Panoro Energy ASA (PEN) Earnings Call Transcript & Summary
May 23, 2024
Earnings Call Speaker Segments
John Hamilton
executiveGood morning, everyone, and thanks for being with us. John Hamilton here. Today I'm accompanied by several colleagues, and a few board members too, joining from Oslo, where it's sunny. Welcome, all. Just a reminder that this conference call includes certain statements that are, or might be considered, forward-looking statements — meaning any statements other than those of historical fact. Such forward-looking statements involve making certain assumptions grounded in the company's experience and its reading of historical trends, current conditions, expected future developments, and other factors we consider appropriate under the circumstances. While we believe the expectations reflected in these forward-looking statements are reasonable, actual events or results could differ materially from those projected or implied in them, in light of known or unknown risks, uncertainties, and other factors. For your reference, we issued a series of announcements this morning, and they're available on our website at www.panoroenergy.com. Next slide, please. For those of you familiar with our system here, this is how it works if you'd like to pose a question at the end — we'll take questions at the end. You can either type in questions, which you can see on the left-hand side of this pane here, and we will endeavor to answer that question as long as it hasn't already been answered through a previous question.
John Hamilton
executiveAlternatively, if you want your microphone actually unmuted, just raise your hand and we'll do our best to get your question answered too. At that point it would be verbal, over the microphone. I'll remind you about that mechanism again at the end. Next slide, please. This morning we announced the results for our first quarter. In my view, most of the figures are more or less in line with guidance and as expected, and as we recently communicated via our trading update. So for us it was a solid quarter when it comes to liftings, revenue, EBITDA and cash flow. Our balance sheet figures are shown there too. So I'd say this is largely in line with guidance. And it's encouraging to see the production coming through and the liftings coming through, which appear — and we'll go into the liftings in a bit more detail — to be on an even pattern. Perhaps most importantly, this morning we also announced two items consistent with our shareholder distribution framework: the launch of a share buyback of up to NOK 100 million, which will remain valid until the end of September, and also a cash distribution paid as a return of paid-in capital amounting to NOK 50 million kroner. So we're carrying on the strong cash distribution trend that we began a little over a year ago now, with accumulated cash payout to date, including today's announcement, of NOK 240 million kroner.
John Hamilton
executiveMoving to the next slide, please. This is the quarterly production bar chart we present each time. As you can see, the quarter came in roughly within guidance at about 9,600 barrels a day. The second quarter is going to be somewhat lighter. We have a three-week shutdown, a bit longer than what was initially planned. It was two weeks and is now three weeks — that's the annual planned maintenance at Dussafu, and it will have an impact on quarterly production. Before that point, we were producing more than 10,000 barrels a day, so things appear to be going pretty well. We do have a group target of thirteen thousand barrels a day once the current wells in the current campaign — which we'll get to — are online. So that remains unchanged. We are still aiming for more than 13,000 barrels a day over the course of the year, with a range of 2,000 barrels a day on the group average. Next slide, please. We recently announced, in our annual statement of reserves, a 70% reserve replacement for 2023. That's a key part of our business. It's important for us to keep doing what we can to organically replace the reserves we produced over the course of the year, through reserve revisions, which are done by a third-party auditor each year, Netherland, Sewell.
John Hamilton
executiveAnd 70% is a solid figure. The key thing to highlight here is that we have, of course, issued some announcements lately, including encouraging drilling results in Gabon. Those clearly came after the year end, so this snapshot is as at the thirty-first of December 2023. As a result, we can anticipate some additional upward provisions, especially for Dussafu, with this extra oil we've discovered, which we'll come to. Next slide, please. So here's our lifting plan for the year. Looking back at last year, we lifted roughly 2.6 million barrels, averaging about $83 a barrel. This year, we're anticipating an increase of roughly 40% on that, 3.7 million barrels, with about 800,000 already lifted in the first quarter. Second quarter, around 900,000 barrels, a somewhat softer third quarter, and then a strong fourth quarter, which should bring us to approximately 3.7 million barrels for the year, which again reflects the growth in production of the assets. Our average realized price so far is a little over $81 a barrel. What's very nice about the lifting program is that we have our joint lifting in Gabon, together with BW Energy, so the smoothness of the liftings is quite different than last year.
