Thanks, Lisa. I'd like to welcome everyone to PureCycle Technologies' conference call covering our corporate update for the fourth quarter of 2022. I'm Charlie Place, and I serve as Director of Investor Relations here at PureCycle. With me today are Dustin Olson, who is our Chief Executive Officer, and Larry Somma, our Chief Financial Officer. This morning, our focus will be on corporate developments from the fourth quarter as well as items occurring after the quarter closed. You can find the presentation we'll be reviewing today under the Investors tab on our website, www.purecycle.com. A number of the statements we make today are forward-looking, resting on management's beliefs and assumptions along with information available to management right now. Such statements carry known and unknown risks and uncertainties, and many of these may lie outside our control, including the ones described in our safe harbor provision for forward-looking statements, which appears at the conclusion of our fourth quarter 2022 corporate update press release, in the annual report on Form 10-K we filed this morning, and in other reports on file with the SEC that offer additional detail regarding risks tied to our business. Please also be aware that actual results for the company could differ materially from what is anticipated, and unless the law requires it, we assume no obligation to update any forward-looking statement. Today's remarks might also contain preliminary non-GAAP estimates, which are subject to risks and uncertainties, including, among other things, changes related to quarter-end and year-end adjustments. Any difference between PCT's actual results and the preliminary financial data presented here may be material. You're welcome to follow along with our slide deck, or if you're on the phone, you can pull it up at any time on purecycle.com. We're eager to share with you what happened over the past quarter. At this point, I'll hand things over to Dustin Olson, PureCycle's Chief Executive Officer.

Dustin Olson

executive
#2

Thanks a lot, Charlie. I appreciate everyone taking the time to be with us today for this conference call covering our corporate update for the fourth quarter of 2022. Your backing means a great deal to us, and we're eager to walk you through what's been happening lately. I honestly couldn't feel more pride in the PureCycle team, because our first commercial-scale purification plant over in Ironton is just weeks from wrapping up final installation and beginning to make pellets. Everybody across the company has put in serious effort to get past a range of obstacles, and just like so many of you who've been tracking where we stand, we're eager to get operations going at Ironton. During the past 6 months, we ran into a number of bumps in the road and found our way past them, and at this point we hold our own future in our hands; we're thrilled to finally be in a position to give you the specifics behind the fixes we've come up with. The moment has arrived for PureCycle to reshape the world of plastic recycling. Because mechanical completion ran late, the company failed to hit a 1 December '22 deadline contained in the original loan agreement, which in the end meant a waiver had to be arranged between the bondholders and PureCycle. Securing that waiver turned out to be a complicated, drawn-out effort, since there were numerous issues to settle and many parties involved. We feel enormous gratitude for the backing the bondholders gave us in getting to this resolution. Bringing a project of this size and intricacy to the finish line has turned out to be a real challenge. Even so, I'm happy to say that our flagship site in Ironton, Ohio is now in the last phase of construction, with mechanical completion anticipated in early April; right now we remain on schedule to move solvent through the system, make pellets, and reach a point where we can begin ramping up operations by the close of April. It's behind the initial timeline laid out 3 years back, yet that only means the schedule has moved. We continue to expect that we can wrap up our start-up plan within 9 months, just as we first intended. Our objective is still to turn out 55 million to 75 million pounds of ultrapure recycled resin over the course of 2023. Through the fourth quarter, we kept moving forward on long lead purchases and early engineering work for Augusta, where start-up is targeted for the later portion of 2024. We're folding the lessons learned from executing the Ironton project into Augusta and are set to lock in the schedule. Back in January, we revealed our first European site at Belgium's Port of Antwerp. That site can accommodate development of as many as 4 purification lines, which works out to 520 million pounds of UPR resin manufactured each year. We anticipate start-up commissioning for Line 1 happening during the first half of 2026. The enthusiasm behind this facility has been both exciting and motivating. We can't wait to share further details with all of you during the coming 6 months. On top of that, we're thrilled to be making headway in Japan alongside Mitsui, a top global petrochemicals conglomerate. Our in-depth joint venture talks and work on choosing a site keep moving ahead. For the purification facility we're planning in Japan, the site selection process has narrowed to 2 candidate locations. Each has room for multiple purification lines, and together they could support capacity ranging from 260 million to 520 million pounds annually. Together with SK geo centric, our joint venture is putting the finishing touches on the development budget and the financing strategy for the purification facility that will go up in Ulsan, South Korea. You might have caught it in the Newswire last week — SK brought a sizable delegation to Ironton not long ago, and they came away with a clearer picture and a lot of enthusiasm for this project. Throughout this process, SK has dedicated a tremendous amount of time to technical review — literally hours of it. Whenever technical assistance was required, they stepped up, and across the last two years they've proven to be an exceptionally dependable partner for our organization. Given how tough the current climate has been for every company when it comes to securing financing, witnessing real progress in this area is genuinely thrilling for me. The work our finance, legal and accounting teams have accomplished here fills me with a great deal of pride. In addition to the waiver agreement we reached with the bondholders, a substantial credit line — $150 million in borrowing capacity — was secured by our finance team. You shouldn't view this financing as what we intend for capital over the long haul. What it does is give us confidence that we can bridge our way through the Ironton start-up while keeping our growth initiatives moving forward. It positions us to raise longer-term funding for Phase 1 of the Augusta project, as well as other projects, at a more attractive cost of capital. Beyond that, we continue to evaluate incremental short-term financing opportunities along with other debt structures. Let's move to Slide 4. We enjoy showing a recent picture of the Ironton facility, so you can see the progress for yourself since our last update. Our teams are working hard to close this project. Now that we've seen the plant ourselves, everyone can start to picture how this facility will run. The delays have been tough, but we used that time to train, get ready, and validate our operational plans. In the coming weeks, we'll put out a series of videos showing some details of our facility, so you can get a sense of it the way we are today. Turning to Slide 5: under the waiver we recently executed with bondholders, we've agreed to the following operational milestone dates for certification of the Ironton project. Once more, I should point out that these deadlines exist because our bond covenants require them — they aren't the schedule we actually anticipate hitting. Take the certification that Ironton will be mechanically complete as of June 30, 2023: our present expectation is to wrap up mechanical completion entirely during April. As for the certification tied to producing UPR resin from post-industrial feedstock by July 1, our expectation is to have that production underway in April. On reaching either 50% operating capacity or 4.45 million pounds of output within a single month by September 30 — right now we anticipate running at 50% capacity during Q2. Then, by November 30, the full performance test will have been completed, which involves running continuously for 5 straight days. We anticipate being able to conduct that performance test by early Q2, though we might opt to carry it out afterward, during the start-up phase at our facility. As for Ironton hitting 100% capacity by January 31, 2024, our current expectation is that we'll get there in early Q4 '23. Previously the project was set to close by January 31; now we anticipate wrapping it up in November. Given where we stand right now in ramping up Ironton operations, we're confident these milestones will be met. Turning to Slide 6. Ironton today stands at nearly mechanically complete. A few remaining items must be closed out before we're finished, and those relate mostly to the co-products side of the operations, but we expect mechanical completion to arrive in early April. Most of the project is represented by Feed PreP, Control Room, Central Utilities, Offtake, and Rail Operations, and each of those is either up and running or has been fully commissioned and stands ready for operation. Then, on the extruder side, 3 of the 6 units are fully commissioned and able to move plastic through them, while the other 3 are currently working through start-up commissioning. PureCycle and its contracting partners are pushing continuously to reach 100% mechanical completion in the shortest time possible. During Q4 and the start of this year, we ran into setbacks involving engineering rework, shipments of extruder components, and harm to extruder electric equipment during commissioning. After accounting for those setbacks, pellet production is now anticipated to begin in April.

