Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

October 8, 2026

New York Stock Exchange US Industrials Aerospace and Defense earnings 59 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, Operator. This is Brian speaking. I'd like to welcome everyone to Park Aerospace's Investor Call for the second quarter of Fiscal Year '27. As he always does, Mark Esquival, who serves as our President and COO, is here with me. Our second quarter earnings release came out, I believe, immediately following the close. The earnings release contains details on how you can get the presentation we're going to walk through — there's a link, plus a toll-free number listed on our website. It would help if you bring it up, since that makes this discussion of the presentation more useful. This has become something of a pattern over the past few quarters. We have a lot of investors who are new. During the previous call, I think roughly 170 individuals participated. Our audience includes both long-time backers and plenty of first-timers. Striking a balance across those two groups is something we work at—trying to land somewhere in between, a sort of middle position. Naturally, those who've been with us a while likely don't care to hear identical content repeated on each occasion, yet newer participants might get more value and interest from it. That's the best approach we can take. After the presentation wraps up, we'll gladly take your questions. So, shall we begin? Moving to slide 2, where you'll find disclaimer information. If anything about the forward-looking disclaimer material is unclear, just let us know. On slide 3, you'll see our table of contents. Okay, so starting off with slide 1 — apologies — the opening entry in our table of contents is the investor presentation, and that's what we're moving into right now. In addition, supplementary financial information is included as appendix 1 to the presentation. We won't be walking through those materials, but please reach out if anything there raises questions for you. As we typically do, the James Webb Space Telescope appears in our table of contents. Not long ago, the James Webb Space Telescope spotted a puzzling, previously unknown category of cosmic objects known as black hole stars. These resemble enormous stars, and their brightness can reach as much as 100 billion times greater. That certainly strikes me as a huge amount. So thank you — thank you, James Webb Space Telescope, and Park. The James Webb instrument, which I believe everyone is aware, was built using 18 Sigma struts that are proprietary to Park. Moving on to slide 4 now. Here we shift from something extraordinary to something quite ordinary. What you're looking at is our second quarter performance. Let's work through the right-hand column together — that's the second quarter, the one we're reporting today. Revenue came in at $20,791,000. Gross profit was $7,135,000, giving us a gross margin of 34.3%. That's a figure we're happy with, since we aim to keep gross margins somewhere in the 30s. Adjusted EBITDA reached $5,285,000, which works out to an adjusted EBITDA margin of 25.4%. Now, what did we tell you back on our Q1 investor call regarding Q2? We indicated sales would land somewhere between $19.5 million and $21 million. And that's exactly where we ended up — perhaps closer to the higher end of that band, but still inside it. For adjusted EBITDA, our guidance was $4.3 million to $5.1 million. Our actual EBITDA figure landed slightly higher than that range. When it comes to what our forecasts mean, here's a reminder. Most times we hand you these estimates, what we're doing is sharing our view of what's coming. At times we miss the mark, at times we don't, but it's our honest view we're giving. Mark and I typically invest a great deal of effort working through this together and building those ranges for you; padding isn't something we do. I'm aware plenty of others take that approach. We never give you a number and then trim 10% from it, so that once the actual figure is released, we get to say we beat it. That just isn't how we do things. We understand that practically everybody else runs their business that way, but we aren't practically everybody else, which I think you've already figured out; incidentally, there's a Kinks tune you can look up if you'd like. It's a pretty good track. Moving to Slide 5. So we're switching a few things around. I probably ought to have mentioned this at the start. The order of the presentation is different, and the content has been altered somewhat, all in an effort to keep it a bit more engaging for you. Whether it works out or not is unclear to me, but success is what we're aiming for. On slide 5, the upper portion, we're highlighting a few important product categories, several of which we'll return to later. With C2B Fabric — something we mention frequently — sales came to $1.5 million. Applied Materials output using C2B Fabric reached $1.8 million. Those two figures come up often in our discussions, since a big gap or misalignment between them might skew the product. As for the quarterly P&L, the numbers are close enough that we won't dig into it. Still, it's always good to have that information. On missile system programs, the figure is $5.7 million. Missile systems clearly get a lot of emphasis from us, so we figured that figure would be of interest to you. For GE Aerospace jet engine programs, advanced composite materials came in at $8.5 million; we'll return to that topic; it's something we address each quarter; and here's a somewhat notable item regarding what we deliver to you. Our Sales Value of Production for the second quarter, which we refer to as SVP, totaled $21.1 million. That isn't the value of inventory. It's genuinely sales value; and as far as we can tell, that marks a modern-day record since we sold our electronics business. That's a genuinely positive development, and a great deal of credit belongs to our factory personnel, or four people, for manufacturing that much product and shipping it out the door. Honestly, getting that done was a solid win given the conditions weren't exactly perfect — though honestly, when are they ever? So we felt it was important to give a shout-out to the folks on the production side for the volume of output we achieved this quarter. Another item we typically don't touch on during these calls with investors is EPS — that's just not something we discuss. Still, there's one thing we wanted to flag for you. You'll get more specifics once our 10-Q drops, and I'm anticipating a Tuesday filing date, because Monday is a holiday. That's the place to look for it. That said, maybe you've already noticed this, and I want to tackle it right up front: our tax rate came in at 1% for Q1, while for Q2 it was 18.6%. That's not a typical tax rate. During Q2, we saw significant advantages from people exercising stock options. There was a substantial amount of option exercise activity in the quarter, which delivered a meaningful boost. Without those stock option exercises, our tax rate would have been approximately 26.5%, in that vicinity. And just so you're aware, if we had applied what you might call a more standard tax provision or rate of 26.5%, we would probably be reporting 19 cents rather than 21 cents. As I said before, diving into EPS details is something we're reluctant to do. That's not something we normally address, but the difference in tax rate struck me as significant enough that you'd likely want to understand that information. Should you need further details on this, you really ought to give Gus and Chris a call and speak with them.

