Alright, thanks Peter. Good to have everyone on PureCycle Technologies' Q3 earnings conference call update. My name is David Brenner, and I serve as Chief Commercial Officer. With me this morning are our Chairman and Chief Executive Officer, Mike Otworth; our Chief Manufacturing Officer, Dustin Olson; and our Chief Financial Officer, Michael Dee. Today we'll be walking through what's happened on the corporate side during Q3. You can find this presentation on the investor relations section of our site, purecycle.com. A number of the things we say today are forward-looking, resting on management's beliefs and assumptions along with information available to management right now. These statements carry known and unknown risks and uncertainties, and many of them fall outside our control, including the ones laid out in our Safe Harbor provisions covering forward-looking statements, which appear at the conclusion of our third quarter of 2021 corporate update press release and in our Form 10-Question — both filed yesterday — and also in our other reports on file with the SEC, which give more detail on the risks tied to our business. Also, please be aware that actual results for the company could differ materially from what's anticipated and, unless the law requires it, we take on no obligation to update any forward-looking statement. Today's remarks might also contain non-GAAP financial measures. More information about these non-GAAP financial measures, including reconciliations to the most directly comparable GAAP financial measures, is available in our slide presentation and in our third quarter 2021 corporate update press release, issued yesterday. Feel free to follow along with our slide deck, or if you're on the phone you can pull it up whenever you like at purecycle.com. We're eager to share what's new from the last quarter with all of you. And now I'll hand things over to Mike Otworth, PureCycle Chairman and Chief Executive Officer. Mike?

Mike Otworth

executive
#2

Hello, and thanks for being here this morning. Like David mentioned, we're going to walk through the key points from our third quarter today. We'll go over how our feedstock strategy is progressing, talk about kicking off the PureZero program alongside the Cleveland Browns, share where our first feedstock preprocessing site will be located in Florida, give you the latest on the Ironton plant, cover our FDA Letter of No Objection, and after that we'll get into our customer pipelines. So, let's turn to slide 3, where you can see that our 2021 Q3 highlights cover wins in operations, feedstock, commercialization, and finance. Let me spend a short while pointing out a few important areas. Running things well is still the core of everything we do at PureCycle; and even with a tough supply chain backdrop, our Ironton facility is still slated to start operations in Q4 of next year. We just gave the green light to a set of extra investments at Ironton meant to both lower operational risk and expand what we can process, so we can handle an increasingly broad variety of feedstocks. Back in Q1, we laid out our feedstock strategy for going after post-consumer feedstock and building recognition of the value of number 5 polypropylene plastic, and I'm happy to say we're carrying out that plan, having pinpointed more than 1.6 billion pounds of feedstock. Since the prior quarter, we've entered six LOIs, which cover 168 million pounds of feedstock; those LOIs will support supply for our first preprocessing facility in Central Florida. On top of that, we've created and rolled out our PureZero program aimed at helping stadiums, entertainment venues, and retail become more sustainable; we kicked off this program together with the Cleveland Browns, and we're beyond excited about this partnership. Our hope is that it becomes a practical route for similar organizations to advance their sustainability goals. We brought out our first commercial product, with EC30, a Procter & Gamble brand centered on sustainability. We handed in our FDA Letter of No Objection, in September, and moved forward customer talks covering 277 million pounds across existing and new market segments, using a feedstock-plus pricing model. And finally, on the finance side, we closed the third quarter with $494 million in total cash and investments, and have used $45 million to move our key projects forward. Turning to slide 4, you can see PureCycle keeps growing our global footprint in the markets offering the greatest opportunity; we're working toward definitive agreements with the MOU partners we announced earlier, and we keep assessing further opportunities. Slide 5; we point out shifting consumer trends that fuel demand for sustainable products. As I mentioned, our first commercial product arrived on the digital shelves with the EC30 shampoo dispenser, made of ultra-pure recycles polypropylene produced from our Ironton facility. EC30 was truly the ideal partner for our first product launch, since they share our focus on providing genuinely sustainable products with the smallest carbon footprint. With this kind of product, we're showing brand owners that our resin can provide outstanding looks and performance, satisfying sustainability targets while also pleasing the consumer. People reject greenwashing — corporate greenwashing, any form of it; what they look for is companies offering top-tier goods containing high proportions of recycled material. This launch is evidence that PureCycle's offerings satisfy both requirements. And at this point, Dustin Olson, who serves as our Chief Manufacturing Officer, is going to talk about how we're executing against these objectives. Dustin?

