Perseus Mining Limited (PRU) Earnings Call Transcript & Summary
July 20, 2021
Earnings Call Speaker Segments
Nathan Ryan
executiveGood morning, everyone, and thanks for joining the Perseus Mining webinar covering the quarterly activity report for June 2021. <<operator_script>> At this point I'll pass things over to Jeff Quartermaine, who serves as Managing Director and Chief Executive of Perseus Mining. Thanks, Jeff.
Jeff Quartermaine
executiveThanks so much, Nathan, and hello everyone joining Perseus Mining's webinar on the June quarter. Today I want to give those listening a rundown of the June '21 quarterly report we put out to the market earlier this morning, and after that we'll hold a Q&A session to cover any questions that appear either from that report or from a presentation. Now, at the risk of people saying I sound like a broken record every quarter, I'd note that Perseus has delivered yet another robust quarterly result — this time turning out 102,788 ounces of gold, which is 16% above the March quarter and 50% higher than the December quarter. Along the way, we achieved a cash margin of USD 605, or roughly AUD 820, on each ounce produced. That translated into notional cash flow of USD 62.1 million for the quarter, along with a rise of more than $50 million in our net cash position compared with the prior quarter. I think we can safely say Perseus is delivering on what we promised — moving the company toward becoming a dependable multi-mine, mid-tier gold producer and placing us squarely on track to hit our stated goal of generating 500,000 ounces or more of gold annually at a cash margin of USD 400-odd per ounce or better starting in fiscal '22.
Jeff Quartermaine
executiveOver the quarter, all 3 of our mines did extremely well — Edikan in Ghana, plus Sissingué and Yaouré in Côte d'Ivoire. In fact, Yaouré and Sissingué each came in comfortably above the upper limit of their own guidance ranges, for both the June half year and the full financial year to 30 June, which offset Edikan falling a little short of its targets. At the group level, we turned out 191,246 ounces in the half year and 328,632 ounces for the full year. And beyond setting new production records of our own, we have along the way beaten the top end of the market's production guidance range for the group in both periods. If that sounds a touch too self-congratulatory to some listeners in flagging these achievements, that isn't the intent. Still, it bears noting that Perseus has travelled a very long way in the last few years. And at moments like this, it's worth pausing very briefly to acknowledge what has been accomplished. These results, now, stem from plenty of hard work and resilience under challenging circumstances by what is today a first-class group of people employed by Perseus, distributed across 3 operating mine sites and several exploration sites in West Africa, local offices in Accra and Abidjan and, of course, our corporate office here in Perth.
Jeff Quartermaine
executiveI also want to acknowledge how much our Board of Directors has contributed, since they’ve steered the management team through this stretch. So my sincere thanks go out to everyone who played a part, and I should include their families too, because they gave a great deal of backing while we dealt with the COVID pandemic over recent times. I should mention as well that the results we’ve delivered came about in a fairly sustainable way, as our very detailed 2020 Sustainability Report set out — that report went to the market early in the June quarter and was well received by an investing public that appears to be paying growing attention to these matters, together with their many advisers and rating agencies. So to sum up, Perseus as a company once more turned in a very strong performance during the June quarter, and it remains in a very good position. And for anyone who hasn’t yet had the chance to go through our June quarterly in any detail, let me spend a brief moment going a little deeper into the main parts of the performance and then take questions. So first, let’s talk about the Yaouré mine, which as you know is our newest operation.
Jeff Quartermaine
executiveIn the quarter, Yaouré yielded 37,343 ounces of gold, and for the half year we came in at 59,438 ounces — comfortably ahead of the 48,000 to 52,000 ounces we had guided for the June half. All-in site costs for the half year came to USD 1,036 per ounce, below the guided range of USD 1,100 to USD 1,300 an ounce. I should point out that this figure really reflects all-in site cost for the June quarter alone, because before we declared commercial production on 31 March, all costs were capitalized under generally accepted accounting principles. This was quite a remarkable performance by the team at Yaouré. Over that half year period, we commissioned the plant and ramped up production while also confronting — and successfully resolving — 3 separate incidents of major equipment failure, which occurred during commissioning in the March quarter. On top of that, they had to cope with power rationing imposed by the Ivorian power authority in this June quarter. As a result, from roughly mid-May onward, we operated with reduced power draw for a significant part of each day. Yet despite these challenges, the team found a way to live one of our core values and deliver on our promises by doing what we said we would do.
