Primoris Services Corporation (PRIM) Earnings Call Transcript & Summary

February 23, 2021

New York Stock Exchange US Industrials Construction and Engineering earnings 50 min

Earnings Call Speaker Segments

Brook Wootton

executive
#1

Thanks, Amy. Hello everyone, and welcome to the Primoris conference call. With me this morning are our Chief Executive Officer, Tom McCormick, and our Chief Financial Officer, Ken Dodgen. Ahead of getting started, I want to make sure everybody is aware of some language included in our safe harbor statement. The company advises that some of the statements we make on this call are forward-looking and carry a variety of risks and uncertainties. Our actual results could differ materially from what we project and expect. Those risks and uncertainties are addressed in the reports we file with the SEC. These forward-looking statements reflect our outlook only as of today. We disclaim any obligation to update them, except as the law may require. At this point, I'd like to hand the call over to our CEO, Tom McCormick.

Tom McCormick

executive
#2

Thanks, Brook. Morning, everyone, and I appreciate you being here as we go over what we achieved in Q4 and across all of 2020. It was a remarkable year, even with social unrest, the pandemic, a big drop in oil prices, and the presidential election. In Q4, favorable weather meant certain business units that normally close down following Thanksgiving kept operating right up to the close of the year. That gave us a pleasant lift and a fantastic finish to 2020. The figures clearly demonstrate how well our strategy has worked, even in a tough market, since we reported record revenue totaling $3.5 billion for the entire year, which is 12% higher than the previous year. For 2020, our earnings per share reached $2.16 per diluted — fully diluted share, which is yet another record for the company. Given our robust performance overall and the helpful weather in December, Q4 revenue rose 13.6% year over year, reaching $897.3 million. Our Pipeline, Power, Utilities and Transmission segments all delivered particularly strong revenue during Q4. I'd like to extend a special thank you to every one of our employees, whose dedication and focus on working safely made it possible for the company to enjoy the success we all saw this year. Now, let's review our segments. For full year 2020, our Pipeline & Underground segment achieved outstanding top line growth, finishing at nearly $900 million, which is 77.6% above full year 2019. The primary driver was pipeline projects in Texas that kicked off in Q1 2020, partly offset by a Mid-Atlantic pipeline project being cancelled and a pipeline project reaching substantial completion in 2019. Our field services delivered solid results for the year even with the difficulties brought on by falling oil prices, the pandemic, and hurricanes that hit the Gulf Coast last year. Moving to our Power, Industrial & Engineering segment. Revenue grew 9.1%, from $729.3 million in 2019 to $795.4 million in 2020. Solar energy projects and advancement on an industrial project for a California customer fueled this growth. The renewable solar market keeps expanding. We started work on a new 380-megawatt solar project in the late — in Q4 in Nevada. Additionally, during the quarter, we were chosen as the EPC contractor for 2 large solar projects in Texas, totaling 885 megawatts, which will get underway this quarter. In Q4 2020, we wrapped up phase 4 engineering services on a green diesel project situated along the Gulf Coast, and we're still making headway on the renewable project in California that was mentioned earlier. In 2020, we ran into elevated expenses tied to an LNG project up in the Northeast, and that hurt our margins. Our expectation is that this project wraps up late in Q2 and starts commissioning early in Q3, and once that happens — once that happens, this problem won't be affecting us anymore. Something worth pointing out: every project we're carrying out in this segment is meeting its plan or doing even better. Over in our Utilities & Distribution segment, greater productivity and more activity with our customers pushed revenue up, from $886.5 million in 2019 to $906.6 million in 2020. This segment ran at full capacity. Conditions from the weather were favorable. Our crews put in safe, productive work; and our major customers used their budgets with hardly any interruptions. We also finished mobilization on a new MSA contract in the western region of the U.S. and think this will become a lasting relationship with plenty of chances to grow. Revenue of $459 million in 2020 was recorded by our Transmission & Distribution segment, versus $497.3 million the year before; we've grown more selective about what kinds of work we take on, and we also got a lift from more storm work over the year. We finished restructuring this segment in Q1 of 2020, and that has led to better performance, improved contract pricing, a management reorganization and a cut in indirect costs. We anticipate this momentum will propel us into 2021 and past that. Positive margins came during the fourth quarter from storm remediation work our crews did as we responded to storms hitting the Midwest, Gulf and Mid-Atlantic regions. Improved project performance on our transmission projects gave margins a boost as well. For 2020, revenue in our Civil segment came to $433.5 million, a drop of 11.2% from $488 million in 2019. Lower textile order volumes were the main cause, along with the substantial completion in 2019 of a project with a major refining customer and an ethylene project. Even with that modest decline, our management team stays focused on executing projects, and the results are evident. We remain highly selective about the civil work we bid on, and because of that, the segment landed within our target margin range. Our Louisiana civil projects did well also, even though that same active storm season that generated storm work for our T&D group had a negative effect on the Louisiana projects to some extent, particularly Hurricanes Delta and Zeta. When I look at all our segments, I feel extremely proud of both their financial results and their safety results. I'd like to thank our management teams and employees for keeping their focus on workplace safety throughout the year. Our teams put in over 27 million work hours, and our total recordable incident rate for 2020 came in at 0.53, one of the best in the company's history and well below the industry average. Over the year, we earned numerous safety awards. ARB was named the overall winner of the California Plumbing and Mechanical Contractors Association Safety Star Award and winner of the Safety Star Award. ARB Underground was awarded the Arthur T. The Distribution Contractors Association gave us the Everham Safety Award in the category for 2 million and over work hours. The Division I Greater Baton Rouge Industry Alliance Award went to I&M. And at the 2020 Canada's Safest Employer Award ceremony, Primoris Canada took home an Excellence Award. While I'm glad 2020 is behind us, I'm eager to discuss our direction for 2021. To seize the opportunities before us and build a sturdier foundation for growth, we examined how our operations are organized, and in January, we shared that we're simplifying that structure so it works more efficiently and encourages teamwork and cross-selling. Because of this, our segments went from 5 down to 3. Our gas Utilities & Distribution segment, the electrical Transmission & Distribution segment, and the telecom services we gained by acquiring Future Infrastructure are now combined in the new Utilities segment. The new Energy segment brings together the Power, Industrial & Engineering segment and the Civil segment. The Pipeline & Underground segment keeps its existing structure but gets a new name: the Pipeline Services segment. Making our structure less complex is clearly the right move.

