug by conventional shaft methods at that site. Our view is that this approach offers the greatest certainty. It would provide the most support, and in fact it appears fairly advantageous for carrying out that project. So we hope to make an announcement within roughly the coming quarter, but that is more or less the direction things are moving right now.

Cosmos Chiu

analyst
#25

All right. Great. So perhaps shifting direction a bit regarding Dolores — as you mentioned in the MD&A, there were certain — not problems, exactly, but output was behind schedule because of leach pad kinetics. Could you expand on that a little more as well? Is it tied in any way to pulp agglomeration? Or is it really the heap height at this stage? If I calculated it using your figures, it appears silver recovery came in at roughly 56% for the quarter, which is similar to the 53% from last year. Gold was weaker, 58% against 73% a year ago. So I suppose what I'm asking is, what's the driver behind the leach pack kinetics? And is it truly just affecting the gold?

Steven Busby

executive
#26

Yes, that's a really good question, Cosmos. Let me start by saying that with regard to the inventory build at Dolores, most of it — roughly two-thirds — was essentially high-grade material from the pit being stockpiled, and that's a strategy we're using this year so that we keep high-grade available for the pulp agglomeration plant during the rainy season. Once the rains arrive there, the bottom benches of the pit, which is where the high-grade sits, can't be accessed. So we're stockpiling that material, and that accounts for most of the inventory increase. As for the leach pad kinetics, you're right, we're a little bit behind, mostly on gold, when it comes to that kinetics. And interestingly, it relates to this connection between 2 of our leach pads, Pad 3 and Pad 1, and it's an area where the ore isn't that deep. It's in an area where the ore is pretty shallow. And making that connection is just tricky — the topography there, the terrain there is very challenging. So what happens is we have to load and leach very quickly and then get off of it, and we're going through a number of cycles there and trying to stabilize the heap as it builds and connects to those 2 areas.

Steven Busby

executive
#27

We therefore need to get through that section really fast and bring our leach cycle times down, and that is the impact of what we are observing in that area.

Cosmos Chiu

analyst
#28

All right, thanks. So I take it that not every bit of the inventory increase ties directly to recovery — some of it also comes from mine sequencing, given the higher grades?

Steven Busby

executive
#29

Precisely. A substantial portion of that comes from my own sequence.

Cosmos Chiu

analyst
#30

Understood. All right, so perhaps one final question from me. Regarding Manantial Espejo, I notice the guidance there has been reduced by roughly 8% to 10%. I believe I raised a question on the Q4 call too. Michael, a substantial portion of that earlier guidance hinged on the ramp-up of COSE and Joaquin, more or less. Now that production guidance for Manantial Espejo is lower, how much have you built in for possible delays or setbacks at COSE and Joaquin?

Steven Busby

executive
#31

Yes, Cosmos, this is Steve once more. To be honest, things are going quite well at COSE and Joaquin in terms of mining. What holds us back is having sufficient miners available there to pull out the tonnage we're aiming for. Also, we're working what you might call the early stopes located on the deposit's fringe. As a result, grades have come in lower than our expectations. That makes it even more critical to extract additional tons, and staffing is what restricts us there. The tonnage issue is truly what we're concerned about, and it's the reason we don't expect any easing over the foreseeable horizon — at least through the coming few months. That is genuinely what pushed us to conclude we must cut the tonnage produced at COSE in Joaquin relative to our initial forecast, and compensate for it with lower-grade output from Manantial Espejo — that's the overall consequence of this adjustment.

Michael Steinmann

executive
#32

Perhaps I should add some context here for those who aren't very familiar with South and Patagonia when it comes to underground mining. Most mining companies, ours included, bring in their underground miners from various provinces, and some, of course, from the province itself. Open pit miners, though, can be found within the province, while for underground mining, many companies also draw workers from other provinces. And that's really where the problem sits: interprovincial travel is heavily restricted in Argentina, which makes it harder for us to get the tons out of the underground operations there. So that explains the reason behind that change.

Operator

operator
#33

Trevor Turnbull from Scotiabank has the next question.

