analystYes, thank you. Good afternoon, ladies and gentlemen. On behalf of JM Financial, I'm glad to welcome all of you to the second quarter FY '27 earnings conference call of PNC Infratech Limited. From the management, we have with us the company's managing director, Mr. Yogesh Jain, Mr. T.R. Rao, Director Infra, and Mr. Pankaj Agarwal, Vice President Finance and Accounts. Management will begin with opening remarks, and a Q&A session will follow. Thank you, and over to you, sir.
Yogesh Jain
executiveSir. Yes, good afternoon everyone. On behalf of PNC Infratech Limited, I warmly welcome everyone for joining us today on this call. Today I have with me Mr. T.R. Rao, Director of Infra; Mr. Pankaj Agarwal, Vice President; and Strategic Growth Advisors, who serve as our Investor Relations Advisors. Both the financial results and the investor presentation are now available on the stock exchanges, as well as on the company's website, for your reference. To begin, I'll discuss the major industry developments, then move on to the company's key operational updates and the financial performance highlights for the quarter and half year that concluded on 30 September 2026. After that, we'll be glad to take your questions. Following a pronounced two-year stretch of sluggish project awarding activity, the highway sector began to display indications of a rebound during quarter two of financial year '27. In the second quarter of financial year '27, NHAI handed out highway projects spanning roughly 230 route kilometers, versus 107 route kilometers in the first quarter of financial year '27. NHAI had identified 54 projects to award over the rest of financial year '27; of those, 19 have already secured approval, another 17 have been appraised, and the remaining ones should get approvals before long. Awarding activity is anticipated to pick up even more in the periods ahead, backed by a solid project pipeline. With the government looking at building about 51,000 kilometers of high-speed corridor nationwide over the coming decade, highway developers should see a substantial number of fresh business opportunities arise. Beyond highways, big openings are opening up in other areas too. The government keeps its attention on railways, metro rail, freight corridors, power transmission, renewable energy and storage, mining, water resources development including drinking water supply, and urban developments. These give steady growth chances to infrastructure companies that are well stabilized. The railway sector keeps providing a strong lineup of new projects, backed by government emphasis on capacity expansion, freight connectivity, and logistic efficiency. Under the National Rail Plan and Vision 2030, the government has already pinpointed 514 new railway infrastructure projects covering roughly 40,000 kilometers, with a total estimated investment of INR 8 lakh crore, which highlights a major large-scale opportunity in this sector. We think the proposed HAM-based approach for new railway projects—which draws on what highway development has already achieved—should also open broader opportunities for a highway infrastructure player with a stabilized position. India's solar rollout is proceeding quickly: capacity had already exceeded 1,670 gigawatts by September ‘26, and in the first half of fiscal ‘27 more than 20 gigawatts was added. As demand continues to rise for transmission networks and battery energy storage systems that keep pace, substantial medium- to long-term investment prospects are emerging across the renewable sector. A projected INR 6 lakh crore of capital expenditure in power transmission over the coming 5 years, meant to evacuate more than 900 gigawatts of non-fossil capacity, should deliver strong opportunities for infrastructure developers in both the near and longer term. Highways remain our core focus area, but we are also pushing actively into other core sectors so the order book becomes broader and more resilient, supporting sustainable growth over the long run. Higher crude prices stemming from the West Asia conflict have pushed up costs for key inputs such as diesel and bitumen, putting severe strain on procurement, transport, construction, and equipment operations. MoRTH, NHAI, and AI have pushed out the monthly price adjustment escalation mechanism for eligible EPC and HAM projects until December 31st, 2026, but the actual relief that financial mitigation provides is quite limited. Consequently, persistent increases in input costs, combined with escalation coverage that is only partial, continue to pressure the operating margins of infrastructure companies. Now to recent company updates. On October 12th, 2026, the Honorable High Court stayed the effect of the divestment order that the NHAI had issued against both the company and the concessionaire, Awadh Expressway Private Limited. This means the company can submit bids to all government authorities, including NHAI, MoRTH, and NHIDCL. Back in July 2026, the company got the letter of award from the Airport Authority of India for EPC work at Pantnagar Airport in Uttarakhand. The contract is valued at INR 302 crore, and execution is expected to take 12 months. 24 months. On 31st July 2026, the arbitration award came out in the company's favor, at INR 244 crores, related to the EPC project for the Sonauli-Gorakhpur section of NH 29E, which was executed for MoRTH through UP PWD. Our subsidiary, Yamuna Highway Private Limited, had its rating upgraded to Care AA+ with a positive outlook during the quarter. And to pursue international growth beyond the domestic market, the company has incorporated a subsidiary called PNC Infratech LLP in Kazakhstan. This strategic step puts the company in a position to evaluate long-term opportunities within the country's road infrastructure program, which spans more than 3,000 kilometers over the coming three years. In pursuit of expanding into international markets, the company filed a bid in September ’26 with the road department under the Ministry of Infrastructure of Georgia for a road project in Georgia. The company's project portfolio, held across 17 funds, consists of one BOT toll project, two BOT annuity projects, and fourteen HAM projects. The combined bid project cost for those fourteen HAM projects exceeds INR 17,200 crore. Of the total fourteen HAM projects, one MPRDC financial project document has also been submitted, and for two recently secured NHAI projects the concession agreement has been signed while financial closure is underway. The equity investment needed across those 14 HAM projects comes to INR 2,125 crore. Through September 2026, the company has put in INR 1,212 crores, with the balance equity of INR 913 crore to be invested across the coming 2 years to 3 years. Internal accruals generated during the next 2 years to 3 years ought to be sufficient to cover the varying quantity of investment required. Moving on to what we have in the pipeline, our unexecuted order book — now including the 2 NHAI HAM projects we recently won — comes to over INR 18,000 crore. Of the total executed order book, highway contracts represent 63%, while water canal railway and airport contracts make up approximately 21%, and coal mining contracts roughly 16%. As for bidding activity, we have submitted 17 bids across various authorities, with an estimated total cost of INR 16,600 crores; the price bids for these have yet to be opened. I would now like to share the results for the quarter ended 30 September 2026. For Q2 of fiscal ’27, revenue on a standalone basis came in at INR 1,146 crore, which is 17% higher than the INR 983 crore recorded during the same quarter in fiscal ’26.
