Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary

February 20, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 33 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line. I’m the conference operator speaking. Good day, and welcome to the Pan American Silver Corp. conference call covering results for the fourth quarter and the full year 2024. Please note that everyone joining is in listen-only mode and that this call is being recorded. Following the presentation, attendees will have a chance to pose questions. At this point I’ll hand the conference over to Siren Fisekci, VP, Investor Relations. Ms. Fisekci, the floor is yours.

Siren Fisekci

executive
#2

We appreciate everyone being with us on today's Pan American Silver Corp. conference call and webcast, where we'll go over the Q4 financial results, the audited financial results for the 2024 year, and what we expect in 2025. On this call we'll be making forward-looking statements and providing information, and we'll also reference non-GAAP measures. For those, please refer to the cautionary statements found in our MD&A, our news release, and the presentation slides covering our 2024 audit results — all of which you can find on our website. At this point I'll hand the call over to Michael Steinmann, Pan American's President and CEO.

Michael Steinmann

executive
#3

Thank you, Siren, and good morning, everyone. It's great to have you with us as we go over Pan American Silver Corp.'s results for 2024 and what we expect in 2025. We're extremely happy with how the company did during the last year. Q4 revenue hit a record $815.1 million, and for 2024 it reached $2.8 billion, which shows the impact of a full year of output from the Yamana mines we acquired plus robust metals prices. Our 2024 production guidance was met. Silver output came to 21.1 million ounces, while gold output set a company record at 892,000 ounces. All-in sustaining costs for the silver segment, excluding NRV inventory adjustments, came in at $18.98 per ounce for 2024, a bit above guidance. Gold segment all-in sustaining costs, excluding NRV inventory adjustments in 2024, were $1,501 per ounce, which fell inside the guidance range. During 2024, we wrapped up a number of significant projects, most notably the new ventilation infrastructure at La Colorada. We're already realizing the upside through greater throughput at La Colorada—hitting our 2,000-ton target at the end of last year—and reduced operating costs per ounce. We completed construction of the new filtration plant and filter stack tailings storage facility at Huaron, along with the paste backfill plant at Timmins.

Michael Steinmann

executive
#4

Those investments have positioned those assets nicely for what lies ahead. And at present, our operations are producing record cash flows. Cash flow from operations hit a record $274.1 million in Q4, and also a record $724.1 million for the full year, which reflects strong margins. We also delivered record free cash flow of $196.2 million in Q4, or $445.1 million for the full year. We posted net earnings of $107.8 million, or $0.30 per share, in Q4. Net earnings for the full year came to $112.7 million, or $0.31 per share, in 2024. Net earnings in Q4 reflect a gain on the sale of La Arena that was almost entirely offset by adjustments at Dolores to the closure and decommissioning liability and to the net realizable value of the inventory. Those adjustments at Dolores reflect the completion of mining and the shift to the residual leaching phase and active reclamation. According to our latest estimates for residual heap leaching in the post-mining phase, we expect economic production to carry on at decreasing rates through mid to late 2026. The gain from the La Arena sale and the adjustments at Dolores were adjusted out of earnings. That produced adjusted earnings of $126.9 million, or $0.35 per share, in Q4.

Michael Steinmann

executive
#5

For the full year, adjusted earnings came to $286.7 million, which works out to $0.79 per share. Pan American Silver Corp. is heading into 2025 from a position of financial strength. We now hold a net cash position, with $887 million in cash and short-term investments set against debt of roughly $800 million, mostly tied to the two long-term bonds we picked up through the Yamana transaction. Our credit facility is still undrawn, which leaves us with $1.6 billion in total available liquidity. That puts us in a great spot to go after our growth objectives while still returning capital to shareholders. Yesterday, we announced the $0.10 per share dividend for Q4. During the first quarter of 2025, we also bought back approximately $20 million, or roughly 900,000 shares, under the share buyback plan. That brings total repurchases since we introduced the share buyback plan last March to roughly 2.6 million shares. Dividends paid out across 2024 totaled $145.4 million. I take a lot of pride in the fact that we've returned over $1 billion in dividends and share buybacks to investors since 2010 by investing in growth, keeping a strong balance sheet, and never issuing equity to public offerings. Turning to our guidance for this year. In 2025, we expect operations to be largely steady-state, with the notable changes versus 2024 being the sale of La Arena, the lower center in the residual leach phase, and better operations at La Colorada after the ventilation upgrade.