Trevor Turnbull

analyst
#34

I've got a question, I suppose, about Bell Creek. It came up near the close of last quarter — you were doing some geotechnical adjustments to handle what sounded like broader ore. So I'm wondering whether it's simply a matter of installing extra support or additional rock bolting, that sort of thing, or whether there's a bigger planning component in how you tackle those zones. The reason I ask is that the fix appears as though it will take a while. You mentioned it getting more or less back to where you want it later this year. To me, that suggested it might be more than just putting more hardware onto the problem.

Steven Busby

executive
#35

Trevor, this is Steve. Yeah. So what we've got going on there is a bit of instability and some ground control problems on the sill pillar in a couple of stopes that we began mining late last year. That wider zone is actually an opportunity in our view, and it sits in the lower — the next levels of development at Bell Creek. So we're eager to get into that lower development, because we had to slow the mining down in order to install more ground support, more seismic activity monitoring, and more controls around the sill pillar, so to speak. And so it slowed mining in that area. So that's what brought us down late last year. As we said last year, we're advancing on this wider zone, which is the next levels down. And so we're eager to get into that around midyear this year so we can get our tonnage rates back up. And throughout, we're redesigning these sill pillars to try, through the mining sequencing and the support — the combination of those 2 factors — to try to avoid those problems in the future.

Trevor Turnbull

analyst
#36

All right, and perhaps a brief cost-related question. At a lot of the silver segment operations, your costs declined, clearly, with La Colorada being the exception, and you've mentioned Manantial. Yet for the rest, you actually reduced the cost guidance going forward. Your base metal assumptions have stayed the same. So that doesn't appear to be the driver. I was just wondering what is behind those improved figures.

Robert Doyle

executive
#37

Yes, Trevor. This is Rob Doyle. Yes, we're observing some byproduct credits flowing in, and that's providing support, and that's the primary driver there. And with the robust base metal output, our base metal guidance remains unchanged. So the benefit really comes on the byproduct side, where we're seeing those gains.

Operator

operator
#38

Our following question comes from Don Demarco at National Bank Financial.

Don DeMarco

analyst
#39

All right. Perhaps I'll begin with Shahuindo. The gold guidance has stayed the same, which is excellent to see. Still, we did observe some of the weaker output coming from Timmins, and that's already been covered on this call. But I also notice that Shahuindo appears to be running under the run rate. Could you just remind me about the seasonal effects on Shahuindo, or confirm what I'm expecting for a year that's accentuated and back-end loaded?

Steven Busby

executive
#40

Yes. Don, Steve here. What took place during Q1 was that, with our mine sequencing, we began opening the new phase of the mine, and we hit material that was finer grained and more clay-like than expected. And that's — at the moment, our objective is to blend that type of material with good-quality rock before putting it on the leach pad, so we make sure permeabilities are good for leaching. And we didn't have sufficient rock in this new section of the pit. So we've stockpiled, as Michael mentioned, 335,000 tons. So roughly 10-11% of what we mined in the quarter went into stockpile, which hadn't been anticipated. Once we get into the rock in that section of the pit, we'll be able to take that stockpile and blend it with better rock and place it on the heap. So that's the reason we expect expanded production rates as we progress through this year at Shahuindo this year.

Don DeMarco

analyst
#41

All right, that's excellent. So perhaps we can go back to the question about how COVID's effects are weighing in, and I do appreciate the detail Michael gave regarding the emphasis on underground operations. But to dig a bit deeper, are social distancing rules what's creating the problems, or is it supply chain delays? What exactly at the ground level is hurting production performance? And what signs do you see that this can be fixed through a vaccine or whatever other steps are being put in place?

