We appreciate everyone being on the line, and we welcome you to the quarterly call from Perseus Mining for March 2020. Everyone joining is in listen-only mode for this session. <<operator_script>> At this point I'd like to pass the conference to Mr. Jeff Quartermaine, our Managing Director and CEO. Over to you.

Jeff Quartermaine

executive
#2

Thanks so much, and welcome to the call where we'll be going over Perseus Mining's quarterly report for March 2020, which hit the market roughly thirty minutes ago. With me this morning is Andrew Grove, our Head of IR. Andrew, of course along with me, will field all those tough questions at the end of this session. Well, what a difference a quarter makes — who would have imagined back when we last reported in January that three months on, the world would look the way it does today. Plenty has changed, and I don't need to explain to you what or why, but it's pretty widely accepted that companies across every sector and every jurisdiction are experiencing the impacts of the COVID-19 pandemic, and Perseus is no exception, though I'm pleased to report that thus far we're managing reasonably well. As a matter of fact, we sit in a comparatively solid financial position, and for now the business continues to perform satisfactorily. Now, whether that holds up through the rest of this quarter and after that, it's impossible to predict. As we reported separately to the market over the past couple of months, we've implemented a series of measures aimed at securing our sites and safeguarding the health and welfare of our employees — these include, first, setting up what we refer to as an island mode business model, under which those parts of our operations essential to business continuity have been locked down and can only be accessed once individuals have undergone appropriate quarantine.

Jeff Quartermaine

executive
#3

Second, we have taken steps to protect our supply chains and find other vendors in cases where existing ones are having difficulty fulfilling their contractual obligations. Third, we have redirected our near-term support toward host governments and communities, focusing on delivering products and services to local health authorities so they can handle the COVID crisis. Turning to the outlook, a number of key issues remain a significant source of worry for us, as follows. First, travel bans put in place by governments. These affect us in multiple ways. For instance, senior managers cannot currently visit sites and speak face to face with our staff, but of perhaps greater significance, Perseus cannot bring technical experts to site whenever needed. This matters a great deal, especially when mechanical specialists are required in the event of equipment breakdown or to perform critical jobs such as mill reline and similar work. Travel restrictions have also stopped us from rotating our rosters. At Sissingué, for example, expatriate employees have already been on site for roughly 12 weeks, and given the travel bans, it appears they will remain there for a considerably longer period.

Jeff Quartermaine

executive
#4

This obviously matters for productivity over the longer run—it affects productivity, safety, fatigue management, and so on, all of which feed through to production and costs. Second, one thing we're watching closely is when our trading operations can reopen in the various countries—meaning the countries where we buy our key consumables today. To give an example, we do obtain a great deal of material from South Africa, which has been operating under very tight restrictions of late, though the President of South Africa recently said they'll move back to Stage 4 lockdown from Stage 5 shortly, and that is encouraging for us and could unlock some supply lines there. Third, there's opportunism and price gouging among suppliers; it hasn't been especially widespread so far, but we have encountered cases where prices for goods and services jumped overnight. When that happens, we've looked for alternatives. Still, I can tell you we definitely won't forget the ones who tried to exploit the situation. Fourth, freight movement within our host countries is a concern right now. Currently everything is moving very efficiently and smoothly, so once goods clear the ports, getting them to our sites has been proceeding fairly unimpeded at this point.

Jeff Quartermaine

executive
#5

If that fails for whatever reason, it would create problems for us. And should infection reach the regional areas outside the capital cities, that's a matter we must watch closely. Lastly, the health of our host communities — this matters fundamentally to us, since it's the health of communities that supplies — it's local communities that supply most of our workforce at every one of our sites. And it's extremely important to us that the community remains healthy; how well local health systems can handle significantly larger caseloads isn't exactly clear yet, though I must say they're managing reasonably well right now, but who knows. Now, despite the fact that plenty of people in the developed world, especially in Australia, appear to think the COVID crisis is over, the reality is that Perseus's future is still uncertain, and that makes it hard for us to forecast accurately things we would ordinarily control, like procurement of consumables and so on, which now lie outside our control. Now, at Perseus, we attach huge importance to doing what we say we will do, and in fact this is one of our company's core values, and we've lived by it over the last couple of years.

