PPL Corporation (PPL) Earnings Call Transcript & Summary
November 6, 2026
What were the key takeaways from PPL Corporation's November 6, 2026 earnings call?
In the third quarter of 2026, PPL Corporation reported GAAP earnings of $0.49 per share, an increase from $0.43 per share in Q3 2025. The company raised its long-term annual EPS growth target to 7% to 9% through at least 2030, driven by a new capital plan totaling $25 billion, which supports a 10% compound annual rate base growth from 2026 through 2030. Management narrowed its 2026 ongoing earnings forecast range to $1.92 to $1.96 per share, indicating confidence in achieving at least the midpoint of $1.94 per share.
What topics did PPL Corporation cover?
- Long-term Growth Outlook: PPL raised its long-term annual EPS growth target to 7% to 9% through at least 2030, with expectations to be in the top half of that range starting in 2027. Management stated, "Our investments across our regulated businesses, combined with continued economic development in our service territories, give us even greater confidence in PPL's growth profile."
- Capital Investment Plan: The updated capital plan totals $25 billion from 2027 through 2030, supporting a 10% compound annual rate base growth. Management noted, "Our base capital plan is $2 billion more than the prior plan, primarily from an additional CCGT in Kentucky."
- NVIDIA Collaboration Announcement: PPL announced a collaboration with NVIDIA for approximately 2 gigawatts of generation capacity in Pennsylvania, which is expected to enhance long-term growth. This was described as "a significant milestone for Invidium and an important step toward converting strong customer demand into tangible generation projects."
- Regulatory Updates: PPL received a partial approval for a rate case in Kentucky, resulting in an additional $7 million in annual revenues. The company also reported a $138 million annual revenue increase in Rhode Island following a base rate review, indicating positive regulatory engagement.
- Cost Discipline: PPL is maintaining a low O&M growth rate of approximately 0.5% annually through 2030, reflecting strong cost management. Management emphasized, "We've worked hard over the last several years... to find efficiencies across the organization."
What were PPL Corporation's November 6, 2026 results?
- GAAP Earnings Per Share: $0.49
- Ongoing Earnings Per Share: $0.54
- 2026 Ongoing Earnings Forecast: $1.92 to $1.96
- Rate Base Growth: 10%
- Annual Revenue Increase in Kentucky: $7 million
- Annual Revenue Increase in Rhode Island: $138 million
PPL's strong third quarter performance and revised growth outlook position the company favorably for future investment. The collaboration with NVIDIA and the substantial capital investment plan are key catalysts for growth, while regulatory engagements and cost discipline support the investment thesis. Investors should monitor the execution of the capital plan and the impact of regulatory developments in Pennsylvania and Kentucky.
Earnings Call Speaker Segments
Andy Ludwig
executiveGood morning, everyone, and thanks for being with us for PPL Corporation's investor update covering the third quarter; the presentation materials are available on the Investor section of our website. Vince Sorgi, PPL's President and CEO, and Joe Bergstein, our Chief Financial Officer, will be speaking this morning. After our prepared remarks, we'll wrap up with a Q&A session. Before we begin, please turn to slide two, where you'll find our cautionary statement. This presentation includes forward-looking statements that carry risks and uncertainties. Actual results could differ materially. For additional information, please see our SEC filings and the appendix. We'll also discuss non-GAAP measures, among them earnings from ongoing operations. Reconciliations to the corresponding GAAP measures appear in the appendix. With that, I'll hand the call over to Vince.
Vince Sorgi
executiveThank you, Andy, and hello to everyone joining us this morning. Turning to slide four, I'd like to open with the key takeaways for today: solid operational performance, an improved baseline growth forecast, and a well-defined route to substantial value creation—including the Invitium and QTS news we shared today. During the third quarter, we delivered on our commitments to shareholders with strong execution, and Joe will walk through our 2026 results in detail shortly. We also refreshed our business plan as of today, and it points to an even more robust long-term picture. The capital we're deploying throughout our regulated operations, combined with ongoing economic development across the areas we serve, leaves us more confident than ever in PPL's growth trajectory. So because of that, we're increasing and pushing out our long-term yearly EPS growth goal to 7%-9% through at least 2030, and we expect growth in the upper half of that raised range every year starting in 2027. Our fresh capital plan comes to $25 billion from 2027 through 2030, which supports 10% compound annual rate base growth from 2026 through 2030. What matters here is affordability: the added investment behind our stronger growth outlook should be covered mainly by the big load customers who are driving those investments, not by our current customers. On top of the stronger base plan, we keep seeing meaningful medium- to long-term opportunities. Looking ahead to 2032, we could see total additional capital investment opportunities of $12 billion to $16 billion. That figure includes further regulated generation investment in Kentucky, which is needed to keep up with ongoing growth in potential demand. Of that total, $6 billion to $7 billion represents incremental investment opportunity through 2032, and within that, $3.5 billion to $4.5 billion comes through 2030. On its own, this investment opportunity provides meaningful upside that could lift our EPS CAGR above 9% through 2030. Beyond that, we expect at least $6 billion to $9 billion in potential future investment from Invitium Energy through 2032. These amounts are stated at PPL's 51% ownership share and are based on 5 GW of executed reservation agreements for combined cycle natural gas turbines. When we talk about those investment opportunities, bridge-type solutions like fuel cells or battery storage aren't included. Invitium Energy also offers substantial potential value for shareowners. Turning our attention to Invitium Energy, we're happy to report that Invitium and QTS have reached an agreement to work together on roughly 2 GW of generation capacity in Pennsylvania, and I'll go into more detail on that on the next slide. For Invitium, this marks a significant milestone and an important step in turning strong customer demand into concrete generation projects. Equally important, these projects help satisfy growing energy demand while also reinforcing the PJM grid and supporting energy affordability over the long term. Our updated business plan does not include any financial impacts from Invitium, including the QTS announcement. Moving