Steven Busby

executive
#42

Yes, Don — Steve here once more. One major element that restricted how many people we could put to work underground during COVID is essentially camp capacity, since we must space everyone out across the camps. What we've observed is that at the open pit mines, there's been sufficient construction camps and similar facilities at those large operations that spreading people around is fairly simple. At the underground mines, we lacked that flexibility of having surplus camp capacity. We've been adding extra camp capacity at all of the — at numerous underground operations. Yet that has truly been the bottleneck. And as I said before, we've also witnessed some epidemic spikes in the areas that have been mostly — I'm not sure why — centered on certain underground mines of ours, such as La Colorada. We detected that via our testing while mobilizing workers. We're simply encountering plenty of people who fail those screenings whenever an epidemic is underway. So it has cut our workforce and our capacity to deploy there. That's why we believe that with the vaccine rollout, once we're able to ease some of that physical distancing and open more room in our camps, and then screen out fewer individuals as they arrive for work, it will genuinely boost our production throughout the year — that's how we forecast it.

Michael Steinmann

executive
#43

I'll also jump in on this. Take La Colorada, for instance, where we're running very extensive drilling campaigns — not just for exploration, but also on the skarn side, for infill drilling, and for the PEA. That means a lot more personnel are needed at the site. As you can imagine, there are many additional contractors and a great number of specialists assisting us in gathering the data for the PEA. And clearly, as Steve mentioned, once more people are on site, everything becomes more complex. Everyone undergoes testing. Certain individuals fail the screening. So complications definitely arise on every front when you're operating in an area with large, larger outbreaks. And like I said, this tends to shift from one region or country to another, as you can observe by looking at the virus map across recent years. Countries can suddenly experience bigger outbreaks. We just went through that in Canada, where we're now emerging from what I believe is the third wave. The same pattern occurs in Latin America. Regarding your question about the vaccine, we observe that rollouts are proceeding slowly, yet in every country where we operate, I believe.

Michael Steinmann

executive
#44

Certain ones move faster, others a little more slowly. Clearly, I’m not in a position to comment on how effective that vaccine is. All I can do is observe what took place elsewhere around the world, and it appears that nations with a high vaccination rate are seeing effectiveness that is very large, very important, for that vaccine. We observe that in Israel, in the U.K., in the U.S. I believe we’re seeing it begin to take hold here in Canada as well. And obviously I would assume we’re seeing the same across the globe and also in the countries where we are working in Latin America. So that really is what I meant with my remark about the vaccination rollouts.

Don DeMarco

analyst
#45

All right, and my last question concerns moving over to the La Colorada skarn. This is certainly a very significant catalyst, and last night you put out a drilling update along with the financials. So from what I can see, there was a highlight hole that came in at 11.7% zinc equivalent across 115 meters. That's above the average grade we calculate, which is somewhere around 8% or so on the other intercepts. How do you find the -- are you really getting high-grade hits like this? And what does it mean for proximity to infrastructure, possibly sequencing some high-grade zones or the like? Any extra color on this particular highlight would be appreciated.

Christopher Emerson

executive
#46

Yes. Don, Chris here. Yes. No, what I mean is that we are clearly doing infill drilling. So high-grade results were what we were hoping for, and in inverted commerce everything is proceeding as planned. Sure. As mentioned earlier, those 30 drill holes — and the particular one you are asking about — sit within that core, which lies very near the intrusive. That is where we have this exoskarn, and it is where the fluids came up and then more or less dispersed outward. So really, around this higher-grade core — which will be the focus of the PEA and where all the infill drilling is taking place — we do expect to encounter these high-grade zones. As we move westward, we get into more of the breccia. So this lies between the breccia and the intrusive, and that is where we anticipate finding those high grades. Specifically, once we went beyond the breccia on U-40, we began to see additional skarn, which is very encouraging for the team and certainly for expanding this project as we go forward.

Michael Steinmann

executive
#47

Yes, I’ll add a few thoughts as well. It really is quite striking. Naturally, if you consider the infill drilling, that is roughly what Chris mentioned the area will be used for in the PEA. Still, it should not be overlooked that those step-out holes to the West or Southwest pass through that breccia, and we are encountering additional broad high-grade skarn intercepts in zones we had not previously identified. As I noted during the call and in the press release, our current emphasis is on infill drilling since we already hold more than 100 million tonnes of resource. That allows us to move it toward the PEA, but it certainly appears that skarn mineralization will keep extending westward. We do not yet know how far out we are drilling at present while still intersecting wide high-grade intervals. So that area remains wide open. And once the information needed for the PEA is available, I am sure Chris and his team are eager to explore farther to the West and grow the size of the existing resource.

