Pan American Silver Corp. (PAAS) Earnings Call Transcript & Summary

November 13, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 46 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line. I’m the conference operator, and I’d like to welcome you to Pan American Silver’s Third Quarter 2025 Results Conference Call. Please note that everyone attending is in listen-only mode and that this conference is being recorded. Following the presentation, you’ll have a chance to ask questions. If you’d like to enter the question queue, press *1 on your telephone keypad. If you require assistance at any point during the call, you can reach an operator by pressing *0. At this time, I’ll hand the conference over to Siren Fisekci, Vice President, Investor Relations. Please go ahead, Ms. Fisekci.

Siren Fisekci

executive
#2

We appreciate everyone being with us today for Pan American Silver's conference call and webcast, where we'll go over what we delivered in the third quarter of 2025. On this call you'll hear forward-looking statements and information, along with references to non-GAAP measures. Kindly refer to the cautionary statements found in our MD&A, our news release, and the presentation slides covering the Q3 2025 results, each of which can be found on our website. At this point I'll hand things over to Pan American's President and CEO, Michael Steinmann.

Michael Steinmann

executive
#3

Good morning, everyone. I'm happy you're able to be with us today for a discussion of Pan American's Q3 2025 results. During the quarter just ended and on into Q4, higher silver and gold prices have worked in our favor, along with a strong cost performance. That led us to record attributable free cash flow of $251.7 million for Q3. We closed our acquisition of MAG Silver on September 4th. We've only had a 1-month contribution from our 44% interest in the Juanicipio mine in Mexico, yet the effect is already visible in lower costs and better margins, which highlights why this transaction made strategic sense. Juanicipio is accounted for under the equity method, though we report production, cash cost, all-in sustaining costs, and capital expenditures on an attributable basis so that our 44% interest is reflected. I'm happy to report that we've posted another quarter of strong financial results. Attributable revenue for Q3 set a record at $884.4 million. Net earnings came to $169.2 million, or 45 cents basic earnings per share. That figure includes a $21.7 million loss on the sale of a subsidiary and $16.3 million of income from Juanicipio. The loss on the subsidiary sale stems mainly from a $28.6 million reduction to the $137.4 million gain we booked back in December 2024 on the sale of La Arena, tied to net working capital adjustments.

Michael Steinmann

executive
#4

That was partly offset by a $6.8 million gain from selling our 80% interest in La Pepa — a non-core, development-stage project located in Chile — which brought in $40 million of cash proceeds in September 2025. Adjusted earnings came to $181 million, equal to 48 cents in basic adjusted earnings per share. Attributable cash flow from operations reached a record $323.6 million. Cash and short-term investments at the close of Q3 came to $910.8 million, along with $85.8 million of cash held at Juanicipio for our 44% interest. That figure comes after a net outlay of $409.3 million on the MAG acquisition, transaction costs included. With $1.7 billion in total available liquidity, our financial position remains very strong. In light of that strength and our cash flow generation, I'm pleased to share that the board has approved raising the dividend to 14 cents per common share for Q3 2025. Even though the quarter-end cash balance reflects the cash paid out for the MAG acquisition, the board used its discretion on this quarter's dividend, given the strong cash flow we are generating. We didn't buy back any shares during Q3, partly because of the blackout tied to the MAG acquisition, but we are still ready to move opportunistically.

Michael Steinmann

executive
#5

For the first 9 months of 2025, dividends and share repurchases totaling $146.9 million have gone back to shareholders, and the dividend payment approved yesterday will add another $59.1 million. Now on to operations. Attributable silver production in Q3 came to 5.5 million ounces, which includes 580,000 ounces from the 1-month contribution of Juanicipio. Performance at La Colorada keeps pleasing us, since better ventilation conditions there are letting mine rehabilitation and development rates speed up, which raises the count of production areas, especially within the deep, high-grade zones of Candelaria East. At Huaron, silver output took a hit from lower silver grades, a reflection of more development and reduced stope or mining rates aimed at growing the inventory of prepared high-grade stopes, and those are expected to strengthen production stability and reliability in the future starting mid-2027. Cash costs for the silver segment were $10.41 per ounce, while all-in sustaining costs came in at $15.43 per ounce. Those costs sit below Q2 2025, already showing the positive effect Juanicipio is having on bringing silver costs down and improving margins, even though it has only been in our portfolio since early September. Low all-in sustaining costs at Cerro Moro also gave the quarter a boost, thanks to high byproduct gold production and prices relative to Q2.