John Hamilton
executiveSo as you can see, we had virtually no liftings during the second quarter of last year. Hopefully, then, we've now built a platform that lets us have more even lifting patterns from quarter to quarter, and liftings translate into revenue recognition, and they translate into cash flow. So those matter. This is a significant development for the company. Next slide, please. We have a slide covering debt. I won't spend too much time on it. We have our amortization program. I think the key point to make here is that we went through our—annual redetermination process, which is a process in which the bank lenders coordinate with the company, and using third party reservoir consultants, determine the overall health of the business, and the result of that is our RBL has been redetermined. We have substantial headroom within our banking facilities, has allowed us to actually increase our bank facility by $10 million, which we used during the quarter. Post period, we will have repaid during the second quarter, $10 million, so this number will come right back down, when you see our second quarter results. Our capital guidance remains at $75 million for the moment. We're obviously in a very heavy CapEx year.
John Hamilton
executiveCapital expenditure also leans heavily toward the first half of the year. So as things stand, that figure remains valid. We believe it is still a solid number as far as guidance goes. Let's move to the next slide, please. This is our cash flow reconciliation — as always, we present this slide each time. Two points worth noting: investment in assets of $27 million. That represents our CapEx. So, to return to the earlier point about CapEx being weighted toward the first half of the year, this illustrates it. I'll highlight a couple of other items here. First, we had some liftings late in March, so those are reflected in revenue, but the cash hasn't come in yet. As a result, cash receipts will have been received in April, but obviously they aren't reflected in the cash flow reconciliation. And after the period end, so in April, we announced that the operator, BW, completed a sale and leaseback of our MaBoMo production facility, which produced an inflow after the period of $26 million that isn't reflected in this current waterfall. And once again, those funds will go toward repaying some debt, and to support shareholder distributions and our ongoing business development activities, working capital.
John Hamilton
executiveMoving to the next slide, please. So Gabon has been pretty busy lately. We've put out several strong updates. First, I'll speak about production. Output for the quarter came in at an average of 29,000 barrels per day — nearly 30,000 barrels per day — since we managed to bring some new wells online and swap out a couple of the ESPs there. The situation remains unchanged. In the main producing Hibiscus field, three of the four wells are on ESP, one is flowing naturally, and the fourth well is going to be worked over during the current campaign. We've drilled the Ruche well, and it will be brought on stream using a conventional ESP instead of the retrievable ESPs we've relied on previously. The Tortue field is still performing very strongly, and right now we have this 3-week maintenance window during which we are shut in. That's scheduled maintenance in May. More recently, what happened is we first drilled what we refer to as the Hibiscus South extension. You can see it on the left side of the screen, that shaded area. This was a region that held some 3P reserves — no, 2P reserves, but 3P reserves as well.
John Hamilton
executiveAnd together with BW, we made the decision to drill into this structure that was clearly visible on the seismic, and we found a 25-meter net oil column of Gamba. So Gamba sands of good quality. Early estimates come in at roughly 14 million barrels in place. That works out to, let's say, 6 million barrels recoverable, and the very next operation will be putting a production well into this structure. We also spent a little time before getting into the workovers and the development wells to place a well where the star is there, the Hibiscus Northern Flank, where we encountered, once again, 24 meters of net oil pay, a larger column on that 37-meter column, both Gamba and Dentale sands. Reservoir quality looks very good. It's a little early to discuss volumes there, and the reason is something we can perhaps touch on a little later, and maybe there will be some questions about it. But this opens up the area to the north here on the flank, and so quite a bit more technical work has been done before determining volumes on it, but nonetheless, a very, very positive result. So what happens next in Gabon is we're going to be drilling the production well there in the Hibiscus South extension area.
