PureCycle Technologies, Inc. (PCT) Earnings Call Transcript & Summary

November 8, 2023

NASDAQ US Materials Chemicals earnings 57 min

Earnings Call Speaker Segments

Charlie Place

executive
#1

Thanks, Stacy. I'd like to welcome everyone to the conference call covering PureCycle Technologies' corporate update for the third quarter of 2023. My name is Charlie Place, and I serve as Director of Investor Relations at PureCycle. With me today are Dustin Olson, who is our Chief Executive Officer, and Larry Somma, our Chief Financial Officer. This morning, our focus will be on corporate developments from Q3 as well as events occurring after the quarter closed. You can find the presentation we'll be walking through on this call under the Investors tab at www.purecycle.com. A number of the remarks shared today are forward-looking, resting on management's beliefs and assumptions along with information available to management right now. Such statements carry known and unknown risks and uncertainties, and many of these could fall outside our control, including the ones laid out in our Safe harbor provisions for forward-looking statements, which appear at the end of our third quarter 2023 corporate update press release and in our quarterly report on Form 10-Q, plus other reports on file with the SEC that offer additional detail regarding risks tied to our business. Also, please be aware that the company's actual results could differ materially from what is anticipated, and unless the law requires it, we assume no obligation to update any forward-looking statement. Today's remarks might also contain preliminary non-GAAP estimates, which are subject to risks and uncertainties including, among other things, changes tied to quarter end and year-end adjustments. Any gap between PureCycle's actual results and the preliminary financial data described here could be material. You're welcome to follow along with our slide deck, or if you're on the phone, you can pull it up at any time on purecycle.com. We're eager to share updates from the last quarter with all of you. At this point I'll hand things over — hand it over to Dustin Olson, PureCycle's Chief Executive Officer. Dustin?

Dustin Olson

executive
#2

Thanks, Charlie. I appreciate everyone being on this call, and we're glad to walk you through a significant development today. The main thing we want to cover is what's happening at Ironton. Q3 proved difficult for Ironton, but the real operational strides we're achieving make me proud. We've adjusted to and gotten past a lot of startup obstacles that came at us, and we keep driving this project ahead. Utilities and solvent operations stand out as an area where we've moved forward, and those are essential for reliability. Without power and steam, nothing runs, and without correct solvent circulation control, nothing runs either. Across the last 4 months, we've advanced well, boosting how reliably both operations perform, and we expect that trend to keep going. Even with all the mechanical problems we'll get into, we managed to feed 410,000 pounds of feedstock into the purification system. That figure isn't what we'd hoped for initially, but it does prove our technology is capable of recycling substantial volumes of feedstock and taking out contaminants. Had we not limited our pelletizing capability, which I'll cover soon, that figure would have been far bigger. We keep learning and refining our process IP, and we're sure we can control and manage the system. Q3 saw limited production rates overall, yet we've demonstrated the ability to operate at high rate levels across our 3 operational steps: PreP, feed extrusion and product extrusion. After utilities and solvents ran dependably, we then increased feed rate. In those operating windows, we demonstrated these key operational rates: 14,000 pounds per hour of PreP feed rate, roughly 97% of nameplate; 9,400 pounds per hour of feed extruder flow rates, or 77% of nameplate — note, that came with just 1 extruder running, and we need to and plan to operate both extruders simultaneously; and 13,400 pounds per hour, or 109% of nameplate flow rates, on the final product extruder; these strongly suggest the system can hit nameplate rates, and once uptime gets better, we anticipate production rates rising exponentially. We've also kept broadening which feedstocks we can use. We've processed 4 different types of post-industrial recycled material, or PIR, across varying melt flow rates — 5, 10, 15, and 20 — and we've also run both PCT PreP Agglomerate, which is raffia and super sacks, plus flake made from post-consumer recycle waste. Beyond