Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary
May 9, 2024
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thanks for joining the conference call and webcast covering Pan American Silver's unaudited first quarter 2024 results. Right now every line has been placed in listen-only mode. After the presentation, there will be a question-and-answer session. Should you need immediate help at any point during this call, just press star zero to reach the operator. Please be aware as well that this call is being recorded on Thursday, May 9th, 2024. I'd now like to hand the conference over to Siren Fisekci, VP, Investor Relations. Please go ahead.
Siren Fisekci
executiveWe appreciate everyone being here for Pan American Silver's conference call on the first quarter of 2024. On this call we'll be sharing forward-looking statements and information and referring to non-GAAP measures. Kindly refer to the cautionary statements found in our MD&A, our news release, and the presentation slides covering our unaudited Q1 2024 results, each of which can be accessed on our website. At this point I'll hand things over to Pan American's President and CEO, Michael Steinmann.
Michael Steinmann
executiveThanks, Siren, and thanks to all of you for being with us today. The operating results we posted for Q1 came in at or above what we had expected. Output of silver and gold landed inside the ranges we had guided, and I'm especially happy about how well we did at keeping costs under control. Cash costs and all-in sustaining costs, leaving out net realizable value inventory adjustments for the Silver and Gold segments alike, came in below expectations. During Q1, operations produced $133.2 million in cash flow before changes in working capital. That figure includes $41.1 million of cash taxes paid, and Q1 is usually the quarter when cash tax payments run highest. We posted a net loss of $30.8 million, or $0.08 per share, in Q1, which takes in a $34.4 million tax expense — $15.2 million of that tied to an inflation adjustment in Argentina — $14.4 million of net realizable value inventory expense, and a $10.8 million non-cash investment loss, mostly from the decline in the New Pacific Metals Corp. share price. Adjusted earnings came to $4.7 million, or $0.01 per share. We came out of Q1 in a strong financial position. Cash and investments came to $331.4 million, and the full $750 million remains available to us under our undrawn credit facility. Total available liquidity stands at $1.1 billion.
Michael Steinmann
executiveThat solid balance sheet enabled us to give back $58 million in capital to shareholders during Q1 — $36.5 million came through total cash dividends paid, and $21.5 million went to share buybacks. After our share buyback program was approved on March 4, 2024, we bought back roughly 1.7 million shares at an average price of $14.16 per share, all for cancellation. That includes <<inaudible>>. We're taking an optimistic approach toward future share buybacks. The dividend was kept in place, and yesterday we announced a cash dividend of $0.10 per common share. Beyond keeping a robust framework for shareholder returns, we are putting money into our operations to achieve safe and efficient performance improvements. Operations largely met expectations, though Dolores came in weaker than expected because of lower grades and heavy rains that forced us to cut irrigation rates, which produced a lower ratio of ounces recovered to ounces stacked. NRV adjustments at Dolores also pushed all-in sustaining costs up by $838 per oz. Without those NRV adjustments, all-in sustaining costs at Dolores were $1,529 per oz. At La Colorada, the new ventilation infrastructure remains on track for completion in mid-2024. We expect that to deliver a significant improvement in ventilation conditions at the mine, which will let us accelerate development rates by opening more areas for production.
Michael Steinmann
executiveWe expect that to result in increased mining rates, getting back to about 2,000 tons per day by year-end, compared with the current rate of roughly 1,300 to 1,400 tons per day. In addition, we are moving the La Colorada Skarn project forward. On April 7th, 2024, we announced further drill results from the exploration program we have underway at the skarn. Those results included some of the highest-grade intercepts we have seen so far, among them a remarkable 22.5 meters at 1,435 grams per ton silver, 31.9% lead, and 20.5% zinc. An updated mineral resource estimate for the skarn will be provided in August, along with our mid-year corporate mineral reserve and resource report. We remain in discussions with parties that have shown interest in a possible partnership involving the skarn. Ideally, we would like to structure a partnership that lets us keep exposure to the silver, with estimated annual production of 17.2 million oz over the first 10 years, while the partner would keep exposure to the zinc. We are also enthusiastic about the potential at Jacobina. A study is in progress to assess alternative mining methods and upgrades to the processing facilities. Its purpose is to find opportunities that would optimize the mine's long-term economics.
