Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary
August 11, 2021
Earnings Call Speaker Segments
Siren Fisekci
executiveGood morning, and welcome to the Pan American Silver second quarter 2021 conference call. Those of you from the media and other participants joining us are invited to take part in listen-only mode. Our results came out after the market closed yesterday, and you can find a copy of the news release, the MD&A and the presentation slides for today's call on our website. The material in today's call includes certain statements and information that constitute forward-looking statements and information. We ask that you review the cautionary statements included in our news release and presentation, along with the risk factors described in our most recent Form 40-F and Annual Information Form. Joining us today from Pan American are President and CEO Michael Steinmann; Steve Busby, Chief Operating Officer; Rob Doyle, Chief Financial Officer; Martin Wafforn, Senior VP, Technical Services and Process Optimization; and Chris Emerson, VP, Business Development and Geology. I'll now hand the call over to Michael for a brief overview of the results before we open the call for questions.
Michael Steinmann
executiveThanks for being with us today as we go over the results for our second quarter. During Q2, we turned out 4.5 million ounces of silver along with 142,300 ounces of gold. Several factors held silver production back: the ventilation constraints at La Colorada, mine sequencing at Dolores moving into higher gold and lower silver grades, the timing of heap leach sequencing at both Dolores and Shahuindo, and COVID-19 related protocols that restrict how many workers can be deployed. At La Colorada, ventilation constraints have been weighing on silver output for the last 18 months, ever since some ventilation infrastructure failures occurred. Like we said before, construction had wrapped up on a fresh primary ventilation raise that goes from the surface all the way down to the 345-meter level at the higher grade Candelaria East deposit. But when we commissioned it in Q1 2021, the bottom 42 meters of that raise became blocked. We were quite happy that in July we got that blockage cleared, put on shotcrete, and brought this key ventilation raise at La Colorada into full commissioning, which brings quality ventilation back to the most valuable section of the deposit. Mine development is now in progress so throughput rates can climb. Now that this project is done, along with a number of other upgrades to the ventilation circuit, overall ventilation flow rates should be close to the levels we saw in 2019. During Q3 2021, our plan is to bring two additional major ventilation raises back into service, and that will drive total airflow beyond where it stands now — reaching a level 50% higher than what we saw in 2019. Then, early in 2022, we anticipate starting early-stage construction on a refrigeration plant tied to the future development of the skarn deposit. That project would lift overall ventilation flow rates to 180% of 2019 levels, further enhancing the working conditions we currently have in the deep, high-grade sections of the mine. As we focus on growing the La Colorada mine and advancing the skarn deposit, our Board gave approval yesterday for a new concrete-lined ventilation exhaust shaft serving the eastern part of the La Colorada mining area and positioned above the northern boundary of the new skarn deposit. We think this ventilation solution will be strong and long-lasting for the tough ground conditions in that mine area, giving extra protection against future premature failures of ventilation infrastructure. In the future, this shaft can be extended to supply ventilation infrastructure for development of the deeper skarn project. We estimate that constructing the shaft — 5.5 meters in diameter and 560 meters deep — will cost roughly $47 million, and it should be finished in early 2023. Q2 gold production came to 142,300 ounces, helped by mine sequencing into higher grades at Dolores and La Arena. We also built up 23,800 ounces of in-heap gold inventory at Dolores and Shahuindo. The bulk of that should hit production during the latter six months of the year. Over at Bell Creek, we continue to mine at lower rates and grades while we adjust our mining methods and ground support system to suit the wider ore expansions within this section of the mine plan, and we anticipate output rates climbing in the back half of the year. At Shahuindo, as we noted last quarter, we're working through a pit area whose host rock is more fine-grained and contains greater clay levels. During the second quarter, we stockpiled approximately 857,000 tonnes of this fine-grained material — that's 23% of the ore we mined in the quarter. Later this year and into 2022, it will be blended with coarser ores that we'll mine and place on the heaps, which supports higher output in the second half of 2021 and aligns with our annual estimates. In addition, we are looking at the possibility of operating the agglomeration plant to process this fine-grain material beginning in late 2022 and in 2023. Doing so could increase gold production rates at Shahuindo, but compared with our blending and run-of-mine heap leaching, it would mean additional operating costs for the plant. Looking ahead, we anticipate a stronger performance in the latter portion of 2021, and we've kept our production guidance unchanged from the revision made in May 2021. For the silver segment in Q2, cash costs came in at $12.71, while all-in sustaining costs reached $16.36 for each silver ounce sold. Those cash costs mirror reduced silver output, fewer gold byproduct credits resulting from Dolores being shifted into the gold segment during 2021, higher treatment and refining charges stemming from a larger contribution out of concentrate mines, plus greater royalty costs, chiefly at San Vicente mine. All-in sustaining costs for the silver segment encompassed $4.19 per ounce in sustaining capital, reflecting additional spending on the critical ventilation project at La Colorada. During the second quarter, cash costs for the gold segment came in at $857, while all-in