Tom McCormick

executive
#3

Within each segment, the various business units overlap considerably when it comes to clients — sorry, I mean the separate business units inside every segment do share many of the same customers. So when you're able to align all of them, we're capable of self-performing a bigger share of the work on hand, generating several revenue streams, and that in the end boosts our margins while letting us capitalize on synergies across the different business units. Now, what lies ahead for 2021? Let me spend a moment on a few segment highlights, and then I'll cover 2 areas that carry broader consequences for where we're headed, namely the recent addition of Future Infrastructure to our family of companies and the new presidential administration. Turning to our Utilities segment, which as before contains our gas and electrical Transmission & Distribution businesses along with our new telecom business, we're positioned well to keep improving and to grow overall, building on momentum from 2020 and also widening our geographic footprint and client base. The utility crisis in Texas last week only underscores how much infrastructure work is needed. Gas, electric and telecom all operate in MSA-based markets, and going forward their focus — and ours — is on maximizing synergies and scale, further enhancing productivity and growing our market share. The telecom market remains robust; we've locked in MSAs with 2 telecom companies out west and ought to begin performing work during the first quarter of this year. As for the Energy segment, which again brings together the Power, Industrial & Engineering business and the Civil business, there's plenty to discuss regarding renewable energy under the new administration, and I'll return to that in detail. In the meantime, we're monitoring whether state spending levels, particularly in Texas, might impact our civil projects. TxDOT has historically spent $8 billion to $9 billion annually, and that figure could dip somewhat because of falling oil and tax gas revenues — oil and gas tax revenue, pardon me. When it comes to the Pipeline Services segment, with the industry facing headwinds, we anticipate fewer new pipeline projects. The encouraging part is that our Pipeline segment already holds over 40% of its 2021 plan in backlog, and they keep chasing additional projects. More than half of the operating pipelines across the United States have outlived their design life, and a number of them exceed 50 to 60 years in age. Beyond how old these pipelines are, certain ones face other possible issues, like coating that is absent or deteriorated, anomalies, or possibly — given their age — having been constructed without modern manufacturing or construction techniques. The government has just rolled out a new Mega-Rule that broadens what's required for verifying, monitoring and enhancing pipeline integrity. Under this new rule, every pipeline must verify its maximum allowable operating pressure if it is to stay in service. Should the minimum pressure not be achieved, the pipeline will need to be upgraded, repaired, replaced, repurposed or decommissioned. Our pipeline division is being realigned so that we can capitalize on what our field services teams do best, helping clients comply with these new regulations and handle every aspect of pipeline integrity work, upkeep, and building projects. Stepping back for a wider view, I want to address the Future Infrastructure deal we closed last month. It represents a phenomenal match for Primoris and satisfies every criterion we established when we set out to find our next big acquisition a number of years back. It launches us into the telecom sector. Telecom services is a rapidly expanding market that will keep growing far into the future, carried by the momentum of an ever more digital world; it also bolsters the utility offerings we already have, providing a broader territory in which to draw on the strength of the Primoris name, our loyal clients, and our know-how; and it shifts us away from purely engineering and construction toward an operation with greater margin growth potential and recurring revenue through MSAs, which is precisely where we intend to steer our portfolio; this is a remarkable match and a pivotal moment for Primoris. I'm pleased to say that integration is proceeding very smoothly. We're a bit ahead of schedule. FI's leadership team is tremendously enthusiastic about joining Primoris. Every one of them has agreed to remain with the company and has even put their signatures on employment agreements. They're thrilled to become part of the Primoris group of companies, and we're starting to move into new geographic regions to broaden our telecom footprint; we've already begun capturing the synergies we pinpointed, and we anticipate saving no less than $10 million. From that amount, we ought to be able to book $5 million during this year, with the other $5 million plus any further upside coming over the next 12 to 18 months. Last, I want to talk about what lies ahead for us under the incoming presidential administration. We've all witnessed the domestic energy sector struggling over the last several years. Even though our pipeline segment posted a record year, this development will impact our pipeline construction prospects moving forward. And limits on drilling could keep holding down new construction even as the economy bounces back and demand climbs. A further worry would be a potential rise in corporate taxes. Yet there are also places where the new administration's objectives open up meaningful opportunities for Primoris. To begin with, President Biden has said he intends to prioritize rebuilding infrastructure. As I mentioned before, America's gas pipeline network is getting old and requires investment; more broadly, swapping out other outdated infrastructure like roads and bridges likewise presents chances for Primoris across our Industrial, Engineering and Heavy Civil businesses. Secondly, the Biden administration is prepared to push renewable energy aggressively, and that aligns perfectly with our growing involvement in renewable energy markets. Back in 2018, renewable energy projects brought in $45 million of revenue for Primoris, and that worked out to under 2% of the company's total revenues. Then in 2019, we announced roughly $170 million worth of solar projects that would be built across 2020 and 2021. And in 2020, we came out with about $470 million in solar projects slated for construction in 2021 and 2022. For 2021, our renewable backlog sits above $430 million. Another $570 million of projects have been unofficially awarded to us, and those will probably convert into backlog during 2021 and 2022. What that adds up to is the possibility that at some point in 2021, we hold as much as $1 billion in backlog that gets executed purely on solar work across 2021 and 2022. We're extremely deliberate about picking which projects to pursue and which clients to partner with. There's also a cross-selling angle that comes with solar projects. Transmission lines and substations are needed to support a solar project, and that opens doors for our new Utilities segment. On a standard solar project, we've had up to 4 Primoris business units contributing some amount of work, among them I&M handling site preparation and Heavy Civil constructing the access roads. Wind isn't the only other option — solar isn't our sole renewable market either; we're weighing an expansion into wind, though only for particular scopes.