Jeff Quartermaine

executive
#6

So in the situation we find ourselves in right now, where we can't any longer give assurance that what we've communicated to the market will actually be delivered, well, we do need to take stock of that. And so we've concluded that it's prudent to pull our market guidance to June 30 — that covers both the half-year and the full-year guidance. We'll review where things stand in three months' time, and there's a good chance the world will look quite different by then. In the meantime, investors can be absolutely certain that all of us at Perseus are doing everything we can to hit the guidance we previously stated, but we're no longer in a position to guarantee it will be achieved. Now, turning to the body of the quarterly report — for those of you who haven't yet had a chance to read the document, let me give you a summary before diving into a few issues in detail. First, the two operations — Perseus's two operations, Edikan and Sissingué — they continue to perform; during the quarter they produced roughly 50,000 to 57,993 ounces of gold at a production cost of $951 an ounce, with a weighted average cost of $1,083.

Jeff Quartermaine

executive
#7

For every ounce of gold we produced, the average cash margin came to $409 an ounce. That beat our strategic target of $400 per ounce, and it produced notional cash flow of roughly 24 million for the period from the operations. Production in the quarter was below the level of the prior quarter, and our all-in site costs are a little bit higher. I'll address what caused that later on, but it's worth pointing out that our December quarter results have historically been among the strong quarters we've had since we began producing gold. So any comparison really has to be viewed in that context. Meanwhile, our strategy for creating value by developing mineral resources is moving forward as planned, despite the coronavirus, and development of Yaouré, our third mine, is now about 52% complete, running on time and on budget, and a stretch target of pouring first gold in December, 2020 remains within our capacity as long as we don't encounter any unusual delays stemming from the virus later in the year. And lastly, throughout the quarter, Perseus has kept its balance sheet strong through robust cash flows and prudent management.

Jeff Quartermaine

executive
#8

So, as I mentioned, with a cash margin of $406 per ounce, we produced, as I said, 23.7 million — 24 million from operations over the quarter. We also made the decision to draw down our corporate cash advance facility in full, which pushed our debt position from 50 million up to 150 million, while at the same time our cash balance rose by $100 million. The reason for doing this was to make sure we had operating flexibility given the certainty stemming from the COVID pandemic. As we look at it today, it's highly unlikely that we'll actually need to use that cash. But we believed that having the cash on the balance sheet, with the uncertainty surrounding us, was in Perseus's best interests, even if it does carry a small holding cost. Now, taking all of that into account and allowing for the fact that during the quarter we put roughly $29 million into developing Yaouré, noting of course that around 83% of this came from operating cash flows. We also funded exploration and paid corporate overheads. Our cash and bullion balance at the end of March stood at $162 million, which gives us a net cash position of $12 million, positive.

Jeff Quartermaine

executive
#9

When it comes to Yaouré so far, we've spent roughly 129 million, which is 49% of the 265 million development costs for Yaouré, meaning 136 million is still left to be paid. And since we have 162 million in cash on hand, the cost to complete development is fully covered before we even factor in ongoing cash flow from operations, which is quite considerable at current gold prices. So financially we're in a strong position, and while our operations didn't perform quite as well as we'd have liked during the quarter, they did run reasonably well. And so far in June, we've materially improved, and they're on a trajectory to exceed the elevated production of the December quarter, which I said earlier was one of the stronger performances registered by the company. And if my calculations are correct, we're about — this far into April, we're about 20% — looking to be about 20% higher than December, actually, at this stage. So things are certainly looking up. Very importantly, as you find ourselves in a strong gold market that, according to some experts, is going to continue rising, our growth profile in terms of gold production and cash flow continues to compare very favorable to those of our peers.

Jeff Quartermaine

executive
#10

Alright, that covers the quarterly report at a high level. Now let's go into a few of the finer details, if we may. Starting with operations. As I noted, across both operations we turned out a combined 57,983 ounces — 38,019 from Edikan and 19,964 from Sissingué. Sissingué's output beat our targets and performed very well on every measure, while Edikan fell short of the internal targets we'd set, largely because of lower gold recoveries tied to problems with the ore blend going into the mill. Interestingly, how the two mines performed relative to each other was the — it was the reverse of what happened in the December quarter, which shows the clear advantage Perseus gains from being a multi-mine producer. Now looking more closely at Sissingué, run time for the quarter was 96%. Recovery was 95%, and both are very strong and, in fact, ahead of our plans. Grade got better as the quarter progressed. We averaged almost 1.8 grams per ton over the quarter. So far this month, we're nearer to roughly 2.5 grams per ton. As we moved deeper into the high-grade ore in the Sissingué stage 2 pit, reconciliations got better.

