PureCycle Technologies, Inc. (PCT) Earnings Call Transcript & Summary
March 6, 2024
Earnings Call Speaker Segments
Christian Bruey
executiveOkay, thanks, Didi. I'd like to welcome everyone to the PureCycle Technologies conference call providing a corporate update for the fourth quarter and fiscal year that closed at the end of 2023. My name is Christian Bruey, and I handle Corporate Communications here at PureCycle. With me today are Dustin Olson, who serves as our Chief Executive Officer, and Jaime Vasquez, our Chief Financial Officer. During this morning's session, we're going to walk through our corporate progress for Q4 and the fiscal year ending in 2023. You can find the presentation we'll be referencing during this call under the Investor tab on our site, purecycle.com. A number of the comments we make today are forward-looking, resting on management's beliefs and assumptions along with information available to management right now. Such statements carry both known and unknown risks and uncertainties, and many of these sit outside our control. That includes the items laid out in our safe harbor provisions and forward-looking statements, which appear at the close of the fourth quarter 2023 corporate update press release we filed yesterday, in our annual report on Form 10-K filed this morning, and in other reports we have on file with the SEC that offer additional detail regarding risks tied to our business. Also, please be aware that the company's actual results could differ materially from what's anticipated, and unless the law requires it, we assume no duty to revise any forward-looking statements. Today's remarks might also contain preliminary non-GAAP estimates, which are subject to risks and uncertainties, including, among other things, adjustments connected to quarter end and year-end. Any gap between PureCycle's actual results and the preliminary financial data presented here could be material. You're welcome to follow along using our slide deck, or you can join by phone, and you can pull it up whenever you like at purecycle.com. We're eager to bring you updates from the quarter that just passed. At this point, I'll hand things over to Dustin Olson, PureCycle's Chief Executive Officer. Dustin?
Dustin Olson
executiveIt's great to be with all of you today; this morning we're in Ironton, Ohio, and we're eager to walk you through what we've achieved. That said, before we get going, I want to bring our new CFO, Jaime Vasquez, into the conversation. Jaime brings a deep resume. He arrives with substantial, directly relevant experience, and he's contributing value already. Jaime, please go ahead and tell everyone about yourself — the floor is yours.
Jaime Vasquez
executiveThanks, Dustin. I have to say, I'm genuinely thrilled to be part of this, and to be collaborating alongside such a capable and committed group. During my first 3 weeks at PureCycle, the teamwork, the way decisions get reasoned through, and how key priorities have been carried out have all really stood out to me. My 30 years spent in a range of finance positions, at publicly traded as well as industrial businesses, should, I think, dovetail nicely with what this strong team already brings. I'm eager to speak with plenty of you by phone before long.
Dustin Olson
executiveThanks for that intro, Jaime. Even more significant, though, is that you put on the jersey and became part of this team. I want to say how thrilled I am to have Jaime with us. His arrival at PureCycle comes with many years in the field, deep expertise in core finance, and experience steering through a range of fast-changing business settings in previous roles. Jaime is going to contribute a well-rounded perspective to the key decisions we make, which will support us in achieving solid business outcomes. Getting to know Jaime during these past few weeks has been a real pleasure, and I look forward to many years of working together; Ironton operations had a busy quarter. Once the screen changer was installed, we could for the first time build stronger end-to-end production, allowing us to watch the whole process operating as one; tangible gains are beginning to appear throughout every operation. Since the November outage, our focus has been solely on PCR grade feedstock, and that has let us finish commissioning every part of the operation. Although only 2 months have passed with no bead contaminations during operation, we have already hit many production milestones, reaching roughly 8,000 pounds per hour of end-to-end processing, successfully producing co-product 1 and 2, pelletizing at rates ranging from 9,000 to 10,000 pounds per hour, and successfully filling numerous railcars with pellets. And we accomplished all of that while using far fewer utilities than we had initially projected. Our end-to-end production is the metric that matters most; by that I mean we operate feed extruders at 8,000 pounds an hour, move the feed through the whole plant, generate both co-product 1 and co-product 2, and pelletize the resulting product at the end of the plan; this was not achievable before because we encountered lengthy bead plugging problems. The highlight of this new phase was observing co-product 1 and 2 being produced. I remain convinced that nothing demonstrates our process working better than witnessing these co-products being made. Keep in mind, although our task is producing ultrapure recycled resin, the way we do it is by taking out contaminants. So removing CP1 and CP2 is, in fact, essential