rate progress, we've made on-spec product successfully for our PIR and for assorted PIR/PCR blends. We keep testing different feedstock mixtures alongside product quality, so we can reliably and predictably supply offtake to our customers. Our first production shipments to Formerra last week and to Milliken this week recently confirmed that we're getting product to spec. Those shipments represent a crucial first step toward helping our customers reach their sustainability targets. A pretty positive surprise this quarter came from how we're doing on plant utility consumption, or variable cost. Across every operation at the site, we've been keeping a close eye on electricity and natural gas use, and it's quite clear that real power consumption runs well below what the preconstruction estimate originally assumed. It's still early in what we're learning, but the opportunity here has us encouraged; it keeps reinforcing the broader economics of the plant. On top of that, cheap feedstock prices right now, a competitive variable price and variable cost, plus differentiated pricing on our product, all back up a strong business model. Obviously, getting Ironton started up hasn't come without difficulties. Truthfully, when I look back at the past 12 months and recall every challenge this team has dealt with, I feel enormous pride alongside the frustration. The technical and operational resilience of our people makes me incredibly proud. The unforeseen design, installation, and operational setbacks we ran into were tough, frequently badly timed, and highly challenging from a technical standpoint, and yet the team kept pushing. Look, it's extremely hard for anyone outside to see within our bubble. And when technology is new, problems tend to take longer than anyone expects. We know our stakeholders can find it deeply frustrating while we troubleshoot these operational problems. Please know that everyone at PureCycle is dedicated to fixing these issues and sharing our wins. But keep in mind, our team needs a clear grasp, a resolution, and a way forward before we say anything to the outside market. The single biggest constraint on production has come from the adsorbent bed leaks, which caused bead contamination. I'll go deeper on this in the coming slides, but it has blocked us from making any meaningful production progress; we tried out a number of possible short-term fixes, yet ultimately none performed well enough. So now we're putting in an automated screen changer over the next 2 weeks, and we think that will dramatically alter the course of our operations. A screen changer is a standard piece of equipment, and it will let us automate bead removal and keep the pelletizer running nonstop. A few days ago, we began de-inventorying the unit to get ready for a shutdown expected to run 2 weeks. That outage matters greatly for reaching high rates. It doesn't just let us install an automatic screen changer — we also intend to use the downtime for a set of improvement projects targeting the less severe but just as annoying operational headaches. Ultimately, making product and making profit for our shareholders is our responsibility; I'm completely devoted to that. Once the outage wraps up, we'll bring production back on at 50% rates. Our aim is to push rates up, with the clear target of reaching 4.45 million pounds in December. For that effort, we've got a solid plan in place for feed and production. This progress we've witnessed — the process is functioning and functioning effectively — and we're eager to put the changes we've talked about into action. What shareholders should take away from this update is this: our technology delivers results; feed is being recycled by us, contaminants are being taken out, and on-spec product is reaching the system. Beads have slowed production rates, yet given this 2-week outage, our belief is that we're in a stronger spot to achieve robust production. Startups aren't simple; nobody ever thought this would be easy, but operational momentum keeps building on our end; additionally, we're genuinely enthusiastic about how good our product quality is. Early signs of success were favorable, and we covered those on earlier calls. Side-by-side looks of the pellets were shown in past presentations, and today we're producing on-spec material. Odor and color — both come across well for the PIR and PIR PCR mix feedstocks; furthermore, take note that commercial shipments of our on-spec material have been finished for both Formerra and Milliken. Their ongoing partnership means a lot to us, and we're eager about what they'll create using this material.

