In the fourth quarter of 2025, PG&E Corporation reported core earnings of $1.50 per share, reflecting a 10% increase year-over-year and aligning with the midpoint of their guidance. The company raised its 2026 core EPS guidance to a range of $1.64 to $1.66, indicating continued growth momentum. Key highlights include a 43% reduction in serious injuries and fatalities and a 19% improvement in reliability metrics, alongside a fourth consecutive reduction in electric rates, which are now 11% lower than January 2024. Management reaffirmed a long-term growth outlook of 9% annually from 2027 to 2030.
What topics did PG&E Corporation cover?
- Core Earnings Growth: PG&E reported core earnings of $1.50 per share for 2025, which is a 10% increase from 2024. CEO Patti Poppe stated, "This marks our fourth consecutive year of double-digit core EPS growth."
- Guidance Update: Management raised the 2026 core EPS guidance range to $1.64 to $1.66, up from previous estimates. This adjustment implies a 10% growth expectation for the year ahead.
- Safety and Reliability Improvements: The company achieved a 43% reduction in serious injuries and fatalities and a 19% improvement in reliability metrics. Poppe emphasized, "We had a third consecutive year without a major fire caused by our equipment."
- Affordability Initiatives: PG&E has reduced residential electric rates for the fourth time in two years, resulting in bills that are now 11% lower than in January 2024. This aligns with their strategy to improve customer affordability.
- Data Center Load Growth: The company reported 3.6 gigawatts of data center demand in the final engineering stage, which is expected to contribute to future load growth. Poppe noted, "For each gigawatt of large load, we see the potential to drive savings of 1% or more on average monthly electric bills."
What were PG&E Corporation's February 12, 2026 results?
- Core EPS: $1.50 (up 10% YoY, inline with guidance)
- 2026 EPS Guidance: $1.64 - $1.66 (raised from previous estimates, implying 10% growth)
- Reduction in Serious Injuries: 43% (compared to 2024, significant safety improvement)
- Reliability Improvement (SAIDI): 19% (improvement from 2024, indicating better service reliability)
- Residential Electric Rate Reduction: 11% (lower than January 2024 rates, enhancing affordability)
- Data Center Load: 3.6 GW (in final engineering stage, expected to drive future growth)
PG&E's strong earnings growth, improved safety metrics, and commitment to affordability position it favorably in the utilities sector. However, the ongoing legislative developments regarding wildfire risk management remain a critical factor to monitor, as they could significantly impact the company's capital allocation and operational strategy in the future.
Earnings Call Speaker Segments
Jonathan Arnold
executiveHello, everybody, and thanks for being here on this call covering PG&E's results for the fourth quarter and the full year of 2025. Joining us are Patti Poppe, our Chief Executive Officer, and Carolyn Burke, our Executive Vice President and Chief Financial Officer. Additional leaders from our team are also present with us at the Oakland headquarters. To start, please note that remarks today will contain forward-looking statements regarding what we expect for future financial performance; those statements rest on information management has at present. Several significant factors that might cause actual financial results to differ are outlined on page two of the earnings presentation for today. That presentation also provides a reconciliation of non-GAAP to GAAP financial measures. You can find the slides and other pertinent materials online at investor.pgecorp.com. We'd also suggest you look over our annual report on Form 10-K covering the year that ended December 31, 2025; and now, I'm happy to turn things over to Patti Poppe, our CEO.