Dustin Olson

executive
#3

Thanks, Mike. It’s clear from what we’re seeing that our presence keeps growing both across America and internationally. Construction on our inaugural commercial plant in Ironton, Ohio, is progressing nicely, and we expect it to come online during Q4 of 2022. Once running, that site will turn out 107 million pounds each year of ultra-pure recycled resin. Looking ahead to Q2 of next year, we’re planning to kick off Ironton feed PreP operations as we get ready to launch the facility — a major step forward for us as a business. Then in Q3, PureCycle gave the green light to further investments at Ironton aimed at lowering risk and broadening the process, which pushes the overall project price tag up by $30 million to $40 million compared with what we originally budgeted. Roughly two-thirds of that extra spending goes toward handling a greater share of contaminants in the feed, plus enhancements to process safety design, while the other one-third comes from rising costs for base materials. We’ve put in place an approach to building plant lines meant to cut construction risk and let us scale up more effectively. With that in mind, we’ve put capital into growing our construction capacity so we can manage building three full plants at the same time, and we’ve also rolled out the Born Digital platform to make all construction and operational readiness work flow more smoothly. As we anticipate running the plant next year, we’ve brought on about 15 operators and staff members during the past six months. These people fill essential operational positions for Phase 2 at Ironton, and they fit right into our operational readiness strategy. Our work on process safety management and training development remains on schedule too. All of our Phase 1 Augusta OSBL and ISBL line engineering work is finished, and we’re currently pushing ahead with detailed head start engineering for the long lead equipment. We’ve brought in our main long lead strategic suppliers to make sure we stay on track for a mid-2023 startup. We’re also wrapping up engineering procurement and construction contracts, and we anticipate breaking ground in Q1 of next year. During the past quarter, our growth efforts in Europe have centered on picking a site. We’ve found five locations that work, secured feedstocks, and we plan to use the same data from our FDA letter of non-objection submission as we get ready to work with the European Food Safety Authority, EFSA. We also shared some big news in Q3 regarding our push into Asia-Pacific. And we’re continuing to move our memoranda of understanding forward to definitive agreements with SK Geo Centric in South Korea and Mitsui in Japan. Our Augusta, Georgia facility, which we announced in July, will eventually house five purification lines, with room for as many as eight lines in total. Those first five lines are set to deliver a nameplate capacity of roughly 650 million pounds per year once they’re all built. We devoted a lot of the last quarter to putting together the financing package, and we’re working toward finalizing our offtake and feedstock arrangements. How the project gets financed will be clearer once the debt is settled; at this point, though, our assumption is that several draws on that debt will fund five purification lines. Right now we're constructing purification plants intended to handle our target of one billion pounds of polypropylene waste by 2025. Slide eight shows that we're moving toward that target; we've given quarter-by-quarter capacity specifics and also updated the production ramp bar to reflect when nameplate capacity should arrive. You'll see production remains on schedule, though that schedule hinges on getting debt financing closed. Once more operations come online, they'll be added to this chart so the detailed timeline can be mapped. I'd also like to point out how strong our modular manufacturing approach is. With so many projects around the world appearing to slip and costs rising sharply, we've managed to collaborate tightly with our suppliers to keep worldwide disruptions to both timing and budget overruns in check. During recent months, you've increasingly heard us discuss this PreP idea. Let me spend a few minutes explaining what a feed processing facility is and why it matters to PureCycle. Our PrePs will be regional preprocessing sites that sort, wash, and densify feedstock ahead of purification; at Ironton, that preprocessing site sits alongside our purification line and is built to handle film, fiber and mixed rigids, with enough capacity to deliver more than 126 million pounds annually. The Central Florida facility we announced recently, which should supply feedstock to our Augusta Purification Plant, is built to process mixed rigids. Initially we expect to handle 75 million pounds per year, and after that we expect capacity to scale up to 150 million pounds. Commercial operations are planned to begin in the third quarter of 2022. We've also signed an MOU with Titus, a secondary Murf operator based on the west coast, to boost feed supply for both Ironton and Augusta while creating a supply source for a third U.S. location. Ultimately this will help diversify our feed system as a whole. Our PrePs let us carry out a few essential activities. First, they let us form strong regional ties that a centralized approach might make too costly. Second, they let us tailor facilities to the feedstock available in each region. And third, they let us keep our carbon footprint down by shipping only polypropylene to our purification facilities. Now I'd like to share how Tamsin Ettefagh, our Chief Sustainability Officer, is mapping a route to 1 billion pounds of polypropylene. Across the past six months, we've expanded our team along several pillars to start constructing our feedstock network. Alongside our feedstock procurement strategy, we're refining our search across multiple feedstock lanes. We're strengthening PureCycle's position in the market, and through that work we've identified more than 1.6 billion pounds of feedstock. Over the past quarter, our team signed letters of intent covering 160 million pounds of feedstock. We're carrying out our plan to lock in feedstock from a range of suppliers throughout the United States, and we're actively pursuing three different categories of waste streams. The first one is post consumer curbside. Because PureCycle can process that stream, a broad range of contaminated feedstocks becomes available to us. With that in mind, we've identified 270 million pounds of feedstock opportunities, and 10% are diverted from landfills or incineration. Right now we have 30 million pounds contracted and 14 million pounds signed under letters of intent. The second pillar is post-consumer non-curbside, and with this post-consumer non-curbside stream we are aiming to implement, we're targeting and looking to implement circularity programs. So far, we've identified 1.1 billion pounds of feedstock opportunities, and 50% of those are diverted from ending up in landfills or incineration; for this stream, we have 80 million pounds of feedstock contracted and 154 million pounds signed under letters of intent. The third feedstock lane is post industrial. There we're targeting volumes direct from industry and brokered waste opportunities. To-date we've identified 225 million pounds of feedstock opportunities and have 100 million pounds of feedstock contracted, and we watch the price and availability of feedstock options very closely.

Dustin Olson

executive
#4

Because PureCycle's technology is capable of processing a broader range of feed streams, we have the ability to optimize into or out of those streams. For instance, as of today, prices in the market have lately gone up for post industrial waste, and we're currently assessing that segment to find the strongest opportunities for achieving high volume at the most favorable price achievable. Partnerships play a central role in our broader strategy for building awareness of PureCycle and what it means for sustainability; this strategy lets us multiply our efforts when it comes to securing feedstock, collaborating with brands on commercial products, and helping us spread the word about PureCycle's work addressing the plastic waste crisis. There's an opportunity we've identified to boost visibility for PureCycle's technology and bring recycling to a broader audience by accessing feedstock at sports stadiums, conference and entertainment venues, and retail locations as well. This week, through an exciting partnership with the Cleveland Browns, who've brought us on as their plastic recycling partner, we launched our PureZero program. PureZero is our approach for getting the most out of recycling while reducing environmental impact at these venues. Our sustainability teams at PureCycle have examined the volume of plastic waste produced, and we recognize a significant opportunity both to obtain feedstock and to establish enduring strategic partnerships. What we're doing with PureZero marks just the start of our creative strategy around feedstock and around building greater awareness for sustainable plastic. Through our alliance with exploreMedia, we're teaming up with top entertainment and content partners to bring messages to children and families across America. Right now, we're creating a run of episodes that center on plastic waste and what PureCycle is doing. What we're after isn't just sparking the interest of the coming generation of stem and eco minded buyers — we also want PureCycle to become a name everyone knows. Over on the commercial side, the team continues to gain ground, expanding our pipeline through additional customers and creating marketplace awareness for PureCycle's offerings. Sustainability is having a one of a kind moment, and PureCycle sits in a spot to assist eco oriented brands in reaching their sustainability targets. At the outset of our journey, considerable attention came our way from the packaging and consumer goods sector, yet what began as a niche area for sustainability has since become a worldwide imperative, and interest is now emerging from wider verticals such as health and auto. On slide 14, you can see the many uses that have been developed with our resin, among them the very first PureCycle item available commercially, spanning blow molding, injection molding, and thermally formed components. Our aim is to cover a wide array of applications as proof of how adaptable our resin can be; we feel lucky to work with strategic partners who recognize the enormous promise of our resin and the worth it delivers to the people they serve. We're aware of how much opportunity this new plastic offers the market. Our work carries on as we push to meet the goals required to deliver ultra-pure recycled plastic to both brands and consumers. At this point, I'll hand things over to Michael Dee, our Chief Financial Officer.

