Perseus Mining Limited (PRU) Earnings Call Transcript & Summary

July 20, 2020

Australian Securities Exchange AU Materials Metals and Mining earnings 40 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, and thank you for joining the investor webinar covering Perseus Mining's June quarter. A quick note for everyone watching: your line is listen-only. We'll have a formal presentation, and after that a Q&A session. Should you want to pose a question, just type it into the Q&A panel inside the Zoom application. At this point I'll pass things along to Jeff Quartermaine, Perseus's Managing Director and CEO, who will take you through the presentation.

Jeff Quartermaine

executive
#2

Thank you very much, and welcome to this conference call to discuss Perseus' June 2020 Quarterly Report that was released to the market earlier today. Three months ago, when reporting to you about our March Quarter, I began the teleconference by speaking about the COVID-19 pandemic, which at that time was the topic of the day, and I specifically talked about what Perseus had done to combat the situation. I concluded that discussion by noting that, notwithstanding that many in the West, Australia in particular, seem to believe that the COVID-19 crisis is behind us, the fact is that our future remains uncertain, which makes it difficult to predict anything much with accuracy. Now, at the time, a number of people thought I was being a little pessimistic with that statement, but interestingly, what I said then still stands true today. And I guess that given that there's what's happened on the East Coast of Australia in the last couple of weeks, not to mention in North America and the U.K. in the periods before that, there probably aren't too many who would disagree too strenuously with what I said today. But notwithstanding my reservations about the future that I expressed at that time, we at Perseus have got on with the job, and we've worked very hard to ensure that our employees remain safe and healthy and that our business continued to create as much wealth as we possibly could.

Jeff Quartermaine

executive
#3

And I'm happy to report that we've largely succeeded in doing that—though I have to admit a very strong gold price certainly helped. In a moment, I'll go through precisely what has been accomplished. Before that, however, there are a couple of things I'd like to mention. First, I want to recognize the tremendous contribution made by our staff—both employees and managers—over the past three months. Considerable hardship has been endured and many sacrifices made, and I want to state publicly that this is greatly appreciated and acknowledged. The other thing I'd say, I suppose, is that these are indeed uncertain times we're navigating. In West Africa, as in every other place, the situation shifts daily, and being overconfident or blasé carries real danger. Now, although we've performed very well this quarter at Perseus, we're not out of the woods, as they say. The coming three months—the next three months especially—will be fairly critical for us, given how close we are to bringing Yaouré, our third mine, online, and that both Edikan and Sissingué are performing very well again after a modest start to 2020.

Jeff Quartermaine

executive
#4

Now, regarding the Quarterly Report — and if any of you haven’t yet had a chance to look through that document, I’ll give you a quick summary before we dig into a few points in more detail. First off, both of our mines, Edikan and Sissingué, turned in a strong performance this quarter. At Edikan, we recovered very effectively from a disappointing March, while Sissingué has kept building momentum. Edikan produced 41,201 ounces, which is roughly 9% higher, and Sissingué came in at 23,395 ounces, actually up 17%. Together, the two operations delivered 64,676 ounces of gold, with a production cost of $805 per ounce and a weighted average all-in site cost of $935 per ounce. At Edikan, costs fell 16% again — bringing the all-in site cost to $1,049. That was a fairly solid effort on that front. Our average cash margin per ounce of gold produced came to $609, which beat our stated strategic target of $400 an ounce by roughly 50%, and it generated notional cash flow of approximately $40 million for the period, up about 66% from the prior quarter. As I mentioned, production rose about 12% quarter on quarter, while costs declined 14%.

Jeff Quartermaine

executive
#5

All-in site costs fell 14% quarter on quarter. Both of those things are evidence of the strong improvement I mentioned earlier. On a half-year basis, that meant group production of 122,659 ounces at an all-in site cost of slightly more than $1,000 an ounce — $1,005, to be exact. For the full financial year, we produced 257,639 ounces, which was slightly lower than the year before. The all-in site cost of $972 an ounce was broadly in line with prior years. We'll discuss the full year results further in August, when we release our full financial report. Now, turning to the future, as I said earlier, things are a little uncertain at the moment, but despite that uncertainty, we've given the market production and cost guidance for the next six months, together with a caveat — and a strong one — that continued strong performance cannot be guaranteed, though we will be doing our absolute utmost to achieve what we've set out to do. With that in mind, our guidance for the next six months is as follows. At Edikan, we expect 77,500 to 82,500 ounces at an all-in site cost of $1,150-$1,250.

