Premier Explosives Limited (526247) Earnings Call Transcript & Summary
February 13, 2023
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, good day, and welcome to Premier Explosives Limited Q3 FY '23 Earnings Conference Call. [Operator Instructions]. Please note that this conference is being recorded. I now hand the conference over to Mr. Vishal Mehta from Stellar Investor Relations. Thank you, and over to you, sir.
Vishal Mehta;Stellar IR
attendeeThank you. Good afternoon everyone. I, on behalf of Stellar Investor Relations, welcome you all to Premier Explosives Limited Q3 and 9 months FY '23 earnings conference call. We shall be sharing the key operating and financial highlights for the quarter and 9 months ended December 31, 2022. We have with us today the senior management team of Premier Explosives Limited, Mr. T.V. Chowdary, Managing Director; and Mr. Srihari Pakalapati, Chief Financial Officer. Before we begin, I would like to state that some of the statements made in today's discussion may be forward-looking in nature and may involve risks and uncertainties. Documents relating to the company's financial performance have already been e-mailed to you. Now I invite Mr. Chowdary to share his initial remarks on the company's performance for the quarter.
Thati Chowdary
executiveThank you, Mr. Vishal. Good afternoon, everyone, and thank you for joining the call. We'll begin the call with company's operational performance during the quarter followed by the key industry updates. The recent updates for missiles and rockets, I am pleased to inform that some of the DRDO-developed technologies, which are transferred to us, have productionized and we received production orders from BDL who is the lead integrator for these projects. And in addition to this, as I have shared earlier, we have received several design and development orders for export purpose. Out of it, 4 numbers we received supply orders and productionization has started, and the deliveries are supposed to be effected in the last quarter of the current financial year. Yes, we always continued to move on our growth track during the quarter. We have generated healthy cash profit of INR 3.3 crores with our execution run rate stable, and given the nature of our cost structure, the operating leverage of our business will help us to generate better cash flow, which will be utilized towards strengthening our balance sheet. The changing business mix with the increase in contribution of defense segment will augur well for our overall margins. On the order intake front, there has been good progress. Let me take you through the new order update issues during 9 months of financial year 2023. The company has recently signed an MOU with Hindustan Aeronautics Limited in the field of manufacturing, assembly and testing, storage and transportation of explosives for bombs and missiles. Received new orders from Israel Aerospace Industries Limited for manufacturing and supply of warhead with total value of USD 537,500 which is equal to INR 4.3 crores and expect to be delivered by May 2023. Production and supply of booster rocket motors for a total value of USD 688,000 equivalent to INR 5.5 crore and the deliveries are expected by March 2023. The company also received an advanced amount of USD 2.44 million, that is INR 19.4 crores towards the development of production lines and procurement of raw materials for the orders received from the overseas entity for supply of rocket motors. During the quarter, the company has received an order from VSSC, that is, Vikram Sarabhai Space Centre for production and supply of 3 sets of PSOM-XL Motors for the PSLV launch vehicle for a total value of INR 3.45 crores, and it will be executed at Katepally, and we have already exhibited 4 PSOM-XL Motors from Katepally and PDK. And this part has to be executed within a period of 8 months. There are some of our notable updates on quarterly order. We are extremely pleased to report that our current outsizing order book as on December 31, 2022, stood at approximately INR 575 crores which translates into 3x of our financial year '22 revenues. In addition to the rocket motors and warheads, production of plates against new orders is going on. This is expected to give good boost to revenue in the fourth quarter and financial year '23, '24. Coming to the Defense Industry future. And the Defense Industry like we have been mentioned and like you may also be aware, Defense sector has a strong manufacturing ecosystem, recently organized Defense Expo in October 2022, which offers to Indian Defense sector, particularly to showcase its chance to present its roots, technologies and solutions to the government decision maker. Along with participation from 63 nations, the last edition of this expo saw an unprecedented gathering of over 600 exhibitors, both physically and online and experienced a huge success of this Expo 2022, which saw 451 MOU ToT agreements to advance India's growing defense industry networking. Efforts are being made to improve manufacturing capabilities. India has recently emerged as a major defense exporter, especially with the development of a strong defense industrial environment and exports to more than 75 countries after seeing a ninefold increase in defense exports over the past 5 years. In '21, '22, India's defense exports reached a record high of INR 14,000 crores. This achievement was made possible with the government's initiatives to increase the export of military equipment to friendly foreign nations. Further, the government of India is targeting to cross INR 19,000 crores mark for defense exports by 2023 and well on course to attain the target of 25,000 crores worth of exports by 2025. Now coming to the industrial explosives segment, the cost of raw materials, which have increased by approximately 200% in the past year -- in the previous year, are ally stabilizing and this also holds true for the coal mining industry. You could see several some reversal trend in some of the raw material prices. The domestic coal output is said increase to 1017 metric tons in '23, '24 and is further likely to increase by 9% to 10% in '24, '25 in light of the anticipated rise in coal consumption owing to economic expansion. Now, I request our CFO to share the financial performance.
