Perseus Mining Limited (PRU) Earnings Call Transcript & Summary
July 29, 2024
Earnings Call Speaker Segments
Operator
operatorYour connection to this meeting is as a participant, and your microphone will stay muted for the entire session.
Nathan Ryan
executiveThis is an investor webinar and conference call. Everyone attending is in listen-only mode. Should you wish to put a question straight to the company, kindly use the Raise Hand feature in Zoom. If you're joining by phone, dial star nine. At this point I'll pass things to Jeff Quartermaine, Executive Chairman and CEO of Perseus Mining. Thanks, Jeff.
Jeff Quartermaine
executiveThanks, Nathan, and hello everyone — welcome to Perseus Mining's webinar covering our June 2024 quarter report. With me on the call today, once again, is Leanne de Bruin, our CFO. Later in the call, both Leanne and I will be ready to take whatever questions you might have. So, as we normally do, today's webinar agenda runs like this: first, I'll give an overview of what Perseus achieved operationally over the quarter, and also across the whole of fiscal 2024. After that, we'll hold a Q&A session to dig into any particular matters that haven't been covered in the presentation. If you're listening to this call on your computer, you should be able to follow the presentation visually on your screens. If not, the presentation went out to the market this morning, and you're welcome to follow along manually if you'd like to. I'll do my best to keep the presentation as brief as I can. Everything you need in order to understand what we achieved this quarter is fully documented in the release. But first, let me point out a few key things. As the title of our quarterly report indicates, our team here at Perseus has delivered another impressive operating performance this quarter, and indeed for the full financial year — not just in gold production, all-in site costs and cash flow, but also when it comes to business growth, since during the quarter we improved the quality of our asset portfolio by successfully completing the acquisition of the Nyanzaga Gold Project in Tanzania.
Jeff Quartermaine
executiveWe also moved forward with the CMA Underground mine development at Yaouré in Côte d'Ivoire, and a final investment decision is due to be made very soon. Now, again, the June quarter, half year, and full year were marked by how consistent our operating performance was and a strong dedication to delivering as guided. Doing what we say we're gonna do is a core value that this business at Perseus is built on. Over the financial year, we produced 509,977 ounces of gold at an all-in site cost of $1,053 per ounce, which makes us one of the lowest cost gold producers of this scale anywhere in the world. Our gold production across the last three financial years has averaged roughly 513,000 ounces. I believe that is at an average all-in site cost of just under $1,000 an ounce, $988 per ounce. So this year we're pretty much in line with those averages, and what a great time to be doing it when gold is selling at around $2,400 an ounce. That's not to say we don't face challenges from time to time. We certainly do, and we did during the quarter, and we will again in the future. But the positive thing is that our team seems to find a way to deliver, and once again, they've done that very, very well.
Jeff Quartermaine
executiveSo let's move straight to the scoreboard and show you exactly what I mean. Turning to the quarter's results, we produced 129,029 ounces, a bit lower than the quarter before. All-in site costs came in at 1,173, marginally higher than the prior quarter. I'll address that in more detail later and explain what's driving it. Our average sale price rose $92 an ounce to $2,017. Margin came to $944, and notional cashflow for the quarter was $117 million, only slightly below the previous quarter, which left us with cash and bullion of $587 million at period end. Now, putting that in terms of the full year, as I mentioned, production is roughly 510,509,977. In fact, all-in site cost of $1,053, with gold price and margins in a similar range. Notional cashflow for the full year reached $490 million, which means Perseus is, you know, very firmly on track to keep funding growth and keep returning capital to our shareholders. As I said, across the last three years we've averaged about 513,000 ounces per year at just a touch under $1,000 an ounce. And, you know, once again, we've hit our market guidance.
Jeff Quartermaine
executiveThat's a point of pride for us, and since the first half of 2020 we've either hit our guidance or gone beyond it. The all-in site cost has been reasonably steady, considering we're in an inflationary climate, with a modest uptick lately. But naturally, holding costs level while the gold price climbs means your margin grows, and that's what's producing the very strong cash flow and leaving us in a very strong cash position on the balance sheet — $587 million at the end of the period, with no debt, and that's after paying in full for the Nyanzaga acquisition. As I mentioned, we did deliver on guidance for the half year. Guidance stood at 226,000 to 254,000, and we landed at 248,000 for the half-year period. And likewise, on the cost side, $1,180-$1,340 — we're a little bit below the bottom end of that range, which was quite a credible, quite a credible result. Yaouré and Edikan performed very strongly against guidance. Sissingué came in slightly under, after a fairly dismal first quarter of the financial year that we never fully recovered from.
