Good morning, everyone, and welcome to Panoro Energy's First Half 2020 Results. I'm John Hamilton, Chief Executive Officer. Joining me today are my colleagues Richard Morton, our Technical Director; Nigel McKim, our Project Director; and Qazi Qadeer, our CFO. I'll be walking through the presentation, but the whole team is on hand for any questions you might have. Next slide, please. As a reminder, today's conference call contains certain statements that are, or may be deemed to be, forward-looking statements, which include all statements other than statements of historical fact. Forward-looking statements involve making certain assumptions based on the company's experience and perception of historical trends, current conditions, expected future developments and other factors that we believe are appropriate under the circumstances. Although we believe the expectations reflected in these forward-looking statements are reasonable, actual events or results may differ materially from those projected or implied in such forward-looking statements due to known or unknown risks, uncertainties and other factors. And for your reference, our results announcement was released this morning in both Norwegian and English, and a copy of the press release and our second quarter report are available on our website at www.panoroenergy.com. Next slide, please. So we're using the webinar system here.

John Hamilton

executive
#2

You can send questions to me and the other panelists by entering them in the questions panel on the control panel shown at the left of the slide — you can see it there and type your questions in on the left, and we'll gather those questions and respond to them at the end. You may also raise your hand, as you can see on the right, to be unmuted for verbal questions — it's circled on the right there, that's how you can ask a verbal question, and we'll try to handle that too. Next slide please. This is our highlight slide. All of us have come through a very challenging few months; oil companies have been hit especially hard by a double blow of COVID plus the massive historic fall in oil price. Despite these challenges, Panoro has performed well and even delivered some achievements we think are noteworthy. First and most importantly, we kept producing oil safely throughout the period. Our health and safety systems held up resiliently across our assets. And we actually achieved and recorded quarterly production rates since 2013 despite all the turbulence.

John Hamilton

executive
#3

Yesterday's major news was the operator Dussafu, alongside their results, setting out how much potential they see in the Hibiscus area of Gabon — which, on the basis of remapping that field, might be three times larger, and I'll come back to that a bit later. On the financial side, oil prices were low. That, of course, affects the headline numbers we report, which have been well guided to the market, and we don't think there are any surprises in them. Still, to show how low cost our business is, we kept both EBITDA and operational cash flow positive even though average oil prices in the quarter sat below $30. When it comes to CapEx, our adjusted program is largely finished, and we also paid back almost $3 million of debt in the first half — all of it a very critical performance against a difficult backdrop. Next slide please. So a quick look at the macro — I think we all follow this, but I think we're touching on it. In recent days, things are better, though not great yet, with oil still stuck in the mid-40s, but definitely better than where we've been. And after that brutal price crash, when producers cut output on a historic scale, we can see the shape of the forward curve on the right there.

John Hamilton

executive
#4

It has been climbing, and we are beginning to notice additional signals in the market — oil majors, banks, M&A deals — all of them pricing future oil at levels substantially above today's forward curve and substantially above where we have certainly been. So our view is that attention has now turned away from fear toward the positive, with demand rising gradually, businesses reopening, and motorists allowed a bit more freedom. In our view, the severe capex reductions everyone saw lately will in the end create supply shortfalls, and that will give oil prices further support. So we stay extremely, extremely bullish on the price of oil. And the market is beginning to acknowledge it too. So hopefully better times lie ahead than what we have experienced during the last few months. Next slide, please. Just a brief note on our hedging. Again, when oil is flat or rising, most people ignore hedging, but the benefit of a sensible hedging policy has become clear to us. A number of our peers have hedged as well, others have not, but it is evident that a sensible policy is worthwhile. Our hedges are referenced to indebted Brent, so we gain the full benefit when prices are low. We have collars in the region of $55.