Dustin Olson

executive
#3

Looking at the lower-left image, you can observe what our PureCycle method extracts from the materials we feed in. That's our co-product #1. It consists of the contaminants that had been in those feedstocks. Its odor matches how terrible it appears, yet inquiries keep arriving from the market for this item across construction, roofing, and various base petrochemical uses. On the left, you see it flowing without restriction, while on the right, it's shown solid after cooling down. In my view, nothing demonstrates our technology functioning better than witnessing contaminants of such quality get taken out of what we feed in. There's a saying that the things you don't anticipate are what surprise and challenge you. That has definitely been true for this plant. Throughout my many years in polymers, I've seldom come across pelletization issues. They simply operate. No attention is required — you switch them on, and they keep going. When we shifted attention toward pellet production in August, we understood that removing construction debris from the extrusion system would be a routine aspect of things, and we understood it might block the die plate and restrict pelletization. So although the first pelletization attempt achieved only modest results, this was attributed to ongoing construction debris rather than seen as something out of the ordinary. Still, as days went by and pelletizer uptime failed to improve in any significant way, we figured the same kinds of adjustments to operating conditions were required to maintain consistent pelletizer operation. Yet with the issue continuing, we realized a deeper investigation was necessary. Since January 2, we've held 2 operational meetings daily, 7 days a week, in Ironton. And I recall 1 day in early September, with all of us looking at the circumstances and saying there has to be another factor at play; it simply should not be this difficult. Pelletizing ought to be the simple portion, among the most established sections of our process. Following an intensive troubleshooting push, we determined the central issue was adsorbent beads leaking. The underlying cause turned out to be an improper well procedure throughout our adsorber beds. After pinpointing the issue, we set to work fixing the beds, yet by then the beads had already tainted the downstream system. We assumed the issue would be brief; we assumed purging the system could clear out the beads. However, each time we altered feed melt flow index or feed rate, the beads appeared to return; we attempted to MacGyver a number of temporary fixes. Every one of those ideas was out of the ordinary, but we persisted in trying. The initial prototype proved most effective, though only at restricted feed rates of roughly 2 hours per day. The second prototype was created to extend its lifespan, but it failed to perform as we had hoped. The purging bin turned out to be a solid answer and let us purge a greater volume; it performed very effectively. A great deal of our longer-term problems got better, yet the beads simply refused to clear out at any decent speed. Words fail me when I try to describe how maddening it is to have a complicated system like this running, only to be held up by the very last and simplest step of the whole thing. Alongside all of that, we pushed extremely hard to locate and rush through an automated screen changer, and thanks to several creative engineers plus a truly strong collaboration with CrossbowFi, we managed to locate, design, and get that project ready for November. In our view, this is what will finally unlock the process and get production moving. Above all else, the screen changer has arrived on site, the engineering work is done, and completion of the project is set for November 22. Plenty of obstacles are behind us now. Slide 9 lists just a handful of the hurdles we have either already gotten past or plan to tackle while the outage is underway. A few main points stand out here. Numerous operational start-up problems got resolved. Each green check mark stands for hours, days, and weeks of effort and clever troubleshooting from our team, yet we kept going. Solid permanent fixes were identified, and these items no longer occupy our thoughts. Second, we have run the great majority of plant functions while the number of new items landing on the list has dropped considerably. Things will inevitably come up, but at this point we don't anticipate any long-lead problems with the plant. Finally, we are on the verge of resolving many persistent annoyances. The more obstacles we clear away, the stronger operations become. I genuinely devoted a fair amount of time to reflecting on where we stand. New technology is simply difficult. There is no easy path. The sole route to solving — the sole route by which we will solve and deliver better results for the planet, is through the hard work, commitment, and grit of our team. Our team's drive and resolve is an inspiration to me, and in my view it will in the end fuel our success over the long term. Although the screen changer counts as the most essential work taking place during this outage, every last project finished while the outage happens will boost how well and how reliably the plant operates. Stepping back and examining the larger items that hit us this year, they fall into 3 key buckets: delayed project closure at 5 to 6 months, seal leaks at 3 to 4 months, and screen leaks at 3 months. I don't want this update to become a deep technical discussion, but I feel it matters to mention a few of the vital fixes already in place. We have weathered several seal failures spread across 3 key seal systems, and every one of them called for a root-cause failure analysis so we could identify a fix and improve going forward. One fact about seals deserves remembering. The moment the correct fix is found, they operate for years. With each failure we experience, we deliver meaningful improvements. A number of these got overlooked when the initial design was done. Certain issues came from outside forces — the power outage stands out as a clear instance. In every instance, we gained knowledge, we made corrections, and we got better. Two months back, our mixer seal was swapped out, and it has operated with no trouble at all since then. Since the most recent upgrade, our Scheibel bottom pump has performed nicely, and following the outage, we anticipate the Scheibel mixer seal will perform nicely too. The question I hear constantly is whether we're improving. Yes. I say it with emphasis: yes. This slide illustrates the fundamental trajectory from our prior state to our current one. Tasks that once required weeks now require days; tasks that once required days now require minutes. Work that once required 3 people now requires 1; and work that once needed third-party support is now handled more effectively by our own team. I can state with complete certainty that each day brings improvement. Older issues are diminishing, and we address fresh issues as they arise. The count of fresh issues emerging has shrunk considerably, and we anticipate it will keep shrinking. All of us at our company, along with our core partners, are dedicated to making this succeed.

Dustin Olson

executive
#4

As we gain additional insight into Ironton and collect further operational specifics, while we keep moving forward with construction of our Antwerp site, I want to call attention to two essential elements of our life cycle analysis. To begin with, because of the lower utility consumption that early Ironton operations have shown, we are presenting roughly a 10% gain to every LCA for both Ironton and Antwerp. That figure is preliminary, and we will keep watching how things perform and update the market later. Second, take note of how Antwerp differs from Ironton. Being involved in the next-gen district in Antwerp has us thrilled. In Belgium, we already sense that we belong to the family and the community; yet even more significant is our enthusiasm for the plan, since situating our facility within the next-gen district allows for an energy footprint that is highly carbon favorable. The electricity we use will come from windmills, and the steam we use will be generated from bio hydrogen made by a neighboring operation. Once you put the advantages of the location together with the gains we are seeing at Ironton, the Antwerp facility is going to deliver excellent product with an extremely low carbon footprint. Now I would like to hand the presentation over to Larry Somma, our CFO.