sustaining costs reached $1,163 for each gold ounce sold. Those cash costs benefited from Dolores being shifted into the gold segment as well as the present sequencing at La Arena, which produced greater throughput and grades—gains partly offset by lower grades at Bell Creek and by higher waste mining rates and/or stockpiling at Shahuindo. Our operations remain affected by the COVID pandemic. We're still following health and safety protocols that hold back how many workers we can deploy, which trims normal throughput by roughly 5% to 10%, and that hits our underground mines proportionally; those same protocols add expense and push some project work from 2020 into 2021. In the first half of 2021, energy, wages and consumables showed cost increases bigger than we had anticipated, and the Canadian dollar came in stronger; even so, by July 2021 these seem to have flattened out, so we're keeping our cost guidance for the year as it stands. Beyond that, we anticipate COVID's effects will lessen across the coming two quarters, and we take encouragement from the growing vaccination rates in a number of the jurisdictions where we operate. Vaccination efforts are, naturally, essential in the fight against this virus. In Q2, we committed our support to UNICEF Canada's GiveAVax campaign. The goal of that effort is fair worldwide access to COVID-19 vaccines through delivering 2 billion doses of COVID-19 vaccines to low and middle-income nations prior to the end of 2021. Turning now to our financial results. Q2 revenue totaled $382.1 million. Revenue was affected by a $45.1 million buildup in dore and concentrate inventories along with a $47 million buildup of heap leach inventories during the first half of the year, and both are expected to normalize and lift revenue for the second half of 2021. Inventory buildup accounted for most of the $37 million used of cash from working capital, producing operating cash flow of $87.1 million in Q2. Once all the sustaining requirements of our business, project capital and dividends were funded, cash and short-term investments climbed to $240 million at June 30. That figure includes the sale of noncore assets totaling $14 million. We completed a sale of a royalty portfolio to Maverix, and we got nonrefundable deposits tied to the divestiture of the Waterloo exploration-stage asset. That Waterloo deal closed in early July, at which point we collected another $22.7 million that will show up in Q3. On top of that, we kept a 2% net smelter royalty covering any production that comes from the asset down the road. Q2 net income came in at $71.2 million, or $0.34 per share, mostly on the back of robust mine operating earnings of $103 million. Adjusted income for Q2 stood at $46.6 million, or $0.22 per share.
Michael Steinmann
executiveGiven the robust operating cash flow we saw in Q2, along with our strong financial footing and a better outlook for operations, we announced a 43% raise in the quarterly dividend, bringing it to $0.10 per common share. That represents the third time in the last 18 months that the dividend has been increased. Now I'll give a quick update on the catalysts across our portfolio. At La Colorada, work continues toward delivering a preliminary economic assessment for the skarn deposit late in 2021, and that assessment will contain an updated resource model. At Escobal, 2 pre-consultation meetings have taken place so far under the ILO 169 consultation process for the mine. A third meeting, which had originally been set for July 17, 2021, was pushed back to August 2021 because of the COVID situation in Guatemala. The key agreement from those first 2 meetings is the need to prepare a cultural and spiritual impact study covering the Escobal mining project. We're encouraged that the court-mandated ILO 169 consultation process has begun with wide participation, yet we cannot give any timing on the consultation process or on a possible restart of the Escobal mine, since the details of that process remain undetermined. At our Navidad project, the legislator in Chubut, Argentina still has not voted on the amendment to the mining law that would permit open-pit mining in certain zones of the province, and we don't know when that bill might be debated. The legislator did, however, reject a bill that would have banned mining activity throughout the entire province. After yesterday's market close, we also reported our estimated mineral reserves and resources as of June 30, 2021. Silver mineral reserves are estimated at 529 million ounces, and gold mineral reserves at 4.2 million ounces. COVID-19 restrictions cut the exploration program by 50% over the past year, though we did complete the planned exploration program for Timmins and the La Colorada skarn. At La Arena, we replaced 141% of the ounces mined, adding another year of mine life. Mine life also gained another year at Timmins, where discovery of 209,000 ounces of gold in new mineral reserves replaced 147% of ounces mined. At La Colorada, ventilation restrictions held back exploration activities. Even so, the recent upgrades to the ventilation circuit should let us ramp up exploration drilling at this long-life mine, where we hold over 100 million ounces of silver mineral reserves and 192 million ounces of inferred resources, including the large skarn deposit; for the 12-month period ending June 30, 2021, Pan American's producing mines replaced 8 million ounces of silver mineral reserves and 98,000 ounces of gold mineral resource. Total reserves at Shahuindo were affected by containing gold production of 193,000 ounces and by the reclassification of 146,000 ounces of gold mineral reserves into resources, which contributed to a total depletion of 339,000 ounces of gold based on geological interpretation, cost estimates and cutoff grades. Moving the La Bolsa project out of mineral reserves and into resources cut gold mineral reserves by 315,000 ounces, and silver mineral reserves dropped by 4.5 million ounces as well. La Bolsa is a noncore asset that the company plans to divest. Pan American holds one of the largest silver mineral resources and reserves anywhere in the world. With that said, I would like to open the call for questions.