Jeff Quartermaine

executive
#6

For Sissingué, our guidance is 48,000 to 56,500 ounces, with all-in site costs of $600 to $700 per ounce. At the group level, that works out to roughly 125,500 to 139,000 ounces at $940 to $1,025. That's a slight increase over what we delivered in the last six months. These are fairly conservative figures, and I freely admit that. But we set them with the awareness that conditions remain somewhat difficult. Turning now to the quarter — the one we're in — our value-creation strategy of developing mineral resources in-house with our own team has progressed as planned. Yaouré development stands at approximately 67% complete, and it is tracking essentially on schedule and under budget. Our stretch goal of first gold pour in December 2020 remains achievable for us, despite the difficulties present in the environment. Also, in the quarter we announced a proposal to acquire Exore Resources Limited, a small explorer holding a sizable block of highly prospective ground close to our Sissingué mine in Northern Côte d'Ivoire. This acquisition is intended to secure extra mill feed for Sissingué and to prolong the life of that exceptional operation.

Jeff Quartermaine

executive
#7

I'll revisit that with more detail a bit later on in the presentation. Last, across the quarter, Perseus has kept its balance sheet strong by way of robust cash flows and sensible financial management. Given the $609 per ounce cash margin I referenced earlier, we produced notional cash flow from operations of, as I noted, roughly $40 million during the quarter, which rose about 60%-67% versus the prior quarter. So, factoring that in and allowing for the roughly $29 million we put into developing Yaouré during the quarter — we funded exploration, we paid tax, we covered corporate overheads, and so on — our cash and bullion balance stood at $164 million at the end of June, which leaves us with a net positive cash position of roughly $14 million once debt is factored in. As of today at Yaouré, we've invested about $156 million, or 59% of the $265 million total budget, which leaves $109 million still to be spent there. So, with $164 million of cash in hand, the cost to complete development is entirely covered even before accounting for future cash flow from operations, which is fairly substantial as we speak.

Jeff Quartermaine

executive
#8

Alright, taking that $40 million from the most recent quarter as a starting point, we think there's potential to bring in another roughly $80 million or so, assuming gold prices hold at current levels — and that would leave us at the close of this year, when the Yaouré build wraps up, in a really solid financial position. Obviously, that bodes very well for what lies ahead. So that sums up the June 2020 quarter in brief. Before we open things up for questions from everyone joining us today, though, I'd like to dig into a couple of key matters in a bit more depth. The Quarterly Report, I should note, is packed with a tremendous level of detail across every part of our business, and it's fairly clear on its own if you'd like to work through it. So, breaking with how we've done things before, I'm not going to walk through all of it — all that detail — during this call. What I will do instead is make an offer to every person listening and, for that matter, to anyone who isn't on the call as well. Once you've gone through the report, should anything in it be unclear or something you'd like further explanation on, or if you want a little additional context — provided it isn't information outside the public domain — then please reach out to us by email or phone without hesitation.

Jeff Quartermaine

executive
#9

You can find our contact information on both the first page and the last page of the release, and I'd be glad to discuss any of those items with you. Now I want to move on to a few topics that I believe our shareholders will find especially relevant, given the many conversations I've had with people over the past couple of months. These topics are as follows. First, our position on gold price hedging. Second, the continuing turnaround at Edikan. Third, how things are progressing at the Yaouré mine development and where that is headed. And finally, the Exore acquisition along with other exploration results. If there's anything of interest I fail to mention, maybe you can raise the question during the Q&A session. But let's begin by looking at hedging. This is something investors ask us about often. And as you can imagine, the questions get more intense when the gold price climbs, as it has done recently. I mean, looking at it overnight, it's 18, 18 or something like that. And the gold price certainly looks fairly promising for the foreseeable future. Now, Perseus has a very clearly defined hedging policy, and we have followed that policy for a long time.