Yogesh Jain
executiveFor the second quarter of financial year ‘27, standalone EBITDA came in at INR 138 crore, with a standalone EBITDA margin of 12.1% for that quarter. Standalone PAT for Q2 of financial year ‘27 was INR 73 crore, and the standalone PAT margin for the quarter stood at 6.3%. Standalone revenue for the first half of financial year ‘27 reached INR 2,664 crore, up 26% from INR 2,119 crore in the first half of financial year ‘26. Standalone EBITDA for the first half of financial year ‘27 was INR 513 crore, an increase of 85 percentage compared with INR 277 crore in the first half of financial year ‘26. The standalone EBITDA margin for H1 of financial year ‘27 was 19.2%, while standalone PAT for the first half of financial year ‘27 was INR 343 crore, which is 12.9%. Consolidated revenue for the second quarter of financial year ‘27 was INR 1,322 crore, higher by 17% versus INR 1,128 crore in the second quarter of financial year ‘26. Consol EBITDA in Q2 of financial year ‘27 came to INR 279 crore, up 10% from INR 253 crore in the second quarter of financial year ‘26. The consol EBITDA margin for quarter two of financial year ‘27 was 21.1%. Consol PAT was INR 115 crore. Consol PAT margin for quarter 2 of financial year ‘27 was 8.7%. Consol revenue in the first half of financial year ‘27 was rupees INR 3,011 crore, which is 18 percentage higher compared t. in the first half of financial year ‘22. Consol EBITDA for the first half was INR 802 crore, higher by 29% versus INR 620 crore in the first half of financial year ‘26. Consol EBITDA margin for first half ‘27 was 26.6%. Consol PAT in the first half of ‘27 was INR 447 crore. Consol PAT is 14.8% on standalone basis. Our net worth as of 30 September 2026 was INR 6,143 crore. Average standalone debt from banks and financial institutions and infra corporate deposit was INR 1,312 crore. That translates to net debt to equity of 0.21 times. Total cash and bank balance including current investment was INR 1,252 crore. Taking into account the total cash and bank balance including current investment, the net debt equity ratio on a standalone basis is 0.1, 0.1. On consol basis, our net worth as of 30 September ‘26 was INR 7,248 crore, whereas total debt was INR 5,912 crore. That translates to net debt to equity of 0.82 times. The total cash and bank balance including current investment was INR 2,936 crore. Taking into account the total cash and bank balance including current investment, the net debt equity ratio on consolidated basis comes to 0.41. With this, we now open the floor for question answer. Thank you.
Shravan Shah
analystI have a couple of questions, but first just one clarification. Is that INR 244 crore arbitration not recorded in the Q2 revenue?
Talluri Rao
executiveYes, that's right, because look, this arbitration — the award has only just been made; we still have to collect that amount. You see, it's only when the amount is actually received that we bring it into revenue.
Shravan Shah
analystIs there any toll revenue or payment still outstanding for the monetization that we have booked as part of revenue in Q2?
Yogesh Jain
executiveNo, no.
Shravan Shah
analystAll right, all right, understood. All right, understood. So, just a couple of the — regarding the first point on the guidance side, so anything concerning the INR 6,000 crore revenue for this year and INR 7,500 crore for next year and 12% margin; so is there any change in the guidance?
Talluri Rao
executiveNo, right now, no, nothing has changed. The same guidance will be maintained by us.
Shravan Shah
analystAlright. And regarding the inflow as well, INR 15,000 crore, so I believe INR 6,000 crore has already come in for us. So does that guidance stay unchanged too?
Talluri Rao
executive<<inaudible>> It will stay unchanged.
Shravan Shah
analystAll right, all right; and regarding the coal revenue and the JJM revenue, the last time around we said INR 500 crore for this year — coal revenue this year — and next year likewise roughly INR 500 crore, and JJM INR 700 to 800 crore this year and INR 1,000 crore next year, so does that too stay as it is?
Talluri Rao
executiveLook, there will be a slight moderation in the coal revenue. For this year, we expect revenue from the coal mining project to land between INR 350 crores and INR 400 crores. As for water, this year we are expecting about INR 650 crores, versus INR 750 crores that we had mentioned last time. And the rest of the figures will be more or less the same, because next year coal revenue would come in at around INR 500 crores and water also will be around INR 1,000 crores.
Shravan Shah
analystAll right, all right, understood. Then, if you could also assist me with a couple of balance sheet items — specifically retention, unbilled revenue, mobilization, and the HAM data, along with the water datas?
Pankaj Agarwal
executiveShravan Ji, please jot this down. The retention money stands at INR 272 crore.