Dustin Olson

executive
#3

We have consistently stated our preference to allocate whatever time is necessary for a safe and effective launch of the facility, and that is exactly what we plan to do. Starting up a plant of this kind demands purposeful action backed by analytical justification; our ramp-up will reflect that approach. As soon as the data justifies raising output, we will raise it. The final performance test will be scheduled after we have accumulated initial operating experience with the plant and at the point that best serves the overall operation. I'd like to say thank you personally to the 400 craftsman, engineers, operators, technicians and professionals across all of our partners. Through those cold, rainy, muddy days in Ironton this winter, their commitment never wavered. Without their support, we wouldn't be closing in on this mountain's summit. Each time we tour the facility, we see it taking shape in front of us, and our confidence and excitement about operating it keep growing. Let's move to Slide 7. Our technical teams continue working hand in hand with customers on new applications. Thanks to the strong technical collaboration we share with our partners, the data we've been producing is convincing, and it demonstrates our resin's superior performance. When we test our UPR resin, we look at four key things: how easily it processes, how strong it is, how little odor it gives off, and whether it has color. By using different additive packages, we're able to offer the market several product grades that vary in melt flow and strength, and we do this without having to alter the feedstock going in. With help from our partners, we can now share odor analytics. These reveal a four-times gain over food-grade recycled material, and a two-times gain compared with virgin PP. That means PureCycle PP could potentially stand in for virgin PP in any application where customers need low odor. To give a concrete illustration, PureCycle's product should be capable of cutting down that new car smell by taking the place of virgin polypropylene. Beyond that, we've turned out a large number of gorgeous color samples and shown that matching shades doesn't require giving anything up. To put it simply, our view is that PureCycle's offering comes out ahead. We continue to put money into developing what we make and the technology behind it. We hold the data that backs up what we're doing, and getting these products into our customers' hands is something we're eager to do. Even now, the margins and demand picture around what we sell are substantial, and we expect that picture to grow down the road once people see how the product performs at scale. Moving on to Slide 8. Back in January, we got an invitation to join a sustainability panel at Davos during the World Economic Forum, and we took that chance to share the news that PureCycle had been chosen to build a purification facility at Belgium's Port of Antwerp. The site, as planned, can accommodate 4 lines — as much as 520 million pounds — and operations should begin in early '26. Right now our team is putting together a financing plan, working on a partnership with a solid financial institution, and going after circular project grants to secure funding incentives. Conversations around feedstock and offtake arrangements have gone extremely well, with LOIs executed that show feedstock oversubscribed at 125% while offtake is close to fully committed at 75%. The sheer volume of backing for our project has been stunning and thrilling, especially since we've gotten more than 15 letters of support from government bodies, customers, suppliers, banks and other backers of the project. On top of that, we keep advancing our joint venture agreement with Mitsui, having signed an HOA that lays out the anticipated key terms of the JVA. For site selection, we've narrowed things down to 2 locations in Japan, situated near areas of high population density with room to build multiple lines; over in South Korea, PureCycle and SK geo centric have put together teams dedicated to operations and finance to set up and oversee the development project budget and financing strategy. The strength of our global partnership and the strides made in Europe and Asia ought to give the industry faith in our technology, the appetite for our product and the PureCycle team. Every partner has stepped up to offer any assistance we might require to get the Ironton project across the finish line and demonstrate scalability. I'd like to say thank you from the heart to our partners around the world for their support. Now I'll turn the call over to our CFO, Larry Somma, who will walk us through the financials.