for us to create our final product. On the commercial side, momentum is also beginning to show. We generated our first revenue via sales in Q4 and started sending samples of our product to customers for final application approval. Early results look favorable, and we anticipate this progress will keep going. As we get ready for the remainder of 2024, we plan to carry out a 2- to 4-week outage in early Q2 to push forward several reliability improvements. This brief halt in production ought to help put the facility in a position for better reliability. So PureCycle is moving into a different stage now. The plant has been commissioned, we've pinpointed the places where opportunities exist, and at this point we're shifting over to standard manufacturing practices — boosting reliability, fine-tuning the process, and generating improvements day by day. Our attention will be on the core operations so that we can reach higher continuous plant rates and produce more consistent product quality, which lets us get a superior product into customers' hands. Our progress across the last 6 to 12 months was solid, yet 2 critical challenges held back how fast we moved: seal failures and absorbent bed leaks. Diagnosing and resolving both of those took a substantial amount of time, and even more significantly, it stretched out our learning curve. Some parts of the operation stayed untested until continuous end-to-end operations could be established. The most recent 2 months have looked different. Operating in this mode let us try a broader range of PCR feedstocks, and each one carried its own distinct characteristics, plus rate test the plant up to the operational boundaries of every feedstock. Feedstock characteristics vary widely and demand process optimization. Those differences include things such as high and low melt flow indices, high-low concentrations of co-product 1 and 2, and numerous other minor behaviors that affect how the plant gets optimized; it also let us build stronger expertise in solvent purification. As we figure out how to run this commercial-scale facility, we're simultaneously demonstrating that we can solve new challenges daily. And through that, we're learning to operate this plant more and more reliably each day. In the end, how quickly we fold learnings into our operations has defined our success. Without question, new challenges will come with every new operational tier, yet that's typical of typical manufacturing operations, and the right team is in place to tackle the next challenge and hit our goals. Our metrics today aren't where we'd like them, but they keep improving; quarter-over-quarter progress has shown up across many of our key metrics. Pellet production is up 5x, from 200,000 pounds to 1.3 million pounds, with a single-day feed record of 102,000 pounds and a single day pelletization record of 144,000 pounds. Purge rates sit at 1/3 of last quarter, going from 70% to 22%. Purging is a technical term meaning our extruders aren't running efficiently; we're seeing steady and reliable increases in CP1 and CP2 production levels. In fact, once reliability improvements were implemented in January, our CP2 production rose from 16,000 pounds to 48,000 pounds between January and February. Since the November outage we've run exclusively on PCR, and we've tested numerous new feedstocks, both produced internally and produced externally. And our core support operations are hitting stronger reliability levels. Steam availability reached 99.8% in Q1, and our solvent circulation reliability climbed from 71% to 98% in Q1. Our overall uptime has been variable, but our daily production performance, when reliability problems aren't interfering, has been stronger. Our attention remains fixed on putting smaller reliability gains into place, and we also anticipate a stepwise jump once the scheduled outage has been completed. Day by day, the metrics keep getting better, and we allow data to steer what we do, influence how we behave, and assist us in improving. Where we stand does not please us, yet our team will not ease up. Everyone on our team looks forward to what lies ahead, not only because of the concrete progress, but also because of the lessons learned that we are now building into our base design. We are planning a modest outage of 2 to 4 weeks in Q2, which we believe will deliver a substantial favorable effect on how we operate. Several critical areas are what we intend to address while that outage takes place. Across the July and November outages, a number of critical upgrades were put in place by us. When this next outage comes, we will carry out additional upgrades to boost extraction efficiency and, as a result, also enhance recovery of co-product 1. Public disclosure regarding the co-product 2 discussion has already happened, and we will talk about it further at a later point, though the work we are doing here matters greatly for making settling performance better and for preparing the way toward CP2 removal. Filtration has proven to be a persistent reliability problem for us. It capped uptime throughout Q1, which had an effect on rates. Repeatedly, it left us with no choice but to halt and resume operations. Even so, a bypass line was successfully installed by us, and that raised uptime, yet additional time will be required while the outage is underway to clean the system so that operations can be brought back to baseline. Seals have been something we keep talking about and a challenge that keeps recurring.
