PureCycle Technologies, Inc. (PCT) Earnings Call Transcript & Summary

August 12, 2021

NASDAQ US Materials Chemicals earnings 65 min

Earnings Call Speaker Segments

David Brenner

executive
#1

Much appreciated, Mary. It's great to have everybody joining us for PureCycle Technologies' conference call covering the second-quarter earnings update. I'm David Brenner, and my role here is Chief Commercial Officer. Joining me are Mike Otworth, who serves as our Chairman and Chief Executive Officer; our Chief Manufacturing Officer, Dustin Olson; and Michael Dee, our Chief Financial Officer. During today's call, we'll cover corporate developments and partnerships from Q2, including the revised strategic plan. You can find the presentation we'll be referencing on the IR section of purecycle.com. Most of what we say today constitutes forward-looking statements, based on information management currently has available. On today's call, some of what we say will look ahead rather than back. Those remarks reflect what management believes right now, along with the assumptions and information we currently have on hand. A range of risks and uncertainties could affect them, and plenty of those sit outside our control. You can read about them in the Safe Harbor section covering forward-looking statements, which appears at the close of the second quarter 2021 corporate update press release we put out this morning, as well as in our Form 10-Q — that filing is expected today or sometime later this week — and in the other reports we've filed with the SEC, where additional specifics about the risks tied to our business are laid out. Also, be aware that what the company actually achieves could end up substantially different from what we expect, and unless the law demands it, we have no duty to revise any statements about the future. Today's comments might likewise contain financial measures that aren't based on GAAP. You can find more information about those non-GAAP financial measures, such as how they reconcile with the closest comparable GAAP financial measures, in our slide presentation and in the second quarter 2021 corporate update release we put out this morning. At this point I'd like to hand things over to PureCycle's Chairman and Chief Executive Officer, Mike Otworth. Mike?

Mike Otworth

executive
#2

Thanks, David, and hello everyone on this call, and I appreciate you being here for our second-quarter corporate update. Feel free to open the slide deck and follow along. If you happen to be on the phone, it's available whenever you need it at purecycle.com. We're glad to walk you through what happened over the last quarter. During this session, we'll go over the key points from Q2, revisit how well Investor Day went, share the schedules for expanding our lines in Ironton and Augusta, highlight what's happening in operations and feedstock, and wrap up with the finance section. Please turn to Slide 3, which shows the Q2 2021 highlights covering wins in operations, feedstock, commercialization, and finance. To start, as I mentioned, we revealed that Augusta, Georgia will serve as the location of our first cluster manufacturing site. We're getting ready for long lead purchases during Q3 and Q4, and we expect construction activity at the site to begin in Q1. At the same time, Plant 1 is still on track for commissioning in the second half of 2022 while we keep working on de-risking activities in Ironton. We also entered a multi-year agreement with Emerson to push our Born Digital strategy forward. On the feedstock side, we constructed an R&D unit built to characterize and process mixed rigids, along with advanced mechanical sorting and separation technologies. We additionally started purchasing mixed plastic bales nationwide for evaluation and processing, negotiated several feedstock contracts that should close in Q3, and are in active negotiations for £300 million plus of feedstock. On the commercial front, we've negotiated further offtake agreements that should close in Q3 and plan to submit an FDA letter of no objection this quarter. We've also moved forward with JV discussions and are finalizing partnerships aimed at bringing PureCycle purification capabilities to Asia. Now that site selection is finished, we're prepping for long lead purchases in Q3 2021, and we closed Q2 2021 with $238 million in unrestricted cash and investments, which we'll cover in just a few miles. Turning to Slide 4, our global priorities have been updated, and we'd like to share them with you now. In North America, the Ironton plant is still on track for its Q4 2022 opening, and our second location and first cluster facility was just announced in Augusta, Georgia. Analysis for Plant 3's selection is currently in progress. In Europe, we keep working closely with our partners as we advance plans for detailed site selection activities, purification processes, and growing feedstock aggregation and sorting capabilities. In Asia, we're close to announcing two memorandums of understanding for JVs meant to speed up our presence in that region. Moving to Slide 5, I want to start by talking about how successful our first Investor Day event was, which took place in June of this year. Over a 100 attendees from across our industry and the investment community traveled to Ironton to see our operational strategy for themselves and witness firsthand how we're executing across construction, operations, digital, and commercial collaborations. After that, we bring both existing and prospective investors into our feedstock R&D site so they can see how mixed waste plastics first get sorted, using infrared sorting plus advanced water separation to maximize how much polypropylene we recover. Then, at our Feedstock Evaluation Unit, we show the PureCycle process in action and explain how the unit operations work. Starting the moment polypropylene feedstock goes into the system, our engineers guide everyone through every stage of purification, up to and including the last one, and guests there got the chance to view and handle our ultrapure reflux polypropylene. At this point, I want to bring in Dustin Olson, our Chief Manufacturing Officer, to talk about how operations progressed during Q2.