Jeff Quartermaine

executive
#10

I'd probably say that over a long stretch it has served the company well, especially during periods when gold prices were softer than they are now. Through the June quarter, we kept actively managing our hedge position consistent with that policy. We delivered into forward sales contracts for roughly 39,080 ounces at a weighted average hedge price of $1,353 per ounce. In addition, we sold another 38,747 ounces at spot prices, averaging $1,738 per ounce. That brought total sales for the quarter to approximately 78,000 ounces at a weighted average price of $1,544. As the quarter closed, our overall hedge position comprised forward sales of 323,000 ounces of gold in total at a weighted average price of $1,442 per ounce. That's 5,700 ounces above what we reported at the close of last quarter. I should also note that the average price across the entire hedge book rose by $49 per ounce over the quarter. So we've been handling it quite prudently, lifting the average as the gold price has flowed through. These sales give us downside protection covering roughly 22% of our forecast gold production across the coming three years.

Jeff Quartermaine

executive
#11

Put another way, although some price protection is in place, 78% of our production remains exposed to the gold price. The next matter I want to bring up, I suppose, is the continued turnaround at Edikan. Those who have tracked the Perseus story for some time will be aware that a couple of years ago, we turned Edikan around, taking it from a struggling operation to one producing steady levels of gold and reasonable amounts of free cash flow every quarter. You will also be aware that in the last quarter, our streak of strong results was broken by a hiccup that caused the gold recovery rate to drop quite sharply, temporarily reducing our production levels and pushing our unit costs higher. I am very glad to report that we have reversed that situation during the last three months, and the improving trend is carrying on very strongly into the current quarter. To sum up, in the June quarter we produced 41,281 ounces, as I mentioned earlier, up from 38,000 ounces in the prior quarter. The production cost came to $906 an ounce, and the all-in site cost was $1,049, well below the previous quarter. Gold sales came to 51,168 ounces, achieved at an average price of roughly $1,528 an ounce, which gives a margin of $479 per ounce — about $200 an ounce above last quarter — and generated cash flow at Edikan of approximately $20 million for the quarter.

Jeff Quartermaine

executive
#12

So at 90%, mill runtime came in slightly ahead of what we saw in the March quarter. Weighted average head grade was roughly flat at 1.06 grams per ton — a little bit lower, in fact, just marginally beneath the prior quarter's figure. The quarter's major gain came on the gold recovery side, where we averaged 76%, well above the 61% recovery posted in the previous quarter. That gain stemmed mostly from having less ore from the Bokitsi pit concentrated in the mill feed. As our experience in the March quarter showed, a big share of Bokitsi ore in the feed hurt the recovery process. Throughput this quarter reached 819 tonnes per hour versus 923 tonnes per hour, and that gap mirrors two factors. First, softer Bokitsi ore in the feed was swapped out for harder ore from Fetish, which pulled the throughput rate lower. Second, and here's where COVID enters the picture, we had to baby the crusher somewhat over the quarter, since we couldn't get specialists in from South Africa to perform certain crusher repairs.

Jeff Quartermaine

executive
#13

And instead of risking a failure, we had to handle that quite gradually. In any case, the drop in throughput rate was more than offset by higher recovery rates, which came about because of the blend change. So throughput rates fell by 11%, while recovery rose by 25%, cutting the quantity of Bokitsi ore. It also brought down slightly the head grade of ore processed. Still, it should be noted that this is not a loss of gold. It is merely a deferral of the gold, since Bokitsi ore will now be processed across a longer stretch of time than originally planned. And with the approach we use, it doesn't affect recoveries the way it did in the March quarter. Doing it over a longer stretch of time truly makes no difference to us at all. I noted that production costs of $906 an ounce fell by 17% quarter on quarter. That was driven by mining unit. Mining costs declined. They came in at $3.08 per ton versus $3.24, largely because of lower drill and blast costs plus some savings on fuel prices from the global drop in oil prices.

Jeff Quartermaine

executive
#14

Processing costs came in at $8.43 per ton, compared with $8.75 per ton previously — a decrease driven mainly by lower power costs. That drop stemmed from a move by the Ghanaian government in response to the COVID crisis. It also reflected the fact that the national electricity grid held up better during the quarter, so we needed to produce less power ourselves by running our standby diesel generators. G&A costs for the quarter were $1.63 million, a modest decline from $1.79 million in March. I should note, though, that the March figure was substantially inflated because of government back charges related to mineral rights stretching back many years. The June quarter G&A costs do include expenses tied to steps we've taken to fight COVID-19. Those include extra transport costs, meals, accommodation, incentive payments, and so on. Actually, I should have mentioned that earlier. Across the entire company, the operating-level cost of handling COVID comes to roughly $20 an ounce. So when I refer to all-in site costs, it's worth keeping in mind that this amount sits inside that figure. As I mentioned, the all-in site cost at Edikan has fallen by around 16%.

