We appreciate everyone being here for the Pan American Silver Q2 2022 Conference Call. Forward-looking statements and information are part of this call, and it also refers to non-GAAP measures. Kindly review the cautionary statements found in our MD&A, news release and presentation slides covering our Q2 2022 unaudited results, each of which can be accessed on our website. At this point I'll hand things over to Michael Steinmann, President and CEO of Pan American.

Michael Steinmann

executive
#2

Thanks, Siren, and good morning everyone, and welcome to our Q2 call. During the second quarter we generated 4.5 million ounces of silver, with La Colorada driving that result through its strong performance. Output at La Colorada rose by over 50% versus Q2 of last year, reaching roughly 1.7 million ounces, which mirrors better ventilation conditions underground. The new refrigeration plant started running in July, and we anticipate that it will bring further gains to working conditions at the mine. Gold output came to 128,300 ounces in Q2. That came even though Dolores delivered weaker results than anticipated from Phase 9B, which likewise pulled down consolidated silver output. Gold production for Q2 landed inside the range we had projected for the quarter. Dolores weighed heavily on our Q2 results. The cause is the grade shortfall out of Phase 9B and the production year-to-date that came in below expectations as a result, which set off an impairment analysis. We carried out that impairment analysis against a backdrop of cost inflation across the industry, building in higher cost assumptions, and it hits shorter-life assets like Dolores hardest in terms of value. That played into our choice to halt the underground mine during Q2 and the later reclassification of underground reserves into resources, and it led us to shorten the estimated duration of economic residual leaching through 2030. Naturally, this depends heavily on metal prices and costs across the years ahead and will be revised as conditions warrant. The exploration drilling initially done for Phase 9B of the Dolores open pit returned some high-grade intercepts in the zone we planned to mine during the first half of 2022. Those high grades, though, did not materialize fully, and we now think the high-grade intercepts played a part in a localized overestimation of contained ounces inside Phase 9B. Our updated winter resource and production plan for the life of mine accounts for that overestimation. We booked a $99.1 million impairment charge tied to Dolores in Q2, and along with $62.8 million in net realizable value inventory adjustments, mostly at Dolores, that drove the net loss of $173.6 million, or $0.83 loss per share, for Q2. Adjusting for these items, among other adjustments, gives an adjusted loss of $6.5 million, or $0.03 loss per share. Cash flow from operations came to $20.8 million, including $42.4 million in cash taxes and the $19.5 million working capital buildup. Turning to our 2022 guidance. We are keeping our production guidance for silver and for gold, though we expect to land at the low end of the ranges. The slides on our website that go with this conference call contain a quarterly breakdown of production in 2022, which gives a clearer picture of what we expect for the year, which has always been weighted toward the back half of 2022. Cash cost for the silver segment was $12,000.10 per ounce and $1,132 per ounce for the gold segment in Q2. Every operation felt the negative effect of inflationary pressures, particularly from higher diesel prices and certain consumables, including cyanide, explosives and steel products such as grinding media, as well as supply chain shortages. Beyond that, we’re seeing higher costs for services and other supplies, which are indirectly tied to inflation affecting consumables in their input costs—especially diesel fuel. Along with those global inflationary pressures, cash costs in the gold segment took a hit from lower grades at Dolores, Shahuindo, and La Arena because of mine sequencing; for 2022, we expect gold segment cash costs to land at the high end of our original guidance range. All-in sustaining costs for the silver segment came in at $17.30 per ounce. When net realizable value and our readjustments are excluded, silver segment all-in sustaining costs were $15.90 per ounce. Our 2022 guidance for silver segment cash costs and all-in sustaining costs remains unchanged. Gold segment all-in sustaining costs were $2,051 per ounce, and $1,540 per ounce excluding NRV adjustments; we are raising our guidance for gold segment all-in sustaining costs to a range of $1,400 to $1,550 per ounce, excluding NRV inventory adjustments, reflecting higher capital spending and the significant shortfall at Dolores. Our estimate for sustaining capital has been raised to a range of $240 million to $250 million because of a shift in the financing strategy for certain plant sustaining capital investments at the open-pit mines in Peru. Instead of funding those projects through construction loans, as we originally planned, we will fund them directly from cash flow, which will be offset by lower expected future cash flows and loan obligations. We have lowered our estimate for project capital to a range of $55 million to $60 million, based on anticipated delays in spending at both the La Colorada Skarn and Timmins projects. Total capital spending is now expected to be in the range of $295 million to $310 million in 2022, a slight increase from our original guidance of $280 million to $305 million. The reduction in capital for the current La Colorada Skarn project reflects delaying the design and start of the access from development so we can optimize alignment with the highly efficient bulk mining method designs now under consideration. The current major projects at La Colorada are moving along well. In addition to completing the refrigeration plant, we set the Galloway structure during the quarter and are now installing the headframe and hoist for the concrete line ventilation shaft. We will begin sinking the shaft before year-end and aim to reach a depth of 600 meters by this time next year. Yesterday, we gave an update on our consolidated reserves and resources as of June 30, 2022, which showed reserve replacement at our most significant mines. At La Colorada, we replaced 108% of annual silver production and added another 42.8 million ounces to inferred mineral resources in the veins above the Skarn. At Huaron, we replaced 165% of the several mine last year. At Shahuindo, 81% of gold production was replaced, and at La Arena, 46%. Timmins replaced 26% of the gold mine and added a further 53,000 ounces to inferred resources at Timmins West. Reserves of gold and silver took a hit because at the Dolores underground mine some reserves were reclassified as resources. Later this quarter, we expect to update the resource estimates for the La Colorada Skarn. On July 21, we announced the latest drill results for the La Colorada Skarn, and they featured the highest grade intercepts to date: 97 meters at 654 grams per tonne of silver, 15.35% lead and 11.38% zinc. Those newest full results will not be part of it, since the drilling happened after the cutoff date for the new resource estimate. At Escobal, the ILO 169 consultation has moved from pre-consultation into the consultation phase, with the next meeting set for August 21. We look forward to taking part in the next stage of the consultation process and to hearing the Xinka people's views on Escobal in an open, inclusive and respectful process; we are on track to meet most of the ESG goals we set for 2022. Our third annual ESG call takes place on September 22, and there we will share more about our progress and the areas where we need to improve. To close, our financial position remains solid, with $241.3 million in cash and short-term investments and an undrawn line of credit of $500 million; in line with our dividend policy, we declared a dividend of $0.11 per share. And now I would be glad to take your questions.

