operatorThanks for joining the Perseus Mining investor webinar and conference call. <<operator_script>> At this point I'll pass things over to Perseus's CEO and Managing Director, Jeff Quartermaine. Thanks, Jeff.
Jeffrey Quartermaine
executiveThank you so much, Nathan, and I'd like to welcome everyone to this Perseus Mining webinar, where we'll be going through our quarterly report for December '22. As has been the case before, our CFO, Lee-Anne de Bruin, is here with me on the call, and she'll be able to field specific questions as required later on. Lee-Anne and I are both speaking to you this evening from the Yaouré Gold Mine in Côte d’Ivoire, where we're in the middle of our quarterly operations review program. Normally, the Internet and power supply at site are extremely dependable. Should we drop off part way through this webinar, though, that will be down to telecommunications issues. So I do apologize in advance, and let's hope that apology won't be needed. What I'm intending to do today is, first, give you an overview of what Perseus has accomplished operationally over the period that ended 31 December 2022, and then follow it with a Q&A session. I'll try to keep the presentation as brief as I can, since all the details you need in order to understand what Perseus has achieved this quarter are fully set out in the market release that came out earlier this morning. Let me, however, highlight a few key points, and after that we can go into the detail if you'd like.
Jeffrey Quartermaine
executiveI want to begin by expressing how genuinely delighted I am to be able to report that, consistent with the pattern Perseus has been following for quite a while now, we have once again achieved a robust gold output and cost result this quarter — one that meant we beat market guidance on both gold production and costs for the December '22 half year as well as for the full 2022 calendar year. Turning to the half year, output came to 268,371 ounces with an all-in site cost of USD 930 per ounce. For the full calendar year, we produced 521,220 ounces at an all-in site cost of USD 941 per ounce. Each of those figures surpassed our production and cost guidance. To put it another way, as I mentioned, they sat above the top end of the guided production range and beneath the bottom end of the guided cost range in both cases. In that connection, I would also point out that the Edikan and Sissingué mines each exceeded their guidance ranges too, whereas Yaouré wrapped up the year within the upper half of its guidance range. So a terrific outcome on every front. Just as importantly, we have kept delivering on our commitments, and that, as all of you know, is a core value of our company.
Jeffrey Quartermaine
executiveTurning to the December quarter, gold output came in at 130,911 ounces. That was a touch below the quarterly record we set in the prior quarter, yet it remains a very strong outcome. Weighted average all-in site cost for the quarter was 983 per ounce, under the roughly $1,000 an ounce figure that is commonly used as a benchmark, and it rests on a weighted average production cost of USD 881 per ounce. That is a very solid result considering the difficulties posed right now by cost inflation along with logistics and procurement around the world. On all-in site costs, Perseus sits toward the lower end of the global cost curve — a position we have not always been in a position to claim. Like every other company in mining, Perseus is preparing to fight hard against the worldwide pattern of escalating costs. We are keeping our costs reasonably in check, though that certainly does not come about without effort. Full credit belongs to our site teams, who are certainly proactive about seeking out opportunities to cut costs. Perseus's strong performance across the last few years continues to show quite clearly, I think, the value of our corporate strategy of becoming a multi-mine, multi-jurisdiction company.
Jeffrey Quartermaine
executiveBy doing this, we've been able to substantially boost output and cash flow, while also lowering volatility for investors by distributing our risk across 3 operations in 2 different countries. Our operating performance, which has been very strong and dependable, has also reshaped the business on a financial level. During the 2022 calendar year, with support from a robust gold price that averaged roughly 1,714 per ounce across the year, our operating performance produced notional cash flow from operations of USD 402 million. Then, after repaying debt, funding inorganic growth, paying overheads, and declaring both a dividend and a bonus dividend, we finished the year with USD 405 million — or almost AUD 600 million — of cash in bullion on the balance sheet. This amounts to roughly USD 76 million more in net cash than at the close of last quarter, which works out to an increase of about USD 242 million, or AUD 324 million, year-on-year — a rise of about 149%. This result clearly has set the company up for a very promising future. Before we discuss that, though, let's go into more detail about the immediate past as reported in the quarterly. For the past few quarters, our Yaouré mine has been the standout performer.