Dustin Olson
executiveWe've already put in place multiple upgrades to our systems and enhanced how we monitor operations, and those are delivering better performance. That said, to reach the long-term results we're aiming for, we'll need to keep upgrading key seals throughout our facility. That work won't wrap up during the outage and will probably call for more activity down the road. Our digital foundation is quite solid; we have a platform that ought to let us capture long-term gains throughout the whole digital ecosystem. Even so, it has also been moody. We've addressed hundreds of programming glitches that needed fixing. And even though fixing them isn't expensive and things keep getting better, the toll on uptime has still been a challenge. We have a skilled digital team and we'll keep learning and improving, and every one of those lessons applies directly to growth projects ahead. Right now, co-product 2 stands as the main constraint. We're able to run feed through the system, purify it through extraction and produce co-product 1, settle it in the process and produce co-product 2, and pelletize the product; those core processes do work. What's limited, though, is the capacity to take CP2 out of the system. This isn't hurting our ability to produce CP2 — it's capping our ability to purge CP2 from the system; and in the end, that cap restricts how much rate we can push through the facility. Initially, we only anticipated making the granular form of CP2. But across the last 2 months, as we began running the plant with various feedstocks, we started producing lower density foam and higher density logs — which we refer to as dinosaur bones — along the way. That variation ends up conflicting with the original design and caps how efficiently we can remove it from the system. We have a few near-term fixes in mind. First, we'll keep pulling CP2 out manually through the trades at roughly 3,000 to 7,000 pounds per day. Second, we'll keep buying lower CP2 feedstocks so we can boost feed rates within the current removal capacity; and third, we're looking into a small project to flake-sort the material coming off the PreP wet line, so that more post-consumer curbside material can be processed. For the longer-term fix, we're drawing on commercial data to engineer a more robust, continuous operational asset. Early-stage construction and design work has already begun, and we intend to make critical tie-ins during the Q2 outage. In the end, our team is working to optimize the near-term options so we can bridge to a longer-term fix. This change will take time, and the final implementation ought to happen just after the Q2 outage wraps up. We don't anticipate the final implementation affecting plant production, since the critical time points will be installed during the outage. Our operations are getting better. At times it's a grind, but our team stays unwavering in its push to run the facility efficiently, reliably and consistently; it will take time, but we're making positive strides every day. The mission is what drives us. There's purpose behind everything we do, and we take pride in the difference we're making globally. As we scale toward robust operations, the core unit economics are also moving in a favorable direction. Of course, when you stack our unit economics against the projections from 3 to 5 years back, you'll find pluses and minuses, yet we see the overall effect as favorable. On the revenue side, demand for what we sell has come in above our initial expectations, while quality competition is in shorter supply. That holds for PureFive and for the other variants with higher color as well. On energy, consumption has come in below what we first projected. What we once labeled waste, we now refer to as co-products. Real appetite exists for alternative uses of this product, which turns what was a $0.04 per pound cost into a revenue stream today. Working against those gains, feedstock logistics costs have run above expectations, and SG&A cost has too; even so, the net effect is favorable, and as reliability keeps getting better, the economics will follow. Our energy performance makes us extremely proud. It delivers 2 key messages to the business and to shareholders. First, our overall variable cost ought to be lower and is projected to cut electricity and natural gas usage. That ought to translate into $2 million to $4 million per year in utility savings for the business; yet what excites us even more is the environmental benefit. Better energy performance ought to shrink our overall carbon footprint. This means, first, that producing our product should require under 1/2 the carbon compared with fossil-based equivalents made by others. Our customers can present their sustainable product to the market with greater confidence. And last, end consumers can once again feel good about the plastics they buy. There's still more work ahead, and these are