Shravan Shah
analystOkay.
Pankaj Agarwal
executiveMobilization advance is INR 58 crore.
Shravan Shah
analyst58 crore rupees?
Pankaj Agarwal
executiveThat's right, just INR 58 crore as of 30 September.
Shravan Shah
analystAll right. And what about unbuilt revenue, HAM data, water data?
Pankaj Agarwal
executiveThe unbuilt revenue stands at INR 490 crore.
Shravan Shah
analystOkay.
Pankaj Agarwal
executiveHAM data is INR 418 crore.
Shravan Shah
analystAll right. What about water data?
Pankaj Agarwal
executiveThe figure for water data comes to INR 786 crore.
Shravan Shah
analystAll right, all right; so water data shows a decent reduction. All right, all right. Understood; and regarding the equity, the balance we have to put in for FY28 and ‘29, especially on the BESS side, I just wanted to get a sense of both HAM and BESS, how will it be invested?
Pankaj Agarwal
executiveThe overall equity need, taking in the two HAM projects, stands at INR 913 crore outstanding, and that has to go in over the next 2 to 3 years.
Shravan Shah
analystYeah, so what sort of figure are we looking at for '28 and '29? I believe we laid that out in the presentation for the second half.
Pankaj Agarwal
executiveThe target for '28 is INR 460 crore, and the remainder comes in the financial year '28-'29.
Shravan Shah
analystAnd what about BESS?
Pankaj Agarwal
executiveThere's an update regarding the BESS project. I want to share this with you, with all the participants. This project was awarded by NHPC, and the power purchase agreement was to be executed with NHPC within one year from the award date. And the signing of the power sale agreement by NHPC with the prospective DISCOMs is one of the key conditions, a precondition, before signing the PPA; but NHPC could not sign the PSA, the power sale agreement, with the DISCOM. As a result, the power purchase agreement also could not be signed within the 1 year stipulated time from the award date. So we sought an extension of 1 month, from 31 August until 30 September, but both agreements could not be signed before that date. So as per the RFP stipulations, since these agreements have not been signed, the LOI, LOA that was issued stood cancelled, and the bid security we submitted, they have returned it to us, they refunded it to us. So, if you can say so, we safely exited from the project and we realized our bid security. So this project will be, will no longer be, part of our order book.
Shravan Shah
analystAll right. And finally, after we obtained that stay order from the High Court, we're now bidding. And when the final hearing comes up in November, everything will stay as it is. So we ought to be able to carry on taking part?
Pankaj Agarwal
executiveYes, yes, we are taking part.
Talluri Rao
executiveWe are participating. We should be able to participate further also.
Parikshit Kandpal
analystMy first question concerns diversification. Earlier we were looking to diversify away from roads into water. For some reason that didn't pan out. The industry isn't doing well and payments aren't arriving; then we decided we'd go into renewables, and then this BESS order gets canceled along with whatever is happening with inflation on the battery side — I think it's a good exit for us that we didn't carry on with this project. Then now you're planning to go beyond India into Kazakhstan, even though you gave a very robust commentary on the pipeline coming up in India. Somehow the signals are mixed. I can't work out how the growth will come into the order book. Beyond roads, whatever order we're winning is in road or MDO. How should one view order book growth in the near future, this year, perhaps next year? So what's your thinking? How is your internal strategy team thinking about growing from here in terms of order backlog or revenues?
Talluri Rao
executiveLook, Mr. Parikshit, our focus will remain on the highways, given the very robust pipeline of opportunities available in the highway sector across the implementation models, including HAM, EPC, and as well as the BOT toll. So highways will remain our focus sector for expanding our business. Nonetheless, in the case of water, yes, there are certain issues. But if you look, during the quarter ending September 30, across 3 months, the government has released INR 267 crore as our pending payments. Accordingly, what was outstanding as on 30 June now stands substantially reduced as of 30 September. Going forward as well, we see that we will receive timely release of the payments. So in the water sector, maybe at the end of the day, there shouldn't be any issue. And similarly, in the irrigation sector too, there is some encouraging development. During the quarter ending 30 September, we received INR 183 crore from the government of Andhra Pradesh; this is also a substantial realization we could get from the government of Andhra Pradesh. And on revenue, we booked around INR 500 crore of revenue book, and we have done around INR 80 crore of work during quarter 2. So irrigation as well — the situation is improving. With regard to coal mining, there are initial hiccups because of severe resistance by the locals in vacating the land, and the encumbrances and encroachments are there. But there too things are now getting improved, and in the month of October as well, we could do better execution at the coal mining. So this MDO and all these lots of other projects are coming. We don't see any issue. The sole problem that came up was with NHPC, though it actually works out in our favor, since the continuing conflict in West Asia and all of that has pushed input material costs up sharply, along with other items such as batteries, and logistics costs have risen too. So even though we walked away from that project, that's the better outcome for us. As for the Kazakhstan project, that one is a road project, and we bring over 3 decades of core expertise in the road sector, so we don't see an issue — even if you win certain projects in Kazakhstan, we ought to be capable of executing them. In the same way, the project we submitted in Georgia is likewise a road project. Within these countries, our focus is on road projects, where our core competency lies. So realistically, we should be able to carry out these projects. Beyond Kazakhstan, we are also chasing opportunities in Uzbekistan and the United Arab Emirates, and we are actively at it. As things stand, as the MD mentioned, we have submitted 17 bids, and those are currently under evaluation. The price bids for the 17 bids…
Yogesh Jain
executiveOn the bids.