Dustin Olson

executive
#3

Thanks, Mike. For the operations side of things, I'd like to walk through where we stand on three phases: Ironton, Augusta, and the third cluster facility. At Ironton, things keep moving along nicely even with a lot of turbulence in worldwide markets tied to COVID and inefficiencies in the supply chain. Both cost and schedule remain where they should be, and equipment is showing up at the Ironton site — you can see that in the monthly independent third-party engineer report available at purecycle.com. Through ongoing detailed schedule analysis, we keep assessing equipment supply chain and project de-risking choices. There is enormous volatility and flux in the worldwide market, yet we take real pride in the fact that this project remains on track. We expect module construction at Ironton to begin in Q3, and we're collaborating with our strategic suppliers regarding their ability to deliver modules for Plants 2 and 3. Turning to our first cluster facility, located in Augusta, Georgia: the initial engineering design for Plant 2, whose capacity is £130 million per year per line, should be finished by early October. Our move away from the original £165 million per year design to one of £130 million per year keeps paying off, since it cut the overall engineering lead time and procurement work substantially. Purchasing of long lead equipment for the plants is moving forward, with the first purification buys anticipated in Q3 and certain feed preprocessing sortation buys already completed. We are searching for a location for our third plant and anticipate wrapping that up and making an announcement near the end of 2021. For cluster Plant 3, we anticipate the process will resemble Augusta's, with long lead equipment purchases anticipated during the first half of 2022. Now on to Slide 7. We want to explain how we approach targeting sites and how Augusta ended up hosting Plant 2. More than 50 sites throughout the Southeast, Central and Eastern United States were assessed. In the end, we concentrated on the Southeast as the perfect spot for feedstock acquisition and reaching global markets. After that, we measured locations against 13 key criteria, among them environmental, engineering, supply chain and overall economic value. Augusta stood out plainly thanks to its robust labor market, superb supply chain and dependable infrastructure inside the industrial park. As you can see, Augusta brought a variety of logistical and supply chain benefits, being near interstate intermodal terminals plus the ports of Savannah and Charleston for export, with considerable spare capacity and container availability at both ports. We also find attractive utility rates for electricity as well as natural gas, cheaper and convenient access to post-consumer and post-industrial feedstock, a strong nearby community with a skilled labor market, and robust local backing for essential permitting needs like air, wastewater and storm water. Engineering work for this particular location began in early April, so nothing was delayed while the site selection process played out. I want to express my gratitude to the Augusta Economic Development Authority for helping us get this deal done, and I also want to thank the people of Augusta for making us feel at home in your city. Now I need to talk about that $440 million figure that appeared in the Augusta press release. I think some clarification is needed here. During our contract negotiations with the Augusta economic council, we gave the community an initial estimate covering both jobs and project value. That $440 million figure cited in the article is an amount PureCycle expects to hit once it constructs the first three lines, but it does not reflect the complete CapEx projections for Phase 1 of this project. Because Augusta remains in the engineering stage, our project costs continue to be finalized. We anticipate revising the feed prep and purification estimates as we complete the procurement review and engineering work. On Slide 9, you'll find the original detailed timeline that we discussed during the prior earnings call. You'll notice we've included the specific installed capacity by quarter, and we've also added another production ramp bar indicating the timeline for nameplate capacity. As you can observe, our original timeline is still on schedule. It's also worth noting that there is considerable overlap among the specific activities, and the new colors indicate when the following activity starts, not when the preceding activity finishes; on Slide 10, we are giving additional detail about our planning process that lays out the specific project milestones from line one in Augusta. You'll see that there's substantial overlap in activities spanning major categories. But we remain on track with the original projections for Cluster 1. Also note that the engineering phases for lines two through five in Augusta should be considerably shortened because we can leverage the work already done on line one. The same will probably hold true for assumptions regarding all subsequent plants. Every time we select a new location, we'll have to update the engineering for the particular geological factors, including seismic, wind and average temperatures and also local regulations, but these ought to amount to minor adjustments to the overall plan and a meaningful schedule improvement; next, on Slide 7, we'd like to share how Tamsin Ettefagh, our Chief Sustainability Officer, built out our feedstock team, identified strategic suppliers and canvassed the material recovery facilities, or MRFs, throughout the U.S. That laid the groundwork for our feedstock execution plan. We keep our discussion centered on four key lines. Post-Consumer curbside, that's your personal recycle bin at home. Post-Consumer Non-Curbside, that's the recycled material generated at your favorite restaurants and stores. Post Industrial, that's the waste created by companies that manufacture products we use every day; and Advocacy, which represents our efforts to collaborate with consumers, companies, regulators, and the broader market to increase polypropylene use. Across all lines, we've discovered promising opportunities for large volumes at good value. Suppliers appreciate how well PureCycle handles feedstock containing greater amounts of contamination, and this capability unlocks additional input materials that previously were not recyclable at all. Information gathered at our feedstock preprocessing facility is furthermore delivering significant insight into how quality differs from one region to another, enabling our team to set bale prices more accurately. Last, we completed and carried out a National MRF survey covering more than 150 MRFs, aimed at pinpointing the ones most appropriate for supplying PureCycle with either polypropylene bales or mixed plastic bales sortable at a PureCycle site. Advocacy should be regarded as a possible source of volume. Our expectation is that once PureCycle demonstrates it can scale up polypropylene recycling, a greater number of consumers, businesses, and regulators will start altering their habits by moving to number five and recycling more; meanwhile, we keep buying mixed bales from different parts of the country to process and analyze at our feedstock preprocessing facility, which is now operational. We are arranging talks with nearby municipalities and MRFs to assess their interest and supply agreements. One important choice in Q2 involved splitting our feed preprocessing—or prep, as we say for short—away from our purification operations and introducing plastic sortation into the process. The reason was to steer our own future regarding feed procurement, to cost-optimize our supply chain network by situating feed prep operations close to the waste streams available, and to maximize yield from purification facilities. Although we stay quite open to partnership structures in this area, we will simultaneously pursue PureCycle-controlled solutions for gathering, sorting, and preparing feed for Augusta along with plants to come. These facilities will be located near the feed so that non-polypropylene streams need not be moved unnecessarily to our purification sites. Toward that goal, and getting ready for Augusta this month, we will issue purchase orders for long lead feed prep equipment amounting to as much as 200 million pounds of feed capacity for Augusta. Installation and operation of this equipment are anticipated during 2022. Turning to Slide 13, I want to present a sample of what gets produced using our resin. Those of you following the slideshow will notice transparent containers manufactured from PureCycle’s recycled polypropylene. Such containers and lids once again prove our capacity to eliminate contaminants, for instance odors and color. Here is one more piece of evidence that our product satisfies some of the toughest specifications and matches, and occasionally surpasses, virgin polypropylene products. Now I would like to bring in Michael Dee, our Chief Financial Officer, to go through the remaining slides. Michael?

