Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary

February 24, 2022

Toronto Stock Exchange CA Materials Metals and Mining earnings 34 min

Earnings Call Speaker Segments

Operator

operator
#1

Thank you for holding. I’m the conference operator, and I’d like to welcome everyone to the Pan American Silver conference call and webcast covering full year and fourth quarter 2021 results. Please be aware that everyone attending is in listen-only mode and that this conference is being recorded. Once the presentation is finished, we will open the line for questions. If you would like to enter the question queue, press star followed by one on your phone’s keypad. If you require help at any point during this call, you can reach an operator by pressing star and zero. At this time, I’ll hand the conference over to Siren Fisekci, VP, Investor Relations. Ms. Fisekci, please go ahead.

Siren Fisekci

executive
#2

We appreciate everyone being with us for Pan American Silver's conference call covering the fourth quarter and the full year of 2021. Forward-looking statements and information are part of this call, and it also makes reference to non-GAAP measures. Kindly refer to the cautionary statements found in our MD&A, our news release, and the presentation slides for our Q4 and full year 2021 audited results, every one of which can be accessed on our website. At this point I'll hand the call over to Pan American's President and CEO, Michael Steinmann.

Michael Steinmann

executive
#3

Thanks, Siren. I'll give a quick summary of how we did in 2021, and after that I'll turn to what we're expecting for 2022. Our revenue for 2021 came to $1.6 billion. Metal prices were fairly strong, and on top of that, output bounced back from where it stood in 2020, when every operation except Timmins in Canada was hit by temporary suspensions ordered by government because of COVID-19. Production picked up noticeably late in Q4 2021, and that pushed finished product inventories up by roughly $22 million, which we did not record as revenue in the quarter. We had no government-mandated suspensions in 2021, yet COVID kept weighing on output, costs, and project advancement, mainly because we stuck all year to our rigorous COVID protocols, covering testing, contact tracing, isolation, physical distancing, and sanitary measures. Silver output for 2021 reached 19.2 million oz, matching the revised guidance we issued in November 2021 and coming in 1.9 million oz, or 11%, above the prior year. That gain mostly reflected the temporary government-mandated suspensions at our Latin American operations that had weighed on 2020 output, partly offset by lower silver grades at Dolores, as anticipated from mine sequencing. At La Colorada, we enhanced ventilation to the high-grade deep eastern section of the mine in mid-2021, which opened access to higher-grade ores in the second half of the year and lifted output to 1.6 million oz in Q4.

Michael Steinmann

executive
#4

During 2021 we turned out 579,300 oz of gold. That matched the revised guidance we issued in November 2021 and came in 57,000 oz, or 11%, above what we achieved in 2020, a year when temporary mine suspensions affected us. The 2021 figure for gold output shows much better grades at Dolores, which is what mine sequencing led us to expect. Partly offsetting that gain was a larger-than-anticipated amount of clay-rich ore at Shahuindo, which raised blending needs and held back leaching efficiencies. Throughput at Bell Creek also fell because of geotechnical difficulties. By the close of 2021, roughly 46,900 oz of gold heap inventory had been accumulated. All-in sustaining costs for the silver segment came to $13.57 per oz in Q4 and $15.62 across the whole of 2021, a touch under the revised guidance from November 2021. For Q4 2021, all-in sustaining costs sat 18% beneath the level seen in the first nine months of the year, which mirrors gains at every operation. On the gold side, all-in sustaining costs reached $1,461 per oz in Q4 and $1,214 for the full year, consistent with our initial 2021 guidance. Net realizable value inventory adjustments at Dolores pushed gold segment all-in sustaining costs up by $21.7 million in Q4 and by $8.7 million over the year. Operations brought in $392.1 million of cash flow during 2021, including roughly $71 million of cash consumed by working capital changes.