Michael Steinmann

executive
#6

Working against those items were reduced silver output from Huaron and an $8.3 million royalty charge at La Colorada during Q3, mostly owed to a third party under a profit-sharing arrangement tied to mining on a neighboring concession. Attributable gold output came to 183,500 ounces. During our Q2 call we noted that several technical problems at Cerro Moro, El Peñón, Timmins, and Minera Florida, detailed in our MD&A, would likely carry over into Q3, which fits with our view that gold production would be weighted toward the back half of the year. Those same technical problems at Cerro Moro and El Peñón also pulled down silver output in Q3. Cash costs for the gold segment ran $1,325 per ounce, while all-in sustaining costs, before NRV inventory adjustments, came in at $1,697 per ounce. Production and costs overall, across both the silver and gold segments, are still tracking with our 2025 operating outlook. That said, we have lifted attributable silver production guidance to 22 to 22.5 million ounces and cut silver segment all-in sustaining costs to $14.50 to $16 per ounce to reflect Juanicipio's contribution. Guidance for all other costs and production stays the same. Capital project spending this quarter totaled $35.3 million, primarily at La Colorada and Jacobina. At La Colorada, we kept up exploration and equipment spending to open further access to high-grade zones deeper in the eastern portions of the Candelaria ore zone.

Michael Steinmann

executive
#7

Back in September, we announced fresh high-grade drill results and grew inferred mineral resources by 52.7 million ounces of silver — a move that meaningfully stretches the resource potential eastward and southeastward past the areas we currently mine. That's an exciting step, and it opens up considerable synergies by way of a possible 2-phase development plan for our big La Colorada skarn project. Under phase one, we'd pair skarn development with the vein mine, and that's expected to deliver higher grade, lower tonnage, and a less capital-intensive build than what our 2024 PEA laid out. Phase two would bring in the cave mine expansion. With this phased approach, an enhanced vein mine can run in parallel, drawing on shared infrastructure synergies and lifting overall project value. A PEA covering this 2-phase development plan together with enhanced vein mining is in progress and should be issued in Q2 2026. On top of that, we're well along in partnership discussions that take this enhanced development approach into account. Over at Jacobina, the extensive optimization study has turned up a number of opportunities to ease constraints that could potentially benefit mine life, production, and operational efficiencies. Those opportunities include, but aren't limited to: a tailings filtration and filter stack project to ease existing long-term tailings capacity limitations; a mine paste backfill plant project that takes advantage of the tailings filtration circuit, thereby enabling an increase in ore recovery in selective high-grade ore zones; and a significant process plant streamlining project to improve reliability, release throughput constraints, reduce mine operating costs, and enhance gold recovery.

Michael Steinmann

executive
#8

We've just brought a pilot plant on-site into operation to show the gains that come from simplifying a plant flowsheet, which was established via bench-scale metallurgical lab testwork. We've likewise hired a top engineering company to produce detailed designs, schedules, and cost estimates for finishing these optimization projects. As these engineering efforts move forward over the next year, we'll keep giving updates on how these exciting projects are being implemented. At Escobal, the Guatemalan Ministry of Energy and Mines has convened a number of separate working meetings with the ministries taking part in the ILO 169 consultation process, with representatives of the Xinka Parliament, and with the company. The Ministry of Mines has additionally named several key personnel to supervise and carry on activities for the Escobal consultation process. No timeline has been supplied by the ministry for concluding the ILO 169 consultation, though discussions continue to be active and respectful. Before I finish, I want to acknowledge Steve Busby for his outstanding contributions to Pan American Silver across the last 22 years, 17 of which he served as Chief Operating Officer. Steve is moving into the position of Special Advisor to the CEO, and I'm thankful that we'll keep benefiting from his deep technical expertise.

Michael Steinmann

executive
#9

I'd also like to extend a welcome to Scott Campbell, who joins us as Chief Operating Officer. Scott has 25 years of operational experience in Latin America, and I'm eager to keep working closely alongside him as we move our strategy forward. At this point, I'd be glad to take your questions along with the rest of our management team.