Larry Somma

executive
#5

Thanks, Dustin. As we mentioned, Ironton was our main area of attention in Q3, though there were 2 significant financial items to bring up since the previous call. Although the revised bondholder agreement hasn't been executed yet, we do have one agreed upon in principle. We're quite near completion and anticipate wrapping it up during this week. In a moment, I'll go over the top-level terms. It's been a bit more than 2 months now, but I would be remiss if I didn't mention the capital raise we completed in Q3. Our green convertible bonds at 7.25% performed well in every respect; demand exceeded the offering multiple times over, the size was increased by $50 million, greenshoe included, and the 7.25% coupon landed at the bottom of the range we marketed. Even more significant is that the money brought in restored badly needed cash to our balance sheet, which will go toward covering a portion of the equity needs tied to our growth initiatives. Let's move to the following slide. The key result of this agreement is that PureCycle gets a 3-month extension on every milestone deadline. Plus, we'll put an extra $50 million into the Trustee account, and PCT gains another 3 months to remedy any milestone that might be missed prior to an event of default being set off. PureCycle can also sweep the interest income accumulating on the $150 million of cash collateral held in the Trustee and Liquidity Reserve accounts. On to the next slide. Here we present the effect of the convertible notes, which brought in $218.5 million in net proceeds. During the quarter, we kept moving forward with financing plans for certain PreP sortation equipment, generating an additional $2.5 million in proceeds. Our goal hasn't changed: supply enough capital to push our strategic initiatives forward while giving ourselves the time required to carry out a capital-efficient project financing plan for Augusta. We closed the quarter with slightly more than $211 million in unrestricted liquidity. Cash outflows went toward continued PreP equipment purchases and funding our Augusta project. Cash used for corporate and preoperational employees came to $7.7 million in the quarter, which includes certain stock compensation taxes that were paid. We spent $23 million in cash during the quarter on ongoing corporate and Ironton operations; that covers items such as legal and professional services, repairs and maintenance, utilities, feedstock, finance expenses, property leases, storage, and assorted other things. Lastly, once the second limited waiver is executed, we'll need to move an extra $50 million out of unrestricted funds and into restricted funds. As a reminder, there's also a $150 million undrawn revolving line of credit we can tap. With that, I'll hand the call back to Dustin for his closing remarks.

Dustin Olson

executive
#6

Yes, Larry, thanks. At this stage, I believe we’d like to begin taking questions from everyone.

Jason Vernoff

analyst
#7

Jason Vernoff here, filling in for Noah Kaye. I've got a handful of questions about Ironton feedstock and yield. To start, regarding the 409,000 pounds of feedstock that went through the plant — you brought up a variety of feedstocks, but broadly speaking, how did virgin and recycled materials break down in terms of what was run through the facility? And then second, absent the pelletization bottleneck, what yield of finished products would you have gotten from that 409,000 pounds? Also, once operations restart at Ironton, which feedstock mix is the company intending to run for the rest of the year? And at 50% capacity, what finished product yield do you anticipate?

Dustin Olson

executive
#8

Okay. That's quite a few questions. Sure; when we kicked off operations at Ironton, we began with virgin feedstock at first, though we moved over to PIR pretty quickly. PIR has accounted for most of the production run through the system, and more recently, during the past couple of weeks, we've also fed multiple batches of post-consumer recycle into the plant. On yield, we've observed really strong yields throughout the plant. Let me walk through some of the figures. We've pelletized in excess of 100,000 pellets. As you may remember, in the various presentations we gave, we demonstrated product quality improving across those pelletization steps. Most of the earlier pelletization steps got recycled back around to boost quality, since construction debris is still contaminating the pellet. Fine. Another part of the mass balance to monitor involves purge versus feed. The feedstock we talked about in this presentation — we ran it through the whole process. Each step of purification was carried out to produce the final product at the end; however, immediately before the pelletizer, we purged a portion of material out while trying to get the beads out of the system. So purged material, in an effort to remove beads, accounts for the overwhelming bulk of the gap between 410,000 pound feed and 110,000 pounds of pellets. There are 2 additional questions you had. Would you mind asking those last 2 questions again? I believe one was about what we plan to do with the process coming out of the outage? Coming out of the outage, we've prepared a great deal of feed, okay? PreP operations are performing quite well. We've built up substantial inventory, both on-site and off-site, and our intention is that production after the outage ought to be effectively 100% PCR. We'll use a blend of agglomerate, which was produced on site at our PreP, and a PCR that's flake sourced from post-consumer recycle. You have to be — our plant is pretty flexible; we also have the ability to bring in external feeds. Additionally, depending on how the market looks—whether prices rise, fall, or we're dealing with distressed feedstocks—we'll probably buy feedstocks from outside as well, bringing them in to supplement the plant's operations in December.

Jason Vernoff

analyst
#9

Understood. Now, for my next question. A lot of the operational difficulties you mentioned tie back to how seals are designed or whether they're adequate. Could you talk about why you're confident these seal problems can be fixed for good, and that nothing basic about operating pressure and temperature or other core process parameters calls for a redesign?