Srihari Pakalapati
executiveThank you, sir. Good afternoon to everyone. The result presentation for the quarter has been uploaded on the stock exchanges and on the company's website. I believe you all may have gone through the same. Now I would present the financial results for the quarter and 9 months ended 31st December 2022. The revenue from operations for Q3 FY '23 stands at INR 37 crores as compared to INR 50.8 crores in the corresponding period last year with a de-growth of 26.6%. Our operating profit for Q3 FY '23 stands at INR 5 crores as compared to INR 4 crores in the corresponding period last year. The operating margin for the quarter stands at 13%. In Q3 FY '23, we reported a net profit of INR 0.6 crores compared to the same in Q3 FY '22. The revenue from operations for 9 months ended -- I mean, 9 months FY '23 stands at INR 150 crores as compared to INR 139 crores in the corresponding period last year, which is translating into an 8% growth year-on-year. Operating profit for 9 months stands at INR 18 crores as compared to INR 17 crores in the corresponding period last year, which shows a flattish growth. The operating margin of 12% in 9 months FY '23. Net profit in 9 months FY '23 stood at INR 4 crores compared to INR 4 crores in 9 months FY '22. Now coming to the order book. The company's current total order book stands at INR 575 crores, out of which explorative business comprises around INR 108 crores. Defense segment is at INR 335 crores, which is around 58% of our total order book. On the southern segment, that is operations and management is around INR 132 crores. The order book retains a strong growth over the [Audio Gap]
Operator
operator[Operator Instructions] The first question is from the line of Aman Vij from Astute Investment Management.
Aman Vij
analystFirst question is on the order book for space. If you can quantify that. And also if you can talk about, typically, we are, as of now, providing mostly motors to the rockets. So what is the typical percentage cost of a motor of the total cost of the rocket? And these are the questions on the space side, if you can talk about the same.
Thati Chowdary
executiveSorry, can you repeat what exactly.
Srihari Pakalapati
executivePercentage of rocket motors on the overall order book.
Aman Vij
analystNo, no. I was talking about percentage of the cost of motor as the total cost of a rocket, just to understand if a rocket costs example [ $15 ] million. So what is the typical cost of a motor in that?
Thati Chowdary
executiveThis is very difficult to say because the cost, it has 3 divisions, rocket motor, basically. One is rocket motor and missiles -- has 3. One is Rocket motor. Second is the warhead and then guidance system, electronics and all those things, seekers. So this domain remains as on date with the rocket motor and then warhead in some cases. But seeker is definitely -- seeker and then those portions are the costliest parts of the motor. And percentage, I won't be able to tell. Probably BDL can tell this part.
Aman Vij
analystAnd sorry, what is our order book as of today in the Space division?
Srihari Pakalapati
executiveIn defense, we have INR 335 crores order book.
Aman Vij
analystYes, that I know, sir. Specifically, you need to ISRO or Space. I was talking about that.
Thati Chowdary
executiveISRO Space requirement.
Aman Vij
analystYes. Out of this order book, how much is for Space/ISRO.
Thati Chowdary
executiveRight now, it is only around INR 3.45 crores.
Aman Vij
analystOkay. So the new orders which you were talking about at the start, that is not into the order book?
Srihari Pakalapati
executiveYes, it's a new order book which we received was INR 3.45 crores. Old order, we have executed.
Aman Vij
analystOkay, sir. My second question is 2, 3 years back, you used to talk about we had bid for ammunition, I believe, grenade. So if you can update on that order.
Thati Chowdary
executiveRFP is still not opened and finalized. And in the meantime, parallelly, we are working with, as I mentioned in my initial notes, we are working with ARDE on a DCPP program for development of ammunition. So whereas the RFP is still not opened commercially.