John Hamilton
executiveThat work is already in progress at this point. A series of well workovers is going to be carried out, and by well workovers I mean we are going to swap out the retrievable ESPs and install more conventional ESPs in their place. That also involves placing conventional ESPs into wells where no pump exists at present. So what you'll see is a blend of development drilling — using rig time for development drilling at Hibiscus South and the Hibiscus Northern Flank, where this new oil zone was found — combined with well workovers, all aimed at maximizing production; that's the plan here. So we're essentially juggling logistics against maximizing production and deploying our rig time in what we consider the most efficient way to maximize production, giving ourselves the best shot at returning to that 40,000 barrels a day, which we strongly believe is within reach through this activity. So ultimately, we'll end up with eight production wells on this asset, which is a very nice position to be in. That's greater than the original six, and it lets us think about sustaining production plateaus at higher levels, for longer, over time. So really, a fantastic set of results. I think this Hibiscus area just keeps getting bigger, which is wonderful.
John Hamilton
executiveReservoir quality looks, looks excellent, in our view. And finally, we have the Bourdon prospect — a target that BW Energy and we ourselves are both very eager to drill within this campaign. So provided there's some rig time remaining once the core production work with the rig is finished, we'll drill a well there as the final operation on this block prior to releasing the rig. So with luck, the stars and the moon will line up, and we can get in and drill Bourdon during this activity too — it's a very, very attractive structure, with an estimated up to, you know, 29 million barrels recoverable in the Gamba and the Dentale. So that's something we'd very much like to drill within this campaign. Next slide, please. So our start in Equatorial Guinea was somewhat delayed. Those who've followed us will recall that we had a rig that didn't work out, and that rig departed. We're very pleased to report that, as we had hoped during our fourth quarter results call in February, we had identified a rig that would be available and that would be suitable for the time period in which we needed it to arrive.
John Hamilton
executiveThat's now taken place. We've got a rig contract award with Noble for the Venturer — the drillship that's currently working in Ghana — and it will shortly be heading to our fields. The purpose is to restart the development drilling campaign we announced earlier. So on this one we're a few months behind, but even so, it's back, back on track now, which, which is great news as far as we're concerned. And this rig is going to drill two development wells. So this is, where the red circles are. There's one at Ceiba and one at Okume. These wells are aimed at, you know, production, strong production wells, where we can see that we have strong, strong reserves, that, that can be developed. And when the rig has finished the development wells, we'll move then to, the star there, which is the Akeng Deep prospect, which I'll touch on in the next slide. But this is a very exciting prospect. This is a Kosmos-operated, exploration well that, we believe is quite interesting. We also, in Equatorial Guinea, have the Panoro-operated Block EG-01, which is the inboard block there in the light-shaded blue, which is busy with seismic reprocessing. Kosmos have joined us on that block, and together, we are reprocessing and interpreting that seismic, which could yield some very interesting drillable prospects, both in the sort of Okume complex type of target, but also the deeper Albian, which is what the Akeng Deep is targeting.
John Hamilton
executiveSo this is a highly prospective block, and we're at an early stage of getting to know it a bit better. Next slide, please. We have two panels here. The panel on the left covers the recent announcement. We signed a memorandum of understanding with the ministry in Equatorial Guinea, along with GEPetrol, the state-owned oil company, to pursue Block EG-23. We don't have this production sharing contract yet. It is being negotiated with the government, but we hold a period of exclusivity within which to finalize that production sharing contract. What we like about this asset is that it sits in a very, very good neighborhood. To the southwest lies the Zafiro Field, which is, to date, Exxon-operated, with over 1 billion barrels already recovered. Directly to the south of us is the Marathon-operated Alba Field, which has produced in excess of 1.2 billion barrels equivalent. So these are giant world-class fields, and our block sits right in that same neighborhood and benefits from both petroleum systems that Zafiro and Alba have. Again, if any questions come up in the Q&A, we'd be glad to take them, and and Richard, I think, can give you a little bit more detail on that.