Don DeMarco

analyst
#48

All right, all right. That's everything from my side. And best of luck as you get production and costs back on track for the remainder of the year.

Operator

operator
#49

We'll take our next question from Lawson Winder at Bank of America Securities.

Lawson Winder

analyst
#50

Thanks for that update, Michael, Steve, and the team. You come across as quite sure that the ventilation problems at La Colorada are going to be fixed. To me, that certainty is entirely logical. Still, I'd like to dig into it a bit further, if I may. I'm aware we've discussed this extensively already, specifically regarding the schedule and the cost effects involved. So let me just ask: under the present setup — what amount of ventilation does La Colorada have right now? And with only the ventilation you currently have running and operational, for how long could you keep mining?

Steven Busby

executive
#51

Yes. Thank you, Lawson. In approximate figures, we are currently pulling roughly 350,000 CFM across the entire operation. That is the factor capping us at a capacity of 1,500 to 1,600 tonnes per day. We hold substantial reserves in the levels reachable at that ventilation rate for a good while yet. Once more, the grade is lower. It is simply to run at that level, and we foresee no future restrictions on that. That is something we can keep up. As we develop these additional ventilation raises, the blocked one and several of the others, we expect to reach approximately 900,000 CFM, which is the level needed for 2,200-2,400 tonnes per day. And again, I want to emphasize that the problem lies in this volcanic dacite material. Historically, every ventilation raise at La Colorada was just a raised bore. No personnel or equipment were sent down those holes to support them. At the shallower mining levels at La Colorada, those were sufficient. They stayed intact without issue. The airflow rates were sufficiently low. We observed no signs of erosion developing over time. As we progress further down this ore body, temperatures rise, condensation increases, humidity goes up, and our float rates must rise as well, especially given the greater production rates we now have.

Steven Busby

executive
#52

So once we start pushing additional air — hotter and wetter — through those raises in the dacites, we're beginning to observe erosion in them. So it's clear that over the long term, this has been — I would call it an excellent learning tool for us as we prepare for the skarn, since we must build quite a bit of infrastructure through this type of material for the skarn. So what we've picked up here is enormously valuable as we head toward that skarn project. And we found that you have to — we need raises that are fully aligned and fully supported. We can no longer have unlined raises going through this dacite material. And that's the reason we're examining alternative technologies and possibly even blind shaft excavations for the raises we do in the future. With those, we're fully confident that we can achieve the flow rates required to keep this operation running strongly into the skarn and the large production rates of the skarn.

Michael Steinmann

executive
#53

Regarding what you asked, Lawson, about what those would cost: I believe we began this raise at roughly $4.5 million. Given all the extra work involved, we'll likely land in the vicinity of $6 million. So it's a solution whose cost is considerably lower. But as we found out, even when grouting is used, issues can still arise. Steve has told you about the confidence for the concrete line, the larger blind shaft excavation, since we have a completely lined shaft that we use for extraction — one exceeding 600 meters in length that we constructed in 2017, correct? And clearly it operates daily. We use it to extract the ore. It's fully concrete lined, large diameter, I think 5 meters, a 5.1 diameter shaft. So naturally that carries a higher cost, but we know we're capable of building it. And when we consider skarn and the much, much greater throughput at La Colorada, that's likely the direction it's headed.

Lawson Winder

analyst
#54

Okay, that's really helpful context. The added expense of doing more shotcreting in the raises that already exist is in fact pretty minor. Now, if you had to switch to blind raises for all upcoming ventilation, what extra cost would that involve? Say you took the first existing ventilation shaft, or the one completed most recently — how would that figure compare with the full blind cost, or rather, what a blind raise would cost?

