Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary
May 15, 2025
Earnings Call Speaker Segments
Brian Shore
executiveThank you, Operator. Brian here. Everyone, welcome to Park's investor conference call for the fourth quarter of fiscal 2025. Joining me is Mark Esquivel, who serves as our President and COO. Immediately following the close, we put out our earnings. A news release went out with our earnings. If you'd like to review it, the earnings release contains instructions for accessing the presentation, whether by a link or via a website. Give it a look. Get it pulled up in front of you before we walk through the presentation. Once we finish the presentation — that might take around 45 to 50 minutes — just be aware of that. Mark and I will gladly take any questions you may have. Alright, let's begin. Our forward-looking statements disclaimer is on slide two. Rather than reading through each item, just reach out if you need anything explained further. Now on to slide three — the James Webb Space Telescope. Honestly, it feels like this topic surfaces quarter after quarter. There's never a shortage of news about it. Many of you are likely aware that our SigmaStrut — the strut technology we developed and own — was used in building the James Webb Space Telescope. So what do we have to report this time? We were able to get something of an image of the James Webb while it was in the L2 Lagrange orbit, roughly 1 million mi from Earth. I'd call that quite a distance. Ninety-seven percent — wait, my mistake, it's actually 99.7%. That's an extremely large share. The odds look quite favorable. The probability of extraterrestrial — here's the thing — of life beyond Earth. I'm not kidding around. Within the galaxy we inhabit — the Milky Way, which as far as I know is the name we use for it — there exists a planet called K2 to 18. That's what the planet is designated as. I'm sure you've heard plenty about this one. It sits just 124 light-years away from our planet. Honestly, that's basically right around the corner. It belongs to our own galaxy. Give James Webb the credit; the way I understand it, the James Webb picked up on particular kinds of gases that biological processes alone could produce. That's really remarkable. And here's something else that strikes me as a bit strange, you know? Is this something you see covered on the nightly news, like constantly, all hours of the day and night? The existence of life on a different planet, at 99.7% certainty. I sure don't. There's nothing about it that reaches my ears. Look, I have no idea what stories they choose to run, but you would figure something like this would get round-the-clock coverage, yet apparently that isn't happening. Moving on — the table of contents, or investor presentation, that's what we're going to walk through next. After that, there's supplementary financial information in the back, plus the Pennex material. That part isn't covered while we present, but absolutely reach out if anything about it is unclear. Alright. Let's move ahead to slide four. Quarterly results covering 2023, 2024, and 2025, in thousands. Let's move directly to the column on the far right, the fourth quarter, the one we've just reported. Revenue came in at $16,000,939. I want to flag that we'll circle back to this, but $4.4 million of that revenue was from C2B fabric. Next, gross margin landed at 29.3%, and — we'll revisit this too — but that C2B fabric, we moved it. It shipped with only a slight markup. With that in mind, I have to say, the gross margin number surprised me with how strong it turned out. As you're aware, we don't like seeing our gross margin below 30%, but under these circumstances, plus the startup cost we're going to go through, I was surprised, same as myself, at how high it was. I think the biggest factor was that output was extremely robust, and it exceeded sales, which matched our intentions. We'll dive into that shortly. On the Q3 investor call, what did we communicate about Q4? We projected sales between $15.5 million and $16.3 million; we ended up slightly above that. For adjusted EBITDA, we estimated a range of $3.3 million to $3.9 million, and we finished inside that range. Let me stop and bring up something—we used to bring this up each quarter, and I thought, all right, I've beaten it to death. But after our Q3 investor call, a few remarks came in implying that we should inflate our guidance figures. Let's revisit this — we don't participate in that practice. Providing guidance isn't something we do, and frankly, it isn't something we care for. It's an odd sort of exercise. Think about it this way: suppose our expectation for the quarter is some figure, X. Convention says we should announce X minus 10%. Then when we land at X, we're celebrated, or we've exceeded our own target. That strikes us as very peculiar. As for everyone else, they can operate however they choose. I'm aware that nearly all other companies do it, but that's not our approach. What we offer instead is a forecast. Our message to you is simple: this reflects what we anticipate will occur — not what is guaranteed to occur — and we won't shave off 10% to game it. We simply want to make sure you're all aware of that, and our position on it isn't going to change. Beyond that, it would strike us as somewhat odd if we stood here telling you that the outcome will be X — 10%. That wouldn't be truthful, would it? Having integrity is something we care about deeply. I'm not claiming others lack it. What I'm saying is that it's how we operate. Whenever someone asks, "Hey, why not inflate your figures?" — know that we won't be doing anything like that. Any time we hand you a forecast, what we mean is: this is our best sense of what's coming, and there will be occasions when we get it wrong, and at times it's obvious that we have. When we give you that guidance, it reflects our current expectations for what will occur. We simply want to note that this used to be a topic in our quarterly discussions. We haven't covered it in a while, but it might be useful to revisit it one more time. Please turn to slide five. Here are the things to keep in mind for Q4. Let's dive straight in. The relationship between production and sales: back in Q3, we pointed out that the sales value of production for that quarter — SVP for short — differs from inventory value. It's purely sales value. That number came in $1.2 million below our sales. Over at Park, a large share of costs get moved into produced inventory through production SVP. So — and keep in mind we're only revisiting Q3 here for background — the Q3 production shortfall, to use that phrase, put a heavy drag on our Q3 EBITDA. That Q3 production shortfall was on us. We said as much during our Q3 call. Put differently, we simply came in under a number; there was a production target; we failed to reach it; the fault is ours. We fell short of our target. We also noted we expected to turn that around in Q4; turn it around we did, and that too is our responsibility. The miss on a target in Q3 is something we own. Our team, in my view, deserves the credit for reaching the target — our target — in Q4, and for performing really well on that, in fact. During Q4, our production came in above our sales, once you adjust for RAYCARB C2B fabric, which isn't a product we make in any case. As you're aware, the gap was $1.4 million, and that was the target we'd set.
