Perseus Mining Limited (PRU) Earnings Call Transcript & Summary

August 25, 2020

Australian Securities Exchange AU Materials Metals and Mining earnings 32 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and thanks for joining the Perseus Mining Annual Financial Report 2020 Investor Webinar and Conference Call. <<operator_script>> At this point I'll pass things over to Perseus Managing Director and CEO, Jeff Quartermaine.

Jeff Quartermaine

executive
#2

Thank you so much. Morning, everyone, and thanks for being here on this webinar as we go through Perseus's financial results for the year ended 30th of June, which the Board approved last night and which went out to the market earlier today. Elissa Brown, our Chief Financial Officer, is with me on the call. Once I've run through an overview of the results, Elissa will be available to give a bit more color on particular aspects of the financial report, and then she and I will both be happy to take any questions you'd like to put to either of us following her remarks. So, turning to the trends. A successful move in fiscal '20 to being a gold producer with multiple mines across multiple jurisdictions. We posted earnings before interest, tax, depreciation and amortization, EBITDA, from our operations of roughly $274 million — $273.8 million, to be exact — which is an increase of around 67% versus the prior financial year. That fed through to a net profit after tax of $94.4 million, or $0.081 per share, against net profit after tax of $7.6 million, or $0.07 per share, last year. So that is a very substantial rise — a 1,146% increase in net profit after tax. And that is a big jump by anyone's measure.

Jeff Quartermaine

executive
#3

As has been shared before, the Perseus Group generated roughly 257,639 ounces of gold over the 12 months ending 30 June. Weighted average all-in site costs came to $972 for each ounce of gold produced. That figure was 1% higher than in the prior financial year. Gold sold during the year averaged USD 1,457 per ounce, roughly $200 an ounce above the prior financial year. Our substantially better financial results stemmed from a number of factors, among them the stronger gold price. Those factors, I suppose, encompassed a 16% rise in overall revenue to $591 million. And that -- what I mean is that it mirrored greater gold sales at Sissingué relative to the prior year, along with that stronger gold price I referred to. We likewise recorded an 8% drop in cost of sales for the year, driven mainly by reduced mining costs at Edikan, where we have effectively rolled out a revised mining strategy that shifted us from a 2-contractor operation to a single-contractor operation beginning -- effective from 1 January. So we experienced a full-year effect from that strategic change. Our depreciation and amortization expense totaled $134.1 million for the year, a decline of roughly 13% versus the prior year, owing to, among other things, reduced mining rates at Edikan as the revised mining strategy required.

Jeff Quartermaine

executive
#4

There's also a write-down and impairment expense of roughly $4.5 million in the result. That figure rose compared with the prior year — an increase of approximately $4.4 million. It's mostly tied to exploration expenditure that was written off around the Sissingué and Edikan mines. The results additionally contain a foreign exchange gain of $13.8 million. In fact, last year that gain came to $15.5 million. So the FX gain is actually lower by about $1.7 million. This FX gain comes about through devaluation of the Aussie dollar relative to the U.S. dollar, along with revaluation of intercompany loans. Another item worth noting in the result is that it includes income tax expense of $32.2 million. That's $34 million more than the prior year, when we recorded a benefit of $1.8 million. The higher tax reflects the start of paying Ghanaian income tax installments during the current financial year, after we applied accelerated depreciation for tax purposes in earlier years, as Ghana's tax laws permit. Turning to cash flow, operating cash flows rose 46%, or $67 million, in fiscal '20, reaching $213 million, or $0.182 per share, and as I mentioned earlier, that was largely driven by higher revenue and lower costs.

Jeff Quartermaine

executive
#5

During that period, we invested $270 million in cash overall. Most of it was directed toward developing the Yaouré Gold Mine — roughly $215 million went into Yaouré. Exploration also received investment, with approximately AUD 19 million allocated to exploration. We received net proceeds of $181 million from borrowing over the year, and we paid lenders $15.3 million in borrowing costs. So as of the end of June, cash and bullion on hand had a total value of $237.5 million, which is roughly $69 million higher than the prior year. That works out to an increase of about 41% in cash and bullion on hand — a fairly significant jump. At 30th of June, the company's net assets stood at $876 million, or approximately $0.75 per share, after accounting for that cash and bullion on hand of $237.5 million, as I mentioned, and also taking into account interest-bearing liabilities of $217 million — $217.7 million. Now turning to the future. Perseus' financial performance is expected to stay very strong, with continued solid gold production and cost structures improving at each of our mines. We previously released guidance for the December half year, which is as follows: we anticipate producing somewhere in the range of 125,500 to 139,000 ounces.