Operator

operator
#10

Thank you. At this point we'll move into the question-and-answer portion. If you'd like to get into the queue for questions, just press *1 on your phone's keypad. A tone will sound to confirm that your request has been received. Should you be on a speakerphone, kindly lift your handset first before you press any keys. If you want to take your question back, press *2. Our first question comes from Wayne Lam at TD Securities. Please go ahead.

Wayne Lam

analyst
#11

Oh, yeah. Thanks. Morning, everyone. I'm just curious about that guidance increase. Is it fair to think the earlier Juanicipio guidance has stayed unchanged from what MAG had before, and I'm wondering whether there have been some slight downward adjustments within the silver segment of the guidance? Since the deal closed in September, I would have expected the pro forma silver guide to come in a bit higher, so I'm wondering if there are any other offsets coming from the rest of the operations in the portfolio.

Michael Steinmann

executive
#12

Hello, and good morning. No, it's quite close to what MAG reported. As you'd expect, we've really only had that operation under our wing for two months now. Our expectation is that output for the rest of the year should be much the same as what we recorded in September.

Wayne Lam

analyst
#13

Thanks. Then perhaps regarding Huaron, specifically about the grades and the rise in development ore being processed. For a couple of quarters now, you've been dealing with somewhat higher dilution on the mining side, and I'm just wondering whether that might also be tied to the reduction in cut-off grades, in the sense of process grades coming down somewhat. I'm just curious whether we should expect grades to bounce back over the next few quarters, or whether that's more of an active strategy you're using to lower the cut-offs so as to bring in somewhat more economic material.

Steven Busby

executive
#14

Hi, Wayne — Steve here, and I can take that question. Last quarter we launched an initiative aimed at speeding up development: we're working to get ahead, to have some high-grade stopes ready, and to build up a stock of stopes so production becomes more dependable. That effort will carry us through the whole of '26 and on into '27. What you're seeing is a much bigger share of ore coming from development, and that ore is more diluted than what comes out of stope mining. The whole point of the initiative is to build a stock of stopes at the mine, which will give us greater flexibility down the road once we've pushed all of this development out ahead of ourselves. That's what you're seeing.

Wayne Lam

analyst
#15

Thanks. Maybe just one final question, then, about Jacobina and the optimization studies currently underway. Could you share a little more detail on what exactly is being optimized at the mine and/or the plant, and how that could affect future operations? Would it be on additional tonnage or lower costs, and when might we see the results of that?

Michael Steinmann

executive
#16

Thanks for that. A great deal is happening at Jacobina, and I’ll hand things over to Steve. You heard earlier that Steve is going to retire as COO, though he’ll remain with us, bringing his tremendous depth of knowledge. For expansion efforts of that kind at Jacobina, Steve will be extremely important. Steve, perhaps you’d like to take that question.

Steven Busby

executive
#17

Absolutely, Wayne — glad to take that one, and it's a really exciting area for us right now. At the mine itself, things are quite flexible, since we're effectively mining seven areas and will soon add an eighth with Maracota, which gives us considerable room to maneuver in how ore gets delivered from the mine to the plant — whether that's throughput expansion, tonnage, or similar considerations. The optimization effort is mainly centered on the plant. That plant is an old one — it was first constructed back in the '80s as a facility processing under 4,000 tonnes a day, and over time it has been pieced together bit by bit. Numerous components and quite a few circuits have been tacked onto the flowsheet, making it something of a complicated flow network, so to speak. We believe there's a chance to step into that plant and streamline it — take out circuits we don't require, tidy up some of the circuitry, aim for larger equipment with fewer units, bring down maintenance expenses, boost reliability, gain efficiencies, and lower costs overall — and, tied to that, when we consider Jacobina over the long term, we genuinely see a chance to move to a filter-stacked tailings facility.

