Good morning, everyone, and thanks for being with us on this quarterly webinar update from Pantoro Gold. Paul Smirlk, the Managing Director of Pantoro Gold, is presenting today, and he'll be giving you an update on operations at the Northern Gold Project now that the company's September 2026 quarterly activities report has been released. <<operator_script>> Once Paul's presentation wraps up, we'll address as many of your questions as we can. And where appropriate, we will group similar questions together. Before we get things started, I would like to remind you all that today's webinar is being recorded. Paul, over to you.

Paul Cmrlec

executive
#2

Thank you so much, Sam, and I appreciate all of you being on our webinar today. It's a real pleasure to share this quarterly update with you. During the September period we delivered a strong quarter that matched our guidance. As the period ended, our balance sheet stood at $240 million in cash and gold. We remain free of debt, and we remain unhedged. Operational cash flow came in strong, with $63 million of EBITDA, and our cash and gold position rose solidly. As you'll notice, after the quarter closed, we restarted some buyback activity, supported by that cash flow generation. Production, as I mentioned, tracked guidance, and it benefited considerably from mining getting underway at the Green Lantern open pit, along with the continued enhancements at our existing mines that we've discussed for quite a while. One very exciting thing this quarter, and in the one before it, was the discovery of the Racetrack deposit. That is developing into a highly significant element of our growth strategy, and I'll devote some time to it today. If you glance at the key metrics for the latest quarter, it's clear that production and cash flows have risen while our costs have declined.

Paul Cmrlec

executive
#3

During the quarter, we noted that diesel prices, which have impacted numerous operators throughout the period, have likewise influenced our costing. Even so, I want to point out that the all-in sustaining cost sits near the guidance level one would anticipate, given that the first half of the financial year should deliver 40% to 45% of our gold. Turning to operations, and beginning with safety and community as we always do in these webinars. To start, it's very pleasing to see our safety figures continuing to move in the right direction. Across the Norseman operation, we have now gone 15 months without an LTI, which is a tremendous accomplishment and genuinely mirrors the emphasis placed on safety throughout the site. Medically treated injuries and total injury reports have also declined during this period. It has been a busy stretch in the community. Once again, we welcomed a visit from Carmel Adventist College. We host them every year. Their mining program is excellent, and being involved is wonderful for us, helping draw more students into the field. As for further community initiatives, we have kept up our support for events within the Norseman community.

Paul Cmrlec

executive
#4

When you look at what we achieved in the Norseman quarter, it's clear we sold a bit less than 23,000 ounces of gold, and the price came in at slightly above $6,000 an ounce. The main things driving that, I believe, are better grades at both of our underground mines and at our open pits, which means we're leaning less on those lower grade stockpiles. We'd expect that pattern to carry on as we progress through the year. Throughput at the processing plant has stayed roughly where it sat over the last year, at 260,000 tonnes for the quarter. I'm happy to report that early in this quarter we've had extra fresh rock coming from the Green Lantern open pit, and because of that, we're running at higher throughput rates. We anticipate being back above that 1.2 million tonne per annum throughput rate as we go forward. Third party ore gave us only a small contribution this quarter. We think there'll be a little more than that in the current quarter, though we certainly won't be depending on it. Most of what we produce will keep coming from our own ore sources. One final thing I should flag here is that our exploration spend keeps rising.

Paul Cmrlec

executive
#5

We currently have 10 drill rigs running throughout the site, plus an air core rig operating on the lakes, so we're producing an enormous volume of exploration data—and that's beginning to return some very attractive results, as this presentation will show. Turning to the individual mines and the discoveries we're encountering in those areas: the OK Underground mine delivered a solid performance over the quarter. The management plans we put in place for seismicity have functioned extremely effectively. We experienced no meaningful geotechnical-related delays at any point during the quarter. We anticipate that will remain true given the adjustments we've implemented in the mine development stoping sequence, along with the seismic system we've installed at the mine. Output rose considerably quarter over quarter, and we expect it to hold near present levels through the rest of the year. On the upper left portion of the diagram, you'll see the proposed access decline toward the Racetrack discovery, which I'll now discuss for a few moments. Over on the right side, there's the plan view diagram of the OK Underground mine.

