Perseus Mining Limited (PRU) Earnings Call Transcript & Summary

October 19, 2022

Australian Securities Exchange AU Materials Metals and Mining earnings 45 min

Earnings Call Speaker Segments

Nathan Ryan

executive
#1

Good morning, everyone, and thanks for joining the Perseus Mining investor webinar and conference call. <<operator_script>>. At this point I'll turn things over to Jeff Quartermaine, Perseus' CEO and Managing Director. Thanks, Jeff.

Jeffrey Quartermaine

executive
#2

Thanks a lot, Nathan, and hello everyone, welcome to the Perseus Mining webinar about our September '22 quarter report. As always, I'm joined today by a number of my senior colleagues: Lee-Anne de Bruin from Finance, Jess Volich from Sustainability, and Phil Russo in Investor Relations. Later on, all of them will be available to answer particular questions in their areas of expertise. What I intend to do this morning is give a quick overview of what Perseus achieved operationally in the September 2022 quarter, and then we'll move into the Q&A session. My presentation will be short, since all the details you need in order to understand how we performed this quarter are fully set out in the market release published earlier today, but let me point out a few key items, and then we can go through the detail if you'd like. So, once again, Perseus has turned in another strong quarter on both production and costs — record gold production, in fact — and we are positioned not only to meet our December half-year production guidance, but if things go according to plan, we should have a pretty good chance of beating the guidance range outright. In the September '22 quarter, Perseus produced 137,460 ounces of gold, which is 12% more than the June quarter and almost 7,000 ounces above our previous best quarterly result, set in the March quarter this year. Perhaps more importantly, given the current economic climate, weighted average all-in site cost for the quarter came in at USD 879 per ounce. That figure is based on a weighted average production cost of USD 762 per ounce. This all-in site cost, the second-best quarterly all-in site cost on record for Perseus — I believe the best was back in March 2019 — is roughly 12% lower than the June quarter and certainly puts Perseus toward the bottom end of the global cost curve, a position that few would have associated with Perseus a few years ago. And once again, we are well on track to hit guidance. Not everyone can say that at the moment. Like everyone else in the mining industry, though, Perseus is fighting the global trend of rising costs, but for the time being we are managing to keep things reasonably in check, and long may that continue. Now, as I've said before, Perseus's strong performance over the last few years clearly vindicates our corporate strategy, which was to transform us into a multi-mine, multi-jurisdiction business as rapidly as possible. That strategy has allowed us not only to increase production and cash flow materially, but also to reduce the volatility of our performance by spreading our risk across 3 operations. Even with many difficulties coming from inside the company and from outside it, diversifying has kept us on track and allowed us to honor our commitments, and that sits at the heart of what this company stands for. Over the last few quarters, our Yaouré mine has clearly led the way. This quarter it carried on in that vein, though below the record levels of the prior quarter, turning out 71,469 ounces of gold at an all-in site cost of USD 658 per ounce. That puts Yaouré comfortably far down the global cost curve. The standout this quarter, however, was the Edikan mine. I haven't been able to say this for some time. But this quarter Edikan put the problems of run time, grade and recovery from recent quarters behind it and turned out 52,127 ounces of gold. That is 82% above the previous quarter, at an all-in site cost of USD 1,060 per ounce, a huge gain over the USD 1,859 per ounce cost booked in June. Full credit belongs to our team at Edikan, under Stephen Ndede, and to Chief Operating Officer Chris Woodall, who has, as I have, taken every knock along the road at Edikan during the last few years. Finally, of course, our Sissingué mine also turned in a better performance this quarter; in the September quarter Sissingué turned out 13,864 ounces of gold at an all-in site cost of USD 1,336. Both figures improved on the prior quarter and plainly show that this small mine, which many believed should never have been built, keeps punching above its weight and makes a solid contribution to our bottom line. So overall it has been another very good quarter across all 3 of our sites. Looking ahead, our market guidance for production and costs for the December half year of 240,000 to 265,000 ounces, at an all-in site cost of $1,000 to $1,100 per ounce, appears very achievable right now; and that ought to mean our calendar year guidance of 493,000 to 518,000 ounces of gold at an all-in site cost of $980 to $1,025 is likewise well within reach. I should note that in carrying out all of our mining exploration activities throughout the company, we have tried to do so in a way consistent with the global sustainability standards we have adopted. The precise metrics of our ESG performance are set out in full in the quarterly report and in our annual sustainability report released to the market last Friday. It is worth, however, drawing attention to just a few of this quarter's achievements on this call. On safety, our safety performance across our operations has largely improved. Our TRIFR — that's total recordable injury frequency rates — keeps heading lower, going from 1.45 at the close of March to 1.21 at the end of June, and now 1.19 in this quarter. Across the group, the lost time injury frequency rate stayed at a fairly credible 0.26. Turning to the social side, Perseus has kept up the economic contribution to our host countries that we've made in the past. This quarter it came to roughly USD 116 million. That figure included approximately $87 million paid to local suppliers, which is about 78% of our procurement, $8 million in salaries and wages for local employees, around USD 21 million in payments to government through taxes, royalties and so on, plus about $1 million in social investment. Money like this really matters to our host countries, and we're very proud to contribute in this way, even if we don't normally take to the grandstand to highlight the work we do. Local and national employment has been kept above the 95% level of our total workforce, and gender balance across the group is fairly stable at around 14% female and 86% male, which — given the industry we operate in, but more particularly the cultural setting of our host countries — is a reasonable outcome. I should note things are different in our corporate office, where the female-to-male split is about 31:69, and in our management team it's 40:60.