Michael Steinmann

executive
#5

We returned $72 million to shareholders through dividends, which came to a 55% rise in total dividends compared with 2020, and closed out the year holding $283.6 million in cash and cash equivalents along with $51.7 million in short-term investments. Net earnings for 2021 reached $98.6 million, equal to $0.46 per share, and that figure includes a $59.7 million non-cash mark-to-market loss on short-term investments — mainly tied to our stake in New Pacific — plus an income tax expense of $146.4 million. That elevated effective tax rate largely comes from a substantial amount of expenses during the year that generated no matching tax benefit, chiefly the Escobal care and maintenance spending. The investment losses were connected to New Pacific. Adjusted earnings for 2021 came in at $161.8 million, or $0.77 per share. Yesterday we also put out our production and cost guidance for 2022. That guidance takes into account the difficulties we faced in January and February 2022, when the Omicron COVID-19 variant spread quickly in and around our operations — something that, thankfully, is now fading fast. Over the past two years, the pandemic's effect on operations has been hard to forecast, and it has brought knock-on effects, mostly in the form of cost inflation, high absenteeism, supply constraints, and shipping disruptions. We're very happy to report that more than 90% of our workforce is now fully vaccinated.

Michael Steinmann

executive
#6

For 2022, we're looking at silver output somewhere between 19 million oz and 20.5 million oz, and that figure factors in the effect of moving the Morococha operation into care and maintenance. Early this year we finalized an arrangement with Aluminium Corporation of China, which we call Chinalco, to decommission our processing plant. As we've said before, our agreement with Chinalco calls for the core Morococha facilities — the processing plant among them — to be relocated so that their copper mine can be expanded. For a number of years now, we've held conversations with Chinalco about when that relocation would happen, and we've been developing preliminary engineering designs for a new plant, as reflected in our private capital budgets. That said, at this point we don't see the economics justifying building a new processing plant. We're starting to assess a number of alternative opportunities for Morococha and are working to make sure the workforce sees a fair transition. In 2021, Morococha delivered slightly less than 2.2 million oz of silver output — the smallest contribution among all the operations in our silver segment. Our 2022 silver production outlook had assumed a 1.7 million oz–1.9 million oz, or 33%–37%, rise in silver output at La Colorada, which the shift of Morococha into care and maintenance will offset. That gain at La Colorada stems from the ventilation upgrades, and additional work on the ventilation system is scheduled in the coming years as we keep mining deeper within the eastern extension of the mine.

Michael Steinmann

executive
#7

This covers the commissioning of a refrigeration plant near mid-year, plus finishing the concrete line ventilation shaft during 2023, which will then get large, more efficient ventilation fans in 2024. Beyond that, we'll invest to speed up mine development rates and upgrade ground control systems, which will help advance the shift of the Candelaria area of the mine toward a more mechanized, efficient mining method employing long-hole stoping techniques across the coming couple of years. For 2022, our gold production outlook sits between 550,000 oz and 605,000 oz, comparable to what we produced in 2021. At Dolores, we're anticipating another strong year of gold output. We also expect better leaching efficiencies, which should yield a higher ratio of ounces produced to stacked at both Dolores and Shahuindo, thanks to more favorable pad construction sequencing and enhanced ore blending. Versus 2021, we forecast reduced production at La Arena and Manantial Espejo, mainly stemming from lower grades as a result of mine sequencing. At Timmins, we anticipate a modest production increase from mining a wider zone at the Bell Creek deposit. Ground control has turned into a production bottleneck at Bell Creek during the last couple of years, so in 2022 we will start building a paste fill plant to enhance backfill quality and availability for more effective ground support systems.

Michael Steinmann

executive
#8

We think this is going to lift mineral resource recovery rates going forward. Even with the inflationary pressures we've seen lately and Morococha having been moved to care and maintenance, we expect all-in sustaining costs for the silver segment in 2022 to be fairly flat versus last year. Our forecast range is $14.50 per oz-$16 per oz, which reflects the benefit of higher production at La Colorada and Huaron. For the gold segment, all-in sustaining costs in 2022 are forecast at $1,240 per oz-$1,365 per oz, an increase relative to last year. Beyond cost inflation, gold segment costs are affected by a sharper rise in community and environmental spending and by higher waste mining rates at Shahuindo, plus additional ground support and backfill costs at Timmins. Sustaining capital expenditures should be consistent with 2021, in the range of $200 million-$210 million. We intend to put $68 million-$81 million into project capital at La Colorada for further drilling of the skarn deposit, engineering work to determine the optimal project design for developing the skarn, and site infrastructure upgrades that we expect will benefit both the long-term development of the skarn and the current vein system operation.