Larry Somma

executive
#4

Alright, thanks Dustin. Ahead of getting into where we stand right now on liquidity and the balance sheet for the fourth quarter, I'd like to give everyone a status report on financing. Over the quarter, the team achieved meaningful headway on the things that mattered most — we got the waiver negotiated successfully, and at the same time we kept moving forward on a number of substantial capital alternatives. While that was happening, we were in a position to thoroughly assess how much financial capital our business plan actually requires. We have confidence in the direction we've begun taking to bring in the capital that the Augusta facility needs. Turning now to Slide 9. We closed out the quarter with a little more than $326 million of total liquidity available to us. Through the fourth quarter, we kept funding investments across our Ironton, Augusta and prep facilities, with unrestricted assets providing most of that money. Cash along with debt securities available for sale came down by $52.5 million versus September. The Augusta construction escrow account increased by $29 million to cover pre-engineering work and purchases of long-lead equipment. Investments in Augusta purification and prep made up $11.5 million of what we invested in the fourth quarter. Corporate and preoperational employee expenses came to $7.2 million in the fourth quarter, a bit above the previous quarter, largely because of taxes paid when employee stock vested; in addition, we made our semi-annual interest payment to bondholders totaling $9.1 million, drawing on the capitalized interest and debt reserve account. Last, normal corporate operations — things like insurance, professional fees and assorted other expenses — consumed $6.6 million of cash during the quarter; let me now offer some comments about our budget for getting the Ironton project finished. As our 10-K notes, PureCycle presently expects that investments made during 2023 to bring the Ironton facility to completion might fall somewhere between $55 million and $80 million. Where we land in that range hinges on several contract contingencies and how they ultimately get resolved. January and February saw us spend $29.1 million, and per what the waiver agreement lays out, we sent $25.3 million so it would be on hand for the project costs that remain. Thanks to the waiver we negotiated, the bondholders additionally consented to release $13.2 million of funds that had been raised from the bond. Let's move on to Slide 10. In the end, we got to a mutually satisfactory agreement regarding a waiver; we're extremely grateful for the backing our bondholders demonstrated in getting to a resolution, since a great deal of the added economic effect on the business lined up with what we had planned previously. Under the agreement, PureCycle must meet the following financial requirements. We're going to move $50 million of unrestricted cash into a restricted trustee account. Worth highlighting: this does not represent an added cash requirement. The amount of cash PureCycle has to reserve under the loan agreement stays the same; we're going to move $25.3 million into the project equity account so that the cash requirements we expect will be needed to finish the project are set aside. Once more, worth highlighting: this does not represent an added cash requirement; we're going to move $12.3 million into the capitalize interest and debt reserve account so that interest and debt reserve are extended through June 30, 2024. So no further cash is required to cover interest payments over the coming 15 months. For working capital, we intend to secure no less than $150 million in financing. That goal was met on March 15th, when we closed a $150 million revolving credit facility with Sylebra Capital. PureCycle is lucky to count Sylebra as a partner, given the substantial resources it has dedicated to making sure this company succeeds. Yesterday, PureCycle moved $37.6 million into bondholder accounts, and the remaining $50 million will go out over the next few days; once that happens, bondholders will free up $13.2 million of restricted cash from the project fund to cover Ironton expenses already incurred but not yet reimbursed. On Slide 11, you can see the specifics of what I just described and how it affects the fourth quarter 2022 balance sheet on a pro forma basis. As shown there, unrestricted cash falls by $74 million while restricted cash rises by $74 million on a net basis. Now please go to Slide 12. We're genuinely thrilled to at last be in a position to discuss operating figures with all of you. Under our loan agreement, PureCycle must provide budget-related information to bondholders on EMMA; given that, we're offering a summary of the December budget profit and loss data. At Ironton, our priority is a safe start-up together with dependable operations. After we get there, we'll scale up the technology and turn out large volumes of UPR. Achieving that in the short term means PureCycle will face elevated costs, though we'll push toward becoming a best-in-class operator. Across the months and years ahead, we'll fine-tune the facility to bring variable costs down. We'll fine-tune how we buy feedstock and price coproducts for both the prep and purification operations, and we'll also strive to remove the near-term fixed cost increases that come with early-stage operations. The budget we're showing reflects a December gross margin percentage of 49.1% along with an EBITDA percentage without overhead of 35.1%. In our view, those figures reflect early-stage operations. Because of that, we've provided a longer-term perspective in which our gross margin percentage climbs to 63.6% and our EBITDA percentage without overhead climbs to 54.9%. That anticipated improvement rests on a range of operational excellence efforts aimed at fine-tuning the plant's operations and cost profile after the initial facility start-up. I'd also like to remind everyone that Ironton's offtake contracts are mostly tied to virgin pricing plus or minus a spread. Every future operation, Augusta included, will rest largely on feedstock plus contracts, which we believe shields PureCycle from the volatility of shifting feedstock prices; now let's finish with our summary on the last slide. In spite of near-term difficulties, we've kept executing against both our near- and long-term objectives since the previous call. We reached a mutually agreeable deal with our bondholders. We're grateful, as I mentioned, for the backing we've received from our bondholders, since the economic effect lines up with what we had planned previously. We also locked in new arrangements for feedstock and offtake with CellMark, iSustain and Formerra for the Ironton facility. At Ironton, mechanical work is almost finished, and we expect mechanical completion by early April. We remain on schedule to start commercial output of UPR resin pellets in April. We obtained a revolving credit line of $150 million, which is accessible to keep funding our operations and growth efforts; talks are actively underway to bring in more capital, and that gives us confidence we can resolve the forbearance tied to our Augusta site before it expires at the end of June; we shared news of our European expansion with a site at the Port of Antwerp, drawing quite a few notable letters of interest and support, particularly on the capital side. We executed an HOA with Mitsui that lays out the terms of our anticipated joint venture, and site selection has become more focused. We're eager to bring the market up to speed on the milestones ahead as we finish our flagship Ironton facility and work through the Augusta financing process, as soon as we're in a position to do so. Thanks for being with us on today's call. We're now glad to take your questions.

Michael Hoffman

analyst
#5

Dustin, Larry, congrats on the headway you've made and the hurdles still ahead. That said, a handful of milestones remain to be finished; so could we spend a bit of time going through the coming 4 weeks? Dustin, you mentioned and gave thanks to your 400 contractors — do 400 folks remain on site? Or have you moved well beyond that peak, meaning we're truly at the stage of dotting i's and crossing t's?

Dustin Olson

executive
#6

No, Michael, yes, that's a wonderful question. I appreciate it. Headcount at the project topped out in January, early February time frame, and since that point we've been gradually reducing it. What the coming 4 weeks look like is wrapping up the last details in the co-products area at the Ironton facility, followed by kicking off the operations PSSR process, which lets us bring in solvent. To offer a bit more detail on our position, every extruder is essentially mechanically complete, with 3 fully commissioned and the remaining 3 in commissioning. I'll address the one extruder shortly. More detail on the system overall: we're in the gross pressure check phase at that facility, meaning operations is beginning to bring in air and afterward nitrogen into the process to look for gross leaks ahead of solvent introduction; that's essentially the last step before operations handover, and that's where we stand at present. Regarding the coming 4 weeks, we noted in our remarks that an electrical failure happened during commissioning. During the commissioning phase, an electrical part on one of our extruders was damaged, and it caused — effectively a 6- to 8-week delay to the overall project, since we had to source and swap out the electrical components and then begin commissioning anew; that's the long pole in the tent; all the electrical parts arrived this week, and we're restarting commissioning on that extruder this week too. So the coming 4 weeks, Michael, look quite different from before, given that the volume of work on site is dropping dramatically.