Patricia Poppe
executiveThanks, Jonathan. Morning, everybody, and I appreciate you all being on the call. Today we're sharing core earnings for full year 2025 of $1.50 per share, which sits at the midpoint of the EPS guidance range we gave and represents a 10% increase versus 2024. That makes it our fourth year in a row delivering double-digit growth in core EPS. I take pride in the way our team remained concentrated on what matters most — service that is safe, reliable, and affordable for the people we serve — while simultaneously producing solid outcomes for investors. Turning to what's next, we're both raising and narrowing the 2026 core EPS guidance range. The bottom end goes up by $0.02, taking the range to $1.64 to $1.66. At the midpoint, that 2026 guidance works out to 10% EPS growth. Farther out, I'm glad to restate our outlook for growth of 9% plus each year between 2027 and 2030. As has become customary with us, future growth will keep being anchored to our actual earnings. As we told you earlier, last month marked the start of the 5-year extension of my contract as CEO, taking me through 2030. The work in front of us gives me a lot of energy. Our priorities haven't changed: keep power on and gas moving safely, and make bills easier to handle; that's a safety, reliability, and affordability trifecta, and it's what we're delivering at PG&E. When it comes to safety, during 2025 we cut serious injuries and fatalities by 43% relative to 2024, and our rate of serious preventable motor vehicle incidents got 30% better, giving us some of the strongest safety metrics we've ever posted. On the reliability side, system-wide performance as measured by SAIDI came in 19% better than 2024. And regarding affordability, steady execution against our plan — our simple, affordable model — is what lets us carve out a differentiated path for our customers; on January 1, we brought electric rates down for the fourth time in 2 years, and gas rates fell as well. Adding those to earlier decreases, our bundled residential electric rates now sit 11% below January 2024, and a typical customer pays roughly $20 less each month — the kind of progress customers can actually feel. Should our pending 2027 GRC win approval as filed, combined gas and electric bills would be flat to lower versus 2025, and we'll keep pushing, since fighting for customer affordability sits at the heart of our strategy. Going forward, we see chances to improve this trajectory even more by adding rate-reducing load from data centers and other electric growth. That new load can create a win-win for California — economic development plus affordability. Slide 4 ought to look familiar by now, and it sums up our steady execution record. Every year brings its own headwinds and tailwinds, yet our method doesn't change: plan conservatively and execute relentlessly so we deliver consistent, predictable results over the long term. During 2025, we faced early headwinds and responded with strong execution throughout the year, especially on costs, which ultimately left us ahead of plan. That let us redeploy and pull ahead costs during the back half of the year. That is our model performing precisely as intended, producing steady outcomes for owners while redirecting superior performance to serve our customers. On this slide, you can see that across the last 4 years, efficiencies created through our straightforward, cost-effective approach have enabled us to redirect more than $700 million toward customer benefit, all while continuing to deliver for our investors. Those are funds that might otherwise have appeared as greater earnings, yet we opted instead to channel them into improved customer results and reducing risk in future periods. To put it differently, earnings and customer savings are inseparable. Moving to Slide 5; we continue to be sharply focused on assisting California in finding a way forward on the state's wildfire problem. We will remain constructive and persistent until we achieve a more sustainable, safer and more affordable future for our customers, for our communities, for our state and for those who entrust their capital to us. Since our previous call, the California Earthquake Authority stakeholder process for SB 254 Phase 2 has been moving ahead, and they are on track to submit their report and recommendations to the governor and legislature by April 1. I should mention that the April 1 CEA report will not represent the conclusion of Phase 2. In reality, it will signal the start of the legislative process. We aren't providing specifics today about which policy options might prove most effective, but rest assured, our team is actively involved. Regarding core principles, our objective is to tackle the open-ended and unknown risks, which the existing framework places on the IOUs and our customers. For California to draw in your much needed capital, you must be capable of quantifying and pricing the risk. Our customers in hometowns need us to obtain affordable capital as a precondition for the safe, resilient and clean energy system they expect. Moving to Slide 6. Ignitions declined 43%, leading to a third consecutive year without a major fire caused by our equipment. This was accomplished even with elevated fire activity across the state. As we do annually, we aim to drive additional safety enhancements in 2026. We anticipate further expanding our continuous monitoring capabilities, including our smart meters, which are assisting us in getting ahead of potential problems, foreseeing failures before they occur; in late January, we announced the launch of Emberpoint, a new venture between Lockheed Martin and PG&E Corporation, marking a critical milestone in our mission to end catastrophic wildfires. Emberpoint is meant to integrate next-generation wildfire solutions and establish a new standard of wildfire safety. With our regulators' approval, we can contribute our wildfire mitigation experience and proven layers of protection, while Lockheed Martin contributes its cutting-edge prediction and detection along with military-grade equipment and tools to help our firefighters stay safe while extinguishing fires more quickly; we can speed up at scale the deployment of technology at the lowest societal cost, the objective being speed to safety, making our system and others safer faster. Beyond that, Emberpoint offers a route for returning a portion of savings to our customers as time goes on. Additionally, January saw the announcement of 5 finalists in the autonomous response track of XPRIZE Wildfire, with PG&E serving as a main sponsor. Come this summer, those 5 finalists will be asked to show autonomous systems capable of detecting and completely suppressing a high-risk fire inside a 1,000 square kilometer test zone within minutes, all while leaving decoy fires alone. We are beyond thrilled to support the real-world adoption of these game-changing solutions. Turning to regulation, the CPUC issued revised guidelines in December for utility undergrounding plans. That marks a key step forward, moving us toward likely initiating our 10-year plan filing with OEIS in the third quarter of this year. Earlier this week, together with the other IOUs, we completed a required filing with the CPUC to establish the benefit cost ratio methodology. In line with that, the CPUC guidelines give us a path to file for approximately 5,000 miles of additional undergrounding over 10 years starting in 2028. Those miles will make up the next phase of our undergrounding journey and will add to the 1,900 miles we expect to have completed by the end of 2027.