Jeff Quartermaine
executiveTurning to the electricity situation in Côte d'Ivoire, that served as something of an eye-opener for us, and since then we have installed and commissioned an 18-megawatt backup power station at Yaouré. Beyond that, the Ivorian power authority center resolved its own problems. So everything is fine on that side. And as of earlier this month, July, our power allocation went up, and we have largely been operating without disruption. We intend to put out a revised life of mine plan for Yaouré in mid-August. That is somewhat later in the month than we had previously signaled. But it will line up with the publication of our group reserve and resource statement update, which we typically issue each year a little before we release our financial report for the year ending 30 June. That should be published around -- roughly the 20-something -- or the 20, I believe it is, of August. This year, we have made incremental additions to the Yaouré reserve and resource inventory. And instead of muddling things by putting out these documents separately, we have delayed the life of mine plan, and the documents will be published at roughly the same time. As I mentioned, this life of mine plan rests on a mineral resource that incorporates a modest increase relative to the original DFS, but it will not incorporate the extra resources that came from the recent drilling of Yaouré underground targets.
Jeff Quartermaine
executiveOnce we've estimated those extra resources, we expect that to materially extend the life of mine. Further updates on that, though, will come later in the year and beyond. The life of mine plan update, however, will reflect actual costs, and I expect this will show improved project economics compared with the DFS. So Yaouré is up and running very successfully. And having visited the site myself early in the June quarter, I can say it's everything we had hoped it would be. So far this month, we've been feeding 100% high-grade fresh ore from the CMA pit into the mill. And the results are very encouraging, and let me just say that without going into detail, very encouraging. And at our other Ivorian mine, Sissingué, we produced 23,224 ounces of gold there during the quarter, or 48,763 for the half year, once again comfortably above our production guidance range of 39,500 to 43,000 ounces for the June half. Our all-in site costs for the period were $715 an ounce, which was in the guided range of $650 to $725. Mining costs have gone up a little at Sissingué as we got deeper into the Stage 3 pit relative to the last half year.
Jeff Quartermaine
executiveAlso during this quarter, in U.S. dollar terms, we felt the effect of the euro getting stronger and hence the <<inaudible>> versus the U.S. dollar over that stretch. That hit diesel costs in particular, since diesel, as you're aware, powers not just the mining fleet but also the Sissingué power station. To slide this, it has been an excellent year for Sissingué over this financial year. On the production side, everything has gone very well, month after month. We beat most, if not all, of our production KPIs, including run time, grade and recovery. That let us turn out 104,672 ounces of gold for the year at a weighted average all-in site cost of USD 676 per ounce. With the strong gold price we benefited from all year long, we were able to bring in close to $105 million of notional cash flow from Sissingué by itself. Anyone who has tracked us for some time will recall that this is roughly what it cost us to construct this mine. Since the capital invested in Sissingué was fully repaid in early 2020, that cash flows directly into equity, which is a healthy return on our investment.
Jeff Quartermaine
executiveThere was another positive development for Sissingué in the quarter — or actually, it happened a couple of days after the quarter closed — when President Ouattara, the Ivorian President, signed a decree that grants the long-awaited exploitation permit for the Fimbiasso area. That has been a long time in coming. Now that the license has been issued, though, we are able to plan the future with confidence. We have also been finalizing a definitive feasibility study covering the Antoinette, Juliette and Véronique deposits, which sit on the Bagoé tenement — the Bagoé exploration tenement. That DFS, together with an environmental and social impact assessment, will be lodged with the Mineral Commission in early August, along with an application for an exploitation permit covering this area. We are now confident that the concept of satellite mining has gained acceptance from the Ivorian government, given the issuance of the Fimbiasso EP. Approval of the Bagoé EP ought to come through reasonably quickly. In any event, once the Bagoé DFS is complete, we will begin preparing an optimized life of mine plan for a combined Sissingué, Fimbiasso and Bagoé operation. Our expectation is that this will push the life of the Sissingué operation past fiscal '24 even if nothing further is discovered on any of the licenses, which at this point appears fairly unlikely.