Michael Dee

executive
#4

Thank you. I'd like to build on the points Dustin laid out, since what's happening with us is unfolding quickly on every front of the business. My goal here is to give you a wide-angle view of the numerous places where we're building momentum toward achieving what we've set out to do. Let's turn to Slide 14. The first thing I want to address today is something I brought up during our Q1 update; namely, how we'll price upcoming sales contracts. As I mentioned three months ago, we're essentially constructing a brand-new company each day; our aim is to commercialize this proprietary solvent-based technology and we're adapting quickly to serve market demand and establish a business model that works and lasts. Central to that effort is the way we structure sales contracts; when Ironton launched, our pricing was tied to a premium over the IHS commodity polypropylene index. It turned out, though, that demand for our ultra-pure recycled polypropylene was so strong that we quickly saw our pricing no longer tracked that index. That discovery energized us, and before long we had signed deals with fixed prices ranging from $1.50 to $2 per pound. Even so, our model only assumed $1 for third-party sales, which worked out to a net $0.86 once you subtract the assumed feedstock price, and while that was great for margins, it still left us open to basis risk separating feedstock pricing from the off-take price. So, since commodity polypropylene passes through the oil price, we ought to pass through the feedstock cost as well, then tack on a processing fee for purifying waste polypropylene back into an ultra-pure form. Doing so would shield our margins from the danger of feedstock prices climbing. Even better, it would let customers come out ahead whenever feedstock prices fell below where they stand now. Because we'd be neutral toward the feedstock price under that arrangement, such a structure would let feedstock settle at whatever level lets suppliers add capacity while earning a sensible return on capital; that in turn would bring more preprocessing capacity online at the moment PureCycle needs it. With all that as context, I'm delighted to report that this new pricing approach, which we refer to as feedstock plus, has been embraced by the market. What's more, we now anticipate adopting it as our standard pricing model, giving us a stronger ability to secure the feedstock we require as we scale toward our target of 1 billion pounds of production in 2025. At present, we expect it to deliver pricing to PureCycle that matches or exceeds what we modeled a year ago. It also plays a vital role in our continuing work to reduce risk in the business model while improving our margins. Looking ahead, we're confident we can handle our legacy pricing models as the feedstock plus model wins broader acceptance. Let me turn to the right-hand portion of Slide 14 and give you where things stand with our approach to sales contracts under the new Augusta cluster plan. To begin with, roughly 40% of the total 650 million pounds of planned Augusta output is already committed to our existing strategic partners from Ironton. Those arrangements should be converted into formal supply agreements before long. Next, that still leaves ample capacity for the feedstock plus sales contract to cover the rest of the production volume available. Third, we are currently moving several feedstock plus proposals toward definitive deals, with closing anticipated in Q3. And lastly, as news of what our recycled resin can do gets around, we are pursuing additional verticals for sales contracts — automotive, home products and pharmaceuticals among them — so that our customer base grows and we reach the consumers who place the greatest value on our ultra-pure recycled polypropylene. It bears repeating here that even when output reaches 1 billion pounds in 2025, that amount will represent just one half of 1% of what is produced worldwide. Turning to Slide 15, I'd like to draw attention to our liquidity position, which stands at $539 million. Two categories of liquidity exist here, I should point out. The blue section on the right represents restricted funds, amounting to slightly more than $300 million, earmarked for building the Ironton plant along with the associated reserves, including capitalized interest established to back the Ironton build out, which has full funding; the green section on the left represents unrestricted funds, amounting to $238 million, available for construction down the road, purchasing long lead time items, corporate overhead and equity supporting the future project finance we intend to pursue. Essentially all of this money sits in highly liquid investments and can be drawn upon when required, carrying minimal or no market risk. Slide 16 presents the same figures from the previous slide set against the close of the first quarter, at which point liquidity on the balance sheet stood at $570 million. The decrease of approximately $30 million came about through $14.5 million of operating in general expenses, $4.8 million of construction expenditures and $11.9 million of interest payments. Moving to Slide 17, I want to discuss — we have long anticipated, and continue to anticipate, funding future plant construction through a blend of project financing, equity and equity like financing; for the Ironton facility, we issued six tranches of debt during the prior year, comprising senior and subordinated debt, taxable and tax exempt debt, for a total of $250 million. We got this transaction done prior to having a signed merger agreement $310 million of a pipe and pre-pipe and other financing sources; we feel enormous gratitude for the trust our investors placed in us by completing this financing. As this chart demonstrates, even with U.S. Treasury interest rates climbing, our bonds, since the time they were priced, have seen their yields drop considerably, by 300 to 400 basis points. Take, for instance, the instrument we trade most actively — that gray horizontal row — the 20-year notes carrying a 7% coupon. Their yield has come down, moving from 7.25% to nearly 4.25%. That works out to roughly 300 basis points of decline, and in price terms it amounts to a gain exceeding 20%. So as we proceed with project finance, our credit standing is meaningfully better than it was a year ago. Turning to Slide 18. PureCycle has no revenue yet and sits at the earliest phase of what we regard as an extremely lengthy growth path for the distinctive value we offer. Today we lack the customary financial measures that most companies at a later stage report, yet we are achieving significant headway toward fulfilling our singular future vision. That vision won't come to fruition on its own, since we count among our ranks some of the finest customers, investors, and partners anywhere in the industry — every one of them dedicated to seeing us succeed. Above all else, though, there are our employees. Every single one was individually chosen as a standout in their respective discipline, and they match our drive and dedication to the social benefit we deliver as the sole enterprise capable of converting waste polypropylene into ultra-pure recycled resin in an economically viable way. Now allow me to walk through what I consider the key milestones we've reached of late, along with those we anticipate reaching before long.