Brian Shore

executive
#2

As I mentioned, once the 10-Q is filed, you'll get a bit more detail on that specific item. All right, let's not dwell on it too much; moving along to slide 6, which shows our five biggest customers for Q2, listed alphabetically. Let me connect each customer with its picture. The simple one is Kratos, the BQM-177A — a target drone that clearly links to Kratos Defense & Security. Then the Airbus A320neo, powered by LEAP 1A engines, which connects to Middle River Aerostructure Systems, known as MRAS. Next up, the Patriot — something we bring up a lot — the PAC-3 MSE, that's the Defense and Missile System, and it gets counted as two for one, tied to Lockheed Martin and L3Harris Missile Systems, which works out quite efficiently. Down in the lower right is the Bombardier Global 8000 business jet, which connects to the Loring Group. Okay, let's move to slide 7, where we have our pie charts. There isn't much to call out there, pretty stable. So we'll skip spending time on slide 7. Let's just continue. Moving forward. Of course, if anything comes to mind, let us know later, but right now we're going to slide 8, which is a bit more engaging. Park's niche military aerospace program. Every quarter we put this slide up for you. This one belongs to Landis. She always performs really well. That pie chart is pretty fascinating. Take a look at the percentage for missile systems — it's going up. Of course, that's just a single quarter, so we'll keep an eye on how it trends from one quarter to the next; shifts like this are only natural. Still, we've talked about missile systems extensively, and their slice of that pie chart keeps growing. We're not going to go program by program and describe each one, though we always point out that we never display photos of programs where we aren't involved in some capacity. There was a time when we shared more details. Right now, we don't believe we can do that. It's just too sensitive. We're in the dark about exactly where the boundary sits for what's permissible to share; since we can't, we'd rather not stretch things too far. Turning to slide 9 now. Alright, GE Aerospace jet engine programs. Like I mentioned, we're changing the order around a little, just to keep it more engaging. This slide also looks a bit different compared to the way it appeared before. Park's advanced composite materials, along with sole source qualified and multiple engine cell and thrust reverser components, apply to these GE Aerospace and CFM engine programs. So, real quick: there's a Boeing 747 to 8 using a Gen X-2B engine. Those are for spares. That program of ours has been canceled. LEAP 1A engines for the A320neo or family — that's the big one. LEAP 1C — that one's for the COMAC C919, the Chinese narrow-body. Shifting from the CF34 over to the 10A: it supports the COMAC C919, a Chinese regional jet, along with the CRJ 200, which we already talked about, and the Bombardier Global 8000, which runs on the Parasport 20 engine. So what's actually going on in this case? Park has an LTA requirements contract, again extending through June 2029, and it covers those programs with MRAS, which is a subsidiary of ST Engineering Singapore. Now, what's truly happening? Every item on that list looks like a GE program. Take a look at that tiny footnote. According to it, MRAS is in fact a subsidiary of GE Aerospace — so that clears things up. When we first engaged with these programs, MRAS belonged to GE Aerospace, and then, I believe around 2018 or 2019, GE Aerospace divested MRAS to ST Engineering, a sizable aerospace firm based in Singapore. Park also serves as the sole supplier of AFP composite materials for that same casing on the GE9X — the next engine for Boeing's Triple 7. Let's move ahead to slide 10. An update on the GE Aerospace Challenger Programs. We begin with the Big Kahuna — the A320neo aircraft family. We won't read the variants aloud, since you can look at them yourselves. As of August, Airbus had shipped 4,741 of those planes, with a firm order backlog of 7,571. This program is massive on a scale that's hard to overstate — quite possibly the biggest commercial aircraft initiative in history. Because of that, we consider ourselves fortunate to have a role in it. Let me walk you through how the production increase played out. It's pretty evident when you look at it. Output kept climbing right up until everything collapsed in 2020 — the year the pandemic hit. Since then, they've been struggling to recover. Deliveries totaled 607 planes in 2021. Regarding the figure for 2022 so far, digging into that number isn't something you'd want to do. It wouldn't be a smart approach. Sure, you're free to try, but that's simply not the way this works, since these plane makers basically earn their entire year, if you will, across the last two months. The key point is that this number is substantially higher than what we saw in the same stretch of 2025, when there were 333 deliveries in the year-to-date period ending August 2022. That's a positive sign — it indicates GE Aerospace and Airbus are increasing production on this program, which is good to hear. So, 511. Okay, where do things stand? By the end of '27, Airbus is targeting a monthly delivery rate of 70 to 75 for the A320 aircraft family. If you think back to the earlier page — I think when we mentioned 25, it was around 51 per month, so there's still a ways to go. And after that, it levels off at the '27 rate. So, about the engines that have been approved — this is the key point — two engine types have gotten the green light for the A320 aircraft, which is part of the NEO family. The first one is the CFM LEAP 1A. That's the program we're involved in; our involvement is with the A320neo aircraft family using the LEAP 1A engine from CFM, and we don't participate in the A320 aircraft family program that uses the Pratt engine. We covered that in the first and second bullet points. There's something interesting in that third bullet. As of June 30, among firm engine orders for the A320neo family, the CFM LEAP 1A's share came to 66.9%. So that market share continues to rise pretty nicely. During earlier quarters we went through the reasons behind this, what's driving it; we won't get into that now, but feel free to ask us if you're curious. What matters is that the LEAP 1A share, the program we're on, keeps rising. When we first put these presentations together, I believe it was perhaps under 60%. I can't recall exactly, but it has increased substantially and it's still increasing. Plus there's a massive backlog, so there's plenty of ballast, so to speak, behind that share. It isn't simple to shift market share that much from month to month or quarter to quarter. Even so, that's what's taking place. At a delivery rate of 75 A320neo family aircraft each month and with 66.9% market share, that works out to 1,204 LEAP engines annually, which is a hell of a lot of engines, excuse my language. Moving on to slide 12. So... Still on the same program as of June 30, firm LEAP-1A engine orders totaled 8,546. And that is a tremendous number of engine orders.