John Hamilton
executiveBut our sense is that this is a really, really strong neighborhood. There are already discoveries on the block, and we look forward to giving people updates as we move into the PSC negotiations there. The panel on the right is the Akeng Deep prospect that I mentioned earlier, just outboard of the Ceiba, the FPSO. It sits quite close to existing infrastructure. What we're going after here is a deeper target, the Albian, which hasn't been drilled in this area, but the seismic indicates an interesting structure is present there. We know a lot of oil has been generated in this area. The source rock here, the Ceiba-Okume, has already produced almost 500 million barrels of oil, so we know a lot of oil has been generated in this area. And then the question is whether it has accumulated and whether we have good quality reservoir here. So this carries about a 25% chance of success, so it's pure exploration, but if it works, it opens up a new play fairway in the area, and it's quite close to infrastructure. So this would be a really, really nice outcome. The plan is to drill this well as soon as the two development wells have been completed on Block G.
John Hamilton
executiveYou'd be looking at late third quarter into early fourth quarter, most likely, for when that well gets spudded. Let's move to the next slide, please. When it comes to drilling and exploration activity, Tunisia isn't as catalyst rich as the other two assets, but it keeps giving us very strong reserves, solid production, and plenty of long-life activity on this block. Right now there isn't much newsworthiness around it, yet it remains a very important asset for the company. We're also busy there with some field extension processes. So in Rhemoura and Cercina, we've got applications in to extend the field lives of these assets, and those processes are going very well. It's a normal process, but really positive momentum around those activities. And the final slide, please. So to summarize, we're still on the production growth ladder, moving from the 9,000s and 10,000s, hopefully up to 11,000 to 13,000, over the course of the year. A very strong reserve and resource position, so this business will be around for a long time, 63 million barrels of 2P and 2C, which gives the company a very, very long reserve life.
John Hamilton
executiveDevelopment work has kept moving forward across each of our three core assets, which gives us an especially robust organic pipeline within all three. Then, in the middle section, there's something we take real pride in: we keep generating intriguing exploration activity organically inside the company. Exploration matters enormously — it is the lifeblood of this business. It hopefully substitutes for the reserves and resources we produce, replacing them. We've enjoyed some excellent successes, and people have seen them in both Hibiscus South and Hibiscus Northern Flank. Those discoveries can be returned to production rather quickly, are easily monetized, and deliver high-value barrels through infrastructure whose fixed costs already exist. So we're very, very pleased with developments of that kind. Beyond that, we hold the high-impact wells, in Equatorial Guinea as well as Gabon — Akeng Deep and Bourdon. Perhaps not every one will succeed. Hopefully most will. In our view, this is a crucial pillar of the company's success as we move ahead. And in the last column, we believe all of this is arranged within a company that possesses what we regard as a highly sustainable base for shareholder returns, a well-governed company, a strong board, sound governance practices, a sustainability report, and a genuine emphasis on targeted distribution to shareholders via a quarterly sustainable dividend, supplemented by shareholder distributions.
John Hamilton
executiveThis morning we announced the share buyback, and we're obviously always keeping an opportunistic eye on business development — how can we expand this business in an accretive manner so we can keep delivering this platform for many years ahead? That brings my slide presentation to a close. Could we go to the next slide, please? As a reminder about asking questions, you can type one into the panel, and we'll endeavor to answer it, or you can raise your hand. My one caution is that our annual general meeting of shareholders begins shortly, so depending on how many questions come in and how long they take, we may need to cut it off — and if we haven't answered your question, please do send us an email, and we'll hopefully be able to get back to you. Time is just a little short this morning, this morning, with the annual general meeting. Right. So my colleague, Andy, will survey for questions.
Andy Scott
executiveThanks, John. Our first question comes from Alex Smith. Alex, you’ve got yourself muted. Please unmute and ask your question. All right, we’ll go next to a question from Christoffer Barth. Christoffer, you’re muted as well. Please unmute yourself, and go ahead.
