Perseus Mining Limited (PRU) Earnings Call Transcript & Summary
July 29, 2026
Earnings Call Speaker Segments
Nathan Ryan
executiveGood morning, everyone, and thank you for joining us for the Perseus Mining investor webinar and conference call. <<operator_script>> At this point, I'll pass things over to Craig Jones, Managing Director and CEO of Perseus Mining. Thanks, Craig.
Craig Jones
executiveThanks, Nathan, and welcome everyone to Perseus Mining's quarterly webinar covering the June 2026 quarter report. Our Chief Financial Officer, Lee-Anne de Bruin, is here with me today. This quarter brings the 2026 financial year to a close, and once again we've seen solid operating performance from our 3 operating gold mines, with strong cash generation and continued progress on our organic growth projects. Turning to operating performance: we produced 109,000 ounces of gold, which was up 1,869 ounces on the March quarter, and the higher production came from 2 of the 3 operating gold mines. The weighted average production cost was USD 1,340 per ounce, and the all-in site cost was USD 1,941 per ounce. The comparable all-in sustaining cost for the quarter was $1,865 an ounce. Gold sales from the 3 operations totaled 114,567 ounces, which was 18,000 ounces more than the quarter 3 of the financial year. The realized gold price was USD 4,086 per ounce, and our average cash margin for the quarter was USD 2,145 per ounce, resulting in a notional cash flow of $216 million. And we finished the quarter notably with over $1 billion in cash and bullion.
Craig Jones
executiveTurning to how we performed over the FY — the 2026 financial year — we generated 405,000 ounces of gold at an all-in site cost of USD 1,750 per ounce. Gold sales across all 3 operations came to 399,000 ounces, with an average realized gold price of USD 3,693 per ounce, which is $1,150 per ounce above financial year 2025. Our average cash margin for the year stood at USD 1,943 per ounce, $635 per ounce greater than the '25 financial year, giving us record notional operating cash flow of $769 million from all operations, $119 million above financial year 2025. Moving now to Yaoure, total gold production from the open pit and the CMA underground reached 38,900 ounces of gold at an all-in site cost of $2,277 per ounce. The Yaoure open pit yielded 30,440 ounces, while the CMA underground contributed 8,472 ounces. On the whole, processed head grade came in below plan at 1.13 grams a tonne, down from 1.29 grams a tonne last quarter, and there are 2 reasons for this: first, access to the higher-grade Yaoure Stage 1 area was constrained because of heavy rainfall. And second, we mined the oxide section of the Zone 2 deposit in June, which delivered grade below what was planned.
Craig Jones
executiveSustaining capital came in higher, driven by the timing of work on the new community road — that's part of the waste dump extension — along with replacing the tailings pipeline. As I said earlier, quarterly production at the CMA underground reached 8,472 ounces, an increase of 1,600 ounces in Q3. Total gold sales for the site came to 39,000 ounces at USD 3,920 per ounce, including 7,252 ounces sold from CMA underground production, and Yaoure generated a notional cash flow of $50 million for the quarter. On the CMA underground, this was a landmark quarter. To date we've advanced 3,604 meters of lateral development across the 4 declines. And critically, we began stoping in April, with 3 states completed delivering 33,606 tonnes of ore. Preparations got underway for installing the primary ventilation fans and expanding the generator farm, with contractor engagement for civil structural steel works. Project development progressed well, with USD 89.6 million spent by 30 June 2026. So while CMA underground started later than we initially planned because of the permitting delays, the team has managed to recover some of the lost production through strong performance throughout the year, and I really look forward to seeing my underground project add considerable value to Perseus as we ramp up to commercial production, positioning CMA underground as a long-term key value driver for Yaoure.