Michael Hoffman

analyst
#7

So, to put it all together, then — that entire amount of rework that was required, you've more or less finished it, and what remains is essentially the pressure testing plus repairing that single extruder?

Dustin Olson

executive
#8

That's not quite everything. I brought up the co-product section. As you may remember, roughly 1.5 years back, we had rolled out what I'd call an enlargement of the project to bring in higher feedstock — meaning lower-quality feedstock — along with additional co-product capacity. Delivery of that extruder slipped at the end of last year, and some tasks are still outstanding when it comes to handling the co-products leaving the system. Still, for the most part, Michael, your description is pretty close, except there's somewhat more remaining than what you mentioned regarding the co-products.

Michael Hoffman

analyst
#9

All right, that's reasonable. Some of your offtake arrangements — actually not offtakes, feedstock agreements — have come apart. When it comes to the overall amount you need, how far along are you in securing it? What share of the feedstock volume do you have locked in with firm sourcing?

Dustin Olson

executive
#10

For Ironton, we have firm sourcing in place for every bit of feedstock we require, and we also have all the offtake commitments we need. That side is fine. That said, as I've said a number of times, one factor behind why our ramp-up process for Ironton, which is our first facility, is stretched out is that getting our feedstock suppliers up to speed will take a while, and getting our offtake customers up to speed will take a while too. So that is factored into the ramp-up plan as a whole. Still, on paper, we're in good shape and well positioned when it comes to both feedstock and offtake.

Michael Hoffman

analyst
#11

And only so that everyone is clear, the raw materials available, the increase you're referring to involves the logistics of this material needing to begin moving in your direction in an organized way?

Dustin Olson

executive
#12

Precisely correct; precisely correct. What I'm saying is we need to demonstrate that we can be a dependable outlet for — to take in the feedstock, plus we need to begin purchasing it and begin using it and begin making payments for it. And those items require time. So we have incorporated some time into our plan for increasing capacity to account for that.

Michael Hoffman

analyst
#13

All right. And so, Larry, do you ever see yourselves actually pulling down that $150 million revolver, or even more significantly, avoiding a draw after June 30 once the spread doubles?

Larry Somma

executive
#14

That's a terrific question, honestly. This is a committed line. So if necessary, we'll draw on it—it functions as a safety net, Michael. Like we mentioned, other capital raises are in the works. So the thinking is that it's available should we need it, but we're looking at other options, since this facility isn't meant to serve as Augusta's permanent, longer-term answer.

Michael Hoffman

analyst
#15

So what I'm picking up from what you're saying is that once day 30 passes, you won't pull any more money from it, which means you could pay it back sometime before that point. Yet your goal is to secure cheaper options over a long horizon rather than accept the increasing spread built into that revolver?

Larry Somma

executive
#16

Exactly. Anyone who read the 8-K would notice the spread steps up as the term goes on, and that gives us a reason to line up alternatives, so we aren't stuck relying on it, especially toward the end of that term.

Michael Hoffman

analyst
#17

So, regarding the deadline set by AEDA — the Augusta economic development authorities — what sum needs to be collected before the 30th? My guess is that it isn't the entire amount, but at least some part must be.

Larry Somma

executive
#18

That's right, it isn't the whole thing. We've held several conversations with them, and we've discussed giving them confidence regarding one line, which they feel fine about. So, picture the approximate financing we must show them falling somewhere in what you might call the $400 million to $450 million bracket. Keep in mind that a substantial chunk of that has already been used, as we've mentioned before. Therefore, the financing threshold we need to demonstrate to them isn't the complete $400 million, since when we brought in the equity last year, a large share of those proceeds went toward financing both line 1 and line 2.

Michael Hoffman

analyst
#19

Alright, so putting it in plain terms, there's an extra $200 million to $250 million you need to find?

Larry Somma

executive
#20

That's right. Also, $150 million has already been announced, with the line of credit serving as where that comes from. Once more, that functions more as the backstop, and our intention is to swap it out, though it is a committed facility of capital that would serve the purpose with the AEDA.

Michael Hoffman

analyst
#21

All right. That's great. So the main takeaway for the market is that you aren't in a position where you're forced to go out and raise a huge amount. You just need to bring in a bit more on an incremental basis to stay in compliance with that, and after that you can keep making sound choices regarding what that capital costs you whenever you need it.

Larry Somma

executive
#22

Yes. That's a wonderful point. And Dustin and I have been meeting with the AEDA every month at their meetings, and we've provided a great deal of information, and they know where we stand. It's a meeting that benefits both sides; so you're correct. We've always emphasized that our goal is to preserve optionality and enjoy full financial flexibility. That's among the reasons we obtained the forbearance, since the AEDA shared our view that having a gun to our head didn't give us the best opportunity to raise capital in the most effective manner.

Noah Kaye

analyst
#23

I want to return to the first thing Michael asked, which was essentially a detailed walkthrough of the execution milestones and getting the plant started up; you've described for us what needs to occur during the coming 4 weeks to reach mechanical completion. Could you take us through, at least briefly, how initial pellet production begins and what that process involves? And then, more broadly, how do you become confident about hitting the execution milestones set out for the remainder of the year?

Dustin Olson

executive
#24

Yes. So — on the tactical side, our production start-up plan calls for wrapping up mechanical completion in early April, after which we hand things to operations for walk downs, the last punch list items, and the final PSSR, meaning pre safety start-up review, which must be completed before solvent can be introduced into the system, all right? So every bit of that is underway right now and will continue through the first week in April. Come the middle of April, commissioning of the extruder with the damaged electrical parts will be complete. As soon as that is done, we'll begin feeding the system and begin producing product from it as well. That falls in a middle to second half of April type window. And from there, that will drive, say, the first PIR, post-industrial recycled production. After that point, it becomes, let's say, a matter of operations discussing, observing and deciding how fast we ramp production at the facility, okay? When you're dealing with a new technology or a new plant such as this one, you must get it running, observe how it performs, learn to run it effectively, and then identify where the constraints lie. So all of that will be taking place across the April, May, June time frame, and ultimately we'll build production up to satisfy the 50% rate requirement and the 100% rate requirements. In our view, the schedule gives us plenty of time for these activities. And so we're grateful for the work with the bondholders to agree on milestones that we were comfortable with.