Jeff Quartermaine
executiveSo to wrap up, fiscal '21 was a really strong year for Sissingué. Unless we uncover additional very high-grade ore, production lines over the coming years won't be as robust. Still, as long as we maintain control of our costs and continue producing gold in sensible volumes, we'll keep generating incremental cash flow — and there's absolutely nothing bad about that. Moving now to the Edikan mine: June quarter output came in at 42,221 ounces at $1,217 per ounce, which was slightly under what we'd anticipated on both the production and cost fronts. It did mark an incremental gain over both the March and December quarters, yet we had actually been hoping for a somewhat better result than that. For the half year, though, we turned out 83,045 ounces of gold at $1,213 per ounce, which looked favorable next to the December half. That said, as I mentioned, we ended up a little short against the guidance parameters for our half year market. A number of factors contributed to this. In the course of the period, maintenance at 2 of our key contractors slipped behind schedule, which cut equipment availability at a critical time set — meaning we couldn't get at the ore we'd planned to access during that period, and I'm referring to some relatively high-grade ore in the AG pit.
Jeff Quartermaine
executiveNone of that material was lost. It simply wasn't mined when we had expected to mine it. That also meant we had to add ore from our other resources to the mill feed, including low-grade run-of-mine stockpiles, and doing so changed both the grade and the hardness of what we were feeding in, which hurt throughput rates, and all of that hit production. The second factor was specific to the Fetish pit, our other main pit, or main source of ore, for the quarter. As we noted in the March quarter, reconciliation of processed tonnes and ore grade against the mineral resource block models at the Fetish pit fell short of standards — below industry standards — and that carried on into early April. So to fix it, we moved quickly to start an infill drilling program. We drilled roughly 1,100-odd meters across 9 RC holes, and after that we revised our geological interpretation of the Fetish ore body, which included narrowing certain high-grade gold-bearing structures. We then updated the Fetish mineral resource model to match more closely the tonnes and grades that grade control was recording in the March quarter and around April.
Jeff Quartermaine
executiveSo because of that, grade and reconciliation got better starting in May. But looking at the full quarter, the ore grade that came out of Fetish was also below what we'd originally planned, and that had a direct effect on gold production as well. On the positive side, though, we're back on track now. And in June and in July — certainly in July, where I think as of this morning, or up to the 18th, we're roughly 8% ahead of our budgets or thereabouts. So Edikan does appear to have gotten back on track. Look, Edikan has never been an easy mine, but we're a fairly resilient group and we've gotten quite good at spotting problems and fixing them quickly and successfully. That said, the difficulties we've faced at Edikan over the years were the main reason we adopted a corporate strategy of diversifying our production portfolio and adding more mines in different jurisdictions, which is exactly what we did by developing the Sissingué and Yaouré mines. Now every one of our mines will have good stretches and not so good stretches from time to time.
Jeff Quartermaine
executiveHowever, throughout the whole group, we do anticipate being able to reliably hit our group budgets and reach or perhaps surpass our group targets. That is definitely what occurred throughout the portfolio during the June quarter, the June half year and the 2020 financial year -- 2021 financial year, and we fully expect that it will once more be repeated in the periods ahead. Now, turning to the periods ahead, we have given production and cost guidance to the market within our quarterly report for the 6-month and 12-month period to 31 December 2021. Now throughout the group, we're anticipating producing somewhere between 225,000 and 255,000 ounces in the 6-month period at an all-in site cost of $925 to $1,025. You can read in the report how that breaks down across the various mines. It's enough to say that the greater proportion of that gold will be coming from Yaouré. What that means in terms of the calendar year is that this calendar year, we'll be producing somewhere like 416,000 to 446,000 odd ounces in the range of $975 to $1,035 ounces. Now, look, as a general rule and with a measure of prudence involved, Perseus typically provides guidance to the market for 6 months in advance only.