Brian Shore
executiveThat is genuinely useful. A substantial amount of money falls through to the bottom line — likely $350,000 or more for the quarter. In the same way Q3 carried a large negative, Q4 carries a large positive, and that is exactly the outcome we were after. Moving to slide six, the additional output during Q4 gave our Q4 EBITDA a meaningful lift. This matters. That extra production additionally let us restore finished goods inventory to levels we consider more acceptable, roughly $1 million higher than in Q3. At the start of Q3 it was far too low, since we were drawing down inventory instead of producing. We have now replenished finished goods inventory to levels we view as more reasonable. Turning to ArianeGroup. As you're aware, we signed a business partner agreement with them back in 2022, and under it they made us their exclusive North American distributor for the RAYCARB C2B fabric, which is used to make a blade of composite materials for advanced missile program systems. We've been through this already, but we sold $4.4 million of C2B fabric in Q4. That is in fact $500,000 above what we forecast in our Q3 investor presentation — the actual figure came in higher. Whether you believe it or not, $7.5 million across all of 2025. That is a great deal. A very great deal. It places a real weight on our P&L. As we've said before, we sell C2B fabric to our defense customers at a modest markup. Clearly they are purchasing large quantities of it for stockpiling. You don't need to be a rocket scientist to grasp that, even though this is rocket science, that's exactly what's happening. Slide seven. Park sold. Here's the other side of the coin. $420,000. It isn't $4.4 million, but it is $420,000 of blade materials made with C2B fabric in Q4, and $2 million in 2025. That's excellent, because on an incremental basis it adds a substantial amount to the bottom line — likely more than $300,000 — and that gave the bottom line a big boost too. We mentioned some C2B material sales, and as we've explained previously, our margins on producing and selling blade materials made with C2B fabric are significant and bold. Recall. A recall by one of Park's key customers of C2B fabric. I need to pause here for a moment. You read those transcripts at your own risk, because we bear no responsibility for them. There's an automated computer, AI, I don't know what, but those transcripts contain so many errors. Sometimes I'll read a transcript and I don't even know what the hell I'm saying. What am I talking about here? I can't make sense of it. There are so many mistakes in those things. We accept no responsibility for them. The transcript, which was for the Q3 call, mentioned a recall of C2B, which would be a genuinely bad thing. There is no recall. We went back. There's no reference to any read. There was nothing about a recall at all — neither in the slides nor in what we said. After that, though, articles came out discussing a recall of this product, and that was based on the transcript, which was wrong. I'd simply like to caution you: if you go through those transcripts, you do so at your own peril, since we bear no responsibility for them. So where does the recall stand? That's something a lot of people have been asking me. It's a tough question. I'm asking — we're going to ask Mark to help us sort that out. Mark, could you tell us where things stand with the recall?
Mark Esquivel
executiveOkay, hi everyone. So where things stand is that the specification hasn't been revised yet. That means work on it is still ongoing. Park isn't the one handling the testing — that responsibility sits with our customer, just to be clear on that. We've been informed it ought to wrap up during this month, by the close of May. I mention that somewhat hesitantly, since these timelines have slipped before. I just wanted to put that out there; we expect to receive an update once the month ends. There is, I can share, a bit of positive news. Everything tested so far — and that's most of it — conforms to the specification. Our hope is that the small number of remaining tests, which must be finished by month's end, will land in that same compliant group. Basically, we're waiting eagerly, the same as everyone else, for those results; we're truly hoping they hit the target when the month closes. As I mentioned, it's genuinely beyond our control. Our customer holds that responsibility; we keep the lines of communication open. We keep monitoring where things stand. We'll check again as we approach the end of the month, which is 2 weeks away. With any luck, when we speak next, the next time we hold a call, we'll be able to give you all an update.
Brian Shore
executiveAll right, thank you. Yes, we're keeping things open. The only thing we can do is relay whatever our customer tells us. On the prior call, I believe we mentioned March, and that came from what we were told. Clearly, it didn't occur. We'll find out what unfolds now. The following point is one we've brought up for three straight quarters. Just a reminder that we're bringing this new plant up to speed, even though capacity isn't the reason. We're doing it so the factory will be ready for what we call the juggernaut; it's expensive; it's dragging down our P&L. Shipments missed in total for the quarter came to $175,000. Mostly, what a shock, problems with international shipments. That has gotten better. It's not wonderful, but I believe a couple of quarters exceeded $1 million. I suppose that's a positive direction, at least for that quarter. Slide eight, how tariffs and costs tied to tariffs affected Q4. There weren't any. Effects going forward. We'll return to that afterward in the presentation when we discuss some updates. All right. Moving to slide nine. Our top five customers. This is somewhat of a tradition, listed alphabetically. Donna handles that slide. Yeah. Some folks in the audience could likely explain this better than me. Aerojet Rocketdyne, that's the Patriot missile. Middle River, I believe we're on the A321XLR commercial aircraft. Kratos, clearly, the Firejet. Nothing for Textron, too confidential. NorDam, the Bombardier Global 7500. The aerial target aircraft, it's unmanned. They attempt to recruit men and women to fly the target aircraft, but no volunteers showed up. Okay. That's my try at humor. Let's move to slide 10. I promise no more of that. Slide 10; here's our projected revenues broken out by aerospace market segment. As you can see, we discuss this often. Twenty-one was somewhat unusual because of the pandemic. For 2022, 2023, 2024, and 2025, the pie chart appears quite similar. Let's move to slide 11. This is a LANUS project. Park lov es Niche Military Aerospace Programs. As we always note, radon meant rocket nozzles and drones are niche markets for us; even aerospace structures count as niche for us, since that's where we focus. This doesn't mean small. It means something special where we can offer something special, which typically means the margins would be pleasant and attractive for us. We don't have to cover