Steven Busby

executive
#18

So that gives us a considerable amount of room for disposal. With conventional tailings, we'll likely exhaust capacity at this site around the mid-2030s. Our plan is to add a filter plant to this flowsheet. We've put a lot of effort into this. We're evaluating vacuum filters, similar to the ones we operate at El Peñón. Those look pretty promising, and we're essentially proposing a vacuum filter plant located down at the tailings facility, and it would let us build a stack that we're designing beneath what we refer to as the B2 dam. Where this sits also works in our favor, since we can install a modular temporary paste plant and take a portion of the tails to produce cemented paste that can be pumped into the northern section of the mine, where a number of our higher-grade mining zones are, and that gives us better recovery from certain higher-grade stopes that we otherwise wouldn't achieve without some form of cemented backfill. That's how all of this optimization fits together. I hope you can see that this is a substantial brownfield project in and around the plant. It will call for very careful planning and very careful sequencing of how we carry out these modifications. That's where we're working closely with an engineering company, and once we begin to get the designs, the sequencing, and the costing finalized, we'll begin to truly demonstrate what the overall value of this project will be.

Steven Busby

executive
#19

This is something we’re genuinely thrilled about.

Wayne Lam

analyst
#20

Excellent. That gives us plenty of useful information. I appreciate your time in answering my questions, and I wish you the best, Steve.

Steven Busby

executive
#21

Thanks, Wayne.

Operator

operator
#22

Our following question comes from Fahad Tariq at Jefferies. You have the floor.

Fahad Tariq

analyst
#23

Hello, and thank you for taking my question. Perhaps, regarding the gold guidance, which remained unchanged, could you discuss how you are approaching the fourth quarter, considering some of the dilution you mentioned at Timmins and El Peñón, along with some of the development delays you referenced at Minera Florida? I am simply trying to get a sense of the confidence level for the fourth quarter on the gold side. Thank you.

Scott Campbell

executive
#24

Yeah. Good morning. Scott Campbell speaking. We certainly faced difficulties in Q3, but we are keeping our Q4 guidance, and we feel confident that it will be met. There was some dilution at Peñón, and we encountered challenges along with minor delays regarding ground support at both mines we operate in Chile, yet we are holding the guidance. In November, gold production in the southern countries has already begun to improve.

Fahad Tariq

analyst
#25

All right. So perhaps we can turn now to the revised approach to development at the La Colorada skarn. You mentioned during your opening comments that talks with partners have moved along considerably. Any specifics you could share on that front would be useful. Thank you.

Michael Steinmann

executive
#26

Morning. So, the talks are at a quite advanced stage, though it's premature to disclose them publicly right now. Things are looking quite compelling. That new approach—we've obviously been watching it for quite a while to figure out how we might push forward the really high-grade portion of our skarn ore bodies. As you may remember, over the past couple of years we put out a few press releases showing some very striking, long, very wide, high-grade intercepts across two of the three skarn ore bodies we discovered. Truly, finding those high-grade structures in addition that we came across during 2025 and published in September, and thereby lifting our resource by roughly 53 million ounces already—that blend of the near-surface high-grade discovery along with the wide, high-grade intercepts in the core section of the skarn really lets us move to this phased approach and anticipate two phases going forward, as we mentioned, with smaller tonnages, yet still an impressive mine, delivering very similar silver output to the original plan we had envisioned, but clearly at higher grade, with less tonnage and less capital, and then shift to the larger cave mine at a later point. Very interesting advances.

Michael Steinmann

executive
#27

As we said, the PEA will be released in Q2 of next year, but there's been very encouraging progress at La Colorada. We're looking forward to reviewing that partnership agreement and bringing in a very strong partner for this truly exciting project as well.

Fahad Tariq

analyst
#28

Okay, and one final thing — would it be accurate to say that the partner would really only be involved in Phase 2, or do you see them also putting money toward capex and taking part in Phase 1? Thanks.

Michael Steinmann

executive
#29

I can definitely picture doing that in stages as well, with a smaller-scale partnership choice during Phase 1 and a bigger one during Phase 2. That still hasn't been decided yet.

Fahad Tariq

analyst
#30

Alright, thanks.

Operator

operator
#31

Our following question comes from John Tumazos at John Tumazos Very Independent Research. You may proceed.

John Tumazos

analyst
#32

Thanks for letting me ask. We’re aware that you turn out a modest amount of base metals as well, and there’s a sizable gap between zinc at $1.44 and lead at 93 cents. What’s your view on why zinc has been the stronger price when global steel production is off a couple percent this year, and why lead is trailing when global auto production is solid, with China heading toward 33 million cars, a record, and so on?