Patricia Poppe
executiveWhen you add in the work on overhead hardening, our overall system hardening plans through 2037 would reach nearly 11,000 miles, which covers over three-quarters of the high fire threat miles we intend to harden under our present modeling. Operational controls such as PSPS, EPSS, maintenance — vegetation management and continuous monitoring among them, just as we do now — will protect the rest of our overhead system along with the HFTDs. Slide 7 illustrates how PG&E's affordability story stands as our story of the year. Like I mentioned earlier, we reduced the rates for bundled residential electricity on January 1 — marking the fourth reduction in a span of two years. Today, the typical bill for those customers is 11% lower than it was back in January of 2024. That point is worth restating. A lot of the conversation around affordability focuses on absolute figures. But what tends to get overlooked is this: if you look at the share of wallet, our bills actually come in below the U.S. average. That means when you factor in income levels, the value we offer is better than average. Our pricing is moving in a favorable direction, and we believe it will become simpler for policymakers to see that going forward. When we put forward our 2027 GRC filing, we explained that the straightforward, affordable approach we follow gives us room to fund necessary investments while holding customer bill growth to no more than ordinary inflation. Back in 2024, we started talking about an enhanced version of that straightforward, affordable approach. What we found was that each of the core components held potential for further improvement, and our goal was to push the path of future customer bills down even more. So now, as you can see on Slide 8, I'm pleased to share that we are officially revising this approach, setting a fresh objective for future bill growth of 0% to 3%. That's not a misstatement — holding our bills flat, at 0%, is achievable; we've strengthened 2 main drivers: reductions in nonfuel O&M expenses and growth in electric load. We're gaining more and more belief in the PG&E performance playbook and in what we can do when it comes to producing savings. There's still plenty of room for savings, which our capital to expense ratio shows — it went from 0.8 to 1.0 over the last 2 years. Even with that progress, our ratio remains far below the 2.0 average for our peer group, and the top decile performers are close to 3. Turning now to Slide 9 and our rate-reducing load story. Since the update we gave in the third quarter, the number of projects reaching the final engineering stage has climbed a great deal, and they now add up to nearly 3.6 gigawatts. We added 2 gigawatts, which is over twice what we had in the prior quarter. We're excited about the opportunity to serve large load and pass savings along to our bundled customers, all while supporting growth and economic prosperity in our state. Carla Peterman attended a ribbon-cutting in January for us at the Equinix Great Oaks South Data Center — the inaugural data center to go live as part of our joint implementation agreement with the city of San Jose. Here was a chance to show that PG&E keeps its word when it comes to supplying big energy users with power that's both quick and dependable; for every gigawatt of large load, we anticipate the ability to generate savings of 1% or more on the typical monthly electric bill. To achieve that, honestly, the answer is fairly straightforward. The only thing required is for us to set the pricing correctly. And although the connection between data centers and what customers can afford is getting considerable national attention these days, proving savings for our core customers was nonnegotiable for us right from the start and remains that way. Having said that, I'll turn things over to Carolyn.