every single one of these. We'll be somewhat less open regarding our involvement in these programs, except I'll say something about the Halcon Sky Knight. That's a UAE program. That's been in the news lately, UAE. I figured you'd be interested in that; we see two references to the Sentinel GBSD; that's the ground-based strategic defense. This replaces the Minuteman program from the 1960s. Up in the top right, you've got the warhead, the re-entry vehicle for that warhead, and then the missile, the missile system itself; those sit in silos placed around the country. The plan calls for hundreds of them. I believe you're aware of what those warheads contain. Feel free to look it up if you'd like; it isn't a particularly pleasant subject to discuss. Let's move along. That said, maybe let's settle the audience down a bit. Moving on to slide 12. It's called MAD, Mutually Assured Deterrent, or whatever the term is, correct? Do you recall that from the 1960s? Does anyone remember it? Slide 12, GE Aerospace. Each quarter we show you this slide, simply as background. Firm pricing LTA spanning 2019 to 2029 with Middle River Aerostructure Systems, a sub of SDE Engineering. Every time, we walk through this. In the factory we're finished; we've seen some reduction. That, you know. Take a look at these programs. Going through them isn't something we'll do. They all tie back to GE Aerospace programs — that's the shared thread. What links them? I think that's clear to you. Back when we landed these programs, Middle River Aerostructure Systems, MRAS, was a sub of GE Aerospace. Today it's a sub of SDE Engineering, a Singapore company. Let's move on to slide 13. At the top of the slide, also sole source, primary structure component for the Passport 20 engine. That falls under the GE Aerospace LTA, not the MRAS LTA. Fan Case Containment Wrap for the GE9X for 777X aircraft; that gets produced using our AFP materials and other composite materials. The intent is for this to be part of the MRAS Life-of-Program agreement, not the LTA. Actually, this happened after the LTA was entered into. Let's see. Park MRAS LTA. We went over this, gave a 6.5% weighted average price increase January 1; it was also amended to bring in three Park PhilMahesa formulation products recently. Life-of-Program was requested by MRAS and SDE. That's still in progress. I think when we last spoke, I told you the ball's actually in our court. We're gathering pricing as much as we could, long-term pricing from our suppliers, so we could hand pricing to LTA program pricing to MRAS and SDE. That's done. Now the ball's sort of back in their court. Either way, we're happy. Staying with the LTA, the current LTA, makes us happy, or moving to LTA program. MRAS and SDE requested this. Doing the LTA program also makes us happy. Either way, we're happy. Slide 14. Okay. We're discussing some of the programs. A320 Neo family. That's the big dog, as we like to say. Airbus has an enormous backlog for the A320 Neo aircraft, 7,256. That's a whole lot of airplanes, I'm telling you. Then there's a bit of history on their A320 deliveries year-over-year. As you can see, it climbed back to roughly 50 per month in 2024, a little over 600. The thing creating the bottleneck is those supply chain problems you're already familiar with. This comes up in nearly every one of these calls. On the bottom line item, their goal is to reach a pace of 75 Airbus A320 family planes delivered each month by 2027. So why aren't they hitting that today? Supply chain problems are the reason. Their order book stands above 7,000. Getting to 75 a month, which works out to 900 a year, would make them quite happy right now. Reaching that point hasn't happened yet; 2027 is the target they've set. The reason they can't get there is that supply chain represents the constraint. Slide 15; regarding the engines approved for the A320, this is something you're aware of; we've got the Pratt engine, and the CFM LEAP-1A engine. The CFM LEAP-1A is what we're on, not the Pratt. Per AeroEngine News, in its first quarter edition, the LEAP-1A held a share of firm engine orders — and these represent thousands upon thousands of orders, ladies and gentlemen — of 65.2%; that, now, is a solid market share. Once we reach the juggernaut slide near the end, we assume a 60% market share, which at least keeps us on the conservative side; it seems to keep creeping upward a bit. Perhaps it'll drift back down. I can't say. It shifts from one quarter to the next, and month to month.
Brian Shore
executiveWhen you're delivering 75 planes a month, a 65.2% share for the LEAP-1A works out to 1,174 LEAP-1A engines annually. Compare that with the juggernaut — we're projecting just 1,080, so this figure is well above the juggernaut. As of March 31, 2025 — again, this comes from AeroEngine News — there were 8,196 firm orders for LEAP-1A engines, and that's from a couple of months back. Naturally, Airbus and CFM both want to move more planes and more engines; what I'm citing is simply the current firm order book. So these engines are going to be delivered, in my view. What does that mean for Park? Roughly $250,000,000 for Park. And that's not all. As I said, I'm confident Airbus would like to sell additional planes, and CFM would like to sell additional engines. Moving to slide 16 — this covers a variant of the A321X, pardon me, the A321 Neo family, specifically the A321XLR; it's off to the races. This plane has now been delivered and is in service. It's being flown on new routes that single aisles have never served before. This is a single aisle aircraft — I suppose I should have mentioned that. What matters most is that its range and payload capability match a wide body. This plane has flown on what used to be a wide body route, perhaps a 787 route, yet it costs far less to operate. That's why CNN — I don't usually devote much time to CNN, but on this occasion I appreciated them — said the A321XLR is redrawing the world's air map. What that means: these single aisles are flying routes that were once the exclusive domain of wide body aircraft, which cost much more to operate. That's a huge, huge deal. Boeing has no answer, and nothing planned. It's a key program for Park. Slide 17. Let's turn to China — the Chinese, Comac, the Chinese aircraft manufacturer, the C919. It's a single aisle they built to take on the A320 and 737. They're only now ramping up. Their target is 30 deliveries in 2025. They won't reach 900, but we'll see how far they get. They intend to raise production capacity to 50 airplanes this year. They aim to hit a production rate of 150 aircraft by 2028. They're reported to hold over 1,000 orders for these planes. Comac is pursuing EASA certification in 2025. That matters because EASA is essentially Europe's FAA — the European Aviation Certification Agency. The theory used to be that these Chinese planes would be China-only, flying solely within the Chinese market. That's plainly not what Comac has in mind. Their stated intent to obtain EASA certification is significant — certification