Tyler Langton
analystTo begin with, I wonder if you could give a bit of color on the effects of COVID you're seeing right now — particularly at La Colorada and Manantial — and how that compares with a quarter ago. Then, just on your guidance, do you need COVID-related restrictions to keep easing, I suppose? I'm simply trying to get a sense of how sensitive the guidance is to COVID restrictions, roughly speaking.
Michael Steinmann
executiveYes. This is Michael. I'll begin and then hand things over to Steve, who can give you more detail on the operations. As you remember, at the start of the year, we assumed restrictions would ease in a straight line each quarter, with the first quarter unaffected being Q1 2022. Naturally, life doesn't move in straight lines. We're aware of that. So I believe we certainly experienced a larger impact than we had assumed, still in Q1, and perhaps somewhat at the start of Q2; we clearly are seeing strong improvements at present, with quite impressive vaccination rates in most locations where we operate. So I think the trend will simply be similar to everywhere else in Latin America. And hopefully it becomes easier for us. But impacts definitely remain; and perhaps Steve can share some further details.
Steven Busby
executiveYeah, Tyler, let me just jump in and build on what Michael said. It's obviously tied to vaccination rates. Just like in North America, once we're able to push vaccination rates up to 50%, 60%, that's when I think we can finally begin loosening those COVID protocols and restrictions. At the moment, we're probably at roughly 20% of our workforce in Mexico, and maybe as high as 40% in Argentina. During the first half of the year, it really was a very sensitive period for us, and we did see a lot of cases arriving at our dates that we had to turn around, and we had high numbers of people who had to stay out of the workforce; so it definitely brought some challenges during the first half, and we're hoping vaccination rates, as Michael mentioned, are picking up a lot, and we're optimistic that as we move into the second half, we'll see the easing that we projected in our current forecast.
Michael Steinmann
executiveTo wrap it up, we're seeing roughly $7 million in cost each quarter, correct, just as we had assumed at the start of the year, and that essentially covers everything we're doing on testing, quarantines, extra transportation. And so every one of those additional COVID costs we're seeing. So I'd say we're largely on track on that front with what we assumed at the start of the year.
Tyler Langton
analystAll right, that's useful. Then, I suppose, regarding La Colorada and the ventilation obstruction — now that it's behind you — could you say a bit about how fast throughput, grades, and I suppose output ought to pick up in Q3 and Q4, and how costs get better too? Any detail on that would be a help.
Michael Steinmann
executiveYes, of course, Tyler. Some context first: we've come to see that many of those infrastructure breakdowns over the past couple of years essentially stem from a problem with heat and humidity. When we go deeper and farther east on this deposit—especially in the high grade—we're encountering bigger jumps in heat and bigger jumps in humidity. What we're finding is that the acetic ground we have genuinely begins to break down under that added heat and humidity, and that is what gave way in those raises. Developments are presenting difficulties to a comparable degree as well. What we've come to recognize is that there's some catching up needed on shotcreting our developments, much the same way we shotcreted these raises in order to recover them. At present, our forecast projects roughly a progressive 10% to 15%—call it—rise in throughput every quarter ahead relative to where we stood in Q2, and perhaps a 10% to 20% gain in silver grades per quarter too, as we advance, open things up, and get ahead on development into that higher-grade zone. That's what we've built into the forecast, and we feel fairly confident about achieving it.
Cosmos Chiu
analystMy first question is probably about Dolores. During the previous quarter's discussion, we brought up leach kinetics. At that time, I believe you mentioned stockpiling higher-grade ore ahead of the rainy season, plus stabilizing the leach pad area between Pad 1 and Pad 3. Can you give us an update on where things stand? I assume we're in the rainy season in Mexico now. So have you begun stacking any of that higher-grade material? And what effect has that had on recovery?
Michael Steinmann
executiveYes, we did succeed in stockpiling the high-grade material during the dry season. The agglomeration plant keeps running, and we're well into the wet season now, so that high-grade material is moving through the plant quite nicely. On leaching kinetics, we are dealing with — or have been dealing with — a design and construction challenge, attempting to tie the valley fill leach Pad 3 into the earlier sidehill leach Pad 1, which we're rebuilding from the original Minefinders build. Leaching in some of those areas was held up until we could install some buttressing and put liners in place in a manner that ensures stability there, since the geometry is very challenging given some of the steep terrain in that area. That limited our ability to leach there, and that in turn grows the heap inventory. That's the situation. Right now, we've pushed heap loading forward into the unaffected areas. So we expect to get away from building those high inventories that we've seen over the last 9 months or so. We're collaborating very closely with our heap designer and expect to bring leaching back online in that area within the next few months or so, and that will begin drawing those inventories back down. So really it's just a matter of the geometry there being a bit tricky, and it calls for some buttressing along with unique liner placements and handling of the preg solutions flowing through that connection between the valley fill and the old sidehill heap that Minefinders built.
Cosmos Chiu
analystAnd as far as the impact goes, Steve — right, Michael.