Michael Steinmann
executiveAt the Escobal mine in Guatemala, the ILO 169 consultation process has been delayed ever since the new government was sworn in during January 2024. In meetings that took place in Q1 2024 involving Pan American, the Ministry of Energy and Mines (MEM), and other institutions, the government affirmed its commitment to finishing the Escobal ILO 169 consultation process. No update on the timeline, however, was provided. On April 29th, 2024, the MEM removed the Vice Minister of Sustainable Development, the official who had been tasked with overseeing and coordinating the Escobal ILO 169 consultation process. A replacement for this position has not yet been named by the MEM. On May 1st, 2024, we announced our agreement to sell the La Arena gold mine, along with the La Arena II project in Peru, to a subsidiary of Zijin Mining Group. Per the terms of the agreement, at closing Zijin will pay $245 million in cash and will grant Pan American a life-of-mine gold net smelter return royalty of 1.5% for the La Arena II project. In addition, once commercial production begins at the La Arena II project, the agreement calls for Zijin to make a further payment of $50 million in cash. We anticipate the La Arena transaction will close in Q3, subject to satisfaction of the customary conditions and regulatory approvals.
Michael Steinmann
executiveThis divestment fits with the pledge we made, once the transaction amount is settled, to sell off properties that don't match our long-term strategy—and at the same time it bolsters our financial position so we can put money into high-quality growth opportunities, cut debt, and give capital back to shareholders. Once the La Arena deal closes as expected, we will have raised $837 million in cash from asset sales since the Yamana acquisition. On top of that, we will have kept four high-quality royalties with industry-leading partners, plus contingent payments of $50 million. And finally, these divestments are also expected to bring our yearly care and maintenance costs down by more than $70 million. To wrap up, Pan American turned in a strong Q1, and we remain on track to meet our operating outlook for the year. We anticipate free cash flow rising through 2024, especially in the second half, given our expectation of greater production and lower costs weighted toward the second half of 2024 along with supportive metal prices. We look forward to giving our usual mid-year update on mineral reserves and resources in August. With that said, I'd like to open the call for questions.
Operator
operatorThank you. At this point, ladies and gentlemen, should you wish to pose a question, on your touch-tone telephone press star and then one. A three-tone prompt will follow, confirming that your request has been received. Should you instead want to drop out of the question queue, all you need to do is press star and then two. In addition, when you are on a speakerphone, we kindly ask you to lift the handset prior to pressing any keys. If you do have a question, please press star one at this time. Our first question comes from Ovais Habib of Scotiabank. Please go ahead.
Ovais Habib
analystThank you, operator. Good morning, Michael, and to the whole Pan American team. Congratulations on a really strong beginning to the year. I have just a couple of questions. To begin with, you got off to an excellent start this quarter, since costs in both the Silver and Gold segments beat the quarterly guidance you had given. In the Silver segment specifically, total cash costs and AISC fell 34% and 40%, respectively, on a quarter-over-quarter basis. Could you help us understand what is driving that? Are you seeing these easing cost pressures across the board? Maybe some color there, Michael.
Michael Steinmann
executiveOkay, Ovais, I’ll begin with that, and then I’ll pass it to Steve so he can add more detail straight from operations. As usual, this comes down to our cost position when you examine it, correct? These figures are costs after subtracting by-product credits. So one component is clearly our production cost, and the team did an excellent job controlling costs there. The second component with major effects is base metal prices in the Silver area and in the Gold segment, where at times there is some Silver too, along with a by-product credit. So if metal prices rise, naturally that works in our favor on the cost side as well. And then the final factor, which I mention often, is our currencies, right? A large share of our expenses is in local currencies, and it always hinges on where that currency is traded. So in Mexico at present, the currency is very strong, and naturally that is a headwind for our costs. Elsewhere, for instance with the Canadian dollar, the dollar is quite weak at the moment. Naturally, that benefits us on the cost side because we report in U.S. dollars. Although we are based in Canada, that is a foreign currency for us.
Michael Steinmann
executiveSteve, perhaps you could fill in a bit more detail there.
Steven Busby
executiveHonestly, Ovais, there isn’t much I can add. I mean, currencies certainly mattered a great deal, especially in Argentina. We didn’t really observe the effective U.S. inflation quite — I mean, it remained substantial, yet it didn’t reach fairly the level we had expected when planning. In Chile as well, things looked quite favorable on the FX side. I’d say that with consumables, we are generally noticing somewhat improved usage — actually lower usage of consumables than we had planned. That is still under evaluation, so we don’t want to alter the year, the full-year guidance, or the guidance for the future quarter. We believe that guidance remains valid going forward, but we are examining it. We did observe some reductions in usage during Q1, and we simply aren’t certain yet whether that is related to ore type.
Ovais Habib
analystSo guidance stays as it is, but is there potentially some upside when it comes to cost improvements, you know?
Steven Busby
executiveSure, as long as you don't hold me to it.