Craig Jones
executiveAt Edikan, our gold output came to 41,940 ounces, with an all-in site cost of $1,959 per ounce. The head grade processed stood at 0.79 grams a tonne, compared with 0.84 grams a tonne during the prior quarter, which reflected pit sequencing and mining in lower grade sections of the Nkosuo pit. On a quarter-on-quarter basis, Edikan's production costs rose 17% to USD 1,155 per ounce. That increase came mainly from higher mining costs, which were driven by elevated diesel prices and greater blasting volumes tied to larger amounts of fresh ore, as well as higher rehandle costs. On top of that, grade control drilling at Nkosuo was stepped up during the June quarter after weather-related delays in the quarter before. These higher costs were compounded by lower production volumes, which hurt fixed cost absorption. The weighted average all-in site cost climbed to $1,959 per ounce from $1,539 per ounce in the prior quarter, driven by the higher production costs together with an increase in royalties and the timing of sustaining capital spend linked to construction of the new cyanide tailings storage facility and the perimeter dewatering wells. Royalties went up by $216 per ounce owing to the new scaled royalty put in place by the government of Ghana, effective from the 10th of March 2026.
Craig Jones
executiveEdikan contributed gold sales of 43,868 ounces, priced at USD 4,347 per ounce. In addition, we started the reductions in dewatering at the Fetish and Esuajah North pit — the future sources of ore for Edikan after the Nkosuo pit is completed. As a result, Edikan generated notional cash flow of $100 million during the quarter. Sissingue stood out as the quarter's top performer: our Sissingue complex turned out 28,161 ounces of gold with an all-in site cost of USD 1,550 per ounce, which works out to an 11% rise in production and a 3% decrease in all-in site costs versus the prior quarter. This stronger result came largely from a greater share of high-grade ore out of the Antoinette pit at Bagoe. Gold sales totaled 31,453 ounces at a realized gold price of $3,890 per ounce. The complex brought in notional cash flow of $66 million for the quarter, and when the March quarter is included, notional cash flow came to $60 million. Sissingue has contributed meaningfully to how the business has performed. Turning to our FY '27 production and cost guidance, we anticipate output ranging between 420,000 and 480,000 ounces of gold, with an all-in site cost of USD 1,835 to USD 2,070 per ounce.
Craig Jones
executiveThe cost guidance we've given rests on an assumed gold price of $4,000 per ounce, along with government royalty rates of 8% in Cote d'Ivoire and 11% in Ghana. That guidance takes into account the start of production at Nyanzaga, and it includes 55,000 ounces of gold, which is based on the FID as released in April 2025. Every operating cost at Nyanzaga gets capitalized into commercial production, and that's planned for Q4 of FY '27. At this point I'll pass things over to Lee-Anne, who'll walk through the financial aspects of the quarter.
Lee-Anne de Bruin
executiveThanks, Craig. Our sites' performance in this transitional year has not disappointed, and it let us strengthen the balance sheet even more. As Craig mentioned, our net cash and bullion position finished the year at a bit more than $1 billion. That's after we kept investing in growth projects throughout the business. The business's liquidity position stands at $1.4 billion, including our undrawn debt facility of USD 400 million. This liquidity doesn't include the USD 230 million of liquid investments tied to our investments in predictive discovery and aurum. Given the strong state of our balance sheet, we kept buying shares under the share buyback program announced in September '25. The AUD 100 million mark was hit in June '26, and on the 15th of June 2026 the Board resolved to raise the share buyback further to AUD 115 million. By the end of June '26, we had bought back 24.1 million shares at an average price of AUD 5.24, for a total cash outflow and a return of AUD 126.6 million. In FY '26, Perseus has returned AUD 194 million to shareholders through its interim dividend declared in February of $0.05 per share, totaling AUD 67.5 million.
Lee-Anne de Bruin
executiveAnd as I mentioned a moment ago, the buyback came to AUD 126.6 million. Since our first distribution back in September '22, shareholder returns have kept climbing, which the graphs make clear. Looking ahead, our Board will weigh further capital allocation when the financial statements come out in August '26, consistent with our capital management framework and dividend policy. Perseus's robust financial vision has been constructed over years of dependable, sustainable cash flow generation, achieved through disciplined execution by our committed teams around the world. Having served as CFO of formal for almost 6 years within Perseus, I've been privileged to walk everyone on these calls through these results, yet it's a team effort — every single person across the Perseus team helps produce these outcomes. A strong gold price, combined with attention to cost and capital discipline, generated an average Q4 cash margin of $2,145 per ounce and produced notional cash flow of USD 216 million for Q4. And as Craig noted earlier, that has meant a record notional cash flow of USD 769 million for the full financial year — a milestone for Perseus.