Jeffrey Quartermaine

executive
#3

I think that reflects more how Australia is culturally oriented, rather than the orientation of the host countries we operate in across Africa. On the environmental side, we had zero incidents of any kind over the quarter. And in absolute terms, our Scope 1 and Scope 2 greenhouse gas emissions have in fact gone down by roughly 5%, from 0.55% at the close of last quarter to 0.5% at the close of this quarter. That has come about largely because Edikan has swapped its grid power for power produced on-site, using natural gas as the energy source. On the ESG side generally, we're performing fairly well, and we remain dedicated to steadily bettering our results there, measured against the benchmarks we've established for ourselves — benchmarks that, in the majority of cases, match globally recognized standards. Also worth mentioning: we plan to hold a standalone webinar on November 3rd — that's the date as I understand it — covering the fiscal '22 sustainability report. If you'd like a more thorough look at this subject, do join us for that session, where we'll walk through everything in detail. Now let's move on to the financial side. When the quarter wrapped up, we had gross cash and bullion totaling USD 354 million. Taking out our $25 million in outstanding corporate debt leaves a net cash and bullion position of USD 329 million—that's $51 million more net cash than we had at the close of the June quarter. Worth pointing out: the $354 million in cash and bullion consists of $197 million in cash along with 93,634 ounces of bullion held, valued at a spot price of $1,672, for a total of USD 156.5 million. Out of the 93,634 ounces of bullion we have on hand, 67,261 ounces of gold sat in the purchases metal account, and the rest was either in transit or at a site. Worth noting: that 67,261 ounces in the metal account represents gold produced during this quarter and earmarked for sale under forward sale agreements already in place, at an average price of $1,780 per ounce — so there's no price risk at all on that metal. The deals on those sales will wrap up during the December quarter, and that's when we'll recognize all the revenue. And in case someone wonders why we didn't settle the hedge contracts prior to quarter-end and book the cash, there's nothing especially noteworthy there. It's really just about how we manage capital balances and cash flows, plus ensuring every approval is secured for shifting funds between our onshore and offshore bank accounts before we do it. So, by the close of '22 — by the close of this calendar year — every one of those designated hedges will have been closed out, and our cash balance at year-end is going to reflect the receipt of some rather substantial sums of cash over the quarter. Consider, for instance, that the hedge price of $1,780 per ounce on those roughly 60,000 ounces is higher than the spot price at which they were carried on the balance sheet I mentioned earlier. Turning to hedging more broadly, in addition to the 67,261 ounces we hold that were presold under the forward arrangement I referred to, we also have further forward sale contracts in place. These cover an additional approximately 336,000 ounces of gold — gold to be produced in the future — at a weighted average cost of about USD 1,890 per ounce. That represents roughly 23% of our forward production on a three-year rolling basis. That's important, since Perseus's anticipated cash flows are largely protected even if gold prices weaken below current levels because of a strong U.S. dollar—and that's a very solid financial position to be in. To help listeners understand how much cash we're generating right now, our notional cash flow for this quarter was approximately USD 112 million. That's clearly not the same as the $51 million net increase in cash—those are two different things, so please don't confuse them. I don't want to make this more complicated than it needs to be, but notional cash flow is a bit theoretical, since it doesn't factor in when payments are made and when receipts come in. Still, it's fair to say that at present Perseus is producing a great deal of cash and is very well placed to fund all of its activities — including exploration and the development of new projects, plus continuing our dividend policy — from existing cash balances ahead of any future cash flows. Now, turning to business growth activities, that's another area where we've been very busy and, pleasingly, very productive this quarter. Let me start with the acquisition we completed most recently — the Block 14 Project in Sudan. We've just handed a 100,000 meter drilling program to Capital Drilling, a well-respected international drilling contractor. Right now they're in the process of moving equipment out to the site, and our hope is that drilling gets underway before this month is over. Their first assignment is infill drilling at the GSS deposit, which should allow some inferred mineral resources to be converted into measured and indicated resources — material that can then be folded into the Ore Reserve as part of the mine plan. They also need to carry out sterilization drilling, so that—in their eagerness to site waste dumps and tailings dumps as near as possible to infrastructure—the property's earlier owners haven't sterilized any valuable mineral deposits. We've also engaged our friends at Lycopodium to do a front-end engineering and design study, a FEED study, on Block 14. As it happens, I prepared the definitive feasibility study for the property's prior owner, so they know the project very well. But maybe even more significantly, they also know very well the exacting standards Perseus will demand for this project to be built. Over the past five years or so, building Sissingué and Yaouré has taught us a great deal, and all of those lessons are going to feed into how the Block 14 mine development is ultimately designed. In addition, within that FEED study, we will carry out confirmatory work on the water aquifer at Area 5. That lies roughly 80 k from the main deposit, and eventually that area will provide water for Block 14's operations after they begin running. We have now raised the priority of this work, since water supply matters so much in this region. To repeat, the contractors we plan to engage are highly experienced in Sudan, and a number of their consultants actually contributed to the original study for the earlier ones.