Aman Vij
analystOkay. Okay. So correct me if I'm wrong, but solar industries had won orders for some grenade. So we didn't bid for that order. Our bidding was for separate products? If you can talk about the same?
Thati Chowdary
executiveThe solar industry is not into this ammunition as far as I know, but if they are there, can act. But you may be talking about some multimode grenade.
Aman Vij
analystYes, yes, yes.
Thati Chowdary
executiveNo. We -- consciously, we did not participate in that tender. So they are alone in that and we are not in that business as on date.
Aman Vij
analystOkay. Okay. But in our portfolio, with ARDE, which you are talking about, do you have this option of grenades also? Is it multimode? Or is it different?
Thati Chowdary
executiveSee, the multimode grenades, as far as I know, they are like any hand grenades. What I'm talking to grenade is grenade ammunition, which is fired from a grenade launcher. It's a larger ammunition, 40 millimeter, 30 millimeter, which is fired from a gun or multi-grenade launcher or a under-barrel gun launcher. That is the ammunition, which we have participated and waiting for it to be awarded.
Aman Vij
analystOkay. And if you can talk about what is the opportunity in this category, the grenade launcher, grenade basically.
Thati Chowdary
executiveThe opportunity is good in the grenade ammunition. Right now, it is being imported and then some quantity is being I think made by Ordinance Factory, but there is a good demand and the RFP quantities are also good.
Aman Vij
analystOkay. And when do we expect, sir, any orders -- confirmed order from this category?
Thati Chowdary
executiveI think it may happen in the next financial year, probably in the middle of financial year. Because we have to go through the qualification process and all those, then only it will be -- after all technical quantitation, then only it will happen. But apart from that RFPs, our facility, we are also planning for many agencies who want to outsource to us for manufacturing, that are also we are planning and the discussions are going on. So we are not just dependent on only on the RFP.
Aman Vij
analystSure, sir. And sir, last point on this, how many players have bid for this? And if you can quantify the imported amount just to understand what is the opportunity.
Thati Chowdary
executiveIt's a little difficult to say. This is not an open information. We have to get from, I think, 3 or 4 agents have participated in it, including us.
Aman Vij
analystOkay. Sir, next question is on the -- so in the presentation, you have talked about we are supplying a propellant to the missile program basically of the 6-missile program. So sir, typically, I just wanted to understand, you mentioned last call, we have INR 100 crore order book combined of this 6 programs per year. But sir, isn't this number too less, because my understanding is these 6 programs, the amount of orders that is expected is much, much more. So since we have very high market share in the products which you have mentioned. So why is that order book only INR 100 crores per year and not more. If the propellant cost as the cost of total missile is very small. Is that the reason we have only INR 100 crore order book instead of much bigger number?
Thati Chowdary
executiveSo where did you get this INR 100 crores?
Aman Vij
analystLast time some -- an analyst had asked you this question. So out of that 6 programs we have, what is the order book expected. So you mentioned additional INR 100 crores per year.
Thati Chowdary
executive2 Which program, ISRO program?
Aman Vij
analystNo, no, not ISRO. This missile programs, Slide #20. Slide #20, we have 6 missiles programs, Akash, MRSAM, Agni, BrahMos?
Thati Chowdary
executiveOkay. Okay. See, these are -- in these programs, the hardware and everything is coming as FIM because Akash, MRSAM, Astra, these programs. So our portion is only the propellant. And it is linked with the numbers taken for assembly by BDL. So the BDL right now the quantities which are happening there, it is that. And Akash program, which was really going in a big way, that is almost tapered down. It is tapering down. So that quantities have reduced. Other counties to come and take over, it may take time. So that's why we have indicated a figure of that.
Aman Vij
analystAnd we are as of now only doing propellants. We are not into the motors in these missiles as of now, right?
Thati Chowdary
executiveWe are doing both. These projects -- this is -- BDL is making the hardware and all those, and they are dependent on us for propellant. Where there's other programs and all those others, we are including the hardware, we are applying exports to Israel and other countries, including hardware, we are supplying entire rocket motor, not just propellant. Similarly, the new projects like NGRAM and other, this includes the hardware also in our scope, full rocket motor assembly.