Jeffrey Quartermaine
executiveAlso this quarter, it was responsible for almost 50% of the gold we produced, with output of 65,352 ounces at an all-in site cost of USD 798 per ounce — a figure that by itself puts Yaouré quite far down the global cost curve. That level of gold production came in very much as we had anticipated. And although it is below the prior quarter, the outcome mirrors an anticipated shift in where mining takes place within the CMA pit, moving into a zone of somewhat lower grade. Now every other KPI at Yaouré met or exceeded target, grade reconciliation included, where contained ounces of gold in the ore fed to the mill matched the contained ounces in the block model almost exactly. So despite a modest pullback in output, Yaouré is performing extremely well. Edikan, which got off to a troubled start in 2022, has kept demonstrating the gains from the turnaround we first reported in the September quarter. Now in the December quarter, Edikan turned out 53,850 ounces, roughly 3% above the prior quarter, and that accounted for roughly 40% of what we produced in the quarter. And this was achieved at an all-in site cost of $1,058 per ounce.
Jeffrey Quartermaine
executiveThat's a huge improvement versus the costs we reported earlier in the year. And the performance meant that, when you look at it on a half-yearly basis, gold production came in above market guidance for the mine, while all-in site costs landed under the guidance range, as I mentioned earlier. The half-on-half production increase of 58% was pretty pronounced. And I'm delighted to report that thus far this quarter, we're seeing similarly robust results at Edikan. So it really does appear to be hitting its straps nicely. Then last but not least is our Sissingué mine. There we put up another strong result against plan this quarter. During the December quarter, Sissingué turned out 11,709 ounces of gold, with an all-in site cost of USD 1,672 per ounce. Both of those metrics came in slightly ahead of what we expected at this point in the mine's life and, as a matter of fact, meant Sissingué also beat its half-year market guidance. Partly, this improved performance stems from a positive 6% reconciliation in ounces contained in the mill feed against the block model. But the majority of the other metrics were also very solid compared with internal targets.
Jeffrey Quartermaine
executiveI should mention that in the September quarter at Sissingué, we processed low-grade material from small pits surrounding the main Sissingué pit, since we were in a kind of holding pattern until ore could be accessed in the Fimbiasso East and West pits. I'm delighted to report that we are now mining higher-grade ore from Fimbiasso East. And this will be — we'll begin holding this back to the mill toward the end of the current quarter. So a step-up in the contribution from Sissingué isn't very far away. Overall, it's been another very good quarter for Perseus in terms of gold production and costs across all 3 sites, as I said, and looking ahead, we expect this level of performance to continue. So our market guidance for production and costs for the next half year is 230,000 to 260,000 ounces, at an all-in site cost of $1,000 to $1,200 an ounce, which on a full year financial basis translates to something like 498,000 to 528,000 ounces of gold at an all-in site cost of $1,000 to $1,100 per ounce. I should also note that in carrying out our mining and exploration activities across the company, we have sought to do so in a manner consistent with the globally recognized sustainability standards set out in our fiscal '22 sustainability report.
Jeffrey Quartermaine
executiveThe exact ESG performance figures for this quarter are laid out pretty clearly in the quarterly report, but I'll just call out a couple of those achievements. On safety, our lost time injury frequency rate for the group came down from 0.26 to 0.25. Together the sites hit a safety milestone worth celebrating — something like 1.6 million hours without an LTI at Edikan, 17.2 million hours without an LTI at Sissingué, and over 2.4 million ounces without an LTI at Yaouré — so that was a fairly solid safety performance. On the social side, Perseus kept up its significant economic contribution to our host countries of Ghana, Côte d'Ivoire and now Sudan. For this quarter, that came to roughly USD 116 million, or about 33% of revenue. That included about $99 million paid to local suppliers, which represents 80% of our procurement on a purchase order value basis, $9 million in salaries and wages paid to local employees, $7 million in payments to government taxes and royalties and other payments, and about $1.4 million in social investment. These sums matter a great deal to our host countries, some of which are struggling financially at the moment, and we're very proud to keep contributing in this way.