Jeffrey Quartermaine

executive
#4

And we are eager to get early verification that the aquifer holds enough capacity to meet all our water needs and, beyond that, to have surplus water we could share with any communities nearby. I have to say there are not many communities in that area, but if there are indeed people living there, they will be able to access it. Now, beginning with the above. A great deal of preparatory work is underway on the ground in Sudan. Things are progressing very, very well; and one point that merits mention is the tremendous backing we are getting from key ministers and their departments in the Sudanese government. A small number of people have voiced concerns regarding our investment in Sudan, drawing on what they know of the country's recent history; but I can honestly say we have received excellent — an excellent degree of support from the government. We fully recognize that Perseus and the government are closely intertwined on this project and that a successful development will be enormously valuable to both parties. We are also quite comfortable backing our capacity to establish operations in a new country, just as we did in Côte d'Ivoire with the development of Sissingué and Yaouré. Now at this point, we are aiming to make the final investment decision for the Block 14 Gold Mine at roughly this time next year, if not slightly earlier. Being conservative, it is probably safer to say in the second half of 2023. On the basis that this will be the very first industrial-scale gold mine development in Sudan, and there will be no prices for us committing capital prematurely. This project and all the other opportunities that are beginning to emerge from our first-mover advantage into Sudan are far too important to mess up. And so we will take whatever time is required to ensure that this project is a fantastic success, not only for Perseus, but also for the people of Sudan; now also, as we announced recently, we have had exploration success close to our existing infrastructure in West Africa and are making pleasing progress toward being able to sustain our targeted level of production of 500,000 ounces of gold per year out toward the end of the decade. And that is without taking into account any M&A or greenfield development activities. During the quarter, we issued a market release detailing the results of work being completed at the Nkosuo deposit located about 7 kilometers from the Edikan mill in Ghana. In summary, we announced an indicated mineral resource of 422,000 ounces and a bit more inferred. We have done a feasibility study on the project and that resulted in probable ore reserves of about 332,000 ounces of gold. According to this study, processing Nkosuo ore reserves at the Edikan mill should add roughly 18 to 24 months to the Edikan operation's life, pushing the current expected life out to around the end of fiscal '27. We recently filed with the Ghana Minerals Commission to have the land covered by the Agyakusu exploration license folded into our existing Nanakaw mining lease. Talks on that are going well and ought to mean ore from Nkosuo gets mined and trucked to Edikan for processing sooner rather than later. Defining this mineable deposit at Nkosuo is really a major accomplishment for Perseus, since Nkosuo is our first discovery in what we think is a mineralized zone spanning 3 separate exploration license areas north of Edikan — northwest of Edikan. Besides recently exercising our option to purchase the Agyakusu license where Nkosuo sits, we have also issued a notice of intent to exercise options for the remaining 2 license areas adjoining our land packages, as both show potential similar to the Agyakusu license; so that is quite exciting. We