Carolyn Burke
executiveThanks, Patti, and good morning to all of you. On Slide 10, what we're presenting is the earnings walk for full year 2025. At the midpoint of our guidance, core EPS stands at $1.50, which represents a 10% increase over 2024. From our customer capital investment, we've contributed $0.07, putting essential capital to work for customers in areas like safety, resiliency, reliability, capacity, and new customer connections; in fact, regarding new connections, by late 2025, application intake time had been reduced by 40%, going from a 2023 average of 76 days down to only 45 calendar days. And thanks to our performance playbook, engineering design times have fallen by 1/3. For the year, our operating and maintenance savings totaled $0.20, and we could redeploy $0.09 back into our system for customers' benefit. During 2025, we had more than 160 waste elimination initiatives, coming from all across PG&E, from the front line to the back office; and we're not finished, since this is a muscle we keep strengthening. Timing items reversed for the full year, with the other bucket here largely reflecting benefits from smart tax planning, as we discussed on the third quarter call. Now to Slide 11. Our $73 billion 5-year capital plan is unchanged. We continue to see at least $5 billion beyond the plan, a large portion of which is FERC jurisdictional capital, which can enable rate-reducing load growth. Here on Slide 12, I'm glad to share our 5-year financing plan. During the third quarter call, I shared our financing guidepost; those principles remain the same and are reflected here. Importantly, our plan is structured so that no new common equity is required through 2030; we keep prioritizing investment-grade ratings, including sustaining FFO to debt in the mid-teens. And we still aim to reach a dividend payout of 20% by 2028 and maintain that level through 2030. As you probably noticed, we doubled our annual share dividend to $0.20 for 2026. And according to our payout guidance, consistent increases can be expected in the next 2 years. This plan provides flexibility across the 5-year period and rests on conservative assumptions; on this slide, we're also presenting our expected 2026 utility debt issuance of up to $4.6 billion. Some modest additional parent level debt financing is included in our plan, which may involve efficient tools such as junior subordinated notes. Overall, we expect our percentage of parent debt to stay below 10% through 2030, which sits at the lower end of sector norms. While this need falls more towards the back end of the plan, we'll always be opportunistic about timing our market access. Given uncertainty on timing and indeed whether the contingent contributions to the continuation account will be called, we've not explicitly included these in our waterfall. If they were called, PG&E's share would be $373 million annually over 5 years, which we would plan to debt finance and still maintain our mid-teens credit metric. Now to Slide 13. Securing investment-grade ratings and obtaining financing efficiently are central tenets of how we plan to fund the business. If we had that investment-grade credit, we could tap debt at a cheaper cost, which would open up a significant additional lever for making things more affordable for the people we serve. On the subject of how we allocate capital, in line with our prior comments, a state-led process and wildfire policy reform are currently in motion, and our view remains that the investment plan we have today is the one that serves our customers and investors best. A change is not warranted right now. That being said, you'd naturally expect us to be disciplined in how we go about it. And should we get to a stage where clear signs of legislative progress aren't appearing, then rest assured we will scrutinize every element of our plan very carefully. Turning to Slide 14, this is the part that genuinely energizes me. We brought nonfuel O&M down 2.5% during 2025, which means our target has now been beaten 4 years running, and there's certainly more work ahead. As Patti noted, on today's call we revised our simple affordable model to capture O&M savings within a 2% to 4% range, which is higher than the 2% goal we had previously. And keep in mind, that savings goal comes after inflation and other cost pressures have already been absorbed. Slide 15 lays out the legislative and regulatory dates ahead of us. California's legislative session has begun already. As you're aware, the Wildfire Fund Administrator's report has an April 1 due date; over on the regulatory side, our general rate case is moving forward, with intervener testimony scheduled for tomorrow and hearings set for April. We anticipate submitting our 10-year undergrounding plan to OEIS during the third quarter, and we're on track for a November proposed decision in the Kincade and Dixie cost recovery proceeding. I'll wrap up here on Slide 16 with the value proposition. It serves as a reminder that the simple, affordable model delivers results. The idea itself is straightforward, yet it's our differentiated performance that is creating benefits for customers and investors alike; and with that, I'll turn things back over to Patti.