Noah Kaye

analyst
#25

Apologies. I just...

Dustin Olson

executive
#26

Noah, please rejoin the queue, and we'll move you right back up to the front. I believe we likely ended your turn a bit too soon there. My apologies for that. All right, Lisa, please hand the floor over to Noah once more.

Dustin Olson

executive
#27

Yes, we've got you now, Noah. You're good.

Noah Kaye

analyst
#28

Sorry about the tech issues on our end. You've handed us useful detail on the various components of the balance sheet and the items tied to funding Augusta. Still, I'd like to confirm everyone's got the big picture here. You mentioned that somewhere between $55 million and $80 million remains to be funded in CapEx for Ironton — again, I want to be certain we grasp how much of that budget has already gone out the door as of today. Then please shed some light on what would push things toward the low end as opposed to the high end of that range. Specifically, how much of that CapEx would actually be spent in 2Q, since it sounds like not much additional equipment is being brought in if the bulk of it is commissioning what's already in place?

Dustin Olson

executive
#29

Yes. During January and February, roughly $30 million in cash went out the door to service the facility. Keep in mind that those two months represented the peak labor counts for the projects. As a result, we anticipate March will be declining, all right, along with the headcount at our facility. The difference separating $55 million and $80 million mostly concerns conversations we still need to hold with our third-party counterparties regarding obligations in those contracts for various contract contingencies. So we're actively talking with them about the total effect that has on the project cost. On top of that, we're charting out the coming month or so of cost to ensure we hold a firm grasp of the final figure. Regarding your last point about how much will land in Q2: keep in mind there's a fairly substantial performance guarantee built in at the close of this project, once we successfully finish the Leidos 5-day at 100% test. That gives us some latitude on when we run that test; and when we and when we wrap up that test. So it's conceivable that, that performance test takes place in Q2 — probably a strong likelihood of that. However, the time required for the documentation needed to confirm it was successfully performed will take a while; so I wouldn't anticipate that final payment arriving until Q3 at the earliest.

Noah Kaye

analyst
#30

All right, that's really useful. Now I just want to ask about the revised assumptions for project returns. For a number of reasons, the Ironton budget has clearly gone up, correct? So if I look at the annualized EBITDA you're forecasting from December, once it's fully loaded and optimized, it sort of points to IRRs in the mid-teens. What should we make of your return assumptions for Augusta? I believe you gave a figure of $400 million for 1 line at Augusta. And clearly there will be meaningful leverage from adding a second, third, and fourth line there. Please just walk us through the working assumptions as they stand today.

Dustin Olson

executive
#31

Sure. Let's begin with Augusta. Keep in mind, the $400 million we referenced covers, as you noted, a great deal of infrastructure, a utility plant capable of serving multiple lines, and a Feed PreP warehouse built for multiple lines of operation. So for the first line, we expect something in the $400 million to $450 million range. After that, though, each additional plant comes in at $200 million to $250 million, all right? That's what we anticipate right now. To build on that, now that the Ironton project is complete, we understand there are meaningful gains available to us in both execution and the overall efficiency of construction design when comparing Ironton with Augusta. These aren't major technological shifts. They're more along the lines of how to carry out construction more effectively in the field. So what we learn at Ironton will carry over straight to Augusta, and later on we'll be able to demonstrate the cost effectiveness, or the savings, that come from those lessons learned; this is quite normal with first-generation technologies. You observe a CapEx per pound curve that shifts dramatically with time. Each plant you build makes you smarter and more capable at it. And honestly, the work we're doing alongside SK, and to a lesser extent with Mitsui and Europe now, but especially a great deal with SK, is helping us pin down some of these items and figure out how to do them better going forward. As for the economics of Ironton near term, we deliberately included extra cost and, I'd say, a conservative bent in certain figures, so that we'd have some room to maneuver when we bring this facility online. We know that once it starts up, we'll have a far clearer picture of the overall variable cost, whether that's electricity, natural gas for steam, or filter media for the facility. That's why we've been reasonably conservative in our first year operations, since we recognize there will be a tremendous amount of cost optimization to carry out at Ironton during that project's first years, all right? The other element here is simply the early stage support. So, any time you bring a facility like this online, you know there are going to be issues, and during that initial year we're going to be spending on maintenance, on support, and on the items we want to repair and enhance. That's why, when we put together the budget for Ironton's first year, we accounted for all of it. What I mean is we set a first-year budget with our eyes wide open, and I realize it doesn't compare favorably to the initial figures, but that's just year one — it isn't the long-term picture. Once you shift to that longer-term picture, we essentially identify 2 or 3 main categories where we can cut costs and, shall we say, boost EBITDA margin or add value to the overall economics. The first one is the variable cost reductions I mentioned earlier; we're aware that we overbuilt the utilities at the Ironton site, and we're confident we can tune them down to levels that are more attractive to us. We're also aware, from digging into the feedstock procurement side of this business, that there are numerous chances to do better on feedstock purchasing, to upgrade the products or the feed we purchase, and to buy more effectively as time goes on with feedstock. A portion of our first-year budget involves supplementing some of our feed with pricier feeds during those early phases while we ramp up available feedstock. Then, as time passes, we'll keep purchasing greater quantities of the less expensive feedstocks available on the market. And finally — and I realize this is, I suppose, fairly obvious — the corporate overhead dilution is genuine, and it's going to have a sizable effect on our operations going forward. When you launch a company the way we have and begin from scratch the way we have, it's all a blank sheet of paper. That means many corporate functions, the central support functions, the initial staff for core functional groups — those are the same individuals who will serve Augusta and beyond. So although we'll see incremental headcount growth as we — we'll see incremental corporate headcount growth as capacity grows, the corporate overhead is essentially set for what we need here, and over time we'll be able to dilute it. So look, I'm quite optimistic about where we stand on the overall Ironton economics and very excited about where we can take this plant, because we've seen — throughout the build, we've seen plenty of opportunities for solid performance from that facility, and it's pretty much in line with what we've been saying across the last 2 to 3 years, even with the highly inflationary environment all of us have been facing.