beyond China. Trade conflicts. People raise the question of trade conflicts. Could Comac build a 919 without U.S. suppliers? The answer is absolutely not. Absolutely not. Absolutely not. If U.S. If suppliers got removed from the initiative, in my view — and I'm not alone in holding it — that initiative would instantly be gone for good. For the Chinese, this is a hugely significant prestige initiative; they won't allow that outcome. It's fortunate that commerce exists, with what you might call an interdependent relationship of shared benefit, where each side relies on the other. The Chinese won't permit that to occur; they'll have to keep obtaining these essential parts from an American provider. At least, that's how I see it. Slide 18. Turning back to the Chinese, the Comac 909 — the regional jet. A somewhat smaller aircraft. Consider what they're up to. They've handed it over to Lao Airlines in Vietjet, Laos in Vietnam — so those aren't Chinese carriers, so what's the story there? Put differently, once again, everyone kept saying, "Oh, these planes are only for China." I doubt Comac sees them that way. The 777X featuring the GE9X engine. The flight test certification effort is said to be advancing nicely. The 777X test effort has racked up over 1,300 flights. Quite a lot, across 3,800 flight hours. They're aiming at 2026 for Boeing's certification and initial delivery. Let's hope for the best on that. Let's wish for it to come through. There are reportedly 521 outstanding orders — that figure is from roughly a week ago. Did you catch that Boeing brought on this new heavyweight sales executive? That fellow just secured an order yesterday for 30 planes from Qatar — Qatar, I believe. I say it both ways. Did you hear about it? That new heavyweight sales executive. You have to add those 30 to the 521. Slide 19. GE Aerospace program sale history. These figures are familiar to you. Fiscal 2020, prior to the pandemic, we came out at $29 million. We're sort of struggling, sort of fighting our way back. $25 million, $24.7 million. Still not quite at that level. The Q1 projection, $5.2 million-$5.6 million. That's somewhat on the weak side. I wouldn't overinterpret it. From quarter to quarter, plenty of factors tied to inventory management and similar matters push figures around in ways that don't truly reflect longer-term patterns. As for the 2026 projection, we're keeping it at $28 million-$32 million. That's the same guidance we provided last quarter. Even though, as you can tell, we're off to a sluggish Q1. That projection rests on data our customer supplied. Our customer gave us three scenarios: low, middle, high; that one is the low scenario. I can't say. Perhaps we'll need to revise it downward afterward if this keeps up. Q2 appears comparable to Q1. We'll have to wait and see. As I mentioned, we're starting off somewhat slowly. For the moment, we're holding to the projection. Alright. Slide 20; now we're discussing Park, meaning financial performance history and forecast estimates. You all know the history, so we won't spend much time on it. We've already discussed the quarter. We've already discussed the fiscal year. So why don't we go straight to the forecast, our Q1 forecast. Sales of $15 million-$16 million, EBITDA of $2.5 million-$3 million; that's our Q1 forecast for Park. We've already discussed how historical sales looked, how much C2B content was in historical sales for the last year and the last quarter. If you look at the last footnote on the slide, we're also talking about $1.2 million in C2B fabric sales expected in Q1. Of course, that affects our bottom line, holds our bottom line back a little bit. Let's move on to slide 21. Historical. Now we're looking at historical results with a fiscal year emphasis. We've already pretty much covered most of this. $62 million. Oh, I know. This is a good slide to look at to get perspective on our using our new factory. If you look at 2025, our sales were $62 million, but about $7.5 million were C2B. That's not produced. That means equivalent to about $55 million. Go back to fiscal 2020, $60 million. The new factory did not exist at that time.
Brian Shore
executiveThat $60 million came entirely from our current plant — both made and sold there. Do you follow what's happening? A new facility was put to use. We're in the process of getting that factory up and running, scaling it for the juggernaut, yet it's dragging our P&L down. Bringing a new plant into operation carries plenty of added expenses; I think this serves as a solid example of that. Let's look at what's next here. Key matters — constraints in the supply chain. Right. Once more, check the top line. Sales: $31 million, $40 million, $51 million, $60 million. Truly heading the right way. Look at what occurred. A pandemic swept us all up, and now we're simply struggling to recover. Ramp-up expenses tied to the juggernaut — we've discussed that. We also discussed the share of our fiscal 2025 sales that came from C2B fabric. Moving along to the following one, slide 22. A few general updates. A new agreement with Aerient. We spoke about our prior agreement. The first check item — already addressed, so no need to go over it once more. Next check item. Just recently we signed a new agreement. Per this agreement, Park is advancing EUR 1,587,000 to Aerient. What's the reason? Aerient will apply those funds toward financing the acquisition and setup of new production equipment for its C2B fabric manufacturing. That sum goes to Aerient across three installments, with the first one already paid in Q1; that comes to roughly $1.5 million. Again, once we reach our Q1 balance sheet, you'll be searching for that $1.5 million outlay. Put differently, we show it in our cash. This new agreement exists to supply the extra C2B fabric and production capacity needed to meet the quickly growing demand for C2B across Europe and North America. Slide 23. Additional general updates. This one's rather pleasant. Possibly not a massive deal, but our Lightning Strike Protection Material received certification on the Passport 20- engine for the Global 7500 business jet. That's valued at roughly $500,000 annually. It'll take effect later this year. We're quite happy about it, since it took so long. I'd never tell anyone this, but privately, in my own quiet thoughts, I was likely on the verge of abandoning hope that it would ever come through. That news turned out surprisingly well. When a call came in saying, "Hey, this got certified," I responded, "What? There must be some mistake." It wasn't. Park's a blade of composite materials, qualified as sole source; we've covered this previously; that's the next generation Iron Dome. Park signed an agreement with a major OEM, the Licensed Technologies, for hypersonic missile programs. As we understand it, we hold the only license. Phase two manufacturing trials and testing of the licensed technology is ongoing. We brought this up during the prior quarter as well, so I'd appreciate it, Mark, if you could share where things stand with those trials.