Paul Cmrlec

executive
#6

On this slide, you're looking at a three-dimensional view that's straight down in plan view—from above, directly down onto the mine as shown in this diagram. Our mining is taking place in the O2 Lode and the Star of Erin Lode. Approximately 600 meters north, you can see the Racetrack deposit, along with a decline that the Pantoro board has now approved, and development has begun heading out toward that lode. I think the scale of the Racetrack Lode is visible there. Its overall strike length is very significant when compared with what we've been mining in the O2 Lode and in the Star of Erin. I should point out that it remains open at depth and to the east, and we'll also keep testing the additional repeats to the west. This is an early stage for a very exciting deposit, but already a very large footprint—900 meters along strike and 600 meters of depth—has returned strong results. You can see those results in the center of the page there. They have been nothing short of spectacular and very consistent. As we said in the first release on this deposit, it's rare for Norseman, which is known for very high grade but nuggety gold, to have so many very strong results throughout the ore body.

Paul Cmrlec

executive
#7

Typically, you'd anticipate a combination of lower-grade and high-grade results, yet the high grade has remained extremely consistent so far at this deposit. I've included a comparison with the Bullen mine, one of the most recent discoveries at Norseman. That mine was found in the early 1980s and was worked from the mid-1980s until roughly 2000. During that span, the cross-link structure — which shares a similar orientation to Racetrack — yielded approximately 0.5 million ounces of gold at 10 grams per tonne. What I've done in the diagram on the left-hand side is superimpose the full extent of the Bullen mine development onto the Racetrack deposit as it currently stands. As you can see, Racetrack already extends over a longer strike than what we observe at Bullen. We've already confirmed it across the entire depth that Bullen reached and are continuing to test past that point. At present it's very comparable in size to what Bullen was, but there's enormous potential to grow. What I find particularly interesting is that prior to mining starting at Bullen, 90 holes had been drilled in that area. On average, those holes were 1.37 meters wide at 10.3 grams per tonne.

Paul Cmrlec

executive
#8

So with that nuggety character, an upgrade was observed, and they ultimately mined it at 10 grams per tonne. At the Racetrack deposit to date, we've drilled 43 holes, which is roughly half of what's been drilled at Bullen so far. Our average width has been 3.6 meters, and our average grade has been 18.6 grams per tonne. You can see there that purely on the raw data, without any modeling, and putting it into context in terms of where those results sit, we're at just over 2x the width and nearly twice the grade relative to the early data at Bullen. It's shaping up very well, and we strongly believe this is going to be a very important deposit in our growth journey and is really, I guess, affirming the potential of Norseman and what we saw when we set out on this large growth drilling program back in September 2024. Moving on now to the Scotia underground mine. We're getting to a point now where mining at Scotia is getting towards business as usual. We have the 3 areas in the mine — Scotia South, Scotia Central and Scotia North — all active. If you compare this diagram with the previous diagram from last quarter, you'll see that we have advanced that next level on the southern side of Scotia.

Paul Cmrlec

executive
#9

We have definitely kept pushing forward with both stoping and development in the central zone, and a fair amount of extra stoping has taken place up in the northern section of the mine — that has truly been the main factor behind the improved grade and the added flexibility we now have, with several areas producing at the same time. With these new areas contributing to both production and development going forward, we anticipate Scotia will keep delivering solid results all year long. Turning to open pit mining, things are extremely active at site. As you can see in the 2 diagrams on the right, we have an open pit operating at Green Lantern, which sits within the Scotia mining center down in the southern portion of our tenure. The photo on the left shows Green Lantern. We are mining at Gladstone as well, something we have discussed at some length during the past couple of quarters ever since operations began there. A major reason for mining at Green Lantern is that, as this photo makes clear, it reaches fresh rock quite near the surface, and that supplies fresh rock feed to the processing plant, letting us significantly raise our throughput, consistently and no matter what the weather brings.

Paul Cmrlec

executive
#10

It's a somewhat lower grade, but the overall pit grade is roughly 1.5 grams per tonne. We're expecting just under 0.5 million tonnes to be mined. Sorry — 350,000 tonnes mined at a grade of approximately 1.8, plus a further 350,000 tonnes mined at about one gram per tonne. During this year, we'll be building a very large stockpile, and that will guarantee a very smooth feed into the processing plant across the next couple of years. With a single fleet, this pit would keep running for 4 years if we work it through the whole period. Right now, we expect to work it for somewhere between 12 and 18 months, then rest it while we draw on those stockpiles we'll be building. Meanwhile, the Green Lantern open pit is currently undergoing the stage 3 cutback. Late in this quarter, we'll be back strongly in ore. That open pit delivers roughly 20,000 ounces in the back half of the year at grades above 3 grams per tonne, and carries on into the next financial year for another 30,000 ounces at around 3.5 grams per tonne.