Tom McCormick

executive
#4

Buying big cranes so we can set turbines and fan blades isn't something we plan to spend heavily on. That said, site clearing and grading will be handled by us, along with road construction and all underground work, which covers the foundation and duct banks. Pulling and terminating cables is another thing we can do, plus we can build transmission lines running to the facility and handle both design and construction of the substations. Opportunity here is substantial; at the moment we're handling green diesel and biofuels work for customers along the Gulf Coast and out West. On the West Coast, our refinery is being retrofitted for biofuels. That project runs over $200 million. A second client on the Gulf Coast has a $50 million project where a refinery is being modified to produce green diesel; the political landscape has been clear to us, and clients keep leaning further toward renewables; we've been actively exploring various ways to assist our clients, and there's more to come. Being smart matters when it comes to selecting clients, choosing which projects to execute, how we estimate them, and how we staff whatever project we're awarded. Our renewables group will keep growing organically, though an acquisition could be considered as a target. Should the right target appear, the fit would need to be right, culture included. Rural broadband initiatives, at both the national and state level, represent another area that will affect our business. What the pandemic has exposed is that current network infrastructure suffers from a major bandwidth shortage, in metropolitan areas as well as in smaller towns and cities; here in Texas, Governor Abbott recently put his signature on a rural broadband initiative for our state, and my belief is that other states will do the same; demand for broadband, we've been told, is doubling roughly every 6 months. And although the pandemic created the urgent demand we see now, the longer-term picture over the next 10 to 15 years also looks promising. With that, I'll hand things over to Ken.