Aman Vij
analystYes. You have talked about you're developing motor for Astra missiles also. Is it Astra Mark II dual pulse motors or we are only talking about Astra Mark I only?
Thati Chowdary
executiveAstra, we are not developing the motor. Astra, propellant is developed by us. Astra rocket motors and all by other agencies from the DRDO.
Aman Vij
analystOkay. On the Slide 18, you've mentioned production under ToT Astra motor -- in production under ToT?
Thati Chowdary
executiveYes, first production order has come. But like we have mentioned that it depends -- execution depends on the FIMs hardware to be supplied. BDL still is in the initial stages for Astra. MRSAM, yes, we are getting continuously and we are regularly producing and delivering them. But Astra still, it has to pick up.
Aman Vij
analystBut are we developing II-stage and III-stage motors for missile?
Thati Chowdary
executiveFor Astra, you're talking?
Aman Vij
analystAny missile, sir. The advanced motors, advanced missiles, where there is II stage and III stage.
Thati Chowdary
executiveAs I mentioned to you about NGRAM, Rudram, where we are with hardware, we are [indiscernible].
Aman Vij
analystOkay. Okay. Sure, sir. Final question, sir, on the defense side.
Thati Chowdary
executiveAnd all export orders of rocket motors, all are complete rocket motor, including hardware and everything.
Aman Vij
analystOkay. Okay. And sorry, how much is export order out of our total rocket motor order, just to understand the price where we will be providing both hardware and propellant versus only propellant?
Thati Chowdary
executiveWith hardware, we have the order book. I mean, the order book includes the hardware exports is about INR 100 crores. Exports are all complete rocket motor. It's not hardware or it's not propellant. It's complete rocket motor is exported.
Aman Vij
analystSure, sir. And do we expect further orders in this where we are both the complete rocket motor.
Thati Chowdary
executiveYes, yes. Only part of the development only got converted into production orders. Now there are others in line which have completed the development and demonstrated performance and all those. Now they have to be converted into production orders.
Aman Vij
analystGreat. Last question from my side on the defense order book which we have of INR 330 crores, sir. We were expecting to execute much more than INR 70-odd crores we have done in 9 months. So was there any delay in, say, December quarter normally is a good quarter for defense. So do we expect a very high ramp-up in Q4? Or do you think only next year, we'll be able to execute most of this defense order book.
Thati Chowdary
executiveNo, actually, we are expecting the billing to happen in Q4. Most of the billing is expected to happen in Q4. A lot of clearances and permission are yet to come. So I think that will become -- clearances, permissions means -- if you see these export are particularly, they are shipped. So availability of ship and then containers because you require the ship which carries the explosives. So unless we bill it, it will not appear in the paper. So we are expecting that to be completed in the fourth quarter.
Aman Vij
analystSo you expect maybe like a big portion. So defense wise, at the start of the year, we had a target of maybe around INR 150 crores for the full year, but we have done only INR 70 crores. So do you think Q4, we will be able to make up for the loss? Or do you think next year only we can target this INR 150 crore kind of run rate in defense?
Srihari Pakalapati
executiveSo we expect some good numbers. We cannot share an exact number, but we can get -- you can expect a good number to happen in Q4.
Thati Chowdary
executiveWe are finding a little difficulty in hearing. I think a lot of strain we have to put on understanding the question. Is it possible to improve it further, audio.
Operator
operatorShould I reconnect your line. [Operator Instructions] Next question is from the line of Niraj Mansingka from White Pine Investment Management.
Niraj Mansingka
analystJust wanted to know LRSAM, MRSAM, and NGRAM orders...
Operator
operatorMr. Mansingka, please use the handset mode.
Niraj Mansingka
analystYou can hear me better right now?
Operator
operatorSir, are you able to hear Mr. Mansingka?
Thati Chowdary
executiveNot clear. Your voice is very clear, but his voice is not so clear.
Niraj Mansingka
analystNo, I'm totally on the handset mode only. So I don't know if -- should I connect again or should I wait?
Thati Chowdary
executiveI think maybe you can speak slowly. Probably, we will be able to...
Niraj Mansingka
analystOkay, I will tell you, I know that. So basically, we were expecting -- we have 100% suppliers for MRSAM and LRSAM Astra. And we are not seeing much scale up in your difference revenues? I know you said that Q4, you will be reporting the numbers. But can you say from an industry perspective, when do you expect a scale-up of MRSAM and LRSAM in the orders for your side?