Michael Dee

executive
#5

First, our initial commercial-scale facility located in Ironton, Ohio, remains on schedule and has all necessary financing in place. Progress can be tracked through the Lighthouse reports that come out each month, and those get posted in their entirety on our site during the third week of each month. Second, exactly as we committed, we just revealed the location of our inaugural cluster plant, which will be in Augusta, Georgia. Upon completion, its 5 planned lines are going to deliver a capacity of 650 million pounds. Taken together with the Ironton facility, that gives us 75% of the production we are targeting for 2025. Third, the marketplace has embraced our approach of combining feedstock with sales pricing, and this ought to accomplish two things: it reduces risk in our business model and lets feedstock discover its own market level, which in turn supplies the volumes we require to hit our production goals. Fourth, as much as 40% of the 650 million pounds of planned Augusta capacity has been set aside for current customers of the Ironton facility, which gives us a foundation to expand upon for the rest of this year and afterward. Fifth, our feedstock approach is advancing swiftly, with 300 million pounds under active discussion, and only this week we executed an LOI covering as much as 80 million pounds per year from one customer, with additional agreements expected as we broaden where our supply comes from. Sixth, at Ironton we are acting fast, and we have already put feedstock pre-processing capacity in place 12 months ahead of the plant starting operations. That is already paying off as we work out a stronger regional pre-processing plan aimed economically at meeting our feedstock requirements going forward. Seventh, we fully expect to submit our FDA no objection letter during this quarter, and we anticipate hearing back from the FDA prior to the close of the year. Eighth, expanding around the globe matters greatly to our mission. And today we were pleased to share that an MOU was signed with SK Global to explore a joint venture addressing plastic pollution challenges in South Korea. Interest from numerous other parties is coming in, and we expect further partnerships down the road. Ninth, with Augusta now chosen as our first cluster plant, we will complete the line engineering work and begin the project finance strategy for that location. Number ten: PureCycle remains fully in step with all shareholders, and the company is entirely committed to getting the Ironton facility commissioned at some point in Q4 of 2022. Before I finish, please let me share a couple of final points about PureCycle. First of all, we possess proprietary technology that is licensed from Procter & Gamble, a company operating one of the top research and development efforts in the world. Our manufacturing feasibility has been demonstrated, and anyone is welcome to see it at our feedstock evaluation unit located in Ironton, Ohio. What distinguishes us is our ability to bring waste polypropylene back to its original ultra-pure condition; compared with producing commodity resin, our process consumes less energy. Demand exists for recycled resin, and the pricing premiums attached to it are both established and proven. When it comes to our product, that imbalance between what's available and what's wanted should last quite a while. We also have the in-house expertise, together with our partners, to build things out successfully, expand, and hit the goals and targets we've set. That's what defines PureCycle. Also, I'd like to ask everyone to keep in mind the societal benefit that PureCycle delivers given how enormous the plastic pollution crisis is around the globe right now. Efforts spanning worldwide, country, state, city, company, and home levels are already underway and woven into what lies ahead for us. We can't go backward, and PureCycle plans to lead the way forward. Thanks. We'll now take questions on the call.

Noah Kaye

analyst
#6

Morning. Appreciate you taking my questions, and thank you for the thorough update. Clearly, there’s a great deal happening with the company. I want to begin with the MOU announcements involving SK Global. Congratulations on those. It isn’t mentioned in your release, but according to SK Global’s release, the MOU envisions breaking ground on a JV plant in South Korea by the end of 2022, reaching commercial operation by 2025, with roughly 100 million pounds of processing. Could you share some background on these developments and on how the relationship with SK has evolved? What diligence have they performed, and what key milestones might the parties be anticipating as they move forward formally with the JV, to whatever extent you’re able to comment.