Cosmos Chiu

analyst
#3

My first question is probably about Dolores. Obviously, given the write-down, you've made some changes, as you said — I believe mining will probably continue for another 2 years, and it sounds like residual leaching will run until 2030. Could you sum up for me what the new mine plan looks like? And how has it shifted from the assumptions you had before?

Michael Steinmann

executive
#4

Sure, Cosmos — let me begin with the big picture and then hand it to Steve for more specifics. In fact, the mine plan and the open-pit mining didn't alter the timing, those 2 years. After that, we move into residual leach, which was the longer-term piece there. We've cut it off at 2030 for now, as I said on the call, and clearly that will be an economic analysis done each year — right, when you get to whatever 2028, 2029, 2030, depending on costs and metal prices, et cetera — how long that leach cycle keeps going. But I'll turn it over to Steve for further details.

Steven Busby

executive
#5

Yeah. The one thing I’d add there, Cosmos, is that in the original plan we had once open-pit mining wrapped up, we had certain stockpiles that would be processed through the plant for — I believe the initial estimate was a couple of years. When you look at the open pit life of mine plan we have now, the ore tonnage really hasn’t shifted much at all. What has dropped out is just those 2 additional years of stockpile rehandle. And then, as Michael mentioned, we’ve also cut down how long residual leaching runs.

Cosmos Chiu

analyst
#6

All right, that's great. Then perhaps two follow-ups. First, regarding Dolores, following the write-down, what would you say the asset's book value stands at right now? Second, as you mentioned, underground operations have been suspended at this point, so how easy would it be, based on metal prices, and maybe hopefully with higher metal prices down the road, how easy would it be to get it going again? And during this period, are the pumps still running so that you're dewatering it and keeping it in good condition?