John Hamilton

executive
#5

In July we added another swap, and the benefit from that will show up in the third quarter. Worth repeating that gains or losses hitting the P&L through realized or unrealized hedge gains don't land in the revenue line — they sit further down the P&L. So you need to look a bit deeper. On top of that, you do get some volatility from unrealized oil price hedges being marked to market; those move up and down and can distort the P&L. So it matters that you recognize that volatility. At the close of the second quarter, the mark-to-market on our remaining hedges stood at $5.5 billion. Also worth noting: the gains we've made here sit outside the petroleum taxation regime. Tax regimes in our sector can sometimes be quite punitive. These hedges fall outside of any tax that may apply. Next slide please. So an update on some of our assets. I'll begin with Gabon. In Gabon we've been active since 2008, and we've been part of all the success the block has seen since then. But why is Gabon so interesting? During the opening of the South Atlantic and the early cretaceous, a series of pre-salt basins formed along the West African Brazilian coastlines.

John Hamilton

executive
#6

What happened there generated globally top-tier oil fields in Brazil as well as West Africa. Dussafu happens to be one of those. Since drilling began back in 2011, we have enjoyed 14 consecutive successful well penetrations. Dussafu also stands as the biggest exploitation license ever awarded in Gabon, and we hold production and exploration rights here for a further 18 years, with the possibility of extending past that as well. In the quarter, two new wells came on stream — they actually came on stream during the first quarter. Four wells in total are now on stream, and the field is performing really well, currently producing roughly 18,000 barrels a day from those four wells. BP lifted oil for us in June, and we expect three additional liftings over this second half of the year. OpEx runs around $17 to $18 per barrel. So it's a favorable, low-cost operating setting. Clearly, operating costs will decline as we bring more oil online, we will produce more, and we will produce more going forward. Next slide, please. Once more, we've covered this before, but it's worth revisiting, again, now that we've had recent news on Hibiscus, which is that we've had 14 consecutive successes at Dussafu since the first well was drilled by Panoro in 2011.

John Hamilton

executive
#7

That is establishing that the quality oil fields continue to expand, and Dussafu thus far is providing — is demonstrating itself to be a world-class asset. Once more, we hold the rights to produce and explore at this location for 18 years; the long-term character of this asset deserves to be kept in mind against the backdrop of all the short-term volatility witnessed in the markets lately. There are no license commitments here, meaning we are able to take our time. We can select our timing based on when it suits ourselves and our partners to explore at this site. So we have plenty of time <<inaudible>>. Next slide, please. So a quick small update on Dussafu and what to expect going forward. We announced, obviously, that Tortue Phase 2 was curtailed because of the crisis. Two additional wells were supposed to have been brought on stream, yet the rig had to be demobilized after the successful drilling of the DTM-6 well. DTM-7 was going to be the final production well drilled as part of this campaign, but that one also was postponed. We anticipate that these two wells will be finalized and brought online during the first half of 2021 next year, so not too far off now.

John Hamilton

executive
#8

Also, per the operator's guidance, we expect output to rise significantly once those 2 wells come online—we think more than 20,000 barrels a day gross altogether. Moving to the middle of the slide, we discuss Ruche Phase 1. Ruche Phase 1 was deferred too, though that had less to do with COVID-19 and more to do with the state of oil prices—a multimillion hundred billion dollar project with existing reserves. Those reserves are highly economic even when oil prices are low. But prudence meant we held off when oil was at 20. I believe many people postponed things like this. Still, the teams are using this period productively to look into possible cost savings on that development while we wait out the drop in oil price. We hope to re-sanctions this valuable project in due course. On the right side of the slide, exploration—exploration wells were cancelled as well during the crisis; we didn't intend to drill probably 2 wells before the rig was sent back. But these remain very much part of our strategy, and hopefully we'll see them drilled perhaps as early as Q4 of this year or Q1 when the rig returns to finalize the Tortue Phase 2 DTM-7 well.