Jeff Quartermaine

executive
#15

That is quite robust, especially given that our gold is being sold at $1,528 per ounce. Thanks to the turnaround at Edikan, output rose while expenses fell. I am delighted to report that through roughly the first 18 days of July, Edikan continues to perform extremely well indeed. The favourable patterns from the previous quarter have carried on, and operations are proceeding nicely — assuming, naturally, that no surprise emerges from the COVID crisis or anything else, for that matter. Broadly, the shift there has been a positive one, and we are happy with how that mine is running. Turning now to building our third mine, Yaouré: during this quarter we have kept up very strong momentum across every area. As I noted earlier, we remain on course to hit that stretch goal of first gold in December this year, despite the difficulties created by COVID. I ought to point out that the formal contracted date is January next year, though we believe we can outperform that somewhat. For anyone who has observed the mine's progress, or would like to see it for yourself, I would recommend taking a look at the drone video footage captured at the end of June and posted on our website, so www.perseusmining.com.

Jeff Quartermaine

executive
#16

Honestly, this provides an aerial perspective on what is taking place at ground level. Appendix A of the Quarterly Report also contains some photographs, and those photos convey a story too. But to sum up clearly, we're achieving very strong progress at that site. And we've accomplished this while maintaining a strong safety record. On this project we surpassed 3 million hours worked with zero lost-time injuries. That milestone was reached in early July. And that's a record we're quite proud of, and it reflects credit on the team that has been toiling in challenging conditions at Yaouré. Engineering work off-site is now fully complete at 100%, and procurement, which includes deliveries to the site, stands at roughly 96% complete. So essentially everything required to construct the project is either already at the site or is aboard vessels en route to Abidjan. So we're in solid shape on that front. I won't walk through every detail of on-site progress, chapter and verse. All of that is available in the Quarterly Report. But it's enough to say that matters are proceeding remarkably well. And to give you a sense of scale, the ball mill and the SAG mill are set to be lifted into position this week, on Thursday or Friday as I understand it.

Jeff Quartermaine

executive
#17

Hydraulic testing is underway on the CIL tanks. The crusher components are set to go in late in the first week of August. The TSF works are essentially finished. And I believe the plastic lining on the TSF is roughly 15% done. Our permanent camp is basically complete. People have already moved into the accommodation blocks. There are only a couple of ancillary buildings left to finalize plus a bit of landscaping, and then the camp will be finished too. Our mining contractor, EPSA, has its team on site now. Their equipment has been arriving gradually over the last couple of months, and they'll begin building their facilities very, very soon. On the financial side of the project, as at the end of June — at the end of June — we capitalized $166 million of expenditure and paid roughly $156 million to suppliers of goods and services. So that's about 59 to 60% of the $265 million budgeted for the build. All told, our commitments come to $204 million, which is about 77% of the budget. And that means costs are pretty much locked in as we speak, and the risk of overrun is quite small at this stage of the game.

Jeff Quartermaine

executive
#18

To repeat what I mentioned before, provided nothing else gets pushed back, our ambitious goal of pouring first gold by the close of the year — December 2020 — can be met. And we are definitely making every effort within our power, together with our contractors, to reach that milestone. It would be an oversight on my part, though, when discussing Yaouré, to leave out the fact that we recorded our initial COVID cases at the site just after the quarter ended. We responded very quickly to this, and we think we have managed to keep the virus from spreading. Even so, we must not play down the danger the virus poses to us, particularly over the coming six to eight weeks. Once that stretch has passed, the number of workers on site drops quite substantially, and we will then be able to seal off the site in the same successful way we did at Edikan and Sissingué, where in fact we have recorded zero COVID cases whatsoever. That, hopefully, means commissioning can be finished without a hitch and we can reach the ambitious goal we have set for ourselves. Should we manage it, it would represent a tremendous achievement for our people and for our contractors' teams, yet it is far too soon to declare success at this point, and we will undoubtedly remain anxious right up until the first gold bar is poured later this year — and at that stage, naturally, an entirely new set of difficulties will emerge, though we will not get ahead of ourselves on that front.

