Panoro Energy ASA (PEN) Earnings Call Transcript & Summary

May 24, 2023

Oslo Bors NO Energy Oil, Gas and Consumable Fuels earnings 30 min

Earnings Call Speaker Segments

Operator

operator
#1

We're starting the broadcast now. Everyone attending is in listen-only mode.

John Hamilton

executive
#2

Morning, everyone. John Hamilton here. Welcome to Panoro Energy's First Quarter Results. We have a presentation ready to go through. Just waiting for it to fire up. Next slide, please. I won't read our disclaimer. But just to note, our disclaimer regarding forward-looking statements. As usual, we will be making certain statements and this disclaimer is meant to cover off on some of those things. Next slide, please. As a reminder, this system that we use allows participation both by voice and by text. If you have any questions, we will endeavor to try and answer as many as we can. You can either raise your hand, as you see on the right side of the panel and that will then allow us to open up your microphone. Or you can enter it to a text as you see on the left side we will try to answer those questions as well. There'll be a reminder of how to do this as the final slide as well. Next slide, please. Right. So here are our quarterly results and a few of the key things that we wanted to point out. I think this is more or less in line, we've guided on the production and on the lifting side.

John Hamilton

executive
#3

I'd say those figures are pretty much consistent with the guidance we gave, with revenue around $60 million and EBITDA around $35 million. We finished the quarter with net debt of $25 million. I'll revisit that point when we get to the balance sheet and one of the upcoming slides. During the period we also made fairly substantial principal debt repayments, roughly $13 million. I'll come back to that as well. Let's move to the next slide, please. We put out our annual statement of reserves recently, and in that press release we discussed organic reserve replacement of 92% this year, which we consider quite formidable. Here's a reconciliation of that figure. I won't walk through every detail. But I'd like to highlight a few things, again, which is that we replaced 92% of our reserves over the course of 2022. This was only announced recently. And if you look at our 2P and our 2C resources shown on the right at 65 million barrels, and you examine the breakdown of where those reserves and resources sit, you can see that we're a very well diversified business, which is really what we set out to do at Panoro — to create a diversified business with multiple production hubs.

John Hamilton

executive
#4

Moving on to Slide 4, please — this one illustrates our trajectory, both past and future. As we had guided, output during quarter one took a hit because the FPSO in Gabon was shut down for a fairly lengthy stretch while we prepared for tie-in of the MaBoMo, Hibiscus's production facility. That shutdown was planned, though it ran somewhat longer than we had expected, and the consequence was likely a lower quarterly production figure than we had initially forecast. Everything is operating now, however, and our full-year guidance stays at 9,500 to 11,500 barrels per day. Where we land inside that range really hinges on the timing of the new Dussafu wells coming online. Should they come on quickly, we sit at the top of the range; should they take a bit longer, we would drift toward the bottom of it. Right now we are more or less where we want to be. Once all 6 wells in Gabon are online — guided for roughly year-end, possibly slipping into early January — we expect to reach about 13,000 barrels a day, in excess of 13,000 barrels a day. But at around the year end, roughly 13,000 barrels a day is what we should be targeting.

John Hamilton

executive
#5

Right now, production is performing really well—roughly 8,500 barrels per day, occasionally a touch above that. At this point we're simply awaiting the upcoming well at the next level in Gabon. My expectation is that over the course of June, you'll witness yet another step change in output, moving from that 8,500 figure to a considerably larger one once the new well starts up, and a couple of additional activities in Tunisia also return to service. Next slide, please. Here you can see our lifting. This lifting guidance is pretty much what we've shown before. We did have somewhat greater lifting in Q3, and a portion of that has shifted into Q4. But as you'll notice, we are—once more, heavily—heavily weighted toward the latter half of the year when it comes to the volumes we lift. Approximately 75% of our volumes get lifted during the third and fourth quarter. We're discussing 3 million barrels of sales for this year. So it's a comfortable figure, and very much consistent with guidance. The second quarter, as we guided previously, will be an extremely, extremely slow quarter for us where sales are concerned, with only some domestic sales in Tunisia, really, getting through—the major international lifting, the ones that truly move the needle, will land in the third and fourth quarter.