Patricia Poppe
executiveThank you, Carolyn. We recognize that for a lot of investors, the key uncertainty continues to be how the state handles wildfire risk under SB 254 Phase 2, and we are absolutely dedicated to reaching a result that satisfies the main objectives. Those objectives include keeping up our momentum in cutting wildfire risk, while at the same time making sure our customers can afford their bills and drawing capital into California's energy infrastructure. Before we get to your questions, I'd like to walk through a few things that stood out over the last 12 months. We posted a major drop in serious injuries and motor vehicle incidents, which gave us some of the strongest safety results in our history. Ignitions came down by more than 40%, which meant a third straight year in which no major fire was traced to our equipment. Electric reliability got 19% better compared with the prior year. Right now, 3.6 gigawatts of data center demand sits in the final engineering stage, which puts us in position to capture load growth that lowers rates. Our customer transaction score, which we track daily, has risen, and when our customers deal with our frontline team, our field crews receive a 9.5 out of 10 rating from them. Our brand trust has gone up. O&M came down by 2.5%. We turned in yet another year of double-digit earnings growth, which stretches our execution track record even further; and on top of all that, we brought bills down once more through our now amplified, simple, affordable model, which offers a pathway to 0 bill inflation. That's a year worth being proud of; with that, operator, please open the lines for questions.
Nick Campanella
analystIt's good to see the overall progress, and we certainly heard you regarding the 0% to 3% build growth in the refresh plants, so thank you for that. Perhaps, if you were to look back on the CEA process, what encourages you the most? And then, what's your take on getting something accomplished through legislation in June rather than September, considering where the summer recess falls? In the past, I believe matters have stretched all the way to September. I'm curious whether, in your view, there's enough broad alignment to potentially finish something earlier than that? And any thoughts on timing?
Patricia Poppe
executiveYes. Thank you, Nick. I'll begin with the timing questions. Look, this is a complicated legislative undertaking, and we absolutely want to back taking the time necessary to do it properly and achieve the right results. And clearly, doing it sooner would be preferable, but we want to ensure the single most important thing is getting something done correctly this year; so we are very focused on truly helping ensure we're standing on the right footing, that we possess the right information and that decision-makers have the information they require to make good decisions; and so that brings us to the CEA process. And look, I would say they are exactly where they ought to be regarding timing within the process; they are doing what they committed to doing. That encourages us. And as they wrapped up their most recent webinar, the CEA stated they're concentrating on an actionable, viable and durable solution. And wow, we really back that because we know our customers and our investors carry a disproportionate cost under the current construct, and it is regressive. Our most vulnerable citizens are overpaying under this current construct; and so we definitely support the actions being considered; we do believe the most important criterion for us as we examine it is ensuring we keep concentrating on risk reduction and recovery outcomes for costs that are incurred. Affordability clearly must be a key element of any solution that exists. And currently, the present model is unaffordable for our customers; and so we must repair that and ensure then that most importantly for the audience on this call, we continue and are able to remain investable and that you can price the downside risk tied to the legal construct here in California. So we are very focused on achieving the right results and taking the time needed to do so here in this legislative session.
Nick Campanella
analystAnd I recall that in the prepared remarks, there was some talk about how you'd take another look at the whole plan based on what signals of movement you see in legislation generally. Could you — if things don't unfold the way they're supposed to, could you give us a feel for a few of the items, or how you'd sort of rank what comes first in capital allocation — whether that's capital investment, the dividend, or something else you'd examine initially?
Patricia Poppe
executiveLet me step back for a moment and talk about capital allocation broadly. Like Carolyn said, and I'll say it again for everybody listening, we see the same things you do. We can run those numbers too. Today's valuation simply cannot be sustained. We're raising that alarm everywhere we possibly can across California, in every office and every discussion, so that folks grasp what the investor-owned utility model is worth and why bringing in low-cost, high-quality investment matters so much for spreading infrastructure costs for customers across the long term. That requires an appealing legislative construct. Which is exactly why SB 254 Phase 2 matters so much. We say that, and like I mentioned before, we do believe they're exactly where they ought to be, and people are doing what they promised, so that leaves us feeling good. But when we think about capital allocation right now, since that progress encourages us, since we're having the right discussions, and since we're delivering everything I discussed on this call — performance is power here. This isn't the moment for us to retreat from serving our customers. As I noted, our safety keeps getting better. Reliability is 19% higher year-over-year. Customer satisfaction has risen. Trust has risen. Rates have fallen. All of which is to say this isn't the moment to alter the model; still, to your final question, Nick, if things stall or go off track or we sense the state has stopped caring about reaching the right result on 254, then clearly every element of our plan has to be and will be considered. We won't keep sustaining this valuation. So as of today, that might look many different ways, and I won't rank and stack them for you on this call, but there are numerous ways to tackle that issue. And the whole plan will be considered if we don't see movement or if it stalls and goes off track.
