In the first quarter of 2026, Pinnacle West Capital Corporation reported earnings of $0.27 per share, a significant improvement from a loss of $0.04 per share in the same quarter last year. Revenue growth was driven by increased transmission revenue, favorable weather conditions, and a 2.2% increase in customer growth. Management maintained its annual sales growth guidance of 4% to 6%, indicating a strong start to the year and reaffirming their commitment to infrastructure investments to support ongoing demand.

What topics did Pinnacle West Capital Corporation cover?

  • Strong Customer Growth: Pinnacle West reported a customer growth rate of 2.2%, which is near the high end of their annual guidance. This growth is indicative of the expanding demand in Arizona's economy, particularly in the semiconductor sector. Management stated, "We continue to see a consistent ongoing influx of customers into our region."
  • Transmission Revenue Growth: The company experienced a notable increase in transmission revenue, contributing $0.16 to earnings per share. This growth is attributed to heightened transmission investments to support the growing customer base. Andrew Cooper noted, "Transmission revenues contributed $0.16 of benefit this quarter."
  • Weather Impact: Favorable weather conditions contributed significantly to earnings, with a $0.13 benefit attributed to increased cooling degree days in March, which was the hottest on record. This weather-driven demand positively impacted both residential and commercial sales. Cooper mentioned, "The resulting impact was a benefit of $0.13 attributable to weather in the first quarter."
  • Operational Efficiency: Pinnacle West reported a significant decrease in O&M expenses, primarily due to lower plant outage expenses and reduced energy efficiency program costs. This focus on cost management supports their goal of declining O&M per megawatt hour. Cooper stated, "We continue to have a strong focus on cost management."
  • Rate Case Progress: The company is progressing with its rate case, having completed multiple rounds of written testimony, with hearings scheduled to begin on May 18. This is crucial for reducing regulatory lag and improving investment recovery. Geisler mentioned, "Our rate case remains on track."

What were Pinnacle West Capital Corporation's May 4, 2026 results?

  • Earnings Per Share: $0.27 (compared to a loss of $0.04 per share for the first quarter of 2025)
  • Transmission Revenue Contribution: $0.16
  • Weather Benefit: $0.13
  • Customer Growth Rate: 2.2% (near the high end of our annual customer growth guidance)
  • Weather-normalized Sales Growth: 9.4%
  • O&M Expense Reduction: null

Pinnacle West's strong first quarter results reflect solid operational execution and favorable market conditions, positioning the company well for continued growth. Investors should monitor the progress of the rate case and subscription model negotiations as key catalysts, while also being aware of potential regulatory challenges that could impact future earnings.

Earnings Call Speaker Segments

Amanda Ho

executive
#1

Thank you, Matthew. I want to express my appreciation to each of you for joining this conference call and webcast, where we'll go over our first quarter earnings, recent developments, and operating performance. Joining us today are our Chairman, President, and CEO, Ted Geisler, along with our CFO, Andrew Cooper. Jose Esparza, SVP of Public Policy, is also with us. Before we begin, there are a few details I need to go over. The slides we'll be referencing can be found on our investor relations website, together with our earnings release and related information. Today's remarks and our slides include forward-looking statements that are based on current expectations, and actual results could differ materially from those expectations. Our first quarter 2026 Form 10-Q was filed this morning. Please see that document for forward-looking statements, cautionary language, and the risk factors and MD&A section, which identify risks and uncertainties that might cause actual results to differ materially from those contained in our disclosures. A replay of this call will be posted on our website shortly and will remain available for the next 30 days. It can also be accessed by telephone through May 11th, 2026. I'll now hand the call over to Ted.