are dedicated to intensive exploration across this zone, anticipating that Nkosuo will prove to be one of — will be the first of several discoveries there. And if so, we can look forward to additional extensions of the Edikan operation's life ahead. And with the substantial time, effort and money we recently put into upgrading the Edikan plant, which produced the very good results this quarter, Edikan definitely has what it takes to become an important part of our asset portfolio once again. Speaking of organic growth, I should note too that we have kept making excellent progress defining a large additional mineral resource at Yaouré that can be mined economically with underground methods — underground mining techniques. In the quarter, we announced a maiden ore reserve of roughly 259 million — sorry, 259,000 ounces for the initial stages of mining the CMA ore body via underground methods. The pre-feasibility study we finished on the drilled-out portion of this deposit, which extends about 200 meters down dip, has shown that carrying out that mining operation beneath the existing pit is both economic and technically viable. We have more widely spaced drilling below the pit indicating that mineralization continues quite a lot further. In fact, total mineral resource at present stands at about 1 million ounces. Over the course of this year, we’ll be drilling out the structure’s next 300 meters, which takes us down $500,000, and we do expect to be able to put that into the reserve statement toward the end of this year. Beyond that, we’ve also had some fairly encouraging results come back from exploration drilling of deep holes below the non-mineralization. That is certainly very interesting, and what inspired us to do it was the results of a 3-dimensional seismic survey that clearly shows us something is down there. We’re not quite sure what it is, but it’s certainly giving us a fairly high level of encouragement that further expansion of the CMA underground operation is very possible. It is early days as far as the CMA underground project is concerned, but I suspect more will be said about this as the drill results come in over the coming months. So in conclusion, as I said at the start of the call, the September quarter has been another outstanding quarter for Perseus on all fronts, including gold production, all-in site costs, cash flow generation and business development. We’ve delivered gold production and all-in site costs; that puts us well on track to achieve, if not exceed, stated guidance ranges. And in doing so, we’ve outperformed a lot of our peers. Our all-in site costs are currently very competitive in terms of global measures, and we are managing our business successfully, even though we are operating in a fairly tough economic environment at the present time. Perseus has excellent growth potential in front of us.

Jeffrey Quartermaine

executive
#5

What matters a lot is that we've got the people and the money already in place to pull this off and create value, which we've shown we can do multiple times lately. Looking at it from an equity market perspective, our share price has been fairly resilient despite some quite strong headwinds driven by the U.S. dollar's strength, yet we're doing comparatively well against the broader market, and I'd like to believe that reflects the solid record of accomplishment we've established over the last few years. So, as I mentioned, a strong quarter for Perseus. We're really happy with how things are progressing and we look forward to doing this again in future periods; so thank you very much for listening today. That concludes my presentation. My colleagues and I are now glad to take whatever questions you may have. Thank you.