Michael Steinmann

executive
#33

Yes. Morning, John. So, clearly, base metals — and incidentally, right now that's only around 8% of revenue for us. That'll definitely grow once La Colorada skarn is up and running. It's a modest slice of what we bring in. On the base metal side, I'm certain zinc, having been pushed and outperforming, is now being counted by multiple countries among their critical minerals. Incidentally, I'm sure you've also seen that silver was added to that US list too. Base metal prices truly mirror the view on the global economy and where it's headed. I suppose some folks remain uneasy about where things go in the coming few years, and those prices show that. Without question, zinc being listed as a critical mineral is a support for the price.

John Tumazos

analyst
#34

I appreciate that.

Operator

operator
#35

We now move to the following question, coming from Ovais Habib at Scotiabank. You have the floor.

Ovais Habib

analyst
#36

Thanks, operator. Hello, Michael, and greetings to everyone on the Pan American team. Congratulations on a strong quarter, which also produced solid free cash flow. Scott, my congratulations to you too on your recent appointment. Michael, many of my questions have already been addressed, but I have some follow-ups to those, beginning with the one about Cerro Moro, El Peñón, Timmins, and I believe Minera Florida too. Clearly, they have experienced some problems when it comes to reconciliations or technical issues. Do you expect these problems to persist into Q4, or have most of them been resolved by now? I just want to clarify that point.

Michael Steinmann

executive
#37

Yes. Morning, Ovais. You'll remember in Q2 — and actually a few of those technical problems began then. We said at the time they'd carry over into Q3, and that's what we're seeing. That is clearly why our production profile, particularly for gold, leans more toward the back end. As Scott said, we're already seeing an uptick in those grades. We look forward to hitting the guidance and the goals we've set. Maybe, Scott, you'd like to add a little more context here?

Scott Campbell

executive
#38

We appreciate those warm and genuine remarks. When it comes to Timmins, a few of the geotechnical difficulties we face relate to squeezing in the production drill holes within the deep central mining zone at the Bell Creek operation. Our approach to mitigating this has involved casings—PVC casings—and in certain instances a sealant or a polymer is used. That has brought us some success. In addition, we are putting in extra ground support at development headings when we move through areas of high strain and stress, relying on dynamic support. The paste backfill system at Bell Creek that was commissioned not long ago is also seeing growing use. Utilization keeps improving, the learning curve at that facility has really leveled off, and as a result we are seeing considerable success. Once again, the figures appear favorable as November approaches, roughly midway through Q4.

Ovais Habib

analyst
#39

Thanks, Scott. As we head toward 2026, is this mainly about getting ahead on production and development—and speeding up development as we move into 2026?

Scott Campbell

executive
#40

Yeah, generally speaking, that's right. At a number of our sites, we kicked off extra development programs during Q4 so that we'd have more optionality going into 2026. In a couple of instances, our development fell behind and we needed to bring in new equipment. In some cases, that meant hiring outside third-party contractors, and that includes Huaron and Timmins. Yes, doing all of this serves our best interest by making sure we succeed as 2025 wraps up and really through 2026.

Ovais Habib

analyst
#41

Yeah, thanks for that, Scott. So turning now to Juanicipio and the completion of the MAG transaction — Michael, is everything moving along the way you expected? How hands-on are you with the operations, and is there any push to get additional exploration going in the surrounding area?

Michael Steinmann

executive
#42

No, I’m extremely pleased with where it stands. I believe everyone got a sense here of what Juanicipio will deliver for us with just 1 month in Q3, and you’re seeing the robust production and robust cash flow coming from that operation. You can picture, with metal prices even higher at present, how well that asset is performing. In fact, I was there only last week, and it remains, once again, an impressive operation. There’s a great deal of involvement from the operational teams here at every level, truly, from operation to metallurgy to geology to exploration. A lot of exploration is underway as well. I’m really, really pleased with how this has turned out so far, and I’m very much looking forward to a full quarter of Juanicipio in Q4, as I said, combined with very favorable metal prices as well. Naturally, we come out in early January, or mid-January typically, mid to later January, with the forecast for next year, which will also include our exploration spending in our budget. You’ll see all the details then, Ovais, regarding how it looks for the production profile. I would say it has at least met or considerably exceeded my expectations at Juanicipio.