Mike Otworth

executive
#7

Thanks, Noah. For the most part, I’ll let Dustin Olson handle this question; but I’d like to add that it was encouraging to hear SK’s CEO during our online signing ceremony last night say that what drew them to PureCycle was largely the fact that we’re deploying cutting edge, highly differentiated technology to serve a market that has yet to be realized, and where significant social good could be achieved. So, I think our — there’s very strong alignment of interest and strategies between PureCycle and SK Global Chemical. And they appear extremely enthusiastic and committed to moving the relationship forward along with our stated objectives. But it was largely Dustin who brought this relationship to PureCycle. So I’ll let him finish responding to your question.

Dustin Olson

executive
#8

Absolutely, Noah — many thanks. We're quite thrilled about the connection with SK, and it has come along really well across the past several months. Regarding the important actions taken to get ready for this, I'd note that this is an MOU that will launch the subsequent steps toward a definitive agreement, and we are currently working through those processes so we can reach resolution before long. As for the key actions on our side, the first item was many hours of conversation covering due diligence, technical matters, construction, and broader talks regarding the arrangement and how it would function with respect to the JV's structure. Yet what likely impressed SK more was their trip to the Ironton site on Investor Day. SK was given the very same walkthrough as everyone else, so they witnessed it operating firsthand. I believe that provided them with a substantial amount of confidence. Then, concerning the construction wheel that will launch, I'd point out that it won't begin until we have finished the feasibility study and secured a definitive agreement. Even so, we've held plenty of in-depth conversations regarding the specifics of the MOU. So we aren't beginning from square one. We've achieved alignment on many — perhaps all — of the essential items within the MOU. At this stage, it's simply a question of formalizing it. We also have the ability to move fast when it comes to construction, since we'll be applying the design plans that we'll use in Augusta, along with the digital strategy that we'll bring to Ironton and Augusta, plus the construction wheel that we'll rely on to build every one of these plants. Thus, I believe that once the definitive agreement is finished, we'll be positioned quite well to proceed swiftly on this project. Thank you.

Noah Kaye

analyst
#9

Thank you, Dustin. Mike, that was really useful. I'd like to follow up on your prepared remarks regarding how the Augusta plant's output will be allocated and priced. I appreciate you making clear that the 40% earmarked for strategic customers applies across the full 650 million pounds. You've previously mentioned pricing of $1 and feedstock costs of $0.14, which works out to that $0.86 spread, I believe, as you move toward feedstock cost plus. It sounds like we might hear announcements down the road about particular agreements. But in general, should we assume these contracts carry a spread exceeding $0.86 per pound? Given your conversations, how should we think about the potential upside?

Mike Otworth

executive
#10

Michael Dee, would you like to address that?

Michael Dee

executive
#11

Absolutely, happy to do that. Thanks, Mike. Right, so $0.86 has long been the figure we view as a target we believe we can surpass. So indeed, the quick reply is that we expect to outperform that $0.86; and beyond the benefit of stronger margins, what matters more, in my view, is that it reduces the basis risk linking feedstock and the off-take price. And we're working to build — we need to open up the lens a bit wider here. We're working to build something that isn't around today. 99.2% of all polypropylene goes unrecycled. On the feedstock side, our aim isn't to fight over the feedstock tied to the 0.8% that does get recycled; we'd like to see that recycling figure climb to 10%, 15%, 20%, 30%, 40%, 50% eventually. For that, an ecosystem — we're building an ecosystem, and our processing and purification method permits and empowers that ecosystem to permit the aggregation, the sorting, the cleaning, the grinding and the delivery of elevated volumes of polypropylene to us. So for us, being feedstock neutral assists the market in constructing that entire system. And it isn't too far off from commodity polypropylene, where oil at $20 a barrel or $100 a barrel is essentially a pass-through price. So we think there will be far less volatility and far more capacity constructed to supply us feedstock under this pricing model, and that lowers our risk in several ways and gives us a — both an upside and a risk adjusted upside. Thank you, Noah.

Noah Kaye

analyst
#12

Thank you, Michael. Perhaps I can fit in a single additional item before I hand things over. It ties into what you were just describing — namely, the ability to reduce risk on the feedstock side of things and assist in developing that market. So, to make sure we grasp your intentions for Augusta: the plan is to carry out pre-processing at the location itself or close by, handling 200 million pounds — as much as 200 million pounds; and would that apply to the whole complex? Does it cover only Phase 1? Should we broadly assume that roughly 30% of total feedstock would undergo pre-processing as a sensible template going forward?

Mike Otworth

executive
#13

Dustin Olson, please take this one.

Dustin Olson

executive
#14

Yeah. Thank you, Noah. What we mean regarding Augusta is that our plan is for that site to handle purification as its main job. That means any pre-processing needed—say, getting the base feedstock to the grade and traits Augusta requires—would happen at other sites. Why are we taking that approach? It really makes a great deal of sense for the supply chain. The concept is to site feed processing nearer to where the waste stream actually is, so you avoid hauling non-PP material farther than necessary. So we have not yet said where those feed processing sites will go, but we did say we've bought 200 million pounds of sortation capacity, and that will sit at our feed prep sites. We made that purchase anticipating those sites would be spread across the country and then supply Augusta. So 200 million is truly a figure reflecting the feed prep capacity we've bought up to now.