preliminary estimates that ought to get external validation before long, yet the early data looks quite strong; this matters for our customer base. It sets us further apart from rivals and in the end strengthens the value proposition for sales. The net outcome is highly favorable for our business, for our customers, but above all, for our planet. Market response to our product is favorable because what we make is a genuine plastic-to-plastic solution with advantages other technologies can't match. Keep in mind, the majority of chemical recycling technologies yield a plastic-to-fuel solution with low yield, and the majority of mechanical recycling technologies mix feedstock into the process with only limited capacity to strip out internal contaminants. Ours is the sole commercial option capable of giving customers a genuine plastic-to-plastic solution with high yield, high quality and a low carbon footprint. We've produced product from both PIR and PCR, and although pellet output varied with color, even the variants with higher color see strong demand thanks to superior mechanical processing properties. Even though we'll always aim to make the product more consistent and boost quality throughout the feedstock mix, the truth is that end customers' desire for recycled material, combined with a big shortage of high-grade product, is driving robust demand for what PureCycle makes. Our team finds the first round of product testing genuinely thrilling. Across numerous customers, we're putting commercial products through testing so we can secure approval for long-term commercial supply. One particular use case deserves attention: fiber. Fiber comes about when you melt polypropylene and stretch it into lengthy strands. Picture it visually as being similar to dental floss. It goes into a great many, great many, great many uses — textiles, apparel such as watch bands, rugs, carpet, clothing — and it can even be molded into semi-rigid parts that add extra strength. All of that sounds great, yet it isn't the finest part of the story. Producing fiber out of fossil-based PP ranks among the hardest manufacturing uses within the polypropylene sector. Picture hundreds of continuous yards made up of separate long strands of this product racing through the plant at fast speeds and passing through numerous extremely advanced pieces of equipment. Then picture, too, the difficulties that arise whenever one single strand snaps mid-production.
Dustin Olson
executiveTraditional polypropylene recycling products struggle a great deal with this application, since CP1 and CP2 remain present in the mixture for the majority of these items. Once stretched to the surface, the inconsistent contaminant levels lead the strands to snap. Running PP fiber with recycled feedstock has simply not worked for the industry. I take real pride in displaying a spool of polypropylene fiber produced successfully from our purified material, along with the applications that this production will generate; here is one more powerful proof point that our product quality is superior even in the toughest applications, and that it serves as a sensible substitute for fossil-based alternatives. Another thrilling milestone in product development concerns the PureZero program's collaboration and our relationship with Churchill Containers. Churchill Containers leads in manufactured serviceware, and producing stadium cups for venues across the country is a key application lane. Under this partnership, Churchill has produced stadium cups using our commercially manufactured UPR resin at the Ironton facility. We anticipate that our PureZero partners will have these cups serving beverages of choice in stadiums down the road; that is genuine circularity. The chance to partner, the chance to team up with our PureZero partners and Churchill to bring about a real plastic-to-plastic circularity transformation, is precisely what the world seeks from our industry. For Ironton the path is clear, and we believe we are on the right path. Our attention will remain on operations here so we can reach higher continuous plant rates, deliver more consistent product quality, keep enhancing our product for customers to secure final commercial qualifications, and carry out the Q2 outage efficiently. Although today's focus is largely Ironton, we want you to know we are still working diligently alongside our partners to get our growth path ready. Every project sits in a somewhat different position, yet all share the primary focus: integrate Ironton learnings into the CapEx plan, find efficiencies that shrink the overall project stack, and prepare the engineering to ensure strong project deliveries. These efforts, together with the improved unit economics, ought to yield strong projects with dependable cost and schedule performance and excellent returns. With that, I hand the presentation over to Jaime Vasquez for a financial update.