Paul Cmrlec

executive
#11

Gladstone serves as a high-grade, long-term supply source while the extra underground mines are brought into operation. Green Lantern provides long-term feed that can be switched on or off as needed so the operation keeps running at optimal throughput rates. Turning to our added development in the Mainfield, we've made very good progress there. The dark blue you see covers both rehabilitated portions of existing development and new development we've pushed forward over roughly the last 15 months in the Bullen underground mine. As a result, we've rehabilitated about 8 kilometers of development. We've completed approximately 2 kilometers of new development, and we've carried out a substantial amount of drilling, which has let us identify 3 initial areas that, as you can see on the overall Mainfield scale, appear small, yet their strike lengths are in fact very similar to what we're mining in total at the OK Mine. We have 3 separate areas moving into development. The Phoenix area on the right-hand side, marked with the red circle, currently has an in-ore ramp running through that block. At the Butterfly area on the bottom left-hand side, we're developing the first levels toward it.

Paul Cmrlec

executive
#12

So because of that, we’ve moved a bit more slowly on the dewatering and rehabilitation work toward O’Briens, but ore will be coming from the O’Briens area later this year. No meaningful production is planned from the Mainfield during this current financial year. We’re setting up extensive workings, and through that growth journey we expect over the next few years, the Mainfield will become a very important production source. You can see there that, from the mineral resource update we’ve completed, we now have a mineral resource in this Mainfield area of just under 1.5 million ounces. Importantly, our ore reserve stands at 1.7 million tonnes at 5 grams for 280,000 ounces. That’s quite a significant portion of our ore reserve now, and we could expect to keep seeing it grow as we develop these areas and continue drilling over the whole length of the field and establish additional areas throughout the life of this mine. Finally, on our greenfield exploration, we’ve talked a lot for some time now about exploration on these salt lake areas and the real potential they have. As we reported last quarter, we gained access into this area at the end of April this year.

Paul Cmrlec

executive
#13

We began drilling in June and have kept at it continuously since. The Lake Cowan program—slightly more than half of the overall air core program—now stands at 50% complete, with drilling ongoing. In the coming months, we'll finish all the holes marked in orange there. That lets us bring together the anomalies we encounter in those holes and proceed with the planned RC and diamond drilling targeting the anomalies that best suit that next exploration stage. This is a really exciting period for us. It isn't the kind of thing that produces a great deal of news for the market while we're in this air core phase, but we have strong confidence that the work under way will deliver some meaningful additional targets that we'll proceed to drill once this initial phase wraps up. Turning to the mineral resource and ore reserve update we released at quarter end, it's been another successful stretch for us. The mineral resource has remained relatively flat, yet rose 2% across the period after mining depletion. Importantly, we lifted the ore reserve by 9% after depletion.

Paul Cmrlec

executive
#14

We keep growing that ore reserve even with all the mining taking place. It's really important to point out that the Racetrack discovery isn't part of this yet. Once we put a resource and then an ore reserve on that area, we expect a very substantial increase from the Racetrack discovery. Our target is a maiden mineral resource near the end of the first half of next calendar year, and we'll look to have some ore reserves on Racetrack when the annual ore reserve updates happen during September. In that period, though, we will develop out toward the ore body. We'll start some development in the upper levels while all of that information is being assembled. Having that underground access lets us do fairly short range drilling once we're out there and makes sure we're well and truly in the right location for those first levels. Our aim is that within 12 months, we'll be in a position to develop the first of our levels in that Racetrack deposit. To summarize what we've discussed today, I think Pantoro remains in a fantastic position, as it has been for some time.

Paul Cmrlec

executive
#15

We keep building up our cash. At quarter end, our position in cash and gold was really solid, and that gives us the ability now to seriously look at ramping up drilling, both inside the Racetrack deposit and across the other exploration zones we have over the site. That maiden reserve at the Mainfield, at 280,000 ounces, is very much an interim figure. As we've said, we fully expect the Mainfield to turn into a very significant producer over a very long period as drilling continues there. Something I didn't mention earlier in the presentation, but probably should have, is that a big part of the better performance at Norseman has come from the workforce numbers in our underground areas particularly being largely addressed. We're at contract manning levels right now. We keep drawing more people in so that we have good redundancy for turnover and absenteeism. But for all intents and purposes, we're now at the levels we intend to be at. I think that's really important with the 2 underground mines in operation, in production, a third underground mine in development, and those 2 open pit mines also operating.

Paul Cmrlec

executive
#16

We're in a strong position to keep going through this year and deliver a good, positive result for the period. Thanks so much for spending time with us today. We're glad to take a few questions.