Michael Dee

executive
#5

Thanks, Dustin. Starting on slide 15, let's look at where we stand on liquidity: $494.1 million. That figure represents cash held on the balance sheet. Broken out, the blue section on the right shows $273 million in restricted cash, while the green section on the left shows $221.1 million in unrestricted cash. The restricted portion is earmarked for the Ironton plant, and it comes to $156 million, plus three reserves adding up to $114.8 million and $2.2 million classified as other. Our bond agreement requires these reserves. With $221.1 million in unrestricted cash, we have enough to keep operational activities running, and we expect to supplement that through additional project financing as construction proceeds in Augusta, Georgia. Worth noting: the extra $30 million to $40 million we plan to spend at Ironton will be dispersed across the next year and covered by unrestricted cash. Moving to slide 16, we go through third quarter liquidity and what changed versus the prior quarter. Capital spending in Q3 came to roughly $45 million, and within that, $27.9 million, or 62%, went toward Ironton construction, which is still on track for expected completion in Q4 2022. Another $7.7 million, or 17% of the quarter's total spend, went to expanding our feed prep and future capacity. That $7.7 million breaks down as $2.5 million to acquire the Winter Garden preprocessing location, $2.9 million for the preprocessing facility in Ironton, and a $2.3 million investment tied to preparing for the Augusta build. Last, $9.3 million, or 20%, went to operating expenses; that covers $4 million in payroll expenses, $1.4 million for third party service providers, $900,000 connected to our digital strategy, and $2.9 million in other expenses, rent and insurance among them. To sum up, we keep meeting our commitments, and we're staffed with deeply experienced talent. With engineering for Augusta almost finished, this quarter we'll kick off the project financing process to raise capital so we can begin procuring the long lead time items for Augusta. At this point, I'll hand things back to Mike Otworth, our CEO.

Mike Otworth

executive
#6

Thanks, Michael. At PureCycle, we're not just making incremental improvements to how plastic waste is handled—we're transforming it entirely. What we provide goes beyond ultra-pure recycled resin; we're giving companies a way to build genuinely sustainable goods and to completely close the loop on plastic. So let me walk through a handful of key points. To start, construction at our flagship Ironton facility is progressing well, and we expect it to come online in Q4, 2022, with an anticipated ability to turn out 107 million pounds of ultra-pure recycled resin. I really can't emphasize this enough—our team has remained, and will remain, completely locked in on getting Plant 1 in Ironton commissioned. We put substantial resources into optimizing purification capacity at Ironton, and we keep doing whatever we can to reduce risk and boost the odds that startup there happens as scheduled and on time. Our feedstock approach is designed to broaden where we source from, and LOIs signed this quarter add up to 168 million pounds of feedstock. We're working to decentralize how we take in feedstock, which lets us gather plastic waste more easily and at lower cost from every region of the U.S. As Dustin noted, our first satellite preprocessing site opened in Central Florida. We anticipate being able to generate as much as 150 million pounds of plastic waste at that location, and we expect to break ground and start building the Augusta plant during the first quarter of 2022, with the initial one of five purification lines anticipated to wrap up in the second-half of 2023. Our customer pipeline is solid, with 277 million pounds of offtake under active discussion. Just as we said we would, we filed our Letter of No Objection with the FDA in September. We also watched the first PureCycle product arrive on digital shelves through EC30's shampoo dispenser—I've got one stuck to my shower wall right now. Plus, we created and rolled out our PureZero program, aimed at plastic waste at stadiums, entertainment venues, and retail stores too. The Cleveland Browns are the first team sports organization to embrace this program, and I expect the Browns to lead the way for many more. Here at PureCycle, we understand that a more sustainable planet begins with people and how they relate to the environment. Now more than ever, shoppers are placing sustainability at the very top of their priorities when deciding where to shop and what to purchase. The consumer data makes this clear. And we know we're not the only ones who recognize the massive potential at PureCycle. We know consumer demand is strong for companies to genuinely confront the plastic waste crisis, rather than simply tick a box to claim they're green. What we're building at PureCycle is more than plastic that can be infinitely sustainable. We're handing our customers and prospective customers a chance to be intentional about making sustainable products that keep our environment front and center. Thanks for spending time with us this morning. At this point, we're ready to take questions from participants.

Noah Kaye

analyst
#7

Morning, everyone. I've got several questions touching on operations and financing, though I believe the place to begin is that disclosure in the 10-Q from last night concerning the SEC probe. Could you provide any color about this investigation? What are you able to tell us regarding its scope, and if you can, the expected timeline for reaching some kind of resolution? Also, what reassurance might you offer investors right now about this situation?

Michael Dee

executive
#8

Thanks, Noah. This is Michael Dee. I'll do my best to respond. Per what we put in our 10-Q, back at the end of September, an investigative subpoena was issued by the SEC to PureCycle's CEO, seeking testimony related to an investigation. This is a fact-finding inquiry that isn't public. Our reason for disclosing it is that we believe transparency matters, and shareholders deserve to know this matter exists; worth emphasizing is that because this is fact-finding in nature, no conclusion should be drawn that any violations took place. Neither the subpoena nor the inquiry carries any judgment, and neither signals a negative view of the person receiving it or of the underlying facts; our cooperation with the SEC will be complete. I know you understand that we cannot address additional questions about this right now. Thank you, Noah. Who's next?

Noah Kaye

analyst
#9

All right, I suppose I'll proceed to the next person.

Gerry Sweeney

analyst
#10

I appreciate you taking my question. It seems Noah's line dropped there; regardless, could you — my question was about the process enhancements taking place at the Ironton site. From what I gather, those processes permit a greater volume of contaminated material to pass through. But what I wanted to ask was whether a higher level of contamination in that feedstock means less purified polypropylene is produced at the back end? I'm just interested in how that dynamic functions, and then perhaps what you expect in terms of a return on this investment?

Dustin Olson

executive
#11

Yes, thank you. This is Dustin; regarding the investment we're making in Ironton, or rather the incremental investment there, the first thing to note is that it has no effect whatsoever on the backend capacity for producing polypropylene. What it actually accomplishes is broadening the range of feed we're able to bring into the facility, and it gives us a chance to, say, diversify our feed slate, and to be more selective regarding the cost profiles of the feeds we take in. That's part of it. The second aspect here is truly a means of enhancing the operation and the process safety management at the facility. And that essentially carries no capacity consequence for the plant, yet it boosts the overall reliability of the final operation.

Gerry Sweeney

analyst
#12

All right. Turning to a different subject, the SK Geo Centric Mitsui MOUs — in that press release, you mentioned they are advancing. Could you give us anything on the timing terms, how close these deals might be to being finalized, any thoughts there?