Jaime Vasquez
executiveOkay, thanks, Dustin. We've got several financial points to go over, beginning on Slide 16, where you can see how unrestricted and restricted cash moved between the close of Q3 and the close of Q4. During that stretch, unrestricted cash fell by a bit less than $90 million. The biggest factor behind that swing was a $50 million bump in the general liquidity reserve, which was mandated under a second amendment to the Ironton revenue bond indenture, signed in early November '23. Operating and corporate-related costs came to $27.5 million in Q4, and once you adjust for severance tied to the December reduction in force we'd already announced, along with the timing of some payments, that expense level matched what we'd expected and what we saw in Q3. Now to Slide 17 — this isn't something that happened in Q4, but it's a really significant move that took place this week, which is why we're calling it out during our Q4 discussion. On March 5, we bought roughly 99% of the $249 million Southern Ohio Port Authority revenue bonds. That was a major step, because it essentially wiped out all restrictive covenants, letting us concentrate more effectively on resolving operational start-up difficulties by pursuing the solutions that serve Ironton's long-term interests, rather than operating the plant just to hit short-term volume targets and other near-term milestones. Beyond that, buying the bond ought to give the company approved cash cycles as we move toward commercialization via termination of the operating revenue escrow account; and we aren't retiring the revenue bonds. That leaves us the option to remarket revenue bonds when attractive opportunities arise, and we think they stay appealing thanks to their tax-free status and first priority lien on a valuable asset. Slide 18 lays out a pro forma liquidity change stemming from the bond purchase, based on our year-end '23 liquidity position. As you can see, the purchase drew on $74.5 million of unrestricted cash plus a little under $185 million of restricted funds — almost 75% of the total issue — that sat in revenue bond escrow accounts; and once again, we have a chance to strengthen liquidity by remarketing the revenue bonds. We're also pursuing the release of money still sitting in escrow, which includes a pro rata share of the debt service fund for the bonds we bought, and that might unlock roughly $20 million in liquidity. Finally, we raised the line of credit from $150 million up to $200 million to restore some liquidity following the bond repurchase. With that, I'll hand things back to Dustin.
Dustin Olson
executiveThanks, Jaime — the strides we've made during this quarter have us genuinely enthusiastic. Full production runs, start to finish, have been completed successfully at the main purification facilities, and we hit rates of 8,000 pounds per hour. At commercial scale, we turned out meaningful volumes of co-product 1 along with co-product 2, and a set of smaller initiatives was put in place successfully to lift our month-over-month output of co-product 2; commercial grade samples have gone out to our customers so they can give final application approval, and the feedback we've gotten on product quality has been strong. Nearly all of their Ironton revenue bonds have been bought back, which ought to give us a mechanism for extra liquidity, and preparations are underway for a Q2 outage that we anticipate will reshape how reliably our operations perform. Right now, I'd like to pass things to our moderator for the Q&A portion.
Gerry Sweeney
analystOkay, let's begin with CP2. Clearly, this appears to be the more significant obstacle you're dealing with. When you consider the engineering difficulties involved here, how hard is it to design a solution? I know you covered some specifics during the call, but it seems like a process with multiple steps. Still, on the whole, how tough do you expect it will be to get this finished?