Jeff Quartermaine

executive
#6

And that ought to happen at an all-in site cost of roughly USD 940 to USD 1,025. Right now, we haven't provided guidance for the second half of the year, mainly because we expect to bring the Yaouré Gold Mine online toward the end of this year, so we'll produce our first gold from Yaouré late in December this year. And I think we'll have to wait and see how that goes and how quickly the ramp-up happens before we make any bold predictions about the second half of next year. However, I will note that the June half will involve production from 3 operating mines rather than 2, as has been the case in the current 6 months. So we would be looking to see a significant increase. Now one of the things, of course, is also that this year, having released the results that we have, we have not declared a dividend. However, as I said earlier, with Perseus becoming a 3-mine operator with steady cash flows and a reliable line of solvent cash, paying dividends is something we as a company are very keen to implement. And we'll be looking very closely at the situation once the Yaouré investment is completed and once we're in a sustainable position with our third mine.

Jeff Quartermaine

executive
#7

Basically, that sums up the 2020 financial results. Before I pass things to Elissa for additional remarks, I should mention that we released a report today running roughly 95 pages that covers everything thoroughly. After this call, then, should any questions come up that you'd like explained more clearly, my first suggestion would be to turn to that document. If that doesn't resolve things, though, feel free to reach out to any of us here in the room, or better yet by email. We'll make every effort to clear up whatever isn't immediately clear. So, Elissa, I'll hand it to you to shed light on anything I've mentioned that could assist our investors in grasping what we put out today — please go ahead.

Elissa Brown

executive
#8

Thanks, Jeff. Before we move to questions, I want to expand on a few items. Net profit after tax came in at $94 million — a very strong outcome and a substantial rise versus the prior year. One factor behind that was the higher gold price we received, which had a meaningful effect on revenue. The average price received this year was $1,457 an ounce, up 16% on the prior year. That reflected gold deliveries split between spot, at roughly 70%, and forward sale contracts, at 30%. Perseus does run an active hedge program, and as of 30th of June '20, we had 323,000 ounces of gold sold forward at an average sale price of $1,442 an ounce — equal to 22% of anticipated gold production over the next 3 years. On depreciation and amortization, that came down from the prior year because of lower mining rates at Edikan, as Jeff mentioned. Beyond that, since the reserve at Edikan was increased substantially in the second half of the year, the remaining written-down value of mine properties is now spread across more tonnes, which produces a lower fund amortization rate. Edikan began paying tax this year after using up all carryforward capital allowances.

Elissa Brown

executive
#9

That came about through accelerated depreciation, which, as Jeff noted, complies with Ghanaian income tax legislation. And clearly we anticipate that, going forward, we will keep paying tax at Edikan. The finance costs shown in the statement of comprehensive income are tied to charges on the debt facilities Perseus held before it put the new corporate facility in place. A majority of the costs connected with the new facility were capitalized. And as you can observe, cash paid for borrowings during this year totaled $15.3 million. Working capital rose $70 million for the year versus the prior year, mostly because cash grew following the full drawdown of the corporate facility. So during the year we established this corporate facility in order to retire the earlier Edikan and Sissingué debt facilities and to supply funding for the Yaouré development project along with other corporate needs. Given the COVID-19 pandemic, the entire facility was drawn down, consistent with the strategy of ensuring the business remains stable amid the uncertainty created by COVID. The expectation is that, once construction at Yaouré is finished and the mine is in operation, a substantial portion of the facility will be repaid early in the following year.

Elissa Brown

executive
#10

My final remark concerns the remuneration report. For us, this is a year of transition. Historically, the STI payments we reported reflected awards from earlier years and so did not really align with what we were reporting for the current year. This year, we moved our performance review process forward so that the current year STI could be recorded in this year. Consequently, the remuneration report reflects both the 2019 and 2020 STI. Going forward, only the current year STI will be recorded and reported, so that it aligns with the results we present on production and costs. I am now happy to take any questions you may have on the financial report.