Michael Steinmann
executiveAssuming, as we said, that nothing changes, then yes, I'd say it's fair to call that obvious.
Ovais Habib
analystAlright, that makes sense. And when it comes to divesting those non-core assets — Michael, you and the team have really done an excellent job these past couple of months getting those sold. Is there anything further on the way? Can you share any details about other assets that may likewise be non-core and that you're hoping to sell down the line?
Michael Steinmann
executiveI do want to give credit to the team here, and doing 4 transactions in a single year after that large Yamana deal is truly impressive, right? And really, you know, divesting a few of those assets that simply aren't core for us, and I'd say divesting them at a strong, strong price, and not just a strong price but for cash, and largely cash plus some royalties. So when you consider the caliber of the royalties we kept on each of them, with very high quality mining, big, large mining companies, that's a very valuable royalty portfolio that sits in our ownership once more. So that makes me very happy. That will let us participate, obviously, in future increased metal prices, when that happens and those projects get developed. We still hold a lot of ground, a lot of exploration ground, a lot of some advanced exploration projects, I would say, that don't really fit that came in from Yamana, some we had before. I think in Argentina, we returned the COSE project. So there is a lot of smaller things, but not big dollar numbers, but it's, you know, it all takes time for management and cleaning that up and streamlining that portfolio, just as everybody very more focused and, you know, helps a lot for the future.
Michael Steinmann
executiveGoing forward, then, we’ll keep focusing on the smaller assets and continue making that portfolio more efficient. Right now, though, when it comes to large-scale deals—similar to what we saw last year—the MARAs and the La Arenas of the world were truly the major ones we were looking to divest.
Ovais Habib
analystAlright, thanks for that context, Michael. I do have a few questions regarding Escobal, but perhaps I’ll rejoin the queue later and let others pose their questions too. Thank you.
Michael Steinmann
executiveAlright, thanks.
Operator
operatorLadies and gentlemen, we'll take questions once more — just hit star one on your keypad if you have one. Our next caller is Don DeMarco from National Bank Financial. The line is yours.
Don DeMarco
analystThanks, operator, and good morning, Michael and team. I believe I'll simply continue from the point where Ovais stopped.
Michael Steinmann
executiveGood morning, everyone.
Don DeMarco
analystI've got a few questions about Escobal. So the ILO process, as I understand it, has run into some delays. You know, I suppose we find it encouraging that MEM confirmed its commitment to finishing that process. But I have three questions here: did they give any timeline for completion? And is a replacement needed for that vacant post in order to get things back on track? And has the next meeting been scheduled at this point?
Michael Steinmann
executiveYes. Sure, Don — I’ll begin, and after that I’ll pass things to Sean McAleer, who oversees our operations in Guatemala. Sorry, I just lost my place. What was the first question?
Don DeMarco
analystYes, the timeline.
Michael Steinmann
executiveRegarding the schedule — my apologies.
Don DeMarco
analystYeah.
Michael Steinmann
executiveNo, like we mentioned, look, that deal—the transition, sorry—with the new administration ended up taking quite a bit longer, I'd say beyond what was anticipated. You're correct, it's clearly encouraging that the government has committed to finishing ILO 169, but I'd also want to remind everybody that this is a court-mandated process that all of us need to go through. So, you know, that's simply part of ILO 169, which has ordered that it must be completed. I, there really isn't an option, I think. And, there simply is no timeline attached to it. So the process is highly prescribed, and the government is working on it together with the former government, with good strides forward last year. Definitely a slowdown with the change of government here. And as you mentioned, this vacant post that in the past was really the—another individual who was running that process for the Ministry of Energy and Mines. Just to remind everybody, this is a process between the Ministry of Energy and Mines and the indigenous Xinca group, and we are merely a party to it. So we have no control over timelines here. So the post was very important in the past. I can't speak for MEM to see whether in the future, when they reassign a new person, that will be the individual in charge of the process or if they want to use someone else for the process.
Michael Steinmann
executiveSo with that, I'll pass things over to Sean. Sean, you're much nearer to this than I am.
Sean McAleer
executiveRight, Michael, there isn’t much I can add. Obviously, we’re waiting on that new appointment, and it’s going to be key for us. We’re in touch with the government regularly, and with MEM in particular, to get updates, but no revised timeline has come through. The timeline posted on MEM’s website was tentatively for March 31st, and that date has now passed. Still, we’re hoping to hear something in the coming weeks and months as matters progress. Unfortunately, there’s nothing we can offer by way of an update, and no dates for future meetings.