Jeff Quartermaine

executive
#11

What also happened was that the rock became harder, which did cause throughput rates to slow. Even so, it was a solid outcome. And provided we can hold the run times, recovery, grade and so forth, and provided the steps we have taken to lift throughput rates deliver as planned, then Sissingué should enjoy a particularly strong quarter. Speaking of Sissingué, an update to the life of mine plan for that operation has now been finished. It is set to be presented for consideration at our next Board meeting. The revised plan does not differ materially from the plan we published before, though it does factor in present costs and operating parameters. We are currently applying for a new mining license covering the Fimbiasso deposit. That deposit is to be mined under the new plan. And as soon as this license has been granted and we have certainty regarding the path ahead, we will publish the updated life-of-mine plan. That said, I can tell you there ought to be no major surprises in it for anyone. Now, as we reported earlier, at Edikan we have achieved considerable progress in turning that operation around across roughly the past year by tackling difficulties we had encountered before, among them getting everything through the mill given the hardness of the ore being mined, particularly ore from the Esuajah North pit.

Jeff Quartermaine

executive
#12

We also gained a much greater degree of control over the processing circuit by bringing in new mill monitoring technology. And the benefits of that effort showed up especially clearly in the prior quarter, with better throughput rates around time recovery. This quarter, throughput rates kept getting better. So we hit 923 tons per hour versus 909 tons per hour in the previous quarter. Run time dipped somewhat because of some unscheduled maintenance downtime in January, though it still wasn't too bad relative to December. So run time came in at 88% against 90%. Where we did run into trouble at Edikan this quarter, however, was gold recovery, where we saw a substantial drop in recoveries, from roughly 85% last quarter to roughly 61% this quarter. The cause of that decline has now been traced to the composition of the ore fed into the mill. During the quarter, we mined a relatively high-grade Bokitsi deposit. Not only is this ore much higher in grade than other deposits — it runs at about two grams a ton, whereas, say, Esuajah North is 0.9 and AFG is 1.09 — so it's materially higher grade. It's also much softer and therefore materially lifts our throughput rates.

Jeff Quartermaine

executive
#13

And as I mentioned before, throughput rates increased from 909 tons per hour to 923 tons per hour, while the average head grade rose from 0.98 to 1.05. So Bokitsi ore being present definitely made a difference. Unfortunately, this Bokitsi ore's metallurgical composition isn't ideally matched to our plant. And what we've found is that when the ore feed blend includes more than roughly 15% Bokitsi ore, it has a bad effect on recovery across the whole mill, not only Bokitsi, because it disrupts control of both the flotation in the CIL circuit. Now, as I said, we experienced some maintenance problems early in January that affected run time. Now, when we shut down for the scheduled mill reline, we observed that the mill opinions were won. And we made the decision that instead of risking additional damage, we would fix that damage right away. Now, this meant the mill stayed down a day or two beyond what was planned. Now, our team on-site is very focused on meeting targets. They decided that to compensate for time lost during that extended maintenance period, we would raise the percentage of Bokitsi ore and see.

Jeff Quartermaine

executive
#14

And just to remind you, that was supposed to deliver both better grade and faster throughput. Sadly, though, the treatment turned out to be worse than the problem itself, since recoveries dropped, and it took us a good part of the quarter to pin down precisely what was causing it and then put a fix in place. So Edikan's output was lower during the quarter, but I'm happy to report that through the first 25, 26 days of April we're tracking toward a significantly stronger June quarter. That's assuming, naturally, that nothing else goes wrong or emerges unexpectedly because of COVID. Turning to the group's costs for the quarter, our all-in site costs came in at $1,083 per ounce, which was above the group AISC we reported last quarter. That figure reflects costs at Edikan of $1,242 an ounce and at Sissingué <<inaudible>>. Sissingué actually declined a couple of percent versus the prior quarter. At both Edikan and Sissingué, we did recognize certain costs tied to getting ready to steer our way through the COVID crisis. These weren't large in the grand scheme of things, but they covered items such as purchasing extra stores, bedding, fencing, additional consumables, et cetera, et cetera.

Jeff Quartermaine

executive
#15

So obviously, at Edikan, the production shortfall we saw this quarter fed straight through into higher costs — though if anything, the cost increase came in proportionally smaller than the drop in production, and that shows the cost base at Edikan has kept coming down, even with the COVID crisis. During the quarter, our technical services team also finished an update to the Edikan life-of-mine plan, and the results have been reported to the market. For anyone who missed that announcement, in summary: with the underground operation added to mine the Esuajah South ore body, plus optimization of the existing pits assuming a 3,900 gold price, gold production now averages 212,000 ounces a year across Edikan's currently estimated remaining 6.2 years of life starting from July. That figure includes roughly 231,000 ounces of gold production on average for the next four years. Total estimated gold production comes to 1.3 million ounces over the mine's life. That is about 95% higher than what the previous life-of-mine plan estimated for the same period. Forecast weighted average all-in site costs fall in the range of 870 to 890 per ounce over the remaining life of mine, which works out to roughly a 5% decrease in average costs across the life of the mine.