Dustin Olson

executive
#10

Yes. I believe the main focus of that question is the seal on the Scheibel column. Yes, we have strong confidence in the Scheibel column seal. It's a problem from the early design stage that showed up when we started up, and we've essentially put in place a solution very much like the one we use for a couple of other mixtures in the process. As for temperature, pressure, and how the facility runs, well, the solvent circulation I brought up several times during the presentation is a crucial signal of our capacity to keep this process maintained and under control. Honestly, we handle temperature and pressure quite well throughout this operation, and the 97% uptime we cited in the slides demonstrates that. Regarding the candle filter specifically, there is no seal at all, no mechanical seal or mixing seal on a candle filter. So I'm not certain where that question is coming from. Still, the process from feed all the way through pelletization is performing very well.

Hassan Ahmed

analyst
#11

So, a short report was released not long ago — likely written by someone without a chemical engineering background, a kid in his 20s — and it raises doubts about several matters. I would really appreciate it if you folks could respond to those points. The recycling technology was the main item, first and foremost. This individual described it as just a pile of butane, which he says is what your solvent amounts to — correct? Since I come from a chemical engineering background myself, I'd like to believe there's significantly more to it than that. So let's begin there. Could you walk us through the technology once more? In other words, is it merely "a bunch of butane"?

Dustin Olson

executive
#12

Fine, let me briefly touch on that report, since honestly I don't believe it deserves much of our time. Every report of this kind contains a few strands of truth alongside certain claims that simply aren't accurate. It's a fact that we remain in ongoing litigation with Danon Blise. And within that report, there are numerous remarks regarding the issues we had concerning the engineering, the handling of materials, and the overall operation of that project. Largely, that reflects our view of where things stand with that litigation. That said, I would note that our team performed exceptionally well when they stepped in and helped bring the project to completion; but past that point, honestly, I have no idea where this information originated. Take the candle filters — they don't have a mechanical seal. Every unit operation in the process had the feedstock run through it. It isn't as though pellets went in at one end, final product came out the other, and Scheibal made it happen. As for the thermal imaging that displays 50 degrees, frankly, that demonstrates excellent insulation rather than a process unit that's down. And regarding safety, sure, every operation plan will carry safety concerns; however, safety sits at the center of everything we do — operating safely is our foremost and daily purpose. And honestly, one factor behind some of our schedule slippage is that we deliberately opted to proceed more slowly and with greater safety. As for what was said about butane, Hassan, I'm truly not going to delve into the specifics of our solvent, all right? What I can tell you is that the solvent plays a vital role in how the plant operates. The operating conditions, at a super critical temperature and pressure, matter enormously to whether our operation succeeds. And we're seeing truly strong performance from the solvent with respect to the polymer mixtures, as well as in the solvent extraction that removes contaminants. Hassan, when I consider the tech, I step back and ask myself, all right, how are we performing in that area? Okay. To start with, we've faced a massive number of mechanical problems that had to be worked through. A portion of that comes with the territory for any ordinary startup, and even more so for a technology in its first generation. Some of those difficulties existed right from the outset and required solutions, though we've been progressing past them. Still, looking at the technology overall, the blending of solvent and polymer is going extremely well. The extraction pump is doing an excellent job pulling containments out of the polymer. The polymer's phase change, allowing it to be filtered and purified within the adsorber bed, is also going extremely well. Then we reach the final stage of the process, where the solvent must be taken out of the polymer, and that step is proceeding very nicely too. Pelletization stands out as the sole step in this process that hasn't performed the way we anticipated. As you're aware, or perhaps aware, pelletization is typically quite simple. However, that small leak in the adsorber bed genuinely caused a major headache — at first it was hard to pin down, and after that, it proved tough to resolve for quite a while.

Hassan Ahmed

analyst
#13

Understood. My apologies for dwelling on this topic, but there was a different assertion brought up regarding environmental consequences, correct? What was stated is that the ecological footprint is comparable, perhaps even more detrimental, than making virgin polypropylene. Would you be able to speak to that point too?