Jeffrey Quartermaine
executiveEmployment locally and nationally has stayed above 95% of our total workforce. This quarter, gender balance across the group shifted a little: female employees went down from 13% to 12%, and as a result male employees rose from 87% to 88%. Considering the industry we're in, and even more so the cultural orientation of our host countries, these ratios are fairly reasonable. To illustrate, I'd point out that at our corporate office in Australia, the female to male ratio of employees comes to roughly 31% to 69%. And the senior management team is 40% female, 60% male. So that mirrors the cultural orientation of Australia as much as anything, rather than our African host countries, which take a different approach. We recorded no environmental incidents of any type this quarter, and in absolute terms, our total Scope 1 and Scope 2 Greenhouse Gas emissions rose marginally from 0.47% to 0.5%, which isn't anything to be too concerned about. So on the ESG front, we're doing reasonably well, and we stay quite committed to continuing to incrementally improve our ESG performance relative to the internally adopted standards, which, as I mentioned earlier, align with internationally accepted standards in the vast majority of cases.
Jeffrey Quartermaine
executiveNow moving on to the financial side. In the quarter, we brought in USD 101 million in national cash flow, and as I mentioned before, adjusted across the full year that comes to USD 402 million in notional cash produced by operations. And as I noted, once exploration and development costs, corporate overheads and so forth are subtracted, gross cash bullion and — cash in bullion on hand at period end stood at USD 405 million. That figure comprised USD 361 million in cash plus 24,431 ounces of bullion, valued at spot at roughly $44 million. As I said, that's 149% higher than the equivalent point a year ago. So this represents extremely strong growth in that area. During the quarter, we also paid off the outstanding balance on our corporate debt facility, which leaves the debt balance at 0. You may also remember that at the close of last quarter, at the end of September, we held 93,634 ounces of bullion on hand because of some timing issues we were working through. But as promised, that gold, priced at the time of reporting, was delivered into forward sales contracts this quarter, which lowered gold inventory and, more importantly, lifted our cash balance exactly as we said it would.
Jeffrey Quartermaine
executiveTurning to gold price hedging now — Perseus holds a combination of designated forward sales contracts and spot deferred contracts at the moment, and those cover roughly 345,000 ounces of gold at a weighted average sale price of $1,906 per ounce. That accounts for approximately 23% of our production measured on a 3-year rolling basis, and what matters to us is that should the gold price soften from present levels because of a strong USD or another factor, Perseus' projected cash flows are largely underwritten. Perseus is producing substantial cash right now, and its balance sheet is very strong, which puts us in a position to fund all of our activities — exploration and the development of new projects among them, such as the Meyas Sand Gold Project in Sudan — and to continue our dividend policy out of existing cash balances, which will earn any future cash balances as well; that is a very nice position to be in. On the subject of business growth activities, this is another area where we've been very busy and pleasingly productive this quarter. Let me start with our latest acquisition, the Meyas Sand Gold Project, formerly referred to as Block 14 in Sudan. As we reported last quarter, we had awarded a 100,000 meter drilling program to Capital Drilling, a very highly regarded international drilling company.
Jeffrey Quartermaine
executiveAnd in the December quarter, they got the site mobilized and began drilling beside the Meyas Sand Project. The first assigned job is infill drilling on the main deposit at Meyas Ssand, so that impaired mineral resources can be turned into measured and/or indicated mineral resources we can put into an ore reserve estimate within the mine plan. Beyond that, a second local drilling contractor has been given the job of sterilization drilling, making sure the planned locations for plant waste dumps and tailings dams haven't accidentally ended up sitting on top of valuable mineral deposits. Over the quarter, we also kept working closely with Lycopodium, our engineering contractor, engaged to push the front-end engineering and design study forward — they prepared the definitive feasibility study for the property's previous owner, of course, so they know this project very well. And since they've worked with our construction team before on a couple of occasions, of course, they're also well acquainted with the exacting standards Perseus will demand when the project gets built. At this point, it's about checking assumptions and folding in the extensive lessons we've learned from developing and operating both the Sissingué and Yaouré plants — both of which Lycopodium built on our behalf and both of which, I might add, are running very, very well.