Eric Stine

analyst
#32

I really value the details on the operating budget for Ironton that you released yesterday, as well as what's included in today's presentation. I'm just wondering—since that reflects more of a virgin, or older, pricing approach—I'd like to hear how you see things developing as you move toward greater feedstock usage, and regarding the EBITDA margins you expect over the long run at Ironton, how does that stack up against what you anticipate for Augusta and other additional plants?

Dustin Olson

executive
#33

Yeah, that's an excellent observation, Eric. The Ironton budget has us excited too, since it demonstrates our ability to get that facility generating profits quite rapidly. However, you've raised something important: the influence that virgin polypropylene pricing has on Ironton, and on facilities we'll build later. Our perspective is that roughly 50% to 60% of Ironton is based on virgin polypropylene, whereas for Augusta—excuse me, I meant to contrast with Augusta—around 20% to 30% of Augusta is based on virgin polypropylene. The remaining portion of the pricing approach is essentially feedstock plus. So you end up seeing greater dependence on feedstock plus at Augusta, and less dependence on feedstock plus at Ironton, and I'd describe it as creating balance across the total margin forecast. Sometimes, when polypropylene prices are very high, having more reliance on virgin can actually work in your favor. That's why, when we consider Ironton and look back at margins from 1 year ago, there was a notable boost to Ironton's earnings a year back simply from the shift in polypropylene pricing. That said, looking at the flip side, feedstock plus pricing provides really solid consistency for the overall margin framework, since it remains stable no matter what happens with feedstock prices. So—there's definitely a distinction between Ironton and Augusta, but my take is that it functions somewhat as a balancing factor connecting the two. Once Augusta is operational, we won't have as much exposure to virgin polypropylene, and we'll enjoy improved, shall we say, margin safeguarding thanks to feedstock plus pricing from Augusta.

Larry Somma

executive
#34

Eric, I’d like to take you to Slide 12, the one we showed; that choice was deliberate. Looking at the 2 columns included there, we intentionally kept the PP pricing and the #5 pricing unchanged. The point was to demonstrate that once we get to feedstock plus, those two figures, no matter where they land, were mostly protected. So for this Ironton view, we wanted those held steady, since the gains at Ironton are going to come from the cost reductions we mentioned. As we shift to Augusta, we’ll be in a position to take advantage of those cost reductions, yet we won’t face the volatility, because we could have just as easily shown you a different column in which we altered the PP price and the #5 price, but doing so would only have made things more complicated.

Eric Stine

analyst
#35

Alright. Perhaps to frame it differently — this won't reveal whether I've got the wrong idea, but as long as virgin pricing doesn't, say, remain more or less typical, correct? Whatever that amounts to. Yet if it's typical, then regarding margin, your expectation ought to be that those two are fairly comparable when those surges occur, like you mentioned, that, I suppose, in such a case, virgin could translate to better margins, but you folks still must contend with that fluctuation. Does that capture it fairly?

Dustin Olson

executive
#36

Yeah, I'd agree, Eric. What I mean is that volatility in PP pricing is certainly going to affect margins overall. Yet what we present — and I believe we presented it, I'm not sure whether it was 12 months back at this point, on that slide during one of the earnings calls. Even so, the resilience our margins demonstrate is quite robust. Thus, even when polypropylene margins are low, as is the case right now, we continue to post fairly solid earnings, and those will keep getting better as our cost profile at Ironton gets better.

Eric Stine

analyst
#37

Understood. All right. Perhaps only one more from my side. This morning you simultaneously made public the arrangement with Formerra. I'm just wondering, could you describe what that arrangement covers? I understand it's aimed at North America. I mean, is this a case where they're going to distribute to the off-takers you already have? Does it relate more to the open volumes at every plant as those unfold down the road? Or what's the right way for us to frame that?

Dustin Olson

executive
#38

Yes. So Formerra has been picked by us as the partner for distribution in the U.S. for domestic sales within the U.S. Let me walk you through how this works — beginning with the reasoning behind picking Formerra. In the polypropylene space, they're the top player. Their engineering expertise is remarkably deep, and on top of that, they've got the reach to serve customers at an extremely broad scale. What I mean is, this organization is really good at building a strong sales force and identifying the buyers who'll benefit most from what we offer, right? So, honestly, when it comes to this partnership, my enthusiasm is more than I can put into words. I think the two of us are going to have a genuinely strong joint push in the market as we bring this offering to many different buyers who might not come across it any other way. Typically, the way distribution works is that they won't take over our main accounts — for instance, we'll keep handling Procter & Gamble ourselves — but they'll be there to help us with every new customer we're aiming to add. Initially, our collaboration was with Formerra, who joined as a fresh associate for the Augusta site. However, when contractual circumstances shifted at Ironton, we managed to transition them over there, providing us with an early advantage that we think will transition smoothly into Augusta too. Consequently, they'll play a key role in distributing smaller quantities via boxes and trucks rather than railcars, and in connecting with clients we don't plan to hire staff to serve directly.

Gerry Sweeney

analyst
#39

I wanted to ask a follow-up — clearly, there's been a great deal of discussion regarding the debt and so on. Yet we've consistently discussed attempting to locate — you signaled to the market that you would seek out, or possibly some form of bridge financing, which is what this $150 million credit facility gives you. But when can you swap out this facility for a different one carrying a reduced interest rate? I believe we've always discussed lenders growing more at ease once the facility is derisked; so when during this ramp-up do you kind of reach that derisking moment, and alternatives become relevant — possibly become relevant?