Ted Geisler

executive
#2

Thanks, Amanda, and I appreciate everyone being on the call today. We've gotten off to a strong beginning in 2026, posting first quarter results that back up the financial guidance we gave in February. Before Andrew walks through the quarter in greater detail, I want to call out a number of operational, customer, and regulatory items that show the momentum running through our business. Arizona's economy, which is diverse, keeps growing at a robust and durable rate, which cements the state's standing as a nationwide leader in semiconductors and advanced manufacturing; we take pride in backing TSMC's faster expansion in Arizona and in collaborating closely with the company on the infrastructure required to fuel their growth. Now that its second fab is finished, TSMC anticipates starting volume production of 3 nm chips during the second half of next year. Work has begun on the company's third fabrication facility, and TSMC has broken ground as well on its fourth fab and its first advanced packaging facility, and those facilities should come online by 2029. Notably, this momentum reaches far past TSMC. Throughout the region, activity up and down the semiconductor supply chain keeps building, as key suppliers quickly set up and grow their local operations to match faster production timelines. United Integrated Services Corp, Sunlit Chemical, and Mornstair have each bought land in North Phoenix. Meanwhile, engineering firms, clean room specialists, electromechanical integrators, and equipment suppliers are adding headcount and expanding operations throughout the valley. These investments show robust confidence in Arizona's economy and bolster the sustained growth we see across our service territory. Shifting to operations, we stay focused on providing top-tier reliability, bolstering grid resilience, and putting money into the infrastructure and technology required to serve our customers safely and efficiently. Companywide, we're leveraging automation and advanced analytics to sharpen decision-making and execution. As an example, we're deploying machine learning tools to anticipate equipment performance better, rank asset maintenance, pinpoint outage restoration with greater accuracy, and boost situational awareness when wildfire or weather risk runs high; these capabilities help our teams respond more quickly, direct investments more effectively, and keep enhancing reliability for our customers. We're still making steady headway on our plans to invest in generation and transmission. Construction has started at our Redhawk expansion project, which will bring eight combustion turbines and roughly 400 MW of dependable natural gas capacity onto the system. We're also moving the Desert Sun project forward, having locked in major equipment reservations and continued working through early development steps, such as siting and permitting. On procuring resources, we recently got proposals responding to the all source RFP we issued later last year, which sought new resources starting service between 2029 and 2031. We're reviewing those bids at present and coordinating with counterparties to figure out which projects fit our system and customers best. We anticipate final awards later this year. We plan for long-term growth, and we're also concentrating on near-term summer readiness. Palo Verde Unit 2 is wrapping up the last days of a scheduled refueling outage and should be back online shortly. Once all 3 units are running, Palo Verde will keep supplying dependable, around-the-clock, cost-effective power that helps us satisfy summer demand; we are ready to serve our customers in a safe, reliable, and affordable way over the coming months, when they rely on us the most. We keep reinforcing a culture centered on customers, with team members dedicated to dependable service, fewer outages, and a smooth experience through phone, field, and digital channels. During Q1, APS posted solid results under the Escalent customer relationship model, placing in the first or second quartile on every core KPI. APS likewise placed in the first quartile through J.D. Power and received national recognition as a top performer in customer awareness and engagement with products and services, achieving the nation's highest awareness score for offered customer programs. Finally, our rate case is still on schedule. We have finished several rounds of written testimony, and the hearing is set to start on May 18th. We look forward to engaging with the Commission and intervenors promptly and constructively; in short, we are carrying out our plan. Providing operational excellence for our customers, putting capital into grid expansion to support Arizona's rapid growth, and enhancing investment recovery to shrink regulatory lag while preserving affordability for our customers; with that, I will hand the call to Andrew.