Talluri Rao
executiveThey haven't been opened yet, and they consist of 13 EPC bids, 3 HAM bids, and one TBCB bid for power transmission across the various projects. So, taking the overall picture, roads will stay our core area, with 63% of our order book made up of road sector projects. Beyond that, we're pursuing other diversification in a very calibrated manner. We also see some synergy between roads and other sectors, such as railways and other things, linear projects. So we believe that expanding into other sectors will let us keep up sustainable growth and resilience during challenging times.
Parikshit Kandpal
analystNo, I completely get that. What I'm saying, though, is the opportunity looks like it's shrinking, because the bids we're seeing—even in roads, which is your biggest segment—the way these wild bids are coming in, I don't know if people will actually make money on them. So the odds of us winning, even with a showdown in ordering at a very aggressive bid, don't line up with the margins, the profitability, or growth. Power—as I mentioned, you exited BESS. Fine that you got out, but I don't know what opportunity is left for us there on the BESS side now. That too, a growth driver, has somehow gone quiet. Railways—I don't see you winning any major orders there. So the worry is, over the next 2, 3 years, how does this company grow, sir? That's the difficulty I can't get my head around at the moment. Yogesh, perhaps you could speak to this. How are you thinking about growth from here, off a base of INR 6,000 crores in revenue, which you're saying you'll likely do this year? Since we had a weak first half, we need to bring in almost INR 3,500 crores of revenue in the second half. So even INR 6,000 looks a bit challenging; so off that base, how do you figure you can grow at 10%-15%?
Talluri Rao
executiveLook, with the INR 18,000 crores order book we have—unexecuted order book—and importantly, that order book doesn't include the BESS project. From the very start, you see, we never put the INR 2,000 crores BESS order into that order book. As it stands now, our order book is INR 18,000 crores. An order book of that kind should definitely let us hit that INR 3,000-plus turnover over the next six months, in this H2. We don't foresee any big difficulty in delivering the 30% growth that we've guided for. Looking ahead as well, even at the close of the current financial year, we'll still have an opening balance of INR 15,000 crores of unexecuted order book, even if you assume no new orders. If you do factor in new orders, there will be additional ones. Second, when it comes to competition and all, yes, there is competition on EPC and smaller-size projects. Our view is that competition will be lower in large-scale, large-size projects, and where projects are fund-based, like HAM and other such things, where investment has to be made; so there we don't see any fierce competition. We expect some projects to come. Then too, as I said, we're expanding into TBCB projects. A huge number of projects are coming. Also in railway, more than 400 projects have been launched across the railway zones. We're bidding very actively in railway, and we expect to secure some projects in the railway sector as well.
Sarvesh Gupta
analystSir, I appreciate the opportunity to ask. My first question again concerns the guidance. We've achieved INR 2,500 crore, but I believe that figure incorporates INR 200 crore of claims received during the last quarter. Removing that, our first half growth is only around 15%, whereas our guidance calls for 33% growth, from INR 4,500 crore to INR 6,000 crore. Sir, and if we also exclude that INR 217 crore, I think margins for the first half come in below 12%; for the second half, does this INR 6,000 crore include that INR 200 crore or exclude that INR 200 crore? Second, going from INR 2,300 crore to INR 3,700 crore once that one-time claim is left out — sir, is reaching INR 6,000 crore and 12% for the whole year achievable?
Talluri Rao
executiveLook, based on how this business typically moves, the opening six months of any fiscal year will come in below the closing six months, given the monsoon and similar factors. During H1 we brought in INR 2,664 crore. Sir, that figure includes INR 217 crore from an arbitration award we received. Altogether it comes to INR 6,000 crore. That INR 6,000 crore is the guidance we provided. The arbitration award would be counted within it. That figure does include the arbitration award. We still have INR 3,336 crore of revenue left to earn. Given the current order book, and with these five major road projects underway — five HAM projects plus two MSRDC highway projects — those are moving into full swing, and we'll also be starting many other recently awarded projects in Q3 and Q4. We don't foresee any significant problem or major hurdle in reaching INR 6,000 crores this financial year. On the question of getting to that 12% EBITDA margin: look, given the INR 2,664, since their delta is going to show up in the second item, and with fixed overheads staying where they are, we ought to be able to hold the 12% EBITDA margin at this point.
Sarvesh Gupta
analystSo that 12% figure applies to the remaining INR 5,800 crore, sir? And apart from that, this INR 217 crore is purely profit, correct? If not, your core EBITDA would come in at only about 9% or thereabouts.
Talluri Rao
executiveNo. Our guidance is for 12% EBITDA on the INR 5,800 crore, with the arbitration claim left out.
Sarvesh Gupta
analystAll right, sir. You said bitumen is having a partial effect on the infra players. That 12% does factor in that impact as well, correct?
Yogesh Jain
executiveYes, that's already included.
Talluri Rao
executiveYes. We're factoring that in.
Sarvesh Gupta
analystAll right. Second, sir, given how far our share price has dropped and the decent cash we hold on our balance sheet, though we also have some further use for it, I think we'll be selling down operational assets as well, as we've done before. I don't believe we'll really face any shortage of funds. Have you considered an open market buyback, at prices like these, which are probably one-fourth of what they were 2, 3 years back? Does the management have any stance on that?
Yogesh Jain
executiveYes. We're thinking; we're thinking along the same lines, to buy back.