Dustin Olson
executiveYeah. Good question there, Gerry. Well, the positive side is that CP2 is being produced through our process. The simple truth that we're making CP2 and it's reaching the lower section of our system proves definitively that the fundamental technology is functional. We've encountered various hurdles of this kind in other parts of the business, yet we've consistently managed to resolve them. That's normal when introducing new technology to the market; regarding CP2 specifically, it's a difficult technical issue, though we believe we've got a solid design answer ready, and we expect to develop that well during Q2.
Gerry Sweeney
analystUnderstood. And separately, you mentioned, I believe, going after certain feedstock with a smaller amount of CP2 in it. To be honest, I don't know precisely what co-product 2 actually is. But when it comes to that kind of supply chain, or being able to source PCR waste material containing less CP2, is that harder and more costly? Or what's our thinking there?
Dustin Olson
executiveRight. What I mean is, the CP2 we're mainly talking about here is polyethylene. As you collect polypropylene feedstocks from the marketplace, the bales arrive containing polyethylene contamination at differing levels. Consequently, the more polyethylene present in a bale, the greater the CP2 removal that's needed; so at this point, we're genuinely coming at this from several directions at once. First, we're hunting for products that already exist on the market and that we're able to buy. These are offered at a range of prices. Our view is that all of them still work within our purification economics; on top of that, we're enhancing how the existing CP2 removal operates, and we're evaluating a modest project aimed at essentially sorting the polyethylene out of the PreP material we've processed, which would let us lower how much CP2 goes into the feed.
Gerry Sweeney
analystUnderstood. All right. Still, it's fair to say there's a sufficient amount of raw material waste possessing CP2 traits that works in your favor and is available for you to secure, correct?
Dustin Olson
executiveThat's our view. What I'd say is, at this point we have a fairly solid feedstock network; we're continuously looking in new places for additional supply sources; and through the testing we did at the purification plant, we keep identifying more and more chances to introduce new feedstocks; so our expectation is that this won't become a long-term constraint.
Gerry Sweeney
analystUnderstood, that's really useful. Next, regarding SG&A, what ought we to keep in mind? One item that surprised me somewhat, and I can't tell whether it reflects a reporting change, was that R&D came in higher. SG&A, I believe, was roughly $29 million — don't quote me on that — for the quarter. And clearly, the fourth quarter had a lot of noise. If you would, what would make a sensible target run rate for SG&A? Thanks.
Dustin Olson
executiveSure. When we discuss SG&A in connection with unit economics, what we mean specifically is the share of corporate overhead devoted specifically to supporting Ironton operations; and we present that as somewhat above the figures we projected 3 to 5 years back. It's understandable why that occurred, considering the volatility and inflation worldwide throughout the last several years. That's the main cause. As for the broader corporate SG&A, this is something we consistently focus on. We're constantly seeking ways to optimize our overall cost position; that's simply sound business practice and something we monitor regularly.
Eric Stine
analystI'm interested in this. Could you share some details regarding the offtakers at Ironton? I realize that historically, and I understand why, you don't reveal much about particular contracts, but I'm just wondering. Within these offtake agreements, are there any dates set such that, should you fail to hit them, the customers have the option to exit the contract or to renegotiate it? I'm simply attempting to gauge the patience level of the customer or the ultimate offtakers, considering that Ironton has required more time than you would have preferred, and definitely more time than the customers would have preferred too?
Dustin Olson
executiveYes. Look, we perceive no issue in that area; demand for the product is very strong on our end. And every one of our main customers remains engaged, currently testing commercial scale products for the end-use application and prepared to accept volume at scale. Also, keep in mind, we possess a fairly solid customer portfolio thanks to the Augusta project. And a number of them likewise want to take early material from Ironton so they can kick off the sales process for themselves out of Augusta.
Eric Stine
analystUnderstood. Then, I suppose what I'd ask next is whether it truly hasn't had any effect on the pipeline for upcoming facilities either. What I mean is, I realize you clearly designed it to assist you when it comes to constructing those facilities, but is it causing zero harm with prospective buyers?