John Hamilton

executive
#9

Moving to the next slide, please. So the major development from yesterday—and with luck it still is today, and hopefully will remain so for some time—is Hibiscus. This area keeps being really exciting, and just to remind everyone, we drilled that discovery roughly 12 months back, and when we found it, it was 4 to 5 times larger than what we had estimated before drilling. And as you might remember, we've had a seismic reprocessing effort underway that uses modern methods, taking the seismic data Panaro acquired in 2013 and applying every modern technique available to extract the maximum from it, while using the new wells we drill to help calibrate it. BWE, the operator, released their mapping yesterday, and the images displayed here, which indicate there could be a considerably larger structure connecting Hibiscus with Hibiscus South and Mupale, which were other prospects on our inventory. Their preliminary estimate points to 3 times larger oil in place volumes plus potential recoveries, and roughly 3 times as large as the reserves currently booked, so beyond 150 million barrels. Now appraisal wells will be needed to prove these volumes into reserves. But Hibiscus was already a game changer in the block and now looks like it could potentially be much bigger.

John Hamilton

executive
#10

With any luck, we can put down one or two wells on Hibiscus, Hibiscus South and Mupale once the board rate returns near the close of this year or at the start of next year. Next slide please. Exploration at Hibiscus is not where things end. The map on the left displays where the existing fields sit in green, Hibiscus among them, and it outlines the main prospects and leads in orange, yellow and brown. As you can see, plenty of potential remains on the block — we have defined 13 prospects holding a total P50 gross perspective resource of another 281 million barrels. Reserve auditor Netherland, Sewell has assigned the prospects a geological chance of success ranging from 36% to 90% chance of success. We have been working on this reprocessing project, which is going to improve the definition across the entire license. And we intend to use the result of this work to modify the portfolio and identify new prospects. Dussafu will remain an exciting exploration province and we fully intend to drill additional wells in combination with our production drilling operations over time. Next slide please. So moving on now to Tunisia. As a reminder, we entered Tunisia through two transactions in 2018.

John Hamilton

executive
#11

Two deals — one driven by production, the other exploration-focused. Through that, we managed to secure a solid footing and arguably the strongest operating position in Tunisia. Among the country's leading oil producers is where we sit. What drew us to Tunisia was the trend we observed: the majors were pulling out because the asset sizes didn't stack up against their bigger worldwide portfolios, private equity was withdrawing, and other sharp operators were stepping in to fill the gap. And we're active in the Pelagian Basin <<inaudible>>. An active operational program is running in Tunisia for us, and it got temporarily pushed back while COVID was going on. We've since restarted it, with several well workover operations. Travel restrictions in Tunisia remain in force. So certain activities are still taking a while. But we're figuring it out. And we're now at a point where new activity that had been parked — delayed for three or four months — is moving, and I'll share more on that shortly. First production for the second quarter came in at just under 4000 barrels a day, in line with what we saw in the first quarter. That marked a rise over last year, when the fourth quarter averaged roughly 3500, so an increase of about 15%. And plans are indeed in place, already underway, to reach 5000 barrels a day gross.

John Hamilton

executive
#12

Costs to operate in the region are really quite low—under $15 per barrel. Let's move to the next slide, please. This slide here basically lays out the story. Before I get into our restarting activity and our target of reaching 5,000 barrels per day, I wanted to take you through the context. The first half of this slide, on the left, shows you last year—the second half of 2019. As you can see, as the new owners of the asset, we're focused on a thorough review and hunting for quick wins. Once we got there, as you can see, we managed to raise production at the end of 2019 from roughly 3,500 barrels a day gross to more than 4,000. Over the months that followed, we succeeded in hitting peaks near 4,300, 4,400, and then COVID hit, and we had to push back certain work—remarkably, into our credit, our partner's credit, and our team's credit. We've kept production running throughout that stretch, which not all of our peers can claim, and we succeeded in lifting and selling and collecting payment on every one of our crude sales. You can see a slight dip lately.