Dustin Olson

executive
#13

Yes, so, thanks for asking that. Yes, I would say the talks with SK are going quite well — SK and Mitsui are going quite well, or moving ahead on several tracks, to address every question they have regarding our business and regarding the technology, so they feel at ease with what we intend to do together moving forward. Right now, we don't have a — shall we say, a detailed timeline to offer yet. But I can tell you the talks are going quite well, and we're making solid progress on every front there.

Mike Otworth

executive
#14

Gerry Sweeney, the last query: Mike Otworth, I'd simply put in that it is —

Gerry Sweeney

analyst
#15

Yes.

Mike Otworth

executive
#16

The response we've seen from both of their technical groups visiting us has been extremely favorable. So those partnerships have solid momentum going, and when it comes to timing, that's honestly about as much as we're able to share.

Gerry Sweeney

analyst
#17

Understood. Then one last thing — I believe the presentation also included a remark about the Augusta facility being on schedule, though my understanding is that depends on getting the project financing closed. What's the status there? Any worry it slips or doesn't materialize the way you're anticipating, perhaps regarding debt-to-equity style ratios?

Michael Dee

executive
#18

Yeah, thank you. This is Michael; we've only just kicked things off. Since the Augusta announcement came out not long ago, the engineering had actually been underway long before we went public with it. So once that engineering effort wraps up, we'll be in a position to go out and start talks about arranging that project finance; as already announced, we do have capital on hand to get things moving. That said, we're keen to complete the project financing, so this quarter we'll begin conversations with intermediaries as well as banks to launch it. It's very reassuring to us that prior to the merger, the pipe convertible, and all of last year's financings, we had already brought in $250 million of debt through the public tax exempt market. As I noted last quarter, those bonds have performed quite strongly, climbing roughly 15 to 20 points above their issuance level. So we believe there's a really strong credit curve in the market that investors can reference. Thank you.

Gerry Sweeney

analyst
#19

Understood. Nothing further from my side. Thanks for that. Appreciate it.

Noah Kaye

analyst
#20

Thanks. About the FDA NOLs, I wanted to ask whether you could tell us what you currently expect on timing. You've obviously submitted to the FDA, but what would be a fair expectation for when you hear back and receive that letter of no objection?

Mike Otworth

executive
#21

David Brenner, would you like to take that one?

David Brenner

executive
#22

Yes, this is David Brenner, the Chief Commercial Officer. As we said, the filing went in during September, and our expectation is a reply before the year is out. That said, the real amount of time the FDA may need in order to get back to us regarding what we filed might differ, so our hope is for the close of the year, though that might shift.

Noah Kaye

analyst
#23

All right, that's good. Now, regarding the offtake contracting, if you look at slide 13, it shows the breakdown among allocated, contracting, and early discussions, reaching up to 625 million pounds. I think it would help to know what activity sits behind that. You likely have potential customers coming in and reviewing the origin plan, but could you give us additional detail on where some of those contracting talks stand and what's being signaled about pricing structure? Are more people now visiting the plants? Just give us a sense of how demand is moving.

David Brenner

executive
#24

Yes, that's a great question, Noah. From where we sit, something we've truly managed to accomplish across the past couple of months is bringing more and more of these potential customers to the FAU, which had been difficult throughout the prior two years because of COVID. As for what you asked about, covering both early discussions and contracting, we use a very clear-cut process whenever we work with a customer, in which we basically cover the main terms that make up our long-term offtake agreements. We invest several weeks talking through those main terms. A core element across every one of our agreements is this feedstock plus model, which in essence is a fixed price plus the cost of feedstock divided by yield loss; that genuinely lets us reduce the volatility that has been present during the past six months in the price of recycled polypropylene or a bale of polypropylene. After that, when we execute a term sheet or reach agreement on that term sheet, we hand over a small sample for further testing; and when that sample and test are finished, we are either advancing the commercial agreement at the same time or we proceed to sign that commercial agreement. So I would characterize the current state of discussions as, you know, a very strong pipeline, with a number of those customers that have agreed on the key terms and are moving toward the final details on the commercial agreements.

Noah Kaye

analyst
#25

All right, so regarding the feedstock angle, from what I can tell the biggest volume when it comes to LOIs involves post consumer non-curbside material. So, is that mostly number five, or is it mixed bales? Because it really looks like a significant chunk of what you folks have been up to these past couple of quarters has centered on building out more preprocessing capacity, and my understanding is that sortations are part of that. So I suppose it would simply be useful to get a handle on what makes up the feedstock you've pinpointed.

David Brenner

executive
#26

Tamsin, would you like to weigh in on that?

Tamsin Ettefagh

executive
#27

Tamsin Ettefagh here, Chief Sustainability Officer. Our preprocessing has leaned somewhat toward curbside-collected material, since that offers substantial room to grow, but when it comes to LOIs and locating fresh feedstock, we've concentrated mainly on post-consumer, non-curbside sources. Consider how polypropylene turns up in so many different settings — grocery stores use it in bakeries, the foil department, the meat department, even signage. So imagine approaching an organization and saying we can help you reach zero waste: gathering all of that material together amounts to a sizable volume that traditional systems never recycled before. Take The Cleveland Browns and stadium service wear, for instance — think super sacks throughout the industry, holding items like coffee beans at a Starbucks manufacturing roasting plant, which consumes plenty of polypropylene super sacks. Those aren't heavily contaminated. In fact, they frequently contain greater percentages of polypropylene; it's just that nobody has really examined recycling that material. That's why, when we go out and identify opportunities, we claim we've located more than a billion pounds out there that likely went unrecognized previously. So I hope that answers your question — materials that have served their intended purpose but aren't picked up curbside, if that makes sense.

Noah Kaye

analyst
#28

All right, that's quite useful. Thanks.

Eric Stine

analyst
#29

Morning, all.

Mike Otworth

executive
#30

Morning.

Michael Dee

executive
#31

Morning.

Eric Stine

analyst
#32

Morning. Could you shed a bit more light? In the release, you mention the 277 million pounds where you're in active discussions. Would it be accurate to say all of those tie to Augusta? Also, in the presentation you provided the pipeline sort of by end use, but I'm just curious whether you might discuss the pipeline by geography.

Michael Dee

executive
#33

That pipeline is — but, when we consider how we're executing in Europe and in Asia, the right of first offers our partners hold, those aren't factored into that 277 number.

Eric Stine

analyst
#34

All right. And I'm not sure whether it was only my phone dropping the call, but I missed the start of what you said regarding the 277.

Michael Dee

executive
#35

Got it. Right — that 277 is truly centered on demand for Augusta.