John Hamilton

executive
#6

Moving to the next slide, please. I won't spend a lot of time on this. Every quarter, though, we make an effort to give the market an update on our debt profile, and nothing much has changed on that front. One item I do want to flag, however, is the RBL facility: our debt, or gross debt, as of the balance sheet date, March 31, stood at $68.4 million, and you can see that in the upper left area. What occurred there is that we ultimately acquired the Tunisian business, and that deal closed early in April. So in effect, during the second quarter, we drew down $15 million under the RBL. What we wound up doing, then, was raise our debt by roughly $9 million, though we paid down some debt to complete that transaction in the first quarter. We'll see that come back somewhat. So in the second quarter, you should expect our gross debt figure to rise to $83 million. We just want to flag that a bit — it's somewhat of an anomaly, but it falls entirely within what we had announced previously; it's simply how the quarter happened to end.

John Hamilton

executive
#7

It sort of landed in between the two quarters. Guidance on CapEx remains at roughly $75 million for this year. We've had a bit of concern about that up to now. So on the CapEx side, there's still a fair amount left to go. Next slide, please. Once more, I won't walk through this in huge detail. But each quarter we do make an effort to reconcile cash flow. You can see net cash from operations, CapEx, loan repayments, dividends paid and the cash at the end of the period we will record — we'll run this waterfall every quarter. Next slide, please. So Gabon is really the central story behind production growth this year, as those of you who follow us know. We're drilling 6 new production wells in the Hibiscus Ruche area. The first well has come online, and it's performing extremely well. Probably a little better than expected. And we're very, very pleased with that. Well, the second well is being drilled right now and we're running completion on it. So hopefully in June there'll be some further announcement on that second well; everything appears to be going to plan on that one at the moment. And then the crude gets transported from the MaBoMo production platform back to the FPSO.

John Hamilton

executive
#8

Everything is on target, then. We're quite pleased with what we've found so far beneath the surface at these production wells. And the production rates shown to date make us very happy as well. So on this development, all is proceeding according to plan — maybe even a touch ahead of it. The gas live compressor aboard the FPSO and at the Tortue field has been installed and is in commissioning right now. Startup ought to happen within the next few days. That will underpin output from the Tortue field wells that already exist. Next slide, please. In Equatorial Guinea, we haven't discussed it much. But the rig is under contract, and we have a three-well infill drilling program that really ought to lift production even more. That has not truly been factored into our production guidance. The impact of it will mainly be felt starting in early 2024. Even so, as we finish the drilling program and deal with the six wells there, we have three additional production wells set to come online during the first part of 2024, which is pretty exciting. A great deal of work is underway there too.

John Hamilton

executive
#9

As we shared recently, we've <<inaudible>> Block S — that's the large blue block on the left, the one marked with a star. In addition, we've been awarded the operator role, with Cosmos partnering with us at EG01, an inboard block. If I could have the next slide, please — I've got one more that explains a bit about what this is really about. What we're pursuing here, with Cosmos also serving as operator, goes by the name backing deep. Deep, I believe, is a sizable four-way structure visible on the seismic. At present it appears to be roughly a 180 million barrel prospect — and to give that some context, our interest in this asset stands at 12 and a half percent, so it's, you know, extremely material should we encounter reserves through a successful exploration drilling campaign, or Panoro would represent a truly significant discovery. And what makes this one so attractive is that it's infrastructure-led exploration. Any discovery here can be tied straight back into the Seba field, where existing FPSO and production facilities are already in place. So although Panoro isn't really an exploration story this year, next year you're going to see us drilling what a great many people describe as one of the most exciting exploration drilling prospects anywhere in the world — one that many have been talking about, and all of a sudden people are waking up to the possibilities here. If it comes in, the chance of success is about 20, or 25%.

John Hamilton

executive
#10

So that's exploration. But should it come through, it would be something of a game changer for that area, since it de-risks a whole set of those other yellow prospects visible across both of our exploration blocks. So you'll hear us discussing this asset more and more. Again, this prospect probably won't be drilled until the second quarter of next year. So roughly a year out, let's say — but this is potentially a very, very interesting development for Panoro and its shareholders. Next slide, please. In Indonesia, we're continuously working here. We have recently, as well, finished acquiring our minority interest there, which you've probably been following. That's roughly 3 million barrels of TP reserves added into our reserves bucket for 2023. So you won't see that until the ASR next year. But nevertheless, it adds reserves and production. We bought it, we think quite cleverly, at about $66 per TP barrel, which I think is a very accretive transaction for us. It's really helped simplify our corporate structure down to asset 100% now, and it really has been an easy acquisition for us. we haven't really changed much at all, in terms of the company, in terms of accommodating that acquisition.