Jeff Quartermaine
executiveYet what this illustrates is the advantage of a diversified portfolio: one project might be underperforming relative to the others, but the remaining two are able to make up for it. And collectively, we keep hitting the targets we've established for ourselves. On a full year basis, we've performed reasonably well too. The guidance range was 491,000 to 517,000, and we landed at approximately 510,000. So comfortably within that guidance range. Likewise on costs, we're within guidance and, as I said, delivering exactly what we committed to do. That matters a great deal to us. As I noted, Yaouré enjoyed a fairly solid year, though it must be said that through the June half year we had difficulties with waste stripping — clearing the backlog of waste stripping. Our goal was to finish that by the end of June, but regrettably that didn't happen and it will carry over into the September quarter, though it ought to be wrapped up by the close of that quarter. The consequence of this is a modest upward push on costs, driven by elevated mining costs over the period.
Jeff Quartermaine
executiveAnd naturally, when the grade is impacted too, that lowers gold output a bit, and it affects operating costs as well. But as you can see, the notional cash margin of $937 an ounce produced quite healthy cash flow from the operation. And very pleasingly, we're seeing pretty sensible reconciliation between our block model and the mill. So, you know, we're achieving what we expect to achieve. At Edikan, in the same way, actually, Edikan has been, you know, a great performer for us for quite a while now. In fact, I think this really, you know, deserves a mention, because for many years, a good number of people were quite critical of how Edikan performed. But it's producing, you know, close enough to 200,000 ounces a year. It's 195,000 for the year at $1,000 an ounce, and there aren't too many mines producing at that scale, at that level of all-in site cost. So, you know, that's quite an achievement, and that has been achieved with a, a 100% Ghanaian workforce and management team, I might add, and those guys are, are very justly proud of what they've done, and well done to them. So Edikan is running very nicely. As I said, Sissingué got off to a poor start in the September quarter last year because of exceedingly wet weather and various other challenges, but it has bounced back, though not enough to fully recover from the poor start to the year.
Jeff Quartermaine
executiveBut right now it's going quite nicely, and we're advancing downward into the Fimbiasso deposit. In fact, we've grown that resource a bit over the past 12 months, which gives us additional material to feed through. The exploitation permit for the Bagoué deposit — another satellite — was granted as well during the period, so in due course it will be incorporated into the mine plan. Turning now to the future, the guidance for the next six months: we're indicating output of 220,000 ounces-260,000 ounces, with an all-in site cost of $1,230-$1,330. That means for calendar year 2024 we're projecting 46,000 ounces-508,000 ounce at $1,182-$1,223. That's a reasonably steady performance from us, you know, once again moving forward. And I think one month into that six-month period, we're definitely on track to well and truly deliver on that result. So things are progressing fairly well for us. As I mentioned, once again we expect a reasonably strong half year ahead through to December. Now, on the financial side, I'll hand over to Leanne to walk you through that.
Lee-Anne de Bruin
executiveThanks, Jeff. Hello, everyone. As Jeff said earlier, we closed out both the quarter and the financial year with $587 million in cash and bullion, no debt at all, and access to an undrawn debt facility worth $300 million. That compares with $702 million at the close of the March 2024 quarter. Importantly, cash flow from operations came to $162 million, and 45% of it was generated by Yaouré, 46% by Edikan, and 9% by Sissingué. Investment in our exploration activities has offset this. We also paid $52 million in taxes to our host countries, and we acquired OreCorp Limited, the owner of the Nyanzaga Gold Project, for $153 million, including $16 million in change of control taxes. Importantly, our cash flows are underpinned by a hedge book of 330,000 ounces, roughly 24% of our three-year forecast production, at a weighted average price of $2,109.99 per ounce. Turning to our capital management framework. For Perseus, this is the first time the capital allocation framework has been published. It contains some very key components that we've used over the last few years, with the most important one being the delivery of reliable and strong operating cash flows. We strive to keep a balance sheet that is resilient under a range of trading conditions, and we achieve this by maintaining liquidity, setting clear net debt gearing targets, and ensuring our cash reserves are available to sustain a dividend to shareholders of a minimum of a 1% annual yield.