John Hamilton

executive
#13

When we were just coming out of COVID, we had to swap out two pumps on a pair of our highest-producing wells, and each of those was putting out roughly 500 barrels per day. So we experienced a decline there. We're actively getting those back up right now — one is already done. The second should be restored in roughly one to two weeks. That ought to get us back to what is more or less our steady-state level for 2020, which is approximately 4000 barrels per day. Next slide, please. Fortunately, starting in June we've been able to pick operational work back up, gradually working around COVID restrictions. Operationally it has been difficult. Even so, we have restarted. As you can see at the top of this slide, the number one priority was getting those two wells I mentioned back — the routine pump replacements, with each well at about 500 barrels per day. Those wells matter a great deal to us, and they genuinely required new pumps. So we seized the chance to change out those pumps. They're nearly finished — one is already on line, and with the other we are literally downhole at this moment.

John Hamilton

executive
#14

So we think we're stabilized back at 4000, which is where we believe the steady state sits right now. But even more important is that we're now able to kick off our new production activities. The second half of the slide, then, lays out five different items that we're either currently doing, have already finished, or expect in the very near term. On the El Ain field, the first item there: we've finished the workover and tested production rates above 500 barrels a day. That production is awaiting pipeline work before we can truly count it as production, but we've essentially completed the subsurface work and these wells are ready to produce. At Guebiba, we're working on two workovers, Guebiba 4 and 5, which I'll discuss a bit more. Those two wells are in progress as we speak and together, in a success case, would bring about 700 barrels a day. And we've also now identified the very exciting Guebiba 10 sidetrack. I'll tell you a little more about that, which is the first drilling activity on these assets in five or six years now. So it's really quite exciting. And we hope this operation will deliver new production of approximately 500 barrels a day.

John Hamilton

executive
#15

We're also actively making plans for a workover at Cercina, which is our offshore field — that's well stimulation — and we're waiting on some permits for it. It will likely take place a bit later, early in the fourth quarter, and we're also targeting roughly 500 barrels a day from it. So, as you can see, if we take that whole portfolio of activities together, we believe that on a risked basis we ought to be able, during the fourth quarter, to get to what we consider steady state of 4,000 to 5,000 barrels a day. So we've positioned ourselves as well as we possibly can to achieve that goal of reaching 5,000 barrels a day, and the activity is underway, the rigs are on site — I'll show you some pictures too. If we could move to the next slide, please. Again, this may not be terribly exciting, but for us it was exciting, because this is the first activity we've been able to properly resume since coming out of COVID and the travel restrictions. It's our offshore field Cercina. And here's a picture of the pump replacement work that we carried out recently. Again, the pump on this particular well needed to be replaced.

John Hamilton

executive
#16

We got production back up on that well to somewhere between 500 and 600 barrels a day. That operation went very well. It was our first test case as we tried to get back to business as usual. Next slide, please. Yes, sorry. So for folks in Tunisia, this slide is quite exciting. Maybe I'm not sure I can get that excitement across. But we haven't seen anything like this in a great many years. We have 2 rigs running simultaneously on the TPS assets. In this case, the Guebiba field. The lower rig is handling the 2 workovers I mentioned. So that's Guebiba #4 and #5, but it's aiming to establish production of roughly 700 barrels a day in total from those 2. The big rig is there for the Guebiba 10 sidetrack. This is one of the preeminent rigs in the country, the CTF Rig 06. Guebiba 10 is a well that has been shut in for a great many years, and our plan has always been to try and sidetrack the original well bore and just known separate fault compartment. We are underway with that well now. We're at about 1,800 meters depth at the moment, and we hope to complete this well in October at established rates somewhere around 500 barrels a day gross.

John Hamilton

executive
#17

So once more, it’s genuinely, genuinely thrilling for everyone connected to this asset to see this amount of activity taking place in Tunisia — especially given that, in a world where hardly anyone is doing much at all when it comes to production growth, Panoro and our partners in TPS are pressing ahead right now. As a result, we’re receiving considerable recognition for that within the country too. Next slide, please. This one is a bit more technical. Yet alongside all that heavy operational work, we’ve also managed to get some technical work underway. And we must put in time and resources to understand our fields in real detail, since we need to plan further development activity down the road. What lies ahead for Panoro isn’t only the 5 activities I just mentioned to you. It concerns long-term production at this field — across this group of fields. To that end, we’ve begun a program of work, refreshing our subsurface mapping and remodeling. And although this slide is highly technical, it illustrates the work we carried forward during 2020. In fact, the project work was carried out during lockdown, with staff and consultants and stacks continuing in London, cooperating remotely to remap the field’s top reservoirs and build static and dynamic models.