Nathan Ryan

executive
#6

Thanks, Jeff. <<operator_script>> Our first question is from Mike Millikan at Euroz Hartleys. He’s asking about the improvement at Edikan in terms of mill head grades and recoveries. Is all of that attributable to the maintenance that was completed last quarter? What improvements were made? And should we expect this to continue going forward?

Jeffrey Quartermaine

executive
#7

Not really, no. That had little to do with why we did the maintenance shutdown in the first place, which was to swap out <<inaudible>>. What drove the gains is that we've gone deeper into the ore body, which let us clear up some bad reconciliation, especially by applying tighter grade control practices. The other thing behind the recovery was that we emptied and cleaned the CIL tanks while we were down, and that has made the process considerably better. And going forward, yes, we definitely expect this to become standard.

Nathan Ryan

executive
#8

Thank you, Jeff. Your next question comes from Reg Spencer at Canaccord.

Reg Spencer

analyst
#9

Great quarter — really impressive to see. My first question is about Yaouré, Jeff. I realize you may not have — sorry, going back to that very first reserve announcement, deep in the JORC tables, you laid out some production parameters there, including 720,000 tonnes per annum of throughput, which on the basis of that initial reserve would give an initial 3-year mine life, and that material in the JORC table also flagged all-in sustaining cost of $1,250 to $1,300 an ounce. Could you give me a sense of how we should think about the Yaouré underground schedule versus the open pit, given that the open pit, while lower grade, actually also carries lower all-in sustaining costs?

Jeffrey Quartermaine

executive
#10

Well, let me take that point. It's a good one you've raised, actually. That cost includes the capital cost of developing that underground operation. So every cost on the underground operation has been attributed to that first 200 meters. So as we move further and deeper into the structure, the infrastructure will already be there, and those ounces won't carry that incremental cost. So going deeper, that cost is going to average down quite significantly, I would think. So that's point one. As for when it comes into the mine plan, we're working through that specifically right now. But the thinking, in broad terms, is this: in the original mine plan for Yaouré, I believe the higher grade ore from the CMA pit began to decline around year 5 or 5.5, and then we'd move over to the Yaouré pit, which is lower grade. As a result, the production profile would have fallen. What we'll be doing now, though, is opening up that underground operation, bringing back high-grade material from it, and then blending that with the lower-grade material from Yaouré. So we'll be able to maintain the current levels of production, which broadly sit in the range of 250,000 to 300,000 ounces a year. It was closer to 300,000 last year, for instance. But we'll be able to maintain that sort of production level for quite a few more years to come, certainly out towards the end of the decade. And as underground development continues and as we keep finding more satellite pits adjacent to the infrastructure — and I think there's a very high chance of that happening — the Yaouré operation as a whole, which will combine both open pit and underground mining, will continue for quite a number of years to come.

Reg Spencer

analyst
#11

That's really helpful, Jeff. You people put out a few exploration results for a couple of those deeper step-outs — the underground ones, actually — and honestly those results looked quite good. Are there any further updates when it comes to your ongoing debt extensions, or the down debt extensions?

Jeffrey Quartermaine

executive
#12

I can't really bring anything specific to mind right at this moment. I mean, obviously there is something sitting down there, some kind of alteration showing up in those grade and variance intercepts. But look, we never expected to hit a bonanza of a discovery there. What we're actually doing is gathering highly valuable information, and that will feed back into the structural model, which in turn informs the drilling programs we run later. So look, this isn't going to — we won't be announcing bonanzas each time we put out an announcement. All of this fits within a long-term plan; and I think the results, taken as a whole, speak for themselves. Still, pulling all of it together is going to take a bit of time, though right now it certainly looks extremely promising.