Brian Shore

executive
#3

I believe that if you go to the slide — which number is it again? Slide 16 — you can roughly figure out the value of that. You're able to do your own math. Because on slide 16, the revenue per unit is displayed. Let me simply say it this way: it's a big number. And that's not all of it — those are just the firm engine orders; that doesn't represent the entire picture. Obviously, additional orders will arrive over time; so let's continue, let's proceed to slide 12. A different, distinct program, the COMAC C919, which is the Chinese aircraft with the LEAP engine. That engine is a LEAP 1C. According to reports, they have over 1,200 orders. Looking at the deliveries, it seems like they're trying to increase production. They haven't been, well, I'm certain they aren't achieving the output they want. The delivery targets they're aiming for are 59, 28, and 93. Just to clarify, those figures refer to airplanes rather than engines. This concerns the narrow-body jet, the Chinese narrow-body jet meant to take on the 737 and the A320. Moving to slide 13 now. That covers the 777X, which uses GE9X engines. This program has slipped considerably, yet it remains highly significant for COMAC. More than 1,700 flights have been completed under the test program; that's a substantial figure. It has exceeded 4,000 flight hours, which is also substantial. Word is that they hold more than 670 unfilled orders for this plane. Boeing expects the 777X to receive certification, enter service, and make its initial delivery in the coming year. That timeline has slipped repeatedly, with numerous setbacks, though speaking only for myself, I hold a fair amount of hope it will occur next year. That would matter greatly for Park — a key initiative there. Now, here's a good shot of the 777X going through cold-weather trials in Fairbanks; a buddy of mine captured it. Moving along, let's turn to slide 14. There we are. This covers GE Engine Program Sales History and Forecast Estimates. Running through the entire history isn't necessary, so we'll skip that. What deserves your attention is fiscal year '20. Back before the pandemic hit, that figure stood at roughly $29 million. Then fiscal '26 arrived. If you glance at the slide's right-hand portion, around the middle, you'll see '26 as the point where we return to those $29 million levels. The pandemic truly knocked us back, and recovering to where jet engine program sales had been beforehand took quite some time. During our second quarter, sales came in at $8.3 million. Turning to Q3, the forecast for GE Engine Program sales sits between $8 million and $8.5 million. As for the full fiscal year '27, we lowered that projection to a range of 32 to 35. Previously it had been somewhat higher. The figure came from what our customers give us, which is known as a bill plan. And we still don't have an updated bill plan, but to be honest, with two quarters already in the books, our confidence in reaching that bill plan is fairly low. There's a Q3 forecast in place, and for the fiscal year our stance is to be a little more conservative regarding the direction things are taking. We'll see how it turns out. All right, on to slide 15; this one addresses the outlook for the GE programs, which we call our Juggernaut piece, Commercial Aircraft Juggernaut. That's the first of our Juggernauts. Bear in mind GE Aerospace Engines and Programs. When is the Commercial Aircraft Juggernaut expected to land? For a lengthy stretch, across many years, we kept asking, when will this show up, when will this show up? We don’t know, we’ll see. That language is behind us now. What we’re saying is the commercial aircraft juggernaut has arrived, since those programs are unmistakably accelerating. What are the commercial aircraft juggernaut drivers? They include A320neo aircraft family production as it climbs toward 75 airplanes per month. The anticipated certification and free interservice of the Triple 7X and COMAC’s plan. Ramp up the C919 aircraft. The remaining two, GE Aerospace programs, the Global 8000 and the C909, are essentially at rate, which is positive, yet they likely won’t serve as major drivers for the increase in existing rates, the existing revenues rather, toward that aircraft juggernaut type of revenue level. So let’s keep going. Slide, which one is it, slide 16 is where we are, yep, still on the juggernaut; so this is roughly how we present the juggernaut and arrive at that $62,340,000 figure. There are a few adjustments here, though, in the assumptions, and slide 17 contains footnotes explaining how we calculated, how we reached the assumptions and how we ran the math. We actually raised A320neo to 1,200 units because we concluded we truly ought to examine the present market share. We’re refraining from using something like 60% market share, but we felt that no longer made any sense; and we lowered the figure for the C919 simply because they appear to be having difficulty reaching that level. Now, keep in mind, these are engines, so the airplanes must be multiplied by two, meaning 200 engines equals 100 airplanes. So, we run the math and we arrive at $62.3 million. Or $62.3 million. And that is compared with roughly, what, $30 million a year ago or thereabouts. So there’s still quite a distance to cover regarding the ramp up. Yes. Okay, moving to slide 17 — sorry, slide 17, that is. These are the footnotes I referred to earlier. We're not going to go through them. If something comes up, just let us know. Slide 18 — all right, we're changing subjects and probably need to pick up the pace somewhat. Missile systems. On the plus side for missile systems, regardless of all the stuff going on with them on our end — it's, you know, a crazy pace we've got to keep up with. But there aren't many new things being presented in the deck compared to Q1, so a lot of this is really just a recap. That's our new engine of growth. The next big thing coming, missile systems, Park missile systems, which we call Niche. Our expertise lies in designing and making sophisticated composite ablative materials that go into solid rocket motor structures for vital missile systems, such as the PAC-3 MSE Patriot missile system, which gets mentioned frequently by us. We likewise design and make sophisticated composite material for producing other missile systems parts. Depletion of the depleted — we addressed this previously. It's well understood, broadly known that missile system stockpiles have been severely depleted by all those terrible wars we've been part of over the last couple years, running empty, refilling the depleted stockpiles. So obviously there's a highly pressing requirement to refill the depleted stockpiles; but is that all? Does it stop there? Perhaps not. Let's proceed to slide 19. All right, here we go. Making four times as much of the exquisite class of weapon systems. Four times as much, that's quite a notion for our industry. The aerospace industry typically doesn't shift that fast in our experience.