Michael Steinmann
executiveSorry, let me just add one more point. That's a great detail Steve shared with us. But clearly, Dolores keeps going and we've been stacking for many years already. And with the heap leach, that stack grows thicker and thicker. So obviously it will take longer and longer to recover the gold and silver here. Just the amount of time required, given the thicker and larger volume of material there; but Steve — obviously Steve factored all of that into his planning and forecast.
Cosmos Chiu
analystOf course, I completely get that. And that sets up my follow-up question nicely. When I calculate it as ounces stacked against ounces produced, I come up with "a 65% recovery for silver and 59% for gold in Q2." Silver did actually get better than the first half average of 59.6%, though gold has remained roughly unchanged. Should we be looking for that to get better in the second half?
Steven Busby
executiveYes; it definitely is — gold will improve more quickly. That comes down to our faster leach times. So those inventory builds have a bigger effect on gold than they do on silver, given silver's long leach kinetics. So yes, it's definitely a timing matter. So building the inventory happens faster, and reducing it happens faster too, compared with silver. So that's what you're seeing there.
Cosmos Chiu
analystThat's great, and Dolores too. Looking at your reserve and resource update from yesterday, I noticed Dolores reserves were down year-over-year. Perhaps you could speak to that. If I've got the figures right, it appears tonnage-wise there was a drop of 9 million tonnes. I believe across the 12-month period, you stacked roughly 7.6 million tonnes. So it looks as though some tonnage may be unaccounted for. Were there any modeling adjustments? And on a brighter note, is it simply a result of insufficient drilling because of COVID-19 impacts? And could you locate additional ounces there?
Chris Emerson
executiveYes. This is Chris. Yes, no. Regarding reserve depletion, yes, you have depletion from production. But you're absolutely right, I mean we experienced some higher costs throughout the underground. So we did lose some reserves there. And stockpiles as well, we had some low-grade stockpiles that, because of rehandling costs and their positioning right now, have actually been flipped out of reserves. So you're right to say that net-net, the decrease was more than just production. And that really — we're seeing those slight changes attributed partly to cost, et cetera.
Steven Busby
executiveYes, and I’d like to add something there, Cosmos. We sterilized a low-grade stockpile located in the northern section of the property, which again dates back to the Minefinders era. That stockpile was always marginal, but under our current estimates we now consider it submarginal, as Chris mentioned, because of the leach pad handling costs and also the leach pad construction costs those tonnes must absorb. So it is a stockpile in the far north. Depending on prices, it could come back in; it simply has a long haul to get around the pit, plus the cost of building the pad that it has to absorb.
Cosmos Chiu
analystSure. Perhaps we can turn to La Colorada; and Steve, thank you for the guidance on what to expect for Q3 and Q4. I'd like to get a little more specific, though. In Q2, I believe you did roughly 14 tonnes to 15 tonnes per day.
Steven Busby
executiveThat's right.
Cosmos Chiu
analystSo it sounds like — as Michael said — ventilation flow rates could return to where they were in 2019, 2018; I'm revealing my age a bit here. Still, I recall that in 2019, despite a nameplate capacity of 1,800 tonnes per day at the mill, you ran roughly 2,100 tonnes per day, and close to 2,000 tonnes per day in 2018. Could you really get back to that level of throughput? Is that your target? And on grade as well — if I work through the numbers, I believe you'd need a grade above 300 grams per tonne in Q3 and Q4 to hit your guidance. Is that also the grade level you're aiming for?
Steven Busby
executiveYes, Cosmos — in terms of throughput, our present forecast doesn't expect us to average 2,000 to 2,100 tonnes per day in any of the upcoming quarters. As I mentioned, it's roughly a 10% to 15% rise for Q3 versus Q2, followed by a further 10% to 15% for Q4 versus Q3. That simply reflects catching up on the development I referred to. On grades, yes, we'll climb into the 300s, again with incremental quarter-over-quarter grade gains of about 10% to 20%, heading toward that reserve grade as we go into 2022. All of that is included in our forecast.
Cosmos Chiu
analystGood to hear that. Now, regarding La Colorada, I see there was a hold-up with concentrate transport at La Colorada dating back to Q1, and I had assumed it would largely be resolved by Q2, but it seems that isn't the situation. Can you provide a little more information on that? Is this a meaningful figure we're discussing? And when it comes to supporting guidance, was that counted within Q1 production? Or will it show up in Q3, Q4 production once the sale or the shipment of the concentrate actually takes place? And if that's the case, would it then actually benefit you through higher production in the second half?