Andrew Cooper

executive
#3

Thanks, Ted, and I appreciate all of you being here today as well. Earlier this morning, we released our financial results for the first quarter of 2026. I'll walk through those results and give you more specifics on both sales and financial guidance. In Q1 of 2026, we posted earnings of $0.27 per share, versus a loss of $0.04 per share in the same quarter of 2025. The main positive drivers this quarter were greater transmission revenue, favorable weather, increased sales and usage, and reduced O&M. Those gains were partly counterbalanced by higher financing costs, a reduced benefit from our El Dorado Investment compared with a year ago, and greater depreciation and amortization. Transmission revenues added $0.16 of benefit this quarter. That speaks to our ongoing emphasis on expanded transmission investments meant to serve our rising customer base. We anticipate a substantial benefit in this area across the year, consistent with our annual guidance. Weather delivered a notable benefit this quarter as well, largely because of the warm conditions we saw later in the quarter. While January and February brought reduced heating load owing to a mild winter, the National Weather Service reports that March was the hottest on record, with nine days reaching or exceeding 100 degrees. That produced a $0.13 benefit tied to weather in Q1, thanks to more residential and commercial cooling degree days. We keep seeing a steady, sustained inflow of customers into our area, with customer growth once again robust this quarter at 2.2%, close to the upper end of our annual customer growth guidance. Our weather-normalized sales growth came in at 9.4% for the quarter, powered by strong C&I growth of 14.6% and residential growth of 1.8%. There was a one-time adjustment to sales growth in last year's first quarter. Accounting for that, we would still have posted strong weather-normalized sales growth of 7.4% in Q1 of this year. At this stage, we are not revising our annual sales growth guidance of 4%-6%, though it is a robust beginning to the year. This pattern of customer and sales growth underscores our need to invest in our system so we can deliver dependable service to our customers. Turning to expenses, O&M dropped considerably in Q1 relative to last year. That was largely the result of lower planned outage costs and a decrease to Commission-required energy efficiency programs. We remain sharply focused on managing costs, and we are holding to our target of lowering O&M per megawatt-hour. Interest expense came in higher this quarter than in the first quarter of last year, due to larger debt balances from issuances. Our year-over-year benefit from the El Dorado investment was reduced, creating a modest drag. Lastly, depreciation and amortization expense rose slightly for the quarter, as additional plant placed in service was partly offset by the retirement of Cholla. Now, on the balance sheet side — we recently held constructive discussions with each of the three credit rating agencies, and those talks led to our ratings being kept where they are, along with stable outlooks. Our aim is to keep ratings and metrics strong, which benefits our customers, while we keep collaborating with the Commission and stakeholders to cut down regulatory lag via the rate case we have pending. When it comes to financing, our guidance hasn't changed, though we're happy to report that every equity funding requirement we had for 2026 is now fulfilled, and we're also pursuing future year needs as opportunities arise; at present, roughly $850 million in priced equity is at our disposal for later issuance through equity forwards, and that figure includes over $350 million priced in the first quarter. We'll keep drawing on a combination of debt and equity to preserve a balanced capital structure. All remaining elements of our financial guidance are being reaffirmed, and we're eager to serve our customers dependably as we keep carrying out our strategy across the year. That wraps up our prepared remarks. I'll hand the call back to the operator now for questions.

Executive

executive
#4

Morning, everybody. Alex here, filling in for Shar. Appreciate you letting us ask a few things.

Ted Geisler

executive
#5

Morning, Alex.

Executive

executive
#6

Hello, good morning. Regarding the long-term revenue expansion — the 5%-7% figure you've put forward extending to 2030. Clearly there's considerable growth happening across your service area and within the pipeline too. You recorded 7% growth during the most recent quarter alone. Could you elaborate a bit on how durable this projection really is? Might we expect this pattern to persist moving ahead? And do you perceive anything at all that could eventually let you reconsider this projection as opportunities keep coming to fruition? Thank you.

Andrew Cooper

executive
#7

Okay, Alex and Andrew. This is Andrew here. Morning to everyone. As you pointed out, we recorded sales growth during this quarter that came in at nearly 7.5%, even after accounting for the adjustment tied to Q1 of the prior year. We have several of these projects, and each one sits at a different point along its ramp. During the prior year, we managed to raise our guidance for long-term sales growth out to 2030, bringing it to that 5%-7% figure. What showed up in Q1 here was a figure resembling the upper portion of that range over the long term, when measured against our projection for the current year, which sits at 4%-6%. You are genuinely beginning to witness those longer-term patterns show up, particularly around how varied our customer base has become. At this stage, we are, you know, just about to start moving forward with Fab 2 at TSMC, just as Ted referenced, along with the ongoing additions of customers within our service territory, which, for this quarter, landed in the upper half of our range for customer growth.

Ted Geisler

executive
#8

So essentially, that extended horizon tied to the varied sales expansion we're observing across the service territory is something we expect to persist. We'll keep revisiting it, since remember, that rate of sales growth comes from the customers already committed today — those roughly 4,500 MW of customers we've locked in. A substantial pipeline of customers sits in our queue. As we keep working through the capital plan and our capacity to serve those customers, we'll keep seeking chances to invest and find sales growth past our base plan. At this point, we're at ease with the 5%-10% over the long term and the 4%-6% for this year.

Executive

executive
#9

Okay, that clears things up quite a bit. Let me shift direction and ask about EPS along with the rate base CAGR. When you look ahead to, let's say, 2028 or 2029 and past that, do you have any fresh thoughts on the gap we ought to assume between those two figures? Should we keep using 200 basis points, or do you think they might eventually come together, given all the growth and opportunities you're seeing? Thanks.