Eric Stine

analyst
#36

Understood. All right, and then perhaps regarding Europe, I recall that some time ago Europe was somewhat the priority, and after that it moved to the background a bit compared to Augusta. At this point it appears to have picked up speed once more, and you brought up locating 5 sites, so perhaps a few details on how the customers you have now are participating in at least assisting with that choice; and then perhaps any opinions about a schedule for when you might make some decision.

Michael Dee

executive
#37

Certainly. So, regarding Europe, one element of the hold-up was truly centered on gaining a better grasp of which feedstock could be obtained, since we observed a sharp jump in feedstock costs as the price of virgin went up. We have additionally gained an enormous — greater quantity of knowledge while we advanced the Ironton design, which has enabled us to become more precise regarding what we need for a site in Europe. And the most significant thing was getting the FDA letter of no objections turned in, so we can start getting ready to interact with FSA. What we have come to understand through conversations with many of our clients is that a first implementation in Europe would be adequate with an FDA letter of no object available, which was fresh knowledge for us and truly sort of opened a more obvious route to putting money into a European facility. We kept moving forward with choosing a site and that effort has not decelerated. And from where I sit, we are very thrilled about the talks we are having concerning feedstock. Our group has traveled to Europe 2 times within the past 90 days and is advancing both the commercial and feedstock conversations so we can be prepared to move forward with site selection and start the debt financing procedure.

Mike Otworth

executive
#38

Mike Otworth here, and I want to jump in with something. Demand across Europe is enormous, yet when you factor in the whole picture — feedstocks, rules, and various other pieces — things get somewhat more tangled. That's why even our European partners, who are genuinely thrilled about the capacity we're putting up over there, told us that since feedstock supply is comparatively wide open in North America, we ought to be certain we weren't easing off on expanding our footprint across North America and making a bit of a feedstock land grab. So that's exactly what we're doing. Yet at the same time, enthusiasm among our European partners keeps growing, and the strategies are coalescing, on both the feedstock front and a pricing model. So I'd say we're pushing ahead with fresh energy to move the ball forward in Europe, right alongside all the headway we're making here in North America.

Eric Stine

analyst
#39

Understood, that clears things up. Perhaps this will be my final question, and I completely understand why you can't elaborate further regarding the subpoena, but since that happened on September 30th, would it be reasonable to assume that had anything within it risen to a particular threshold, you would have been obligated to reveal it, given that here you're making this disclosure voluntarily instead of under compulsion?

Mike Otworth

executive
#40

Correct. I appreciate that. I genuinely hope you recognize that further discussion of this matter isn't possible for us right now. We have made an effort to provide what we believe is the needed disclosure, despite it not being mandated. And we'll continue keeping everyone updated as things progress, but at this moment, this truly is the extent of what we can share — what we are aware of.

Eric Stine

analyst
#41

Yes. Thank you.

Mario Cortellacci

analyst
#42

Hello, Mario Cortellacci here, sitting in for Hamzah. Pardon me, and I appreciate you making the time. There's one item from the quarter I'd like to bring up, and after that perhaps two questions of a broader nature. The first, I suppose, concerns those incremental costs. What level of confidence do you have when it comes to budgeting on the cost side moving ahead? For Ironton, and for the other facilities too, do you have to update your expectations regarding OpEx and CapEx going forward?

Michael Dee

executive
#43

Well, as we kept working our way through the detailed engineering work for Augusta, we carried on assessing the whole CapEx picture at that site. Right now, certain cost increases have come up, both in base material pricing and, as we talked about for the Ironton facility, a bit of scope expansion. Yet even when that is factored in, the scale efficiencies we expect from the Augusta cluster complex still lower the total CapEx for that build by a very considerable amount. Then when it comes to OpEx, we do monitor it — from the standpoint of labor, wage rates, that sort of thing — yes, we keep track of it and keep an eye on it, though it doesn't make up a meaningful share of the total P&L at any given facility. As we see it today, that isn't a needle mover for our operation.

Mario Cortellacci

analyst
#44

Understood. Then, for one of my follow-ups, stepping back a bit, I suppose, especially regarding the technology, what could you share that would make us feel more at ease that it actually functions? And I think this is really a question aimed more at investors who are newer to this story, still getting acquainted with it, and trying to grasp how confident you are in it. Obviously, your customers and the JV you're partnering with have completed their diligence, I assume, but is there anything specific you can highlight, and is there anything additional that bolsters your confidence in the tech and perhaps makes us feel even better about it?

Mike Otworth

executive
#45

Yes, thank you; this is Mike Otworth. I've spent my entire career, or at minimum my entire adult career, involved in and around early stage technologies, and PureCycle is by a wide margin the most scrutinized technology I've ever encountered; therefore, we have absolute confidence in how robust the technologies are. And I'd suggest looking at our investors, strategic partners, and joint venture partners; they consist of some highly sophisticated companies possessing very deep and broad technical capabilities. And they've performed thorough due diligence on the technology, and that thorough due diligence began at P&G before the technology was even licensed to us and has persisted without interruption across the roughly seven years since we licensed the technology. So these partners and companies include technical teams with exceptionally strong expertise and processes involving temperature and pressure, polymers and chemicals. And so, in each case, I believe it's reasonable to say in each case where we've had someone arrive and conduct deep technical due diligence, dispatching teams of people to our facility in Ironton, they've returned to us very quickly wanting to do something with us. And we've heard remarks such as there are things we do today that are harder than this; and that what you have here really is a scaling challenge, not truly a core technical challenge. So, I truly lose no sleep over worrying about the technology; we have a very big scaling, an execution challenge. There is no doubt about that. But regarding the robustness and the realness of the technology, some of you on this call participated in our Investor Day that we held in Ironton. You witnessed it firsthand. We enjoy hosting people to come and see it because seeing is believing and it's the real deal. It's going to transform plastic recycling; and when you inquire about my confidence, I possess a supreme level of confidence in that; it isn't among our bigger challenges.

Mario Cortellacci

analyst
#46

Understood. For my final question, taking a step back, could you walk us through where things stood in this journey, let's say 12 months ago — what you were telling people, what kind of company you were, and the plans you set out? Then perhaps contrast that with where the story stands now, how those plans are progressing, and maybe highlight some of the major milestones achieved during the past 12 months.