Jeff Quartermaine

executive
#16

They do encompass sustaining capital, which takes in the expense of site rehabilitation. In total, we've set aside roughly $37 million, or $28 per ounce, for that, and as I mentioned, that's factored into the cost. The life-of-mine forecast shows very robust after-tax cash flows, amounting to approximately $356 million, or around A$0.51 per share, at a $0.60 exchange rate — which effectively assumes a flat price of $3,800 per ounce. So if we can fix the deficiencies from the March quarter, and judging by this month's results, I'm quite confident we will. The outlook for the Edikan mine is reasonably encouraging, and we anticipate it being a significant contributor to the group's output, profile, and cash flow for a good while yet. Turning now to financial matters. Over the quarter, we sold 60,015 ounces of gold at a weighted average price of $1,491 per ounce, producing positive cash flow at both mines. Indeed, at that average sale price of $1,491 and an average all-in site cost of $1,083, we achieved an average cash margin of roughly $409 per ounce, as I noted earlier. Multiplying that by the ounces produced gives us notional cash flow from operations of $23.7 million.

Jeff Quartermaine

executive
#17

And 57% of that was from Sissingué, with roughly 43% coming from Edikan. Interestingly, as I mentioned, those proportional contributions are the opposite of what they were last quarter. Now, as I noted, we spent around $29 million on Yaouré CapEx during the quarter. We also acknowledge corporate costs of about A$4 million, along with exploration costs, and similar movements in debtors and creditors. But once all of that is taken into account at quarter end, as I said, we held $162 million in cash and bullion, and I should note that this was clearly lifted by our having drawn an extra $100 million under the corporate cash advance facility. It also meant that at the close of the quarter our net cash position stood at approximately $12 million. Now, another financial item investors often ask us about is the gold price hedge book. Over the quarter, we kept actively managing that hedge book, consistent with our clearly stated corporate hedging policy. And at quarter end, our overall hedge position consists of forward sales of 317,345 ounces of gold at a weighted average price of almost $1,400 — $1,393, to be precise.

Jeff Quartermaine

executive
#18

These sales give us downside protection on roughly 22% of our forecast production for the coming three years. That leaves 78% exposed to the gold price, and obviously right now that price sits well above $1,400, but should it drop back for whatever reason, we have coverage on 22% of our production. Now let me turn to development of our third mine, Yaouré. During this quarter it has been one of the standout bright spots for us. We have kept making very strong progress on every front at Yaouré, and right now, as I mentioned earlier, we are still on track to hit our stretched target of first gold in December this year. For anyone keen to see how the Yaouré mine is progressing, I should note that every month, at month end, we post video footage on our website, www.perseusmining.com, and it literally provides a bird's eye view of what is happening on the ground. I do recommend taking a look at that footage; a new clip will be posted there within the next couple of days, certainly by the end of this week.

Jeff Quartermaine

executive
#19

Also, there are photographs included in the appendix, and I have the report that conveys the same message. I should mention at this point as well that we've achieved this excellent progress while maintaining a very good safety record. Over the weekend, we reached 2 million man hours on the site, and that's with no single lost time incident. Our team takes a lot of pride in this record, and I'd like to publicly acknowledge the very good job they are doing in that area. So well done, guys — it's a great effort. Offsite engineering is now 100% fleet, and procurement, including deliveries to site, is about 85% complete. During the quarter, we saw delivery of a lot of Structural Steel tanks; the Ball mill and SAG mill are on-site, the electricity transmission is all on-site, the transformers are expected on-site in May and switchboard shortly thereafter. I mean, the switchboards are coming from South Africa, so we are dependent on the port sector down there for those. The pleasing news is that notwithstanding the COVID virus, et cetera, cargoes are being efficiently cleared through the port of Abidjan when they arrived and transported to site without much delay.

Jeff Quartermaine

executive
#20

As I mentioned earlier, we've achieved a great deal on-site, and the videos I referenced make that plainly clear. I won't walk through each element of that progress in exhaustive detail. All of it is available for you to read in the quarterly report. But it's enough to note that very substantial headway is being achieved in every area throughout the site. This project has definitely stood out as one of the true high points of a quarter in which genuinely encouraging developments have been somewhat scarce. Now, I noted earlier that by the time the quarter closed, we had capitalized roughly $135 million of Yaouré expenses and paid $129 million, or 49% of the budget, to suppliers of goods and services. We also have commitments totaling $165 million in place, which works out to about 70%. So a considerable portion of the budget has been locked in, and the likelihood of cost overruns has been materially diminished. Therefore, as I stated earlier, there are no further delays, and at this point we don't foresee much on the horizon, though it is possible, that's for sure. Our stretch target of first gold in December is achievable, and both we and our contractors are certainly doing everything within our power to deliver on this milestone.