John Hamilton

executive
#11

There's still a great deal of potential in this asset, in our view. And we genuinely maintain an aspiration — though it isn't factored into the production guidance we've issued — we do hold an aspiration to try to push this to roughly 6,000 barrels a day if we're able to. And we're putting hard work into that. And we see several opportunities that we're actively pursuing right now, which might get us to that point. So this asset, we believe, still holds a strong future and potentially a fair amount of upside too. Next slide, please. So we also released our inaugural sustainability report, which marks a big milestone for Panoro; we've been deeply committed to issuing a sustainability report, one that helps shareholders and analysts assess our dedication to ESG. And it helps our broader stakeholder groups, be they banks, or insurance companies, or joint venture partners or host governments. This kind of sustainability transparency matters enormously for companies like Panoro, along with our commitment to publishing genuine data and genuine information about our operations. And it's been very, very well received, our sustainable report — sorry, sustainability report. And we take real pride in it. I'm not certain anyone has actually read it. A lot of work has gone into it.

John Hamilton

executive
#12

We're quite pleased about that. If any questions come up, we're glad to address them too. Let's move to the next slide, please. To sum up, there are 10 wells being drilled by us over the coming 12 months. Additional rig slot options are available to us. What the normal now really shows us is enormous production growth matching the targets we've already shared publicly. We think there's more upside beyond those targets as we move into 2024, especially through what we're doing in Equatorial Guinea drilling. That said, this company truly has plenty of catalysts — many of them production-led — across the next 12 months, and that includes the exploration well; it came deep, and the first of those wells has performed exceptionally well. Naturally, that doesn't guarantee the remaining ones will go just as smoothly. Still, we're hopeful they do. We've definitely kicked things off with a bang. Our campaign of three wells in Equatorial Guinea should get underway likely late in Q4, and reduce contracted, and with luck we'll be there right on schedule. Acquisition work on our Tunisian business has already begun, which shows we remain able to pull off smart, accretive deals even in the smaller begins case — a small one, yes, but still very accretive for the company.

John Hamilton

executive
#13

We have finished drilling into Block S and Block EG-01. So we keep refreshing our exploration efforts — our infrastructure-led exploration portfolio matters a great deal, naturally, for the medium-term business prospects too. So we remain committed to carrying on with the effort to locate the right sort of exploration asset for this company. The <<inaudible>> well is scheduled for drilling in 2024, which could really be a fairly major catalyst in roughly a year's time, but it is an exciting one. And naturally, also announced today is our commitment to a quarterly cash dividend. We have declared a dividend today as well, as part of our results. So we still have, we believe, a very clear framework when it comes to shareholder return policy. And that brings my presentation to a close. And we have one slide, which reminds you how to pose questions. I believe we do, at any rate. But if you would like to ask a question, you can raise your hand, and we will try to unmute you. Alternatively, you can type questions into the question pane. Perfect. My colleague, Andy, will try to identify the questions.

Speaker

unknown
#14

Thanks, John. Our first question comes from Stephen Foucaud. Stephen?

Stephen Foucaud

analyst
#15

Morning, gentlemen. Thank you for taking my questions. I actually have three, and they will be fairly straightforward. First, regarding the new Hibiscus — the future new Hibiscus — when it comes on stream, so 2, 3, 4, 5, 6. Should we also expect the production platform to be restricted for a certain amount of time? That's my first question. Second, you mention, I believe, 8,500 barrels per day of current production. Could you give us a sense of how that splits across the asset? And lastly, an accounting question. I was looking at the cash flow statement. And it seems that this year — this quarter, for some reason, the DD&A <<inaudible>>, the depreciation interest is not added back. So I was wondering what was happening, perhaps it's in these working capital adjustments. I'd really appreciate some color. Thank you.

John Hamilton

executive
#16

Okay. Regarding Hibiscus, the shutdown we experienced on the FPSO during the first quarter came, I'd say fairly reasonably, right after the initial tie-in of the MaBoMo production facility to the FPSO. Everything is now fully connected, and that's all good. As a result, we won't face shutdowns tied to that work. Normally, we'll have a few smaller shutdowns over the course of the year for certain maintenance activities, but all of that is planned and fully incorporated into our production assumptions and guidance. However, there certainly won't be another planned FPSO shutdown to accommodate the new wells — 2, 3, 4, 5, 6 — as they come online. So you won't see major interruptions from that. As for the production breakdown — let me get back to you on that one, Stephen; I had it right at hand. Broadly speaking, though, Equatorial Guinea remains our largest producer, with Dussafu then second and Tunisia third, and that will obviously shift once we bring a few of these Dussafu <<inaudible>> online, at which point Dussafu <<inaudible>> will likely account for the largest share of production in due course. But I'll have to follow up with you on the exact breakdown.