Mike Otworth

executive
#47

Sure. From day one at PureCycle, we've worked extremely hard to be cautious regarding the commitments we make and to stay sharply focused on executing what we've promised. I believe we've remained faithful to that purpose, and I keep emphasizing it to our people. So, the goals we set out to reach — keeping Ironton on track, finding more sites to begin building additional capacity that satisfies demand, and raising PureCycle's visibility regarding its ability to deliver a positive and transformative impact on the sector. We mentioned the Cleveland Browns. I can share that numerous other organizations are in discussions with us, and a few of them reached out to us directly. Those will be prominent announcements once they materialize. So, beyond steadily expanding our range of customers, widening the range on the feedstock side, we're constantly widening the range of general awareness among various verticals about how we can bring about a beneficial transformation. And as I mentioned in my earlier remarks, helping companies do something viewed as genuine and meaningful rather than anything resembling corporate greenwashing. So I'd say our advancement on every one of those fronts has been considerable. We'll stay focused on the commitments we've made as we head into the next year. We welcome scrutiny over whether we deliver on our word, and I'll let Michael add a few more remarks here, since I can tell he wants to.

Michael Dee

executive
#48

Absolutely, Mike, thanks. So here's what I think matters: you have to rewind to a year, or a year and a half, back to when I put my signature on an NDA with this company on January 5th of 2020, and back to December of 2019, when I initially caught wind of it. What this company has pulled off across the past year, year and a half, and in fact across just the last six to nine months, is stunning — honestly, nothing less than stunning. Let me begin with the team. Think about the depth of expertise here, gathered around a table each Tuesday for 90 minutes, discussing every piece of what we do. Sometimes we meet face to face, sometimes remotely, but the know-how that's in the room when we're figuring out strategies, figuring out obstacles, figuring out the case that Augusta is where we should be, figuring out the reasoning behind choosing a 130 million pound plant instead of 165, figuring out the logic for moving ahead with the feedstock plus pricing arrangement. Gathered at that table is expertise measured in decades upon decades. And every bit of that expertise carries a deeply entrepreneurial spirit. Now, Larry Somma will be stepping in to take my place as CFO, and the simple fact that we managed to bring aboard someone of Larry's standing, coming from a polypropylene producer worth $30 billion — that's a detail nobody listening to this call ought to overlook. The simple fact that we can attract a person at that stage of his career, on top of bringing in people who bring the experience Tamsin has, or Dustin Olson, or honestly I could keep listing 20 more names — it's remarkable. So what drives them to do it? These are folks who live and breathe this industry; they understand that what we're pursuing is achievable, that it can come together, that it can be finished. Is it simple? No. Do we tackle it as a team? Yes. We adjust our approach as market conditions shift. Learning is baked into who we are, our ties with every partner are remarkably solid — and the fact that Mike Otworth secured a license from Procter and Gamble for this revolutionary technology back in 2015 speaks to how strong his relationships are and how capable he is at building companies. And the fact that P&G places such strong trust in us, along with the fact that we've brought in roughly $750 million across the past year, year and a quarter — that says something too. Sure, challenges will come. But I want everyone to understand this clearly: when you're deep inside the belly of the beast, sitting at that table alongside your colleagues every Tuesday for 90 minutes, holding conversations at midnight or 2 o'clock in the morning while your colleagues abroad are posing questions and hunting down information, that capability, and what we're constructing here, fills me with tremendous confidence. I'm extremely proud of the position we're in right now, and sure, there will be obstacles for us to get past. Sure, being a pre-revenue company means there are matters we must handle. But don't misunderstand — whenever we release these quarterly updates, our top objective is showing all of you that a plan has been set forth by us, that a strategy has been set forth by us. Plus, we've got milestones and targets that we're working hard to hit. We aim to provide you with updates on a routine cadence, showing an uncommon degree of openness, such as the Lighthouse report, which is published each month. And we want you to grasp what we're up to and feel certain that our goals are being met — the sole means by which we can strengthen our own confidence and yours is through hitting those goals; and as Mike mentioned, we concentrate on that with laser-like focus. Thank you.

Mario Cortellacci

analyst
#49

Thanks so much.

Hassan Ahmed

analyst
#50

Morning everyone, just a few things I wanted to ask. First, regarding the EP&C side, in the current environment we keep hearing about supply chain issues, logistical headaches, that kind of thing, so I'd like to understand better how your contracts are set up to give you some confidence that the EP&C folks deliver on time when it comes to constructing your plants. And also staying within budget, especially given these unprecedented circumstances with COVID, labor shortages, supply chain and logistics problems, and so forth.

Mike Otworth

executive
#51

Alright, we're moving very aggressively on the EPC contracting approach for Augusta. And I'd say that effort has gone quite well. We're really building on what we know and have done at Ironton to shape the contracts going forward. I think it's somewhat different, though. Our experience at Ironton has taught us a lot, so we can handle the important supplier relationships in a manner that provides something of an edge regarding cost and the schedule for receiving critical long lead items; so, on the EPC side, when it comes to assurances on schedule and cost, it really boils down to those long lead critical equipment pieces that must be ordered to construct the facilities.

Michael Dee

executive
#52

And I want to mention, in today's climate, when you're out there purchasing, that means you're also pitching — pitching the business and pitching what we offer versus the alternatives those vendors have for where to place their product. Dustin and the people working with him have been outstanding at going across the globe and convincing these firms that PureCycle represents the future of plastic recycling. And sure, we might be a smaller buyer right now than some of the other choices you have, but down the road we're going to be a really large buyer. He's had a lot of success getting them to buy into that. And that has mostly taken away the danger on our end of not being able to obtain the critical parts we require; so it caught me off guard that he had to do that. But it also caught me off guard in a good way, given how well he and his team have managed it.

Hassan Ahmed

analyst
#53

Got it, got it — that's a big help. Then, following up on that: once more, I'm fully aware of how sensitive the whole FCC subpoena situation is. Honestly, though, it leaves me pretty puzzled. Here's why — if I'm reading the wording correctly, what they're asking about is your technology and your financial projections. My real frustration comes down to this: my background is chemical engineering. I also hold a Masters in Industrial Engineering, and back in chemical engineering school, we'd be sitting there examining the technology, we'd build a pilot plant, then scale it up. That's really the core principle of chemical engineering. So let's just say those nice lawyers from the SEC come in, most likely bringing zero chemical engineering know-how — what exactly are they going to find out regarding the technology in the time remaining before Q4 2022? Because when you get right down to it, your facility ought to be operational by Q4 of 2022. And once it's operational, that means the technology functions. You've scaled it up. And if the technology functions and you've scaled it up, then your financial projections hold up too, since everything you're doing is applying market prices for polypropylene, and you've got contracts locked in for raw materials. So the financial projections hold up as well. So, in broad strokes, just help me get my head around what these people are after.

Michael Dee

executive
#54

Yes, so I mean, maybe…

Hassan Ahmed

analyst
#55

Can you tell that this is irritating me?

Michael Dee

executive
#56

Yes, I can tell that you're irritated, and we feel the same way, and indeed, we also share the view that we won't be talking about what the SEC is.