Steven Busby

executive
#55

Yes. And to be clear, the $6 million figure we're discussing covers the development and the bypass raise bores too. Shotcreting by itself isn't the whole of it. But we haven't yet put together an estimate for the new blind shaft. That work is underway right now and we're at it diligently. What I can point to, though, is what Michael mentioned — our existing shaft, 5.1 meter diameter, 620 meter deep, with full concrete lining. That shaft comes complete with the hoist, all the gear, and the head frame. So I mean, for a ventilation shaft we wouldn't be looking at that. It would be just the concrete lining, without the hoist and all the rest behind it. But that shaft, we completed it in 2016-2017, and it cost $38 million, taking about 12 months once we began the blind excavations. So obviously, minus the hoist and head frame and all the rock handling equipment, the figure will come in lower, but there's no estimate yet that I'm ready to share at this point.

Michael Steinmann

executive
#56

And naturally, with a diameter like that and a large, deep ventilation shaft, this infrastructure isn't just for the current output from the La Colorada veins — it also supports partial development for future production from the skarn, which will definitely require a huge, very large-diameter, long ventilation shaft to handle much greater tonnage. So I'd describe that as essentially the first step in expanding, or advancing the mine, toward skarn development.

Lawson Winder

analyst
#57

Yes. Okay. That's really helpful context. So, Steve, you just said—replying to my previous question, or actually my first one—that a lot of lower-grade reserves were indeed sitting up front. And I suppose, when you say a lot of reserves, you mean in terms of years rather than quarters?

Steven Busby

executive
#58

Absolutely, and that spans a number of years — correct.

Lawson Winder

analyst
#59

All right, all right. Well, that definitely leaves me feeling a good deal more confident.

Michael Steinmann

executive
#60

Keep in mind that right now, as I recall, we have roughly 11 years of reserves in veins—just the veins in front of us—and probably a comparable number of years in resources, with Chris and his team each year converting a deeper slice from resource into reserve. But yes, I believe we're at approximately 11 years of reserves. Naturally, we'll publish our reserve and resource update at midyear, just as we do now annually.

Lawson Winder

analyst
#61

All right, thanks. And last thing on the clay: have you begun the required EQ work and the other drilling needed to figure out where that clay sits, and maybe to model the controls on it so you can forecast where it could show up and, ideally, steer clear of it as much as possible going forward?

Steven Busby

executive
#62

Absolutely, and thanks for asking that, Lawson. Before launching this raise, we carried out a substantial geotechnical drilling campaign. That work is exactly what informed the pre-grouting program we ended up putting in place. As for mapping clay zones specifically, we haven't been able to do that in a way that would let us bypass them or relocate around them. They tend to be intermingled, and their distribution is highly erratic. Sadly, that's simply the nature of this material. And the further east we go, the more problematic it becomes — this is the type of ground we'll have to find some method of handling. That's simply how it is.

Lawson Winder

analyst
#63

All right, so that's why there's talk about possibly doing blind raises that are fully concreted. Okay, that makes sense. All right, thanks a lot, everyone. That clears a great deal up, and I appreciate you taking the time today.

Operator

operator
#64

Our following question comes from Ryan Thompson at BMO.

Ryan Thompson

analyst
#65

I have a few questions, and they're more on what you might call the social, political, and legal front. In your disclosure, I saw that a legal proceeding was recently filed at Escobal. Could you give us some detail on that, and is there any chance it could cause delays to the ILO 169 consultation process? Or would that legal proceeding essentially proceed alongside it?

Michael Steinmann

executive
#66

Yes. I'll begin, and then perhaps hand things over to Christopher Lemon as well. Honestly, I don't see any further postponement of the pre-consultation. What actually caused the delays is this: as we announced last quarter, I believe on our previous call, the pre-consultation had been scheduled for April. Now it's set for later this month. The reason, really, is that roughly 5 days or a week before it was supposed to begin, the government of Guatemala issued a new decree that sharply restricted gatherings of people and travel. Naturally, under those circumstances, the government couldn't move forward with holding large meetings for a pre-consultation. So it truly stemmed from what was likely the second wave there — yes, the second wave of COVID that we've witnessed in Guatemala, which took a strong hold. That, then, was the actual cause of the postponement. We're very much looking forward to getting into this pre-consultation, hopefully later this month now. And I really don't view this as yet another cause for delay. It's genuinely a COVID-related matter, the kind we encountered last time.