John Hamilton

executive
#18

The key point here is that this represents significant work we must carry out across every one of our fields. Guebiba was where we began, and once the projects there are defined, all of this gives us the foundation for booking additional reserves. Our long-held view has been that there were more reserves to book, and what this work demonstrates is that this is indeed the situation. To have them counted as reserves, we clearly need to schedule that activity. Work continues, though, so that we can ensure a longer-term plan exists for these assets — not merely the near-term effort we have been talking about so far. May we have the next slide. So, a few more corporate updates, covering South Africa and Nigeria. In South Africa, for those of you who track us, we signed a new farm-in agreement for an exciting well there, alongside Africa Energy and Azinam. That deal depends on government consents and on the Azinam farm-in closing as well. COVID-19 has affected these government consents. We have witnessed this universally with the regulators and ministries we depend on in every country where we operate, as they have been slower.

John Hamilton

executive
#19

So we’ve had to sort of bridge the gap by redoing a portion of the subsurface work jointly with partners. Panoro has completed all of its own thorough work on this. And what we’re aiming at is an up-dip spot relative to the 1988 discovery, which was made during the apartheid era. That well found high-quality light oil, and the intention is to drill up-dip from that point. The timing for that remains uncertain right now, though we hope to gain some clarity regarding the regulatory process over the course of this quarter and on into the next one. On OML 113 Aje, as we announced in October last year, we reached an agreement with PetroNor to sell our Nigerian assets to them in return for $10 million of PetroNor shares. This has always been viewed as a win-win arrangement for every party, since it lets PetroNor contribute their technical leadership to the project, where they are collaborating with the operator. And PetroNor has been putting in hard work on this — on Aje’s next phases. The sale depends on consent from the regulators and approval by Nigeria’s ministries, and that process is in progress. Once again, it was affected over the summer because of COVID.

John Hamilton

executive
#20

At closing, though, what we plan to do is hand out those PetroNor shares to our shareholders as a dividend. Let's move to the last slide now, please. This one is the summary slide. When times are tough, it's simple to lose track of the things that make an equity story interesting. I think that we, together with our peers, are to some degree firefighting and fretting over operations, output, liftings, partners and all of that over the summer. So you somewhat stop noticing what makes the equity story interesting. Yet share prices had fallen, and their direction rested solely on developments in the oil price. To a certain degree, we remain partly in that situation. Even so, we think the sector is beginning to locate its first foothold of normality. And we at Panoro believe our positioning is very strong. Our balance sheet is solid. Our production assets are good and low-cost. We think our strategy is a good one and that a good Board backs us. And looking ahead to the near term, we can anticipate output growth in Gabon as well as Tunisia, as I have described. There is the dividend element — the PetroNor shares going to shareholders — which we can anticipate.

John Hamilton

executive
#21

Regarding exploration activities during the coming 12 months, we have prospective wells in the Hibiscus area, in Gabon. We have Salloum in Tunisia, which has also seen a slight delay because of COVID and the situation surrounding it, Block 2B in South Africa. So we stay completely focused on expanding our business. And the crisis did pause some of this work, but we remain dedicated to hitting those near- and longer-term objectives that we've laid out. So with that, I'd like to move to the next slide and invite any questions you might have. Here's a reminder of how it works from your end. I hope I can navigate it from my slide. Let me just check here.