John Hamilton

executive
#17

The slides include the quarterly production figures for the first quarter. I understand that those numbers don't quite reflect where we stand right now, given the new well that's come online and the acquisition of the Tunisian business. So we'll need to get back to you with a breakdown on that. And Qazi asked about depreciation.

Qazi Qadeer

executive
#18

Yeah, John, I believe that has been assigned to the working capital line. I just verified it. I think it's a typo, and we can confirm that it should sit under operating activities.

John Hamilton

executive
#19

What I noticed is that all of it is getting <<inaudible>> merged together.

Qazi Qadeer

executive
#20

Yes. Thanks.

John Hamilton

executive
#21

I appreciate that.

Speaker

unknown
#22

Thanks. Our following question comes from Steffen Evjen.

John Hamilton

executive
#23

Morning to you, Steffen.

Steffen Evjen

analyst
#24

Yes. Morning, everyone. Thanks. Appreciate the presentation. Two questions from me. First, on cash flow: when I look at Q2, liftings are quite limited, and it looks as though CapEx is weighted more heavily toward the back half of this year too. So I just wanted to check whether we should be anticipating a sizable cash outflow in Q2, given both of those factors? That's my first one. My second question ties to that: with the oil price currently under $80 per barrel and with a very strong lifting schedule lined up for the second half, how should we be thinking about your dividend policy, and whether you get to the $20 million market set? Thank you.

John Hamilton

executive
#25

Absolutely, and those are great questions. Yes, so I'd say the second quarter will clearly be one where cash goes out. We don't have meaningful revenue flowing in. Capital expenditure is still there, along with normal taxes and the usual outgoings. So you should anticipate that Q2 will be a quarter of cash outflows. That means our balance sheet will likely shift — the net debt position will move somewhat over the quarter. And then, naturally, it will swing back the other way in the third and fourth quarters once things pick up and the uplift begins to show. So yes, regrettably, the second quarter will be a difficult one in that regard. But once more, as we expected on our side, nothing has changed there. I think we've consistently guided that the second quarter is going to be a bit of fun. On dividends, how do we view them? We laid out what we believe was a fairly clear dividend policy, which essentially said that provided operations went to plan, and provided oil stayed around $80 per barrel, we were targeting a $25 million dividend this year, and that dividend would be weighted toward the second half. And nothing whatsoever has changed there.

John Hamilton

executive
#26

Crude prices have softened somewhat, and that's reflected in the $80 target as well. Even so, the company remains strongly dedicated, and the Board recently affirmed — they confirmed — that they wish to keep paying a regular dividend provided the oil price stays reasonable. Naturally, 2023 is a careful year for us, given that all these new wells are being delivered along with the capital expenditure we're carrying this year, which explains why we're being a touch conservative in this period. But we've consistently held onto it, and it will lean toward the second half, when we knew the heavier lifting program was coming, and also when some of those Dussafu wells were getting derisked. The first one is now online, and the second, we hope, will be online shortly. So I think it's visible that derisking is taking place during this period too, lining up with the larger lifting. Consequently, our full attention is really fixed on the oil price. The oil price is acceptable at its current level — it had been somewhat higher, but it's acceptable. That's also why you've seen us hold the dividend even though oil, and the realizations from our liftings, have come in below $80 year-to-date.

John Hamilton

executive
#27

Even so, our commitment to paying that dividend remains. So I hope that addresses what you asked.

Steffen Evjen

analyst
#28

Thanks, John. That's very clear. I'll pass it along now. Thanks.

Speaker

unknown
#29

Thanks. Our following question comes from Chris <<inaudible>>.

Analyst

analyst
#30

Appreciate you taking …

Speaker

unknown
#31

Please continue.

Analyst

analyst
#32

Hi there, and thanks for taking my question. I was wondering whether you could walk us through the timeline for the Hibiscus Ruche wells, 3 through 6. You said the second one is expected to come on stream in June. What about 3, 4, 5, and 6? Could you give us some indication of how those wells will come on stream?