Jeff Quartermaine
executiveWe are taking that same route once more in the current year. That said, I should note that we anticipate a modest increase in output during the second half of 2022, namely the June half, and as a result our projection of producing more than 500,000 ounces of gold starting in fiscal 2022 stays completely solid and completely within our sites. Moving on to how we stood financially across the June quarter. We have kept strengthening the balance sheet by bringing in robust cash flows and, if I may say so, through prudential -- or prudent -- financial management. The notional cash flow from operations of USD 62 million generated in this quarter let us cut debt by USD 30 million, finance exploration across all 3 sites, settle every kind of tax, including income tax in Ghana, pay dividends to the government in Côte d'Ivoire, cover corporate overheads and still hold a cash and bullion balance of USD 156 million at the end of March, which leaves us with a net cash position of USD 56 million once our outstanding debt of $100 million is taken into account. That net cash position is therefore USD 50.3 million better than where we stood at the end of March, so a substantial improvement. Obviously, a strong gold price is working in our favor, but at the same time strong production growth is working in our favor too.
Jeff Quartermaine
executiveSo in that sense, the timing around when our output increases has worked out extremely well for us. And with that in mind, should gold prices stay robust over the periods ahead, which is what a lot of people anticipate, then expecting our balance sheet to strengthen even more is a reasonable thing to do. Now, since somebody raised the question near the close of the session about whether we keep hedging a small portion of the gold we produce, the response is affirmative. At present, we have hedged roughly 20% of the production we expect to generate across the coming 3 years, at a weighted average price of USD 1,595 per ounce. That average figure sits about USD 43 above where it stood at the close of the March quarter, which reflects our approach of delivering into lower-priced hedges wherever feasible and swapping them for hedges at higher prices. This has let us lift the average value of the book up to this point, where it sits comfortably above our weighted average all-in site costs, which means that even on the hedged ounces, we can readily surpass the target we have set of a cash margin of $400 or better on our production. I should add as well that back in the particularly grim years of 2013 and '14, when the industry was peering into the abyss amid very weak gold prices, Perseus carried a hedge book at $1,600 an ounce.
Jeff Quartermaine
executiveThat hedge book from 2013 and 2014 is basically what kept this company from disappearing entirely. So we believe having a hedge book like the one we hold is extremely advantageous when it comes to making sure our business keeps running through every kind of price environment. Now, turning to the future — as I did when I talked about our balance sheet growth — the growth plans for Perseus' business are likewise something we discuss very regularly with investors and analysts. As I mentioned already, we're near to finishing the DFS covering development of a number of deposits on the Bagoé exploration tenement, and we intend to publish the updated life of mine plan for the Sissingué operation during the September quarter. That plan, as I noted, will bring in the recently discovered extensions of the Sissingué mineralization, along with Bagoé and the Fimbiasso deposits. Now, without getting ahead of that planning exercise, the life of Sissingué will definitely be extended, and we do anticipate further exploration success there. Speaking of exploration success, we've also launched a very substantial exploration program, currently expected to run at least 3 years, in the course of which we'll thoroughly examine a number of exploration targets identified very near existing infrastructure at each of Yaouré, Edikan and Sissingué.
Jeff Quartermaine
executiveAnd if we can pull off what we believe is achievable, we'll make a substantial contribution to the reserve and resource inventory. Right now, our expectation is that the greatest return will come from work close to Yaouré as well as Edikan. We've spoken before about the underground potential at Yaouré that we believe will significantly prolong that mine's life, but there are also several quite promising opportunities emerging at Yaouré that can be reached from surface. And we have a sense that we've barely begun to explore that region. Regarding Edikan, we've also recently commenced drilling at the Breman prospect we mentioned. That sits on the Agyakusu permit, where notable mineralization has been found at surface in our seasonal mine workings. Access to the plan has been difficult, but I'm pleased to report that the rigs are turning at Breman and we're highly optimistic about our chances of success. And I'm sure you'll forgive us if we're a bit circumstance -- circumspect when reporting exploration success in the periods ahead. Finding gold mineralization isn't a massive challenge in West Africa, I must say.