Jeff Quartermaine

executive
#19

What I mean is that COVID-related costs on the construction have added roughly $1.1 million to the project's total cost. That is a relatively modest figure, and it sits comfortably inside the contingency built into the original budget, so there is no risk of a cost overrun arising from it, though handling the COVID situation definitely does involve spending money on the items I listed earlier — transport, quarantining, and so on. But our general stance is that safety and health of people come first, and at the end of the day that is a reasonably small price to pay. Turning now to exploration and similar matters, our exploration team has been highly active during this quarter at Edikan, Sissingué, and Yaouré, each of them. And they are beginning to produce some quite interesting results, which are fully tabulated in the Quarterly Report. We had some quite interesting hits at Yaouré at a location known as Sayikro. Now, the intercepts themselves are not remarkably high, but the interesting part is that they seem to sit at the tail end of the CMA structure, which is the principal gold-bearing structure that we will be mining at Yaouré. And these hits are situated several hundred meters away from the current boundary of the CMA pit.

Jeff Quartermaine

executive
#20

If that proves to be the case and we can extend the strike length of the CMA deposit by a couple of hundred meters, that would represent a major win for Yaouré and for our shareholders. In a similar vein, during the quarter we finished the 3D and 2D seismic surveys at Yaouré. This process yielded a vast amount of data, which is currently under analysis. Results should begin to emerge in the December quarter. Frankly, it will be interesting to see those results, particularly given our plans to develop an underground mine at Yaouré. At Edikan, we have secured options over three contiguous properties situated 8 km from the Edikan processing plant. This is a very prospective land holding, and we cannot wait to begin drilling out there. Unfortunately, we have been impeded in that regard by, I guess, differences of opinion between ourselves and local farmers who, we understand, are receiving benefits from some illegal miners in the area. We do expect that the law of the land will prevail fairly shortly, and that access will become possible. In the meantime, we have been drilling at a deposit to the south of the existing Edikan pits that lies on our existing mining lease, and we have been getting some very, very interesting assays coming from that.

Jeff Quartermaine

executive
#21

A few of those results have been really spectacular, and the next job will be figuring out whether they fit together, but this is definitely interesting and might give Edikan some extra mill feed. Now, over at Sissingué, we had been prepared to walk away from a deposit called Tiana, yet during the most recent drill program we hit some genuinely spectacular results there. Now, as I've mentioned before, securing excellent drill intersections around Sissingué isn't a particularly big challenge. The challenge is getting enough of them to build a minable resource. And it will be fascinating to see what we can eventually make of Tiana. That said, it's always preferable to get assay results like 32 meters at 208 grams or 14 meters at 476 or 2 meters at 3,298 than to be left with a blank score sheet when the assays come back. But we aren't getting massively excited. Let's see what happens here, and it could be something or it could be nothing. But as I say, better to get hits like that than not. The real interest around Sissingué, though, I suppose over the last couple of months, has been our offer to acquire Exore Resources, which is an exploration company listed on the ASX.

Jeff Quartermaine

executive
#22

We announced our offer on 3 June, and right now the deal is moving through completion via a scheme of arrangement. Formal scheme documents, which included a technical expert's report, were lodged with ASIC last week. A couple of weeks from now, once those documents have been reviewed, we expect dates to be scheduled for a meeting of Exore shareholders as well as court hearings to consider the outcome of that shareholder meeting. We're reasonably hopeful the matter will wrap up favorably near the end of this quarter. There is, of course, plenty of information circulating in the market regarding Exore, the proposed transaction, and the reasoning behind the offer we've made. I won't go into those details here, but anyone who wants to look can find them on our website. The main points worth noting, however, are that by acquiring Exore, Perseus will come to own roughly 2,000 sq km of highly prospective ground in northern Côte d'Ivoire, near our operating Sissingué mine — extremely close to Sissingué. Back in December 2018, Exore picked up an 80% joint venture interest in a pair of exploration permits comprising the Bagoé and Liberty projects.