Brian Shore

executive
#4

Back on March 6, 2006 — at the start of that year — President Trump sat down at the White House with seven of the top defense contractors. During that gathering, those contractors said they had consented to boost output of the exquisite class of weapon systems fourfold, and to do it as fast as they could. That is genuinely remarkable, almost startling; and the PAC-3 missile system, naturally, belongs to that class of weapon systems, along with additional items that other programs concentrate on. Let's discuss PAC-3, meaning the PAC-3 MSE Patriot Missile System. Park also holds qualified Vansco composite ablative materials for solid rocket motors used in the PAC-3 MSE missile system program. U.S. allies in the Mideast have employed PAC-3 missile system interceptors widely and with great effectiveness, including across all these nations. And what's the reason they're employing them? The reason is that bad people are firing missiles at them. So they've relied on PAC-3 missile systems to intercept and destroy the missiles coming in, the ballistic missiles being fired toward their countries, launched at their countries, and especially at civilian population centers. Let's move ahead to slide 20. That Patriot MSE missile system: it's an extraordinarily capable missile defense system, with very high rates of successful intercepts and destruction of incoming ballistic missiles and other threats; yet stockpiles of those factory MSE missile systems have reportedly been severely depleted by all these terrible wars. I don't believe we're speaking out of turn. Nothing confidential is being discussed, no website information here. It's simply been widely reported that these... the system stockpiles have been drained by these terrible wars; and here's the thing — Patriot missiles accomplish nothing when they aren't available, however wonderful they may be. Reports indicate dozens of people were killed recently in Ukraine by Russian ballistic missiles. Incoming, which Ukraine could not intercept and shoot down owing to a serious shortage — that's their terminology — of Patriot missile interceptors. It's simply heartbreaking. I mean, you know, these are folks who died, right? It isn't funny. It's heartbreaking. Heartbreaking. On January 6, 2026, this now sort of lands on what are we doing about it? What is our government attempting to do about it? Lockheed announced it had reached a seven-year agreement with the Department of Defense, raising the PAC-3 MSE interceptor production capacity from 600 per year to 2,000. Well, that's, you know, quite a task. 600 to 2,000. Let's move ahead to slide 21, further activity by the government. January 13, roughly a week later, the Department of Defense announces investing $1 billion in L3Harris, the L3Harris solid rocket motor business, to boost solid rocket motor production for the PAC-3 MSE and other missile systems. This is all public stuff; we're not speaking out of turn here. ArianeGroup of France, let's talk about them for a while. ArianeGroup is a joint venture between Airbus and Safran. Ariane is an iconic and legendary missile launch system development and manufacturing company with very deep legacy technology. Ariane’s rocket and missile system efforts include the Ariane 6 heavy lift launcher that the European Space Agency uses, plus M51s, submarine-launched weapons, ballistic systems, nuclear systems, and various missiles. This is a truly remarkable company. Our ties to them and to the organizations that came before stretch back to the early 2000s. We consider ourselves extremely proud and lucky to be their partner. As I mentioned, they are an exceptional company, exceptional individuals, truly wonderful people. We simply want to state publicly so that everyone is aware of our feelings. Our feelings toward this amazing company, how honored we feel to be linked with them, and how honored our nation ought to feel to be linked with ArianeGroup. So let’s move ahead to slide 22. They make — ArianeGroup makes — a proprietary fabric known as Raycarb C2B, and that fabric goes into producing a plate of composite materials for advanced solid rocket missiles. Missile programs. We hold sole-source qualification on a solid rocket motor for the PAC-3 MSE missile program, for specialty-ablated materials made using ArianeGroup’s proprietary C2B fabric. So we are qualified with our pre-preg material, yet it is also qualified with ArianeGroup’s C2B fabric. Park signed a business partner agreement — that is the term they use — with ArianeGroup in 2022, and under that arrangement ArianeGroup named Park its exclusive North American distributor for their C2B fabric. In my view, we had effectively been doing that for quite a while, but they wished to make it official. That idea originated with them, not with us. On March 27, 2025, we signed what they refer to as the new agreement with ArianeGroup, through which Park committed to advance ArianeGroup €4,587,000 against payments for upcoming purchases of C2B fabric by Park; the first installment was paid during our fiscal year 2026, and the second installment will come in our fiscal year 2027. Let’s move on to slide 23. Our third installment is essentially being paid right now; in fact, we sped that up. It had been scheduled for April next year. Now it is, I believe, next month. That happened in return for ArianeGroup raising the allocation and moving the allocation earlier — accelerating it, as you know — and also in return for at least our request that they see whether they can provide even more. We enjoy a terrific relationship with these folks, and it has functioned extremely well. What is the reason for this €4,587,000 advance payment? To fund, on a 50/50 basis with ArianeGroup, the building of extra C2B fabric manufacturing capacity in France; that added French manufacturing capacity is expected to begin operations in 2028. Roughly half belongs to us and half belongs to them, since they require it for their own programs at ArianeGroup. So we split it 50/50 on the — I believe on this extra, additional capacity, and we are 50 to 50 on what it produces. Unfortunately, though, this added French capacity — manufacturing capacity — does not give sufficient support to ramp the PAC-3 MSE program up, or at least not fully, to that 2,000 interceptors per year rate; so what do we do now? Let’s move on to slide 24. Let me speed things up a bit. My apologies — I'm dragging this out. Regarding July 18, all of this was already addressed during our previous Q1 investor call; everything simply unfolded right around then. On that date, Park and ArianeGroup signed a term sheet agreement that sets up the building and establishment — this matters a lot — by ArianeGroup of a C2B fabric manufacturing facility located in the U.S., whose anticipated capacity is more than sufficient to completely cover what the PAC-3 MSE missile program requires at a rate of 2,000 interceptors annually. Under the term sheet agreement, a definitive agreement must also be executed prior to the close of the year. But what does putting pen to paper on the term sheet actually mean? That is, ahead of the definitive agreement being signed. Given the term sheet that ArianeGroup and Park executed last July, ArianeGroup is moving forward with building and establishing our U.S.-based C2B fabric manufacturing plant. That is genuinely significant. Let's move ahead to slide 25. And the term sheet lays that out. All of the output from that U.S. plant — 100% of it — will go to Park, which will rely on it to support Patriot Three along with other missile programs.