Christoffer Bachke
analystHi, this is Christoffer calling from Clarksons. To start with, congratulations on a solid quarter, and thank you for fielding my questions. I've got three for you today. The first one: could you give a bit more detail on precisely when the production well program in Gabon is expected to be finalized? Also, when do you anticipate bringing the Ruche well online, and what gross rate are you forecasting? Second, I'd appreciate some extra color on how you expect the split between buybacks and dividends to look going forward. You've now announced buybacks and distributions totaling roughly NOK 115 million out of the initial NOK 400 million to NOK 500 million, so what should we anticipate in the way of further buybacks ahead? My third question concerns the discovery on the northern flank of the Hibiscus field. Is there anything you can share about what you expect for the recoverable oil estimate? And would it be reasonable to assume something similar to the Hibiscus South discovery from last year? Thanks.
John Hamilton
executiveAlright, I'll handle the first two, Christoffer, and I'll have Richard — a colleague of mine who serves as our technical director — speak with you briefly regarding the northern flank. Richard, we likely have a handful of questions on that topic. So, regarding what we're seeing in Gabon, when it comes to the scheduling of all the well operations and the point at which Ruche comes online, and, you know, precisely. What I believe we're seeing is that BW Energy is performing exceptionally well — clearly, we've been through what you might call a challenging stretch involving those retrievable ESPs. Everyone is concentrated on getting production as high as possible, and there are a great many logistical and technical factors that are continually being balanced one against another when deciding what comes next, and in fact it's rather fluid. That fluidity has in fact produced some intriguing possibilities, such as drilling this northern flank, where we have a bit of slack time, where we're awaiting developments on some of the other activity, and we chose to go drill there, and just look at the result. So that fluidity, I believe, is going to persist, so pinning me down to precisely what the exact order of operations is here is rather difficult, but I can walk through what the priorities are.
John Hamilton
executiveWhat we want to do first is drill two additional development wells — that means the Hibiscus South extension we discovered, plus a well into the northern flank, where we've encountered this extra column. So that's two new wells. Beyond that, six wells already exist in the Hibiscus Ruche area, and a few pumps are waiting on installation, while others most likely need to be swapped out. So I'd say the joint venture's sense is that we're going to go a bit old school at this point. We've had our fun with the retrievables, I think, and we'll probably be shifting toward conventional ESPs. So there will be a program that combines that development activity I mentioned with swapping out those ESPs. And once again, several logistical factors come into play regarding the precise order, the sequence in which it all happens. But the bottom line is that the joint venture is entirely focused on lifting production as high as it can go, as fast as it can. And so I think we'll keep trying to update the market alongside BW Energy on how that sequencing unfolds. But the true goal is getting back to that 40,000 barrels a day that we nearly reached before some of our problems late last year.
John Hamilton
executiveReach that point as fast as possible, in the best and most responsible manner. So I realize that hasn't fully addressed your question, but I hope it gives you a sense of the kind of dynamic situation over there, which, frankly, is going quite well right now. Still, we constantly have to stay on our toes and try to maximize that production. As for how the buyback and dividends split, again, we're trying to remain somewhat dynamic. I think we've hopefully surprised the market a bit this morning with a share buyback somewhat earlier than most people expected. Our shareholder distributions were very clearly signaled to be weighted toward the second half. We're very pleased to have pulled forward some of that activity, and I think we simply need to watch how the year unfolds regarding what that mix might look like as further developments come on oil price and production activity. Also watching the share price movement and the macro as well. So I think we need to remain somewhat flexible, but we've once again reiterated the shareholder distribution framework that the board has approved.
John Hamilton
executiveWe said it again this morning, so ideally that provides folks with a bit of assurance regarding our wish to get there. Richard, would you mind attempting to discuss the northern flank a bit and perhaps respond to what Christoffer asked, but also maybe just cover what you, what you have observed in that area? Since I'm certain there will be additional questions about it.