Lee-Anne de Bruin
executiveSo once those dimensionals are in place, what we're doing next is hunting for chances to make discretionary investments by optimizing assets — pushing simplification, efficiency, and cost cuts. A key point: we fund our growth strategy through dividend acquisitions, just as we recently did with OreCorp, and wherever it's available, we return capital to shareholders, whether via special or bonus dividends or through share buybacks. As the financial metrics for Ventas make clear, Perseus throws off substantial cash thanks to its gold production profile, strong gold prices, and all-in spot costs that sit relatively low. In the quarter, our focus was on the growth strategy, and we picked up the Nyanzaga gold deposit for $151 million, which I mentioned earlier, while also concentrating on exploration — that is, organic growth — and putting money into some equity investments. All of this lines up with the internal strategy we've plainly spelled out to lift our asset quality and lower cost. Even with those sizeable growth investments, chances are we'll have surplus cash to distribute this year, on top of our minimum 1% annual yield. One more important item: on the twenty-eighth of August we'll publish our financials, and that release will carry the details of any final dividends or capital management initiatives our directors approve. We will also probably look at giving shareholder returns through bonus dividends, capital returns, and/or share buybacks.
Lee-Anne de Bruin
executiveI’ll now return the floor to Geoff, who will walk us through how we’ve performed on sustainability.
Jeff Quartermaine
executiveAlright, thank you so much, Leanne, for that introduction. Yes, regarding sustainability, safety has really stood out as a highlight for us. We performed extremely well in that area over the course of this quarter. The group TRIFR figure for this period stands at 1.06, and that comes in under our goal of 1.14. And I should mention that those figures compare very favorably against our global peer group. We've invested heavily in our safety initiatives. At our sites, we operate a program known as SHED, Safely Home Every Day, through which we collaborate with our employees to make sure they stay safe not just while working, but also during their commute to and from work, and while at home too. We've also dedicated considerable effort to a fatality risk management program, which I believe has generated quite positive results for both our employees and our contractors. When it comes to community contribution, this quarter saw $194 million flow into the economies of the countries where we operate, and that's a fairly considerable amount. Looking at it on an annualized basis, that works out to — I believe the figure was $611 million, if I recall correctly, for the full year, which is a fairly considerable amount.
Jeff Quartermaine
executiveNow, a big chunk of that money goes toward paying for products and services supplied locally. Beyond that, we're also investing in host communities, compensating staff, covering taxes, paying royalties, and so on and so forth. So our host nations and the communities around our operations definitely gain from having us there. One specific way they gain is that we always work hard to hire as many local people as we can. During the quarter, local employees made up roughly 96% of our whole workforce. So I believe that reflects favorably on our localization strategy. I mean, our share of female staff is fairly modest, at 13%, which I suppose mirrors, more than anything else, the cultural context, right, of operating on the African continent, which differs somewhat from the West. Still, we have plenty of extremely capable people among our employees, both men and women. And you know, I think the results we're discussing show that they're performing quite well. At the same time, we're carrying this out in a way that's environmentally responsible too, ensuring that greenhouse gas emissions and the like stay on target.
Jeff Quartermaine
executiveWe also make sure those tailings dams are built properly and watched closely, so none of them cause problems at any of our sites. Turning to growth, on the organic front, we've done a fair amount of exploration and drilling at and around the infrastructure across all sites. At Yaouré, on the Yaouré Exploration-Exploitation Permit, we've had real successes around the CMA Underground deposit, plus a bit to the north at a spot we call Zani. So we genuinely expect that ore body to keep growing in the periods ahead and to extend the life of the Yaouré mine. I mentioned earlier some of the success up around Mbiasso, especially the Mbiasso West deposit, where we drilled and managed to extend the ore body somewhat, and that extension will be included in the updated resources and reserves published later on. And at Edikan, we've also been working on our expanded tenement holding, hunting for additional deposits we could put through the Edikan mill. At this point we haven't drilled a huge amount, but we've been examining the property quite carefully and have some very good targets in mind.
Jeff Quartermaine
executiveOver in Sudan, our rigs are back on site and drilling has restarted. We began drilling in May, testing high-priority exploration targets at the GSS deposit. We'll keep drilling in Sudan, aiming to expand a reserve that's already fairly sizable at 2.85 million ounces. We also expect to convert that into a JORC compliant ore reserve before too long. Right now, it's a foreign mineral reserve estimate that we acquired from the previous owners. I mean, in Sudan, there are still hostilities going on between the Sudanese Armed Forces and the Rapid Support Forces. None of us has a terribly clear picture of the situation, but the area around our mining lease is unaffected by combatants. There are artisanal mining activities in the area, though these things aren't impacting our operation per se, and exploration activities will continue into the future. The other piece of organic growth that has been important is the underground development project at the Yaouré deposit. We've made some very good progress during the quarter to be putting ourselves into a position to take a final investment decision on this project in the very near future.