Jeff Quartermaine

executive
#23

Together they span roughly 816 sq km. Those were obtained from Apollo Consolidated Limited. Then, after the scheme was announced, Exore picked up the remaining 20% stake in that joint venture. Exore additionally reported a JORC-compliant mineral resource at Bagoé. Well, the specifics are set out in Exore's recent market announcements, and I'm somewhat constrained in how much detail I can give on this resource without possibly breaching JORC or ASX reporting requirements. So I'll just point you to Exore's recent media releases to see how extensive that discovery is. But it's fair to say that Sissingué, as of 1 July this year, has a mine life of three years. And by acquiring Exore's land package, which includes that defined mineral resource at Bagoé, Perseus will have the option either to develop the Bagoé project as a new mine, potentially leveraging the Sissingué infrastructure, or instead to delineate additional mineral resources at Bagoé that could be economically mined and hauled by truck to the Sissingué plant for processing. That could add materially to Sissingué's forecast mine life. Given how well the Sissingué mine and its team are performing, this will be a very good outcome for all of Perseus' shareholders.

Jeff Quartermaine

executive
#24

To wrap up, as I mentioned when we began this presentation, these are uncertain times we're living in. All of us are facing certain difficulties because of the COVID-19 pandemic. Up to now, we've confronted these directly, and up to now, we're ahead of the game. What comes next is still to be seen. We have great confidence that by remaining vigilant and being proactive the way we have been, we will come through this successfully. So far, so good. On the operations side, the June quarter has been very solid, just as we predicted. We anticipate that the September quarter will be even better, which is clear from the market guidance we published today in this report. The September quarter definitely got off to a strong start at both operations. As I said, that's not the 18th. It's roughly a sixth of the way through the quarter. We are producing toward the top end of the guidance range. Now, whether that can be sustained for the remainder of the quarter and the one after it is still to be seen, given everything that's happening. But one thing you can be absolutely sure of is that all of us at Perseus will be giving it a very big shake and doing our absolute best to deliver those outcomes.

Jeff Quartermaine

executive
#25

On the development side, Yaouré is genuinely heading in the right direction, with outstanding progress both on the ground and off-site. We're eager to keep showing investors that progress by putting our video footage up on the website. Like I've said, a picture is worth a thousand words, and I believe that holds completely true when you watch those videos. We're also very much looking forward to the close of the year and to hitting that stretch target in December, when we pour first gold. On exploration, as I mentioned, we're stepping up our efforts not just to lengthen the life of our current operations but, we hope, to find our next mine as well. We've definitely developed some intriguing targets, and we'd like to think we'll be sharing some positive news on that front before long. On the financial side, we grow stronger every day thanks to solid production performance, lower costs, and robust gold prices. Come year-end, we'll have three mines in operation and a strong balance sheet. Where that takes us is still to be seen. Still, it's fair to say that Perseus' shareholders will reap the benefits of what we are building here, slowly but surely.

Jeff Quartermaine

executive
#26

Thanks a lot for that. That covers the June quarter. At this point, I'd be glad to answer whatever questions you might have.

Operator

operator
#27

Thanks, Jeff. Just a reminder for investors: if you'd like to ask something, please send your question through the Q&A panel in Zoom. Our first question is from Richard. When do you expect the Edikan crusher maintenance to take place, and how will that affect production and costs in the second half?

Jeff Quartermaine

executive
#28

Okay, regarding your question on how production is affected—I believe the guidance we provided shows where production stands. As for the timing of the actual maintenance work, it happens more or less continuously. On securing the outside specialists we require, we're hoping to have that wrapped up very early in August. Right now we're running into a bit of difficulty making that happen. I have to say the tradespeople are somewhat hesitant about a two-week quarantine, which entering Ghana would require of them. We're holding discussions about that. Still, we'll bring them on board as soon as we practically can. We also have a substantial number of spare parts on order, and those will arrive progressively over the course of this quarter. So the risk tied to all of that will fade as the quarter moves forward. And going forward, we'll manage it carefully and keep managing it carefully. I'm quite confident we won't experience any significant effect on production as we move ahead.

Operator

operator
#29

Kate is up next with a question. She notes that recoveries at Edikan have been somewhat weaker than in earlier quarters, and she asks whether Bokitsi Ore — apologies if I'm saying that wrong — was the cause. She also wants to know if we still expect to get back to that mid-80s target.

Jeff Quartermaine

executive
#30

Yeah, I believe that's the goal we're aiming for. And we do see it now and then on the occasional day, though not on average right now. So the trend is definitely encouraging and it's positive. Yes, Bokitsi Ore is a factor. Another element that plays a role is that what we do is we put as much material through the mill as we mine. But we fill any extra capacity with ore from the run-of-mine stockpile. That stockpile holds a mix of fresh, transitional, and oxide ore. And at times it also wreaks havoc with the blend. So it's very much a 24/7 situation. We have to watch that incoming blend very closely and make sure we don't overdo any part of it that would have an impact. But certainly, the trends we're seeing are good and very encouraging. And as I said, we do have some very good days, but we aren't having very good days every day just yet. Hopefully, that's what will happen in the fullness of time.