Michael Steinmann

executive
#6

For 2025, we're looking at output of 20 to 21 million ounces of silver, along with 735,000 to 800,000 ounces of gold. Our expectation is that production of both metals will be skewed toward the back half of the year, and that brings with it lower unit costs during that stretch. Quarterly production and cost estimates can be found in our Q4 news release and MD&A. On all-in sustaining costs, the silver segment should land somewhere between $16.25 and $18.25 per ounce in 2025. As for the gold segment, we're anticipating all-in sustaining costs ranging from $1,525 to $1,625 per ounce next year. Sustaining capital is projected at $270 million to $285 million, while project capital comes in at $90 to $100 million. That project capital takes in investment at La Colorada and the current vein mine operation, which is intended to open up production access to 13 new veins. These discoveries are set to expand the high-grade zones in the eastern portion of the mine, and we highlighted them in our annual exploration update news release dated December 9, 2024. At La Colorada's current project, our plan is to put $39 million to $42 million into exploration and infill drilling, and to move the technical studies forward so we can pin down the best development scenario for the company.

Michael Steinmann

executive
#7

They are likewise putting project capital into Timmins—for building the Stage 6 tailing storage facility as well as exploring satellite deposits. Over at Jacobina, project capital is going toward moving forward a broad mine and plant optimization study, and we expect to outline a few initial value enhancement projects around midyear. At Huaron, we have some remaining project capital tied to the new tailings filtration plant and filter stack tailings storage, both of which have now been successfully commissioned and are ramping up toward full operation. Our exploration investment plan for 2025 is roughly $80 million, mainly aimed at reserve replacement. We are projecting cash taxes between $240 million and $260 million, and about one-third of that will be paid in the first quarter of 2025. Care maintenance costs are estimated at $20.5 million to $24 million in total, largely tied to Escobal. Working meetings among participants in the Escobal consultation process picked back up in late January following the Christmas break. We will keep working alongside the government of Guatemala and Xinca representatives to move the consultation process forward. The government has not yet published a timeline for finishing the consultation, and no date has been set for restarting the operation. As we head into 2025, Pan American Silver Corp.

Michael Steinmann

executive
#8

We're in a strong metal price environment, and we're well-positioned to benefit from it. The mines we picked up through the Yamana transaction, along with the strong operating teams running them, are now well integrated into our organization. We've made significant strides in rationalizing the portfolio, and we'll keep focusing on safe, efficient, and sustainable mining operations. We'll keep building an even better and stronger company that gives investors unique upside to silver with expanding margins as metal prices rise. We're well on track with that goal, and I look forward to keeping you informed of our progress. I'll be happy now to take your questions.

Operator

operator
#9

Thanks. We’re moving into the question-and-answer portion now. If you’re on a speakerphone, lift your handset before you press any keys. Should you wish to take back your question, press star. Thanks. Our first question is from Cosmos Chiu at CIBC. Please go ahead.

Cosmos Chiu

analyst
#10

Thank you, Michael, and thanks to the team. My first question relates to La Colorada. Your 2025 guidance shows 5.5 to 5.8 million ounces. Given that you produced 1.6 million ounces in Q4, I might have expected something a bit higher. That said, things don't always move in a straight line. So could you perhaps comment on the 2025 guidance for La Colorada?

Michael Steinmann

executive
#11

Absolutely, Cosmos. It’s a good morning from me, and Steve will take that question.

Steven Busby

executive
#12

Yes. Morning, Cosmos. Thanks for asking that. As you may remember, back in December we issued a press release pointing to some quite notable exploration intercepts located on the eastern portion of Candelaria. Our decision was essentially this: there's some balancing taking place. We're attempting to ease the load somewhat. Within the system we face a capacity constraint when it comes to moving waste. And we're keen to expand into this fresh zone so as to deliver long-term value for that operation. So we're weighing, you know, which effects we'd like to see in the coming year versus attempting to open up that new area aggressively and gain a fuller understanding of the potential reserves sitting out there. Thus we settled on something of a middle ground for 2025 — a measure of near-term pain in exchange for longer-term benefit. And I'll hand it to Chris to say a few words about what we're observing out there and the reasoning behind it. But first, I'd also like to note that on the route heading east, we do pass through a stretch of concession held by one of our neighbors.