Mike Otworth

executive
#15

Mike Otworth here. To get a handle on our total feedstock approach, it matters that we're not only plugging into the plastic waste feedstock ecosystem as it already exists. As Dustin and others said, we're also developing some of our own capacity so that we largely control our own fate. That's going to involve collaborating with partners who want to recycle other resins. You can get real economies of scale by aggregating plastic waste and then sorting it into its various components, with those components going to the companies that have the best-in-class technologies for recycling each of those plastics. You'll be hearing more from us on this before long. A number of these partners are well-known companies we're currently in talks with, and we're pretty thrilled about it.

Noah Kaye

analyst
#16

Great. Well, quite a bit — sounds like there is a great deal of combination, hand it over. Thanks.

Eric Stine

analyst
#17

Hello everybody.

Mike Otworth

executive
#18

Hi there, Eric.

Eric Stine

analyst
#19

Hi there. Just to make sure we're on the same page about the cluster plant — and I appreciate the specifics regarding how much has been committed to current customers. But when we look at that project, does it lean more toward a hybrid approach on pricing, or will every customer at that facility move over to the Feedstock+ model?

Mike Otworth

executive
#20

Michael Dee, would you like to handle this one?

Michael Dee

executive
#21

My take is that it's a mix. Going forward, I believe the approach will center on the Feedstock+ pricing contract, and alongside it we'll keep running certain of our older pricing agreements. So calling it a hybrid is likely a reasonable way to characterize it. Thanks, Eric.

Eric Stine

analyst
#22

All right. And — well, I'm just attempting to work through this, I mean, are you saying — with all the momentum you're seeing around Feedstock+, do you expect a portion of those existing accounts could choose it just because, as you mentioned, they'd come out ahead should feedstock prices drop, or is your view that, hey, they have sustainability requirements and they're content simply keeping some reserve capacity, and they don't mind if it falls under the prior pricing structure.

David Brenner

executive
#23

Mike, let me handle this one, if that works.

Mike Otworth

executive
#24

Go ahead, David.

David Brenner

executive
#25

David Brenner here, Chief Commercial Officer, thanks. At this moment, I'd rather not say anything about how pricing is structured for the customers we already have, though a fuller update is something we'll give down the road.

Eric Stine

analyst
#26

Alright, that's reasonable. I'll keep an eye out for updates on that. Perhaps we should shift focus to SK — they've entered into quite a few partnerships and deals throughout their core operations, and clearly they harbor some very ambitious goals. So maybe it's premature to ask, but I'm just wondering whether there are any ideas past this initial plan, since my assumption is that they hold far grander designs for this.

Mike Otworth

executive
#27

They definitely do have large ambitions, and those ambitions they hold excite us, but right now our attention is squarely on getting a first undertaking with them to succeed; after that, we'll — once that's done, we'll discuss with them their loftier objectives, though partners who dream big and aim to accomplish remarkable things have always thrilled them. And I believe they unquestionably belong in that group.

Eric Stine

analyst
#28

Yeah, yeah. Definitely. All right. Perhaps this final one is for me. And I'm not sure — possibly I'm interpreting it wrong — but you do appear somewhat more optimistic, apart from perhaps during the previous call, regarding Europe and certain developments over there. So any specifics you could provide on that would be useful for me.

Mike Otworth

executive
#29

Europe represents a distinct set of circumstances compared with North America across many dimensions. Consequently, since the very start, we've remained dedicated to pursuing possibilities throughout Europe alongside partners. That effort is ongoing; we've got a group of current clients who've shown they want to collaborate with us on various initiatives. As such, we're busy conducting a site assessment somewhere in Europe while at the same time tackling feed — developing approaches for gathering feedstock; plus Dustin and Tamsin have each been heavily engaged, speaking with prospective collaborators and weighing various approaches. So indeed, an extremely strong and urgent demand exists across Europe for high-grade recycled polypropylene. Plus, we're aware we're able to meet that demand, and we'll establish operations in Europe, yet concurrently we're also striving to grow what we can do across North America. Additionally, something we consider extremely carefully involves how feedstock availability compares between North America and Europe; we attempt to factor that in whenever we evaluate the schedule and what we prioritize for growth across both regions.

Eric Stine

analyst
#30

All right, thanks.

Gerry Sweeney

analyst
#31

Hello there, good morning. My guess is I’ll reach each one. Mike, David, Dustin, as well as Michael, that means a lot to me.

Mike Otworth

executive
#32

The pleasure is ours.

Gerry Sweeney

analyst
#33

There's been a great deal of discussion about feedstock here, obviously. In the past, I realize, certain folks viewed it as a risk factor. My view is that you can turn it into a competitive edge. You also mentioned that the Feedstock+ program might reduce risk on certain investment opportunities for partners. After speaking with a number of MRFs, some possible announcements came up, so I'm just wondering. Could there be a chance to invest in some of those MRFs, or for some of those MRFs to begin investing themselves? If they're aware that long-term offtake agreements exist, would that accelerate investment on their side and drive more recycling? Is that the direction this is heading?

Mike Otworth

executive
#34

That's a strong question, and a perceptive one, since we truly are exploring options. Next week, my travel plans include several stops to examine some capabilities that are out there. So we're considering how to quickly lock down feedstock for the operations we have planned. And as I mentioned, to the degree possible, controlling our own destiny is definitely something that has to be taken into account and examined. I believe our team has performed quite well in flipping over numerous stones and cultivating a great many relationships and contacts within the industry, which lets them spot a rather expansive universe of options that we will be actively assessing. So yes, your question gets a yes in response, and we're devoting a considerable amount of time to it.