Jeffrey Quartermaine
executiveAnd crucially, there's one more task that has to be completed — locking in the capital budget. As part of the FEED study, we've also finished confirmatory pressure testing on the water aquifer in Area 5, which will in the end provide water for the Meyas Sand Operation once it is running. Again, the contractor engaged for this work, hydrogeology, brings substantial experience in Sudan. From the results we've observed so far, we anticipate confirmation that this aquifer holds far more than sufficient capacity to meet all our water needs across the full life of the Meyas Sand Gold Mine, and also to serve a number of community projects we are presently evaluating. Beyond that, plenty of activity is underway on the ground in Sudan to get ready for a large inflow of workers to the Meyas sand site when construction begins. Matters are progressing very well on that front right now, and we appreciate the tremendous backing for our project that key ministers and departments in the Sudanese government are giving us. So in light of all this, we are presently aiming to reach a financial investment — final investment decision on developing the Meyas Sand Project during the second half of this year, most likely early in the third quarter.
Jeffrey Quartermaine
executiveWhen it comes to funding the development project, we believe we can cover the full capital cost of development using cash balances we already hold at the close of the current quarter. That assumes our earlier estimate of roughly $450 million to develop the mine is confirmed by the FEED study we are currently completing. Despite that strong cash position, we are looking into a number of debt financing options. Should we move ahead with one of them, we would be in a position not only to fully fund development of the Meyas Sand Gold Project but also to have substantial capacity to chase other growth opportunities if they arise. I should note that owning the Meyas Sand Gold Project gives Perseus a clear first-mover advantage in Sudan, a nation blessed with vast mineral wealth and eager to welcome investment. I am also glad to report that several further exploration and predevelopment opportunities are beginning to surface thanks to our on-the-ground presence. It is far too soon to discuss any pending project beyond the Meyas Sand Gold Project at this point. Still, with such a rich mineral endowment, it is easy to see how Perseus's operating footprint in Sudan could grow over time, and we are strongly positioned to make that happen.
Jeffrey Quartermaine
executiveAnd staying with Sudan for a moment, I want to be clear that Perseus doesn’t pick sides in the political debates of the countries where we operate. That said, we’re very encouraged by the recent steps in Sudan aimed at bringing every political side together so they can reach agreement on a mechanism to guide the country forward peacefully and stably. Whether that leads to a civilian-led government and peaceful democratic elections within a couple of years will become clear very soon. In fact, I was reading today that I believe that may happen in early February. But based on everything we’re seeing, that goal certainly looks achievable, which is good for all stakeholders, including the people of Sudan and, naturally, Perseus. Turning now to our other organic growth initiatives. As we announced recently, through exploration success near our existing infrastructure, we’ve made encouraging progress toward being able to maintain our targeted output of 500,000 ounces plus of gold per year out toward the end of the decade, without factoring in any M&A or greenfield development activities that we -- that could come our way. After the quarter closed, we put out a market release laying out the results of exploration work carried out during the quarter at the Yaouré gold mine, where drilling delivered high-grade gold results from the CMA Northwest and CMA North targets, down dipped from the underground ore reserves we announced recently.
Jeffrey Quartermaine
executiveSo what that means is it really shows there's substantial room for additional growth in underground resources, and that's going to pave the way for building an underground mine at Yaouré. Turning to Ghana: last quarter we released an indicated mineral resource at Nkosuo, and we also finished a feasibility study on that project, which gave us a probable ore reserve of roughly — containing roughly 332 ounces of gold. We've just filed with the Ghanaian Minerals Commission to have the land covered by our Agyakusu exploration license, which hosts the Nkosuo deposit, folded into our mining lease. Then last week in Ghana we had very encouraging talks with the authorities, and that ought to mean the expanded mining license gets issued quite soon, letting us upgrade our life of mine plan so it includes an operation that trucks ore from Nkosuo over to the Edikan plant for processing. In the quarter we also exercised options to purchase the neighboring Agyakusu DML and Domenase exploration licenses. Ministerial approval has come through for transferring these licenses into Perseus' name, and that transfer should wrap up within days, if it hasn't already actually. That will let us begin drilling 3 additional exploration targets identified on our land package close to Edikan.