Dustin Olson

executive
#14

Sure. Well, I'd say we possess numerous third-party studies along with substantial data indicating precisely the reverse. We have conducted several life cycle analyses demonstrating our product's true carbon footprint when compared against virgin polypropylene output, and both sets of findings independently corroborated each other, revealing a considerable decrease in carbon emissions for our offering relative to alternatives. That covers the first point. Next, regarding the ecological effects tied to the facility, we utilize a solvent purification setup that continuously recycles and reuses the solvent repeatedly. Consequently, the environmental consequences stemming from our location — specifically our Ironton site, are quite favorable. Finally, I want to emphasize again a few of the findings we've identified during Ironton's initial operational phase. You know, we made our best effort to project the utility demands needed to operate this plant. And we deliberately took a cautious approach. Yet once we actually ran the plants under different conditions and assembled a picture of the true energy consumption throughout the entire facility, it turns out significantly lower than we had anticipated; therefore I believe this will generate even more momentum for our operations, highlighting the beneficial environmental effects of our method. Also keep in mind, Hassan, and I think this ties back to the very question Jason posed about yield. What I mean is, this is a plastic to plastic recycling method. The plastic is not being destroyed by us. We aren't consuming catalysts or solvent. All we do is wash the molecule. As long as you're able to wash that molecule efficiently and eliminate the contaminants during the process, this fully circular plastic-to-plastic approach will be extremely well accepted by the market.

Eric Stine

analyst
#15

I'll keep it to two questions, actually. First, regarding the bondholder agreement — I'm just wondering whether that 2-week outage was factored into it, and whether you're confident it won't throw that process off track?

Dustin Olson

executive
#16

Yeah. I mean, look, as we were working through these items with the bondholders and figuring out various solutions, we anticipated that an outage would be needed at some point. We didn't know exactly when it would occur, but we managed to put the plan together and carry it out in November, and that positions us really well from Thanksgiving onward to hit the milestones. We're really excited that we can operate this plant without contamination, because every indication is that we'll be able to run it continuously at pretty high rates when we do; and that's our objective for December. In December, our objective is to get the plant running continuously at higher rates and reach the 4.45 million pound milestone that was set aside in the original agreement.

Eric Stine

analyst
#17

Got it. That helps. So perhaps, with every improvement step you've implemented here, when you carry those lessons over to additional sites, Augusta and past that, I'm just wondering how that affects capital expenditures. In other words, does that actually bring that figure down, considering a few of the fresh items or equipment pieces you need to add, or what's the right way to look at it?

Dustin Olson

executive
#18

Yeah. See, my view is that all of what we've figured out at Ironton is going to get used at each plant we build later, right? There's an enormous amount of operational knowledge we've gained — we understand the way the equipment ought to run, and that lets us get going quicker; we've also gained an enormous amount of knowledge about how the polymer behaves as it moves through the plant, and that will quite probably let us remove certain key unit operations at the facility, and that ought to deliver some extra cuts in CapEx; plus, as we expand, pick up more, and feed raw material into the plant, I believe we'll find chances either to raise throughput with fairly minor adjustments or none at all, or, like I mentioned earlier, bring CapEx down considerably at the plant.

Gerry Sweeney

analyst
#19

I have two questions, and I think they're fairly simple. I'd like to perhaps return to the topic of produced products. Based on what you've said, it seems you're quite at ease with how consistent and predictable the pellets are when different inputs are used. What I'm getting at is this: when various materials are fed in at varying ratios, are you confident that you can forecast and control the outputs at the levels and melt flows you're aiming for?

Dustin Olson

executive
#20

Yes, Gerry, that's our belief. I mean, we've introduced many different feeds. For us, validating the capacities of different equipment depends heavily on testing the various melt flow rates. As you'd expect, extruders behave quite differently at 5 versus 20. Beyond that, though, we've watched the product travel through the system, and we keep observing solid product quality at the end. So we're at ease with our capacity to produce what we set out to produce, along with the pelletizer delivering good quality.

Gerry Sweeney

analyst
#21

Great. Next, I don't know whether you'd care to address this on today's call, but I'll ask it anyway. Clearly, a few problems have come up. I'm aware of Danon Blise on the construction side. Well, at the finish everyone is always battling. But regarding certain matters, perhaps involving the Scheibel tower, my understanding is that some payments to Koch Modular were held back until specified production levels are reached. Is that arrangement — does it still apply? Or might some of these problems, along with the redesign, actually benefit you in a sense regarding those outstanding payments?

Dustin Olson

executive
#22

Well, I'll begin by talking about the relationship and the collaboration between us and Koch Modular. For quite some time, Koch Modular has been a robust partner, and that remains true. They keep personnel on site giving us continuous support, and they've played a key role in assisting us to work through many of these situations. As for the contract specifics — certainly, there will be consequences for how the performance measure and the performance payments are ultimately analyzed in full. What we're currently doing at the plant could, in certain cases, affect that broader framework. Still, I believe both firms are dedicated to resolving the issue, hitting the targets, getting to the performance milestone, and then handling the contract's closure.

Thomas Boyes

analyst
#23

Let me try to get at this from a more direct angle — the bead problems, what sort of run rate can that facility reach, or is it even able to reach one, before the take down happens? Would it be above that 50% run rate you're targeting by year-end? And I do appreciate the punch list you showed on Slide 9. Does it basically cover everything that has to happen to reach a 100% run rate? I'm just trying to gauge the relative risk involved in moving from 50% up to 100% across the coming couple of months.