Thati Chowdary
executiveSee, the presenter indication, sir, around 25 numbers per month of MRSAM, LRSAM and Astra another 20 numbers per month. It is like that. LRSAM, MRSAM is already going on at that level right now, we are supplying. But Astra is yet to come to that level. And this is the -- these are the quantities which will continue. In earlier -- in Akash, the quantities were more. We're almost delivering 50 to 60 numbers in a month.
Niraj Mansingka
analystOkay. So do you expect more scale up for MRSAM, LRSAM because...
Thati Chowdary
executiveNo. I don't think it will go more than that, but 25, 20 numbers, they will all remain. And about SGRAM and other things, we are yet to now about the actual potential when it comes to full scale production.
Niraj Mansingka
analystOkay. Got it. And so going forward in, say, next 2 years, which are the areas do you see a large growth in our reported revenues for your firm?
Thati Chowdary
executiveNo, not these one. You have -- like our turnover and order book and all are dependent on many other things.
Niraj Mansingka
analystYes, yes. Aware of that. So I just wanted to know from the current whatever understand you will have?
Thati Chowdary
executiveWe have export orders for almost 120, 130 numbers per month, rockets alone, not just propellant casting, but full rocket motors. So that keeps us busy. In fact, that keeps us busy both of our plants, PDK and Katepally.
Niraj Mansingka
analystOkay. Okay. The second question was on the services, the revenues were not reported this quarter. Any reason why the services revenue has not come in?
Thati Chowdary
executiveSorry, entity -- services?
Niraj Mansingka
analystYes.
Thati Chowdary
executiveNot reported?
Srihari Pakalapati
executiveNo, it was reported. Defense and space services. No, actually, whatever revenue is there, it came from the defense services only. The defense billing has not happened as [indiscernible].
Niraj Mansingka
analystOkay. So the defense billing was coming in a continuous range over the last...
Srihari Pakalapati
executiveSorry, I didn't get.
Niraj Mansingka
analystThe defense revenues are getting reported on a permanent range, but this quarter, it has been significantly low. So what has changed that the defense approvals are yet to come for acceptance of the orders?
Srihari Pakalapati
executiveActually, as per the accounting and as per our this thing also, it is only our, we can see it only in one segment. That is high energy material. For the detail -- I mean, for the information purpose, we used to have the -- we used to differentiate between these two, but from now, we wanted to have the commercial and non-commercial only.
Operator
operator[Operator Instructions] The next question is from the line of Abhishek Poddar from HDFC Mutual Fund.
Abhishek Poddar
analystSir, regarding the order inflows in defense and explosives, how should we see, sir, in '24 and '25 and even this year, if you can guide, how much order inflows are you expecting?
Thati Chowdary
executiveThe new orders what we are expecting at least another increase of INR 100 crores in terms of this. This is based on the various RFPs we are participating and export and all those. That's what is conservative target.
Abhishek Poddar
analystOkay. This INR 100 crores is for this year -- additional INR 100 crores for this year only, sir '23?
Thati Chowdary
executiveNo, '23, '24 additional turnover.
Srihari Pakalapati
executiveNo, we will maintain about INR 650 crores to INR 700 crores order book continuously in '23, '24.
Abhishek Poddar
analystOkay. So you will get more orders and you will execute, but your order book will increase INR 650 crores to INR 700 crores?
Thati Chowdary
executiveIn spite of the execution.
Abhishek Poddar
analystSir, could you give a number of how much order inflow will be there in '24 and '25, some sense of it, sir? And if you can't give -- a broad range, if you can give, sir?
Thati Chowdary
executiveYes, that's what -- it's difficult to say that because so many people are in pipeline. Now, how many will come in this year because see defense industry goes different way. It is not like a commodity industry where regularly every month, there is an offtake or something. So order placement depends on various things, which are very difficult to predict. But yes, like I told you, at least an additional INR 100 crores, INR 150 crores should come there.
Abhishek Poddar
analystOrder book build will happen, sir? INR 100 crore, INR 150 crore.
Thati Chowdary
executiveYes.
Abhishek Poddar
analystAnd sir, this defense order book of, let's say, INR 350 crores that you have today, what is the execution time line for this? How many years it's going to be executed in that order book?