Steve Fleishman
analystSo then, perhaps picking up where we left off on the CA matter. Last week, that perspective came through to us from the CPUC. And I'm somewhat interested in what you make of it. And what kind of sway might they carry with the legislature during this?
Patricia Poppe
executiveRight. What the CPUC observes matches our own observation — the model in place today is regressive, and it places an outsized weight on our electric IOUs along with our customers. So I was grateful that they laid out their perspectives; the position they back is the position we back, namely an approach spanning all of society. And I believe folks will certainly pay attention to the CPUC's thinking. Their role as a state agency is to verify that our utilities stay financially healthy and that rates and affordability work for customers. And since we've performed well and can bring rates down even as we keep making service better for customers, our hope is that this makes it simpler for the CPUC to advocate completely for the reforms we consider needed in SB 254 Phase 2.
Steve Fleishman
analystAll right. That's helpful. Now, circling back to the straightforward affordable model adjustments. Regarding the growth rate — does this essentially mean that, with improved visibility from the data centers you currently possess, you have some kind of line of sight toward stronger growth? Yes, the action I'd take would be greater.
Patricia Poppe
executiveCorrect. Correct. We absolutely observe, and as we communicated, 3.6 gigawatts sitting in final engineering; earlier we indicated roughly 1.5 gigawatts out of that total would be operational by 2030; at this point we're stating it's nearer to 1.8 gigawatts becoming operational by 2030. Naturally, that keeps shifting and developing; and when we receive additional applications and are able to merge projects and get things operational more quickly, clearly, we would speed that up. However, the encouraging part is that we truly do witness that genuine load growth at the project stages, which renders it quite tangible, and we hold a great deal of confidence regarding it; we mentioned 2% to 4% load growth within the straightforward affordable model; that 4% sits more toward the latter portion of the 2030 — of the 5-year plan, yet we certainly do observe it within that. And we likewise observe, as Carolyn mentioned, a chance to keep boosting our O&M reductions while we keep improving how we serve customers; so it truly is a blend. I'd add that we continue to witness EV load penetration. We recorded 18% EV penetration during the final quarter of the year, even once the incentives disappeared. Thus we unquestionably continue to observe rising EV demand too, and that represents another load driver.
Analyst
analystMarcelo here, filling in for Shar. I want to pick up where we left off regarding the data center topic. What's the right way to view the schedule for the ramp once we get past 2026? And to make sure I have this right, is that final engineering phase completely baked into the 0% to 3% bill growth and the CapEx opportunities around transmission, or does it become incremental once construction begins?
Patricia Poppe
executiveYeah. That — so the 0 to 3% includes our loan growth; to hit 0, we'd have to see additional volume from that low growth come online. As I mentioned earlier, when we look at the ramp through 2030, roughly 50% of the 3.6 gigawatts should be online by the close of that range, meaning 2030. That falls inside the 2% to 4% zone during that 5-year window; so treat it as a ramp across that period. That said, there are other items we have in the pipeline to support affordability beyond — we discuss O&M and load growth on that. On the other line, we kept it at 2%, but supply costs and other components of the bill matter too; our supply cost improved nicely versus a year ago, which is thanks to our amazing supply team and the efforts they've made to lower the cost of the energy we buy, procure, and generate; so many factors feed into a customer's bill that can move us toward that 0% to 3% range, and we're pushing hard to land as close to zero as possible; we'll keep at it daily.
Analyst
analystGreat. Turning a bit to credit metrics and the investment-grade rating from one agency — what kind of motivation exists to keep enhancing the balance sheet, and what's the visibility on getting investment-grade status from multiple agencies?