Mark Esquivel
executiveMy apologies for that. I had my line muted. I didn't want any background sound getting through. Things are going quite well with the trials on this. As I mentioned, we took a license for the product, so the formulation effort had already been completed beforehand. As for what the phase II involves, we're constructing laminates, we're producing material, and we've got a partner for that too, since investment will be needed once we reach the stage where we've industrialized the project or the product. We're building panels at present; we're producing material. I believe we're approaching the point where testing of the materials will begin, because determining these processes takes a bit of time; this is an ox ox product; it isn't a standard epoxy, and standard epoxy makes up most of our business. Figuring out how to process these materials has required a bit of time. It's quite different from what we're accustomed to. I feel we're making truly excellent headway with it. As for what comes next, possibly within a few months, possibly around 6 months, we'll be able to give a better update on where things stand, once we've buttoned up the processes and obtained some of the test data, and potentially have a product where a data sheet could be released, which would mean we can take it to the public. In the interim, we're speaking with a handful of customers, a handful of OEMs, a select handful of partners, just to get a sense of what their needs are regarding this product. That assists us in developing our test matrix and assists us in determining which kinds of panels we need to build. But once again, we're being extremely selective about who we speak with, because we don't want to go out to the market while we're still trying to work out the product's details, its fine-tuning. As I said, possibly around 6 months, we'll have a better update and give you folks a sense of where we stand with this project; we're certainly making headway with it.
Brian Shore
executiveAlright. Thank you, Mark. Moving on to slide 24. We discussed this during the prior quarter — we anticipate roughly $5 million annually from the fresh LTA with GE Aerospace, and that one differs from the MRAS LTA. Right now we are in talks with a pair of sizable Asian industrial conglomerates regarding joint ventures for manufacturing in Asia. The idea would be a JV to replicate what we already do over there — making prepreg for aerospace. They came to us. Both of those companies are in ongoing negotiations with us. Our plan is to put in no money at all, so the only contribution would be our intellectual property. We'll see where it leads. It might come together, it might not, but I figured we should at least bring it up. Now, the current MRAS Supply Score card — rather. One hundred, 100, 100. That's exactly what we want; we need that 100, 100, 100. That's quite rare. I believe we've talked about this previously, but that's sort of our mentality; that's how we approach things; we aren't chasing 99s. We aren't chasing 99.9s. We want 100s; that's the whole point. Anything under 100 and we're not satisfied. And we'll go to the customer and say, "Alright, what went wrong? How do we correct it?" I'm being serious. At 99.9, we will speak with the customer. I've heard that the majority of suppliers would be content with 80s. Tariffs back to you, Mark. I'll be glad once we get rid of Mark. Tariffs, international trade conflicts, the anticipated effect on Park's. During Q4 we stated there was no effect, but let's discuss our outlook going forward regarding tariffs.
Mark Esquivel
executiveAll right, regarding tariffs — I suppose we're in the same boat as everyone, still figuring things out and trying to make sense of it. We believe we handled it fairly well by acting early once we saw it coming. I believe it was around the beginning of March. We began revising our order confirmations and quotes, adding a message informing customers that should any tariffs hit us, we would be passing those costs on to them. And so far, we've been quite lucky. Not many letters have arrived from suppliers. A handful came in, but our business hasn't been affected at all. Basically, I think there was one, possibly two; those we had to pass on to a customer. As for the others, we managed to offset the tariffs using inventory we already had. Naturally, if you hold inventory, no tariff is owed since the goods are already there. We could process and ship those orders without purchasing new material. Then came the next phase: now we must revise our costs whenever tariffs apply, which, once again, involves just a handful of materials at this point. Our quotes now reflect that going forward. Customers will pay the updated price when placing their orders. Fundamentally, we're no different from anyone else. We're attempting to work this out. Once more, I believe we did well by getting ahead of it, and the business has seen no impact. Again, more developments are likely. The situation remains quite fluid. We don't know how everything will ultimately turn out. We'll likely need to provide you another update on the next call too, to check whether things have shifted. Again, we feel we're in fairly solid shape on this, and we keep communicating with our suppliers, and we don't anticipate anything else headed our way. I can't claim that with 100% certainty, but we feel quite good about where we stand today on this. I think that covers the update.