Christopher Lemon

executive
#67

Ryan, this is Christopher Lemon, General Counsel at Pan American Silver. A small community close to Escobal has filed this claim. It resembles many of the claims we handle across all our operations. It definitely will not affect the consultation process, and we will address the claim and put forward our defenses, and we don't anticipate any difficulty in defending it.

Ryan Thompson

analyst
#68

Understood. All right, so let's turn to Peru for a moment. Clearly, there's quite a bit of talk on the political side there, and the story appears to shift daily, from what I can tell. I was just hoping you might be able to offer some kind of comment on what you're observing or picking up from folks on the ground in Peru regarding the election coming up in early June.

Michael Steinmann

executive
#69

Okay, so generally speaking, it's clear that elections happen wherever we operate, roughly every 4 or 5 years depending on which country it is. That's simply part of a normal democratic process, and in this instance, the people of Peru are going to choose their next leader. We've been in Peru for a very long time, since '94 — right from the beginning of the company. Peru was a good place, and I think it always has been a good place to work, and we will work with the new leader and the new government, the new — in the same manner that we work with the outgoing administration. So I can't give you — clearly, you can look at polls or not. I don't know, looking around at elections across the globe, how predictable the polls actually are or not. We can discuss about it all day long. So obviously I'm not going to make my predictions here because we'll just wait and see what happens. And as I said, this is in the hands of the proven population electing their next leader as it should be.

Ryan Thompson

analyst
#70

All right, and maybe as a final point, copper prices certainly look quite strong at the moment. Could you give us any kind of update on La Arena 2? I know there has previously been some consideration of potentially selling it. Are you noticing greater interest? Or could you simply provide any sort of update on that?

Michael Steinmann

executive
#71

Absolutely. Naturally, there's been a great deal of curiosity about copper. It's behaving the way I anticipated, and plenty of folks—clearly I'm not alone in this—recognize that we're seeing a robust rebound in the global economy following the pandemic. There's a major push worldwide toward electrification, which, as I've consistently said, is going to need a great deal of copper. Beyond that, it will also call for plenty of silver, and a lot of battery metals too. Silver, naturally, will be indispensable for all the electronics and for clean energy generation. So it's tracking where we expected it would head, in my view, and I believe we'll continue to witness that sturdy demand. You've likely seen the Silver Institute's report covering last year, in which we clearly observed a drop in silver demand on the industrial and jewelry fronts stemming from the pandemic—yet it wasn't actually as steep as I'd have anticipated, and it's bouncing back quite well, even as we saw record inflows into the ETPs and on the investment side. So naturally, that explains why my silver price stands where it does at present.

Michael Steinmann

executive
#72

On La Arena, I've mentioned on numerous occasions that drilling continues there. We're continuing to uncover additional gold reserves. The reserve update at midyear will be quite interesting to see, but we've already stated that — I believe at present we still have at minimum another 3 years of production coming from the gold oxide. So we remain a considerable distance from the sulfides of the porphyry located below. That said, with copper prices where they are, there's certainly growing interest in a project such as La Arena, as you might expect. And on the exploration front we'll push the project forward diligently to establish, clearly, how our production plan is progressing in the years ahead, while at the same time examining a potential divestment of the porphyry, which is a very different project, much, much further out and probably further out in that regard, since the oxide side now has longer and longer reserves than we originally anticipated.

Operator

operator
#73

That wraps up the question-and-answer portion. At this point, I'd like to hand the conference back to Michael Steinmann, who will offer some closing remarks.

Michael Steinmann

executive
#74

Thanks a lot, and I really appreciate you joining the call today. I’m looking forward to bringing you up to date on our Q2 results, which will come out sometime in August, during the summer. So please stay safe and stay healthy. And I look forward to catching up in a few months. Thank you so much.

Operator

operator
#75

That brings us to the end of today's conference call. You're welcome to disconnect your lines at this point. Thanks for joining us, and we hope you have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.