Lee-Anne de Bruin
executiveNow let's turn to cash flows and how capital was allocated during the June '26 quarter. Cash and bullion rose to $1 billion, and that came after operational cash flows of USD 276 million, plus roughly $142 million of continued capital investment in our growth projects during the quarter, including $108 million spent on advancing the Nyanzaga growth project, which Craig will discuss later, and another $26 million put toward progress on developing the CMA underground. There was the beginning of the Edikan cutbacks, ongoing exploration drilling at our assets totaling $8 million, with exploration now a key focus in our capital allocation program going forward. We also made continued contributions to our host countries of $77 million, paid in corporate and other income and other taxes. Note that this quarter we received proceeds of USD 260 million from the sale of the Sudan project. And we keep returning capital to shareholders, with AUD 77 million executed on the share buyback in the June quarter. I'll pause briefly here, and this is simply a reconciliation of our all-in site cost cash-based metric to the all-in sustaining cost metric, showing that the all-in site cost of $1,941 reconciles down to $1,845 -- sorry, $1,848 on the all-in sustaining caustic metric.
Lee-Anne de Bruin
executiveI'll now pass things back to Craig, who will walk everyone through the latest on the Nyanzaga gold project.
Craig Jones
executiveThanks, Lee-Anne — those are some quite strong figures. Turning now to our organic growth initiatives, beginning with Nyanzaga. The Nyanzaga Gold project is still on budget and on schedule to pour first gold in January 2027. At quarter-end, overall progress on the project stood at 67%, and costs incurred and committed total $424 million, which represents 81% of the $523 million budget. During the quarter, the Nyanzaga Gold project hit a major safety milestone: it recorded over 8 million worked hours and 532 days without a lost time injury, which shows Perseus' uncompromising dedication to delivering the project safely. Key work fronts made significant headway during the period. All major procurement for the process plant has been finalized, with equipment and material deliveries now at their peak. Every site installation contract has been awarded and mobilized, construction of the tailings storage facility is running ahead of schedule, with the North and South-East embankments finished and the South-West embankment over 60% complete, while the basin is being readied for liner installation. The resettlement action plan was completed successfully, with handover of the final community infrastructure, which includes 2 schools, a dispensary, a granary, the Village office, and the church.
Craig Jones
executiveAt Tusker Hill, pre-stripping of the mining resource carried on, with 1.8 million BCMs relocated to date. As we enter the final stage of construction, Nyanzaga keeps gaining momentum, and I'm eager to share further updates on the build as it approaches completion. Just a couple of photos there. Turning to sustainability. Perseus delivered steady sustainability results across the June quarter and closed out, as we'd indicated, FY '26 LTI free. Our total recordable injury frequency rate came in at 0.87, with 3 medical treatment injuries logged in the quarter, and every site beat its leading safety indicator targets, which helped keep that performance stable. Our contribution to local economies totaled $388 million, comprising $226 million to local suppliers, $10.6 million in local wages, $126 million in taxes and royalties, and $0.5 million in social investment. Local and national employment held at 94%, and female participation rose slightly to 12.8%. On the environmental side, rehabilitation at assay made good progress. Our emissions intensity fell to 0.66 tonnes of CO2 equivalent per ounce produced, and lower water drills at Edikan and Sissingue brought down our overall group water intensity. So all in all, we turned in a disciplined, consistent sustainability performance to close out FY '26.
Craig Jones
executiveTo wrap up, Perseus turned in yet another robust quarter on the operations side, along with solid financial returns and meaningful advancement on the strategic growth projects we've outlined. Our balance sheet was made stronger — and with that stronger balance sheet, high-margin operations, and an obvious route to growth via Nyanzaga and CMA underground, Perseus sits exceptionally well positioned as we head into FY '27. Thanks for being with us today; I'll now open the floor to questions.