Brian Shore
executiveAll right, thanks. Okay, appreciate it. Let's keep going. Turning to slide 25. We went over this during the previous quarter; we mentioned a fresh push toward defense markets and programs. What's the reason behind that? As far as we know, there aren't any new commercial aircraft out there. The 777X — we're involved in that one. The 929 — we'll never be part of that. I won't get into the details right now, but that's not going to happen. We're seeing major opportunities in military defense markets, particularly when it comes to missile programs. Where do we stand on Bladers and hypersonics? How has that push paid off for Park? Honestly, extremely well. We'll come back to that point a bit further into the presentation. Slide 26. Some recent investor questions. We enjoy getting questions. A lot of times we figure, well, three or four others are likely wondering, or perhaps 30 or 40 others, about the same thing. They simply don't want to speak up. If a C2B fabric manufacturer's manufacturing equipment is paid for through Park's advance to Aerient Group, will it sit at Aerient's facility or Park's facility? It will sit at Aerient's facility. Who's going to own and run the new equipment? Aerient will. Next question. The Park MRAS LTA gave us a 6.5% weighted average price increase. Does that LTA allow for additional price increases through 2029? No, other than price increases tied to higher costs for certain raw materials Park uses to make products for MRAS. And what about the Life-of-P rogram agreement? The Life-of-P rogram agreement works a bit differently, since it carries different price adjustments. Should we sign it — perhaps we will, perhaps we won't. As I said, either outcome works for us. We're fine with the Life-of-P rogram; we're fine with the LTA we have now. You brought up that Park is a true blue American company. Based on what Park knows, just one of Park's rivals is an American company. Which one is it? Our understanding is that Hexcel is an American public company. We don't know of others — Hexcel is a far bigger company, yet it remains a competitor; we don't know of any other US-owned competitors. Let's move ahead to slide 27. Park's share buyback. So, the history — let me run through this fast so we don't get too deep in the weeds. But under this May 23, 2022 authorization, we've spent $9,296,000 on it. We're putting some real dollars into this now. During Q1, it isn't shown in our Q4 report. During Q1, we spent $2.1 million, $2,165,000 in Q1 by itself. We'll see that once more in our Q1 report when we discuss our Q1 cash. Just so you're aware, that $2,165,000 falls within that $9,296,000 total. Okay. Should we keep buying back stock? Let's look at that again. Park's amazing cash dividend history. Yeah. We'll go over this each quarter, I believe. Four consecutive years, more than $600 million over the last 20 years, $29.47 per share. That's pretty amazing for a small company like Park. The founders launched this business back in 1954, using roughly $40,000, as I recall, that remained from their wartime service. So this is an enterprise that, over the past 20 years, has distributed more than $600 million in cash dividends. Moving along to slide 29. All right. This next one is significant. Yes. I'd call it truly significant. A brand-new manufacturing build-out for Park's production operations. A major fresh expansion, I should say, of Park's production facilities. Park intends to undertake a substantial new build-out of our production facilities. This planned build-out is going to feature a plant, and it might be located at our Newton Kansas campus, or it might be somewhere else. Our road warriors are out in the field right now scouting alternative sites. Kansas against a remote option. Reaching that decision will be extremely tough, since the financials favor Kansas, yet other factors—perhaps ones that can't be quantified—could tip things toward a remote site. We'll need to sort that out, and we're working on it right now. Will hiring more staff prove difficult? Oh, absolutely; it will be difficult. That's partly why we're also evaluating a remote location, since we figure, well, perhaps having two sites would make it simpler to bring on the workforce we require. This planned build-out is going to feature these new production lines: solution creating, hot melt film, hot melt tape, a hypersonic materials production line, and support equipment. Mark touched on that just a moment ago. Moving along to slide 30. Rough capital estimate for the anticipated capital budget covering the new manufacturing plant equipment: $35 million, give or take $5 million. These are some extremely, extremely large figures we're discussing for Park. Extremely large figures. What's the reason behind this? Our long-range business forecast demands it; that's the reason. Substantial fresh business opportunities across both hot melt and solution composite materials, defense, and missile programs are what's driving this. Recall a few slides back when you asked, "How's that working out for us?" It's working out quite well for us. Our focus is delivering huge results. What's the reason again? Having the flexibility to be positioned so we can seize fresh opportunities whenever they emerge. If we aren't positioned to seize opportunities whenever they emerge, we won't land those opportunities. In what way does flexibility deliver 100, 100, 100 support and service for the GE programs? That matters enormously to us. We don't want 99.9. We require 100, 100, 100. Truthfully, we're feeling somewhat stretched, even on the GE program. That's another factor driving this choice to pursue such a major build-out. We're thinking and planning with a long horizon; we're thinking and planning for what lies ahead. When considering capacity, you must think five years ahead. Building a plant takes three years, and then you must run trials and secure qualifications. Five years minimum. Five years. Using 10 years is probably better. When our gaze reaches that distant point, our reaction is, "Yeah, action is required in this area." This matters greatly. It represents a tremendous chance, yet letting it slip away is not something we want. Please turn to slide 31. Fascinating material. Different approaches exist among others. Their choice might be to hold back until these chances have fully developed, and consequently they could face the risk of losing them. At Park, as all of you are aware, we operate unlike anyone else. Our destiny is something we command. The money to pursue this belongs to us. We're able to act in service of what lies ahead for us. A conversation took place between me and Mark, a businessman from our sector. He's someone you know quite well. His distress was obvious, since he told me his company puts nothing toward the future, and many significant chances have been forfeited by them because by the time those chances appeared, the moment had passed. No investment had been made on their part, so those chances were gone. That type of company is not what we are. Our destiny is under our command; the cash is ours, and we are capitalizing on it. No one has the power to block us from this, from carrying out what is right for our company and what lies ahead. Our long-term business forecast is not something we are sharing.