Ignacio Couturier

executive
#7

Cosmos, Ignacio here. The preferred book value comes to roughly $260 million, and that figure covers both the PP&E and the leach pad.

Steven Busby

executive
#8

So as far as the underground goes, yes, the dewatering pumps remain in operation, since that also keeps the open pit accessible, and we are maintaining ventilation along with all ground control systems. That means we could return. Some development work would be needed toward the open pit in order to unlock the additional ore reserves that shift into resources. Other than that, everything is in good condition to restart.

Cosmos Chiu

analyst
#9

Great. Perhaps shifting focus a bit toward some more encouraging news. Michael, it really does sound as though positive strides are being taken at Escobal. As far as you're able to expand on moving from preconsultation into consultation, what details could you provide regarding what that next stage involves? And then when it comes to negotiations or consultation with the Xinka, have any particular requests been made, whether financial or social, that you're able to share with us?

Michael Steinmann

executive
#10

Yes. Absolutely, the shift there, as we outlined in the press release, is that we've now moved into what is locally termed Phase 2, which is the consultation proper. In this stage, Guatemala's Ministry of Energy and Mines, which spearheads that process, runs it as a formal dialogue process, but they've stated the goal of identifying and clarifying baseline conditions, describing potential impacts and defining possible impact mitigation. So the Xinka indigenous communities, the Ministry of Mines and Pan American Guatemala, clearly a subsidiary of Pan American Silver, are all taking part in that process. So plenty of details exist so far about what has happened in Guatemala regarding the process and what's ahead on the MEN, the government website; so I'd point everybody there. There's a link, I believe, in our Escobal section on our Pan American website, and you'll find links plus videos and a description of the process and how the meetings held so far have gone.

Cosmos Chiu

analyst
#11

Great. And perhaps one final question — something different here. On provisional pricing, I believe I saw in your MD&A a negative price adjustment of $9.3 million, which makes sense for the quarter given where base metal prices went. But I'm trying to square that, because the realized prices for the quarter came in at $4.42 per pound copper and $1.73 per pound zinc, which isn't too bad. So I suppose my bigger question is, how should we think about it going forward? How should we calculate it? And could there be a larger potential impact for Q3 and beyond?

Ignacio Couturier

executive
#12

Cosmos, it's Ignacio again; so yes, the provisional price adjustments simply reflect how much metal has open QPs — quotational prices — at the close of each quarter, and it does vary depending on the contracts we hold; it's a difficult thing to model because a lot of the time, the clients are the ones holding the options on the QPs that they declare; but just to give you some approximate figures, at the end of Q2, we had roughly 1.2 million ounces of silver where the prices were still open and about 1,000 ounces of copper approximately and 3,800 ounces of — sorry, tonnes of copper and roughly 3,800 tonnes of zinc; so that gives you an estimate. But it does vary quarter-to-quarter; we do monitor it; and obviously, given drops in prices, that's what impacts it.

Trevor Turnbull

analyst
#13

I hope I won't be covering too much of what Cosmos already asked, but I just wanted to pose 1 high-level question about the Dolores suspension. I realize operating margins were clearly the issue, but could you discuss what kind of aspect was the tipping point? Was it a matter of the scale of the operation, the grade profile or labor rates? And what I'm trying to get at, I guess, is just trying to understand what would need to change going forward that would let you bring it back online?

Steven Busby

executive
#14

Trevor, I assume you're talking specifically about the underground mine suspension at Dolores.

Trevor Turnbull

analyst
#15

Yeah. My apologies for that, Steve, yes.

Steven Busby

executive
#16

Yeah, yeah, yeah. All right. That's fair. Yes. So really it comes down to cost and what development requires. I believe we mentioned during earlier quarters that the reserves still left on our books to be mined sat roughly around the open-pit mine; so we faced some sequencing difficulties as we mine down through the depth of Phase 8 and Phase 9, where we're currently working, and we really didn't want any interference occurring between the underground mine and the open pit; so over the past few quarters we kept steering clear of that development. And now, given these higher costs, when we examine it and consider what developing back in there demands, at today's cost levels, we simply didn't believe the margins justified going after it. So should the cost structure shift, should metal prices shift, absolutely, that would reopen it and we could go in and take the residual portion of those reserves that move to resources.