Dustin Olson

executive
#24

Yes. Thomas, here's the thing. We've actually managed to hit fairly high rates throughout the plant. For instance, as I said regarding the feed extruder, we've reached 9,500 pounds per hour, while 12,200 pounds per hour is essentially the maximum. That works out to roughly 77%. On the final product extruder side, setting the beads aside, we've already managed to reach 110%, all right? Considering the volume passing through the system and what we've managed as the polymers travel through it, we're quite confident about our ability to reach very high rates plant-wide, above that 50% mark. So yes — what will December involve? We'll begin at 50%, then ramp toward 100%, possibly higher, and we'll see where we end up. As for that list of items, outages of this kind are extremely difficult to plan and coordinate, yet our team has been intensely focused on this for the past several weeks, and every item we show that carries, shall we say, a turnaround icon beside it is something we will finish while the outage is underway, all right? And they differ in how important they are — clearly, the single most critical thing at this plant is getting the screen changer operational, so we're rid of the bead headache. You can picture it: operating 2 hours a day, getting everything running, then shutting down 2 hours later — that simply isn't an effective way to operate a plant. Once the screen changer is in place, that issue disappears right away and entirely, all right? The remaining items on that list are, I'd describe them as, more subtle annoyances. The more you can simplify for an operator or, put another way, make harmless and something requiring no concern, the greater the reliability becomes. Many of those items never worked perfectly, though they did work acceptably, and we'll be able to eliminate them and make the operation far, far smoother.

Thomas Boyes

analyst
#25

Great. I truly value the detail you provided there. As a fast follow-up, or perhaps shifting to another subject, could you give us an update on where things stand with Augusta's financing? Are you still aiming to secure project debt for that plant at some point before the year wraps up? Or would you say it's likelier to happen in early 2024?

Larry Somma

executive
#26

Yes. Thomas, that's what we're aiming for. Everyone knows the market conditions are tough right now. However, the single most critical piece for any Augusta financing is going to be steady operations at Ironton. Once the outage ends, that will put us in a position to begin running at a consistent level. The moment that happens, we'll get moving — we already have a process in place, and a data room set up. We've held a great many conversations. So much of the difficult work has already been completed, though everything hinges on Ironton running consistently. So, to address what you asked, the more probable outcome is that it happens sometime in 2024.

Jeffrey Campbell

analyst
#27

Could you say more about the shift away from third-party PreP? Who handles PreP at this point? Also, is there any significant impact on anything—capital cost, how the system performs, operational costs?

Dustin Olson

executive
#28

Yeah, good question. No, no. What I meant by that remark is that when the equipment was first commissioned throughout the plant, we had the equipment vendors on site working with us to help operate it, learn it, and tune it. That process has now been taken over by us, and we handle it ourselves. And that applies really across extrusion, across PreP, across utilities. The way it works is you receive help at the start and then you begin handling it yourself; and at this point we're handling it ourselves. And honestly, once you assume control of an operation, you discover ways to optimize and make it even better. And that's what we're seeing in PreP.

Jeffrey Campbell

analyst
#29

All right, that's helpful context. Looking at today's discussion from a really broad perspective, it seems the ongoing ramp-up has led to a number of tweaks across the whole system, from the PreP operation you just brought up all the way through to the end product. Once everything is finished and performing exactly as intended, what sort of impact do you expect those lessons to have — how do you think they'll affect the build duration and the cost for the next system you build?

Dustin Olson

executive
#30

My view is that build time won't be affected enormously, all right? Generally speaking, other factors determine the construction schedule. That said, I believe there will be a huge effect on the final design overall, plus modest enhancements that carry into projects down the road; and I'm certain that when these facilities get started up, we'll do so with our eyes wide open. And with far greater clarity regarding how the operation can run, okay. Keep in mind, this marks the first occasion this process has ever been operated at scale; therefore essentially every unit operation is brand new, and it's being carried out for the first time; and going forward, the experience gained at Ironton will feed straight into the operational startup and commissioning phases, which means a meaningful cut in the time needed to reach full operation.

Jeffrey Campbell

analyst
#31

Correct. So in theory, reaching positive cash flow might come sooner. If I may pose something a bit…

Dustin Olson

executive
#32

Yes. To address that point in a more straightforward manner, my view is that the learnings we obtained won't have a significant effect on the project's construction phase. Yet I'm quite confident that in the future, commissioning and startup will move along at a considerably quicker pace.