Nathan Ryan
executive<<operator_script>> Our initial question is from Reg Spencer of Canaccord.
Reg Spencer
analystI have a quick question about guidance, and congratulations on a really strong quarter — there isn't much that needs digging into. That said, I noticed you gave some specifics regarding what you plan to spend at Nyanzaga. But on the group CapEx guidance for FY '27, should we expect that alongside your full year results? Or could you give us some assistance there, please?
Craig Jones
executiveBeyond our capital projects, we haven't given any specific CapEx guidance. The key capital projects for us are really the CMA underground and the Nyanzaga projects, and obviously our sustaining capital is included in our all-in site cost guidance.
Operator
operatorRichard Knights from Barrenjoey has the next question for you.
Richard Knights
analystLet me just ask a quick question about Yaoure. That asset has seen two difficult quarters in a row. I'd like to get a sense of how the CMA underground is ramping up. Of the June quarter production, roughly what share came from underground versus open pit? And looking at guidance for next year, how does that break down between underground and open pit, and I suppose how confident are you in the way CMA is progressing?
Craig Jones
executiveYes. Thanks, Richard. I think where CMA is concerned, that project has had a really, really strong ramp-up. And as you remember, early in the year, the approvals needed to kick off that project came roughly 3 months late. So that held us back at the beginning of the year on the CMA underground side. We've managed to ramp that mine up faster than what we originally had in our budget. So we've actually made up some of that lost time over the course of the year. So that's been quite a solid performance from the CMA underground. And it comes down to a couple of things. I think the team on site are doing an outstanding job building the first and operating the first underground mine in Cote d’Ivoire, and the Ivorians are really embracing that well. But it's also very good ground conditions. So it's meant good development and good stoping performance. So we're quite confident in the ongoing ramp-up. Obviously, we keep ramping that up through the course of this financial year with a bigger second half than first half from the CMA underground. And so we're feeling quite confident with its performance.
Richard Knights
analystYes. And could I press you a bit on the FY '27 guidance — how much of it do you expect the CMA underground to account for? I'm just trying to get a sense of our model ramp-up and grades.
Craig Jones
executiveRight, and we haven't given any detailed guidance on how the split between underground and open pit will look. The only thing we've said is that we anticipate reaching commercial production around later this year — within this calendar year — but that's...
Lee-Anne de Bruin
executiveYes. I think, Rich, the one thing I really want to remind everyone of — as we've said — is that once a commercial reduction is running, you get 70% feed from the open pit and 30% feed from the underground through the mill, and that gives you a sort of 50-50 outcome in terms of ounces out of the RF on the 2 resources.
Craig Jones
executiveBut I think looking back at that first FID announcement for the underground gives you a fairly solid benchmark. We're hoping to outperform it, though at the moment we're running somewhat ahead of that pace. Still, yes — that's a useful reference point for how to think about the underground.
Richard Knights
analystYes, absolutely. Regarding the open pits at Yaoure, when it comes to those grade reconciliation problems and getting access to the pits, do you feel confident about the mine plan for FY '27?
Craig Jones
executiveYes, that's right. If you look at the last quarter, the work season across Africa was really quite wet — in Ghana as well as Cote d'Ivoire. So we ran into some problems that held us out of Stage 1 for a while. That was partly behind the grade issue in the last quarter. And then the other thing is we brought in some cyan oxide material, which was only being mined during June, and it didn't perform the way we expected it to. So those are the 2 mining challenges, more or less, that we faced during the quarter — both short-term issues.
Operator
operatorThe following question is from Branko Skocic of JPMorgan.
Branko Skocic
analystIt's great to see Nyanzaga progressing as planned toward January '27. What I was kind of hoping is that you could walk us through what the critical path looks like from here to that point, and also just confirm whether the mining contractor has been awarded yet? I may have overlooked that detail in the release.