Dustin Olson
executiveNo, not at all. Actually, I'd describe it as the exact reverse. The commercial offering we made from Ironton has heightened the desire for what we sell. Through the Formerra agreement and via our distribution network, plenty of fresh clients are putting our product to the test; and what they're finding is quite encouraging. That's why they come back to us so fast for, say, sales to new clients within the portfolio that's already robust.
Eric Stine
analystUnderstood. That's good to hear; and perhaps to verify one thing, then I have a question. So, as I recall, during Q4 you turned out 200,000 pounds of pellets — was that right? And did you mention, I think the figure was 1.3 million pounds? I'm just wondering, does that cover the quarter so far? In other words, is it a running total? I assume that comes first.
Jaime Vasquez
executiveRight. As far as I know, that output figure covers the quarter so far. Let me pull up the figure here. It covers the quarter so far. Yes, the 1.2 million covers the quarter so far.
Eric Stine
analystUnderstood; and now for my next question, it's excellent news that meeting the milestones is no longer required as specified...
Dustin Olson
executiveEric, let me clear up one part of what you asked. You said 1.3 million, yet the slide displayed 1.1 million. So quarter-to-date it's 1.1 million pounds.
Eric Stine
analystOkay, understood. All right, so I suppose my point was simply that it's a positive that the deadlines spelled out in the bondholder agreement aren't binding on you; still, I'm wondering where things currently stand and how you're feeling about it — clearly you're continuing to pursue those milestones en route to eventual commercial output at scale. So, do you have a view, or would you be open to sharing, on when you expect to reach that 4.5 million pound mark on the path toward 9 million? And I believe included in that is the objective of 7-day continuous production as well.
Dustin Olson
executiveYes. It won't surprise you that when you're dealing with a brand-new technology, operating the equipment for the very first time, forecasting the S-curve for production is extremely hard, all right? Rather than concentrating on particular milestones, our emphasis is on improving a little bit each day. Every day we'll keep seeing production get better. And occasionally, we'll experience step change improvements. The outage we've scheduled for Q2 strikes us as a fairly significant juncture, since during the continuous runs of the past couple of months, we identified new items requiring attention. We've engineered them; we're prepared to put them in place, and we're confident they'll deliver operational improvements once the outage is over; so a difficult aspect of the bond was being so fixated on the milestone that at times you lost sight of the fundamentals that actually get you there. At this point we're highly focused on establishing the proper foundation for the plant so that we can build the facility's long-term productivity.
Christian Bruey
executiveWe also asked for questions through our press releases — this is Christian Bruey once more — through the email address investorquestions@purecycle.com, and we hoped to address a handful of them. The initial one comes from Vishal Bakshi of Morgan Stanley. Dustin, in your earlier updates, you said you had processed a range of feedstocks in order to probe what your technology could handle. Once the co-product 2 remedy you intend to make in Q2 is done, how sure are you that you'll be able to process a wide variety of feedstocks? Or do you expect difficulties over the long haul regarding availability, in the sense of being constrained on what you can put in?
Dustin Olson
executiveAbsolutely. Thanks for asking that, Vishal. I believe it's crucial to keep in mind how big the opportunity is that we're pursuing here. Feeds numbering in the billions of pounds are out there for the taking. The main feeds for Ironton have already been run — conventionally raffia, plus post-consumer curbside rigids — and both came through successfully. So when it comes to whether feed will be available, I have no worry whatsoever. Those 2 key streams by themselves offer more than enough feed to fill Ironton. That said, I also want to remind everyone that our technology lets us purchase what other players are unable to. Since our core process cleans the molecule from the inside outward, we're able to buy materials that others simply can't. As a result, I expect there will always be a cycle of testing around feedstocks, allowing us to discover newer and newer feeds that open up newer economic opportunities for us. Still, when it comes to the base load for Ironton and Augusta and our early projects, I believe we have plenty of feed to accomplish what we need to do.