Jeffrey Campbell

analyst
#33

All right. Great. That's a nice way of framing it. Could I pose one final question regarding Slide 12? It caught my attention that the DNV report concerning Antwerp formed part of the analysis, and especially when you factor in the carbon market, might there be any possibility that a facility in Antwerp could move ahead of Augusta as the facility following Ironton?

Dustin Olson

executive
#34

Yes. Look, I'd rather not comment too much on that report or on how they obtained their information; clearly, that isn't something we were making public or releasing to the market. But regarding the carbon side of the market, this is really a matter of regulation and legislation that I'm sure will emerge over the coming years, decades, since everyone will care about reducing carbon, and different regulatory frameworks, different nations, they'll adopt solutions they think are most effective at bringing carbon down. And whether that takes the form of a credit system or some kind of incentive mechanism, we don't know at this point. What we do have confidence in, though, is that we'll keep concentrating on improving efficiency at our plants, bringing energy utilization down at our plant and, as a result, our carbon footprint as well. That benefits us greatly on variable costs, and it also benefits us greatly when it comes to our carbon footprint. And should regulatory bodies in the future put systems in place through which credits are created, we'll be positioned best to capture those benefits; so I see that as a possible upside down the road that isn't clearly defined right now. But certainly a possible upside.

Brian Butler

analyst
#35

Great. Just the first one. When you think about the time before the shutdown, could you give us a little more information about how frequently operating incidents happened as it got closer? And about the screen you're adding, is there a backup plan if that doesn't work out? I mean, it sounds like you're very confident in it, but I'm just offering another possibility.

Dustin Olson

executive
#36

Well, let me start by saying that changing screens is very routine, okay? These are — this isn't some new technology. Screen changers are a standard piece of equipment across the industry — you'll find them on practically every plant worldwide. At Ironton, for example, we've got them installed on both our feed extruders and our additive extruders, and they perform very effectively, capturing a significant amount of contaminants. So we have strong confidence in our capability to pull the beads out. Beyond that, we're quite confident the beads will ultimately be eliminated. There are a couple of other efforts we're pursuing at the same time. One involves enhancing the internals of the adsorber column so that the chance of beads escaping is reduced. The other is examining the downstream filters connected to those adsorbers, which lets us make sure beads aren't able to pass through. When we were bringing things online, a significant escape of beads occurred within the system—countless thousands made their way in—yet even a small handful of beads is enough to create serious trouble. That difficulty simply persisted. Therefore, we're quite pleased that the screen changer addresses this matter, allowing us to reach continuous rates.

Brian Butler

analyst
#37

All right, and moving to the financial picture, could you describe the current monthly cash burn? And perhaps provide some detail regarding the expenses tied to the shutdown — how much additional does that contribute?

Dustin Olson

executive
#38

I'll address the shutdown's cost first. When it comes to the screen changer, that's an expense of $0.5 million to $1 million that must be paid. However, the remainder of the shutdown carries quite minimal cost, since it's largely labor and mostly metal works. As a result, from either an equipment or a materials standpoint, it's fairly low. My estimate is that the entire outage will come in under $2 million.

Larry Somma

executive
#39

Now, regarding your second point, Brian — our approach is to look at burn for the whole company, and then the whole company again but leaving out the Ironton operations plus the corporate allocation. I'll focus on that second figure since it's the one that matters most. So far, at TopCo, we've been carrying every bit of Ironton's cost. Yet once we're up and running and generating revenue — which is nearly upon us — we'll be in a position to assign both Ironton's cost and a related corporate allocation. Once you net that out, the burn at the corporate level comes to roughly $10 million each quarter. That, then, is the number I'd suggest we monitor, with all of Ironton and your corporate allocation stripped out. Also, we're obliged to file an Ironton budget submission by December 15; we'll get that done, and the market will learn more once it occurs.

Dustin Olson

executive
#40

Absolutely. We appreciate the time you’ve given us today, and we also appreciate how patient everyone has been while we get Ironton started up. We’re aware that Q3 was not what we were hoping for. And honestly, we feel a great deal of disappointment about the beads and about the circumstances we found ourselves in. Still, I believe it matters that we keep our attention on the direction we’re headed, all right? It feels as though each quarter we announce something larger and more thrilling. My sense is that in December, our entire focus will be on shipping the volumes spelled out under the agreement. We recognize that the screen changer is the essential equipment required for bringing this plant online successfully; and we have a plan to finish that work in November. The proper team is in place, we now possess the proper experience, and we have the assets within our control to accomplish what needs to be done, and we’re eager to demonstrate that to the market in December. We’re grateful for your time. We’re grateful that you’ve joined the PureCycle team and that you’re helping us create a pure planet.

Operator

operator
#41

We appreciate everyone joining us on this call today. That brings the program to an end. You are free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PureCycle Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to PureCycle Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PureCycle Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.