Michael Steinmann

executive
#9

The planned improvements involve kicking off development of the ramp around the middle of 2022, which in time would reach the skarn, along with starting work on the concrete lined ventilation shaft and finishing and commissioning the refrigeration plant by mid-year. Project capital for 2022 likewise covers exploration at the Wetmore and Whitney projects in Timmins, plus building the paste backfill plant at Bell Creek that I touched on earlier. All told, capital spending — sustaining and project capital combined — is projected to land between $280 million and $305 million in 2022. Exploration spending for 2022 is expected to fall in the $42 million to $46 million range. About one-third of that goes to brownfield exploration focused on replacing reserves, and it sits within the sustaining capital guidance. Between $22 million and $24 million is contained in the project capital guidance for drilling at the La Colorada skarn and nearby veins, as well as exploration at the Wetmore and Whitney projects in Timmins. The other approximately $8.4 million targets greenfield exploration. For 2022, our priorities are continuing to manage the COVID pandemic so we protect the health and safety of our workforce and communities, boosting mine efficiencies as we get back to full workforce deployment, and moving the La Colorada skarn and Timmins projects forward. We intend to deliver an update on the La Colorada skarn alongside our annual mineral reserve and resource release at mid-year, contingent on how the drilling programs progress.

Michael Steinmann

executive
#10

The pre-consultation meetings for the court-mandated ILO 169 consultation process at the Escobal mine in Guatemala have picked back up after COVID-19 caused delays. During 2021, three pre-consultation meetings took place, and more meetings were held in January and February 2022. The Guatemalan Ministry of Energy and Mines is leading this consultation process with the Xinka people, and Pan American is a participant. Pan American looks forward to carrying on its participation throughout 2022 in a process that is transparent, respectful, and inclusive. Our financial position is strong, with operations producing healthy levels of free cash flow and a net cash position of $238 million. Given that strong position, we have introduced a new dividend policy. The base dividend stays at $0.10 per common share, paid quarterly. Going forward, that base dividend will be supplemented by a variable quarterly dividend tied to the net cash on the balance sheet for the prior quarter. If net cash falls between $100 million and $200 million, we would pay an additional $0.01 per common share. Between $200 million and $300 million, an additional $0.02 per common share. Between $300 million and $400 million, an additional $0.06. When net cash exceeds $400 million, an additional $0.08 per share.

Michael Steinmann

executive
#11

Consistent with the dividend policy we recently adopted, we made an announcement yesterday about raising the dividend by 20%, which comes to $0.12 per share and will be paid out in March 2022. Under this fresh dividend policy, we gain the liquidity needed to finance our growth projects, and at the same time our shareholders get to share in the upside of precious metal prices via greater cash returns on top of capital appreciation. With that said, I'd now like to open the call to questions.

Operator

operator
#12

We're going to start the Q&A portion now. If you'd like to get into the queue to ask a question, press star followed by one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift your handset first before hitting any keys. If you want to take your question back out, just press star then two. We'll take a brief pause while callers enter the queue. Our first question comes from Cosmos Chiu at CIBC. Go ahead, please.

Cosmos Chiu

analyst
#13

Thanks, Michael, and thanks to the team for the call. I’ll start with La Colorada. Michael, you mentioned in your remarks that for 2022 you expect a fairly significant year-over-year rise in silver production. Could you expand a bit on the throughput and the grade you’re anticipating in 2022 to support that increase? In the past, you discussed potentially reaching 2000 tons per day of throughput by mid-2022. Does that remain the goal? Also, in Q4, I believe your head grade came in above the reserve grade. Is that something we can also expect for 2022?

Michael Steinmann

executive
#14

Morning, Cosmos. As you’ll remember, last year’s ventilation upgrades gave us renewed access to our higher-grade zones, and that is clearly what has allowed us to get back into those very high-grade areas. I wouldn’t focus too narrowly on throughput, because grade matters enormously at La Colorada. We have these very high-grade zones, and when you look at total ounces produced, it really comes down to that interplay between throughput and grades. You can see our forecast is somewhere between — what, 6.8 million oz to 7.1 million oz? That is a big increase versus the production we had the year before. Let me hand it over to Steve, and he can give us a bit more detail on that.