Sarvesh Gupta
analystAlright, sir. Sir, could you also give some colour on the pipeline? You said bids worth INR 16,600 crore have been submitted and are still to be opened. Beyond that, how does the pipeline look? In particular, could you break it down between NHAI, MoRTH and others?
Talluri Rao
executiveLook, on the pipeline side, besides the bids we put in, 17 bids worth INR 16,600 crores, we have identified roughly 80 projects in total. A lot of projects are out there in the market and have already been launched by various clients. From those, we identified 80 projects made up of 35 EPC projects, 25 HAM projects, and 20 BOT toll and TBCB projects. The total estimated value of these 80 projects works out to about INR 180,000 crores, and they are to be bid, I would say, over the next 2 to 3 months, through to the end of January. Those bids will be submitted. If you look at the split among MoRTH, NHAI and other clients such as Railways, NHIDCL and state government bids and so on, NHAI, MoRTH and NHIDCL would account for around 60%-65%, while railways and others would be around 35%-40%.
Deepak Purswani
analystSir, to pick up where we left off on the international projects, if you could walk us through your thinking more broadly, how are we approaching this from a business standpoint, in terms of what kind of investment and capital allocation is involved, and then what sort of orders we're looking at, how the competitive landscape shapes up, and how we intend to handle supply chain and labor issues. If you could share your view on these points, that would be very useful. And ultimately, what kind of business do we see over time?
Talluri Rao
executiveLook, on the international front, right now we're going after non-fund-based opportunities, things like EPC projects. At present we aren't considering any fund-based projects, the kind where investments have to be made on our side. Even for an international project, there won't be any meaningful capital requirement apart from working capital needs. Beyond that, we're also inclined to favor projects funded by the World Bank, and for Asian countries, by the ADB, so that funds keep flowing continuously without being disrupted by local issues. Secondly, we have a team in place. These people are traveling to those countries quite often, and they assess local conditions and so on, and they're forming some kind of tie-up. We also have country-to-country tie-ups with local players, so we can offer local support, including logistics support and material support and the like; we carry out every kind of due diligence that would be needed before we submit our bids; as for competition, yes, competition exists there with international players, and a lot of firms from China are taking part in these bids too. Naturally, competition will be present both at the domestic level and the international level; that is something we have to navigate regardless.
Deepak Purswani
analystAs far as…
Talluri Rao
executiveThe third point is that, so we keep risk to an absolute minimum, the projects we're concentrating on internationally are highway projects, an area where our core competency lies and where we bring over 30 years of experience.
Deepak Purswani
analystAnd when it comes to these kinds of projects, particularly internationally, what order size would we be looking at?
Talluri Rao
executiveWell, for Kazakhstan, as my MD mentioned, they kicked off projects spanning over 3,000 km, worth USD 9.8 billion, which works out to KZT 4.6 trillion in the local currency; so that's a pretty substantial thing there. In the same way, road projects are also coming up in Georgia and Uzbekistan; so we have a substantial value there as well.
Vaibhav Shah
analystSir, how much cash and current investment does PNC Infra Holdings hold?
Talluri Rao
executiveThe total cash sitting in PNC Infra Holdings comes to INR 1,115 crore.
Vaibhav Shah
analystAs of March, that figure stood at about INR 1,050 crore. What's the increase been?
Talluri Rao
executiveThe rise comes from interest that has accrued on the FDR we put into PNC Infra Holdings.
Vaibhav Shah
analystAll right. And second, when should we expect to get the appointed dates for the two new HAMs and the MP HAM?
Talluri Rao
executiveFor the MP HAM, we're looking at an appointed date ahead of December 31st; as for the new HAM projects with NHAI, we expect the appointed date to come in Q4.
Vaibhav Shah
analystAre we confident about the schedules for the NHAI HAMs — those should arrive in Q4?
Talluri Rao
executiveLook, for NHAI HAM, the concession agreement was signed by us on July 16; we get a 5 months window to reach financial closure. That lands around December 13th. NHAI, though, has 240 days to satisfy its condition precedent, which includes handing over 80% of the land. So that falls somewhere around the middle of March. NHAI does have time; land acquisition is therefore underway. In both cases, roughly 90% of the ROW for the 3G award and 3H is moving forward. Funds are being disbursed by them to the landowners. So 3H is progressing. As for us, within 150 days from the agreement signing date, financial closure should be achievable. Also, we expect that perhaps 1.5 months after that, NHAI ought to be in a position to provide 80% of the ROW land. Declaration of the appointed date is anticipated in the fourth quarter of the current financial year.
Vaibhav Shah
analystSo if it does land in Q4, what percentage of execution are we aiming for from those projects in FY 2028?
Talluri Rao
executiveLook, these projects take 2 years to finish — 730 days; so the split will be roughly a 35%, 65% ratio; so for FY 2028, we're expecting 35%-40% progress, with the 60% progress coming in FY 2029. No significant work will get done during FY 2027, in the case of the NHAI 2 HAM projects. Whereas we will make some progress, a certain amount of work completed, in the case of Bhopal Bypass of MPRDC, because the appointed date is expected to be declared during Q3 of the current financial year, that is before 31 December.
Vaibhav Shah
analystAlright. Sir, regarding order inflows, you said we're keeping the INR 15,000 crores guidance; now, given that the solar order has been canceled, order inflow for this year comes to roughly INR 3,800. So we basically need INR 11,000 crore plus of inflow in the second half. So how confident are we about hitting that INR 15,000 crore inflow guidance?