John Hamilton

executive
#22

I think we have a question — hold on a second — from Jorgen. So there's a question from the friendly analyst. Is there an updated timeline for the Salloum 1 well? And is it fair to say, given Africa Energy's recent comments, that Block 2B will close toward the end of the year? So you're positioned for drilling in Q1? Jorgen, thanks for the question. Yes, Salloum — I think our guidance has been toward the end of this year. That's probably still okay. But realistically, I think it's going to slip into next year. There have been a number of smaller issues around COVID, around suppliers, around various ministerial consents and working with the municipality. We can't blame everything on COVID. But nonetheless, I think it has been — our priority has been to maintain production and try and grow production. Obviously, exploration activity is interesting and Salloum falls into that. But we have had somewhat less priority on that over the past few months, and so that's now catching up with us. So I think there's a little bit of a time lag on that. I wouldn't put a 2020 date on that. I would move that into 2021.

John Hamilton

executive
#23

Regarding Africa Energy and Block 2B, yes, my expectation is that it will likely complete near the end of the year. Once more, there are two closing conditions. The first is ministerial consent in South Africa. That process is underway. For us to move through the regulator and the ministry, it is currently progressing through the regulator at this moment. I believe I heard from someone that the minister himself actually contracted COVID. So I think that is a realistic timetable that Africa Energy has provided. And that ought to put us in position to drill in quarter 1, provided those approvals arrive in due course. I think we are seeing wells being drilled in South Africa at present. But once more, we need to bring in the rig and the suppliers, and I think people remain cautious. But I think Q1 is what Africa Energy has guided, and we see no reason to say anything different from them. Right. We have a question from Tom Eric at Pareto Securities. Could we add some additional color on the likelihood of success at the appraisal well of Hibiscus? Do the results from the reprocessed seismic also provide a positive read-through on the existing exploration potential on the block?

John Hamilton

executive
#24

Richard, would you mind giving a bit more detail on what kind of chance of success you see for Hibiscus South and Mupale, and also share whatever thoughts you have on the reprocessed seismic?

Richard Morton

executive
#25

Yes, thank you, John. So as you’ve seen, that project was completed in the last few months. And the operator has done the initial work. We at Panoro are now getting our hands on the data ourselves and carrying out our own work to verify it and compare it against the operator’s interpretation. So it’s still a bit early. I think the idea here is to draw everyone’s attention to it, because it could of course be potentially interesting. But we haven’t really assigned any risking to the wells yet. We haven’t defined where possible wells would be located. So it’s slightly early to say anything definitive about drilling at Hibiscus and the likelihood of success. What I can say is that the reprocessing has covered the entire block. So we’re evaluating the existing prospect portfolio that you saw on John’s earlier slide — there’s significant potential prospective resources available in the block — and we’re going through each of those prospects in detail to see how the processing has affected them. So there’s plenty more to come on that subject.

John Hamilton

executive
#26

Thanks, Richard. I also have a question that came in from Teodor at SB1. Is there any constraint on the existing Adolo capacity when it comes to developing Hibiscus? And how could that capacity be raised? Yes. Adolo's nameplate capacity stands at roughly 40,000 barrels a day. In my view, the engineering work remains to be completed, but BWO's belief is that the nameplate — that capacity could be lifted to approximately 60,000 barrels a day by doing some debottlenecking, so it's not major, major CapEx, some CapEx is involved, though not a lot, to reach about 60,000 barrels a day. It could also be pushed beyond that level, which would call for additional CapEx. But at least over the short term, I think the assumption is that limited debottlenecking should let us reach 60,000 barrels a day. Let's see. There's a question here from Stephane at Auctus. Stephane, I believe I just unmuted you — I'm attempting to unmute you. For whatever reason, I can't — it isn't unmuting you. So Hera, could you please try to unmute Stephane there.

Operator

operator
#27

I honestly can’t unmute him from my side. I’m not sure what kind of connection he’s on.