Brian Shore
executiveAt this point, we won't be handing over the sales figure; we'll circle back on that. Plenty of internal effort has already gone into this, so it isn't a case of us lacking the number. We're simply choosing not to disclose it. Numerous possible scenarios exist. For the moment, let's just say we're backing up our words with action through this sizable commitment to what lies ahead. How about the ROI? Extremely substantial. Extremely substantial. Our own cash is what we're deploying. ROI, extremely substantial. Cash flow, extremely substantial. Extremely substantial. Thinking back — and I apologize that this call is running a bit long — but honestly, I have plenty to get through. Across the past five, six, seven years, bankers brought us M&A opportunities, and they were aerospace. It felt, well, incredibly shallow. Oh, aerospace, so that makes it a fit for Park? Definitely not. Being in aerospace alone doesn't make something a fit for Park. We came across companies that changed hands for $120 million-$140 million. Their sales stood at $20 million. Good thing we steered clear, since right now we're discussing some genuine ROIs. I can't say what the ROIs might have been on investments of that sort; these are genuine ROIs, extremely substantial. This big new investment shift — are we considering our cash? Possibly. Possibly we'll address that across a few slides. Buybacks, JVs; those JVs we already mentioned; we informed the JV partners, "No cash from us. Our IP is what we'll put in, not our cash." And the high-level conceptual financial outlook from our latest quarterly investor presentation? Where does that stand? We'll examine that. Moving to slide 32. As you can see, looking at this slide, this is why we sensed a need to speak with you about this right now. Two slides appeared in our earlier presentations. This is one of those two. You notice it reads major new expansion project, $35 million. In those earlier presentations, that figure was $7.5 million for a treater; we thought, well, we certainly couldn't show that slide to you once more; doing so would be so wrong. Deleting the slide was our other choice, yet we figured that would spook investors and stir up anxiety, which we also don't want. Here's this fresh slide. This is among the reasons we sensed, given what we covered in our earlier presentations, that we truly had to inform you about this right now, this major event right now. Take a look at our cash. At quarter's end we held $68.8 million. The $5.1 million, you're aware of that. That's a payment we send to the IRS in June. Buyback during our first quarter, $2.2 million. Advanced payments to Aerient, $5 million, roughly $1.5 million right in the first quarter. So next, there's $35 million allocated for this big expansion, plus or minus $5 million. That's substantial. It comes to $47 million, and we received $68 million. Just running a quick, basic calculation. What that tells us is once all this spending is complete, $21.5 million remains. That's a positive; we carry no debt, though it's no longer the case that we have $200 million sitting there. Another point I should bring up is cash flow. That figure is going to be rebuilt, particularly once this expansion wraps up and we begin using it the right way. Cash flow is going to be pretty substantial, and so will the ROI. We'll begin rebuilding that figure. Moving to slide 33. Okay. This is a topic we address each quarter. We won't get into a lot of detail. This is what we refer to as the financial outlook for GE Aerospace Jet Enter programs, the juggernaut. When will the juggernaut arrive? We have no idea. Uncertain. Nothing can halt it. We'd best be prepared. We're aware it's on its way. Moving to slide 34. This slide is nearly identical to the earlier slides regarding the juggernaut's figures. We simply included an item for consistency. Miscellaneous GE programs, 2,750. What we did was make this slide match the previous one, which contained the GE sales history, since GE sales history covers all GE program sales. This juggernaut slide left out a portion of the GE Aerospace LTA sales. We're now putting those into this final item, miscellaneous GE programs. These fall under the GE Aerospace LTA, not the MRAS LTA. It's somewhat confusing, but our aim was simply to make it apples to apples. So the figure will reconcile with the historical sales. We can move to the next slide and simply examine footnote 9, since footnote 9 explains this new item. Multiple Park composite materials products applied into the GE90, GEnx, and GE9X engine programs under the Park's LTA with GE Aerospace. Again, not MRAS, GE Aerospace. Let's move to the next slide here. And this one, slide 36, is something we showed during the last few quarters. This is, once more, a reason we believed we needed to discuss this major expansion with you. Because we now have big question marks here; we have non-GE programs and commercial sales. Question marks. If you check the footnote, that figure was $15 million in the prior quarterly investor presentations. That figure is blown out the window. Blown out the window. We won't discuss what the figure is, but that figure is gone. So we couldn't give you the same slide. It would simply be incorrect to give you a slide that discusses $15 million in criminal sales; we aren't providing the figure now. We want you to understand that's something very different here. Clearly, the total will be very different too. Right there. But it's simple math. If you take GE programs and round them up, you get $60 million. Non-GE programs have run roughly $30 million, more or less, which brings us to $90 million; add $15 million in criminal and that's $105 million. That figure is no longer valid. We aren't providing a fresh figure, but what we are saying is that it no longer holds up; this connects to the reason we're talking with you about this significant expansion initiative. And that actually wraps up the presentation. We won't be walking through the appendix. Thanks to all of you for listening. Operator, Mark and I would be glad to field questions at this point if anyone has any.
Nick Ripostella
analystHello there, good afternoon. Is my audio coming through? We're able to hear you. Oh, excellent. Nice work on a solid quarter; what you're hinting at regarding this fresh expansion sounds quite thrilling. I've got just a few broad questions when it comes to tariffs. I realize it's difficult, but looking at the larger picture, just your finest estimate about how things could unfold concerning the airlines and Airbus, say. If you're able to weigh in on how you believe it, I know it's tough to respond to, but there are simply so many varying views about how it could turn out. Plenty of aggressive rhetoric is circulating, yet give us your best guess. Next,
Brian Shore
executiveFine, please continue. My apologies. Had you completed your question?
Nick Ripostella
analystThat covers the first one. Now for my second: there's been quite a bit of chatter, plus plenty of sell-side analysis, regarding the supply chain and engine parts. At this stage, do you figure those problems have largely worked themselves out? GE has sounded fairly upbeat, but I'd like to hear your additional perspective. What do you believe would be your number one concern when it comes to holding back the juggernaut right now? I realize that's a tough one too, but when Airbus put out their recent report, I believe an email came back on it. They aren't retreating. There's optimism in that. Anyway, those are the things I wanted to ask. Thanks a lot.