Ken Dodgen

executive
#5

Appreciate that, Tom, and good morning to all of you. I'll kick things off by going over the key financial metrics for both the quarter and the full year, after which I'll walk through our balance sheet, cash flows, and backlog. Following that, I'll finish with our 2021 guidance, and then we can get to your questions. Revenue for the fourth quarter of 2020 came in at $897.3 million, which represents a gain of $107.6 million, or 13.6%, versus the same quarter a year earlier. That rise was mostly driven by greater revenue in the Pipeline segment, given that we had several pipeline jobs underway during the quarter. Revenue also came in higher in our Power and Transmission segments, though this was somewhat offset by reduced revenue in our Civil and Utilities segments, largely reflecting the timing of jobs. Gross profit for the fourth quarter of 2020 reached $97.8 million, versus $89.5 million a year earlier. That improvement in gross profit stemmed mostly from greater Pipeline segment revenue along with better margins in the Transmission segment. Partially offsetting this were weaker margins in the Civil and power segments. For the full year 2020, gross profit rose by nearly $40 million, reaching $370.2 million compared with 2019, on the back of increased revenue. Now let's look at each segment. Gross profit in our Transmission segment climbed $22.3 million to a record $44.9 million, mainly because of higher gross margins on revenue that was slightly lower. Gross margins stood at 9.8% in 2020 versus 4.5% a year earlier, thanks to higher costs in the prior year, higher-margin work in the current year, and a bit more storm work this year. Our Utilities segment kept performing well, with gross profit up by $16.3 million to $133 million, driven by slightly higher revenues and better gross margins. Gross margins came in at 14.7% against 13.2% a year earlier, primarily because of better weather conditions in 2020 and improved margins on projects in the Southeastern part of the U.S. Our Power segment saw gross profits fall by $22.6 million, as slightly higher revenues were offset by lower gross margins during the year. This was mostly attributable to the higher costs tied to the LNG project in the Northeast that Tom mentioned. The Pipeline segment boosted gross profits by nearly $36 million, primarily due to higher revenue, partially offset by slightly lower margins in 2020. At 10.9%, margins were down from 12.2% a year earlier, primarily because of higher costs on pipeline projects in Virginia and Texas this year. Gross profit in the Civil segment dropped $12.6 million this year, primarily due to lower revenue from the timing of projects, as well as slightly lower gross margins. Gross margins in 2019 benefited from the resolution of a large portion of our Belton claims with TxDOT. And in 2020, we resolved the remaining 2 Belton claims with TxDOT, but they only had a small impact on gross margins. Yet even without the claims benefit in 2020, the segment had solid gross margins driven by good project execution and a few project closeouts. In Q4, SG&A came to $50.2 million, which rose from $48.6 million a year earlier. That modest rise stemmed mostly from incentive compensation and IT costs tied to our ongoing efforts to upgrade certain parts of our IT infrastructure, with some offset from reduced travel spending brought about by the pandemic. For 2020, our SG&A totaled $202.8 million versus $190.1 million the previous year, largely for the same reasons behind the Q4 increase. Across the full year, SG&A accounted for 5.8% of revenue, compared with 6.1% in 2019. We anticipate SG&A will land in the low 5 — sorry, high 5% to low 6% range for 2021 as well; we also recorded $3.4 million in transaction costs during Q4 2020, chiefly tied to our purchase of Future Infrastructure. Interest expense for the fourth quarter came in at $2.8 million, versus $2.6 million a year earlier, matching what we had expected. On a full-year basis, interest expense reached $20.3 million, basically unchanged from 2019. Given the extra debt we raised to finance the Future Infrastructure acquisition, I anticipate 2021 interest expense of roughly $7 million each quarter. The effective tax rate on income attributable to Primoris was about 28% for the year, a bit below our expectation thanks to higher pretax profit and reduced state income tax. We look for our effective tax rate to come in around 29% for 2021, though that figure could shift somewhat based on which states we operate in this year. Net income attributable to Primoris in the fourth quarter was $31.8 million, or $0.66 per fully diluted share, against $26.9 million, or $0.53 per fully diluted share, a year earlier. For the full year, we posted a record $2.16, exceeding the $1.61 per share we had established in 2019. Operating cash flows during the fourth quarter totaled $120.4 million. Across the full year, our operating activities produced nearly $312 million of cash flows, versus almost $118 million in 2019. This sizable gain in operating cash flows reflected higher net income along with a sustained emphasis on working capital and securing favorable contract terms. In the fourth quarter, we put roughly $10 million into property and equipment; for the full year, we invested $64.4 million, with about $42 million of that going toward construction equipment. We anticipate 2021 capital spending in the $60 million to $80 million range, with nearly all of it directed to construction equipment this year. Our balance sheet finished the year in strong shape, ending with $326.7 million of cash. Borrowing capacity under our revolvers — under our revolver stood at $148.5 million, giving us total available liquidity of $475.2 million at year-end. Total debt fell to $316 million; and our weighted average interest rate declined to 3.7%, compared with 4% a year earlier. When we bought Future last month, we drew $100 million from our revolving credit facility and raised our term loan by $400 million. During the coming 12 months, we anticipate using cash flow to fund continued organic growth of the company and pay down debt, and we keep searching for acquisitions that fit our growth strategy. At year-end, fixed backlog stood at $1.64 billion, MSA backlog was $1.14 billion, giving us total backlog of $2.78 billion. Although that's lower than 2019, once you take out the effect of the ACP project, backlog is basically level versus the previous year; we're proud of that considering how much revenue we consumed this year. Versus the close of 2019, MSA backlog has fallen $280 million. That reflects our termination of certain unprofitable contracts over the year, lower spending from a couple of utility customers, and decreased spend from some Industrial and Pipeline customers. We anticipate MSA backlog growing in 2021 as we bring on new utility customers and fold in the backlog from the Future acquisition; and wrapping up with our 2021 earnings guidance. We anticipate earnings per fully diluted share landing in the $2.40 to $2.60 range. That figure includes Future Infrastructure's operating results, partly offset by roughly $6 million to $8 million of additional intangible amortization expense and about $12 million to $13 million of additional interest expense. Our preliminary estimate is that Future ought to deliver between $0.30 to $0.40 in EPS during 2021; and with that, we're ready to take your questions. Amy?

Lee Jagoda

analyst
#6

Congrats on the results.

Tom McCormick

executive
#7

Thanks, Lee.

Lee Jagoda

analyst
#8

So, to begin with what's happening right now — the, let's call it, regrettable circumstances in Texas — could you talk about the ways your organization might contribute to fixing this, covering both what can be done right away and what comes later, such as making the grid more resilient and delivering additional upgrades to the infrastructure in that region?