Carolyn Burke
executiveYes, I'll handle that. This is Carolyn. A few points. Keep in mind that Fitch upgraded us to investment grade just this past fall. Our financial metrics, according to both Moody's and S&P, satisfy the criteria for investment grade. What they're focused on, once again, is the headway being made on SB 254, rather than further strengthening of our balance sheet. That being said, our dedication to keeping FFO to debt in the mid-teens range hasn't wavered at all, and we're still focused on putting together a financing plan that can hold up over the long term so we keep hitting those targets.
Anthony Crowdell
analystI wanted to add to what Steve asked. I had just one thing; regarding the legislature, there are some fresh faces or possibly familiar faces in different roles within the state Senate. Senate Lamona serves as pro temp of the Senate, and also a s. I'm just interested in whether you've spoken with them. I'm simply asking if you believe that could be a necessary large share of backing to get something passed.
Patricia Poppe
executiveNaturally, we have been talking with the leadership, and we remain in those discussions — and I believe one of the difficult aspects is that our business model is not easy to grasp. It's also difficult for people to accept and recognize that you can increase profits while decreasing rates simultaneously; that's the reason our results matter so much, and why our saying that performance is power truly applies right now as we strive to inform every legislator, including the leaders and others, that we can indeed put money into long-term infrastructure, keep the system safe, keep the system resilient, and bring costs down. I believe affordability is foremost on the minds of the entire legislature. And I think they will want to grasp that as they make choices and can recognize that 254 is in fact adding to the affordability problems for their constituents, which places us on very solid shared ground. Our goals align; we both want a safe state. We want resources to be able to respond when an incident occurs and spread is happening, yet our customers ought not to be subjected to this regressive policy that leaves them carrying both the expense of hardening the infrastructure and the claims that result when we were, in fact, prudent and capable operators; so I think that issue requires a lengthy explanation for people. Therefore, the more we collaborate with the legislators to assist them in seeing the complete picture, the better. So we anticipate working with those leaders to help ensure they are making the finest choices for the people they represent, who happen to be the very people we serve.
Julien Dumoulin-Smith
analystHey, I just wanted to revisit the upside capital you have here — setting aside 254, how are you thinking about that $5 billion, and when might you be in a position around it? And while obviously you're talking about sales and that trending the right way, I'd love to hear your thinking on upside within the $73 billion CapEx plan. And along with that, how are you thinking about financing it, to the extent you were to go down that rabbit hole? My guess is there's debt capacity that could eventually accommodate that upside capital you're identifying, and/or how do you think about <<inaudible>>
Carolyn Burke
executiveYes. Yes. Julien, Carolyn here. I'll take that one. When we think about that extra $5 billion, as we've said before, there are — we see 3 options. With the first option, you can enlarge the plan, right? You could raise your $73 billion. But given the valuation discount we currently have, that's probably the least likely. Then there's the potential to improve the plan. And by improve, we mean especially in terms of affordability. One example would be accelerating or prioritizing certain capital tied to new load that could enhance our build trajectory. And the third option is we could simply stretch it out by extending our above-average growth runway. So where we stand today, seeing the pipeline for load growth, the way we think about that $5 billion is that if any additional capital comes in, it's probably option 2, where we're looking to improve the plan, staying within the $73 billion envelope of our capital plan, but making sure we can drive affordability for our customers with that additional capital. On financing, I'll just say we continue to prioritize avoiding the need for equity at today's low values and maintaining FFO to debt at mid-teens. So as we look at financing, those are 2 of our key principles.
Julien Dumoulin-Smith
analystGreat. Perfect. And if I could just ask a quick follow-up regarding what's happening on the process side, are there any particular milestones past April 1st that you have your eye on? I realize it can get rather murky and unclear during those summer months, but is there anything notably flat at this stage, at least past that April 1st recommendation?
Patricia Poppe
executiveYeah. My sense is that — I wouldn't highlight any particular milestones. My sense is that conversations will keep happening, and it's still unclear how much of that political dialogue ends up visible to the public, or whether a subcommittee deals with it, or whatever approach the legislature chooses for handling things after recommendations have been handed to them.