Lawson Winder

analyst
#17

I'd like to pose a fairly broad, high-level question about Dolores and the Minefinders acquisition. As we get close to the end of Dolores's life, I think it's fair to say it has somewhat fallen short of expectations since Minefinders was acquired back in 2011. What would you attribute that to — or how would you describe what everyone misjudged at the time of that acquisition? Because I know both Pan American and analysts were quite enthusiastic about it then. Yes, I'd really like to hear what you think about that.

Michael Steinmann

executive
#18

Well, I think a major difference is that — remember, the acquisition took place in 2012, but with metal prices substantially much, much higher. And although we ran plenty of analysis at various metal prices, I believe silver was probably around $30 at that time. We obviously — we didn't factor in that silver price falling to what was the low in that period between $10 and now probably...

James Connor

analyst
#19

$14.

Michael Steinmann

executive
#20

It's somewhere between $12 and $14, so that was likely a major factor behind it. Of course, right now we're definitely seeing much higher costs, but there's still a bit of time remaining, though it's a shorter-life asset at this point; and clearly, as Steve mentioned, we'll need to see fairly significant shifts in metal prices or costs for us to, say, begin the underground. I'm not sure, Steve, whether you'd like to add anything.

Steven Busby

executive
#21

To build on Michael's comments, Lawson, obviously the margins got squeezed more than we had anticipated, since the metal price wasn't as high as the figure we used for the acquisition basis back in 2012, and then costs tightened from the other direction as well. So margins fell short of what was prescribed, given most factors. Overall, the mine, notwithstanding this issue we're dealing with today at 9B in the open pit, the mine resource on the whole has performed, I'd say, fairly close to expectations, all things considered. The only other place where we think we probably underestimated some of the complexities at Dolores was the leach pad construction and the costs of that leach pad construction. That topography, along with the challenges we encountered in building dependable leach pads in that area, was greater than we anticipated going in. Other than that, it was really the margin squeeze driven by pricing costs.

Lawson Winder

analyst
#22

Yes, that's really useful context, and I appreciate you sharing those thoughts. All right. We've covered Dolores quite a bit already. I just wanted to ask about a handful of the other assets. So over at La Arena, are you beginning to observe any higher amounts of sulfide material blended in with the oxide?

Steven Busby

executive
#23

Yes. Lawson, it's Steve again. No, we're mining only within the oxide zones. From all our modeling, we have a pretty solid understanding of where that boundary sits, and we're sitting well above it, outside of it. Right now, I believe we expect the economic hit debt limits will be above that zone; drilling is still ongoing. We're still going deeper. We know the location of that zone; we know when we're getting near it, and we don't really mine any sulfide ore, though it doesn't really recover on the leach pad in any case.

Michael Steinmann

executive
#24

Just to add a bit to La Arena, and you likely heard this during the call, as I mentioned on site in the press release, we once again replaced 46% of the gold ounces mined. It's just astonishing when you consider our purchasing model, where we assumed La Arena would be mined out. Those assets will be mined out, I believe that was mid-2021. With the new reserve update, I think we go well into 2026, with still quite some upside; we are still drilling there. And I think there's probably a good chance for more to come, so at least another 5 years of mine life up to now with more upside; so a very positive story there.

Lawson Winder

analyst
#25

Yeah, I completely agree with that. I mean, the whole La Arena situation has definitely been a really good story for you folks. I also wanted to ask you about Huaron; so during Q2, your lead output was really, really robust, and then silver production came in a bit lower. I just wanted to get a sense of how you expect that split to shift as we go into the second half. So should we expect that to flip?

Chris Emerson

executive
#26

Lawson, it's Chris here. For sure, given how many distinct veins we have coming from Traviata, which carries high copper. We have all these various structures where lead and silver are more dominant, or where we have lead, zinc, silver and copper, et cetera; so really it comes down to a blend of all those different veins as they come in. And certainly, we would be running to budget and forecast. And so I think you can potentially expect us to revert back to that budget.