Tom McCormick

executive
#9

Honestly, I believe you've basically given the answer yourself. Still, on the near-term side, we currently have teams in the field alongside our customers, assisting them in getting electricity back on. In fact, as recently as yesterday, roughly 300 full-time equivalents remained deployed, bringing power back to customers who had gone without it and fixing what the storm damaged. Over the longer horizon, it's precisely what you described — assisting our customers in developing more capacity, whether that means transmission capacity or generating electricity; it also involves making the grid more resilient, so when something comparable occurs again, they're ready and able to endure it; they'll have greater capacity available to endure it; we stand ready for our customers; we possess the personnel and the expertise needed to deliver that. So — and we're incredibly near to them in this situation — and a number of them are located right here in Dallas; so we're present. We've made sure they know we're present. And we're actually tackling some of this at this very moment.

Lee Jagoda

analyst
#10

Understood. Then when I look at Q1, in the past, prior to Future, Q1 has usually been roughly a quarter where you broke even or earned a small amount of money, simply because your utility customers are stuck in the snow, and so on. I suppose the first thing is, does the work required in Texas help or hurt Q1 in particular? And then adding items such as Future and then the solar-related work inside the Power segment, it seems like Q1 compared with prior years could be unusually profitable. Can you address that in any way?

Tom McCormick

executive
#11

Well, I'm not sure we've reached the point where we could claim that. One caution I'd offer is that right here in Texas, we lost a week's worth of revenue from last week alone; so although a few people were working last week, it was very few; so we'll recover part of that through the work we're performing on this recovery. But generally, storm recovery work merely substitutes for revenue you'd have produced and would have consumed regardless. So regarding renewables, I need to check how quickly those projects are moving along and what the revenue burn looks like, but that ought to help counterbalance it, and Future will as well. But with Future, usually, they begin their — there are clients that are — once more, since they're utility clients, they also begin the year somewhat slowly, returning from holidays, completing the design work, and then sending out work orders. So I can't say at this point whether that will counterbalance it and turn Q1 into a profitable quarter with somewhat greater upside than we've witnessed previously, or not. We'll find out over the next few weeks.

Lee Jagoda

analyst
#12

All right. Then I've got another one for Ken, and after that I'll get back in line. Regarding SG&A, it seems like you folks are doing a terrific job of holding expenses down. Could you discuss any particular steps already taken on the SG&A front that will keep those costs lower for good? And beyond that, are there additional initiatives you're evaluating that might bring your SG&A levels down even more, on an absolute basis as well as a percentage of sales?

Ken Dodgen

executive
#13

Yeah. What I'd say is that the majority of the initiatives we put in place to trim G&A have been completed and are now completely reflected in the numbers. As a result, there really isn't a whole lot when it comes to further initiatives. That said, we'll keep watching it. This is the sort of thing that continues over time. The dilution from ongoing revenue growth is certainly going to happen. On top of that, though, we now also carry the extra G&A stemming from the Future acquisition; and we'll need to examine that somewhat more closely and determine how it compares against our past G&A percentages. Over the long run, we might have to do some modest streamlining in that area.

Tom McCormick

executive
#14

And I think there's an opportunity to do that, yes.

Sean Eastman

analyst
#15

Team, congratulations on wrapping up the year in a strong position.

Tom McCormick

executive
#16

Thank you, Sean.

Ken Dodgen

executive
#17

Thank you, Sean.

Sean Eastman

analyst
#18

I just wanted to make sure I understand the Future contribution. So does the guidance include the additional amortization and whatever transaction fees there are, and those aren’t adjusted out of the guidance? Is that right?

Ken Dodgen

executive
#19

Right. That’s right.

Sean Eastman

analyst
#20

And those items ought to drop away as we move into later years, meaning that impact is going to increase near that point, correct?

Ken Dodgen

executive
#21

Correct. Correct.

Sean Eastman

analyst
#22

Okay. Alright. That's great; and I just had a question about the Pipeline & Underground segment. I mean, you folks are being suitably cautious in the comments about the outlook there; but it sounds like you've got a lot of the 2021 plan in backlog. Could you tell us what's included in the guidance for Pipeline & Underground revenue? And is it normal at this point in the year for over 40% of the plan to be in backlog as of today? Or is that above normal? I'm wondering about that.

Ken Dodgen

executive
#23

It really hinges on the year and when projects are timed. So some years we'll enter the year and we've got almost nothing baked into backlog and other years we've got a good amount baked in. It all just hinges on when projects are awarded and when they're going to start. We normally don't give — and then regarding 2021, generally, we normally don't give revenue guidance. But we had a — if you look back at 2018 and 2019, I consider those the normal years for Pipeline for us. We had a really good year in 2020, as you can see. I'm not saying we're going to go back to 2018 and 2019, but it's going to be down in 2021.

Sean Eastman

analyst
#24

All right, understood. And that's my final question. With a bit of hopefulness regarding where we are in the business cycle as the economy reopens and so forth, I'm simply wondering if you're noticing any strengthening in the pipeline of potential work across the Gulf Coast industrial markets, whether that's refining or chemicals. Are there any indications of activity suggesting some sort of turning point there?