Jeff Quartermaine

executive
#21

This project matters a great deal to Perseus, and it really is foundational to the growth we expect going forward. So we're eagerly anticipating making further progress on delivering it. Let me now switch briefly to exploration. On the previous call, I mentioned that we had restated our dedication to exploration as a route to organic growth, and that we had set aside a budget of roughly $15 million for exploration spending across the coming 12 months. Most of that budget will go toward Yaouré, where we believe there is close to the potential for a meaningful addition to the reserve inventory at that site. The remainder is earmarked for Edikan and Sissingué, sites where infrastructure already exists, and our aim there will be to add mill feed to the inventories at both and to extend the life of both operations. Now, at Sissingué, we drilled a number of targets during the quarter. Zanikan, which appeared very promising at the outset, did not hold together once we began estimating a resource and attempting to optimize a pit around it. We are currently drilling several other targets at Tiana and Kanakono. The drill results so far are interesting, though not spectacular. We still have a fair number of targets remaining, so we are certainly not prepared to write off Sissingué at this point.

Jeff Quartermaine

executive
#22

Late last year at Edikan, we said we had signed an option agreement covering a mineral lease named Agyakusu, which sits right next to the ground at Edikan. Early in the quarter, the government gave its approval for this transaction, and during that same quarter we began drilling the prospect. Unfortunately, this put us into conflict with local farmers and artisanal miners, and as far as we can tell, the matter has now been resolved as well as possible. We plan to bring bulldozers onto the site within the next day — I believe certainly before the week is out. This is a very exciting opportunity for us, since success on this tenement might open up thinking around several other regional opportunities and could also meaningfully extend Edikan's life well past what is envisaged in that recently published Life of Mine plan I mentioned a few moments ago. At Yaouré in the December quarter, we drilled three deep diamond holes targeting the structure that we expect will support a material underground mining operation for some years to come off the side of the CMA pit. All of the holes hit the target — they hit the targeted structure at or near the targeted depth. I should say, though, that with the third hole, we had to go back in and extend it in order to reach the structure.

Jeff Quartermaine

executive
#23

But as I mentioned, those holes didn’t produce spectacular results. Still, the fact that we hit the structure was extremely important, and we fully intend to come back to those holes later so we can conduct downhole seismic testing to help interpret the 3D survey that has now been finished across the site below the CMA pit. I should note that this 3D survey required us to halt operations at the tailings dam for 10 days during the quarter so the work could be carried out. Even so, we’ve largely made up that lost time on tailings dam development. And we also obtained the 3D seismic data we had been after, so there were some really good outcomes. The work wrapped up just the other day, and while we were out there we also ran an additional 2D survey line, which finished right last week, and the crew will be off site very, very soon. Now the hard part begins, of course — analyzing all the data collected. This takes a considerable amount of processing, and we expect to have some usable data by the end of the year, if not sooner, which will guide a targeted drilling program.

Jeff Quartermaine

executive
#24

And clearly, whenever updates arrive from every site, we’ll make sure the market hears about them. So then, to wrap up, as I mentioned when the presentation began, these are fairly uncertain times we’re in. What I mean is the pandemic is posing some significant difficulties for us, and up to now we have confronted those directly and we hold an advantage. How things unfold from this point is still unclear, but we’re confident that through staying alert and acting ahead of events, we’ll get through this crisis successfully. On the operations side, the June quarter ought to be considerably stronger than the March quarter for production as well as cost. Sissingué is already performing well above budget for April, and Edikan is recovering too. And in my view Edikan’s June quarter will certainly be much stronger than the March quarter we reported on today. On development, Yaouré is genuinely heading in the right direction, with superb progress both above ground and below ground, and we’re eager to keep highlighting that via the video footage posted on our website.

Jeff Quartermaine

executive
#25

And as I mentioned before, we're very much looking forward to reaching that stretch goal of producing gold by the end of this year. On the exploration side, as I said, we're stepping up our efforts both to extend the life of the operations we already have and, hopefully, to find our next mine. And we've certainly got some interesting targets <<inaudible>> and hopefully there'll be some positive news on that front before too long. Now, I'm sure everyone on the call has noticed how strong the gold price has been recently, and probably noticed some of the very bullish forecasts about the future gold price from analysts at some credible banks. Whether those turn out to be right or not, only time will tell. But one thing is certain: Perseus has positioned itself very well to take advantage of market strength when it comes. In several respects, the quarter didn't turn out the way we planned. But look, in this business, sometimes things go wrong, despite the very best of intentions. Still, we remain optimistic about the company's outlook, having successfully dealt with the challenges of this quarter. And one thing, as I say, shareholders can be absolutely certain of: no matter what happens, we'll leave no stones unturned to make sure Perseus' enormous potential is fully realized.