Steven Busby

executive
#27

Yes. I’d just like to add something to what Chris said. Lawson, this is Steve here. Honestly, we really base that plan on NSR, and from a corporate mine planning standpoint, the sequencing is closely tied to development and to the opportunities the team has to move into different zones, and those zones vary quite a lot between lead, copper, or high zinc. So I’d say it’s difficult for us to predict exactly what will happen in the second half. But generally speaking, we probably won’t see the same amount of lead—maybe a bit more copper is my general gut sense as we go into the second half, but not materially different.

Michael Steinmann

executive
#28

And staying on that same theme, over at Huaron, if you look at the reserves, we replaced 165% of silver ounces. Huaron has been with the company for a long time. I think we'll soon be at probably close to 2 decades of, for the most part, replacing reserves at Huaron. So that shows you just how big and how prospective that ground is. And of course, in that sense it's much easier to replace reserves in a vein deposit than in an open pit, where you're tied to a pit shell.

Lawson Winder

analyst
#29

Yeah, that helps. I believe what you were getting at was the lead. Obviously I understand you have silver production guidance for every mine. But when it comes to each individual mine, there isn't any base metal production guidance, so that color is really useful. That's all from me.

John Tumazos

analyst
#30

I'm trying to picture what the consultation in Guatemala might look like. And I remember going years ago to the Marlin Gold Mine, where the local people spoke a language called Mam, and another time going to the nickel mine in the East, where the local people spoke K'iche. Which language are the consultations conducted in? Can the Xinka people understand how a mine and a profit-seeking business actually works? Would you say that 100% of the consultation covers matters that Pan Am can control and manage? Or does the consultation wander into territory where a big fraction of it is contemporary social issues of the country going back the last 500 years, where the Xinka people might not have been represented by the government, or the 1700s, when the Catholic church paid bounties on Xinka scouts, things like that?

Michael Steinmann

executive
#31

Thanks John, I'll hand it over to Sean McAleer, who is here. He's taking part as the country manager in Guatemala in the consultation. So please, Sean.

Sean McAleer

executive
#32

Right now, the meetings are conducted in Spanish. There is a Xinka language, but currently the meetings take place in Spanish. So every transcript, all discussions, and each presentation is in Spanish, and that is what we anticipate moving forward; issues involving the Xinka language may come up, and they will be handled when they do. As a company, we expect to be providing information, and the Ministries of Health, culture, environment and energy mines will present information about the project along with the company over the next few months. I think at that point we will hear specifics regarding the concerns, and the men will need to address what the government is going to do, and we will likely be asking the company what mitigations may be possible. So we anticipate that developing during the meetings coming up in the next few months.

John Tumazos

analyst
#33

Is this conversation tied specifically to the Escobal project, or does it concern wider social and political matters that might lie beyond your control?

Sean McAleer

executive
#34

So what I'd say is that, up to now, the meetings have genuinely centered on the process itself; and once more, my expectation is that we will get into the sort of specifics you're asking about as the coming months unfold, those being matters we talked over as information gets presented, concerns get raised, and then the issues get resolved; so I expect to — we'll have additional information on that toward the end of the year and probably an update next quarter.

John Tumazos

analyst
#35

I apologize for how detailed those questions were. I simply don't understand what consultation refers to in Guatemala.

Don DeMarco

analyst
#36

Turning to Q2, you also looked at costs at other mines, and concentrating on La Arena and Manantial Espejo, did you carry out impairment testing on those assets? If you did, how did they come out, and what's the asset? They're also rather short-lived, so is the outlook still unchanged despite the higher cost we saw in Q2?

Steven Busby

executive
#37

Yes, I can begin, and then I'll hand it over to Ignacio. Fundamentally, no, the outlook at those mines is unchanged. The Q2 results came pretty much in line with our expectations even though some costs were higher; we believe they stayed within the range where nothing really created any sort of trigger for doing any kind of impairment analysis on those assets. Ignacio, I don't know whether you'd like to add.