Steven Busby

executive
#15

Morning to you as well, Cosmos.

Cosmos Chiu

analyst
#16

Hello there.

Steven Busby

executive
#17

Building on what Michael said, there is some room to maneuver when it comes to tons and grades as we plan for 2022. As we put these long-hole mining improvements in place and speed up certain development work to enhance that long-hole mining, we could see greater ton efficiencies, and that lets us blend in material from lower grade zones. As Michael notes, those high grade areas are accessible to us, so we manage output based on the efficiencies that long-hole mining delivers. I don't want to dwell too much on throughput as opposed to grade. We do have the flexibility to shift in that direction. Broadly speaking, La Colorada carries a lot of fixed costs, so we tend to think in terms of ounces. We're quite confident about our ounce forecast for production this year. Exactly how we reach it, through grade or through tons, remains somewhat uncertain.

Cosmos Chiu

analyst
#18

Thanks, Steve. As a follow-up, maybe — as you said, grade accounts for a big share of this. It sounds like a higher-grade zone toward Candelaria East. But as you noted in the MD&A, you're encountering somewhat more heat and humidity as you go deeper and further east. Is that what you expected? I suppose what I'm asking is whether the refrigeration plant has to be in place before you can reach the Candelaria East area.

Steven Busby

executive
#19

Absolutely, good question. That’s one of the reasons we sped up that refrigeration plant. We know that as we move into the skarn, our thermal isotherms — you know, the thermal gradients as we go deeper — you can see how it gets hotter and hotter. We did expect more heat in Candelaria East as we developed out. I’d say we probably saw a little bit more than we even expected. We are bringing that refrigeration plant on early. That’ll help us manage that in that area and allow us even greater access in future years. We are, you know, somewhat constrained in how much we can pull out of there, and that’ll start to relax as we get more refrigeration into that area.

Cosmos Chiu

analyst
#20

Alright, thanks. And could I get some clarification on La Colorada? Again, in the MD&A, I read that the concrete lined ventilation shaft is expected by mid-2023. And then in the skarn section, you also mention putting some ventilation infrastructure in place for the skarn. Is that the same shaft? Are we talking about that same ventilation shaft, or are those two different ones?

Steven Busby

executive
#21

For the skarn, the first ones we’ve discussed would be two main shafts, and they’re different. Those are bigger—larger than the one we’re currently building. This shaft could potentially provide service to that skarn development. It won’t serve as the primary; it’ll function more as a secondary ventilation shaft and may even be equipped for some material movements and similar tasks. As we also announced, we’re going to push ahead on ramp development toward the skarn this year. We’ll portal the ramps and begin ramp work this year, and that will also supply additional ventilation into those areas. So there are primary and secondary ventilation systems. The one we’re starting now, which we hope will enhance what we’re currently mining on the veins, will likely end up serving more as a secondary shaft in the future. It won’t be the primary ones.

Cosmos Chiu

analyst
#22

Understood. Perhaps shifting topics slightly. Over at Dolores, there was, you know, a certain amount of inventory accumulation during the prior year. It sounds as though, with the building of the phase one south leach pad, that situation has resolved itself. Is that right? Have you begun stacking at the phase one south leach pad at this point?

Steven Busby

executive
#23

Yes, that’s right. Ore stacking began there in late November, and leaching got underway in early December, and we saw a fairly strong production boost in December from drawing down inventories. Moving into January, we’re seeing that carry on now with pad one south. The ore height we’re leaching there isn’t nearly as great, so it gives us a fast return on what’s being leached. Meanwhile, we keep recovering ounces from the inventory builds at pad three, phase five, where the ore is quite deep.

Michael Steinmann

executive
#24

On the inventory side, Cosmos, just broadly speaking — as you're aware, our year was weighted toward the back half, quite similar to what will unfold this year when you consider production. As we raised output during Q4, and particularly as December approached, you likely noticed roughly 13,300 oz sitting in finished goods that went unsold simply because the year came to a close, obviously, and there was no way to move that, well, you know, around Christmas and the final days of December. That represents approximately $22 million in revenue not recognized during the quarter, though it was produced as finished goods.