Ted Geisler

executive
#10

Right, Alex — I think we're going to need to come back to this whole topic once the rate case wraps up. What we can put into capital projects is going to depend on a couple of things: first, how much we can reduce regulatory lag, since that by itself makes a difference in closing the distance between the money we put out and what ultimately shows up in earnings. Second, there's the possibility of striking bilateral deals with a few of our big-load customers. Our hope is to keep pressing those customers to help cover a portion of the upfront money, and that would let us, across the life of the agreement, pull more of that spending toward the early years, which in turn means we'd need to bring in less outside capital to meet those obligations. We're definitely going to examine every piece of this. And since our cash flow conversion keeps getting stronger and more reliable, that opens the door for us to cover a bigger share through retained earnings. We'll keep watching that. Naturally, the capital opportunity is something else we'll be evaluating, and we'll keep putting money back into the system too.

Executive

executive
#11

Great. That's very helpful. I'll leave it there. Thanks.

Ted Geisler

executive
#12

Thanks, Alex.

Julien Dumoulin-Smith

analyst
#13

Hi, everyone. Morning to you. Great job. Isn't that quite a beginning for the year?

Ted Geisler

executive
#14

Yes, indeed. Appreciate that, Julien. Morning to you.

Julien Dumoulin-Smith

analyst
#15

Hi there, good morning. So, first off, thinking about timing, what should we expect from that August 3rd IRP filing? What's your view on this refresh cycle? What sort of hints might we pick up as summer gets going, before any wider update following the rate case? And on a related timing note, how do you view the gating items for the subscription model contract push you're trying to launch? When might contracts get signed? Could that also land sometime this summer? How do you see that coming together, so to speak?

Ted Geisler

executive
#16

Yes, thanks for asking, Julien. The IRP will definitely be a significant update. Right now the team is finalizing the analysis and, in the end, the report. Naturally, we'll ensure we're coordinating with stakeholders to engage across the various review components ahead of the formal filing later this summer. The IRP analysis will genuinely capture our newest long-range view regarding sales growth across the service territory in all three sectors — residential, small to medium-sized business, and industrial growth. Crucially, it will capture all of the additional high load factor growth we've committed to, and it won't capture anything we haven't yet contracted. That stays as upside. But we've put in substantial effort across the last 6 to 12 months to genuinely attempt to assess, over the coming 10, 15 years, where residential growth will land given recent patterns involving distributed generation and energy efficiency. How will long-range ramp rates unfold across this forecast period for the committed 4.5 GW of extra high load factor growth? The resources required to back that up. Inside the near term action plan window of the IRP, it will display certain specific projects already announced, yet past that, it will display buckets of generation and transmission required. As we move the capital plan forward, entering the start of next year or upon conclusion of this rate case, that capital plan ought to then underpin the resource and transmission needs laid out in the IRP, grounded in the committed growth included in that analysis. It will be a material update regarding our newest thinking on load growth and the different resource buckets required to support it. As for the subscription model, we remain in active negotiations with counterparties across multiple projects. It's too early to say how those might end, but once they do, we'd anticipate filing agreements with the commission, and we're still on track to have those filed this year.

Julien Dumoulin-Smith

analyst
#17

Understood. Okay, so that's the case for this year. Great. Thanks. Apologies, and if you'll let me step back just a touch, since from what I can gather, APS's response in this rebuttal shifted a number of mechanics nearer to those the UNS Gas team use on their gas template. What's the right way to view the pace of those 200 basis points? I realize the group posed that question to you moments ago, but how are you framing the timeline for shutting that gap, considering a few of those mechanics you just adjusted in the rebuttal? Does a 50 basis point ROE gap by 2029 still stand, or might there be room to pull it earlier?

Ted Geisler

executive
#18

Yes, we continue to hold the view that our rebuttal stance, and where we see our capacity to keep handling regulatory lag down the road, lines up with the position we've taken so far. Management's aim is to reliably earn inside that 50 basis points, since a certain amount of structural lag will persist. My sense is that the newest thinking around design elements for a formula rate, plus assuming a constructive result in the end on the rate case revenue requirement, would let us get there by 2029 or beyond.

Julien Dumoulin-Smith

analyst
#19

Great. Okay then, I'll stop at that point. Thanks a lot, everyone. Wishing you the best.

Ted Geisler

executive
#20

Thanks.

Richard Sunderland

analyst
#21

Hi there, and good morning. I appreciate you making room for us today.

Ted Geisler

executive
#22

I appreciate it.

Richard Sunderland

analyst
#23

You know, following up on a few of those remarks about the subscription model, I'm just wondering whether you could put it in context — I realize you described these talks as being at an early stage — but has the level of interest changed at all compared with what you were expecting three or six months back? Just curious about whatever color you can offer on those discussions, since those of us outside the company have only limited visibility.