Jeff Quartermaine

executive
#11

All right, go ahead.

Operator

operator
#12

<<operator_script>> Our initial question is from Nick Herbert.

Nick Herbert

analyst
#13

Can you hear me all right?

Jeff Quartermaine

executive
#14

Absolutely, that's a definite yes.

Nick Herbert

analyst
#15

I have a couple of clarifying questions, if that's alright. First, on Yaouré, could you remind us whether there are any special tax concessions, accelerated D&A, or anything of that kind we should keep in mind for our accounting next year? And also, just to confirm, revenue OpEx will all be capitalized until commercial production is reached. So presumably, that means at least the first half of Yaouré will be capitalized.

Jeff Quartermaine

executive
#16

Yes. Okay, let me just respond to that. So we have entered into a mining convention with the state in Côte d'Ivoire, which does provide for a final year tax holiday. So that will apply from the commencement of operations. So there won't be corporate tax paid in that period of time. However, there will be a good deal of indirect tax paid on...

Elissa Brown

executive
#17

On the royalties side.

Jeff Quartermaine

executive
#18

For the various individuals engaged in this project. So it isn't as though we're avoiding taxes in the country; it's simply a matter of how the corporate tax gets paid. Turning to ramp-up, your point is completely correct. We will announce commercial production at whatever moment we feel confident that we have reached cash positive status. How long that will take is still uncertain. Sissingué ramped up faster than we anticipated. It was extremely, extremely swift. And we anticipate — we look forward to a smooth, trouble-free ramp-up at Yaouré too. So I don't wish to venture a bold forecast about precisely how long it will take. But I would be very surprised, in fact, if we haven't declared commercial production by the close of the first quarter. Still, that remains to be seen. During that initial 3-month stretch, naturally, we will be producing, and costs will be incurred in the process. We'll make every effort to be transparent about all of it. For accounting purposes, though, it won't be reflected until after we have actually made that declaration. Regarding the ramp-up, I should note — so that people grasp exactly what will happen at Yaouré — that during roughly the first 6 or 9 months of production from Yaouré, we will be doing 2 things.

Jeff Quartermaine

executive
#19

You'll see us actively taking waste rock out of the CMA pit, and that pit is the main source of ore for the bulk of the currently defined mine life. While that work is going on, we'll be running lower-grade material through the plant, and part of that feed will come from the Yaouré pit, with another part coming from the heap leach pad. As a result, the opening year — or 9 months of output — will not hit the higher rates. That's why we've guided to an average of 215,000 ounces across the first 5 years. Years 2, 3, 4 and so on, we'd expect to be comfortably above that figure. But during that initial stretch, output will be weaker, which mirrors the lower-grade feed we'll be treating as we move into the main pit. I raise this because it would be a letdown if, this time next year, folks were saying, "Oh, gee, Yaouré isn't producing what we expected." There's a grade-related ramp-up over roughly the first 6 to 9 months or so of the mine's life. How fast we get into Yaouré depends on a number of factors. In fact, we expect to begin work on extracting material from the pit very, very soon.

Jeff Quartermaine

executive
#20

Still, we’ll see how that turns out. That’s also part of the reason we were reluctant to issue strong forecasts for the second half of the year until we had a solid grasp of how everything would unfold.

Elissa Brown

executive
#21

And Nick, you're right that up to the point we reach commercial production, both those costs and that revenue are going to be capitalized.

Nick Herbert

analyst
#22

Alright, that's genuinely useful. I have just a few steering questions at the group level. Could you share a D&A expectation or range for next year, along with an effective tax rate?

Elissa Brown

executive
#23

My expectation is that D&A will stay roughly at this level. Obviously, though, when we reach commercial production and Yaouré starts up, a very large asset will sit on the balance sheet, and that asset will be depreciated and amortized. So as Jeff said, I suspect that probably lands in the final quarter of the year. So I don't think it will make a huge difference to our depreciation and amortization. And the effective tax rate, I believe, will be near where it currently stands. So this year, I think, will reflect where the effective tax rate goes going forward, because both Sissingué and Yaouré, as Jeff mentioned, will benefit from a 5-year tax holiday. It's really just reflecting Edikan's tax rate.