Steven Busby

executive
#13

We’ll be mining through a concession in that area, and it appears some ore is present there, and as we pass through, we’ll share a portion of the profits with the concession owner. So that affects cost and production somewhat as well. But the real issue is the waste constraint. We want to develop that area. We have only limited capacity to move additional waste. So something has to give as we open up that area, and over the long term, we believe it will deliver substantial added value to the company, and I’ll let Chris highlight that.

Christopher Emerson

executive
#14

Yeah. Hello. Chris speaking. Hi there. Yes, as Mike said, there are 30 new structures highlighted in the December exploration press release. We've been hinting at this throughout last year. A great deal of effort has gone into shifting much of the exploration toward that eastern portion. We have some of the major structures, the NC2, etcetera. But if you recall, the La Colorada mine has been getting deeper. And, as we know, through these systems it becomes more palmetto rich. So discovering new structures and new areas higher up in the system is obviously beneficial. That's why we're really focusing on that eastern portion and southeast of the Scan area, which is depth as well. But we've had some great results, as you can see in that press release. And that's certainly something to look forward to. The future of the company.

Cosmos Chiu

analyst
#15

Thanks. And perhaps a similar kind of question for Jacobina too. Your guidance is for 185,000 to 195,000 ounces in 2025. I thought that potentially could have gone higher as well, just given that you had a record 52.4 in Q4 2024. Could you maybe comment on that, and also perhaps comment on — I believe there are some optimization studies ongoing at Jacobina? How is that going so far?

Steven Busby

executive
#16

Yes. Cosmos, this is Steve again. Yes. Jacobina had an outstanding year for us. We're extremely pleased with how that operation is debottlenecking — it keeps debottlenecking. That being said, several projects are in progress during 2025, apart from the optimization study, that aim to solidify the plant and provide stability. You know, we have some screens that are undersized. We're running them too hard. So we're swapping out certain screens in the crushing plant and in the grinding circuit. We're carrying out some upgrades to our CIP carbon and pulp tanks to achieve that sustainable run rate, but those projects won't be finished until late in the year, so we didn't want to project the type of production throughputs we saw during Q4 across the whole first nine months, given those projects. Once those projects are complete, we're quite confident, and as part of the optimization work I'll discuss next, we're quite confident mid-year, we'll be able to come out with some — you know, looking forward past 2025 as to how we can push that plant up a little bit. Regarding the optimization study, that work is progressing really well. A few projects are going to come out.

Steven Busby

executive
#17

Later in 2025, around midyear, we'll be announcing those, and they involve how we handle this paste plant concept—the one we've discussed for the underground mine, which lets us recover the reserve and resources there more effectively. Beyond that, looking at the longer-term picture, we have to alter how we're managing some of the tailings, so we're also examining a filter plant at that site. As a result, the optimization study is beginning to split into various phases. The initial phase will concentrate on advancing those projects while also keeping this mill sustained at the throughput levels we witnessed in Q4. And then, the future potential there is genuinely becoming exciting as well, in terms of what we can accomplish across 2026 and 2027.

Cosmos Chiu

analyst
#18

Mhmm. And maybe one final question here, a bit more big-picture. Michael, you've surely seen that Newmont has sold off their assets by now. So does that shift the way you look at your Timmins assets at all? And then, could you also remind us what book value you carry for those assets?