Thati Chowdary
executiveMost of them are in 2 years' time.
Abhishek Poddar
analystOkay. So we can assume that about INR 180 crores to INR 200 crores of execution per year in defense can happen.
Thati Chowdary
executiveYes.
Abhishek Poddar
analystRight, understood. And sir, on the explosive side, we have seen that there has been a big increase in global explosive prices, almost 2x increase, and that had kind of led to a large increase in the order book for your competition. We haven't seen similar kind of growth in our explosive business. So is it that volumes have not kept in pace or what has happened in that size?
Srihari Pakalapati
executiveEven in our case, you can see 60% growth uncover in the previous year.
Thati Chowdary
executiveActually, like we explained in earlier con calls, yes, 2 years back, based on the prevailing raw material prices and margins and all those, we were not very aggressive in fuel explosives area. So that has paid off. In fact, that contained our negative growth in this area in terms of profit. Now the new tenders and other things will happen in the next year. So based on the current things, I think it may -- our participation may be a little more aggressive.
Abhishek Poddar
analystOkay. Because sir, if the explosive prices have gone up by almost 2x and if your growth is 60%. So that would mean that volumes are a little down. Is that the case?
Thati Chowdary
executiveCoal India, particularly Coal India, if you see that we are not there in Coal India, for bulk explosives and all those. That has helped us because raw metal cost was so high and then so our concentration was more on defense and all those rather than straining our sources. But now things have changed, like Srihari was explaining about the last quarter, how this sector segment has contributed, and we are hoping that in the next financial year, definitely, that should help us and our participation will increase.
Abhishek Poddar
analystOkay. Sir, could you give what is the volume you're doing -- expecting to do this year in explosives and what volume growth should we assume next year?
Srihari Pakalapati
executiveWe're doing -- bulk exposures, we are doing about 8,000 tonnes to 8,500 tonnes. Because we have the only 2 location orders and we are doing it -- 8,000 tonnes to 8,500 tonnes. But we are expecting because the Coal India is coming with the new tenders in the coming year in June. So let us see if we get good things, the volumes may go up.
Abhishek Poddar
analystOkay. Understood. And sir, in Slide #4, if I look at the revenue breakup, for defense and space services, the revenues have come down Y-o-Y to only INR 2.8 crores. Any clarity there why that has happened?
Srihari Pakalapati
executiveBecause defense billing as we explained in the early stage, the defense billing to happen in Q4. Most of the building is deferred to the Q4. So I think that will be compensated in Q4.
Abhishek Poddar
analystOkay. Okay. So some shipment probably hasn't happened, but the execution of work has been completed?
Srihari Pakalapati
executiveAlmost the cargo and most of the cargo is ready and we are waiting to dispatch most of it.
Abhishek Poddar
analystUnderstood. And sir, last question on the defense side. If I look at the missile programs order inflow expectation, there is expectation of large orders for Akash, QRSAM, MRSAM in the next 2 years. So you did mention your order book will go up to INR 650 crores, including defense next year. There's only increase of INR 100 crores. Because of these large programs, would you expect large order inflow to come to us?
Thati Chowdary
executiveYes, it has to because we are the only vendor for these -- as on date, we are the only vendor for these programs supply. So whatever increase we get in that, it comes to us.
Abhishek Poddar
analystSo if I just take a number, Akash missile order inflow expectation is in the range of INR 6000 crore, INR 7,000 crores for the first one and...
Thati Chowdary
executiveRight now, Akash missile is no more in such large numbers presently. I think we were -- depending on the export orders received by BDL or other agencies, again, Akash program may pick up, but as on date, it is a low key because I explained it is tapering out. It is other programs -- MRSAM, QRSAM, Astra, these are all -- and all these programs, we are the single vendor.
Abhishek Poddar
analystSir, Akash Prime was supposed to come to BDL is what we understand from the media reports and all?
Thati Chowdary
executiveYes. This is only the initial stages. It has not yet come to a full production scale.
Abhishek Poddar
analystRight. And sir, let's assume if they get a INR 6,000 crore order of Akash Prime, how much location will be to us?
Thati Chowdary
executiveI think like I always answer this question -- because we are not very sure about that contribution of ours and all those things. Maybe, I think 15% or something we may get. I'm not very sure. It's just a ballpark figure.
Abhishek Poddar
analystYou said 15%, sir?