Reg Spencer

analyst
#13

It definitely is. The following question is about Block 14. Could you tell us what amount of spending you have planned for Block 14, since that's a fairly big drilling program, given all that sterilization drilling? What might the expenditure for Block 14 be from now until H2?

Jeffrey Quartermaine

executive
#14

Well, that will very — actually, that program involves 100,000 meters, spread across 18 months, so it's going to keep going for some time. The spending level will hinge on how quickly we progress. For example, the kinds of things we'd want to complete before beginning construction would include installing the water pipeline and borefield. That comes to roughly — I believe it's around $20-odd million, if my memory is right. We also have to upgrade the camp, since once construction begins we'll need housing for considerably more people than we're housing during these exploration phases. The choice to put in incremental capital will be tied closely to the progress we achieve in the country; and as I mentioned, we are progressing very well. Still, we'll hold off on those commitments until we're fully sure this project will move ahead the way we envision. Because if the last 10 years have taught us anything, it's that after you commit and begin spending money, you definitely give up any leverage you might have when negotiating with local communities, governments and the like. So we're proceeding methodically, and we'll make suitable announcements as we take those steps forward.

Reg Spencer

analyst
#15

That's really helpful. Nice work on a fantastic quarter.

Nathan Ryan

executive
#16

Our next question is from Patrick Collier at Crédit Suisse.

Patrick Collier

analyst
#17

Well done on a solid quarter. My first question concerns the choice to keep guidance unchanged — I realize there's likely a bit of conservatism baked in — but is there anything you anticipate shifting in the second quarter that could make it less strong than the first? Or is it purely conservatism?

Jeffrey Quartermaine

executive
#18

Conservatism carries a negative ring to it, Patrick. Look — no, I mean, we've spent enough time in this business to understand that fortunes can swing either way in an instant. So there's nothing to gain from us sticking our necks out here. We expect another solid quarter, yet we won't be making huge commitments that we might find hard to fulfill when all is said and done. That would serve no purpose; we've provided guidance to the market. It's been available for quite a while; we've committed to hitting it, and we will.

Patrick Collier

analyst
#19

All right, and then regarding Yaouré, you said in the report that truck availability has been somewhat of a problem, which you described as temporary, but I'm just curious whether that carried over in any way into the December quarter.

Jeffrey Quartermaine

executive
#20

No, the interesting part is that during the June quarter we had actually — and in March as well — been mining ahead of plan, anticipating that we might get slowed down in the September quarter because of wet weather. Well, the wet weather definitely arrived and it definitely slowed us down, and the truck availability problem happened at the same time as the wet weather. So over the long term it really didn't affect us at all. And as a matter of fact, we're going pretty well right now. Now that the ones at Yaouré have begun to ease. It's actually begun to ease at Sissingué as well, which is a big plus for us up there too. But no, the truck issue hasn't really set us back in any way whatsoever.

Patrick Collier

analyst
#21

Great, thanks for that; and moving on to Sissingué, that's what I want to ask about next. I mean, it was a solid quarter and definitely cash generative, but I'm just curious about the bigger picture, given that the group is targeting a $400 an ounce margin and considering where spot gold sits versus Sissingué's all-in site costs, which are just...

Jeffrey Quartermaine

executive
#22

Look, I'll say this while fully aware that we knew we'd be entering a period of higher costs right now — and thanks for putting that question to me, by the way. Fully aware that a higher cost period was coming as we build access roads and infrastructure for the Fimbiasso deposit, and afterward the — the Bagoe deposits, which we'll develop and mine progressively and bring back, we did in fact put on some hedging at roughly, I believe it was $1,950 an ounce, to cover production through this high-cost stretch. So as it happens, the margins we've secured via the hedge program are quite healthy indeed, considering what we're actually producing at and what we're selling at. And naturally, $1,950 looks rather impressive when you set it against today's spot price.

Patrick Collier

analyst
#23

Sure. Maybe one final point on the M&A side. Valuations have likely softened somewhat, I suppose. I’m curious what you’re seeing in that area, whether there are any opportunities you’re considering, or just what the broader strategy looks like.