Carly Davenport
analystI've got a few fast follow-ups on some of the other topics. First, regarding the data center pipeline — it's really encouraging to see that expansion in final engineering and in what's under construction. Can you give any detail on how the overall pipeline is shifting? Is this a matter of high grading, or are you noticing any changes in the general tone around demand?
Patricia Poppe
executiveYeah. What I'd say is that figure is going to keep changing; as we noted — or at least as we put on the slide — a Chief Commercial Officer has just been brought on board, and we see plenty of opportunity. When people think about manufacturing, California doesn't typically come to mind, but I want to remind everybody listening that no other state produces more goods than California. No other state has more manufacturing jobs than California. My expectation is that those businesses plan to expand; so we're working to ensure we can serve their growth too, whether that's robotics, silicon manufacturing equipment, or chip manufacturing equipment. All of that is based here; and there's an electric bus company in California — companies like these plan to expand. So we want to make sure we're growing alongside them as well; what I'd say is that figure represents a snapshot. And I expect that eventually, once people understand we have the capacity to actually hit the timelines they're looking for and to ensure what we provide is affordable for every one of our customers, we will keep being a crucial enabler of California's prosperity, and that prosperity demands — it calls for growth, and we're thrilled to supply the power for it.
Carly Davenport
analystThat's very clear. Then, returning to the wildfire policy reform, as you mentioned, considering both how urgent and how complex this is. I'm wondering, do you expect it to be finished within this legislative session? Or could you see other processes potentially emerging from this one?
Patricia Poppe
executiveWe hold a lot of hope that the substantive risk and cost allocation has been settled by this, and we're quite hopeful it gets resolved while this legislative session is underway. That would be — this is phase two of a process with 2 phases, a session lasting 2 years. And we've gotten — I believe we've observed the same thing everybody else has, that they are precisely where they promised they would be. Things are proceeding according to plan, and the CEA is an extremely professional organization, and I'm impressed by the steps they've taken and then delivering on precisely what they committed to do.
Gregg Orrill
analystNice work on these results. I wanted to ask about the cost recovery cases tied to Concede and Dixie — who's in charge of those, and what do you anticipate coming out of them?
Carolyn Burke
executiveSure. Back in November 2025, we submitted our filing — it's the first catastrophic wildfire matter involving a prudency reopening. Our submission covers an examination of the amounts the wildfund paid out for Dixie and Kincade, and those claims exceed $1 billion. That comes to roughly $674 million. On top of that, we're seeking to recoup WEMA costs of approximately $1.6 billion. Keep in mind, at that point we lacked self-insurance, so this mainly represents the gap — the doughnut hole — spanning what insurance reimbursed us and the $1 billion threshold we must reach before tapping into the wildfund. So that's the second item we want recovered. Then there's CEMA costs, around $314 million, which we're also pursuing. That sums up our asks. Let me note that for both Kincade and Dixie, we held a valid safety certificate — meaning we're considered reasonable on prudency. Our case is strong, in our view, and we feel the facts back it up.
Ryan Levine
analystI had a quick follow-up to clarify something you mentioned. Is the goal to speed up the prudency determination via the CEA process when it comes to future liabilities or future claims — that CEA process?
Patricia Poppe
executiveYes, Ryan. Through that CEA process, we're examining quite a number of items. So honestly, nothing specific. It will be a collection of options, improvements, and construct. And so I'm reluctant to commit to a particular result, other than wanting to ensure the risk — the downside risk — is knowable and affordable for customers and investors alike, and there are likely many paths to get there.
Patricia Poppe
executiveAppreciate that, Oliver. And thank you all for being here with us today. Let me just cover the main takeaways. So, when it comes to safety, we've gotten better. Reliability is better too. Customer satisfaction has gone up. Earnings have risen as well, and our rates have come down. As far as what really matters in operating a top-tier utility, I couldn't feel more proud of the people on this team and everything they've accomplished. And for an organization that puts love first, Happy Valentine's Day. I hope tomorrow holds something great for you. Make the most of it. Thank you very much. Talk to you soon.
Operator
operatorThat brings us to the end of today's call, everyone. Thanks so much for joining us. At this point, you're welcome to hang up.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PG&E Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PG&E Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PG&E Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.