Talluri Rao
executiveNo. Look, as I said, our unexecuted order book of INR 18,000 crore does not include the solar project. The solar project was never part of our unexecuted order book. That's one point. Secondly, on order inflow, we had spoken of INR 12,000-INR 15,000 crores. So we've already achieved INR 4,260 crores. The remaining INR 8,000-INR 11,000 crores, given the pipeline of, as I said, INR 1.8 lakh crores of new projects that we've identified, and also we've submitted bids for INR 16,600 crores. Price bids haven't been opened yet. So as things stand, we remain confident that we should be able to meet the guidance, whatever guidance we've given for the order book in FY 2027.
Vaibhav Shah
analystWithin that INR 12,000 crores to 15,000 crores, how much are you aiming to get from international markets?
Talluri Rao
executiveAs for the international market itself, we aren't aiming at it. Whatever order book we have, we're looking at domestic only. The reason is that we've only just stepped into the international market, so we need to observe the dynamics and other aspects. Right now, we aren't taking into account any orders from the international market for the current financial year.
Vaibhav Shah
analystSir, one final point about the asset sale. We sold 12 assets. Could you provide the total figure? How much did we get? What remains outstanding? And where has the cash gone so far?
Talluri Rao
executiveFrom monetizing those 12 assets, the consideration we've collected comes to roughly INR 2,517 crore. Of that, INR 150 crore has still not come in from the buyer. The full amount has gone into FD and <<inaudible>> Limited.
Vaibhav Shah
analystYou were cut off partway through. What was that figure…
Talluri Rao
executiveFrom monetizing 12 assets, the total consideration that came to us is INR 2,517 crore. Of that, INR 158 crore has still not come in from the seller. The rest has been put into PNC Infra Holdings as FDR and into PNC Infratech Limited as FDR and mutual fund as well.
Vaibhav Shah
analystApproximately out of 2,500, in case you've gotten nearer to 2,300, 2,350. So, from that, INR 1,100 crore sits within PNC Infra Holdings. The rest, INR 1,200 crores of it, partly lies in the current investment, around INR 750 odd crores. Where does the remaining amount sit?
Talluri Rao
executiveThat remaining amount is…
Vaibhav Shah
analystOf INR 600 crores.
Talluri Rao
executiveThe remainder amount…
Vaibhav Shah
analystPNC Infra Holdings holds INR 1,115 crore, while PNC Infratech Limited accounts for roughly INR 800 crore.
Vishal Periwal
analystSir, I believe you mentioned cash both in the infra holding and on a standalone basis. So why has standalone debt been rising when you have cash on the books? I mean, standalone debt has nearly doubled over the last 6 months.
Talluri Rao
executiveWe took on that debt to fund equipment finance and working capital. The investment we made in the mutual fund is for long-term purposes; we borrowed short-term from the banks, meant for a 2 month or 3 month period. That is the reason we took the bank loan.
Vishal Periwal
analystAll right.
Talluri Rao
executiveSecond point, sir. Pardon me. All right, regarding the loan, we took it as a standalone loan; that is also the type of intra-corporate loans we have drawn from our subsidiary companies where surplus cash is available.
Vishal Periwal
analystAll right. Would it be fair to put it that way, that when you look at investments and cash on the books, we hold close to INR 4,000 crore in investments plus cash, including investments across the various HAMs and so on? Is that a fair characterization, that figure?
Talluri Rao
executiveThat's right, INR 4,000 crore of investment in HAM projects.
Pankaj Agarwal
executiveOn a standalone basis, total cash and…
Talluri Rao
executiveWe have roughly INR 3,000 crore in total cash and bank balance on a standalone basis.
Pankaj Agarwal
executiveINR 3,000 — No, INR 1,000 crore…
Talluri Rao
executiveNo, on a consol basis, INR 2,936 crore.
Pankaj Agarwal
executiveIt will be around INR 4,000 crores.
Talluri Rao
executiveOn a consolidated basis, our cash and bank balance stands at INR 2,936 crores. That's roughly INR 3,000 crores. On a consol basis, we have INR 3,000 crores in cash and bank balance.
Pankaj Agarwal
executivePlus you have invested in the SPVs.
Talluri Rao
executiveYes.
Pankaj Agarwal
executiveINR 1,000 crore.
Talluri Rao
executiveRemaining INR 4,000 is invested in the SPVs.
Vishal Periwal
analystAll right.
Talluri Rao
executiveRoughly INR 4,000 crore has been put into the SPVs.
Vishal Periwal
analystAll right, understood. Just one final question, sir. Has anything changed regarding our depreciation policy during this first half compared with the same…
Talluri Rao
executiveNo. Nothing about the depreciation policy has changed in the financials.
Jainam Shah
analystThere's just one item I want to raise regarding the Awadh Expressway and PNC Infratech. A stay has been granted by the High Court, but was there any particular cost recorded during the quarter — perhaps related to a penalty, perhaps tied to toll collection being suspended, perhaps for some reconstruction or anything of that nature in the second quarter? I don't notice anything significant shifting in the standalone numbers, but has anything at all been booked in the subsidiary this quarter in connection with the Awadh Expressway?