John Hamilton

executive
#28

All right, perhaps he's joined via phone. Fine. Stephane, if you're able to submit your question, we might then try to bring it up in the Q&A module. Should we be expecting 2021 output from Teodor to average near 3,000 barrels per day? Yes. So, I mean, what we'll likely see is an increase, hopefully in Tunisia and hopefully in Gabon as well. So that's probably not far off. We're not yet at the point where we'll be giving firm guidance for 2021. I believe we'll have that at our November update. But directionally, that's not far off. Stephane has now sent in a note from Auctus Securities. At Hibiscus, what did you miss before? What caused the significant changes after the seismic was reprocessed? Maybe Richard, would you like to briefly address — I suppose the first major change was the — it was the 2 wells themselves at Hibiscus. I think that shifted things. And I don't believe we missed anything, but do you — Richard, would you like to address what changes the reprocessing has introduced?

Richard Morton

executive
#29

Yes, I will. So, as John said, Hibiscus turned out to be a success for us. That was an exploration well that we drilled to the southwest of a well drilled several years back. Exploration in this area is not easy — it's actually quite difficult. The seismic imaging here is very complex. That's the reason we had to carry out a fairly detailed reprocessing effort, using depth imaging and the newest methods to assist us. So that has raised the possibility that these structures are connected to one another, and that Hibiscus is somewhat bigger than what we had mapped before. But a lot of uncertainty remains across this area, given how complex the imaging is. So we truly need to consider this in the context of the chance of success and the test well program before we could claim we've seen a big change. So right now, it's still quite early. We do see potential, and it's worth pursuing. And the message is: watch this space.

John Hamilton

executive
#30

Yeah, Stephane, just to remind you, the pre-drill estimate at Hibiscus came in at roughly 11 million barrels, and the reason for that is, like Richard mentioned, the imaging came out difficult and the structure appeared rather flat — it wasn't a big, dramatic structure. And clearly, the first well plus the sidetrack ended up demonstrating that it was considerably larger. So we're still learning. Obviously, we're pretty bullish on that area, and the successes speak for themselves. So we're eager to drill a couple more wells there. I believe that covers the questions. Let me do a quick check here. There's a question from Daniel at Arctic Securities. Good morning, Daniel. Could you comment on how Tullow affects the Dussafu partnership and the working environment? Do they bring useful, complementary competence to the group? Or might there be a risk that they slow down any workflow or decision making within the partnership? Daniel, that's a good question. Tullow are — for those of you who aren't aware, they're a very long-standing E&P company here in London. They've been behind some of the biggest discoveries made in Africa. Much of the big success we're seeing in South Africa now with Africa Energy — a lot of the technical people came from Tullow.

John Hamilton

executive
#31

The successes in Uganda, Kenya, Ghana, and even Gabon — those are outstanding explorers. Having them as partners has been extremely beneficial for us. They collaborate with us very effectively. On every front they handle their own work — engineering, production, exploration, finance — so they're a multifaceted, highly mature oil company. In that regard they're much larger than Panoro or BW. As a result, they contribute an enormous level of resources and expertise to the block. So I don't perceive any risk that they would slow anything down. I believe they're quite eager to move things forward themselves. Within their portfolio, Gabon ranks as their second most important country behind Ghana. So it's a nation they're dedicated to. And it's an asset they favor. Therefore, personally, I see no warning signs with Tullow — quite the opposite, right. I think there's one more question. Regarding exploration drilling in Gabon — you mentioned starting in Q4 2020, first quarter of 2021 — does that include the Hibiscus appraisal, or does Hibiscus come on top of those wells? No, I think the wells we'll drill — again, the partnership hasn't made a decision on this yet. But when the rig comes back, I think we'll want to drill one or two in the Hibiscus, in the greater Hibiscus area, so Hibiscus South or Mupale.

John Hamilton

executive
#32

So it isn't on top of those. It will likely focus on that zone, working to better define that zone, since that will strongly shape subsequent choices regarding the Ruche development if additional oil is found in Hibiscus South and Mupale. It will affect how we approach that development phase. So I believe that covers it, based on what I can gather from the questions. So I want to thank everyone for participating, and we look forward to keeping you and the market updated as things progress. Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Panoro Energy ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Panoro Energy ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Panoro Energy ASA or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.