Jeffrey Quartermaine

executive
#24

As for our broader strategy, we’d really like to hold roughly 3 to 4 mines in the portfolio, each with 10-year mine lives remaining, which corresponds to 10 million to 12 million ounces in reserve. Right now, Yaouré and Block 14 definitely fit that description. And if Edikan exploration delivers more success — additional exploration success — Edikan could too. But I think if we want to reach that objective, we will need to add further assets to the portfolio. The fact that the market is down at present doesn’t automatically mean that management teams at companies whose share prices are struggling feel any more inclined to do a deal than they did previously. So that is — the social issue is something that always gets in the way. Another point I’d make is that, from the outside, many situations look very attractive because the people promoting them make certain that all the positive aspects are known to the market. What they don’t always disclose to the market is some of the less positive aspects, but as a company, we conduct very, very detailed bottom-up due diligence. And quite often, we have been quite enthusiastic about opportunities only to discover that things weren’t quite as good as we had all hoped; so look, we will keep looking at opportunities. We are very open to opportunities. We have the financial and human capacity to execute opportunities as they come through. But we will maintain very strict financial discipline in choosing what — how we deploy our capital going forward.

Nathan Ryan

executive
#25

Our following question is from Andrew Bowler with Macquarie.

Andrew Bowler

analyst
#26

Many of the questions have already been covered. I believe it was mentioned a couple of times in the quarterly about seasonal wet weather, or that kind of thing in the past, which has been difficult to purchase. Could you give us a bit more detail, more broadly, on how Perseus is getting ready differently for wet seasons, or whether it's simply a consequence of going deeper in those pits?

Jeffrey Quartermaine

executive
#27

Yes. Look, it mostly is the latter. I mean, if you look at, say, the last wet season at Yaouré, we didn't have a great deal of hard material around the sheet roads. We managed to sheet some of the roads, though not all of them, by the time the wet season arrived. But we're in far better shape this year. Same situation. I mean, Edikan is — when it rains there, provided we've got pumping capacity, which we do, we're not affected in any major — to any major degree. Sissingué, we had terrible travel when we first opened that up back in 2019, I think it was, when we were in oxide and it rained like blazers and we had no material to sheet roads. But from then on, material has become available in the roads and run pads, et cetera, et cetera, and has been able to be managed more appropriately. So it really comes down to having the right materials available to build your roads properly and to ensure that your vehicles can move safely at all times regardless of the weather conditions.

Andrew Bowler

analyst
#28

And only one more from me. Clearly, you brought up that big bullion accumulation during the quarter. From what you've said before, I believe you noted that some of it could have been approvals to move money out of the country. Could you expand on that a bit and explain what the process involves? And how long is that likely to take? Do you expect all of it to come through in this quarter, or will some of it land in the next quarter too?

Jeffrey Quartermaine

executive
#29

That will get done this quarter. Actually, I believe most of the approvals are already secured. Lee-Anne could set me straight on that, of course. But I think that — I think we're sitting pretty well. And look, it simply comes down to ensuring everybody understands what's going on and that everyone is informed. I mean, if you were to — if we — say, for example, we brought money in and tried to shift it abroad. We — well, whenever you move money into and out of countries, you run into exchange risk and possible leakage based on the rates you happen to be getting; and then, naturally, if you're holding plenty of cash while the company has debt to repay, yet you pay out dividends, then you're hit with withholding tax on those dividends, et cetera, et cetera. So really this is nothing more than prudent financial management. It's about ensuring we shift our funds around as efficiently as we can and with our host countries fully informed, since everything we do is 100% transparent, and we want to ensure everyone is comfortable with those things now; this was simply a situation we had to manage; but by the end of the year, there will be considerably more cash on the balance sheet because those hedges will have been closed out.

Andrew Bowler

analyst
#30

Sorry, just one final follow-up question. More broadly, I take it you haven't seen anything close to the cost inflation that, say, Australian peers have. Could you say a bit more about how that's unfolded over the past few months or so, and about how supply chains going into and out of Africa are faring, along with labor constraints and that sort of thing, where you're still performing well, I suppose, relative to peers?