Talluri Rao
executiveNo. No penalty has been imposed by the NHAI, since every defect that was notified got rectified by us within the timeline the contract stipulates. So there's no time lapse of any kind, nor anything else, when it comes to rectifying those defects. As a result, no penalty has been imposed by the NHAI, and no recovery has been made either for the toll loss. So nothing was booked by us in Q2. The sole expenditure we have booked is what was incurred on repairs and rectification, and that is very minimal.
Bhavik Shah
analystMy first question has to do with the cash. So we have roughly INR 1,252 crore of cash on a standalone basis, and INR 1,115 crore of cash in PNC Infra Holdings. How much is the ICD amount that PNC Infra gave to the standalone company?
Talluri Rao
executiveThat ICD doesn't come from PNC Infra Holdings; it comes from the operational SPV subsidiaries, and it's about INR 494 crore.
Bhavik Shah
analystAll right. So that's a portion of my debt on a standalone basis, correct?
Talluri Rao
executiveYes, that's a piece of the standalone debt.
Bhavik Shah
analystGot it. That remaining debt of around INR 900 crore is owed by me to banks and financial institutions.
Talluri Rao
executiveRight, banks and financial institutions for equipment financing as well as for short-term working capital needs.
Bhavik Shah
analystGot it. So what does the debt cost us, and why are we keeping the cash instead of using it and taking on the debt? What are the earnings on the investments, and what's our cost of debt? Are you seeing any arbitrage there?
Talluri Rao
executiveEvery month we'll always assess what we're earning versus what we're paying on the working capital loan. And based on that, we adjust our decisions on loans and investments.
Bhavik Shah
analystRight now there's an arbitrage situation, and that's why we're doing this. Would it be fair to put it that way?
Talluri Rao
executiveArbitrage isn't the reason behind what we're doing. As a standalone, we have INR 1,300 crores of debt, and that includes INR 500 crores from our own company subsidiaries through inter-corporate deposits and inter-corporate loans; those are our own companies, and the surplus cash sits in those SPVs, so that's what we're drawing on. Then there's another big chunk, over INR 400 crores, in equipment finance, where you're obligated to take on the debt because that's simply how the industry operates. Any time we go in for an equipment purchase, we take…
Pankaj Agarwal
executiveSo that's a loan with a 5 year duration.
Talluri Rao
executiveRight, it's a term loan running 5 years. Beyond that, there's really very little else, just as my colleague mentioned; when it comes to working capital needs, we draw short-term borrowings from banks, and the interest rate there is highly competitive. It isn't done for any arbitrage as such; the corporate debt, the working capital loan we take, is quite thin. As soon as we receive payment from clients on what's outstanding, it gets repaid. While the deposits we hold, cash and banks, that sort of thing, are placed long-term mainly through mutual funds.
Bhavik Shah
analystGot it, sir. Sir, just one more item. About our order, we have obtained the stay. So what's the path forward at this point? What happens next?
Talluri Rao
executiveLook, we secured the stay. The next hearing date falls on 26 November. Per the order, both sides are permitted to submit their arguments, written submissions, and that includes NHAI's reply. Final arguments are going to take place. Since in the writ petition we sought quashing of the debarment orders, and under the CPC we sought an interim stay, the court did grant the interim stay, because if in case. Should the court become convinced regarding the illegality of the debarment, those debarment orders might be quashed.
Mehul Jain
analystTwo questions from me. First, regarding that INR 3,000 crore — if I'm reading it correctly, about INR 932 crore represents the equity commitment we have, the remaining equity commitment, which includes INR 400 crore of HAM. So my first question concerns the balance of INR 2,000 crore. Do we have any plan in place, or are we working out how that gets deployed? My second question: given that we're now also considering opportunities overseas, would it be fair to say we can't locate the right growth opportunities domestically, and that's why we're exploring abroad? Because historically, I think overseas geographies haven't worked out well for infrastructure companies. If you look at roughly the 2000, 2010, 2011 to 2020 decade, plenty of companies made mistakes on that front. Any thoughts on this, sir?
Talluri Rao
executiveOn your first question, you mention that we must put equity into the ongoing projects, where something like INR 900 crore plus of equity is needed, where we've already secured those HAM projects; beyond that, we're chasing 25 HAM projects with an estimated cost of INR 50,000 crore. Even if some projects come to us through this particular model, further equity will need to go into them; we're also pursuing both the TBCB power transmission projects and the DBFOT toll projects. Those number around 20 projects with a total estimated value of INR 95,000 crore. Should we win any of these, some of these projects — and on some we're fairly confident of securing new projects — there will be a fresh equity requirement in them, and the remaining INR 2,000 crore that's available would then be used for equity purposes. As for international, see, international projects that used to come in Africa and elsewhere earlier had some issues, but now projects are coming in the former USSR countries, places like Uzbekistan, Kazakhstan and so on. The second point is these projects are mainly in the road sector, so that's where our expertise lies. That's where we're pursuing. Also, as I said, these projects are primarily funded by World Bank and ADB; so I don't foresee any funding issues or any interruptions in payments. That's one safe area we're looking at. It's not the case that we can't secure projects in the domestic sector, and that's why we're moving into the international sector. Rather, to complement our domestic work and broaden our horizon, we're going into the international sector; it's complementary in nature.
Mehul Jain
analystSir, what does the return margin profile look like for domestic compared with overseas?
Talluri Rao
executiveLook, because we have no first-hand experience with the overseas side, we can't really say. Still, we're aiming for a comparable type of return, the same 12% to 12.5% EBITDA we're working with domestically; we also look at a similar kind of figure in the international market when we bid. And we aren't pursuing any fund-based projects over there. At first, we're going after cash-based kinds of projects like…
Mehul Jain
analystEBITDA.