Tom McCormick

executive
#25

I'd describe it as a slight amount, nothing that would make you overly enthusiastic at this moment. What I mean is, there is work happening, and most of what we're observing involves smaller-scale projects. I have not yet witnessed anything resembling a sudden shift. So no, not at this point.

Adam Thalhimer

analyst
#26

Could we spend a moment on California's prospects at a broad level? I'm interested in both the Pipeline segment and the Industrial segment.

Tom McCormick

executive
#27

On the Industrial side, well, again, they landed — a big biofuels project has been awarded to them, and through this year, and likely into early next, they'll be burning revenue on it. In the past they were able — that group definitely used to handle plenty of power plants. Roughly every 1.5 years to every 2 years, a power plant gets done by them. A lot of that isn't showing up now. Smaller projects, though, smaller capital projects, have let them replace much of that lost revenue, and at that they've succeeded, plus renewables, obviously. Turning to the pipeline, what you're likely referring to is the more underground or gas utility part of that group, since that's really their focus, though for California's utilities they may handle some electrical transmission work. From some of our companies, no drop-off has been seen by us, yet from a major client that just emerged from bankruptcy, with a new CEO only just now in place, we have seen a slight drop-off. And so, because a lot of grid hardening is on their agenda, we expect some of that will pick back up. That CEO, though, has to be given some time to get her organization and business structure in place, and after that determine what their path forward is. So out there we're down a little bit, and last year out there we were down, but our expectation is that this year it won't pick up a whole lot, though I don't think — by any stretch of imagination it's not going away.

Adam Thalhimer

analyst
#28

All right. Then, Tom, could you — regarding the solar segment, walk us through it — it went by fast, and I didn't fully catch it. My recollection is you mentioned roughly $1 billion being what moved into and out of backlog. Or perhaps at some point during the next 2 years, you'd reach $1 billion in solar backlog. What exactly was that remark?

Tom McCormick

executive
#29

Right. My statement was that we have approximately — we have 490 to 450 — hold on, allow me to locate that section. We had roughly $470 million of projects, renewable projects, sitting in backlog, and we've been — normally, how that business works is that we're — you perform an estimating process alongside your clients; and you — after that you're granted — you're informed the project belongs to you. And after that you receive — usually, a limited notice to proceed comes to us, and we'll begin engineering. Some engineering gets done. So that never gets placed into our backlog. The limited notice to proceed's value, perhaps $9 million or $10 million or $11 million, might go into backlog, yet the entire project does not go into backlog. And there's — we've received word that another $500 million exists. So at present we have roughly $430 million of renewable projects in backlog. Unofficially, we've been told another $570 million of projects exists, that should they move ahead, once financial backing and financial support arrive, which is — most of that is already secured, it's merely approval to begin from their respective companies, then our contracts with those clients will be finalized, and afterward that work enters backlog; those projects, that $570 million worth of projects, are likewise projects scheduled to be designed and built across 2021 and 2022. So should that occur, we'll hold over $1 billion of renewable work in backlog for projects getting built during 2021 and 2022.

Ken Dodgen

executive
#30

Either in the backlog or being worked on.

Tom McCormick

executive
#31

Right — or in the backlog or being worked on.

Adam Thalhimer

analyst
#32

But that $570 million — those are add-on projects, correct? They aren't, say, the following stage of work those clients already kicked off?

Tom McCormick

executive
#33

No, they're simply — these are add-on projects, and they sit at varying points of completion, all right? So each customer deals with them somewhat differently. Take some of them: they proceed, obtain a quote, reach an agreement regarding the price, settle on what the scope covers. They return to their senior management, secure approval and funding for the project, and then they move ahead. With others, they go out and sell the project to a developer or whoever else. I mean, they're all distinct, based on who the customer happens to be.

Adam Thalhimer

analyst
#34

Then only one more from my side, and after that I'll hand it off. How have margins in solar treated you up to this point?

Tom McCormick

executive
#35

Possibly reaching that low double-digit figure, 14%, 15%.

Adam Thalhimer

analyst
#36

Honestly, that's fairly solid.

Tom McCormick

executive
#37

Right. Those are attractive margins, indeed.

Ken Dodgen

executive
#38

Correct, Adam. If you look at those two, the nature of the effort differs quite a bit, yet oddly they end up looking somewhat like the way pipeline jobs are run; typically these are contracts with a fixed price. Bids on them usually come in around margins in the low double digits. Then, provided we execute well, keep our costs under control, and stay efficient, there's room to pick up some margin improvement as we work our way along and bring them to completion.

Tom McCormick

executive
#39

Correct — and these aren't your standard builds. They resemble mobile manufacturing far more closely than they do traditional construction work.

Ken Dodgen

executive
#40

Yeah, the nature of the work isn't at all like what you'd see with a pipeline project. That's correct. Still, when it comes to the way the finances shake out for us in the end, they might end up looking a lot like a pipeline project.

Adam Thalhimer

analyst
#41

All right, that's excellent. That does a lot to counterbalance the drop in pipeline.

Julio Romero

analyst
#42

I was hoping you could speak to the streamlined segments, and what the margin range might be for those 3 new segments.