Thati Chowdary
executiveYes, that's all. That's also just a guess rather than current figure.
Operator
operator[Operator Instructions] Next question is from the line of Niraj Mansingka from White Pine Investment Management.
Niraj Mansingka
analystHow much was the defense revenues for the quarter?
Srihari Pakalapati
executiveSorry.
Niraj Mansingka
analystHow much was the revenue reported for defense for the quarter?
Srihari Pakalapati
executiveFor the quarter?
Niraj Mansingka
analystAbsolutely, no billing, sir. That is what my question was last time also just on the call a few minutes back, that we have seen a continuous defense order being reported but this quarter, we haven't seen. Even in Q3 of last year, we saw defense order being reported. So what is that has changed because of this, the reporting is zero? I know you said there's a delay in acceptance by the government. But that is also an ongoing process. So I just wanted to know from your side, what might have led to zero reporting on defense revenues?
Thati Chowdary
executiveReporting of defense orders you are talking about, not the execution?
Niraj Mansingka
analystExecution, I'm talking about. Reported revenues were 0 for the quarter.
Thati Chowdary
executiveLike what Srihari explained, the deliveries did not happen. Unless the deliveries happen, they don't come into the revenue.
Niraj Mansingka
analystOkay. So how much was the value of deliveries which did not happen for the defense for the Q3?
Thati Chowdary
executiveWe have about 60 -- we have the stocks worth about more than INR 50 crores at this point, only inventory.
Niraj Mansingka
analystYes, that answers my question.
Operator
operator[Operator Instructions] Next question is from the line of Aman Vij from Astute Investment Management.
Aman Vij
analystOn the ARDE team that -- RFP that we have applied for, sir, is it for one single product or have you applied for multiple products?
Thati Chowdary
executiveYou're talking about ammunition?
Aman Vij
analystYes, ammunition.
Thati Chowdary
executiveIt is multiple products, different variants.
Aman Vij
analystOkay, okay. And on the second part, sir. Do the original bid which we had done, you had said that has still not opened or something like that. Any update on -- when do we expect any kind of either -- when do we expect the orders, the information?
Thati Chowdary
executiveNo. Right now, it is in the stage of NCNC technical trials. But those samples, delivery NCNC trials, they are delayed because of the present prevailing international conditions, transportation and all those. So I think it may go to the end of calendar year '23, it may go to. Because once they will do the technical evaluation of the samples, NCNC samples submitted, then with the qualified people only, they will open the commercial space.
Aman Vij
analystAnd sorry, what is the potent amount of the orders, not the one we bid, but what is the total quantum of that order, which is expected to open up?
Thati Chowdary
executiveTalking about ammunition, 40 mm?
Aman Vij
analystYes. Yes, yes, yes.
Thati Chowdary
executiveThat RFP part, it goes to around 1 lakh number annum.
Aman Vij
analystSure. And this is for the Army, if I'm right, Right?
Thati Chowdary
executiveYes.
Aman Vij
analystAnd sir, any orders expected for the other agencies like NSA and CRPF?
Thati Chowdary
executiveYes. Other paramilitary forces and police departments, they are all voting and they are presenting the queries. So without waiting for that, like I mentioned to you, we are progressing in the development so that we can meet these requirements.
Aman Vij
analystSo you expect other agencies, orders to come earlier compared to the Army order?
Thati Chowdary
executiveYes.
Aman Vij
analystOkay. And mid of H1, you said is other agencies basically. And Army may be end of FY '24?
Thati Chowdary
executiveYes.
Aman Vij
analystBut you said it is only 1 lakh orders per year, right?
Thati Chowdary
executiveYes. There are 4 different variants there also. It is between them around 4 lakh number per annum it comes.
Aman Vij
analystOkay. And we have bid for all the 4 variants? Do we have that...
Thati Chowdary
executiveWe bid for all the 4 variants.
Aman Vij
analystAnd sir, this is developed totally in-house or we have a tie-up with some...
Thati Chowdary
executiveWe have a tie-up with a foreign OEM.
Aman Vij
analystSure, sir. And is it rough to assume like for solar, the average cost was like INR 6,000 to INR 7,000 per quantity. So this will be much more maybe like INR 7,000, INR 8,000 only per one...
Thati Chowdary
executiveIt's not clear.