Brian Shore

executive
#5

That matters a great deal, since the capacity over in France is something we share alongside ArianeGroup. That capacity serves entirely our needs and our programs. Beyond that, as laid out in the term sheet, we've committed to putting $25 million into ArianeGroup's manufacturing plant located in the U.S. Now, this isn't an investment of the equity or debt variety. That $25 million investment is going to be made by Park through advanced payments, which will be fully applied against Park's future purchases of C2B fabric. Those $25 million in advanced payments are anticipated to be made by Park across 2026 and 2027, and we expect Park to apply them against future C2B fabric purchased at the start of 2030; so what was the reason behind doing this? It seems like a strange thing to do, you might think. What was the reason Park signed the term sheet agreement with ArianeGroup, and what was the reason we made that commitment to $25 million in advance payment commitments? That's because we had to authorize ArianeGroup to proceed with the construction of a C2B fabric production facility located in the U.S. Everyone here at Park feels there's real urgency behind getting ArianeGroup's American plant up and running without delay. Now, let's turn to the next slide — which number is it, 26? Right, slide 26. We aren't able to share the exact C2B fabric output volume anticipated from ArianeGroup's U.S. Once that facility is up and running, the production capability it provides—together with the C2B fabric that ArianeGroup allocates from its European activities—will comfortably cover what the PAC-3 MSE program requires at a rate of 2,000 interceptors annually, as well as the demands of many other important missile programs. So when is the U.S. C2B fabric plant from ArianeGroup, I mean, going to be ready? According to ArianeGroup, the original estimate for their plant was four years. That is quite a while before it comes online. However, ArianeGroup has lately reached an agreement with Park to speed up the schedule for finishing and starting up the U.S. We've moved that plant's timeline up by half a year, and in return Park has agreed to speed up when they pay the $25 million advance. This is great news, since our goal is to have that facility operational as quickly as we can. Under this newly reached arrangement, Park is now anticipated to pay $20 million in advance during this year, with the remaining $5 million coming next year. All of those funds will go toward offsetting upcoming purchases made by Park or C2B Fabric. Naturally, everything here hinges on our signing that definitive agreement, which we anticipate will be completed prior to the close of the calendar year. Let's turn now to slide 27. All right, I want to address this for the record. Sure, our purpose is generating returns for shareholders — thank you very much — and that part's obvious. But for us, it goes beyond just the financials; there's a bigger dimension. As we've said in the past, each time a Patriot missile launches and intercepts an inbound ballistic missile by striking it, there's a good chance that people are still alive and walking around on this earth — or perhaps they aren't — which means lives have been saved. That's what actually happens. This is not a hypothetical, it's not some fascinating academic paper, and it's definitely not a video game. It means an enormous amount to us. Okay, that really matters to us — it's what keeps us going. Nobody here is okay with watching people pass away when that didn't need to happen. That said, let's talk about money for a second. Based on what's written in the term sheet, from 2032 through 2036, Park is expected to purchase a large amount of C2B fabric from ArianeGroup. So why is that a good thing? It's good as well because Park is also expected to send all of that fabric along to customers who've already been lined up, through arrangements that are already in place with those customers, and that's our call to make. Distributors take a markup; on top of that, Park is expected to manufacture and sell a range of materials created for that same C2B fabric, going to those very same customers. So what sort of ROI do those fabric and materials sales amount to for Park? Well, that specific figure won't be disclosed, but let's put it this way: for Park, it's an extremely, extremely strong business deal, and from a business standpoint, you ought to feel pleased about it. Very good. Moving along to slide 28. Alright, shifting topics now, discussing a new plant; and once more, most of this has already been covered, not much fresh information here. On July 17, we signed this lease agreement covering land at the 18 acres located at Tulsa International Airport. Our new site goes there. There will additionally be land available, room for another plant, should the need arise later on. The facility's about 150,000 square feet. On the budget side — cash outflow, sorry — the capital budget comes to $65 million: $10 million in '27, $45 million in '28, and $10 million in '29. As you probably noticed, that moved a little. On our last call, I think we said $25 million for fiscal year '27. It's simply taking longer to work through every one of the incentive agreements with Tulsa and El. Those people are terrific. They're not the problem. The process just turned out to be bigger than we anticipated. The good news, though, is that when you look at the last arrow item, the facilities should still wrap up in '28, with production shipment slated to start in '29. That item hasn’t slipped; you’ll find it on slide 29—sorry, I mean paid—let’s keep moving. The facility is designed to produce the full range of what we sell. Now, the second bullet, and this is significant: we expect it will let Park approximately double the capacity it now has for hot melt prepreg and film production, which supports aerospace work as well as other commercial aircraft efforts. But here’s what really counts—by bringing more people into the hot melt prepreg work we already do, we will operate lines at our Newton, Kansas, site, and that puts us in position to handle the ramp of GE Aerospace programs, the additional commercial aircraft programs, and the hot melt programs we supply. We're going to handle that. People often ask how we'll close the gap until the new plant is up and running. We can do it through our Newton facility by adding staff to our lines. That said, to support those GE Aerospace programs, along with other commercial aircraft programs, in a more proper and sustainable way, we'll need the additional hot melt manufacturing capacity from the new Tulsa plant. So we can make it through this transition with the plant we have now, but it's a really good thing that the new plants are coming online before long. And really, it's almost the identical situation when it comes to solution treating on slide 30 — manufacturing capacity. With a new plant, we are tripling our solution treating manufacturing capacity, and that's used to support, among others. Additionally, regarding programs for missile systems, the answer lies in how we handle manufacturing capacity.