Ted Geisler

executive
#24

Sure, I'd characterize the interest as remaining strong across our service territory. Our queue in total is still sitting at an elevated level, in line with where it stood previously. We keep hovering a bit below 20 GW of demand that hasn't been committed. What portion of that might involve projects that overlap or simply interest rather than projects that are prepared to move forward — that remains to be seen. As far as interest in viable projects that we can actually sign contracts for, it's matching what we originally anticipated. These agreements are complicated. They carry details regarding investments and the build-out of both transmission and generation infrastructure, making certain the rates get calculated carefully so that growth pays for growth, that financing requirements are satisfied, and that the utility safeguards its customers on reliability and affordability while the counterparty receives what it requires when it comes to timing and resource adequacy. Working through these negotiations takes us some time, but progress is happening; we're happy with the way the market responded to the subscription model and with how it's taking shape. Filing them with the commission isn't where we are yet, though that's the direction things are heading.

Richard Sunderland

analyst
#25

Thanks. That commentary is helpful. Roughly 1 month back, I believe the governor's energy task force handed over a report. There was plenty in it, I know — new nuclear among other items. I'm simply wondering which parts of that report you're watching. Is there anything you'd call out on nuclear specifically, or on a wider basis — anything at all that moved the conversation forward from that report? Thank you.

Ted Geisler

executive
#26

Yes, absolutely. We're grateful for the chance to collaborate with the Governor, a number of agencies across the state, and other stakeholders, chiefly to build awareness around which energy needs must be met to fuel Arizona's growth, and how we ought to approach those at a macro level. Those discussions were thorough, I'd say, and they produced a directional report laying out a few key factors. First, for instance, the state must put money into and back new gas infrastructure so growth can be powered dependably. It demonstrated broad backing for the gas pipeline infrastructure that's required. Second, the state will keep gaining from a varied mix of resources, anchored by dispatchable generation available around the clock, while also still gaining from the strong solar radiance we enjoy. Over the long term, the state has long been a front-runner in dependable and affordable nuclear generation, and both the utilities and the state feel that technology deserves attention and an openness to backing it later on, at the point when it makes sense on affordability, on licensing and permitting. We'll keep collaborating with stakeholders on whatever projects lie ahead that would make sense for us to investigate for our customers. As we've stated previously, specifically regarding new nuclear, we aren't able to place the utility balance sheet at risk — yet if we have large customers eager to see new nuclear and prepared to assist with supporting the financing, then, as the operator of the biggest producing nuclear plant in the nation, we would be quite open to those talks at that point.

Richard Sunderland

analyst
#27

Great. Thanks for the time.

Ted Geisler

executive
#28

Thank you.

Paul Patterson

analyst
#29

Hey, good morning.

Ted Geisler

executive
#30

Morning, Paul.

Paul Patterson

analyst
#31

A few of my questions were already covered, but regarding your prepared remarks, you know, the amount you've handled when it comes to equity, plus you also brought up seeking out further opportunities, if I recall correctly. If you could just — sorry if I missed this — what. Could you expand a bit on what your thinking is there?

Andrew Cooper

executive
#32

Sure. Paul, this is Andrew. Yeah, regarding equity, you know, we've kept working to reduce the risk on the equity plan. We have a 3-year equity plan in place through 2028. Admittedly, that's the, you know, base case plan without any of the expectations that could arise from, you know, the formula rate or those bilateral subscription-type agreements. It's basically the foundation of what we require with the CapEx plan we currently have. You know, at this stage, through different equity forward transactions, we've built up close to $850 million of equity ready to deploy. You know, the need we've stated for this year is $650 million when it comes to equity. You know, we've got almost another $200 million that we've secured just through our ATM program to help cover needs in future years too. You know, we're going to keep examining the equity needs at the end of the rate case and what, you know, what our, you know, sort of cash flow situation looks like at that point. We'll take another look at the financing plan together with our capital plan; as for what those base needs are that, you know, $1 billion-$1.2 billion that we've laid out for, you know, new money being raised from 2026 through 2028, we've already begun to, you know, chip away at that figure by several hundred million. You know, we're simply attempting to reduce risk and do it opportunistically as we move forward.

Paul Patterson

analyst
#33

All right, excellent. Fantastic. Thank you very much. Have a great one.

Ted Geisler

executive
#34

Thank you, Paul. Take care.