Larry Somma

executive
#40

Let me address the first portion of your question, since it's a revolving line, we aren't obligated to draw from it, and we may repay it or end it whenever without penalty; the sole expense would arise if we have funds drawn on it and breakage fees apply; so it would — you could picture it would be tiny. As we mentioned, there's been plenty of activity. We discussed the reality that we were out in the market during the prior year seeking a project financing. We make tremendous progress. The response was always, hey, we appreciate what you folks are doing, simply return to us the moment you're producing pellets. As you've heard here, we're getting very near that. Now we don't need to wait until we're done, meaning producing pellets, before we return to the market. So there are several activities that we've mentioned that we will be eager to share with the public as soon as we're capable. We're just not yet at that point where we can discuss the specifics on the other items that we're working on. But as I stated, the line, we're thankful for the resources that Sylebra possesses to support our business so we can have this if needed, but obviously, we're seeking more permanent solutions. And we know that once Ironton is operating, our cost of capital will decline. So we've always aimed to minimize the cost in this short-term bridge scenario and have the flexibility of exiting without large costs, so that we can layer in cheaper cost of capital.

Gerry Sweeney

analyst
#41

All right. For my second question, in what way do you plan to share some of these upcoming steps? During yesterday's presentation, I believe there were even production ramps shown. There's the Leidos report coming out. Would it be possible for you to call out pound production on a monthly basis? In yesterday's presentation, I believe there was a progression included in the 8-K? Or is that going to appear in the Leidos report? Of course, as production rises each month, the outlook for PureCycle keeps improving. So I'm just wondering whether you'll be communicating any of these steps between quarterly results.

Dustin Olson

executive
#42

Yeah. As we move toward closing out milestones, my sense is that this would probably be a public disclosure we'd put out to the market, demonstrating that specific milestones at Ironton have been achieved. Of course, once we reach mechanical completion, first pellets, and first applications, we're going to be celebrating that publicly. So you'll see information there. We touched on it briefly in our presentation today, but our plan is to begin publishing, say, a series of videos for the market so people get a sense for what we see. I mean, Gerry, honestly, when you're walking around the facility and watching it come together, it generates so much excitement in the field; and we get that benefit every day, and we want to be able to share it with folks that are on the line because you've been there on the journey with us, but you haven't had the benefit of being in the field with us; so we'll be doing quite a bit of specific comp stuff over the next 1 to 2 months, that should help fill in all of you on what we're doing.

Thomas Boyes

analyst
#43

Just a few quick items. Of course, I value how much you've shared regarding the Ironton plant's economics. My question was simply what the long-term picture for Ironton might resemble, and what sort of sensible time frame exists for reaching that state? Could you realistically envision that happening during 2024? Or does it lean more toward a 2025-style outlook?

Dustin Olson

executive
#44

Yes. What I'd say is that certain pieces of that will get started right away. For instance, one of the main things we need to sort out involves what this facility requires in terms of utilities. We currently have projections. When we examine those, it looks like we'll enjoy some room to outperform our initial design. So items along those lines — once we're up and running, I believe we'll witness the genuine effect, placing real figures beside the projected ones. And my sense is you'll notice that right away. As for certain other line items, the near-term support and the snags, or rather the near-term — the higher fixed cost tied to the facility. Look, my view is that with typical projects of this kind, you usually encounter your issues early, you resolve them, and after that it falls off quite fast, all right? So there's solid reason for optimism that the long-term Ironton economics could arrive sooner rather than later. That said, this is the inaugural technology plant; we have plenty of, shall we say, work ahead across the coming days or coming months, and we'll be in a position to give the market a better update over the next several quarters regarding where we are on the long-term outlook.

Thomas Boyes

analyst
#45

Understood. Is there any way you could group those, or maybe suggest a share, regarding which of those 3 long-term goals you figure gives you the biggest advantage for reaching that long-term model?

Dustin Olson

executive
#46

The factor we're paying the closest attention to, I'd say, is variable costs, all right? Once we get the facility up and begin drawing electricity and firing up our boilers to produce steam, we'll find that out really fast; and my guess is this becomes something we discuss quite a bit down the road.

Thomas Boyes

analyst
#47

Understood. Then, if we revisit the 3Q presentation, you brought up the items with lengthy lead times, and I think that was at 90 weeks. Has that gotten any better? Or have the funds you allocated for Augusta in 4Q locked in those items? And as a possible signal, what sort of timeline should we expect for Augusta to start ramping up?

Dustin Olson

executive
#48

Right. So every one of the essential long-lead pieces of equipment has been bought; and these are — not every single one, but the initial tier of long-lead equipment has been bought, all right? That covers items such as our extruders, our vessels, those kinds of things that are heavily engineered and require time to manufacture and ship. And you truly need to be in the workflow queue. So securing your place in line to accomplish that matters. That has been handled. And in fact, equipment is beginning to arrive at our Beaumont facility and is being prepped for build, all right? We are now moving into what I'd term Tier 2 long-lead items, which means we — as soon as we gain clarity and closure with the AEDA regarding the forbearance, and we fully give the greenlight for this project to proceed, it will launch the project at full steam. And the biggest bottleneck at that stage will be our utility plant. So we expect an 18-month, 18- to 20-month window for our utility plant to be started and then completed; and therefore I believe we're working toward a — I'd say that is likely the latest possible date for our whole project, which is to get the entire plant constructed within the utility plant, and the utility plant will begin once the AEDA is closed.

Thomas Boyes

analyst
#49

Great, thank you. Perhaps just one more thing. I wanted to ask about what we should expect in terms of cash burn. Since there could be higher interest expenses tied to the revolver you're pulling from, if you end up drawing on it, and that combines with corporate OpEx — because my understanding is that the Ironton economics determine the corporate overhead tied specifically to that plant. So I'm essentially trying to figure out a general burn rate?

Larry Somma

executive
#50

In the past, we've described burn as being about $5 million to $6 million each month, and that figure covered every operating cost tied to Ironton. After Ironton is up and running, you'd anticipate our burn landing somewhere between 3 and 3.5 at the corporate overhead level. Naturally, that number will shift based on which strategic initiatives are underway. So that gives you the burn figure. Beyond that, we're being extremely cautious regarding the commitments we take on to keep advancing parts of the Augusta project, as Dustin just referenced, since we don't want to move too far ahead of ourselves. We need to confirm we have the proper long-term financing lined up, as I mentioned earlier — we won't be drawing sizable amounts from the Sylebra line in order to fund big equipment purchases for Augusta. That simply isn't sensible, and it's not the purpose that line was designed for.