Don DeMarco
analystOh, okay. Well, thanks for clarifying that last part. And what about a few of the main concerns that came up during the earlier sessions? I believe there was some talk about water, perhaps noise, perhaps other things too. Where do those stand — the conversation around those topics right now?
Sean McAleer
executiveRight, so that meeting happened on February 21st. Since then, there's been no follow-up, nor any working sessions addressing those concerns. Still, what we heard lines up with the feedback from the visits and the interactions we had last year. So there isn't much new to report on that front. That said, the dialogue and the process are, you know, waiting on the MEM to take charge and set the dates for the next meeting along with the timeline.
Don DeMarco
analystOkay. And do you consider those problems, or any others, to be solvable? For instance, can you see a route to the parties reaching agreement on whichever subjects were being discussed when you last met?
Sean McAleer
executiveHonestly, that's tough to predict. What I can say is that we're simply keeping the conversation going. And once we're at the table and get into the specifics of the issues, I'm confident we have mitigations or other measures we could take to ease those concerns. Still, I think that's simply how the process works, so we'll see how things unfold.
Don DeMarco
analystAlright, thanks, and perhaps just one more item. Michael, you brought up the expanding royalty portfolio — could you tell us what your plans are for it? Do you view it as something you'll keep for the long term, or might you sell some of it off to help pay for pipeline development?
Michael Steinmann
executiveWell, as you may remember, previously we built up a fairly substantial royalty portfolio—this was back when I was running business development, before becoming CEO. The bulk of those royalties came from us. At that point we spun them out into Maverix, and through the eventual sale of Maverix to Triple Flag, we earned a very attractive return on those royalties.
Don DeMarco
analystMm-hmm.
Michael Steinmann
executiveA lot has changed since that time, in my view. When we launched that effort — I believe it was 2015 — royalty companies were few and far between. Today, in my view, there's a substantial set of very robust royalty firms operating globally, and I'm quite confident that if we ever choose to sell these royalties, we'd receive highly competitive offers from a range of companies. So there's really no reason for us to go and build our own royalty company all over again. That's the point I'm making. If we do decide to divest those royalties, I believe we would, you know, certainly get plenty of bids from very large royalty companies out there. So, you know, that represents a big chunk of potential cash available to us. But right now, I'd say we're in no rush to divest them immediately.
Don DeMarco
analystAll right. All right, that's encouraging to hear. I have nothing further, and best of luck for the remainder of Q2. Thanks.
Michael Steinmann
executiveThanks, Don.
Operator
operatorOur next question comes from Gary Chiu of CIBC World Markets. Gary, the floor is yours.
Cosmos Chiu
analystHi, this is Cosmos speaking, though perhaps I ought to go by Gary — maybe I'd have had more success in life that way. Anyway, it's still me. I'd like to start with a question about La Colorada. Michael and Steve, as you both said, it's nearly finished by mid-2024. We're getting close. So could you remind us what work remains to be done? Then, Michael, as you noted, once the ventilation work is done, throughput will rise because more mining areas will be opened up. But will grade increase too? And if so, would that happen essentially immediately upon commissioning of the ventilation shaft, or would there be a delay of, say, a month or two?
Steven Busby
executiveOkay, thanks, Cosmos. This is Steve, though you can call me Gary if you'd rather.
Cosmos Chiu
analystThanks. Appreciate it, John.
Steven Busby
executiveTo bring you up to speed on our status, the ducting for the fans is going in right now. The main ducting and the 90-degree elbow at the top of the shaft are in place, and we're beginning to install the horizontal runs. The bases have been poured. We're starting to set the mechanical equipment for the fans, the base fans. These fans are quite large. There are two of them, and each is 2,000 hp. Our plan is to have the first one running by the beginning of Q3, and we remain on track for that. Things look really good. A great deal of effort and logistical expediting has been happening, especially with some of the electrical components, the VFDs and items of that kind. So that is heading our way. It looks good. All of that is coming together nicely. Meanwhile, we're drawing up our plans for once that ventilation is running. We know there is rehabilitation work awaiting us in the Candelaria East and the Deeps area. We have to get back in there and rehabilitate some of the ground control systems that were in place and that were eroded or damaged over the years by the hot, humid air passing through those areas.