Gerry Sweeney

analyst
#35

Understood. So then I can simply rely on that £200 million figure you mentioned for Augusta, which I take it represents £200 million tied to a particular share of polypropylene to "supply the system." And that has been resolved, along with a big proportion of the other access plastics being sorted out too. Is that right?

Dustin Olson

executive
#36

Correct. Let me make the £200 million very clear — that £200 million isn't feedstock we've bought; it's feedstock processing capacity that we've bought in advance.

Gerry Sweeney

analyst
#37

Alright.

Dustin Olson

executive
#38

That £200 million in capacity is going to be put in at sites we'll announce down the road, so we can begin collecting, processing, and getting the feed ready for Augusta. On the feedstocks — regarding how we go about acquiring feedstock, the Tamsin part we went over — we've got a lot of conversations underway. I believe what we mentioned was £300 million of active talks on feedstock that would go into Augusta, with £80 million of that currently under LOI. So I want to be clear: one of those figures concerns capacity, while the other concerns the feedstock itself.

Gerry Sweeney

analyst
#39

Understood, that makes sense. And I'm sorry if this came up before — regarding that £200 million, is that the processing figure, meaning you'd take a share of it, which would work out to the polypropylene number?

Dustin Olson

executive
#40

No, no.

Gerry Sweeney

analyst
#41

All right. All right.

Dustin Olson

executive
#42

That’s a fair question. Sorry for cutting in. The £200 million figure refers to the pounds of polypropylene we anticipate that capacity will generate, rather than the pounds of feed that would be delivered into the facility.

Gerry Sweeney

analyst
#43

Great, that's really useful. Then, when we reached the pricing part, there was a remark, and I — David, you — I'm not certain whether this belongs to what you said about not wanting to talk about pricing, but it sounded as though we have the initial Ironton $0.90 to $1, and I think in the commentary there was something to the effect of sign agreements of $1 to $2, and then we're shifting to a Feedstock+ agreement. I'm just wondering whether there's an agreement signed and that $1 to $2 per pound range.

David Brenner

executive
#44

Do you mean at Ironton?

Gerry Sweeney

analyst
#45

I think that was about the 40% that will roll over to Augusta, or…

Mike Otworth

executive
#46

Ironton.

Gerry Sweeney

analyst
#47

Yeah, that's fair to say.

David Brenner

executive
#48

Understood. So when it comes to Ironton, that average sales price has genuinely stayed the same. We arrive at that sales price through a combination of different pricing mechanisms at varying price points to reach that ASP, or average selling price. And you're correct. Until Augusta is completely sold out, I'm not going to discuss the detailed pricing specifics there.

Gerry Sweeney

analyst
#49

Understood. So the average selling price runs from $0.90 down to $1, and that includes a blend of both pricier and cheaper items, and we've covered this ground previously. Great. And then, well, that works for me. I'll get back into the queue, so thank you.

Mike Otworth

executive
#50

Much appreciated, Gerry.

Steve Byrne

analyst
#51

Yes. My question is somewhat conceptual, regarding the cost plus pricing model. It appears to me that the more advanced your capability becomes to preprocess waste plastic, and as your scale grows along with your capacity to bring in an increasing number of new sources of post-consumer waste, your net feedstock costs ought to decline. Conceptually, in that kind of pricing model, who determines the price — is it your feedstock costs, or is it tied to something different?

David Brenner

executive
#52

This is David Brenner once more. An index exists on RecyclingMarkets.net that monitors the price for a number five polypropylene bale, and that is genuinely the benchmark we have used.

Steve Byrne

analyst
#53

All right. So if you can outperform that or broaden your mix, the benefit would go to you rather than to the customer. Is that accurate?

David Brenner

executive
#54

Yes.

Steve Byrne

analyst
#55

Next, I'd like to ask about the solvent-based technology. I'm just wondering how likely it is that later on it might be adjusted so it can handle and capture different polymers, instead of merely sorting them out during preprocessing. Do you figure your purification technology might eventually work for other resins as well?

Mike Otworth

executive
#56

Any rights to that kind of capability would belong to the Procter & Gamble company. Broadly speaking, I'd say yes, that's a possibility. Yes, we've had a few discussions with Procter & Gamble on this topic. I can't really point to anything concrete; however, yes, the overall idea behind our process for polypropylene might also have uses with other resins. And honestly, that's about all I'm able to share.

Steve Byrne

analyst
#57

And that research — who's running it? Is that Procter & Gamble doing it, or is PureCycle?

Mike Otworth

executive
#58

Yeah, that would be you — it isn't us. That's how I'll put it.

Steve Byrne

analyst
#59

All right. Thanks.