Aman Vij
analystYes. So sir, 1 lakh orders which you were saying per annum, does this translate to roughly INR 80 crores per year, INR 80 crores to INR 100 crores per year in amount?
Thati Chowdary
executiveI don't see that relevant to [ INR 60 ] crores.
Srihari Pakalapati
executiveYou want us to comment on that.
Aman Vij
analystSure sir. Sure, sir. My second question is, sir, this year, 2 expos happened. Ammunition expo also and defense expo. Any -- you talked about HAL tie-up in terms of...
Operator
operatorMr. Vij, the audio is slightly muffled. Please use the handset mode.
Thati Chowdary
executiveWe are training a lot to understand you, that's the problem.
Aman Vij
analystYes. Yes. This should be better, right?
Thati Chowdary
executiveYes. Please repeat the question.
Aman Vij
analystYes, yes. I was saying this year, sir, 2 expos had happened. One is defense expo and one is ammunition expo also something of that sort. So we have already disclosed, we are tied up with HAL, but any other tie-ups related to ammunition specifically because that is a big opportunity, and I think we are the only -- very few players in India. So any tie-up with Munitions India or any other for exports, which we did in these 2 consensus?
Thati Chowdary
executiveWe have no tie-up with Munitions India. But we have several tie-ups, MOUs signed with other agencies, Indian industry, where we are the partner for providing the energetic materials and components and assembly and the other partners providing the hardware and other things. We have several.
Aman Vij
analystOkay. Okay. Yes. And we expect any orders from these tie-ups in this year, FY '24.
Thati Chowdary
executiveYes, yes. We are expecting -- we're expecting those MOUs to get converted into -- because a lot of our RFPs are in pipeline, under consideration, already submitted -- different stages of maturity.
Operator
operatorThe next question is from the line of [ Gurcharan ] from GMA.
Unknown Analyst
analystJust wanted to understand the order position from the Israeli orders which you had mentioned earlier. How much percentage have you concluded supply?
Thati Chowdary
executiveFrom the development and all we have completed. Now we received the production order. So like we have explained, now the inventories are produced and build up. So supplies and all those will progress. We have not supplied anything below supply against the production order. There are all started lowering in our [indiscernible], so that whenever they arrange -- because transportation is not in our scope. Transportation, shipping is in their scope. They have to organize.
Unknown Analyst
analystSo the entire order is still outstanding as far as filling is concerned. Preparation has been done, but it has not been yet shipped. Is that clear?
Thati Chowdary
executiveBecause we have to keep on producing and storing. Hence, they will accumulate till they release them.
Unknown Analyst
analystRight. So any further orders? Have they come in the last quarter after that INR 100 crore order, which had come in?
Srihari Pakalapati
executiveNo, we get the normal small, small orders on a continuous basis. So -- but whatever is material, we have disclosed to the exchanges. It is multiple orders -- small, small multiple orders we get.
Operator
operatorThe next question is from the line of [ Parag Kulkarni], an individual investor.
Unknown Attendee
attendeeSir, one thing I want to know. Do we have any plans for the stock split calls or stock bonus if we should, because my concern is the liquidity?
Operator
operatorAudio is unclear from your line, please use the handset mode.
Unknown Attendee
attendeeMy concern is about the liquidity of the stock in the market. Have you seen any liquidity. So do we have any plans to come up with stock split or one-off stock in the future?
Srihari Pakalapati
executiveNo. Not at this moment, sir. Definitely, the -- I mean whenever we wish to do that, we will definitely inform you. But not at this moment. We don't have any thought -- I mean think about it in this moment, at this moment.
Unknown Attendee
attendeeYes. Because what I see is the volumes hardly 5,000, 7,000, 8,000 per day. That is hardly any volume for stock growth. And in longer run, for the investors, the growth is really very far in this way?
Srihari Pakalapati
executiveWe understood your concern, sir. Definitely, we'll look into that.
Operator
operatorAs there are no further questions from the participants, I would now like to hand the conference over to Mr. T.V. Chowdary for closing comments.
Thati Chowdary
executiveThank you very much, sir, for your interest in our company and very valuable questions and suggestions. I think, we'll come out with better results in the next meet. Thank you very much.
Operator
operatorThank you. Ladies and gentlemen, on behalf of Premier Explosives Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Premier Explosives Limited transcript — plus 251,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Premier Explosives Limited earnings transcripts and 251,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.