Michael Steinmann

executive
#19

Clearly, as you'd expect, those assets are performing extremely strongly. That said, I believe we've discussed before that I'm firmly convinced—and all of us here are firmly convinced—that the whole Timmins district has the potential to create far greater value, perhaps in a somewhat different shape; we don't yet know how that would look, but by collaborating across many areas. There are numerous trucks and a lot of transportation moving in every direction, linking Newmont—or soon Discovery Silver—with us. So in my view there's substantial room for optimization. It may be somewhat premature to discuss that at this point, but I believe there's plenty we can accomplish that would benefit our shareholders and in all likelihood benefit Discovery shareholders too. And of course, that was clearly the rationale behind their transaction with Newmont. In my view it's an excellent district in Canada. A strong gold producer. And bear in mind, it isn't just the two operations of ours located there—I think we've previously shared certain results from a few of the more satellite exploration programs that Chris is running at Whitney and the Gold River rehab too.

Michael Steinmann

executive
#20

There are some quite compelling extra satellites out there, to be sure. In my view, all of that will factor into those choices. So for Timmins, I'd call this a genuinely exciting period.

Cosmos Chiu

analyst
#21

Appreciate it. And once more, thanks to Michael, Steve, Chris, Darren, and the team. That covers everything I wanted to ask. Thank you.

Michael Steinmann

executive
#22

Thanks, Cosmos.

Operator

operator
#23

Our following question is from Don DeMarco at National Bank Financial. Go right ahead.

Don DeMarco

analyst
#24

Thanks, operator, and good morning to you, Michael, and the team. Yeah. The constructive guidance does point to a fair amount of stability in the ops. Thank you. So I have a few questions. Am I coming through okay?

Michael Steinmann

executive
#25

Yes, we do. Sure — please go ahead.

Don DeMarco

analyst
#26

Okay. Great. So, you know, I joined a little late. You might have covered Jacobina somewhat, but when is the optimization study due? And what can you tell us at this point regarding throughput gains or mine life extensions, that sort of thing that had been mentioned at some stage.

Steven Busby

executive
#27

Yeah. Hi, Don. This is Steve. Yeah. We had an excellent fourth quarter at Jacobina. We managed to hit a goal we’d set for ourselves—getting throughput through both the mine and the plant to 175,000 tons, which works out to just over 9,000 tons per day. We achieved that. We were really happy about it. But there are some projects we still need to finish in the plant. We’re swapping out some screens in the crusher, and we’re replacing some screens in the grinding circuit as well. We’re also upgrading certain tanks along with some of the tailings pumping. That will provide stability and sustainability for that level of throughput—that’s what we’re observing. So a major portion of the optimization study involves getting those projects completed. It will capture those values and give us sustainability well into 2025 and definitely into 2026. And we’ll likely share what those numbers look like around midyear. Now at midyear, the optimization study is beginning to break into separate phases. And we’re looking at phase one, where we’re evaluating this paste plant that we’ve discussed over roughly the past year, bringing it in so we can recover more of the reserves.

Steven Busby

executive
#28

Beyond that, there are longer-term options for tailings disposal that the paste plant assists us with. In addition, we were examining a filter plant as another means of tailings disposal. That will essentially form the first-phase optimization. We'll share details on certain projects in that area, along with their returns and the investments involved. Our aim is to do so around the middle of this year. After that, we'll progress to phase two, where, once we grasp how those elements feed in, we have some genuinely compelling optimizations that we'll keep pursuing, which will deliver value in 2026, 2027, and 2028 — that will be a phase two program at a later point.

Don DeMarco

analyst
#29

All right, thanks for that. And Steve, since I’ve got you here, regarding El Peñón, you know, we’re looking at production holding steady compared with last year, costs holding steady, and an appealing AISC midpoint of $12.35. In fact, a little bit lower than a year ago. So does that mean those early integration bumps are truly behind us now, and you’re feeling at ease with this asset?

Steven Busby

executive
#30

Absolutely. Yeah, that's a great question, Don. And yes, we're really happy with how stable things are. A lot of our effort is going into exploration. We want to lengthen the life of that mine. For us, it's a strong cash-flowing asset. Costs are steady. The operation is steady. You know, just to remind you, it's producing gold at a level of about 130,000 ounces a year. You know, that's somewhat below what we went after aggressively in 2023. But by, kind of fine-tuning that, we feel quite comfortable with that operation, and it's doing extremely well.