Cosmos Chiu

analyst
#25

Yeah, sure. Perhaps we can finish with a single final question. Regarding your overall guidance for 2022, could you perhaps discuss how much inflation you have incorporated on a unit cost basis? When it comes to COVID-19 costs, Michael, as you noted in your prepared remarks, there are testing costs and there are additional PPE costs of some kind. How much of that has been included in your 2022 guidance?

Michael Steinmann

executive
#26

Sure, before Steve joins, I’ll offer a broad comment. Naturally, what we’re going through is precisely what all of us—and all of you out there globally—are facing. Interruptions in supply chains, late deliveries, and so on, and that inevitably affects cost, which is clearly one factor behind the higher inflation we’re seeing worldwide, along with, you know, the wage pressure on top of that, mostly driven by labor shortages. What we observe in Latin America is quite similar. We’re aware that COVID hit Latin America much harder than many other regions of the world. You know, the pressures we’re seeing closely resemble those across the globe, and perhaps, Steve, you could add some further detail.

Steven Busby

executive
#27

Sure, absolutely. Let me add a bit more detail there. Our inflation rates, as we look toward next year or the end of this year, 2022, vary quite a lot depending on what we're examining. Energy in particular is one of our focal points, as you can imagine given what's happening today. We're also watching wages, logistics costs, transport costs, and supply costs that are coming in. For those categories, we saw fairly sharp inflation figures. When we consolidate everything, as I mentioned, that's why it differs considerably across every material, commodity, and consumable we use. Once we add it all together, I'd say we've assumed roughly 5%-10% for 2022, and that's considerably higher than what we've seen in earlier years, when we were down around 3%-5%.

Michael Steinmann

executive
#28

Naturally, energy costs are under a lot of pressure. Some of our diesel is still hedged for this year, and the MD&A lays out the specifics. That program dates back to when we entered those diesel hedges right at the start of COVID, as you remember, when oil prices fell. It's been an excellent program for us. Naturally, it expires at the end of this year, and we're all aware of where oil stands today. Energy costs are certainly facing more pressure. Just one more point. When you consider inflationary pressures or, you know, headwinds or tailwinds affecting our costs, don't overlook foreign exchange rates, which matter a great deal to us—mainly Canadian dollars, Mexican peso and Peruvian sol. Those have a fairly large impact on us too. I think our annual costs paid in local currencies come to somewhere in the $500 million range. Depending on where the exchange rate moves, that's either a headwind or a tailwind for us.

Cosmos Chiu

analyst
#29

Absolutely. That's really helpful context. Thanks once more, Michael, Steve, and the team. That covers everything I wanted to ask.

Michael Steinmann

executive
#30

Thanks, Cosmos.

Operator

operator
#31

Just a quick reminder that pressing star one is how you get into the queue for questions. Our next caller is Don DeMarco with National Bank Financial. The line is yours.

Don DeMarco

analyst
#32

Thanks, operator, and good morning, everyone. I have a couple of questions. First, Michael, you said the production issue will be back-end loaded, which I had somewhat anticipated given the delays to the guidance, and we would expect Q1 to take the biggest hit. Can you confirm that is indeed the case? We would expect Q1 to be the weakest quarter of the year. Should we expect some of that weakness to be concentrated more in the underground mines, where the COVID impacts are thought to be the largest?

Michael Steinmann

executive
#33

Yeah, I believe that's accurate. Don, naturally, in January and February—particularly January—we encountered precisely what the rest of the world saw with Omicron. It appears to be an extremely large and swift surge, and it's subsiding at this point. But that was, you know, the rationale behind our postponing the guidance back in January, since we were right in the middle of that surge. We're observing easing, you know, in each nation where we currently operate. Again, I think you're seeing precisely the same thing across the U.S., Europe, and Canada. The picture looks very much alike in those places. As was the case last year, yes, it hits underground operations somewhat harder than open pit mining, for clear reasons—when you're dealing with distancing and the workforce we have on hand, the contractors we have on hand to support open pit work compared with underground work. As I mentioned on the call, we're seeing, you know, quite rapid improvements from that, hopefully the final surge, but there's no telling, correct?