Ovais Habib

analyst
#43

Yes, thank you for that, Michael. My final question concerns the La Colorada skarn. You plan to announce the PEA in Q2 of next year. Is the partnership announcement separate from that event, or would you have to see the PEA before reaching some kind of terms with the partner?

Michael Steinmann

executive
#44

No, my sense is we can make the partnership public sooner than that. Once a signed document is in place on it, I believe we'll put that information out.

Ovais Habib

analyst
#45

Alright, that's all from my side, Michael, and I appreciate you answering my questions.

Michael Steinmann

executive
#46

Appreciate it, Ovais.

Operator

operator
#47

Our following question comes from Cosmos Chiu at CIBC. You have the floor.

Cosmos Chiu

analyst
#48

Thanks, Michael, and thank you too, Steve, plus congratulations to Scott. My first question may also concern the skarn technical report that could be released next year — actually, not could, it will be released next year. As you said, Michael, you're now adopting a phased approach featuring a higher-grade, lower-tonnage deposit at the outset. I recall the skarn deposit being focused around a few high-grade centers: the 901 zone, 902, and 903. Is any single zone of higher grade than the others? I'm not sure whether you have that answer yet. Or are we considering higher-grade sections across all three areas, or the upper sections of all three areas? How should we factor what I know regarding 901, 902, and 903 into what might be visible next year?

Michael Steinmann

executive
#49

Cosmos. The high-grade core zones are largely 901 and 902. We're still doing a fair amount of drilling on 903, and we've had some pretty interesting success there, where the skarn appears to extend even further out by quite a good distance. I think on 903, it remains to be seen whether there's a high-grade zone there as well. If you look at the press releases we've issued over the last 2 years on those high-grade skarn intercepts, every one of them sits in 901 and 902. As I said, it's really the combination together with those high-grade structures closer to surface that we published in September, and then, after that, showed in a big increase in resources with our reserve and resource update. It's really that combination that gave us this phased approach. As you can imagine, we were aiming for a phased approach from the beginning. It's obviously a much stronger project if you can do it in a phased approach, less capital upfront and increase later when you really understand the underground and you know the ore body well. As I said earlier, that doesn't mean that our silver production profile will be much lower than what we had envisioned in the full, large cave option.

Michael Steinmann

executive
#50

You get reduced execution risk and reduced capital, the project probably comes online sooner, and on the whole it's simply an exciting step forward at La Colorada skarn.

Cosmos Chiu

analyst
#51

That sounds great. Maybe a follow-up then. Michael, as you mentioned, with this phased approach, the possibility is that the vein mine could run parallel with both skarn phases. Is there some thinking in terms of some of that ore from the skarn could actually go through the current mill?

Michael Steinmann

executive
#52

No — as things stand, the mill we operate produces roughly 2,000 to 2,500 tonnes per day. What we're discussing is several times that figure. A far bigger mill is going to be constructed, and it will be designed so that it can later be expanded much further into Phase 2. The existing operation — the mill we have now — is simply undersized. The metallurgy for the skarn and the vein mineralization is extremely, extremely comparable. It's genuinely an easy project for us, in a sense, to blend the veins with the skarn and run both through one and the same mill. The difference isn't metallurgical; the issue is just that today's mill isn't large enough to handle that.

Cosmos Chiu

analyst
#53

All right, that sounds good. For the skarn, it’ll be a new mill starting from day one, though it could still operate alongside a possible later expansion. Cool.

Michael Steinmann

executive
#54

The truly thrilling progress here is that, clearly, by pushing the cave mining somewhat further out, we're able to keep extracting those high-grade veins—and through exploration it appears we continue discovering more and more of them.

Cosmos Chiu

analyst
#55

Sure, and maybe I should apologize. I've got a lengthy accounting question here. I'm just trying to understand the equity method of accounting for Juanicipio a bit better. I was looking at note number 9, and I could sort of follow along. From what I gather, it's 44% of what Juanicipio reported at 100%. I can follow the $72 million in revenue, $11.9 million in production costs, $15.1 million in depreciation, $45.1 in mine operating earnings. Then it goes to $37.1 million in net income and comprehensive income, and there's a gap there that I don't really fully grasp, which drives the $16 million pickup for Pan American Silver at the consolidated level. Could you perhaps walk me through that small gap?