Michael Steinmann

executive
#31

It was a dumb — well, if you remember, it really came down to how some of that drilling was spaced in certain stopes. That's what we saw hit us early on. I wouldn't really describe it as an integration hiccup. The team at Peñón is doing an unbelievable job and fit very easily into our company and our system. The same goes for the other Yamana assets. So integration wasn't really the issue — it was that spacing of the drilling, and Chris and his team put in a lot of work drilling it out, and I think we're seeing the result of that now.

Don DeMarco

analyst
#32

All right, good to see everyone. And Michael, one final question regarding Escobal. You said no timeline has been released by the government for wrapping up the consultation process. What's your read on this? Things have been stuck at a standstill for roughly 12 months now. That said, there are likely other avenues at play. Is there any cause for optimism looking toward 2025, or what do you think about Escobal?

Michael Steinmann

executive
#33

Well, I wouldn't describe it as a stalemate. There are plenty of meetings taking place. As you remember, when the new government came in roughly a year ago, last year got off to a somewhat slow start. Getting to where we are took time, but a great deal of work is happening behind the scenes among the parties involved. So a stalemate isn't how I'd put it. The government published some meeting schedules years back, and in my view that didn't accomplish much — it simply placed unnecessary pressure on the participants. We'd prefer to keep holding many meetings and having as many discussions as possible on the path toward, hopefully, a positive outcome. So yes, I wouldn't call it a stalemate. There's likely — actually, let me have Shana give a brief update here as well. Quite a lot is going on.

Shana Halvorson

unknown
#34

Yes, thanks Michael. So a new administration came in last year, and as a result they replaced the vice minister in charge of the element's sustain file, the one who runs the process. That played a big part in some of the delays we saw last year, though meetings have kept going into Q4. We held quite a few meetings with the government, and Xinca Parliament also had meetings with the government. So those went well. And then, as always, things ease off around the holidays and through early January, and we've only just begun ramping back up with a few government meetings. So yes, I expect considerably more activity over the weeks and months ahead and, you know, hopefully we can give a more meaningful update on how some of these developments unfold following the Q1 results in May. So I'm looking forward to that.

Don DeMarco

analyst
#35

All right, all right, great. Appreciate that. I’ve got nothing further. Best of luck in Q1 and for the remainder of the year.

Michael Steinmann

executive
#36

I appreciate that.

Operator

operator
#37

That brings the Q&A portion to an end. Michael Steinmann, I'd like to hand the conference back to you for any closing comments. Please go ahead.

Michael Steinmann

executive
#38

My apologies, operator — I notice a question has just come through. Would you mind if we addressed it?

Operator

operator
#39

Absolutely. Next we'll take a question from Ovais Habib at Scotiabank. Go right ahead.

Ovais Habib

analyst
#40

Hey Michael, and hello to the Pan American crew. I’ve just got a couple of questions. Apologies if some of these have already come up, since I’ve been jumping between a few calls. Michael, my first one is about the guidance. From what I understand, both production and costs are weighted toward the second half. Could you give any detail on which assets would account for that first-half versus second-half split?

Michael Steinmann

executive
#41

Okay, Steve can take that one. But broadly speaking, for whoever's listening, this is clearly something that keeps coming up with Pan American, and it's mostly caused in part by weather — so the seasons, wet seasons, dry seasons, chilly winters down in the far south. Still, keep in mind that we operate across entirely different types of climates. You witnessed the same thing last year, plainly the year before as well, and you saw, you know, we had fairly robust production in Q4. Clearly there's nothing we can do about the climate in those places. That's simply how it is for the assets spread so widely across varying climate zones, though I'll let Steve fill you in with a few more specifics.

Steven Busby

executive
#42

Yeah. Thanks, Ovais. And Cerro Moro is among the bigger drivers, and that comes down to mine sequencing as we open up the Naty open pit. We'll be getting the higher grade later in the year. That's really driving a big part of it. Shahuindo, as Michael mentioned, is very, very weather dependent. So generally we see better production going in late in the year there as well. I think those are probably the two bigger drivers. There's a bit of that at El Peñón, but again, it's just mine sequence.