Jeff Quartermaine
executiveHowever, obtaining the development and monetization rights to that gold ahead of any rival entering does take a bit more work to articulate. That being said, we must be in a position to keep the market progressively updated on our exploration results as those results emerge. So where growth is concerned, it's clear that the organic revenue growth we're chasing is absolutely within our sights and appears to hold the potential for producing some fairly compelling outcomes. I should add at this point that in-house technical and commercial teams also routinely evaluate potential inorganic growth opportunities in the business, whether through mergers or acquisitions. Interestingly, over the last couple of weeks, a number of people have told me they know from good authority that Perseus is supposedly poised to swoop on a variety of companies, some of them more improbable than others. Rest assured that should we choose to transact, 2 things are certain. First, the market will be kept fully informed ahead of individual investors, I might add, and second, the transaction will serve the best interest of our shareholders. And those points go without saying, given how challenging it is to implement value-accretive M&A and to apply strict financial discipline when assessing opportunities, we aren't pinning our hopes on this activity to deliver growth in the immediate future, preferring, as I mentioned, to concentrate on near mine and early growth exploration strategies.
Jeff Quartermaine
executiveHowever, we're on the lookout for the right opportunities. So to wrap up, as I mentioned at the beginning of this call, the June quarter has been another really strong quarter for Perseus in a number of ways. Production is solid. Costs are controlled. We're running our business well despite the global pandemic. And on the financial side, we're getting stronger every day. We must be doing something right. We're seeking to expand our business, and we're now at a point where shareholders can quite reasonably expect that an income stream from Perseus will begin to arrive, through either a dividend or a share buyback — both of which ought to benefit our share price in due course, and both of which are under fairly close review right now. Our share price has already done well lately compared with our peers. And it does seem that the market is recognizing the quality of Perseus' performance and its earnings capacity. So from our perspective, everything looks good. And I'm now very happy to take any questions you might have. Thanks very much.
Nathan Ryan
executive<<operator_script>> Our first two questions are from Reg Spencer at Canaccord. He offers his congratulations on the quarter. His first question, then, is whether you could remind him what portion of Edikan's reserves Fetish accounts for.
Jeff Quartermaine
executiveI can't really give you a solid answer on that right off the top of my head, but if you look at the published information, it's fairly evident there. It isn't a huge amount. And I should mention that the problem we ran into last quarter and early this quarter came simply from a lack of drilling in 1 small section of the pit. So I wouldn't conclude that this is going to materially affect the overall gold that comes from that Fetish deposit.
Nathan Ryan
executiveThe next question concerns how we handle dividends. He asked whether, given the anticipated profit and cash flow, we might announce a dividend policy alongside the FY '21 results.
Jeff Quartermaine
executiveYes. Look, I won't claim to speak for the Board, but I think it's reasonable to say that this will happen. We're examining it very closely. One thing we have to do is get our own house in order so that the parent company is able to make dividend payments, and we're looking at that right now. But certainly, the chance to pay dividends has always been on our minds from this period onwards. Once we could see a pretty clear line of sight to consistent cash flow, I think we've reached that point now. And so there's very little reason for us not to announce the dividend policy when we release the full year results in August.
Nathan Ryan
executiveThank you. We have no more questions right now, so I'll turn things back over to Jeff for some closing comments.
Jeff Quartermaine
executiveAll right, well, many thanks, Nathan, and thank you to everyone listening for joining us today. As I mentioned, Perseus has had a strong quarter — another strong one — and we're looking ahead to the next quarter and beyond with a fair amount of optimism. And if how July has begun tells us anything, then we'll be bringing you another solid report before long. So thank you very much, and we'll talk again soon.
Nathan Ryan
executiveThat’s all from us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.