Richard Morton
executiveYeah. Thanks, John. So Christoffer, yeah, that's a fair question. We're really pleased with how this well turned out. Just to give a little context, we had this sort of opening in the drilling schedule, and the operator proposed drilling this well. We agreed. It seemed like a good idea. The rationale behind it is that we have the 6H well at Hibiscus producing on natural flow, and that ranks among the best wells in the field. So there was some indication that more oil might be present in that area, and the spot we targeted sits just north of the 6H well. So we seized the chance to drill out there, roughly 800 meters north of the 6H location, and we encountered a good Gamba column. Around thirty-seven meters of column, with twenty-four meters of net pay. There's an interesting wrinkle we didn't include in our press release, though BW did, which is that the oil also extends down into the Dentale. So that's. We haven't observed that in other wells across the field. So we figure we need a bit of time to figure out what's happening here. So we're collecting data. We'll have some talks within the joint venture, and then we'll arrive at an estimate for recoverable resources in due course.
Richard Morton
executiveAs I’ve said, there will be one more well in that region. So we believe there is sufficient justification — certainly — for a first production well on that flank of the field.
Christoffer Bachke
analystThat's really useful, thanks a lot.
John Hamilton
executiveAbsolutely, and thanks for asking.
Andy Scott
executiveThanks. Our following question comes from Stéphane Foucaud. Stéphane, you've muted yourself as well. Please unmute and go ahead.
Analyst
analystYes. Hi, guys. Thanks for taking my question. I've really got two. The first one is, well, brilliant success in Gabon. Bourdon's coming up, could be quite large. Is there a scenario where you discover so much resources with Bourdon and Hibiscus and South Hibiscus, that you justify an expansion of the infrastructure, and therefore the overall production plateau could go up? That's my first question. My second question is around CapEx. So what's your view of the remaining CapEx in Gabon for the rest of the year? The reason I'm asking is because I was looking at the Q1 CapEx in Gabon, which is, I think you said it's most of the CapEx in Q1, so $25 million, say. The budget is 35% of $75 million, which already is very close to this $25 million. I was wondering whether the CapEx in Q1 in Gabon was because a lot of stuff has been front-loaded or otherwise? Any color would be great. Thank you.
John Hamilton
executiveOkay, sure. So yes, what I mean is that, you know, we continue to discover additional oil within this broader Hibiscus region. Should we be lucky enough to hit oil at Bourdon in due course, that would set off another development phase. That would then need a production facility of its own at that location. The FPSO's nameplate capacity is 40,000 barrels a day. My understanding is that it's broadly assumed this figure can be beaten by 10%, or maybe slightly above that. So I think what we'd need to weigh up is a nice problem to have — precisely how and when we'd go about developing it. But certainly, you know, all of this is very, very encouraging. It stretches out the reserve life of the fields and lets us potentially remain at plateau for a longer period. There is, and always has been, the possibility of expanding the topside facilities on the FPSO to achieve greater throughput. That would, obviously, call for some capital expenditure, which hasn't been given priority at the moment. But certainly, via modifications, the vessel could cope with more liquids than its nameplate capacity. On the CapEx in Gabon, so, you know, we've kept the rig for a longer period. We've had to carry out the workover activity that we're currently doing.
John Hamilton
executiveCapEx, I'd say, is going to come in above the budget we laid out at the start of the year. That said, the broader portfolio has other moving pieces, with some increases and some decreases. So we're just not, not really... I wouldn't read too much into those percentages. As you know, we kept the $75 million guidance in today's report. How that ends up being built through the year across Egypt, Tunisia, and Gabon is still a moving feast. So I wouldn't read too much into that, but there's definitely still some CapEx left to come in Gabon.
Analyst
analystThanks. That's excellent.
Andy Scott
executiveThanks. Our following question comes from Teodor Sveen-Nilsen. Teodor, your line is open now, so please proceed. Thanks.