Robert Doyle
executiveRob Doyle speaking. Yes, I'll handle that question. Yes, I mean, first of all, what has been delayed is revenue. We report production at the time we produce it. So the delay we've really experienced concerns the commercialization of that production; and at La Colorada as well as other places, we've encountered some logistical difficulties tied to the pandemic. You've observed from our balance sheet that finished production inventories rose by roughly $45 million across the first half of the year; and concentrate shipments specifically from La Colorada have been held back by delays in ship and container availability, which is the main factor we've wrestled with there. We are seeing that return to normal, and we have a very strong pipeline of shipments in Q3 and going into Q4. So we do believe those inventory levels will return to normal over the remainder of the year; in addition, we've also experienced some delays in dore shipments. In particular, there was a notably large shipment from Shahuindo in Peru that was held back owing to some complications surrounding the elections in Peru in June. So that was postponed and will flow into revenue in Q3. So it's — all of these are purely timing matters and will come through revenue over the course of time and, naturally, cash flow as well.
Cosmos Chiu
analystGreat. And then perhaps a final question about Shahuindo, since you raised it. You mentioned leach kinetics, and Michael said part of it involved stockpiling the fines and blending them later with some of the coarser ore. Some of it also sounds like it came from stockpiling higher grades toward the end of the quarter. We're roughly a month into Q3 now. Are you pleased with what you're seeing on leach kinetics and recovery? In that context, I went ahead and calculated the recovery, or the ratio of ounces stockpiled versus produced, and it came to 59% in Q2 against roughly 65% in the first half. Might that climb back to the mid-60% level, or even to some of the technical report figures of 70%? Or does reaching 70% require the question and agglomeration?
Steven Busby
executiveGreat question, Cosmos. This is something we're studying quite hard at the moment. First, because of the fine grain clay ore we're mining at high rates right now, we're trying to push those blends as hard as we can out to the heap. As a result, we do have to slow our application rates in certain sections of that heap, which does cut the kinetics and produces the kind of numbers you're describing; we won't see that — we probably won't get back to our normal rates for the rest of this year. We're still trying to model and understand how this fine and clay ore is distributed; it's somewhat challenging when the only exploration information you have is RC drilling. We're just not — we're not able to build those lithologic models confidently, and they matter so much to us right now. That's why we're somewhat hesitant to say we're ready to activate the agglomeration plant and that it will solve all these problems. We're not entirely convinced that's the right answer yet. We're examining that possibility. But in the meantime, we do try to process as much of that fine ore as possible by blending it at as high a rate as we can with the coarser ore and offsetting that with slower kinetics through reduced application rates; so that's what we're doing, and that's what we're forecasting going forward; we do believe this ore ultimately has very high recoveries, above the 70% in the studies we've done before. We've seen much higher extraction rates and expect to get there, and that's what we're trying to evaluate, understand, and model. It really comes down to a question of timing for the kinetics, and whether we need to agglomerate or not, and whether even after agglomerating, we think we would still need to leach at lower application rates and deal with slower kinetics than what we had with the great course ore we saw in earlier years.
Don DeMarco
analystAt La Colorada, there are several ventilation raises going from surface down to 345, naturally. I believe there's also another raise meant to supply ventilation to Candelaria, and perhaps a fully lined concrete shaft even further east. Would you be able to simply enumerate the ventilation raises you have scheduled at the mine across the medium term?
Martin Wafforn
executiveCertainly. <<inaudible>>. Yes, this is Martin Wafforn speaking. So regarding the surface to 345, that's the one whose bottom was plugged. We refer to it as the <<inaudible>> raise. So that's the one that was cleared only recently. That's one raise; there's a second one we call La Libertad, which runs from surface to just below 400 meters then; we had a failure in that one, and we're nearly finished getting it fully rehabilitated now in Q3. In August we're actually shotcreting the entire surface to 220 level section of that raise. And then we're carrying out 2 additional raises to bypass it at greater depth. Another important ventilation raise for us goes by the name La Estrella, located in the Estrella portion of the mine. As you may recall, La Colorada has 2 main parts, one named Candelaria and the other named La Estrella; so La Estrella, in the early part of Q3 towards the end of Q2 — sorry, towards the end of Q1 and the early part of Q2, we managed to take that one out of service and shotcrete it fully all the way from surface down again, it's just over 400 meters, Steve, and I apologize if I misspoke slightly there. We were able to complete that in June and July. So those are the 3 main ones. We also have intake ramps and an intake shaft. The intakes are the El Aguila shaft, from which we have roughly 200,000 CFM of intake coming in. We have the Compania ramp, which we used as an exhaust route while we had the failures in the mine, and it is now going back to serving as an intake airway. So a refrigeration plant will be placed on top of that. It's going to deliver cool air by the end of the year. And then we also have the San Fermin ramp. So that's roughly the — and it is a highly complicated circuit. This is a very large mine that's spread out laterally across a big long distance; and as both Michael and Steve have mentioned, we have heat and humidity that we must deal with when designing the ventilation flows through all of those areas.