Ovais Habib

analyst
#43

Appreciate it. Thank you, and thanks to Steve and Michael too. My follow-up question really comes down to this: once again, you posted a strong Q4, produced substantial free cash flow during Q4, and judging by operations, things appear to be settling down as we head into 2025. That is genuinely encouraging to see. At this point, with all those Yamana assets now integrated and with the strong work you have done on the non-core side, has the moment arrived to put more emphasis on exploration, or how should we think about 2025 where exploration is concerned?

Michael Steinmann

executive
#44

Exploration has never truly been scaled back for us. There’s a meaningful budget allocated to it, as you can see. We usually end up raising that budget as the year goes on. The outcome really dictates it. As you know, I come from a geology background, and whenever exploration delivers strong results, that always earns additional investment. It’s genuinely the core of what we do, and of course, you already have the plant constructed and the mine largely developed. So at every operation, replacing those reserves matters enormously and creates substantial value. Exploration therefore remains a major priority at all times, though as you’re aware, our exploration work concentrates on brownfields—areas near our existing sites. Reserve additions, perhaps within some truckable distance, where we’re evaluating truckable satellites in certain locations. Cerro Moro springs to mind, where we’re currently mining one zone. We’ve just found another one that Chris and his team are drilling out. So exploration is always central to what we do. Looking back, we’ve been remarkably successful at replacing hundreds of millions of ounces of silver across roughly fifteen years through brownfield exploration and on-site exploration. And keep in mind that our exploration program is what discovered Escobal.

Michael Steinmann

executive
#45

That will always remain a major point of emphasis for us.

Ovais Habib

analyst
#46

That's great. Thank you, Michael, for that, and I appreciate your taking my questions. And I look forward to seeing you at PDAC.

Michael Steinmann

executive
#47

Much appreciated. Until next time.

Operator

operator
#48

Our following question is from Adrian Day at Management. You have the floor.

Adrian Day

analyst
#49

Yeah. Morning. I'd like to ask a follow-up about Escobal, if that's okay, but from another angle. Once approval to reopen comes through — and naturally you'll likely have some signal it's on the way before it actually occurs — how quickly would you be producing again, and how quickly until it's fully ramped back up?

Michael Steinmann

executive
#50

Yeah. Hi, Adrian. Look. I'd say it'll take a solid quarter to two to get the first stope up and running, and then, as you know or probably recall from the time with the tower when the asset was producing, those stopes are quite large and generate a lot of silver. So that would begin — I guess one stope at Escobal ought to be equivalent to roughly five to six million ounces of silver annually. So that's already a strong start-up. After that, I think it's probably about a part of the year to bring it back to full production, which was somewhere in the range of 20 to 22 million ounces a year.

Adrian Day

analyst
#51

Alright, that’s useful. And once the approval comes through, is the company set to begin right away, or would you say, well, we have other priorities at the moment, so we’ll wait a few months now?

Michael Steinmann

executive
#52

This is clearly a phenomenal mine and project, so our entire attention is on it. There is always plenty happening. As you know, we have a highly capable team able to manage multiple assets simultaneously. I believe we have demonstrated that consistently, year after year after year. So naturally, that will be the top priority. You have likely observed in recent years that we typically spent as much as $24 million previously, and perhaps now more, somewhere between $18 million and $20 million, on care and maintenance of that kind. This ensures everything remains in peak condition and the restart can occur, or could occur, as swiftly as possible.

Adrian Day

analyst
#53

Alright, I appreciate that — thanks.

Michael Steinmann

executive
#54

I appreciate it.

Operator

operator
#55

That brings the Q&A portion to an end. Michael Steinmann, I'd like to hand the conference back to you for any closing remarks, please.

Michael Steinmann

executive
#56

Thanks, operator, and I appreciate all of you joining us today. Absolutely, this is an exciting period for Pan American Silver Corp. — metal prices are very high, we're generating very strong cash flow, and shareholder returns have been excellent. So, as you know, we'll stay squarely focused on keeping strict discipline over our costs so we can hold on to those great margins we're benefiting from at the moment. And I very much look forward to bringing you an update on our Q1 call in May. In the meantime, take care and have a good day. Thanks to all of you.

Operator

operator
#57

That wraps up our call for today. You’re free to drop off the lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.