Brian Shore

executive
#6

In addition, we plan to add more workers at the solution-treating lines that already exist in Newton, Kansas, and that lets us support the PAC-3 program at a yearly output of 2,000 interceptors. According to our customers — and we won't provide details — we ought to hit that level well before the new plants start operating, although we can accomplish it either way. The key point, though, is that the additional solution-treating production capacity coming from our new Tulsa facility will stay vital for backing the PAC-3 program and other important missile programs in a more suitable and lasting way as we move forward. Why are we constructing the plant? Honestly, the main drivers are pretty obvious — it's our commercial aircraft juggernaut along with missiles. Systems broadly speaking require it, and on top of that, it supports, makes possible, and drives Park's future growth and development as a company. Alright, moving to slide 31 — here's where we shake things up again. These slides land right in the middle of what we showed earlier: Park's financial track record plus forward-looking projections. We're not going to go back through the history, because we already did that. As for Q2 — again, Q2's been covered — $20.8 million in sales, $5.3 million EBITDA, adjusted EBITDA, and for Q3 our forecast calls for sales between $21 million and $22.5 million, with EBITDA reaching up to $5.8 million. Moving on to section 3.2 — this is a slide we bring out every quarter, though the fresh entries now include the first half of the year, with the date shown in the column on the right. That practice will continue; for instance, the next quarter will cover the first nine months, purely for informational purposes. So let's keep going. On to slide 33: recent public offering. This is something you're already aware of — there's nothing new to report. By the time we held our first quarter investor call, it had already closed. Right. It was a $50 million at-the-market public offering — ATM, as I believe it's called. We ended up selling 1,812,000 shares, generating proceeds of $49,996,000, which works out to an average price of $27.58 per share. That at-the-market offering has wrapped up — actually, I believe it finished back in June. Now let's move to slide 34, which is our final slide, thankfully. This covers Park's balance sheet along with our cash and cash dividend history — saving the best for last. Park carries no long-term debt whatsoever. That matters a great deal to us. I won't claim we'll never take on debt, but borrowing runs counter to how we operate. When I catch financial news sometimes, I hear about all these small companies loaded with debt, and they're struggling. Meanwhile, the big seven, or whatever people call them, are thriving. Okay, I can't really speak to that, but debt isn't something we're enthusiastic about either. As of the close of the second quarter of 2017, Park had $114.75 million in cash and marketable securities on hand; that's a sizable sum, I'd agree. Still, keep in mind what we've talked about before: $65 million is earmarked for our big new manufacturing facility in Tulsa, and $25 million is going to ArianeGroup's U.S. plant as advance payments. Yes, that $25 million does come back to us eventually, although it could take four or five years. So you've got $25 million and $65 million — real numbers you can use. One item I'd like to raise that hasn't come up yet — and it might be obvious to everyone listening — is that $65 million figure. That amount covered the capital assets: the equipment, the factory, everything along those lines. Working capital is not part of it, and startup costs aren't in there either, and those will be significant. They arrive gradually instead of all on day 1, but keep that in mind. Looked at from that angle, $114.75 million represents a lot of cash, even if it may be somewhat less than it first appears. For 41 straight years, Park has paid quarterly cash dividends without interruption. We see that as a good thing. And perhaps saving the finest for the end, Park has distributed $616.4 million, which equals $30.10 per share, in cash dividends from the start of fiscal year 2005 onward. I always enjoy contrasting that previous remark with the image of Park's founders during the 1950s at a plant in 19, a plant located in Flushing, New York, in fact — not the first plant or the second plant. These two individuals, the founder and the person who started this company, had essentially nothing. My understanding is that a modest sum was left over from his time in the military. So I guess you could say that from those early days until now, Park has come quite a long way. Even so, I plan to spend considerable effort on this, and I continue to think it's important that every one of us at Park remembers where we came from, because those first years mattered enormously to us and genuinely set a pattern for the sort of, um, the way we want to go about things — going about solving issues, going about dealing with obstacles, going about dealing with hurdles, going about dealing with roadblocks that come up every day at this point. So, all right, I think that wraps up what we had to present. Yes, that's right, operator. If any questions happen to be out there, I'd be happy to answer them.

Jim Ricchiuti

analyst
#7

Thanks. Good afternoon. To begin with, assuming I've got the figures right, it appears we saw really robust expansion in missile systems, on both a sequential and a year-over-year basis; so, you know, can these levels hold, or should we expect, you know, ongoing unevenness until that missile ramp truly gets going in earnest?