Analyst

analyst
#60

Morning, everyone. So I clearly picked up from your presentation that there's plenty happening, correct? And clearly in several regions — you all mentioned Ironton, Augusta, Plant 3, and now you're moving into Europe, plus a joint venture over in Asia. So my question has two parts. First, regarding your internal staffing requirements, given all this activity, could you give us some sense of how you're managing to keep pace with everything when it comes to expanding your own staffing, especially in geographies where you currently don't have a presence? That's the first side of it. And related to that, the second part concerns engineering and construction. You all described how smoothly things are going at the facilities currently under construction — you're on schedule and within budget. Now, the backdrop, clearly, especially this year, is significant commodity cost inflation. I'd like to think capital cost inflation is pretty elevated. Labor cost inflation is pretty elevated. Finding labor is a challenge. So how are your — how do you gain confidence that your E&C companies will truly be able to deliver what they committed to deliver on time and within budget?

Mike Otworth

executive
#61

Yes. If it's okay with you, we'll take your second question first, and I'll have Dustin Olson respond to that.

Dustin Olson

executive
#62

Absolutely. Regarding Ironton, we monitor both the cost and the timeline very carefully. Many of those — actually, every one of those agreements was put in place a good while back. So when it comes to the risk on pricing or the risk on delivery, we see that as extremely low, since we have clear visibility into when the equipment will show up and what building this plant is going to cost. That said, we are watching the costs at Ironton very closely to make sure we remain on track. As for your first question, about the staffing needs for the growth and the plan — look, you raise a very fair point that as we grow and as we expand, more resources will be required; so we're being very deliberate about how we will staff those activities. But I think what matters more is how we plan and execute those strategies. Keep in mind, we've engineered a modular design plant, which can be tweaked slightly for different geographies and built to go anywhere. So we have the construction capacity to build many of these plants simultaneously, if we reach that point and the design is similar. So we're able to remove a lot of complexity from the overall engineering design, staffing and construction process by doing the same thing repeatedly. And I'd also add that beyond actually building a plant, you have to build the infrastructure surrounding the plant, and that's training, procedures, compliance, regulatory activities; and with our born digital strategy, we intend to copy and paste most of the work we're doing at Ironton or Augusta. And most of that work can be copied and pasted repeatedly, no matter the geography or the location we're in. So your point is very fair that we have to be thoughtful with how we grow, but we're building the system internally, so that we can grow smart and do it effectively.

Mike Otworth

executive
#63

Mike Otworth here, and I want to offer a broad observation regarding what you said about labor being available. Whether you look at eateries, HVAC contractors, or tennis clubs, I notice a lack of workers in every kind of business, and it's widespread. I'd add that I've had involvement with numerous early stage companies, the majority of them in technology, and attracting personnel to join has never been simpler than it is now. From interns all the way up to the C-suite, watching the enthusiasm for what we do — for what we're doing in a way nobody else is in the plastic sector — has truly been a joy, and I believe that naturally makes drawing genuinely elite talent simpler. So in any case, that has come as a welcome surprise to me. I also believe we've managed to put together a genuine A list team from top to bottom. And with luck, that will keep being true as we bring people on for our manufacturing facilities spread across various geographies.

Analyst

analyst
#64

Got it, got it. That's really useful. Now, turning to feedstock, following up on that — clearly, you folks have quite a bit of background in the U.S., and you've been working on this for some time when it comes to securing supply agreements and the life. But now that you're moving into Europe and also into Asia, what's your early take regarding what feedstock costs and what feedstock availability looks like; and clearly, I'd guess there are big, big differences between what you're probably seeing in Europe and what you're seeing in Asia, whether it's collection costs, whether it's sorting costs and similar items. So it's a two-part question, Europe and Asia: what are you folks seeing when it comes to availability of that feedstock. And what are you folks seeing when it comes to the pricing of that feedstock that's being charged to you?

Mike Otworth

executive
#65

A global feedstock strategy is something we devote a large amount of time to. It's — front of mind for us each day and as you mentioned, the situation differs by geography, correct? Both when it comes to availability, costs, the kinds of feedstocks differ, that are on offer in various geographies; and that's why we've invested a lot of time cultivating potential partners and collaborators across these various geographies; and Dustin and Tamsin quite wisely have even begun establishing relationships with the suppliers of separation technologies. And so much of our strategy in Europe is being constructed around working with the suppliers of best in class technologies in separation and enrichment. So that — I believe you'll hear more on that, regarding our plans and building sortation and enrichment capabilities that will involve participation from these technology suppliers. That's going to be a key element of our strategy; and I'll — Dustin knows Asia far better. So I'll let him address your question about Asia specifically.

Dustin Olson

executive
#66

Okay, what I’d say is that what Mike said about labor as we build the business applies equally to having partners and folks who are ready to assist across every part of what we do. There’s real enthusiasm about our mission, and many people want to join this movement. As for pricing across various geographies, the reality is that a huge amount of feedstock still can’t be recycled. In every region, that feedstock carries a very low price, so that’s basically all I’d say on pricing. But I’d also point out that with SK specifically, they possess a substantial and expanding base of knowledge regarding feedstocks and the broader sustainability push. They are clearly taking a major stance on sustainability — it’s one of the central pillars in their growth strategy. So our plan is to lean on partners such as SK to also help us grasp the financing side and to identify and secure feedstock for these acquisitions or these projects. That leaves us feeling good about what’s available, and pricing in those regions doesn’t concern us.

Hassan Ahmed

analyst
#67

Very helpful guys. Thank you so much.

Operator

operator
#68

That wraps up every question we had lined up. We appreciate you joining us for Purecycle Technologies’ conference call covering the second quarter earnings update.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PureCycle Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to PureCycle Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PureCycle Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.