Ken Dodgen

executive
#43

Apologies — your audio cut out somewhat. Would you mind saying that again?

Julio Romero

analyst
#44

Absolutely, I'd like to ask something regarding the way the new segments are organized. What do typical losses or intended margins appear to be, perhaps for the Energy and utility segment?

Ken Dodgen

executive
#45

When it comes to the Energy segment, that figure is going to land somewhere around 11% to 13%. As for the Utilities segment, the range will likely be somewhat wider, though as we've typically stated, it generally comes in at about 12% to 14%.

Julio Romero

analyst
#46

Understood. This came up before, yet regarding modernization of the grid outside electricity, simply considering the extended horizon, based on what you've seen, does a storm — well, you likely haven't dealt with one quite like this, yet have earlier storms in Texas somewhat boosted a lasting desire for greater CapEx toward grid dependability? Or does that type of thing fade away once recollections gradually dim?

Tom McCormick

executive
#47

Well, I mean storms always happen — the work to harden the grid that arrives in the wake of hurricanes, correct? The trouble with hardening the grid is, surely when you — I suppose, that's somewhat a distinct category of work. But if we're discussing hardening the grid or placing utilities underground, the figures I've been told range between 7% and 10% pricier to bury power utilities compared with constructing them above ground. If you consider the outcomes or what might result from the storm that struck Texas during the past week, it's really about generating additional capacity, be it transmission capacity or capacity for producing energy, to guarantee you have — that you're able to deliver the electrical services folks require when storms of this kind happen. That's somewhat distinct. In my view, it would lean more toward power generation, or we're adding more power generation onto the system and clearly maybe performing some winterization on the wind farms that evidently wasn't done and they forfeited that ability to generate power, and then possessing the transmission abilities, since you will lose — and afterward when storms of this kind occur, you will lose certain transmission abilities since you will experience certain failures. I mean that's simply how things go, you get temperatures below zero, ice storms, lines freeze, power lines fall, it simply occurs.

Julio Romero

analyst
#48

Understood. And when I consider your backlog and how it splits between MSA-based and non-MSA-based work — if I were to pro forma the Future Infrastructure backlog into your backlog, does that split then come out nearer to 50% MSA versus non-MSA?

Ken Dodgen

executive
#49

Wait a moment. Do you have — yes, that puts quite a bit of pro forma into our overall backlog once more.

Julio Romero

analyst
#50

From my perspective, you mentioned roughly $350 million in projected backlog tied to Future Infrastructure, correct? And if I take that into account, wouldn't I end up near that 48% to 49% area?

Ken Dodgen

executive
#51

Yes. Indeed, you've got it. That is precisely correct.

Julio Romero

analyst
#52

All right. And I suppose the final question I have concerns the CapEx guidance. I believe you said $60 million to $80 million, entirely tied to purchasing new equipment. Is that additional $25 million or so — or that increase, I should say — connected to what you discussed previously regarding this year, and does it relate to the new Future Infrastructure business and acquiring equipment for it?

Tom McCormick

executive
#53

No, only a small piece of that is included for Future. In fact, there is — I mean, a percentage of it is tied to their revenue, roughly 2.5%, 2% to 2.5% of the revenue. It's simply — a year ago, we kept CapEx low purely because of the pandemic, and we wanted to ensure we set aside cash. And it's fairly — looking back at prior years, we've traditionally spent somewhere from $60 million to $90 million or $70 million to $90 million on CapEx. So it's just returning closer to the normal figures, which has been consistent with the way we've run things before.

Brent Thielman

analyst
#54

I realize it will be broken into new segments, yet the Utilities & Distribution group did not experience the same expansion during '19 and '20 that had become typical in earlier years. Now, a portion of that involves seasonal elements, circumstances beyond your control and that of your customers. But I recognize backlog isn't necessarily a flawless forward-looking signal for the business, and I'm simply curious about your perspective on that heading into 2021.

Ken Dodgen

executive
#55

Yes. I mean we had been down, yet one factor in why we've been down somewhat is that we opted to exchange revenue for profit; we conducted a thorough examination of every one of our contracts and asked, which ones are we making money on and which ones are we not? And so — and we discussed this during prior quarters regarding how we walked away from certain contracts or ended some that were simply not profitable, where we couldn't negotiate good profitable — renegotiate profitable rates for some of our customers. Other customers, we were very successful in negotiating good rates. So the cause of the slower revenue growth and decline is that we've been sort of cleaning up some of that so as to generate better margins overall and be more disciplined in that respect. Our continued growth is going to be driven by a number of different things. Geographic expansion, Tom talked about in his comments about expanding out in the West; we've got a new customer in the state of Utah. But we are going to have some ebb and flow, depending on our customer spend, where they are in the rebuild process and our geographic expansion; and that will be further complemented now by the acquisition of Future. Because I think as we mentioned before, Future is mostly telecom, but there was a nice chunk of gas utility work that they did as well down in the Southeastern part of the United States.