Nick Herbert

analyst
#24

Understood. Alright. Lastly, perhaps one more question of an operational nature regarding Yaouré, Jeff, if you don't mind. I'm curious about what the plan is for exploration or for converting drilling results there, particularly given what you already hold in resource and that chance to convert it. I'd just like to understand the timing around when we might see that work delivered to strengthen the reserve, or whether it is simply about getting into the reserve at this point and later on that work will follow — yes, just trying to grasp that broader opportunity.

Jeff Quartermaine

executive
#25

Alright, and no — I appreciate you raising that. It's a solid question, and it's something very much on our minds right now. As a company, we're obviously focused on where we're heading going forward. We already have 4-and-a-bit years of production at roughly the 500,000 ounce per year level secured within the current reserves from fiscal '20 to '22 onward. But what we're trying to do as a business is make sure that roughly 500,000 ounces per year carries on well past that first 4.5-year window. So we've made a very firm commitment as a company to an organic growth strategy — meaning we put capital into exploration and into optimizing assets across each of our 3 operating areas. At Sissingué, there's genuinely a tremendous amount of opportunity to convert — and not just to convert resource into reserve, but also to bring additional resources into the picture. We've been drilling south of the CMA pit, and the results down there have been very encouraging. It really does look like there's a very reasonable chance that the CMA ore body keeps going for some distance along strike. That's an area we'll be concentrating on very heavily in order to bring it into the resource return over roughly the next year.

Jeff Quartermaine

executive
#26

We should also note that grade and trial drilling is underway right now on a few targets quite close to the pit that exists today. And one possibility here: if we can turn that into reserves before mining begins, a portion of that material might actually be destined for milling within the first 12 months instead of what's currently in my port. But I think the real prize at Yaouré comes from the underground opportunities we've had and have there. Now, we previously delineated 600,000 ounces of material that could be mined from underground. And we expect that would be converted into resource -- into reserves and brought into the mine plan somewhere in year, probably end of year 3 and year 4, that's the current thinking. However, what we've just completed, or completed in the last half year, was a 3-dimensional seismic survey over the area to see what happens to that structure we believe can be mined from underground. Now it's very early days as far as processing that data is concerned. But our team has seen some of the early results from it.

Jeff Quartermaine

executive
#27

And I’ll say they’re extremely enthusiastic — and it isn’t just us who are enthusiastic; HiSeis, the group that carried out the work, is also very, very enthusiastic about what they’re observing, since it’s very, very clear that the structures continue. But quite some distance, it’s also very, very clear that structures repeat, and it’s also very clear that other structures exist that we weren’t even aware of in that area. And most importantly, there’s a very, very large heat source, a very large granite sitting below the — quite some way below the bottom of the current pit. So everything needed to produce gold appears to be in evidence in that area. So our challenge over the next couple of years is to finish processing that data so we can really identify a sensible set of targets. And then it’s to commit to drilling those out and bringing them into the reserve. Now the fact that the gold price is high at the moment and the fact that we’re generating a lot of cash does give us the wherewithal to fund that organic growth strategy.

Jeff Quartermaine

executive
#28

That's something we'll be looking to accomplish over the next year and in the years after that. And from where I sit, that gives us the greatest chance to create value for shareholders — a much better value-creation opportunity than shelling out very high prices that any kind of M&A deal would require in today's gold market. So the exploration upside around Yaouré has us very, very excited. We've also got some genuinely strong targets at the other 2 properties as well. And so we'll be seeing a — it's going to be a central element of our business going forward to not only replace what we mine each year but to substantially grow that reserve inventory.

Operator

operator
#29

We’ll now take a question from someone joining us by phone.

Reg Spencer

analyst
#30

Reg Spencer from Canaccord here. I'd like to pick up where we left off regarding the Yaouré underground. Obviously, a scoping study was completed by you guys back in 2018. As further work gets done there, might we expect additional detail in the near term on the possible parameters of what that could look like? Or will that have to wait until you guys are at full production at Yaouré?