Craig Jones
executiveYes. I think if you speak with critical path, it truly runs through the mills — all the infrastructure is moving along pretty much ahead of schedule — and it really comes down to getting those mills up and running and, of course, the commission into operation. So that's the key for the ongoing project. On the mining side, we've moved, as I mentioned earlier, 1.8 million BCMs project to date, and so we're well on track for our ore delivery. We're using local contractors to carry out that work. As for the longer-term mining contract, we're still working through it, and we've got plenty of time to get that contract awarded.
Branko Skocic
analystMy understanding was that the contract had to be awarded by call in September or October of this year. Does that timeline still hold? Or might we be able to push it out a bit and still...
Craig Jones
executiveThere's ample time on our side for that. We're able to move it later.
Branko Skocic
analystThat's reassuring. And then, I suppose my last question is this: clearly, the balance sheet sits in a really robust spot. What I'd like to do is dig a bit deeper into the capital management outlook and how the Board might be weighing sizing any further capital management — and is there a leaning toward something like a one-time special, or toward a sustained stretch of elevated returns across the coming couple of years?
Craig Jones
executiveYes. We’ll discuss that further in August. Clearly, we have the Board meeting during the year where all those kinds of capital-return elements will be considered, and after that meeting we’ll be able to speak with you more about it.
Nathan Ryan
executiveThe next question is from Regan Burrows of Macquarie.
Analyst
analystQuite a few of those have already been addressed, but maybe just on the all-in sustaining cost guidance. And then how sensitive is that, I suppose, to the fuel problems we're currently seeing across all miners?
Craig Jones
executiveYeah. Look, it isn't all that sensitive. Fuel cost makes up roughly a 10% kind of share. So it's not hugely sensitive.
Lee-Anne de Bruin
executiveNo. And when we assembled the total site cost, we relied on fairly recent fuel pricing for those assumptions.
Regan Burrows
analystSo then a big chunk of that inflation effect is really just Ghana's royalty system, so to speak, plus extra costs flowing through. Is that — and I suppose sustaining capital is higher? Is that roughly how we should be thinking about it?
Craig Jones
executiveYeah, for the following year — that's right.
Lee-Anne de Bruin
executiveThat's right.
Analyst
analystAll right, thanks. You mentioned the weather effects earlier — just to confirm, I assume there’s some carryover into Q1 FY ’27 from those weather impacts at Yaoure and Edikan, as I recall?
Craig Jones
executiveNo. Not at Sissingue too. I mean, every site received plenty of rain this year. But no, that isn't causing any continuing impact.
Nathan Ryan
executiveBen Wood from UBS has the next question.
Ben Wood
analystOkay, a quick question, I suppose, about how royalty regimes are shifting. Could you share whether any additional talks have taken place that you’re able to tell us about regarding what’s happening in Ghana, the kind of exposure there, and what you’re observing in Tanzania as Nyanzaga is brought up later in this financial year — and, broadly, I guess, the country-level risk you’re currently seeing throughout the portfolio?
Craig Jones
executiveYeah. I think — well, looking at Tanzania, there really aren't any discussions regarding royalties and similar matters right now. So that situation is fairly steady. Ghana has genuinely been through a shift in how it approaches taxation. So once more, things there are quite stable. As you know, there are always continuing discussions in these jurisdictions. But right now, they're comparatively benign. We remain in talks with the Ivorian government concerning its mining code. So that discussion isn't finalized at the moment, but we'll provide an update should anything change on that front.
Nathan Ryan
executiveOkay. That brings us to the end of the question-and-answer session. I'll turn things back over to Craig now for some closing comments.
Craig Jones
executiveThanks, Nathan. And as I mentioned earlier, I think we've delivered a solid quarter along with a solid year. We're eager to share more updates over the coming financial year, especially regarding Nyanzaga as it moves nearer to production. Still, none of this would be possible without the effort and commitment of the Perseus team, and I sincerely appreciate the outstanding results they keep delivering. And thank you all for joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Perseus Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Perseus Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Perseus Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.