Brian Shore
executiveThank you, Nick. All right. Let's tackle them in the opposite sequence. I suppose the final one is: what stands as the largest hurdle to the juggernaut taking place? I have no idea. To me, it's really a matter of timing rather than possibility. That's how I see it. I can't picture the juggernaut failing to occur. I can't picture a situation where it fails to occur. One could make the case, and clearly folks do, regarding the timing of it. Airbus, assuming we mean day for 20, they've got their say. Others choose to doubt it. Honestly? For my part, I'll admit I grew weary of hearing about it, since it's simply so much noise, noise, noise. Who even cares? From where we sit, all we can do is be prepared, since we're convinced it will occur. Each specialist holds a view. I receive these email bulletins featuring all sorts of aviation specialists. No clue who's paying them, because, well, I don't know what their view is worth, but mine is worth too much. Regarding the supply chain matters, yeah, you've likely heard Airbus is once again making gliders. I believe the count is 17 gliders. Not certain. That figure seems to be what they turned out this year. Gliders means they're turning out planes without engines, owing to whom, well, you know who, since they lack the engines for day for 20. Now, from what I understand, there's a sliver of encouraging news: during the first half, a greater number of engines went toward merely servicing planes already in service, with spares and such. That isn't how it's meant to work. It's meant to stop in the second half; that way, engines coming off the line will head into new planes rather than spares. At least that's what I understand. It isn't exactly great news to learn Airbus has assembled 17 gliders, A320 Neo gliders, simply because they can't obtain the engines. The supply chains involving the engine manufacturer remain clearly a problem. My hope is they find some way to sort themselves out. Not only for Airbus, but clearly for Comac and Boeing too. I'm not sure that's a solid response, but it's the finest one I can give. We'll just have to wait and see. At some point, they’ll need to pull themselves together, though the timing is unclear to me. That may be an answer comparable to what I gave to the first question. Supply chain—what you’re raising now isn’t about our particular supply chain problems. Sorry, the tariff problems. Tariff problems, discussing how tariffs, I believe that’s what you’re asking, will impact the broader industry. Once more, as you sort of hinted and suggested, everyone holds a view. You switch on the news, arguments over how tariffs will shape the world across the next however many years, or perhaps months, weeks. I lack a—what I mean is, there’s nothing I could contribute to any of that, since so many viewpoints exist out there. As you’re aware, the GE aviation programs we participate in, with the exception of the 777X, involve aircraft manufactured by overseas firms, Canadian, European, and Chinese. Certain tariff inquiries could and ought to be raised concerning how tariffs will influence aircraft sales and the provision of equipment going into those aircraft. I don’t know. I suppose whatever my two cents’ view amounts to, I’d say I sense these matters will get resolved eventually, since the worldwide economic requirement is such that resolving these difficulties will prove necessary in one manner or another. I might be mistaken. Only my view. Mark, would you like to say anything regarding tariffs?
Mark Esquivel
executiveNot really — what I mean is, every single person we've spoken with, and I realize he's put the question to both the airlines and the aircraft manufacturers, but my sense is that all of us are hunting for answers here. Honestly, I believe there just isn't any — right, I don't believe anyone is willing to take that risk and declare, "Here's what will unfold." My sense is that every one of us is simply leaning back and holding tight until this whole thing sorts itself out. With any luck, that comes sooner rather than later. That's really all I have to say about it.
Brian Shore
executiveAlright. So Nick, what we're hearing put together isn't really all that much smarter than what you'd catch on a news broadcast lately, though.
Nick Ripostella
analystOh, okay. Can you still hear me?
Brian Shore
executiveYes.
Nick Ripostella
analystYes. And then there's another point. When you described your present production capacity as being somewhat tight, I want to check something. Would it be reasonable for me to assume that you feel very sure about undertaking a significant build-out, and that this is true even prior to the juggernaut truly beginning to matter? We haven't reached — it could be 1 year, it could be 1.5 years, it could be 2 years before they reach 75 months. Park is definitely not being held back by this at all. You're going to proceed with the money you're putting in since you perceive the chance that exists today. Would it be fair to describe it that way?
Brian Shore
executiveYes, that's spot on. At the moment we're fine—keeping pace isn't an issue for us right now—but we still need to prepare for what's ahead. With manufacturing capacity, particularly in aerospace for the type of business we're in, you have to look five years out. You have to ask yourself, "What amount of manufacturing capacity are we going to require in 2031?" The years 2026, 2027, and 2028 don't matter, since 2031 is what we must be ready for. Unless we prepare for 2031 today, we'll find ourselves in trouble, and we'll let opportunities slip away. We might become too stretched and let customers down. That simply isn't how we operate.
Nick Ripostella
analystCorrect. Correct. And when you look ahead, any shareholder would reasonably expect that sales will be greater over the coming 2 years regardless, unless something like a catastrophe beyond our imagination occurs. While the company plans across a 4-to-5-year horizon, it will also be expanding. Would it be fair to assume that?
Brian Shore
executiveYes, I believe that is correct. Here is the thing: you consider the capacity we believe will be required in 2030 and 2031. Fine. We are constructing in the direction of that figure. Does a straight path connect where we stand today with that destination, or is the path more of a wavy one? That is unknown to us. Nick, from our perspective, this does not truly matter, since capacity planning requires us to look 5 years ahead. If we conclude there is not sufficient capacity — and we are certain there is not sufficient capacity — then we must address that, so that upon reaching that moment, we will be positioned as we intend to be. That means not just managing the programs already known to us, but also considering new programs and new opportunities that may arise. As I mentioned, our friend is extremely displeased with this company for failing to invest in its future. When programs emerged, they missed out on them. That is not a situation we wish to find ourselves in. What we want is to be positioned so that whenever new opportunities appear, whatever their nature, we are able to seize them should we choose to, should we determine it is the appropriate course.
Nick Ripostella
analystAlright, here's what I'd say: any of those people in Washington who actually give a damn about manufacturing here in America should be on the phone with the team over at Park, since you folks are planning ahead when it comes to jobs for Americans. Yeah, that's a wonderful thing.
Brian Shore
executiveThank you so much for those words. I don't expect anyone from Washington to ring me up in the near future, but even so.
Nick Ripostella
analystWhat they're attempting to highlight is precisely you.
Brian Shore
executiveThat's correct. I concur.
Nick Ripostella
analystNick, many thanks for taking the time to ask those questions, and enjoy the rest of your evening.
Brian Shore
executiveBrian here — thanks a lot, Nick. Your questions were genuinely useful, and we're grateful for them.
Nick Ripostella
analystOkay.
Brian Shore
executiveMuch appreciated, operator. I appreciate all of you tuning in. Thanks for staying with us if you're still connected, or in fact a bit beyond 60 minutes. Enjoy the rest of your day. Should any additional questions come up, don't hesitate to reach out by phone. Thanks so much. Take care.
Operator
operatorAppreciate it. Everyone, that wraps up the call for today. We're very grateful you were with us. At this point, feel free to hang up your phone.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.