Ignacio Couturier

executive
#56

Hey Cosmos, Ignacio here. If you'd like, we can also take this offline. Hi.

Cosmos Chiu

analyst
#57

Absolutely.

Ignacio Couturier

executive
#58

We can discuss this separately if you'd like, since there's quite a bit of detail here, but the short version is that the reporting requirements don't oblige us to include all of that detail, and among the lines that aren't shown are taxes and other items that are material. In short, there's a whole set of additional things in there that fall outside net income and comprehensive income.

Cosmos Chiu

analyst
#59

My calculation comes out at roughly 18%. Is that a reasonable figure to use for that gap, or does it vary somewhat from quarter to quarter?

Ignacio Couturier

executive
#60

My view is that we should allow a couple of quarters to pass, since these results cover just 1 month. What I'd suggest is that we watch how the next quarter develops. As I mentioned, I'm glad to discuss this with you offline, and we can go over some of those matters a bit. Absolutely.

Cosmos Chiu

analyst
#61

I said sorry to Ignacio ahead of time for posing this, so. I figured it would be somewhat more involved. Are there any further accounting subtleties regarding Juanicipio that we ought to know about?

Ignacio Couturier

executive
#62

No, I’d put it this way: this is the same approach MAG used when reporting Juanicipio. It’s a bit tricky, since we haven’t dealt with this before, and it’s hard right now to discuss how the company is performing when Juanicipio’s results sit inside that equity line—or the investment in Juanicipio line—on both the income statement and the balance sheet. We’ve brought in a few new non-GAAP metrics, such as attributable revenue, attributable free cash flow, and attributable operating cash flow, so we can better understand and discuss company performance, Juanicipio included. One more thing to remember: the cash from Juanicipio that sits at the JV level is inside the investment in Juanicipio line on our balance sheet. That cash will show up in the cash and cash equivalent lines on our balance sheet only after the Juanicipio JV pays dividends.

Cosmos Chiu

analyst
#63

So that cash distribution has a bit of a discretionary element to it, right?

Ignacio Couturier

executive
#64

No, they follow a set timetable. Because of the changeover involving MAG and us, things have slipped somewhat—for 2 quarters now, the joint venture hasn't paid out any dividends. We ought to see a catch-up in Q4 on that front.

Cosmos Chiu

analyst
#65

Alright, so finally, on the dividend — it's great to see you've raised it once more, making that the second quarter in a row with an increase. On how it's calculated, the 14 cents is somewhat of a departure from the matrix you've provided us previously, where the dividend was tied to net cash. So my question is, how should we — not predict, but what ought we to expect next quarter? That's the first one. Second, given that you couldn't use your NCIB in Q3, how much did that play into your decision to raise the dividend on a discretionary basis in Q3? And will you make use of the NCIB again going forward?

Michael Steinmann

executive
#66

Yes, look, on the dividends, great news. This represents something of a departure from our dividend policy for this quarter, and this quarter only. The reason is very simple: very strong cash flow generation. You see, we've nearly recovered already a large part of the $500 million, the cash portion that we used for the acquisition of MAG. It was the board's view that with this incredible strong cash flow generation, it's just the right thing to depart from the dividend policy for one quarter and have the shareholders participate in that a bit earlier. It has nothing to do with the blackout we were in until the transaction closed on the NCIB. We will obviously look again at the NCIB from now on and, like before, make share purchases on an opportunistic way. That is not the reason for the increase. The reason for the increase is that we look at our cash forecast, we look at a strong Q4, and it was just the right thing to have our shareholders participate a bit earlier in that really, really strong quarter.

Cosmos Chiu

analyst
#67

Thanks, Michael. I feel the same way. That covers everything I wanted to ask. Congratulations once more on a really strong Q3, and I'm eager to see how the remainder of 2025 plays out.

Michael Steinmann

executive
#68

I appreciate it.

Operator

operator
#69

Our following question comes from Don DeMarco at National Bank. You have the floor.