Jeff Quartermaine

executive
#31

Well, look, I think we won't be putting updated reserves out or resource reserves out until we move into the operating phase. I mean we would -- at this stage of the game, we don't have a firm date for that, but I mean -- for the release of that data. But I would imagine it would be in the first quarter of next year, and that will presumably include more information around the underground opportunity. I mean one of the results that we get from our drilling over the next 6 months is going to be influential on our thinking there as well. So I think it's tempting to rush this sort of information into the market, but we would prefer to be a little more thorough in that approach and to make sure that what we say is actually deliverable. And so we'll get something out as soon as we practically can, but it is pretty interesting, I do have to say.

Reg Spencer

analyst
#32

That's fair, Jeff, I'm with you on that. And one more question, this time about opportunities beyond the assets you already have. The Exore deal is due to close shortly. How much time do you figure will pass before we can begin considering what the resources on those properties could contribute — whether toward extending the life of Sissingué or toward a different development approach in which you might even consider relocating the mill?

Jeff Quartermaine

executive
#33

Reg, that's a very timely question around here at the moment. I'm not able to give you an exact answer. What I can say, though, is that we've been collaborating with the Exore staff and our own people to determine which drilling programs we want to carry out — not just at the Bagoe River property, where Exore previously announced a resource, but in a few of the other areas too. Our plan, then, is to begin that work right away and to reach a point where we can establish a mine reserve — or mine resource reserve — complete our feasibility study, and put it before the government for licensing purposes, all with the goal of getting mining started there in a couple of years from now. So I'd expect a reasonably steady flow of news from the Exore properties once the transaction — or assuming it closes in September. I realize I'm getting ahead of myself there, since as you know very well, it depends on shareholder approval and also on the courts signing off. And I don't want to get out in front of either of those.

Jeff Quartermaine

executive
#34

That said, this is something we're genuinely enthusiastic about, and there's a clear chance for us to extend the Sissingué project's life by a meaningful amount.

Reg Spencer

analyst
#35

Jeff, is there any risk that, for whatever reason — whether it's permitting access or even exploration success — a gap could open up if that work doesn't get completed within a sufficient time frame, and that's clearly what's driving your wish to get in there and begin as soon as possible?

Jeff Quartermaine

executive
#36

Honestly, claiming there's zero risk would mean flatly disregarding how life actually works. We're engaged — and we've collaborated quite effectively with the Ivorian government previously. Should our ties keep developing the way they are at present, a hold-up isn't something we anticipate. Still, to insist there's no chance at all would be denying reality. Any time you're up against bureaucracy — be it in Western Australia, New South Wales, or Côte d'Ivoire — events rarely unfold exactly as planned. That's why we must be ready for it. Along those lines, we're likewise, as a contingency, examining what plan B and plan C would be should any postponements arise from licensing. The kinds of things that could bridge a gap in such a case might include considering a deeper reduction at the Sissingué pit, or developing certain near-mine resources we've previously identified yet judged as not truly big enough to justify additional investment. So opportunities exist if a delay should appear on the horizon — though that's certainly not something we view as a high-probability event.

Jeff Quartermaine

executive
#37

Ignoring that possibility would be unwise. Even so, starting on day 1, we will work extremely hard to ensure that all licensing requirements and everything required to get a mining operation running are completed promptly.

Operator

operator
#38

We have no more questions right now. <<operator_script>> And in the absence of any additional questions, I’ll turn things back to Jeff for his closing remarks. We have no more questions at this point. Jeff, if you’d like to offer any closing remarks, go ahead.

Jeff Quartermaine

executive
#39

Yes. No, thank you very much. And as I mentioned, we really appreciate you all joining the webinar. As you can see, we're extremely happy with what has been achieved this year. We view it as a reflection of the strategy we put in place a while back to turn Perseus into a dependable gold producer operating across multiple mines and multiple jurisdictions. As you've also gathered from the commentary, there is considerably more still to come. And certainly, Yaouré will be a very significant addition for us as this year unfolds, and we have further opportunities beyond that too. So I think this year's result, good as it is, marks the start of a strong trend in financial performance for Perseus Mining. We share -- we're very much looking forward to sharing that with you in the years ahead. So thank you very much, and we'll speak again shortly.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.