Ryan Levine

analyst
#35

Good morning, or good afternoon. Given what Commissioner Myers said in D.C. not long ago, how are you thinking about turning retired coal plants into gas generation, and what could federal permitting reform do for the company?

Ted Geisler

executive
#36

Yeah, thanks for asking, Ryan. You know, we're always evaluating when it makes sense to take another look at using sites from generation we've retired. Right now, honestly, Cholla is really the only site that would likely be in that group. The study was completed way back in 2015 regarding the need to shut that site down as a coal facility. Since that time, we've kept running analysis to figure out when it makes sense for our customers to possibly switch it over to gas, possibly use the site for new gas generation, or even another technology down the road. That analysis hasn't stopped. As demand keeps growing in our service territory, natural gas remains an affordable resource for us. Because the cost of new gas generation has gone up lately, driven by supply chain demands, gas conversion looks even more affordable. At some point, if converting that on behalf of our customers makes sense for us, then we'll make sure that's clearly communicated, and we'll start those investments and include it in our future plans.

Ryan Levine

analyst
#37

When it comes to federal permitting reform possibly affecting the company, can you give us any color on that?

Ted Geisler

executive
#38

Right now, Ryan, there isn't anything concrete I could point to and say reform would deliver a direct benefit there. I believe we'd share the view of Commissioner Myers — pardon me, Chair Myers — that the wider need for help when it comes to streamlining federal permitting has never been greater than it is today, because of the substantial infrastructure requirements involved in powering some of the markets in our country that are growing. Arizona likely ranks among the highest, whether that's for transmission siting or gas pipeline infrastructure. Anything that helps drive efficiencies in the process and speeds up federal permitting would simply let us implement infrastructure faster and, as a result, meet our customer demand faster. Any chance to examine those reforms has our support. Right now, it's probably too soon to say what specific opportunities might benefit some of our infrastructure plans. Even so, I can tell you that no reform changes are being counted on by us in order to execute our plan, and with those infrastructure investment opportunities, we continue to stay on track.

Ryan Levine

analyst
#39

Regarding what you were saying about the current study on switching to a gas plant, do you have a timeline in mind for when that study will wrap up? Would it happen at the same time as the subscription talks you've got going that aim for the close of this year?

Ted Geisler

executive
#40

Probably the greatest chance to keep examining that comes when we finish our analysis ahead of this IRP filing, which will feature a full review of our generation mix in terms of meeting growth. Part of that involves ongoing fresh analysis of any possibility for a gas conversion or new gas generation at the Cholla site.

Ryan Levine

analyst
#41

Thanks for the time.

Ted Geisler

executive
#42

Thanks, Ryan.

Anthony Crowdell

analyst
#43

Hey there. Morning, everyone. Real quick, on Slide 18, you provide a helpful slide showing committed load alongside uncommitted load. The uncommitted portion sits at 20 GW. I'm wondering about the drivers, or the timing, for potentially shifting that 20 GW into the 4.5 GW. Would you expect conversion to occur by 2028, or what's the timeline? I've got a follow-up.

Ted Geisler

executive
#44

Yes. Appreciate it, Anthony. The subscription model we introduced in the prior year, plus the talks happening right now with counterparties, would capture some portion of that 20 GW that could potentially transition into the committed customer bucket. That effort, I'd say, is currently in progress. When we get the chance to file special rate agreements before our commission, that moment really lets us build more transparency around how much of that 20 GW might migrate as a result of this first subscription offering; after that, as we keep advancing our plan regarding additional transmission and generation infrastructure, that will bring clarity on what a subsequent version of the subscription model might be, which we could then present back to that queue. It's in process at present. We aim to hand those contracts to the Commission for review during this year, and I believe that's when we'll gain better visibility; moreover, our IRP will once again perform the newest analysis reflecting our finest thinking on organic load growth—meaning growth excluding extra high load factor, including residential and small to medium-sized business—and that should likewise deliver some degree of insight into what we're contemplating past the 20 GW queue, specifically the coming 10 to 15 years of demand.

Anthony Crowdell

analyst
#45

Thanks. Regarding APS — and I hope I've got this right — my understanding is that you have a sizable load tariff, and it might be revisited to reassess what it costs to serve those big-load clients. Whether that happens yearly or over a longer stretch, I'm not sure. What I'm wondering is this: whenever you speak with prospective large-load customers who could join your system, do they share any feedback or opinions — are they indifferent to which kind of large load tariff is out there, the one APS provides versus what some other utilities might provide?