Steven Busby
executiveWe're beginning to witness some of that now, since there's a certain amount of flow moving through the shaft at present. So it's bringing us into that zone. We're able to see it. A great deal of rehabilitation work remains to be completed. A great deal of development work is something we have to begin pushing forward. So once that air is on, we'll begin advancing the development, and you'll gradually observe the tonnages inch upward. Getting back to 2,000+ tons per day by year-end is what we're aiming for. So it will be a slow, steady climb from the roughly 1,300 tons-1,400 tons a day we have right now. In truth, we don't, we aren't projecting any grade increase as that occurs, whereas, you know, Q1 had a fairly solid grade, I'd say, a 300+ g per ton. We may see a slight upward adjustment to that once we begin that development work, but we do want to keep that balanced. Again, what we do — what we'd prefer to do is mine La Colorada at its reserve grade. So that is really our objective. We won't go in and attempt to high-grade it.
Steven Busby
executiveOur goal is to raise the tonnage, and we aim to operate at reserve grades in a steady-state condition for as long as possible. So that's sort of, you know, we stand behind the quarterly guidance we've given for ramping that up. That represents a major contributor to the higher production we expect in the latter half of the year. Things are — you know, we do have our challenges. There are rehabilitation challenges, and there are development advance challenges, but we are getting the air there, and matters are looking good. So we feel good about the project, and we remain on schedule to get that fan running and begin this effort to start ramping the tonnage up.
Cosmos Chiu
analystThat sounds great, Steve. Maybe shifting topics a bit — at El Peñon, I saw that grades also came up in Q1 versus the prior quarter, just slightly. Gold rose from 3.24 last quarter to 3.38, and silver moved in much the same way. I know there have been some issues historically when it comes to grades at El Peñon. Are we heading in the right direction? I understand that you're drilling it and still awaiting some of those drilling results, but could you perhaps comment on El Peñon as well?
Christopher Emerson
executiveYes. Hello, Cosmos, also known as Gary. Chris here. Yeah, no, but we have truly started this year at full speed. During the previous year, we did encounter a problem with the drilling, bringing on a new drill contractor. Ramping that up took some time, but we definitely began Q1 at full speed, and we are certainly seeing a great deal of that drilling now feeding into the information for the mid-year reserve and resources update for El Peñon. I would certainly like to think that we will be holding on to these grades, and we have, you know, there are — as you drill through these blocks, you get some good results from it, but in general, we are seeing that reserve grade working out in the drilling. You know, there is, like I said, there is going to be ebbs and flows regarding how this turns out in that mid-year update, and we are looking forward to updating everyone in August.
Cosmos Chiu
analystThanks, that’s helpful. Perhaps one final question about Huarón. As you said, the dry stack tailings project is well underway and is expected to be finished in 2024. Could you remind us what the advantages of this dry stack tailings project are? Is it an extension of mine life? Will there be additional capacity when it comes to tailings? What are the main benefits here?
Steven Busby
executiveYeah, Cosmos — Steve here. Yeah, the conventional tailings we're using right now will hit their ultimate capacity in, kind of mid — Q1 of 2025 on the current schedule. So this is the next stage of tailings for the current reserves and life-of-mine that we see at Huarón — it's moving away from conventional tails and gives us the ability to open up new areas for tailings deposition that are easier to manage, that don't require quite the extensive dam development and embankment development. So it lets us open up more area that we need for the life-of-mine reserves and resources that we intend to mine at Huarón. So really it's just a shift from methodologies to something more robust and with more capacity as we look into the future.
Cosmos Chiu
analystPerfect. Appreciate it, Michael, Steve, Chris, and Siren. That covers everything I wanted to ask. Congratulations on such a strong first quarter.
Michael Steinmann
executiveAppreciate that, Cosmos.
Operator
operatorThank you. And again, everyone, should you have any questions right now, just hit star one on your touch-tone phone. Right now, no questions have come in. Please go ahead.
Michael Steinmann
executiveYeah, thanks, operator, and thank you to everybody joining us today. It was a really strong quarter, you know. I believe we performed well in every area. We hit our targets on production and on cost, and we went further with selling off non-core assets, just like we said we would last year — and I think that moved ahead very quickly with excellent results. On top of that, we gave more back to shareholders. As you could see, that came through a mix of share buybacks and dividends. A strong balance sheet, and there are plenty of genuinely big positives, and we're looking forward to this year, combined with what we're seeing right now — metal prices much higher than the average we had in Q1. So we really look forward to updating all of you again in August. But just a reminder to everyone, we're hosting an Investor Day on June 18th. So please, if you'd like to take part and call in, let us know. Reach out to ir@panamericansilver.com, please, and we'll make sure you're able to participate and call in to that Investor Day. And if we don't speak then, we look forward to talking in August when we go over our Q2 results. Thank you, everyone. Have a good weekend.
Operator
operatorAppreciate that, sir. Everyone, that really does bring today's conference call to a close. Thanks again for joining us, and right now we'd ask that you disconnect your lines, please.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.