Ignacio Couturier

executive
#38

Right, Steve, there isn’t much else I can add. No impairment indicators came up that were different from Dolores. Because of that, we didn’t carry out any kind of testing.

Don DeMarco

analyst
#39

All right. So with Dolores nearing its end, and other mines that don't last long, does the company have a plan for replacing those assets, or maybe a target production level for the gold and silver segments that it wants to keep up?

Michael Steinmann

executive
#40

Well, Don, as you're aware, we're constantly quite active when it comes to business development. There are various routes for that, and exploration is one. As I said earlier, we had substantial replacement of reserves across many of our flagship assets. That was done over a great many years, or decades, in the past. So that clearly is one avenue for growth. Take the example I gave at La Arena — I could give that same example for a number of mines here. Another avenue is a larger exploration success. And I'd really like to mention the Skarn discovery there. When you look at the latest results we published, I think this is turning into a genuinely, genuinely large discovery. We'll be publishing the new resource update at Skarn, I'd say likely in about a month or so. That will be a very interesting data point; but as you can imagine, the existing resource that's currently on our books already stands at 100 million tonnes. And I'd expect that figure to grow. So that's the second route for replacing reserves — adding an entirely new project such as Skarn; and the third route, clearly, is acquisitions, which we always need to scan the market for, to see what's available, whether an earlier stage project or a later stage one. As I've always said, we're extremely selective about that, because we want to — we're after acquisitions that are accretive. And I think we demonstrated that with the Tahoe acquisition 3 years back. And the positive impact that can bring. So really it's those 3 pillars, no different from any other mining company, I'd say; we're in a very strong financial position. So making acquisitions and consolidating our space is clearly something that sits well within our means. But as I said, we've demonstrated over years and years and years our exploration success, and I think that really was capped by the Skarn discovery at La Colorada.

Don DeMarco

analyst
#41

All right. All right. That's fair. That gives us some useful color. Moving to La Colorada, it did well, and I notice access to some high-grade zones has resumed thanks to the ventilation. Do you think that will keep going? And should we look for additional incremental improvements in throughput or grade over the next few quarters?

Steven Busby

executive
#42

Yeah, Don, this is Steve. For sure, on throughput, that ventilation is really, really giving us a big assist, and the refrigeration plant is giving us a big assist too. So it's letting us catch up, so to speak, on ground control and development into the areas that were originally planned for mining a couple of years ago. So we do expect throughput to rise, but we figure grades will more or less hold around the reserve grade of the deposit; that's really what we're aiming to mine; we view this as a very long-term asset, and we would like to mine it consistently at reserve periods going forward.

Don DeMarco

analyst
#43

All right. So moving on to Skarn, then — we're all eager to see those resources. Was there any particular reason it got moved up just a little?

Michael Steinmann

executive
#44

Well, it's simply that we've always put it out in Q3, I mean it was sort of a — is it ready? There's a great deal of work underway at the moment, as you'd expect, given how large it is, plus plenty of decisions regarding the mining method. So we're talking a matter of a few weeks here, not some major change, and well within Q3, when we'll publish those new resources.

Steven Busby

executive
#45

On the resource side. Regarding the mining method, I mean, we're making solid progress assessing that bulk mining approach we discussed a couple of quarters back. And it does look pretty exciting for us, though it's a complex method. This is a deep mine, so building this mine plan is taking a lot of time. And we're examining a couple of unique options, kind of leading-edge technologies for cave mining these days, and applying them here. So we want to make sure we get that right. And correctly, we have a lot of really highly talented consultants who've developed these things around the world. So we need some time to work through that and be comfortable before we start coming out with mining plans, mining costs, things of that nature.

Don DeMarco

analyst
#46

All right. Wonderful. We'll be looking forward to it.

Michael Steinmann

executive
#47

Thank you, operator, and thanks to all of you for being with us on this call; we will speak once more in November when we share the results for our Q3. Enjoy the remainder of your summer. Many thanks.

Operator

operator
#48

That brings us to the end of today's conference call. Your lines can be disconnected now. We appreciate your participation, and we hope the rest of your day is pleasant.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.