Ted Geisler

executive
#46

Sure; an extra high load factor tariff is something we already have, and within this rate case there's a proposal to bring that tariff up to date so it mirrors today's supply-demand conditions, and also to make certain its pricing means growth pays for growth. Broadly, I'd say these big customers take on the obligation of covering the costs tied to serving their expansion. Going forward, two choices will be available to our customers for taking service from us. First, the standard offering — staying on that XHLF tariff, understanding that going forward it will be priced in line with the real cost of service. Second, should they prefer a faster option via the subscription model — where they put money toward financing infrastructure, or perhaps assist in speeding up delivery of key equipment — then a special contract can be arranged and sent to the Commission for review and approval. In either case, we've consistently been clear that pricing, via tariff or via subscription model, must cover the full cost of service, and those customers wanting to do business with APS must accept that, since it's a commitment we've given to our Commission and our other customers.

Anthony Crowdell

analyst
#47

Has their stance leaned in favor, opposed, or neutral? Could you give us any details on that?

Ted Geisler

executive
#48

Sure, my sense is that support is broadly there. Clearly, we've got to stand behind the pricing and make sure customers can see what goes into it. When we talk with counterparties about the added infrastructure required to serve them, that means additional transmission, additional generation — genuinely new construction just to meet their needs. The current system has no spare capacity left to draw on, so everything has to be built fresh. Because of that, the cost looks different from what it did back when you were benefiting from older infrastructure that was already in place. So being upfront with these customers matters, and so does guiding them through the details of what serving them actually involves. I'd say there's broad acknowledgment that this reflects the reality of today's operating conditions, and that this is what's required to connect reliably in the Phoenix market. Demand in the market is still strong. While the price is significantly different from what it may have been years back, when the grid had surplus capacity on hand, the level of interest in demand, from what we can see, hasn't shifted at all.

Anthony Crowdell

analyst
#49

Excellent, I really appreciate you answering my questions.

Ted Geisler

executive
#50

You're welcome, Anthony.

Steve D'Ambrisi

analyst
#51

Hello, and I really appreciate you letting me ask something, plus well done on such a solid beginning to the year.

Ted Geisler

executive
#52

Thank you, Steve.

Steve D'Ambrisi

analyst
#53

Thanks. I want to ask a quick follow-up to what Julien and Anthony raised earlier. As I understand it, the phase two subscription offering was first sized, or originally sized, at 1.2 GW. Or as much as 1.2 GW. Could you explain what led to that sizing? Does it better reflect what you might call the near-term opportunity inside the 20 GW, or does it stem from how much desert capacity is available, such as at Desert Sun? Or is it gas capacity? Because obviously, I think everybody recognizes there's a fairly big load opportunity here, and we're simply trying to get a sense of what the pace might be for possible incremental additions to that sizing. Thanks.

Ted Geisler

executive
#54

Yeah, sure. I appreciate that question. You're right that the initial sizing was driven more by the infrastructure we had determined was available for the subscription offering. That reflected, more than anything, the generation and transmission we could see being available during the period when we understood the subscription counterparties had interest; largely from Desert Sun and the transmission associated with it. This will be evaluated continuously. I'd view it less as a particular capacity amount, fixed at a point in time, and more as an ongoing assessment of how much our organic load growth will need, including existing customers, residential, and small to medium-sized business, and then how much infrastructure we can construct so that we can offer beyond that organic load growth to the subscription queue, after which we'll contract for that availability. When we moved to the subscription queue, we began with that 1 GW-1.2 GW offering, and after that we kept advancing discussions with counterparties about their level of interest, whether that's one counterparty or several; that also creates the chance for other counterparties that might have access to key equipment to add on top of that. It's an ongoing process, a continuing evaluation, but the subscription model's premise is that we first secure the chance to add incremental infrastructure beyond what our organic service territory load requirement is; we present that to the queue, enter negotiations, finalize the capacity that gets awarded, and then return and rebuild that same process again with new infrastructure opportunities we develop for future availability.

Steve D'Ambrisi

analyst
#55

All right, that's quite useful. Many thanks. My remaining questions have already been addressed. I appreciate you taking the time.

Ted Geisler

executive
#56

Thanks.

Travis Miller

analyst
#57

Hello, everyone. Thank you.

Ted Geisler

executive
#58

Hey, Travis.