Jeffrey Quartermaine
executiveAnd should they achieve what they appear capable of — or even just 1 or 2 of them do so — that might give us additional extensions to the Edikan operation's life. Well, having put both time and money recently into getting the Edikan operation turned around, the ability to lengthen the Edikan mine's life has considerable merit when it comes to enhancing the quality of our asset portfolios. So to conclude, as I mentioned at the beginning of this call, the December '22 quarter, the half year and the full calendar year have each been outstanding for Perseus across all fronts, including gold production, all-in site costs, cash flow generation and business development. And pleasingly, this work has been carried out safely and sustainably, in line with the standards we target. We have delivered gold production and all-in site costs that sit comfortably within our half year and full year market guidance. And in doing so, we've outperformed a great many of our peer group. Our all-in site costs are currently highly competitive against our global peers, and we are managing our business successfully in a tough economic environment. We have excellent growth potential ahead of us in the form of the Meyas Sand Gold Project and from the exploration successes that we're racking up adjacent to existing infrastructure at our mines, we're traveling pretty well.
Jeffrey Quartermaine
executiveBut I suppose, just as importantly, on that front, we possess both the people and the financial resources already in place to carry this out successfully and release the value, which we've shown we can do on multiple occasions in the past. Looking at it from an equity market perspective, our share price has been resilient, and compared with our peers in the market, we're doing fairly well. Actually, in market cap terms, we now rank as Australia's fourth biggest listed gold producer, and for investors looking to put money into top-quality gold stocks, we offer a highly credible option. Before I wrap up, I really do want to recognize what everyone has contributed to Perseus's success over the last 12 months — all the men and women across the 4 countries that make up the Perseus team. Their work has been outstanding, and I'm very lucky that, on this current round of site visits, as I mentioned at the beginning of the call, Lee-Anne and I are right now on site at Yaouré. I've been able to thank them in person for their tremendous efforts in delivering on what we promised. So many thanks for your attention today. That concludes my presentation. And at this point — Lee-Anne and I are ready to take whatever questions you might have.
Operator
operator<<operator_script>> Our initial question is from Reg Spencer of Canaccord.
Reg Spencer
analystI have just a couple of questions. Regarding FID for Meyas sand, or Block 14 as it was formerly called, when could we expect some refreshed metrics, whether CapEx or OpEx, for that project? Would that come before FID, given that there still seems to be some fairly strong inflation, or industry inflation, around at the moment? And as part of that, how severe do you think those pressures might be in Africa compared with somewhere like Australia?
Jeffrey Quartermaine
executiveOkay, so what I’d say on that is the $450 million figure I referred to is $130 million above what the prior owners had estimated for the capital cost. When we put that estimate together, we had already built in fairly substantial cost inflation—driven by shipping and logistics expenses, and especially the steel costs we were seeing roughly 6 months back. A number of those cost pressures have since eased. That gives us a lot of confidence that the figure will land near that level, or perhaps even lower. We’ll just have to see how it plays out. As for when we’ll release that information, Reg, I’m not able today to give you an exact date, but it will happen once we feel good about those numbers and are confident we know precisely where we stand.
Reg Spencer
analystThanks, that's helpful. And just beyond <<inaudible>>, it seems you now have some programs at Bagoé. Could you remind me what the approximate grade profile at Fimbiasso would look like before you move into Bagoé? Has anything changed compared with the earlier life-of-mine plan, or should we simply stay with what was previously in it?
Jeffrey Quartermaine
executiveYeah. No, the grade stays exactly as we’ve reported previously. I mean, over the next 2 years, gold production should average, I believe, 72,000 ounces annually. One of those years comes in quite a bit above that, and the other is somewhat lower. But I think what we’ve already provided to the market is what we expect to see.
Operator
operatorThat brings us to the end of the Q&A. I'll turn things over to Jeff now for some closing comments.
Jeffrey Quartermaine
executiveAll right, thank you so much. I suppose no questions at this point suggests we've addressed everything you were wondering about. It's been a solid quarter. As I mentioned, we're quite happy with how things are progressing. And this quarter is certainly bringing more of the same. So we're in a reasonably healthy spot at the moment. And we're definitely eager to share additional updates with you as the quarter unfolds and news becomes available. But in any case, we're in a very strong position, and we want to express our gratitude to our shareholders for the backing they've provided us over a long stretch of time. It's definitely beginning to bear fruit. Well, thank you so much. We'll speak again in a few months.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.