Brian Shore

executive
#8

Hi, Jim, you're fading out a bit on us, but how are things with you? Good, slide 32, that's a solid question. My view is that it can hold. And the reason slide 32 matters here — take a look at the sales, going from '17, '18, '19, '20, we were expanding fairly aggressively, roughly $10 million annually. Then we reached '21, Fiscal Year '21, the pandemic, and that genuinely slowed things down for a number of years, carrying us through, you know, until '25 before we truly returned to '20 levels. But I believe we're once again on that path, and I believe it's fairly aggressive, likely more aggressive than previously. Keeping pace with the expansion across both the missile programs and the GE programs is going to fall to us. I think we mentioned the juggernaut of $62 million for the GE programs. Last year was perhaps, what, $31 million, roughly that. So there's quite a distance still to cover there, and certainly quite a distance still to cover with the missile programs too.

Jim Ricchiuti

analyst
#9

Brian, I hope you can hear me okay. I also wanted to revisit what you said about sales to and with the GE programs for the full year. I mean, you had Q2, I believe, relative to expectations, and still you're cutting back the full year. It sounds like you're taking a cautious approach, but then again, this rests on build plans that you receive. So I'm just attempting to get a clearer picture of that and make sense of it.

Brian Shore

executive
#10

Sadly, Jim, you're cutting out a lot; but I believe your question was about the forecast for the GE programs. Let me see whether I can actually bring it up for you. It was on, so the history, if I can't locate it fast, I won't. Slide 14. Okay, thank you. So you're asking whether the growth can be sustained, whether it's cautious. I don't know. The forecast for fiscal year '27, $32 million to $35 million, I don't think that's where we're attempting to be cautious. I do know there's plenty, what we can tell you. Mark and I can tell you there's plenty of energy going toward ramping up these programs, particularly the A320neo program. And then if the 777X gets certified next year, that program will also see plenty of growth pretty quickly, I think. Got it. As I said, you know, we have fiscal year '26. I would that was that the prior fiscal year $29 million and the GE on of $62 million so a long way to go to the GE programs.

Jim Ricchiuti

analyst
#11

All right. My apologies. I'll rejoin the line.

Brian Shore

executive
#12

Jim, was there anything more? We can't hear you well.

Jim Ricchiuti

analyst
#13

Yeah, no, I apologize regarding the connection. I will get back into the queue. Thanks.

Brian Shore

executive
#14

All right. Thanks, Jim.

Trevor Walsh

analyst
#15

Great. Hi Brian and the team, thanks for taking my questions. Perhaps we can go back to that last question just to make things clearer. So, yes, we noticed you lowered the GE figure for the full year, and I get that there are a lot of moving parts, but would you say your Q2 and Q3 numbers look roughly in line with what we were anticipating, so it appears there might be somewhat more uncertainty around Q4? Is that a fair way to put it? And then past that, is it particular initiatives that are generating that lack of clarity, or is it really more just widespread, just sort of what you're observing, you know, across the entire group for you to...

Brian Shore

executive
#16

Okay, I think there's a misunderstanding here. No, just calculate the numbers. Look at Q1, Q2, and Q3, and then, you know, Q4 would require a big jump to hit that goal. What we provided as our guidance was based on something called a bill plan, right? And in all likelihood they're just ramping it up a bit more gradually than they originally planned. Still, taking this data to mean anything besides a rather forceful acceleration would be a mistake. Our aim with Q4 is simply greater realism. There's nothing holding Q4 back, though we suspect it may end up looking like Q3 and Q2, at least somewhere in that band. We could be wrong, but realism is the only goal here. This isn't us being conservative — it's us being realistic. Yet again, I want to emphasize that reading this information in any negative light — as though things are going poorly or the programs aren't scaling up as fast as they could — would be an error. In my view, the biggest obstacle—and it isn't on our side, it's on our customers' side—is whether they can keep up as these programs ramp. That's a real difficulty, no question about it. Since these are manufacturing businesses, scaling up that fast is genuinely hard for them. At the same time—and I don't want to keep harping on this point—we've obviously moved past that pandemic period when everything was chaotic for an extended stretch and there was simply no growth whatsoever. The growth we're seeing now is aggressive.

Trevor Walsh

analyst
#17

Yeah. Alright. That's reasonable. It tracks, Brian. Thanks for the detail. Perhaps we pivot toward missile systems for a moment. I value the explanation regarding how Newton's site can broadly carry things during this gap while Tulsa is still being brought online, covering the whole scope of the GE ramp and likewise the PAC-3 rate of 2,000. Yet clearly a major announcement just landed involving the Navy and Raytheon regarding SM-6, and I'm aware you have some involvement there. PAC-3 isn't the sole option. So would it be accurate to say that when those other missile efforts also scale up, Newton's site could back those too? Or do you reach a stage where choices must be made regarding which lines handle what, and could you speak in wider terms? I realize there are sensitivities here, but just how at ease are you, considering how quickly the ramp is moving, that Newton can carry us until Tulsa is operational.

Brian Shore

executive
#18

Yeah, we may place too much emphasis on the PAC-3 effort. The reason is simply that it gets enormous attention and plenty of recognition. Other companies openly discuss those rates, which differs somewhat from certain other missile efforts. And because we're the only supplier of materials for solid rocket motors, it's simple to focus the conversation on PAC-3; though, as I walked through things earlier, I found myself thinking that yes, we're stressing PAC-3 perhaps at the expense of numerous other efforts we're engaged in. PAC-3 is obviously our biggest effort right now, yet there are countless additional missile efforts underway. Mark and I had just been discussing that. Um, and um, there's a great deal to track. Right now, the response is that we intend to manage all of it with the new plant, though achieving that will require stretching and adding staff to production lines very aggressively. Um, and uh, yet we intend to reach that point with PAC-3 along with the remaining missile efforts. I believe everyone will feel substantial relief once the added capacity exists; and Tulsa becomes available, since we'll be strained getting to that stage.