Steven Busby
executiveAnd Don, if I could just jump in here, building on what Michael said during his conference, we have given the green light to this new shaft. It will be called the San Jeronimo shaft, located farther to the east, right in the middle of this high-grade zone that we value so much. We recognized the opportunity — the skarn deposit, clearly a deep-seated deposit — we will have multiple ventilation shafts going into that deposit no matter which mining method we end up needing, and we see the chance to begin advancing that shaft so that it ultimately gives us access and ventilation into the skarn deposit. In the meantime, though, it gives us what I would describe as an insurance policy against any additional infrastructure failures similar to those we have experienced over the last 2 years. So we are very pleased that this project is moving ahead. It ought to be finished toward the end of 2022 and into 2023. We have an excellent contractor that was well prepared and could mobilize very quickly on it. So we are quite excited about this opportunity, and it will serve as an insurance policy in case we require another exhaust system for this moist hot air, with a fully lined concrete shaft that is 5.5 meters in diameter.
Don DeMarco
analystAll right, Steve. Yeah, that's more or less my point. I'm simply attempting to grasp the risk here; it's reassuring to hear San Jeronimo will serve as a kind of insurance policy, but I want to get a handle on the risk of a possible repeat of what we've witnessed during the last couple of years, with lower grade and throughput and so forth. Could you speak to that? Do you figure it's highly unlikely that we'd see this occur again down the road?
Steven Busby
executiveWe're quite happy with the shotcreting improvements Martin talked about on those raises. We can get shotcrete into these raises robotically. Well, shotcrete appears to be the crucial element in raises and developments and in sealing off the dacitic ground from the heat and humidity where it begins to degrade. There are risks involved with that; we're not — this is — we haven't actually been doing this over a long stretch yet to see how that shotcrete will perform. So that's why we're really pushing the shaft as our insurance policy. We do consider it a significant insurance policy. But as of right now, I believe in the Hemilio shaft, we reached 6 inches of shotcrete and fully across that wall. And we haven't observed any degradation of it so far. We feel fairly good about it, but we're feeling truly good about having this insurance policy in the future as well.
Don DeMarco
analystAll right. So now that ventilation is back, what's the reason once more you can't return to, let's say, 2,000 or 2,100 tonnes per day? I think this is partly to build on a question an earlier caller raised?
Steven Busby
executiveYeah. No, it has to do with development. Since ventilation was limited, we curtailed not just mining output but also development and ground support. And there's the same type of deterioration we've observed in the raises and in certain development areas, especially toward the east; so we're somewhat behind there, which is why it will ramp up over roughly the next 6 months back to 2,000 tonnes.
Don DeMarco
analystAll right. Let's go back to 2,000 tonnes. All right. That's excellent. In time. And then one last question. So the La Colorada skarn resource was pushed to year-end — was there a reason it wasn't part of the resource update last night? I mean, the current resource is over a year old, and there's been plenty of drilling on this target. I'm curious to see how it's progressing.
Steven Busby
executiveYes. The sole reason we left it out is that there's been some excellent infill drilling there, and we're feeling really good about that skarn deposit, but we're also bringing out the PEA toward the end of this year. So we figured it's best to simply wait for that PEA so we fully understand that new resource before releasing it.
Michael Steinmann
executiveNaturally, a great deal of technical effort is underway at present regarding mining approaches, ventilation and access for the area, processing, and so on and so forth, for the PEA. Every bit of that will eventually have an effect on obviously — well, we haven't reached the reserve stage yet, but even so it will have an effect on our resource and on the way we view development of that skarn. So waiting a few more months for that resource update and folding it directly into the PEA is a prudent approach.
John Tumazos
analystI don't want to go back over what was asked before, but the resource and reserve report kind of gives the impression that no hole was drilled during the last year, which I know isn't the case. Is it fair to sum it up by saying that producing in Latin America with the COVID epidemic brought major challenges? And that simply producing as much as you did took a huge effort, while some of the reserve calculations and updates mattered less than production? Maybe next year, the — we'll get a bit more data. And then second, it seems the processes are advancing in Guatemala and Chubut, which is an improvement over how things stood for the last several years. And I guess it's impossible to say how long those processes will take, whether it's 1 year more, 2 years more, but at least there's communication and engagement, which beats nothing. I'm just — if you could — if that's a fair summary of where we stand, Michael, I'm trying not to put too many words in your mouth.
Michael Steinmann
executiveYes, you — I mean, we know COVID had a big impact on our operations in Latin America. I mean, it was — last year, governments across the whole continent shut us down when the epidemic began. And of course, that also affected our exploration efforts, probably more than it did our production, because the logical step is when you consider yourself a company with one of the largest reserve bases in the world, the logical step is to prioritize production when an interruption like the one we saw from COVID hits, and not exploration. It doesn't really matter much if you deplete the reserves a little in a year like this, but have fewer people on-site and give priority to production. And that's what happened previously; that's why we said in the report that we were probably down 50% on the drilling; and of course, with less data, you get fewer intercepts and you get fewer reserve increases or replacements. You're very well — I'm sure you saw that we still carried out the full drill programs at Timmins and La Arena, where it was easier to do, and we replaced more than a year of production at both. So very, very good news. And obviously it shows you that when you put the effort into drilling, you get the results out of it; but we really felt last year that in many, many of our assets where we have long, very long-life reserves ahead of us, we can — as I said, we can take a slight reduction in our reserves and prioritize our production. So that's probably enough on the reserves. I think we'll clearly be open to providing far more detail, and there's a lot more of it in the press release Chris issued this morning; regarding Guatemala and Chubut, I think your analysis is fair and correct. The other process in Guatemala is progressing with pre-consultation meetings. I believe the meeting that was meant to take place in July has been pushed to August because of COVID restrictions, which remain very, very severe and significant in Guatemala. Of course, all of us need to ensure these meetings are conducted in a safe setting and a safe way, but they are moving forward, and progress will be reported as they move forward.