Operator

operator
#31

Our next question is from Patrick. He'd like to know whether you can clarify how much of the production shortfall came from Edikan versus Sissingué.

Jeff Quartermaine

executive
#32

I don't know which of the production shortfalls you mean.

Operator

operator
#33

He also would like to ask this: regarding Sissingué, what is the right way for us to view the shortfall in grade reconciliation that has come up recently? Is that yet another question that is?

Jeff Quartermaine

executive
#34

Honestly, I'd tell you not to be concerned about that in the least. What we've observed at Sissingué throughout the mine's life is that it hinges on your location within the ore body. It fluctuates. Early on, reconciliation came in negative. After that, we saw quite strong positive results. Things have dipped somewhat over the past couple of months. What we'll do is adjust the resource model slightly, and we'll achieve tighter correlation for mine planning purposes. It has no impact on the pit size that the optimization sets, and that will stay the same. Also, I should mention we're seeing some truly excellent grades right now. To put it plainly, we're currently in the higher grade section of the ore body, and it's doing remarkably well and very much in line with what we anticipated. So I wouldn't panic one bit regarding that reconciliation. We put it in the report for completeness. That said, we'll examine it closely this quarter, and should adjustments be necessary, we'll make them. Turning to the first part of the question, though, I'm not certain which production shortfall the listener meant.

Jeff Quartermaine

executive
#35

I mean, in the March quarter we did decline, and that was mostly because of Edikan rather than Sissingué. But in the current quarter, I think there's been a fairly strong rebound, as I mentioned earlier.

Operator

operator
#36

Thanks. We’ll take the next question from Adam. Regarding Yaouré, he’s asking what the main possible bottlenecks would be that could push back first production.

Jeff Quartermaine

executive
#37

Well, look, as I mentioned before, just about all the things we require are available on-site. So I don’t believe we’ll encounter any holdups when it comes to procurement and similar matters. The workforce is in place. It’s performing very well. Every specialist we occasionally need to bring in is arriving. The international borders opened, I believe, around the start of July or 8th of July or thereabouts. So we’re now actually moving our people into and out of the country. And we brought in specialists from Outotec, the mill people, the other day. So they are on-site right now for the mills’ installation. I think going forward, if we look ahead—as I mentioned before—to the next six or eight weeks, when we still require a lot of labor on-site, we face a risk of COVID infection. We believe we’re handling that quite well at present. We did have some infections the other day, and that was, I think, a bit of a salutary reminder to us regarding the risk that exists, and what happened there won’t be repeated. So that is a risk, that’s certain.

Jeff Quartermaine

executive
#38

Then naturally, as we reach the close of the year—around the December quarter—we'll be moving into commissioning, and once again we'll have to bring in commissioning specialists to carry out that work. Now, should the borders shut or anything of that sort happen, that would create some risk for us. But as I mentioned, nobody can really forecast what lies ahead. Still, the direction in Côte d'Ivoire is clearly toward opening the economy up, not shutting it down. Just last week, they announced that the strict travel cordon holding people inside Abidjan had been lifted, so folks are able to move around the whole country quite freely. And as I said, the international borders are open for international flights. So instead of moving toward closure, they really do appear to be moving toward opening up. I mean, I suppose that carries some risk regarding the spread of COVID. But as I said, we're handling that fairly well right now. So look, overall, we're more or less on track there, and everyone is quite determined to deliver on time. And should we miss the December date, it would only be a matter of weeks before we hit the date.

Jeff Quartermaine

executive
#39

I have complete confidence that we will finish comfortably inside the contractual deadline, which I believe falls in mid-January.

Operator

operator
#40

Thank you. At this point, we have no more questions. I'll turn things back over to Jeff now for some closing comments.

Jeff Quartermaine

executive
#41

All right, thank you so much for that. Like I mentioned, this has been a pretty solid quarter for us. We've achieved a fairly strong turnaround, and we're anticipating the next quarter with considerable optimism, given how strongly it has begun. We're very much looking forward to delivering another round of positive results to our investors and interested parties in 3 months' time. So, many thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.