Jeff Quartermaine

executive
#26

Much appreciated. At this point I’d be glad to field whatever questions you have, and should I be unable to respond to them, Andrew certainly can. Thank you.

Operator

operator
#27

Thanks. <<operator_script>> Reg Spencer of Canaccord Genuity has the first question. Go right ahead.

Reg Spencer

analyst
#28

Hello, and good morning, everyone. I was hoping I could expand a bit further on those met challenges at Agyakusu. Reading through the statement, it's clear you're focused on enhancing those ore blends. However, should we anticipate reduced recoveries across the coming six months, or has the effort completed to date already brought recoveries back up to the budgeted levels?

Jeff Quartermaine

executive
#29

Yeah. Since we made those changes, recoveries have definitely gotten better. So at this point we’re operating quite near our targets, and, like, it’s — we don’t hit them every single day, but on most days we’re right up there. Occasionally we have a day when things slipped down somewhat and we have to keep it in check. Still, for the most part, we’ve got the process under control, and recoveries are going to return.

Reg Spencer

analyst
#30

All right, so this is very much a one-off, the way one examines things in the…

Jeff Quartermaine

executive
#31

Reg, that is definitely how we view it. It caught us somewhat off guard, and I must admit that our enthusiasm got the better of us. We were pursuing the targets, having had a delay because of the repair works we did, and we overcooked the goods, so to speak. That was our mistake, and we should not have done it, but we did. Still, it was done with the best of intentions. And as soon as we got to the real cause of the issue, we acted to fix it. And I do not think there is much more that one can do under the circumstances, but certainly, things are coming back. And as I said on the — just a few moments ago, we are expecting a much better quarter coming up.

Reg Spencer

analyst
#32

All right, thanks. One final question on Yaouré. With the uncertainty that COVID has created, you pulled your guidance, yet the Yaouré schedule has stayed as it was. You flagged the movement of people as possibly a major risk. I'm just curious whether you could lay out for me the reason you remain at ease with that Yaouré timeline while at the same time taking your guidance off the table.

Jeff Quartermaine

executive
#33

Yeah, so look — Yaouré is a bit different. It's not just our own staff; we've got contractors and others as well. And a very big share of our workforce lives in the surrounding communities. Now, I have to say there's a risk of the infection getting into the community, because if the community becomes infected and our workforce goes down, then hitting that target is going to become fairly hard. And I did mention that we're on track to deliver it, provided we don't get thrown off course — I mean, I did include that caveat. Look, at Yaouré things are actually going really well. What we did was get out into the community very early on, in terms of giving support to the local health authorities. And at this point, look, there are no cases of infection anywhere close to us. I think the nearest infection to us was roughly 100 kilometers away, and it turned out not to be an infection after all — someone was placed into a crew, an employee of a beer factory was placed into a crew, but it turned out not to be positive.

Jeff Quartermaine

executive
#34

We’re taking a very hands-on approach in that area, and we feel quite sure we’ll remain together. Then, regarding the people we have working at the site—our own staff—when the virus first began to take hold, I told them they could go back to their home countries if they wished, yet nearly every one of them replied that there was no chance they would leave, that they were staying until this was over and would see it through to the finish. What will therefore happen is this: should the local workforce begin to become infected, we will shut the site down as far as we are able and keep carrying out whatever work we can still carry out, and on that matter we will cooperate closely with our contractors. Lycopodium and we are therefore very much aligned on this point. And as I mentioned, we are collaborating extremely effectively in order to hit that target. The two of us are strongly driven to make it happen.

Reg Spencer

analyst
#35

All right, that's great. Thanks a lot.

Operator

operator
#36

Thank you. Nick Herbert of Credit Suisse has the next question. The line is yours.

Nick Herbert

analyst
#37

Morning, Jeff. You've laid out the COVID difficulties quite plainly. What I'd like to know is how much of that reflects a hit to production rights you hold today versus risk you're flagging for the future. I'm simply trying to understand what output might be achievable in the June quarter if those disruptions fail to materialize, compared with the low end of the guidance range you mentioned, leaving aside any COVID effect.