John Hamilton

executive
#33

Sure. What we've guided to the market, and what we actually believe internally, is about 2 months between wells. That's roughly how the work program has been set up. So my expectation is that a new well should come online every 2 months. In some cases it might be a bit faster, and in others it could be somewhat slower. It really all hinges on drilling operations and what we run into along the way. Again, we're drilling into reservoirs that are very well understood. It's the prolific Gamba reservoir, we're drilling in reasonably shallow water and reasonably good conditions. There are always things that can throw you off the central a little bit, or you can lose some time, or you can gain it when things are going particularly well. But what you should expect is roughly every 2 months. So when the next well in June comes online — I don't have a precise date for you right this moment, but hopefully it's reasonably soon into June. You can then add 2 months to that, and then have 2 months of that, and then add 2 months to that, and that should probably get you to where you need to get.

Analyst

analyst
#34

Thanks, John. Regarding the <<inaudible>>, perhaps I’m mistaken, but I had expected that to become available somewhat earlier. Is that accurate? And if so, could you explain what problem caused the delay? Is it related to logistics or operations? Or can you provide any detail on that? Thank you.

John Hamilton

executive
#35

Yeah, I believe I’ve got the question about the gas compressor and when it will come on stream. So in our trading update, and also in the upgraded BW’s update recently, we said it ought to be running sometime during this month, very soon. We’re nearly at the end of the month now. So with luck, it will be up and running in the very near future. There have been hold-ups with it. The main hold-up has been — more lately, it’s been somewhat intentional, which is that — with the hook-up of the new production facilities. I think they didn’t want to carry out too many operations at once while bringing the new production facility in, taking that first new oil at the same time, and commissioning what might sound like a small item of equipment, but in fact, a very large item of equipment on the FPSO. So it was very deliberately that they were trying to hurry that along at the same time as trying to hurry first oil and end up putting one or the other at risk. We gave priority to first oil from the new well. But even so, it’s probably been a little slower than we would have liked, but it should be running imminently.

John Hamilton

executive
#36

I believe that's the term we use. BW provided guidance this morning in May. So with luck, that will happen soon.

Analyst

analyst
#37

Thanks a lot, though. I appreciate you taking my questions.

John Hamilton

executive
#38

Of course.

Speaker

unknown
#39

John, here's a question that came in online. We talked about the options for the extra rig slots we hold at Dussafu Marin — specifically, could you please go into a bit more detail on the thinking behind those additional options, or rig slots, and how that could add to the <<inaudible>> program?

John Hamilton

executive
#40

Right, so on The Borr Norve rig we actually have as many as 8 slots available. As BW, the operator, we've been open about the 6 production wells, and those were covered in this presentation along with the questions — so everything there is proceeding as planned. That leaves us 2 further slots we could bring into play, and we have a certain amount of time to reach that option decision. I think you'll see the joint venture is now clearly focused on the production levels and so on. But once we get into roughly the third quarter and then through that stretch, we'll probably begin discussing it a bit more. Within the group, at both Panoro and BW, there are plenty of ideas about what could be interesting to drill. My own personal view is that we'd like to see at least 1 exploration well drilled in Dussafu. As you'll recall, you're effectively drilling exploration wells at no cost in this block, given how cost recovery operates under the production sharing contract and the tax structure. So there is far more to pursue in the Dussafu block than just the Hibiscus Ruche <<inaudible>> 2. And it would be good — whenever we have a rig out there, to try and find another oil field.

John Hamilton

executive
#41

We’re aware there’s a great deal more out there. Those prospects need to be identified, and drilling an exploration well is something we’d very much like to see happen. So the way to think about it right now is that it’s probably too early for us to make any commitment, but I think you’d find that both we and BW — provided conditions stayed steady when it comes to oil price, sentiment and all of that — would exercise those options, and either drill one or two exploration wells, or perhaps an exploration well plus another production well. Data from the six wells we’re drilling has to be gathered so we can determine whether other undrained areas look interesting enough to us to drill a seventh production well and thereby add some capacity through that production. That said, I’d describe the glass as half full at the moment regarding exercising those options, though it’s a little early for us to discuss it. My personal feeling right now is that we’d probably exercise them and drill an exploration well, but things may change, and Panoro isn’t the only voice in the joint venture.

John Hamilton

executive
#42

So we’ll just have to see how that plays out, but having these options is a good thing. It’s a great platform for us, if all is going well, to step in and keep that rig maintained as we move into 2024.

Speaker

unknown
#43

Thanks, John. That brings today's Q&A to a close.

John Hamilton

executive
#44

Perfect. Thanks, everyone, and we’re looking forward to continuing to keep you updated. I think the next updates for the company will probably come as we get the second well in Gabon online, hopefully in the near future, and we can provide further updates on more production at that time as well. Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Panoro Energy ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Panoro Energy ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research