John Tumazos
analystMichael, I'd like to pick up on that first point about keeping pace with production. It's clear to all of us that the majority of mining companies were forced to pull workers away from exploration, from CapEx, from waste stripping, and from underground tunnel development simply to deliver the current quarters through the crisis. Even <<inaudible>> trimmed their production forecast by a couple of 100,000 tonnes, since they had fallen behind on waste stripping. I realize you haven't put out guidance yet for 2022, much less 2023. If we can chalk up the 2020 and 2021 setbacks and the weaker output to a whole host of one-time factors, do you believe you can return to 2019 output or the original 2020 guidance in 2022? Or are there too many pieces that need to fall into place, so that it won't be until 2023 or 2024 that we're back to where the trend stood 2 years ago?
Michael Steinmann
executiveWell, we — keep in mind, when we issued the guidance for 2021, we stated there that the first quarter in which we assume no COVID impact was the first quarter of 2022. That outlook hasn't changed. But I mean, only time will reveal how this pandemic unfolds. As I've said on earlier conference calls, I don't own a crystal ball regarding how it will develop, and we must respond to reality here; but thus far I'd say so good. Still, we're watching how things proceed, and there are new variants, and there's behavior of that virus that we don't yet know or understand, and we'll see. Yet with the information we currently have and the vaccination rates we're seeing at present, I believe there's a very strong chance we can return to somewhat more normal rates and fewer restrictions and fewer controls and protocols, et cetera, owing to COVID than we saw this year. However, it's August now, and it's still a little too far off, really, to make additional statements about how the pandemic will behave next year.
John Tumazos
analystSo with underground development, waste stripping, and how CapEx evolves, is it possible that next year you get to 7 million ounces, 7.5 million ounces of silver each quarter, plus slightly above 150,000 ounces of gold per quarter once more?
Michael Steinmann
executiveWell, look, like I said, it's quite early to make that call. We haven't gotten to budgeting yet. I don't have to — the numbers, I haven't clearly seen the forecast numbers, obviously. What I'm saying is that if things keep going the way we see them right now on the pandemic side, we should be able to sort of return to our normal throughput and normal numbers, and obviously very high on the list, as Steve mentioned, at La Colorada, once we get back to normal throughput and sort of normal grades there too.
John Tumazos
analystMichael, that's really good. Other companies are already saying they're way behind and have cut their multiyear guidance. So that's actually better than what a lot of people can manage in this fight.
Lawson Winder
analystMay I ask about the cash cost, the per-unit cost per ounce over at Timmins? Throughput went up slightly, grades were fairly flat quarter-over-quarter, but cash cost rose roughly 5%. What was behind that?
Steven Busby
executiveYes, Lawson, this is Steve. One factor was simply the exchange rate; we saw the Canadian dollar get stronger during the quarter. It has eased since then, so we're feeling better as we head into Q3, but we're also working on some of the geotechnical stability issues we've been facing down at Bell Creek. I mean, it has meant a lot of redrilling of holes that shifted after drilling and much more support, more elaborate support being installed there. So there are extra costs there as well as we go deeper in the levels and get into those transverse stopes, and that should ease going into the second half.
Lawson Winder
analystAre you seeing anything coming in — or any effect on grade at Timmins from what is happening at Bell Creek? And I don't mean this year, I mean just looking ahead?
Steven Busby
executiveYes. Bell Creek is plainly the place where our best grades come from. So we're eager to raise throughput rates at Bell Creek, which will also help us produce at higher grades.
Lawson Winder
analystAll right, understood. Moving on to Argentina, it caught me off guard to notice that the gold reserves — or rather gold and silver reserves at Joaquin actually went up. That's 13% and 15% respectively. So what was behind that? And in the same way, regarding the fairly sizeable drop at COSE, was depletion the whole story? Or did other things contribute to those big declines at COSE?
Michael Steinmann
executiveYeah. At Joaquin, we managed to place 4 or 5 drill holes within the deposit. And clearly, we now have far more geological data from the development work, et cetera, <<inaudible>>, and we were able to upgrade certain zones and thicker zones. So on balance that was a gain, coming from the quite limited exploration we could carry out at Joaquin. At COSE, although production did deplete it, also, once more, we hold much more geological data from development, from actually being nobody from. So that meant a minor adjustment to the geological model too. And clearly we're eager to get back in there to assess and review as we obtain additional geological data from development.