Jeff Quartermaine

executive
#38

Yes, look, Nick, it would be pretty disingenuous of me to pin our output this quarter on COVID, frankly. There has been an effect, though I couldn't put a figure on it. I mean, it's bound to have an effect when people are doing longer shifts and feeling anxious about what's going on at home and that sort of thing. That's unavoidable — it would have to be that way. And some added costs have also come through which, as I mentioned on the call, aren't huge, but there have been some added costs. So I'd say I won't hide behind it and pin the trouble we had at Edikan this month on COVID. That just isn't true. So the chance is there for us to dig in and raise the result.

Nick Herbert

analyst
#39

Got it—understood, thanks. Would you mind giving us a little more of an update on consumables and critical spares? If there's a problem getting those out to sites, I suppose, what might that look like in terms of a possible full-mill shut in this quarter? Do you have, sort of…

Jeff Quartermaine

executive
#40

My answer would be essentially nothing—basically zero. Across all the critical areas, we have a minimum of three months, and likely longer than that, before anything hits us. So my view is that mill shutdowns won't necessarily occur. What could affect us this month, I believe, would be events such as mill shutdowns or an unexpected breakdown. For example, we've experienced some problems with the crusher at Edikan. As I've said, the crusher has given us difficulties from the very beginning. Getting specialists in to resolve those problems is extremely, extremely hard. So it's those kinds of unpredictable events that could significantly affect us. But here's the point: we aren't claiming that we will definitely be affected, but what we are saying is that a risk exists because of these factors that we can't deliver, and instead of making promises that aren't true and misleading people, the prudent course for us is to pull that guidance. And yet, as I stated very plainly, we will be going at it full tilt to try to hit the targets we originally set for ourselves. There is no incentive for us to slow down and take it easy in this situation.

Jeff Quartermaine

executive
#41

We will be giving it everything we have out there. That I can promise you.

Nick Herbert

analyst
#42

All right, thanks a lot. And last thing, building on what Reg asked, about that Bokitsi ore input: what was the contribution originally planned, compared with the 15% that's now been optimized? And does that create any extra difficulty on your side if there happened to be a shortfall and you had to chase all of it from other sources? Or is that all kind of…

Jeff Quartermaine

executive
#43

Seeking from alternative isn’t an issue. The share was roughly 20%, and it was already part of the blend before. Honestly, we pushed past that 20% level. We believe 15% provides us with a strong degree of control. Over the coming period, what we’ll do is steadily raise that share, since it does carry a higher grade. But should we notice any indication at all, as we lift it to 16% or 17%, that negative effects are appearing, we will pull it back down again. This is very much an inexact science — somewhat of a dark art, really, to get that blend precisely right, because we’re not only feeding in Bokitsi ore; we’re also feeding in ore from — well, we actually just wrapped up mining at Esuajah North this week. In fact, we’re running a good buy cut there right now. We’re hauling ore from Fetish, we’re hauling it from AFG, and we’re hauling it from stockpiles. So the ore sources vary. As a result, getting that blend exactly right on a day-to-day basis is a fairly demanding exercise. We’ve handled it before, and I’m confident we can handle it once more going forward, provided we don’t get carried away chasing the higher-grade Bokitsi ore all at once.

Jeff Quartermaine

executive
#44

On the Bokitsi ore itself, I believe we've exhausted that supply around — I think it's during the September quarter. So this isn't a permanent issue for us. That's the reason we feel quite confident about the life-of-mine plan we released — what we've experienced this quarter won't affect it, since that plan relies on ore sourced from AFG, from Fetish, and from both of those plus Esuajah South. And both of those — Esuajah South closely resembles Esuajah North. We've put that material through the plant before. We understand how that material behaves, and we're quite confident no major surprises lie ahead. I should add as well, especially regarding AF Gap, which supplies the largest share of ore — it's a substantial granitic ore body. It doesn't entail the sheer posted material or the metamorphic type, which originates from Bokitsi and is somewhat more metallurgically complex compared with the large granite hosted material. So when it comes to how the life-of-mine plan is affected, we believe there will be any negative impact. And that plan, as presented, stands, and we're looking to deliver to that.

Nick Herbert

analyst
#45

Okay, thank you so much, Jeff.

Operator

operator
#46

Thanks. <<operator_script>> Our following question is from Adam Baker of Global Mining Research. Go right ahead.

Adam Baker

analyst
#47

Hi, everyone. Regarding Sissingué, it's unfortunate that Zanikan didn't clear the thresholds for inclusion in the life-of-mine update. I was just wondering whether you could remind us what the current mine life is expected to be, exactly?