Hassan Ahmed

analyst
#57

Honestly, a piece of me feels like heading back to my engineering school and handing back my diploma.

Michael Dee

executive
#58

See, regarding the SEC, we’re not able to say anything beyond what we’ve already shared. That said, allow me to mention a few points. To begin with, when it comes to this, we’ve never been unaware that now and then there’s roadkill lying around due to scaling risk. That’s exactly why $30 million went into constructing a feedstock.

Hassan Ahmed

analyst
#59

That's good, and I'd say that growing engineering capacity is a legitimate concern.

Michael Dee

executive
#60

Indeed it is, which is exactly why the feedstock evaluation unit matters so much — it has been operating for 2.5 years now — and that's one point. The other point is having individuals such as Dustin Olson, plus the depth of his team, working on the manufacturing side, drawn from folks who've spent their whole careers constructing polypropylene plants. So, we've done and will keep doing all we can to reduce and derisk that process; and we aim to bring to you — and this extra investment that Dustin mentioned is a hugely important piece. We sit down and there are choices we must make, that I as CFO must make regarding investments. And whenever we get a chance to put money in, which raises the likelihood that everything will start up as planned, we'll do that, and the investment we're making in Ironton is sound, it matters, and it's the correct call, and we want to be focused on execution. That's why I've always emphasized how good the people are that we have here. On execution, I'm going to ask Dustin to speak briefly about Gulfspan and why putting money into Gulfspan matters so much?

Dustin Olson

executive
#61

Yeah, what I'd say is this — every single thing we're doing regarding how this company carries out its plan comes back to one idea: locating efficiency, right, and getting things done in the most efficient manner possible. If that stays our focus, then all the rest takes care of itself. So Michael's comment regarding Gulfspan's construction capacity really has two parts to it. First, the Gulfspan site lets us grow at a faster pace, since we're able to construct three plants at the same time; so once the design is locked in, and we begin putting up those plants, construction capacity won't be a risk for us. That's a positive. And it matters. But capacity can be purchased on the market — what can't be purchased is the institutional, shall we say, experience that comes from the people who've built that work. So by putting all our work into that Gulfspan site, first, our IP stays protected, and second, we teach folks how to build — the team at Gulfspan is going to construct our first facility for Ironton. After that, they'll go on to construct the facilities that follow; so look, that's just a small part of the bigger picture of how we'll grow efficiently, but I believe it's a terrific illustration of the way we'll accomplish it, with efficiency as the focus. The same holds true for what we call our born digital strategy. What I mean is, born digital strategy is entirely about how we grow in the most efficient way possible. How do we make sure the lessons from one plant carry over to the next one? How do we make sure that teaching an operator in Ironton carries over into teaching an operator in Augusta, so that when we discover something that works, we hold onto it, and when we discover something that doesn't, we leave it behind. And we keep accumulating that institutional knowledge each and every day. These two strategies especially are truly critical foundational elements, critical pillars, for us pulling this off efficiently; and provided we keep efficiency at the heart of every choice we make, our belief is that we cannot lose.

Hassan Ahmed

analyst
#62

That's really useful, folks. Many thanks.

Steve Byrne

analyst
#63

Yeah, I was hoping to dig a bit deeper into the technologies you've been reviewing for preprocessing, and I realize you're evaluating several different ones. Is there anything that seems to be emerging as the front-runner — something you figure will probably be what gets used at those preprocessing facilities, the ones most capable of separating PT from PE and so on? Or would you say we're still pretty early in assessing these options, along with new players entering the space to build them out? And do you expect to own these technologies yourselves, or will it all be handled through licensing?

Michael Dee

executive
#64

Yeah, fair question — I'll turn it over to Dustin, and Tamsin might chime in too. That said, from our team's standpoint, we've likely encountered every option out there; we hold the accumulated expertise on all that has existed, stretching back roughly 30 years up to now, and how it has developed. Plus what's coming down the pipeline, more or less. So I'll have Dustin kick things off with how he sees your question.

Dustin Olson

executive
#65

Yeah, I believe it's truly crucial to begin by explaining, let's say, the reason there isn't—or the reason a portion of the polypropylene isn't being extracted from waste at present. What's prevented that from occurring on a large scale up to now is the absence of any technology available in the marketplace capable of turning a broad range of plastic feedstock into an ultra pure recycled polypropylene product. PureCycle provides exactly that, and because our technology is now on the market, the chance keeps growing to locate that polypropylene, pull it from the waste stream, and feed it into our process.

Michael Dee

executive
#66

Let me break this down to its most fundamental pieces. The issue here is technological in nature, but that technological issue spills over into a market-side issue, since you simply cannot produce high-value goods that command a premium price from recycled polypropylene of low quality. What we do is empower our customers to produce the highest-quality goods, so they are prepared to pay a higher price for that recycled polypropylene, which in turn allows us to pay a higher price for the feedstock. That opens up an entirely new, workable business ecosystem that never existed before. If you went to someone such as one of our partners on the processing side of the business, a company named Ronky, and asked them, why aren't you extracting the polypropylene from your Cincinnati operation? They would answer, because we have never seen steady demand from a customer like the one you're describing, someone willing to do what you say you'll do — that has never existed before. So we are bringing about a transformation in the supply chain, and at its heart, our quite revolutionary technology is what drives it.

Dustin Olson

executive
#67

Yes, and what I'd add is that now, as we're commercializing that technology and thinking about how we gather and consolidate this kind of molecule, a lot of what we're doing is simply applying conventional equipment in the feed preprocessing step. Right, in plenty of cases this isn't new technology that has to be validated for the approach to succeed. It's proven equipment with extremely low operational risk — we simply have to deploy it in the field to locate the polypropylene. Point two is something we brought up in the script: based on what feedstock is on hand to be recycled, or what feedstock is on hand for us to buy, a distinct form of processing might be needed so that it can be made ready for the purification plant. A solid illustration would be nets, plus ropes — fishing nets, and ropes that tie off cruise ships and similar things; that's a really distinctive product, so preparing it, getting it ready for purification, calls for a distinct processing step. Thus, in every region where we build the satellite prep facilities, we'll assess what's nearby and what we'll have to install to handle the feed that's on hand. The final item I'll bring up concerns, let's say, new technologies in the advanced sortation area — there are several we're assessing; robotics and AI and similar things are certainly arriving on the market. They hold genuinely strong potential and promise, and we in fact have some advanced recycling technology that we've talked about and displayed to everyone and actually constructed at our R&D facility to trial, and we're getting good results with it; so, I believe the key point is that we'll keep scanning the market for technologies we can deploy to process the polypropylene in preparation for the purification. And we will push forward certain in-house technologies, such as the one we built at P4, and we'll also draw on the experience and the offerings from those in the market to assist us. Hope that answers your question.