Christian Bruey
executiveJames Graham sent in the question that came after that one. You brought up sampling — but has anything real actually been manufactured using resin from the commercial plant? If yes, what items would those be?
Dustin Olson
executiveYeah, so I believe going through how projects get qualified at facilities such as this one matters; we've actually produced goods. Those are visible in the earnings packet. Commercial-scale production hasn't happened yet, since the initial stage involves trying them out in the operations to observe how they perform prior to assigning bigger volumes to that operation. After they make it through that first round of testing, they'll then be ramped up for commercial sales; and this is happening on several fronts with several customers.
Christian Bruey
executiveThen we'll take a question from Spencer Moore. If you've already managed to clear the beads out of the system, do you still need the screen changer?
Dustin Olson
executiveSure, possibly not much, though a slight effect might exist. Keep in mind that the screen changer actually serves 2 distinct functions. The first one involves taking out those initial beads that introduce contamination into the system; and I have to say, after what happened with the November outage, we managed to accomplish that, and accomplish it well. It ended up taking more time than we had anticipated, since the quantity of beads present in the system was greater than our estimate, yet that let us recover and get running again. However, after those beads are cleared out, an opportunity will remain for employing the screen changer as something like a last-stage filtration method for the product; and quite frequently that yields a beneficial effect on color and opacity.
Christian Bruey
executiveJohn David submitted a pair of inquiries. Regarding the initial one, where do things currently stand with Augusta?
Dustin Olson
executiveAbsolutely. I should say, the direction we have for Augusta has us genuinely enthusiastic. We've pulled back quite a bit and reestablished our foundational engineering work alongside KBR. As a partner in figuring out smarter ways to design our core facilities, they're proving extremely valuable. On top of that, we're folding in everything we learned at Ironton as part of that engineering effort. And keep in mind, a considerable sum — roughly $85 million — has already gone out for preconstruction, engineering, and long lead purchases. So that project continues to advance at full speed.
Christian Bruey
executiveJohn’s second question is whether the market’s expected price for PureCycle’s resin has moved since our 2023 discussion. Quarter to date, that figure stands at £1.9 million.
Dustin Olson
executiveYeah. So, pricing in the market is something that shifts constantly, and it's a pretty fluid topic. Most likely, we won't get into specifics regarding price points for what PureCycle offers. What I'd say matters here is that demand from customers is really robust, and it spans a lot of different application lanes. When you look at Ironton and Augusta running at their maximum rates, that's still just a tiny share of output, and only a modest piece of the sustainability pledges that even our main customers have made. So there's plenty of runway in front of us; we haven't put the whole market to the test. We'll be doing that as we keep trying out new applications for our process.
Christian Bruey
executiveThe last email question is from Michael Grass. So considering the higher output mentioned and the remarks about strong demand for the product, what would the revenue outlook be for Q1 of 2024?
Jaime Vasquez
executiveHonestly, we feel quite positive regarding where this business's fundamentals are headed. And coming out of that Q2 outage, I'd say that positive feeling will carry forward. That said, at this moment we're not looking to establish a precedent by giving guidance mid-quarter. What matters most, though, is what Dustin mentioned during the presentation — those original economics are something we feel really good about.
Christian Bruey
executiveThose were every one of the questions sent in by e-mail. Now I'll hand things back to Didi.
Dustin Olson
executiveI appreciate all of you taking the time today and setting aside your valuable time for our company and what we do. For PureCycle, this week carries a lot of weight. And honestly, I have never felt more enthusiastic about how far we've come, what we're capable of, and what lies ahead. Thank you for being here today, for putting your faith in what PureCycle is trying to accomplish and in the people on our team. We can't wait to welcome you tomorrow at our Ironton Showcase Day.
Operator
operatorThis concludes today's conference call. Thank you for participating, and you may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PureCycle Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PureCycle Technologies, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PureCycle Technologies, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.