Sam Macpherson

analyst
#17

Paul, the first question we’ve received concerns diesel. In October, fuel costs came in 31% over budget. Could you remind us what portion of costs is tied to diesel and give us an approximate effect on full-year all-in sustaining costs if prices stay where they are now? Does that remain inside the guided range?

Paul Cmrlec

executive
#18

Yeah. So diesel, when you look at it as a share of everything we spend at the site, it's somewhere between 6% and 7% of the total. Call it 7%, basically. With the 30% rise we're seeing right now, that takes it up to approximately 9% of overall costs. So in relation to the total cost per ounce, it isn't a huge burden. Sure, it does have an effect, and in straight dollar terms it's a meaningful figure. Even so, we think that with the costs we see during especially strong months, we'll come in inside that guidance range.

Sam Macpherson

analyst
#19

Turning to Mainfield next: at what point do Phoenix and Butterfly transition out of development ore and into stoping, and when will O'Brien's be delivering ounces that actually matter?

Paul Cmrlec

executive
#20

Yes. So, as I mentioned during the presentation, we aren't anticipating any meaningful output from Mainfield over the course of this financial year. It's really an establishment phase. The areas we're developing there are each roughly the same size as what we're currently mining at the OK area, as you can see. So getting those into full production requires substantial establishment work. Through some of that early development, we're currently seeing small quantities of ore coming out. We're encountering some good, strong mineralized structures in that work. But the Mainfield hasn't been included in our guidance for this year. As we move into next year, we'd expect it to contribute on a much more substantial sort of basis. Think of it as comparable to what the OK Underground Mine is doing at present, and we expect that to keep growing over the following 1, 2, and 3 years after that.

Sam Macpherson

analyst
#21

Could you give us the FY '27 production guidance broken out by ore source for each mine?

Paul Cmrlec

executive
#22

Yes. To give you a rough kind of breakdown: the OK mine comes in at roughly 25,000 ounces. The Scotia underground mine lands somewhere between 45,000 and 50,000 ounces. The rest is supplied by those open pits, and a big share of the Green Lantern output, specifically, is expected to go to the stockpile. By the close of the financial year, we anticipate having on the order of 600,000 tonnes stockpiled.

Sam Macpherson

analyst
#23

Regarding Green Lantern, what is the pace at which that project ramps up, and once Gladstone Stage 3 ore access arrives late in December, what contribution should we expect after that?

Paul Cmrlec

executive
#24

Apologies — I didn’t catch that final part about Gladstone. To start with Green Lantern: it’s producing good ore at present, so the ore is right there starting at the surface. On Green Lantern, the strip ratio overall comes to roughly 6:1. It produces a substantial volume of ore quite fast, and we anticipate fairly sizable stockpiles accumulating as soon as the December quarter. Come the end of December, we ought to see those stockpiles beginning to grow. Gladstone as a....

Sam Macpherson

analyst
#25

Regarding Gladstone, what contribution comes after ore access at Gladstone Stage 3 late in December?

Paul Cmrlec

executive
#26

Yes. As I mentioned in the presentation, Gladstone will produce approximately 20,000 ounces in the second half of the year. In terms of how that output is spread out, it's fairly steady from the beginning of next quarter through the rest of the year.

Sam Macpherson

analyst
#27

Thanks, Paul. That's every question we've received up to now. I'll hand things back over to you for a few closing remarks.

Paul Cmrlec

executive
#28

Thank you. I appreciate that, Sam, and I want to thank all of you for joining today's webinar. I hope it's clear to you that Norseman is well positioned, and that the long-term growth program we kicked off 2 years ago is now delivering some excellent results. My view is that we will keep seeing that substantial exploration-driven expansion, and the mine remains on schedule to produce the growth we forecast back at the beginning, when we first laid out this growth program. I believe I've mentioned this before, but at the outset of that growth program we stated that within this financial year we were targeting 2 additional mines coming online. As you can see, we now have substantial areas in the Mainfield operating and moving toward production, and we are also advancing development out toward that Racetrack period. From the standpoint of that growth program, we have achieved very, very strong success, and I believe that will convert into growth over these coming years. You'll be able to see that in our updated 5-year plan, which we intend to release before this current quarter ends. Clearly, the Racetrack deposit plays a very important role in that.

Paul Cmrlec

executive
#29

Our only goal here is making sure Racetrack holds enough data prior to releasing that plan, and we feel sure we can get there before this quarter wraps up. Thanks so much, and we look forward to bringing you another update in the next quarter.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pantoro Gold Limited transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pantoro Gold Limited earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pantoro Gold Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.