Jeff Quartermaine

executive
#48

Right now it's roughly three and a half years, I believe, from this point—about that. And that assumes no additional satellites come in. If you actually—when we did the life of mine plan not long ago, I went back to check how that stacked up against the feasibility plan we released, right, where we began. And every year we've grown our reserve base incrementally, so we'd be pushing the ore through much quicker than we anticipated, but where we have more tons, more gold, et cetera, et cetera. And I think we will see some incremental extensions, but at this particular time we can't say exactly where they're coming from. But certainly Zanikan was a little bit disappointing to us, but we have actually benefited from that work, there are other deposits along strike from those and we—I think we understand the structure in that area a lot better, and that's Tiana and Kanakono and I think that the next couple of months will be fairly interesting in terms of the drilling that comes from there in terms of being able to potentially identify satellite deposits. And if we are unsuccessful in that area, then I guess what we will need to be doing is to looking to see what else we tend to do regionally to find some other alternative suppliers.

Jeff Quartermaine

executive
#49

Still, we definitely aren't too downbeat regarding what lies ahead there. I mean, having a mine life of 5 or 10 years remaining at that site would be really great, since it's doing wonderfully and beating goals on every measure — it would be a genuine cash cow for us — but let's simply hold off and watch what the drill bit delivers across the next few quarters.

Adam Baker

analyst
#50

Okay, and then second, regarding your staff, what share at every site is made up of expatriates? And broadly, which nation do most of them originate from? I believe you said certain Sissingué personnel have now been at the site for roughly 12 weeks, so what is your view on that, and what do you intend in order to bring some fresh people into and out of those sites?

Jeff Quartermaine

executive
#51

Okay, so, Edikan staff — Edikan, since that one's simplest to cover. Roughly 400 people work there directly, and just 2 of them are expats; one is on site and the other isn't. The fellow on site is an Australian, and the other one is South African, so at Edikan it's fairly — there isn't much of an issue. I mean, for the bloke who's actually on site it is a significant issue, but he's fairly at ease with how things are progressing and he'll remain at the distance. Over at Sissingué, expats make up under 10% altogether — I believe it's around 9%. So that's probably about 20-something people up there in total. And where do they hail from? Well, they come from all over — South Africa, the UK, Australia, the U.S. — so they're spread across the place. And what we're doing there is, we've actually eased off: the guys get a day off each week so they can take a break, and I should mention that at the same time the local fellows as well, the local Algerians, have moved onto longer shifts too, but as for rotating the Algerians off, we don't expect that to be too big a problem, because what we'll do is take them, place them in quarantine for two weeks at a facility we've set up at the <<inaudible>>, bring them up to site, they'll do six weeks on and then get four weeks off, and then they'll go through the same routine once more.

Jeff Quartermaine

executive
#52

So I think the local guys will be fine when it comes to replacing people. As for the expatriates, what's difficult right now is that the airports are shut down. We think there are one or two flights that will start operating in May, so if European airlines begin flying in May, we'll be watching closely for chances to put people on those flights and bring others in as things move along. But if there's a crisis, say a medical problem, medical suppliers have already managed repatriations successfully, so we're confident that can be dealt with. Still, we're monitoring the airline schedules very, very carefully, and in an emergency or a situation that becomes completely intolerable, we would just charter an aircraft from somewhere and fly all the guys out in a single day. But we don't expect that to be the issue — our people are there because they want to be there. When this crisis began, we told them that anyone who wanted to leave would be gotten out right away, and we did that. In fact, a couple of people from Sissingué had to leave for various reasons, given what they had going on at home, and I think there may have been one or two at Yaouré, but overall the team was very determined to get through this.

Jeff Quartermaine

executive
#53

Now, whether they’ll show that same degree of enthusiasm if they stay on for another 3 months is still up in the air, but that’s something we really do have to keep in mind and recognize — that if a lot of effort has to go into handling fatigue and boredom and that sort of thing, then it won’t spill over into productivity.

Adam Baker

analyst
#54

That covers everything I wanted to say—thank you.

Jeff Quartermaine

executive
#55

I appreciate that.

Operator

operator
#56

Thanks. The following question is from Andrew Bowler at Macquarie. Go ahead, please.

Andrew Bowler

analyst
#57

Hey, everyone. Yeah, Adam’s questions pretty much addressed the same points I was raising. So, thank you.

Operator

operator
#58

Thank you. At this point we don’t have any more questions. I’ll now return the call to Mr. Quartermaine for his closing remarks.

Jeff Quartermaine

executive
#59

Thank you so much. Look, as I mentioned while wrapping up my previous exercise, I mean, this quarter has been a challenging one, but we're feeling very optimistic about what's ahead. We believe the difficulties of this quarter can be dealt with successfully, and I'm looking forward to reporting back in July — I guess there will be, and I'm very sure that, we'll have a far more attractive story to share at that particular time. Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.