Jeff Quartermaine
executiveWe've begun hiring personnel. Some of the key management staff are now in place—individuals bringing a great deal of experience to the operation, from both the corporate side and the contracting side, which matters a lot for understanding both halves of the business. We're also collaborating closely with our host government to try to establish appropriate mining regulations for an underground mine, since this will be the first underground mine in Côte d'Ivoire. We anticipate that legislation will change, but we may require a ministerial order to move ahead, as drafting legislation does tend to take some time in these countries. On other activities, we have put an underground mining contractor out to tender, and a number of very good, experienced contractors have submitted offers to us. That includes a couple of Australians and Americans and South Africans, so we have a very good mix of offers on the table. I'm very pleased to say that pricing is very competitive and in fact is well placed relative to our estimates for our feasibility study, so that's attractive.
Jeff Quartermaine
executiveWe’re making progress on placing the mine services area and admin buildings and similar facilities, and we’re ensuring there’s ample support ready once the contractor arrives on site. We’ve also been addressing our power supply. For full backup power capacity, we need roughly an additional 6 MW. We already have sufficient power coming through the grid, but we want to be sure there’s enough backup power to handle the underground requirements, the open pit as well, and then the mills, of course. Being prepared to start is clearly very important, especially given that we’re working at a site that is already active. So there’s a great deal of work underway in operational readiness: making certain our supply systems are properly tuned up, that materials arrive when needed, that our infrastructure and similar elements are fully in place, and that our mine designs are completed to a fine level. As I mentioned, we’re also doing some building around the site. This slide shows a few pictures of some of the work being carried out in preparation for more workers arriving on site.
Jeff Quartermaine
executiveSo overall, here's how the program shapes up: we're aiming to reach the final investment decision in October this year. Before that point, we'll finish up those early works and wrap up the tendering for the underground contract, and from there we'll get moving, which means infrastructure work, getting the contractor onto site, and beginning work on the portals around July 2025, with the goal of producing our first ore the month after that from the underground operation. So things are progressing quite well there, and we're looking forward to it becoming a key part of our business going forward. On the inorganic front, as both Leanne and I mentioned earlier, we closed the acquisition — the off-market acquisition of OreCorp — during the quarter, and through that process we picked up an 80% interest in the Nyanzaga Gold Project in Tanzania. We hold 80%, and the government of Tanzania holds the remaining 20%. The project itself is quite sizable. OreCorp reported a probable reserve of roughly 2.6 million ounces of gold. We'll be doing further work on that to confirm it and hopefully expand on it. We've had extremely strong support from the Tanzanian government to date, since we took control of the project.
Jeff Quartermaine
executiveWe've made it public that we're aiming to reach a final investment decision on this project in December this year, and to begin construction right after that, with the goal of first gold from the operation in the first quarter of 2027. So that gives roughly a two-year construction period. Every key lease required for this operation to function is in place, including a framework agreement that sets out fiscal terms and was executed earlier, and we'll be engaging with the government to clarify some of those terms in the not-too-distant future. We currently have several parallel paths underway so that we can get into a position to make the final investment decision. These include resource definition drilling, which got started recently. We're carrying out various work in the technical area, technical studies and the like, and we're about to begin the front-end engineering and design, subject to signing a contract with our contractors, such as Podium. Early works has begun on site establishment, so there are people on the site working away as we speak. We do expect that the relocation housing exercise will work, contracts will be awarded and work will start on that in August, so next month.
Jeff Quartermaine
executiveAnd in a similar vein, construction of a bypass road circling one of the main villages is set to begin very soon after that. So there will clearly be work happening on the ground, and looking at this slide, you can see we've been quite busy indeed, working closely with the government. In fact, the photo in the center of that slide — the bridge shown there — matters a great deal, since Tanzania's government has put substantial investment into infrastructure across the region, and that bridge links the two shores of an inlet on Lake Victoria, which means travel time to the site has been reduced sharply compared with earlier days. It's roughly 1.5 hours from Tanzania's second largest city, and that matters because it makes access to suppliers and to people very, very, very, very good. The site as such has relatively few residents. A number of people need to be relocated, and we are working on that at present, as I mentioned. And as we noted too, the rigs are now in place. Capital Drilling and a local contractor have mobilized, and the drills have begun turning. So overall, the Nyanzaga development project is beginning to take shape, and we very much look forward to making that investment decision later this year and progressing to full-scale development early in the year.