Tom McCormick

executive
#56

Then there's another piece to this. When you head out to handle utility projects—particularly for gas utilities—a large share of that involves swapping out aging infrastructure in both city and countryside settings. Once that construction phase wraps up, you move on to fresh installations. Should something like the pandemic hit and halt new building activity, that category of work declines; we'll continue serving those customers in those locations through our current MSAs or ones already in place, but that pushes us to seek out additional MSAs in different territories as well. Getting those customers to agree to let you operate in a given territory and prove your capabilities requires some time. Usually, they'll permit you to start with a handful of crews. And building that connection until you're able to assume a portion of that work simply takes time. It's a process.

Brent Thielman

analyst
#57

All right. Do you believe that bringing in certain telecom capabilities will genuinely enable you to land additional clients within the utilities — specifically on the Utilities & Distribution side?

Tom McCormick

executive
#58

That's what I'm banking on. That's what we're banking on. Plus, my belief is that we'll assist the telecom business in acquiring new clients too; the reason being — there are geographies where Future currently has no presence, yet we're already witnessing them getting drawn into those territories by customers with whom we hold relationships. So the benefit flows in both directions.

Brent Thielman

analyst
#59

Great. So in the Power segment, you have a very large backlog, and a significant portion of it appears tied to solar. Could you discuss the portion that isn't solar, along with booking trends — what else you're observing in that unit, and how you expect that to develop across the coming 12 months when it comes to growth possibilities?

Tom McCormick

executive
#60

Yes. We do — there are quite a few activities on our plate that aren't solar. You heard me mention that entering wind is something we intend to begin exploring, though much of this involves renewable fuels, biodiesels, and green diesels. At present we're performing studies on behalf of clients. A portion of those efforts will become construction work for us. We're handling a sizable construction job — you heard me bring it up — for a biofuels effort in California, worth roughly $200 million-plus. And there's an additional $50 million job where we'll carry out some construction along the Gulf Coast; with certain efforts, we're working alongside clients. With others, you're working alongside developers. So plenty of possibilities exist in that space. Projects from developers tend to require more time before turning into actual work. They must go out and obtain — get the process approved; after that they need front-end engineering that backs it up. Then they must secure the financing and then obtain funding so the effort can proceed. It simply requires some time. So several years back we began examining those possibilities, including methane recovery at waste treatment facilities or at landfills. So we have our fingers in the fire across many different areas, working with developers and clients on those efforts. It's just — it requires time. I'm not sure what our plan currently holds for those beyond solar within our business plan. I can't — I'm unable to address that right now.

Ken Dodgen

executive
#61

Right, but as you’ll remember, Brent, that segment is made up of several distinct business units. It covers what we do in Canada; it also covers our industrial work on the West Coast and our industrial work along the Gulf Coast. So there’s a wide range of activity in and around industrial sites, refining and petchem, the Canadian oil sands, Canadian midstream, and so on.

Brent Thielman

analyst
#62

All right. And Ken, one last thing I'd like to ask — my guess is that the outlook bakes in some Civil margin normalization, perhaps returning to the mid-to-high single digit area. Would you say that's accurate?

Ken Dodgen

executive
#63

Yes, that's right.

Tom McCormick

executive
#64

You've got it.

Lee Jagoda

analyst
#65

I'll just ask one brief thing regarding something said before. From what I recall, you said the goal margins for the Energy segment sat between 11% and 13%. My understanding is that you mean the newly formed Energy segment. Right?

Ken Dodgen

executive
#66

Yes, Lee, that's right.

Lee Jagoda

analyst
#67

And as a follow-up, my sense is that looking at the segment as a whole, you haven't reached the bottom of that band since 2015. So, has anything shifted in a structural way such that you ought to hit that band moving forward? And at what point do you really expect to fall inside it?

Ken Dodgen

executive
#68

I suppose my thinking was more along the lines of — actually, that's a fair question. I appreciate you making that clear. My frame of reference was more the former Power and Industrial. Once you add Heavy Civils into the mix, it — good point, it likely won't land at 11% to 13%. Once our Civil segment is included, it will likely be somewhere around 9% to 12%.

Tom McCormick

executive
#69

Yeah, that's correct.

Ken Dodgen

executive
#70

Right, since that's going to dollar average regardless.

Tom McCormick

executive
#71

Heavy Civils traditionally is just a lower-margin business.

Lee Jagoda

analyst
#72

Got it. No, no, that's logical. I only — it caught me off guard that it came in at that level, so I hoped to get some clarity.

Ken Dodgen

executive
#73

No. Wonderful question. Thanks for bringing that up.

Tom McCormick

executive
#74

Once we complete the work up in the Northeast, you're going to watch margins in that segment begin to triple. At this point, they've got some revenue coming in, and they've got a burn sitting there with zero margin attached. So we need to get that project behind us — but renewals will lift those figures up quite nicely.

Tom McCormick

executive
#75

Appreciate that, Amy. To wrap things up, I'd say the Primoris group of companies enjoyed a highly rewarding 2020 — for our investors and the clients we serve too; 2021 has begun on solid footing, and we're eager to discover whatever hurdles and chances this year holds. Thanks to each of you for being here with us today.

Operator

operator
#76

This concludes today's conference call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Primoris Services Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Primoris Services Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Primoris Services Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.