Teodor Sveen-Nilsen
analystMorning, everyone, and thank you for taking my questions. First, regarding that 13,000 barrels per day rate you mentioned, it seems there could be some upside there, considering the Hibiscus South discovery as well as the North Flank discovery. So I was just wondering whether you might talk about the potential upside to that target? My second question concerns Q2 cash flow, given that you'll have proceeds from the sale leaseback and also, probably, that CapEx is front and loaded, and the third point is perhaps a working capital release in Q2. Should we be expecting considerably stronger free cash flow in the second quarter compared with the first quarter? And then my third question relates to the Bourdon prospect. Could you just remind us of the pre-drill estimate? Thanks.
John Hamilton
executiveSure, there's definitely some upside to that 13,000 barrels a day. I mean, again, we've had a difficult stretch with those ESPs. So we just don't want to get ahead of ourselves by pointing to larger figures. But there is clearly some upside there. The one caveat I'd add to that, Teodor, is that obviously in Equatorial Guinea, we've thankfully restarted the drilling program that had been delayed, but we have dropped one well from that program. Now, we're drilling two really, really good wells there. So I'd say yes, there's certainly upside to 13. We just, you know, don't feel the need to stick our neck out much further than that right now. But absolutely, I mean, we're seeing such positive results. Some of these wells in Gabon are performing better than modeled. So we're seeing very, very good, strong reservoir quality and good pressure support. So, you know, we do have some upside there, but, you know, again, the vessel is constrained as well in terms of its overall capacity. Let's call it 45,000 barrels a day for a gross, for an example. But your point is noted and clearly, the positive drilling results do provide some upside potential.
John Hamilton
executiveThe second quarter's cash flow — honestly, CapEx is still likely to be heavy for us in that period. That said, you're right: with working capital coming back in the first quarter and the money from the sale and leaseback, we'll see — probably a stronger free cash flow figure in Q2. For sure, a stronger free cash flow figure in Q2. Bourdon. Richard, would you remind everyone what this is about?
Richard Morton
executiveYes. Yeah, thank you, Teodor. That's a good question regarding Bourdon. It's a very exciting well. We've had this one sitting in our prospect inventory for quite a while, and its character has shifted over that time. It's a distinct structure located to the southeast of all the Hibiscus work we're carrying out. It's a fairly sizable structure that we've identified on the seismic dataset. There's a closure at Gamba, and beneath it sits a large Dentale structure. So it differs somewhat from what we've drilled historically at Ruche and at Hibiscus. For that prospect we're carrying roughly 30 million barrels, divided between the Gamba and the Dentale. I think there could be more potential. But that's highly uncertain. At present there's a wide range of uncertainty around that resource. So this sits quite a distance from the Hibiscus facility. So should we find something, it would likely need a separate facility at that location. And there is a route to tie back into the pipeline running from Hibiscus to Adolo. So we've sort of positioned ourselves, in the event of success, to move quickly on it. Should it succeed, it would likely need a couple more wells to delineate it properly, much as we're doing at Hibiscus.
Richard Morton
executiveWe keep drilling around there, and we're finding somewhat more while refining the reserves. But yeah, for that particular one we're looking at roughly 30 million barrels.
Teodor Sveen-Nilsen
analystThank you. Since you’re going to need additional facilities, could you also tell us what volume level would serve as the commercial threshold? I’m assuming it would be under 30 million.
Richard Morton
executiveYes. It definitely will.
John Hamilton
executiveYeah. So, is the question about where that commercial threshold sits?
Teodor Sveen-Nilsen
analystYeah, that's right.
John Hamilton
executiveThere's a figure we have for that. I mean, we approved, you know, Hibiscus Ruche, at roughly — what was it? Around $50, though at that point the overall total was probably somewhat lower.
Richard Morton
executiveYeah, a bit lower than that. So for this one, you likely wouldn't require a facility as large as Hibiscus. And, you know, we already have a tie-in point on the line going back to Adolo. So we could start with a small unmanned platform or something along those lines, and then we'll drill out and find out how big it is.
Teodor Sveen-Nilsen
analystAll right, thanks.