Jeff Quartermaine
executiveSo the timeline, as I mentioned earlier, is that we're aiming to get started early in the new year and to be producing in 2027. That's essentially everything I wanted to cover in the presentation. As I noted at the beginning of the call, we've delivered yet another strong quarter across the board — gold production, all-in site cost, cash flow, and business development. Happily, this work is being carried out safely, ahead of targeted safety standards and materially better than many of those in the industry. We keep generating very material benefits for all of our stakeholders, including host governments, communities, employees, providers of goods and services, and of course, our investors. And in doing so, we achieve the company's stated mission, which is a pleasing thing. As I said, looking forward, our production and cost guidance for the next six months to 31 December is predicting another solid performance. And, as I also said, after the first month of production, things are on track in that department, so that's very good. Our group's financial fortunes are very strong, certainly helped by buoyant gold prices, but our cost management means that we do manage to keep costs under control in this inflationary environment, and our cash balance does remain very, very strong, notwithstanding the fact that we have invested some of our cash in acquiring Nyanzaga, paying significant amounts of tax to our host countries and funding organic growth.
Jeff Quartermaine
executiveLooking ahead, we will also need to finance the development of the Nyanzaga Gold Mine, and at present we estimate that will cost approximately $500 million, plus or minus. That said, as today's report shows, we keep producing robust cash flows day in and day out, so we will have ample financial capacity to develop Nyanzaga and to pursue additional initiatives past that. Now, the way we will handle our capital from here on is a very hot topic, as Leanne mentioned earlier, and we will share more on this when our full year financial report comes out on 28th of August this year. And without tipping our hand too early, we can say that we do plan to keep growing our company, but we also plan to keep returning capital to shareholders in suitable amounts through suitable mechanisms. So watch this space, as the saying goes. Lastly, to conclude, I want once more to recognize the wonderful contribution of every one of the men and women who make up the Perseus board, management and operating teams across what is now five countries, including Australia. As a team, you have done an outstanding job in fiscal 2024, and on behalf of all shareholders, I sincerely thank everyone of you on this call listening to this for all your efforts in helping us keep delivering on our promises.
Jeff Quartermaine
executiveThank you all so much for joining us today. That concludes my presentation, and Leanne and I would be glad to answer whatever questions you might have at this point. Thanks.
Nathan Ryan
executiveThanks, Jeff. A quick note before we go on: if you’d like to pose a question straight to the company, go ahead and use Zoom’s Raise Hand feature, and we’ll give it about 30 seconds for questions to come in.
Operator
operatorAlright, our first question is from Richard Knights at Barrenjoey. Richard, go ahead — you just need to unmute. Thanks, Richard.
Richard Knights
analystMy apologies for that.
Jeff Quartermaine
executivePlease continue.
Richard Knights
analystHey Jeff, hey Leanne. So I was just hoping you two might be able to shed a bit more light on that cash tax payment — the one around $50 million that showed up during the quarter?
Lee-Anne de Bruin
executiveAbsolutely, happy to. That mostly concerns taxes tied to income tax in Ghana. But there's also the case where we declared dividends out of Ivory Coast, whether from Yaouré or from Sissingué, and withholding taxes were paid on those — that's how those two taxes come together. So they're roughly on par: around $25-$27 million from Ghana and roughly $25 million for the dividend withholding taxes paid out of Ivory Coast.
Richard Knights
analystAlright, thank you. Yeah, that’s clear. And then just one more question about commercial production at CMA Underground. I saw that there was — I believe it was roughly a 7-month or 8-month gap between first production and commercial production there. Could you perhaps give me a little more detail on that?
Jeff Quartermaine
executiveYeah, well, I suppose that ties to the fact that, you know, the moment we enter that area, we're going to be extracting mineralization.
Richard Knights
analystUnderstood.
Jeff Quartermaine
executiveYou know, we’ll be extracting material as we advance the development headings, but it won’t reach full-scale output until we get, you know, all the way into the main ore body.
Lee-Anne de Bruin
executiveSure.
Richard Knights
analystOkay.
Lee-Anne de Bruin
executiveAccounting standards essentially lay out a condition that the asset needs to be operating the way management intends, meaning it must reach a particular production profile before commercial production can be declared.
Richard Knights
analystAll right. Yeah, that’s clear. Appreciate it, everyone.
Jeff Quartermaine
executiveI appreciate that.
Nathan Ryan
executiveThank you. That brings us to the end of the question period, so I will turn things back over to Jeff for some closing comments.
Jeff Quartermaine
executiveAlright, thank you, Nathan, and thank you to everyone for being on today's call. As you mentioned, this has been a pretty solid quarter for us. The coming quarter, and past that as well, appears strong too. We're eager to share more updates with you in the periods ahead — covering our capital management strategy, the full year financial results, and, we hope, additional developments on the business growth front too. So thanks again very much, and we look forward to speaking with you once more.
Operator
operatorThat’s all from me.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.