Travis Miller

analyst
#59

I’ve got a question about the transmission side. How much did revenue and earnings contribute this quarter, and when you think about the year and even years ahead, was there something in this quarter that made it unusually big, or is this the kind of path we should expect again this year and then continue along the upward-sloping line of transmission investment?

Andrew Cooper

executive
#60

Travis, as I said in the prepared remarks, our transmission investment has simply kept rising to serve growing load. If you look back five years, we have doubled and then doubled again what we spend each year in transmission CapEx; on our system, that begins down at 69 KV. Even in the local area, it is a fairly significant share of the infrastructure work we are doing. I think what you are starting to see, and you saw it in our results last year too, is this ongoing step function upward in the results from the transmission investment we have been making. That investment takes time before it starts to show through to the bottom line, and that is really what you are starting to see year-over-year as we take on more and larger projects. That will keep moving upward. It also demonstrates the overall benefit of a formula rate, with gradual increases. It is also a rate that lets us pass wholesale revenue back to our retail customers and has actually kept some of those transmission rate increases fairly stable over the years. It has allowed us to obtain contemporaneous recovery and reduce lag. It is a good sign of what we hope to replicate for the rest of our business, which is producing the right results for customers as we keep growing.

Travis Miller

analyst
#61

All right, that's excellent. And then, very briefly on that topic, regarding the transmission profits, to what extent do they depend on weather conditions? Or does the formula rate fully insulate them from that?

Andrew Cooper

executive
#62

Yes.

Travis Miller

analyst
#63

Could you go over how that rate-making framework works again?

Andrew Cooper

executive
#64

Sure — it gets reconciled, and the goal is for us to achieve our return on the money we've put in.

Travis Miller

analyst
#65

Okay.

Andrew Cooper

executive
#66

Yep.

Ted Geisler

executive
#67

Remember that a balancing account exists here, and a significant portion of that transmission revenue gets reimbursed by wholesale customers as well, which brings down what retail customers owe. An annual true up is included in this. The transmission driver mostly reflects the capital investments we keep making in the transmission system so we can back reliability and growth, rather than weather or some other element.

Andrew Cooper

executive
#68

So, the effect you're observing at this moment comes from the pricing adjustments we implemented around the midpoint of last year. Naturally, after that, there are going to be, well, additional rates taking hold around the midpoint of 2026.

Travis Miller

analyst
#69

All right.

Andrew Cooper

executive
#70

Regarding what we delivered this quarter, those numbers lined up with the guidance we provided covering the entire year for the transmission segment.

Travis Miller

analyst
#71

All right, that's great. Thanks for walking us through all of that. I've got just a single big-picture question about the repeal of the Renewable Energy Standard. Do you have any reaction to it? Was this something you saw coming? What sort of effect do you think it will have? I'd like to hear how you view that whole process — what was it, a few weeks back? Actually, by now it's been a month. Right.

Ted Geisler

executive
#72

Yes, Travis, we're not expecting any effect. In my view, the commission took an approach that was quite logical and well considered, since our utility has already gone beyond the initial target established under that Renewable Energy Standard; the momentum comes simply from broader market interest and demand, plus the level of growth on our system, which has driven a considerable amount of spending on utility-scale solar and battery storage facilities throughout the service territory so far. Keeping an obsolete policy benchmark that dates back many years and that we've already surpassed likely wasn't very sensible. We saw that coming and don't anticipate any consequences for the business in that regard. Looking ahead from here, our view is that the market will drive this. As for the revisions to the Demand Side Management/Energy Efficiency Standard, this gave the Commission a chance to conduct a full-scale examination of which offerings delivered the most benefit and effect for our customers and which delivered comparatively little. In our view, they properly resized those offerings so the focus lands on the ones bringing the most benefit and effect to our customers. Taken together, that produced ongoing, substantial help for our customers in saving energy in the places where it matters most, while also delivering an approximately 1% rate reduction to every customer along the way. Once again, I'd call it a sensible method that maintains the worth of these offerings while opening up an affordability opportunity for all customers.

Travis Miller

analyst
#73

All right, that's excellent. I really appreciate you sharing those perspectives. That was everything I wanted to ask.

Ted Geisler

executive
#74

Thank you, Travis.

Operator

operator
#75

Appreciate it — that wraps up the question-and-answer portion. That brings us to the end of what we had planned for today. At this point you're free to drop off the line, and we hope the rest of your day goes great. Thanks so much for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pinnacle West Capital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pinnacle West Capital Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pinnacle West Capital Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.