Don DeMarco

analyst
#70

Oh, thank you, operator, and good morning, Michael and team. I appreciate you taking my questions. First, we noticed that consolidated ASIC guidance was cut quite a bit. Besides bringing Juanicipio into the mix, were there any other factors behind that?

Michael Steinmann

executive
#71

No, it's really the big effect from Juanicipio. We'd be tracking right along with our initial guidance, just as we are on the gold side. As we mentioned when we announced the deal, this deal is going to make a meaningful, positive difference to our cash cost on the silver side. That's really the outcome you've seen. With just 1 month of it included, you're already seeing that outcome. Factoring in the benefit of having Juanicipio for a full quarter in Q4 is what brought us to the lower cost guidance.

Steven Busby

executive
#72

Don, Steve here—I just wanted to add one thing. To a lesser degree, we’re also benefiting from higher gold prices compared with the price we use for guidance. That byproduct gold price is helping to offset some of the cost increases we’re seeing.

Michael Steinmann

executive
#73

Yes. Once more, as I likely mention on each call, quite a few elements — significant ones — affect what we spend. Some can help us and some can hurt us, beyond our influence, and exchange rates are one of them. Naturally, whenever the dollar weakens, our currencies in local markets typically rise, and that by itself becomes a cost headwind. There's also an extra upside when the dollar is weaker, since we observe precious metal prices climbing. That's roughly how the mechanism operates. Whenever the dollar is strong, we notice metal price pressure, yet we get a cost tailwind in local currencies, and the reverse holds too. Please always remember that currency rates matter greatly here as well.

Don DeMarco

analyst
#74

Alright, thanks for that. So, regarding Minera Florida and Timmins, we did see somewhat higher costs during the quarter, though naturally the margins remain solid. Are there any performance criteria you use to spot possible divestment candidates, and could you take us through what your divestment priority order might look like?

Michael Steinmann

executive
#75

So, over the past several years, we've completed quite a few divestments. You may have noticed that we also sold off a project in Chile called La Pepa, which brought in $40 million in cash during the quarter. Our business development team currently has a number of other smaller projects in the pipeline and in progress. With what we hold on the operational side of our portfolio at present, I'm quite pleased, and I look forward to carrying on with those assets. Okay. Then.

Don DeMarco

analyst
#76

Turning to the other side of that, once MAG and, before that, the Yamana acquisition are factored in, what level of silver or gold output would you consider a solid long-term target to reach or sustain?

Michael Steinmann

executive
#77

My view is that until we have the final budget for Juanicipio in hand, I can't really respond to that. As you can imagine, going forward it represents a very substantial and significant portion of the silver we produce.

Don DeMarco

analyst
#78

Alright, we'll be watching for that guidance next year, then. That's everything from my side. Appreciate your answers to my questions, and best of luck for the remainder of the quarter.

Michael Steinmann

executive
#79

I appreciate it.

Operator

operator
#80

That wraps up the question-and-answer portion. Michael Steinmann, I'll hand the conference back to you for any closing remarks.

Michael Steinmann

executive
#81

Thank you, operator, and I appreciate all of you joining the call. We delivered another excellent quarter: revenue reached a record of almost $890 million, operational cash flows hit a record $323 million, and attributable free cash flow came in at a record of nearly $252 million. These are very strong figures, and they clearly prompted us to raise the dividend — the second increase in a row now since Q2. It's wonderful to have shareholders benefit not just from a higher share price but also from an added return under our dividend policy. A great quarter. I'm truly pleased with where we stand. As I mentioned, we got our first glimpse of what Juanicipio can deliver in a full quarter, and that first complete quarter will come in Q4. We had only 1 month of the mine in Q3, and already we're seeing a very positive effect. Just picking up on Don's last question there, we will see a meaningful impact on our silver production from Juanicipio going forward. I'm really happy with where we stand, and I look forward to a great and strong Q4 report early next year, and also to reporting our outlooks for '26 and showing you in detail how our guidance for that — the cost guidance and production guidance — looks.

Michael Steinmann

executive
#82

Appreciate you all joining the call, and enjoy the remainder of the year — we’ll reconnect early next year, around February I’d say, when we report our Q4 results. Thank you, everybody.

Operator

operator
#83

That wraps up today's conference call. You're free to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan American Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.