Lawson Winder
analystAll right. No, that's wonderful. And speaking of that, what's your current thinking regarding the mine life there in Argentina? So the whole Manantial operation — Joaquin, COSE, and whatever remains at the original Manantial deposit — because from where I sit, on my figures, it still appears to be essentially at end-of-life in under 3 years. Do you still view it that way? And — or might it be expanded? Or might it be shorter?
Michael Steinmann
executiveYes, Lawson, as you're aware, Joaquin — Joaquin and COSE both have been satellite deposits from the start, 2 of them, extremely high-grade, yet quite small and constrained in size. And honestly I believe nothing has changed. Of course, as Steve — as Chris said, we keep picking up a bit more information through development and production there. And that will push reserves slightly up and down. But I wouldn't anticipate a major difference from our reserves here as we go forward. So I think your estimate on timing is probably about right, that alone that we would make in our big discovery, but that's how it looks right now.
Lawson Winder
analystAll right, that’s great. And now regarding Dolores — naturally, we’ve talked about the reserve decline there fairly extensively already. Still, just considering that asset: I mean, is it an asset with a 3-year mine life? Or do you see a chance to lengthen that mine life over a longer horizon?
Steven Busby
executiveYes, Lawson — this is Steve. We’ll be mining there through at least 2024 and possibly into 2025; but no, it’s driven by the open pit, and that open pit is an economically constrained pit. To the west there’s some fairly steep, rugged terrain that we simply can’t afford to strip any longer. So we don’t really see much exploration upside there. There’s a bit underground, but that underground is quite small compared with the open pit. So mine-wise, I think we’re moving into 2024, maybe a little beyond that, but then processing will carry on with the leach — the trickle-down leaching will continue for quite a while given the slow kinetics of the silver on that thing.
Lawson Winder
analystAll right, that's excellent, Steve. So perhaps just one last question about how you're thinking strategically regarding gold production moving forward? Clearly it has contributed enormously to the company for <<inaudible>> acquisition. It will keep doing so — for a couple more years at least, but as we look toward the longer term, is keeping gold production around these levels a strategic imperative? Or are you comfortable with more silver output replacing gold output over something like a 5 to 10-year horizon?
Michael Steinmann
executiveWell, look, ultimately geology is what dictates it. And I think Dolores is a really good example, where the deposit gradually shifted from being a silver deposit with gold to a gold deposit with silver, and of course that shows up in how we account for it; and remember, at the start of the year, we moved it into the gold sector in that sense, away from the silver max, simply because there's far more gold for the remaining life that's coming. So geology really drives it. What I focus on is free cash flow and asset profitability; and these gold assets have performed very well for us; and I mean the fact that we've managed to replace — even in a tough year replace reserves once again by more than a year at Timmins and at La Arena, they're certainly very important assets for us. And they've developed very, very nicely. When we ran the purchase model, we basically assumed La Arena would be finished by 2021 I believe. And now we've even added another year; so gold production will continue, and I'm very happy about that.
Lawson Winder
analystYeah. La Arena has really been a fantastic asset for you folks. All right. Look, we're nearly at the top of the hour. Those are solid answers.
Analyst
analystMost of what I wanted to ask has already been covered, so I'll keep it to one quick question; it was encouraging to see the guidance reaffirmed. It appears, obviously, that some mines are performing better than others. And you went into quite a bit of detail regarding La Colorada for the second half of the year. What I'm wondering is, would you frame the reaffirmation of guidance as something we should view more on a consolidated basis? Or is the guidance being reaffirmed for each mine individually? And specifically, I mean San Vicente, Manantial and Timmins — are you confident that you can get production up fairly substantially in the second half? Or should we be thinking that some of the other mines will be, I guess, carrying the load for those assets so we reach consolidated guidance?
Steven Busby
executiveYes. Ryan, this is Steve. Good question. Broadly speaking, yes, I'd say without a doubt it's consolidated — that gives us a bit more breathing room, absolutely. And there will be pluses and minuses, no doubt in my mind about that. That said, I do believe that as of today we expect, yes, we will see Timmins, we will see San Vicente, Manantial move up somewhat in the second half; that is what we anticipate. So our general view is that they'll hit the guidance we laid out for each individual mine; but certainly, what we're really aiming at is the consolidated basis to give us — there are — one of the benefits of having many different mines is that when one is struggling, generally we have another performing well. We do expect that. That's simply reasonable.
Michael Steinmann
executiveThanks, operator, and I appreciate all of you joining us today. I'd like to remind those on the call that on September 9 at 11:00 a.m. Eastern Time, we'll be holding our second annual call now to go over how Pan American approaches environmental, social and governance matters. So if you have the time, please mark that date and dial in. Keep an eye out for more details, as we'll issue a press release containing the call-in information and so forth. You'll be able to locate it on our website as well. So we look forward to speaking with everybody, hopefully, on that ESG call of ours. And in case you're unable to attend, I'm sure it will be prerecorded and made available afterward. We'll obviously be talking again at the close of Q3. Enjoy what's left of the summer, everyone, and stay safe. Thanks so much.
Operator
operatorThat brings us to the end of today's conference call. You're welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research