John Hamilton
executiveAndy, I think we’ve likely got room for one more question or a couple of quick ones, but we’ll probably need to wrap up within the next few minutes here so we’re ready for the annual general meeting. Are there any questions left?
Andy Scott
executiveSure, of course. We have time for 2 more questions. Our next question comes from Tom Erik Kristiansen. Tom, your line is unmuted, so go ahead. Tom Erik? All right, we'll move past that one. Next up is Chris Aristidou. Chris, you're muted yourself. Please unmute and go ahead.
Analyst
analystHello there, is this coming through clearly at the moment?
Richard Morton
executiveYeah, we can do that.
Analyst
analystApologies for that — sorry. So I have two questions, and I’ll try to keep them brief. First, what is the current count of conventional ESPs that you have? And perhaps you could make clear how many are required, since two are needed for the two wells on the retrievable lines. One is needed for the well on natural flow. I assume one is needed for the well that will be worked over. And do you basically need two additional units for the two new development wells? Or is the plan basically to place those new development wells on natural flow first from day one? Or is any ESP needed from day one? My second question is whether you have gotten to the bottom of what happened with the retrievable-line ESPs, and whether you are entitled to any compensation from Baker Hughes? Those would be my two questions, please.
John Hamilton
executiveThanks, Chris. So the thinking within the JV right now is that we'll wind up with those eight wells, and conventional ESPs will be installed in all eight. A number of those are already with us in Gabon, a number are on their way, and a couple more are still being manufactured for us. So as we see it, we'll have a full supply of conventional ESPs whenever we need them. Again, from a risk management standpoint, for lack of a better term, I think we've decided to go old school with the ESPs and return to something tried and tested, rather than the newer technology. So I think you'll see us eventually migrate to full, conventional ESPs, and we're working very closely with Baker, the supplier, to make sure we have them just in time for our activities. So that workover activity we talked about on the Gabon slide is principally either putting a pump in where there isn't one, or replacing. We have 2, 2 wells, 3 wells, actually, with the retrievable ESPs in them right now. So those would need to be replaced.
John Hamilton
executiveThat process, however, requires roughly 2 to 3 weeks for each well to be swapped out. So these are fairly fast, small-scale operations. As for the new wells — well, gosh, I think, you know, when we move into these new areas, my sense is these wells likely have the ability to free flow. You know, we have really strong reservoirs and solid pressure in them. It's possible to bring them on without an ESP. I think what we still need to pin down precisely, you know, is — while we're there completing the wells — do we let them free flow, or do we take the time to go ahead and install the conventional ESP, or do we make it a priority to put a conventional ESP into one of the other wells and allow this well to free flow for a period, and then at some point install the pump? But yes, I think our belief is that these two new well areas will likely free flow under their own pressure. Richard touched briefly on the Hibiscus 6 well, which happens to be the one free flowing on its own at present, and it has been doing that for some time now and remains extremely strong. When it comes to the ESPs and compensation and all of that, a number of investigations are still underway.
John Hamilton
executiveAs we’ve mentioned before, we think the problems we encountered with these ESPs were likely caused by several factors coming together. For me to make any firm statement on that would be too early. Still, our choice to switch to conventional equipment should make clear that we’ve concluded that approach probably isn’t right for us on this asset as we move ahead. On compensation, that remains under discussion between the operator and the supplier. I’m confident we’ll reach a good outcome there, but it wouldn’t be appropriate for me to go into that on this call.
Analyst
analystGot it. I’ll let you head to the AGM, and I’ll reconnect with you afterward. Thanks for taking my questions.
John Hamilton
executiveAs a reminder, if anyone else believes their question remains unanswered, please email us. I believe Andy can also be contacted regarding any written questions we haven’t addressed, and we’ll make an effort to respond. But we’re signing off now to attend the AGM. So thank you all very much for joining, and keep following the story. Thank you very much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Panoro Energy ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Panoro Energy ASA earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Panoro Energy ASA or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.