Jeffrey Quartermaine

executive
#31

Well, I'm not so sure about that necessarily. Look, it's a daily fight, and we put a lot of effort into holding our costs down. I mean, we don't believe West Africa has experienced the same kind of workforce problems as Australia, where fly-in, fly-out arrangements have created difficulties at a number of mines in Western Australia and led to losses of personnel. In the African nations where we operate, I think people are quite happy to hold their jobs, they wish to retain them, and they are eager to continue working — so that's one element that benefits us. Having said that, our employees do expect fair pay for the work they do, and they receive it. As a result, we occasionally encounter some cost inflation. Supply chains are holding up fairly well. At times in the past, we may have kept larger spare inventories than usual simply to avoid running short, though on the whole that's fine. On fuel, we benefit from a subsidy in Côte d’Ivoire—the government subsidizes diesel across the board. As a result, the price we pay in Côte d’Ivoire isn't as high as in Ghana, for example. Ghana is around $1.50-ish a liter, and I believe Côte d’Ivoire is currently about $1-ish a liter. That subsidy certainly won't continue indefinitely, and eventually we'll likely see some cost inflation on the fuel side. Another place where we've had a bit of protection, I suppose, is consumables. We've been running under long-term supply agreements. And sooner or later, those agreements will expire and have to be renewed; when that moment comes, we'll be out there buying product, and we'll run into the same problems some of our competitors are up against. But here's the thing: cost inflation is real out there. Anyone who claims otherwise hasn't taken a look at their financial statements lately. Yet our job as managers is to do all we can to ensure we run things as efficiently as possible; at best, we can hold — keep our standing, and we might encounter some inflation going forward.

Nathan Ryan

executive
#32

The next question is from Alexander at Citi.

Analyst

analyst
#33

Congrats on yet another solid quarter. Could you remind me what the upcoming key milestones are for Block 14 before FID?

Jeffrey Quartermaine

executive
#34

The next key milestones. Well, you'll see progressive drill results coming through, plus results from the bore test and that kind of thing. I think the next milestone will probably be when we make decisions about beginning to invest in infrastructure. As I say, plenty of work is going on behind the scenes. This is likely a stretch where I'd say there isn't a great deal of news and photographic evidence of progress, but a lot will be happening beneath the surface, I can assure you.

Analyst

analyst
#35

Perfect. And when might we see a refreshed life of mine plan for Yaouré, one that includes the final integrated CMA underground or reserve?

Jeffrey Quartermaine

executive
#36

Well, look, we — I would like to say that, that will happen at some point during this year. It really hinges on how successfully the infill drilling proceeds and matters of that kind. There is not much sense in releasing a new life of mine plan covering just the first 200 meters, though we could do that. For sure, we could do it right now, I suppose. And one thing we are not fully certain about is precisely when underground mining would begin. That is what we are currently trying to work through, to pin down exactly when the best timing would be, weighing the trade-off between pushing deeper into the pit and carrying out development and moving into the underground; so these are matters we are working through. But rest assured we will update the market as soon as we have found the right answers, and we will not be coming out half-cooked.

Nathan Ryan

executive
#37

That's all the questions we have. I'll pass things back to Jeff now for some closing comments.

Jeffrey Quartermaine

executive
#38

All right. Thanks, Nathan, and thank you to everyone listening in, and to those folks who submitted questions. It's been a strong quarter and we're really pleased with how it went. We'd like to believe we'll keep moving in the same direction from here. I should note, though, that headwinds exist out there, on gold pricing — we're fairly well protected there thanks to our hedge book — and on the cost side too. In that respect, we're working as hard as we can to keep things steady; but overall, things are going well. And we're certainly fairly consistent in how we perform, and we stack up reasonably well against our peer group. So on that basis, it's been a good quarter and we feel reasonably comfortable about it. Many thanks, and we look forward to speaking with you again in a couple of weeks — first on sustainability, and then on our next set of results in roughly 3 months' time. So thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.