Dustin Olson

executive
#51

Thomas, one more thing I want to mention: once you take the Ironton cost structure out of the corporate burn, what's left within that remaining burn — the 3 to 3.5 that Larry brought up — also covers the project staff needed to advance the Augusta project, all right? So as we bring the project to completion, we have funding secured for it, and additional corporate overhead burn will shift over to that project too, which will bring the number down even more, okay? So at this point, corporate overhead is supporting the whole company — everything for Ironton, everything for Augusta, and everything for the JVs. And as financing comes together for those projects, the overall corporate overhead burn will keep going down.

Hassan Ahmed

analyst
#52

I really do appreciate how much information you've shared — it's extremely useful, especially at this point in the project. I just wanted to explore a little further the unit economics you've laid out, both in the Q4 update and in the 2023 budget presentation. In the past, you would describe pricing as roughly within a $0.90 a pound to $1 a pound band, and you'd describe EBITDA per pound as falling between $0.45 to $0.55 a pound. That implies EBITDA margins of 50% to 55%, correct? Turning to Ironton's EBITDA margins — you've indicated we'll reach 24% to 25% by the end of the year, and 34% excluding management fees, and I fully recognize that with optimization, that figure will climb back toward roughly 50%. That said, I'd like to devote some time to pricing, since the update references an assumption of $1.10 per pound, while the budget cites $1.26 per pound and calls that figure conservative. I'm attempting to reconcile these numbers, particularly around the pricing assumption and the EBITDA-per-pound assumption. A clarification on this would be very helpful.

Dustin Olson

executive
#53

Yeah, Hassan, that's a really good question. On the slide about Ironton's economics during the early-stage ramp compared with the new long-term view, there's an item listed under COGS labeled offtake breakdown. That refers to what it costs to move product from a railcar into trucks and boxes. What we didn't reflect on the revenue side is that this expense is also baked into revenue. So in the overall economics, it functions somewhat like a recycle stream. The offtake breakdown cost won't be ours to carry — it gets passed along to the customers. That figure of $1.26 to $1.28 we brought up is actually inflated, and the amount doing that is roughly $0.18 we've included for bulk breakdown, all right? Turning to what we discussed regarding $0.90 to $1, polypropylene pricing plays a huge role there, all right? That's why our consistent position has been somewhere in the neighborhood of $1 to $1.10, I believe, when it comes to what the product overall costs, and here's what we anticipate seeing eventually: first, when polypropylene prices climb, it's clear we'll earn more at Ironton. At the same time, the better we get at selling to value-oriented buyers, the more that lower-end tail of the curve will lift the top line too, all right? That brings two slides into view, I think. First, the Formerra relationship—we see it as very advantageous for both sides. Second, the product quality slide. Hassan, look closely at that product quality slide and you'll find real benefits our product offers that the market, frankly, isn't pricing in today. Nobody is paying us extra because our material smells less than virgin resin. They aren't giving us a premium for colorability either, right? So when you take all 4 of those components together, once the market actually sees what this product is capable of, recognizes the true quality we have, and begins demonstrating that and applying it in their own applications, our belief is that the enthusiasm surrounding what we're doing will keep building and building, okay? That's why we're incredibly excited about where product pricing is headed on our end, because we see a superior product that we're on the verge of launching into the market. One more thing, Hassan, speaking personally on product pricing, I'm very enthusiastic about it, and this genuinely varies from one region to another. As we start forming ties in Japan, Korea, and Europe, we're noticing this pattern. Still, how much worth gets placed on sustainability, carbon credits, cutting greenhouse gases, and fossil fuel credits — every one of those spaces where we do really well — varies by degree. Right now, our product pricing doesn't capture that, okay? So I think there's a lot of room to grow. Of course, we're quite enthusiastic about it, but I do think there's substantial potential regarding where our company's product pricing heads down the road.

Hassan Ahmed

analyst
#54

That's really useful. As a follow-up, regarding the feedstock side, I mean, past Ironton, could you discuss a little how your talks are progressing concerning costs tied to feedstock and also feedstock availability? And this is, as I mentioned before, past what we intend.

Dustin Olson

executive
#55

Yeah. That's a solid question, Hassan. Keep in mind, with the Augusta project, we've built sorting capability into the Feed PreP, which we consider critical to our broader strategy — not just so we can get access to larger amounts of feed, but also so we can get access to less expensive amounts of feed, alright? From that angle, we're definitely adding a piece to feedstock, let's say, performance, that will be improved through Augusta. Another thing I'd remind the team about, and we're beginning to observe it, is that we'll purchase feeds that others are unable to purchase, alright? Color doesn't matter to us. Odor doesn't matter to us. We don't care about the same kinds of contaminants that others do care about. That places us where we can buy better than others. And honestly, we aren't even using that muscle at this point. I mean right now we're operating the prep facilities at Ironton. We're figuring out how to buy. We're getting flow through the plants. We're figuring out how to operate the equipment at Ironton — the grinders, the shredders, the wash equipment — and all of that will build muscle that lets us buy better going forward.

Dustin Olson

executive
#56

Absolutely. I appreciate you making room for me today. It probably won't surprise you that things have been extremely hectic around here for the past 4 to 6 months. There were quite a few obstacles along the way, just as we mentioned during the prepared remarks, and we got through them; I'd also like to give another round of thanks to everyone at PureCycle and to our partners. What I mean is that this stretch has been extraordinarily difficult, and we've come out the other side. As we like to put it, our own future is now ours to shape, and we're eager to press ahead and deliver recycling to the world. Let me close with this thought. Everything that happened across the past 10 years has led us to this point. Your backing means a great deal to us. Our position is one we believe in, and our optimism about what lies ahead could not be greater. So thanks to each of you for your patience and for staying with us, and we're looking forward to speaking with you individually or on the next quarterly call. Thank you, everyone.

Operator

operator
#57

That brings us to the end of this call. We appreciate everyone for joining in. You're welcome to hang up now. Have a great remainder of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PureCycle Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to PureCycle Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PureCycle Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.