Trevor Walsh

analyst
#19

Understood. Excellent. Really useful. Perhaps one more thing from me, and after that I'll rejoin the queue. It's encouraging to hear that ArianeGroup can sort of move up its schedule regarding the construction of their plant; it sounded as though an extra injection of funds and dedication from your side was needed for that to happen. If circumstances became truly severe, with everything needing C2B, could that be brought forward even further through extra money, either from you or from some other third party assisting to push it along, or is that basically the situation as it stands now?

Brian Shore

executive
#20

That's an amusing question, since folks keep posing it. My answer would be no, regarding cash. That's the whole story. What we did was bring our advance payments forward. Our advance payments weren't raised. We moved them ahead. We sped them up so they could get their plant operational faster. So is there a chance for us, for ArianeGroup, to compress that timeline, say four years, three and a half years, under three and a half years? I'm not sure. My sense is it would be tough. I believe it would be hard. I'm not claiming it's impossible. And, you know, perhaps a couple of months you were there; but substantially, um, my guess is likely not; it isn't about cash either; that's not the problem. The reason I'm sort of laughing is that people have proposed that. What would it take? It isn't money. Alright.

Trevor Walsh

analyst
#21

Yeah, understood. All right, that's great. Thank you, Brian. I appreciate it, those questions. Thanks.

Analyst

analyst
#22

Good afternoon, and I appreciate the presentation. I'm speaking to you from Switzerland. Like you mentioned, you reduced your projection for full-year sales on a few of the programs. Regarding shipments that got pushed back, have customers given you new dates for delivery, or do you still expect those revenues to come back? When we look at fiscal year 2028, does your most recent customer schedule point to quicker sales expansion than what we'll see this year, or should investors also temper their growth assumptions for that period? Um, what I'm really getting at is the gap between confirmed orders and anticipated demand. Might you provide an approximate split of that decrease and let us know when you think any postponed sales will be recouped?

Brian Shore

executive
#23

I'm not certain I follow what you mean regarding a decrease tied to delays. We haven't given any guidance for the current fiscal year or the one after, but I don't quite grasp what you're driving at with these delays or the reductions you mention. I apologize. Okay. Perhaps you could clarify, or, yes.

Analyst

analyst
#24

No, I’ll hear about it, and I gave it some thought — some programs that account for a reduction, roughly, for those engine programs, correct? The engine programs? So...

Brian Shore

executive
#25

Regarding the engine programs, I’m not sure what to tell you. If what you mean is that we split out the forecast for the entire year, perhaps that’s what you have in mind. Yes, I believe I get it now; when it comes to the GE programs, I assumed you meant a forecast covering all of Park. Yes, we split that out, but yeah, a couple million. Yes, yes. As I said, I believe the initial forecast we gave was tied to the bill plan our customer handed us. And we didn’t push it; we didn’t inflate rates in that way. And we’re simply saying now, given that two quarters are behind us, and we have a Q3 forecast, that we want to lower that figure somewhat so it’s realistic. But the ramp, as we see it, will occur. Whether it shifts by a couple of quarters one way or the other, I believe, doesn’t matter. We began discussing the GE Aerospace juggernaut. I think our key point was that we don’t know the exact time frame, yet what matters is it will arrive, and we’d better be prepared; so I think with the second question on this, I think we’re truly overinterpreting or too fixated on the fact that we reduced that figure somewhat. I don’t think it truly signifies anything when it comes to the long-term big picture; those programs remain and they continue ramping. I think it isn’t a function like the, we mentioned the COMAC program, the C919, so perhaps that’s what you have in mind; that program is somewhat delayed, but I don’t think we truly held large expectations for it this year at all. So it isn’t a function of the programs themselves; it’s a function of how fast our customers can increase their production. We can satisfy their requirements because Park isn’t the issue. But I don’t think it’s the end market either. I don’t think it’s the programs or how many airplanes the OEMs can sell. I think it’s simply a function of how fast the industry could ramp up. And that’s truly been the story for several years now as we attempt to emerge from the pandemic. Because you likely know this, but Airbus had that target of 75 airplanes a month for years ago; and they truly were struggling to reach, you know, even 50, maybe beyond 50; it wasn’t that the market wasn’t there. Look at the backlog; they have so many airplanes sold. Yes; so it’s a function of the industry ramping up production, not Park alone, but the entire industry ramping up production to reach those rates. But honestly, perhaps we're giving too much thought to this yearly projection, since obviously, the—I'm not sure—the atmosphere, if you look at it that way, suggests a strong acceleration is underway. And when we speak with our client, they describe ramping up extremely aggressively. I suppose maybe we've got it wrong. Perhaps we're being overly cautious. Perhaps that initial billing schedule will ultimately prove correct. We don't receive updated billing schedules annually from them. And ask, how do you feel regarding the billing schedule? We're simply attempting to be somewhat more grounded, drawing on Q1, Q2, and Q3; yet I think if we're—we shouldn't overthink that or read too much into it, to phrase it that way. That's my view regardless. The GE Aerospace Juggernaut, as we refer to it, I believe remains very much whole and quite thrilling for Park.

Analyst

analyst
#26

All right, thanks a lot. That's fine. So what's the story with the GE Aerospace outlooks in July? That's my question.

Brian Shore

executive
#27

Yeah. Thanks. My apologies — at the start I didn't catch what you were asking. I was simply thinking. That's fine. We'll be seeing you in July. Yeah. Thanks.

Brian Shore

executive
#28

Alright, Brian here once more. I appreciate everyone tuning in, and thanks for asking those questions; it was really great speaking with all of you. If anything else comes up that you'd like to ask, just reach out by phone. We'd be glad to assist. Stay well. Enjoy the rest of your day. Goodbye.

Operator

operator
#29

Thank you all for joining, and that brings today's call to a close. You may now hang up, and we hope the rest of your day is great. Please note this transcript was produced automatically, with no person involved in creating or checking it.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.