Tamsin Ettefagh

executive
#68

I simply wanted to say I agree with what Dustin said in that final point. To me, it feels like that has given us the biggest push forward, since we've already installed machinery that places us in a leading position when it comes to sorting — I'd call it post-consumer curbside material — relative to whatever exists on the market right now. And I have confidence that we can keep expanding on it as we grow and as these new machines arrive in a stronger form. My view is that AI remains somewhat in the background, though it is progressing.

Dustin Olson

executive
#69

Who's next?

Thomas Boyes

analyst
#70

Thanks a lot for fielding my questions. It's clear that the majority have already been covered, but a few points I'd like to dig into further. Specifically, I saw that the study in Europe is, from what I understand, now shown at 107 million pounds of capacity. My recollection is that it used to be 130, so could you speak to why that capacity figure moved — is it tied to how much feedstock you believe you can lock in, is it about demand driving the choice of the Ironton design rather than a cluster facility, or are there particular site limitations?

Dustin Olson

executive
#71

Honestly, the choice between 107 and 130 hasn't been finalized yet, so to speak. Both technologies are within our ability to build, and in the end it will hinge on what feedstock is available for us to process and on timing — if we secure sufficient feedstock under contract for a 130 million pound plant, that's what we'll build, but if we're able to begin with a 107 million pound plant, we might go that route. Keep in mind that when we chose to move from 107 to 130, we actually reused a great deal of the same design from the 107 and only tweaked it slightly to get it to 130. So it's reasonable to say that we could apply some minor adjustments later on in the process to settle the question of 107 versus 130.

Thomas Boyes

analyst
#72

Understood, that clears things up. Then, if we could just touch briefly on Europe, with the FDA letter of no objection you'd be holding, would you run both tracks at once when filing with the European Food Safety Authority, or would you more or less hold off for that formal clearance and afterward file everything so that all the technical data you gave the FDA lines up with the letter?

Michael Dee

executive
#73

Yeah, from where we sit, we're getting ready to engage with EFSA, though our view is that having the FDA letter of no object in hand gives us the strongest route ahead. So at present, we're doing a great deal of preparatory work so we can start the engagement, but the formal engagement has not yet begun.

Mike Otworth

executive
#74

My sense is that a large portion of what we'll need to hand over to the FDA overlaps with what EFSA will ask for. So once that effort has been completed, there's no need to repeat it. That's the reason we see advantages in using the FDA work to support EFSA.

Michael Dee

executive
#75

That really is a strong observation.

Thomas Boyes

analyst
#76

Excellent, I appreciate the detail. Then, one more item — could we get slightly finer resolution on that two thirds of the cap increase which is unrelated to inflation-driven construction costs? My assumption would be that most of it ties to feedstock and contaminant processing rather than safety, though perhaps I have that wrong — it isn't as if you're installing additional handrails around the site. Are these tied together in some manner I'm failing to see?

Mike Otworth

executive
#77

No. Yes, no — no, in reality there are two separate tracks here, and I'd highlight one important distinction. Process safety, as we discuss it, relates heavily to how dependable the plant is, and to the assurance that its operation stays safe and dependable continuously; it connects less to occupational safety exposure such as handrails and similar items, yet the cost pattern for that work has not really shifted much. Regarding the two thirds against one-third split — certainly the two thirds is, shall we say, largely the build-out of feed processing operations, and then finished off by process safety, while the one-third concerns escalation in materials across the plant as a whole. To put it another way, certain suppliers have approached us saying, look, we cannot supply the equipment at the price we quoted you initially, and we won't, because materials now cost more than the finished product does. So a choice has to be made on our end: either seek another party capable of doing it, or accept that this is a market and revise what we pay for that equipment so the schedule holds.

Thomas Boyes

analyst
#78

That’s logical; and maybe just the last thing, so, given that you pointed to 1Q 2022 as an important financing window and with the pipelines in Augusta backed by those three debt draws, is there a particular amount of travel you need to lock down during that period against those long-lead time items, or is it still TBD depending on some of the engineering work that still needs to occur at that location?

Mike Otworth

executive
#79

Yes; so, regarding when the capital has to be put to work, we didn’t really go into much depth about the key supplier relationship here. But the truth is that when you examine the spending curve across the plant and then break that down into a curve for spending across every piece of equipment, you see that not much capital has to be deployed right away. Most of what gets done at this point in the process is detailed engineering. And so, we can keep the timeline moving before we have the final financing, because it takes a relatively small amount of capital to do that. So, that’s my answer. I mean, certainly we need to get financing secured in the Q1 window, but the fact that we don’t have the financing today does not mean we are slowing down at all on the Augusta build.

Thomas Boyes

analyst
#80

Right now, I appreciate you holding this call. That's everything I have.

Barry Haimes

analyst
#81

Thank you very much. I wanted to circle back to the topic of scaling up, so to speak; when you're working through construction out in Ironton, roughly how many distinct critical processes are involved? And can you confirm several of them as you go, or is it closer to a case where you get to the finish, flip the switch, and see if it functions? I'd really appreciate getting some kind of idea about how all of you approach proving out these different processes, and to what extent some of that work could get done before that last deadline arrives. Thank you.

Mike Otworth

executive
#82

My understanding is that the first split when it comes to processing happens between prep — that's the term we use — and what we call purification. As for the prep side, the facility we brought up in Ironton is slated, or at least ought, to begin running during the second quarter of the coming year. That will serve as the earliest confirmation point for the machinery we purchased to get the feed ready ahead of purification. We should have a pretty clear read on how the preprocessing section is performing relatively early in 2022. That's a big plus, since it removes the need to build that level of skill and learn the operational risks by the time the purification plant is set to start up. Once construction on the purification plant wraps up, we'll carry out all the required mechanical commissioning checks — for example, confirming valves move in the correct direction, verifying proper wiring, and passing pressure tests. After that, a set of process commissioning phases gets underway, and one piece of that involves running virgin polypropylene through to confirm the flow behaves correctly across the plants. So during the commissioning phase, we'll gradually introduce varying amounts of fully recycled material—normal feedstock, you could call it—into the process, which lets us test out the remaining operations. That's really the best way I can put it.

Barry Haimes

analyst
#83

Great, thanks. I appreciate the color.

Mike Otworth

executive
#84

Okay. <<call_end>>…

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PureCycle Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to PureCycle Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PureCycle Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.