Don DeMarco

analyst
#34

All right, all right, we’ll keep an eye out for that. Moving on to Escobal for a second question — it’s good news that the ILO 169 pre-consultation process has started up again. There were 3 meetings last year. Could you give us some idea, though, of what — you know, we’re still at this pre-consultation phase, which suggests it’s an early stage, it’s pre. Will we eventually move into a consultation stage? Or what should we expect during 2022 assuming the meetings aren’t disrupted?

Michael Steinmann

executive
#35

Well, to start, COVID certainly slowed everything down across the past two years, as it did in every country. I'm really glad those meetings have picked back up. The process began with first reviews—it has four stages. After that comes pre-consultation as stage two, consultation as stage three, and then court review as stage four. Our website explains this in great detail if you'd like to read more. Yes, right now we're in the pre-consultation phase. As I mentioned, I don't have timing. Whenever we transition from one stage to the next, naturally we'll inform the market when that occurs. Currently, as I noted, we've already held one meeting in January and one in February. It's great that we're back on a regular meeting schedule.

Don DeMarco

analyst
#36

All right, we’ll simply watch for any updates as things move along. That’s everything from my side. Best of luck in Q1 and for the remainder of 2022. Thanks.

Michael Steinmann

executive
#37

I appreciate that.

Operator

operator
#38

That brings the Q&A portion to a close. Michael Steinmann, I'll hand the conference back to you for any closing remarks.

Michael Steinmann

executive
#39

Much appreciated, operator, and thank you to all who joined the call. We look forward to sharing a Q1 update — when is that again? In May 2022. Have a good day, and thank you, everyone.

Steven Busby

executive
#40

Looks like there’s one additional one.

Michael Steinmann

executive
#41

My apologies. Operator, it seems there's one more question waiting in the queue.

Operator

operator
#42

Absolutely. We’ve got a question coming from Craig Hutchison at TD Securities. Please go ahead.

Craig Hutchison

analyst
#43

Hello there. Good morning, everyone. I have just one question.

Michael Steinmann

executive
#44

Morning, everyone.

Craig Hutchison

analyst
#45

Turning to Morococha — apologies, I just have one question about Morococha. I understand the plan is to place it on care and maintenance, but when should we expect that to take place? Would it be a Q1 event or a Q2 event, just for purposes of modeling production? And does your CapEx guidance at this point include anything for that?

Michael Steinmann

executive
#46

Okay, I'll go ahead and speak with him.

Steven Busby

executive
#47

Yes. Hello, Craig. This is Steve. As you know, we began the process of winding operations down. That’s a process we undertake—winding down and, you know, working through stockpiles and similar items. We actually began that process in December. So we have started it. You know, the specific dates for when it actually comes down are somewhat of a moving target, and we’re working with the employees, the unions, and the ministries in Peru to manage that as carefully as we can. So in our guidance, we have included a small amount of production during January, which offsets some of the effects of Omicron to a degree. Our guidance reflects, in its contribution, what we think we’ll see for the full year. We have not included the cost of care and maintenance in our sustaining capital. We provided guidance outside sustaining capital for care and maintenance, which includes Escobal and Navidad, and we put approximately $12 million–$13 million in for Morococha this year.

Craig Hutchison

analyst
#48

Alright, could you walk us through the process you plan to run, specifically regarding the strategic alternatives you'll be evaluating?

Michael Steinmann

executive
#49

Yeah, absolutely. Look, I mean, we carried out a thorough risk assessment of this asset — naturally, economic risk, social risk, political risk within the country — and, you know, we reached the conclusion that right now this represents the best path forward for actions with Morococha to preserve value at this point, examining alternatives and opportunities for it, which is the smallest asset in our portfolio. You know, Morococha generated roughly 2.1 million oz of silver during 2021. Of course, plenty of analysis is being done on that, that's our conclusion, and I believe it's the correct way forward at this point for Morococha to consider strategic alternatives.

Craig Hutchison

analyst
#50

Alright, I appreciate the background, everyone.

Michael Steinmann

executive
#51

Alright, thanks.

Operator

operator
#52

That wraps up the question portion. Today's conference call ends here. You're free to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.