Talluri Rao
executiveEPC, and possibly item rate in certain instances.
Vaibhav Shah
analystCould you tell me what our CapEx guidance looks like for 2027 and 2028?
Talluri Rao
executiveAre you there?
Talluri Rao
executiveHi there?
Vaibhav Shah
analystHow much capital expenditure are we guiding to for 2027 and 2028? <<inaudible>>
Talluri Rao
executiveRight, go ahead. I believe Mr. Vaibhav Shah had a question.
Vaibhav Shah
analystSir, could you tell us what the CapEx guidance is for FY 2027 and FY 2028?
Talluri Rao
executiveWhat about revenue guidance?
Yogesh Jain
executiveCapEx.
Pankaj Agarwal
executiveCapEx guidance.
Vaibhav Shah
analystCapital expenditures.
Talluri Rao
executiveWhen it comes to financial year 2028, our guidance is roughly INR 150 crore for CapEx.
Vaibhav Shah
analystSir, and '27?
Talluri Rao
executive'27, around INR 200 crore.
Vaibhav Shah
analystSir, the first half already stands at INR 150 crore, correct?
Talluri Rao
executiveAlready…
Pankaj Agarwal
executiveYou've already put that money in.
Talluri Rao
executiveWe've spent INR 155 crore on CapEx, and across the remaining period the overall figure we're going to reach is INR 200 crore.
Vaibhav Shah
analystIt's likely just INR 50 crore in the second half.
Talluri Rao
executiveYes.
Vaibhav Shah
analystAlright. Sir, secondly, you said you're fairly confident about getting order inflow of INR 12,000 crores-INR 15,000 crores, so that's an incremental INR 8,000 crores — INR 11,000 crores in the second half; but if the NHAI orders don't come our way, and the ban carries on past November, then are we still holding to our guidance, or could there be the same guidance?
Talluri Rao
executiveLook, that's a somewhat hypothetical sort of scenario. We're hoping the stay, or the relief, would carry on past November 26 as well. NHAI is bringing out a large number of projects, both under HAM and under DB.
Pankaj Agarwal
executiveRailway work is another area where we're putting in bids.
Talluri Rao
executiveOn top of that, railways hold over 400 project opportunities. We remain hopeful about securing between INR 8,000 crores and INR 11,000 crores in fresh orders ahead of March 31.
Vaibhav Shah
analystLet me flip that around. In that INR 8,000 crores to INR 11,000 crores, what portion would come from NHAI on our side?
Talluri Rao
executiveSir, the bulk of it would come from NHAI. Over 50%-60% would be from NHAI and MoRTH and, I believe, NHIDCL. And 30%-40% would come from the non-NHAI side.
Deepashree Joshi
analystI have a question about your canal project. What guidance would you give for FY 2027 and 2028?
Talluri Rao
executiveYes. As things stand right now, we've paused the work, since they release water into the canal system. In effect, we get about six months of working time each year. We expect to resume the works from the middle of November. So in the current financial year, we should be able to execute another INR 60 crores-INR 70 crores of work. And in FY 2028, we're targeting around INR 400 crores of work. They granted an extension of time up to 12/31/2028 for completion of the project.
Deepashree Joshi
analystUnderstood.
Talluri Rao
executiveWe've already completed INR 495 crores of work, and we've already executed it.
Deepashree Joshi
analystOkay, so at this point roughly INR 790 crores or so remain, is that correct?
Talluri Rao
executiveThat's right; we ought to be able to complete it over the coming 2 financial years.
Deepashree Joshi
analystAll right.
Talluri Rao
executiveYou brought up that roughly INR 183 crores came to us from the government, and that is a somewhat encouraging step forward. We got that during the quarter we are in now.
Deepashree Joshi
analystRight, understood. So far this year your mining project has brought in roughly INR 260 crores, yet your guidance for 2027 sits at just INR 350 to INR 400 crores. What's behind the cut to your second-half outlook?
Talluri Rao
executiveWell, it isn't INR 250 crores; through the end of September we've actually done about INR 160 crores. Over H2 we're looking for another INR 200 crores plus.
Deepashree Joshi
analystAlright, understood. For my final question: you're giving guidance of INR 7,500 crores for FY 2028, correct? But now that the BESS project has been canceled, are you still holding to that INR 7,500 guidance? Where does the visibility for that come from?
Talluri Rao
executiveYes, since we're excluding the BESS project, as of today we hold an unexecuted order book of INR 18,000 crores. We expect to execute another INR 3,000 crores plus, INR 3,300 crores, during this financial year. Even with that order book, we'll be entering FY 2028 with an order book of INR 15,000 crores, plus any new orders we would secure during the H2 of the current financial year. With an order book of that kind, around more than INR 25,000 crores, we should be in a position to achieve INR 7,500 crores, which works out to roughly 25% over FY 2027.
Yogesh Jain
executiveThanks to all of you for joining our earning call so actively. Should you have any additional questions, you can reach out to Strategic Growth Advisors, our Investor Relations Advisors, or you are welcome to contact us directly. Thank you.
Talluri Rao
executiveThank you.
Operator
operatorThanks. On behalf of JM Financial Institutional Securities Limited, that brings this conference to a close. We appreciate your participation, and you're welcome to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PNC Infratech Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PNC Infratech Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PNC Infratech Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.