to slide five, we can share a few more specifics regarding the Invitium Energy announcement. Invitium has signed a letter of intent with QTS to serve as its generation solution provider across parts of Pennsylvania. Under this LOI, QTS and our company have agreed on all major commercial terms for approximately 2 GW of generating capacity tied to the Salem Township Data Center project, with an initial 20-year term allowing multiple five-year extensions. Additionally, a cost reimbursement agreement has been executed, which provides us with reimbursement and safeguards against risk on specific development costs and commitments in the event that certain approvals and development conditions are not satisfied. The plan for generation includes a pair of combined cycle natural gas facilities, along with fuel cells and battery energy storage, or BESS, and how the mix will ultimately divide between fuel cells and BESS is still under review. Using current cost estimates of $2,500 to $3,500 per KW, 2 GW of generation would come to about $5 billion to $7 billion in total project investment, and PPL's 51% portion of that is roughly $2.5 billion to $3.5 billion. The fuel cell and BESS capacity could be operating as early as 2029, while the combined cycle plants are expected to be running in 2032 and 2033; that arrangement aligns with the White House's Ratepayer Protection Pledge and with Governor Shapiro's clean and firm energy requirements under Pennsylvania's grid standards. This kind of structure gives you a risk profile that looks a lot like regulated assets, and it's built to generate long-term earnings and cash flows that are steady, predictable, and growing. There's a fixed monthly payment that steps up each year, and that covers the return of capital as well as the return on it, plus fixed operating costs. Fuel and the other costs of running the plants are covered by variable payments whenever the plants are operating. On top of that, the ultimate data center customer has to meet minimum credit ratings or provide credit support, and that reduces counterparty credit risk. In summary, by pairing the key commercial terms we negotiated with the cost reimbursement agreement, we create a solid basis for investing with discipline, achieving appealing long-term returns, and generating substantial growth while maintaining suitable safeguards against risk—and it brings roughly 2 GW of new generation to Pennsylvania. This demonstrates how strong the platform we are constructing is and the increasing momentum at Invitium Energy, which is currently in active talks with several counterparties about further generation projects in Pennsylvania. Turning to slide six, this slide illustrates where the updated plan departs from our earlier plan and, just as importantly, which elements remain unchanged. To start, the key adjustment is a 100 basis point raise to our yearly EPS growth objective; that expansion is supported by a bigger investment initiative, financed primarily through our large load customers. Compared with the earlier plan, our base capital plan is $2 billion larger, largely due to one more CCGT in Kentucky. Rate base CAGR over the plan period remains near 10%; we are likewise maintaining rigorous cost control, with overall planned O&M growth of about 0.5% annually through 2030 for our customers' benefit. Our financial footing also remains solid. We're still targeting an FFO-to-debt ratio in the 16% to 18% range, and the plan has our credit metrics moving up toward the middle of that band as the plan period unfolds. On the dividend, our commitment is unchanged as well. While we fund a substantial CapEx plan, we're shooting for the low end of the 4% to 6% annual dividend growth range. The takeaway is this: the growth outlook in front of us is stronger, we stay focused on keeping things affordable and efficient for customers, and we're bringing the same financial discipline that you've come to expect from us. On top of the strong base plan, the additional capital investment opportunities I mentioned are on the table, coming from the potential for more Kentucky generation and Invitium Energy. Turning to slide seven, here's a brief regulatory update. Kentucky's Public Service Commission has partially approved the reconsideration we filed concerning its decision in the 2025 rate cases for LG&E and KU. Several portions of our request got the green light from the commission, adding $7 million in yearly revenues; in total, LG&E and KU received approval for an aggregate increase of about $240 million in annual electric and gas revenues. Even though the commission did approve part of our reconsideration request, it declined to approve the sharing mechanism that would have allowed us to stay out through 2028. Because of that, LG&E and KU plan to submit base rate cases over the coming months. Meanwhile, in Rhode Island, fresh base rates went into force on September 1st, after the commission signed off on a $138 million yearly revenue boost—the first base rate review for Rhode Island Energy since 2017. That ruling is a favorable result that backs our capital plan for upgrading the state’s electric and gas networks.
Vince Sorgi
executiveWe likewise managed to secure a settlement that addresses our hold harmless obligation, and under that agreement our electric and gas customers will receive $163 million in bill credits from October 2026 through September 2027. For customers, those credits mean real savings during the winter heating season and assist in offsetting base rate increases. The Rhode Island PUC did approve a rise in annual revenues, but the second-year revenue increase we sought was not approved. Given that, Rhode Island Energy plans to file a further rate case as soon as next year. Keep in mind that the rate case settlement for PPL Electric went into effect on July 1st, and the result proved favorable for both customers and share owners. The $275 million increase that was approved supported the essential investments we're making, and it works out to an increase of under 4% across all our rate classes. That settlement also included a provision barring further rate changes for two years, although we anticipate staying out beyond that two-year period agreed to in the settlement. No matter which jurisdiction we operate in, our focus remains consistent: we invest responsibly in the infrastructure needed to support reliability and economic growth, we engage constructively with regulators, and we maintain a strong emphasis on affordability for our customers. If you turn to slide eight, it covers customer affordability. Ensuring customer bills stay affordable remains one of our highest priorities, and it influences how we operate our business and execute our plan. Because regulators have delivered favorable decisions and we keep a steady focus on running lean, the typical household bill at every one of our utilities has stayed under the comparable state or regional benchmark. The share of those bills that falls under our control sits roughly 10% beneath the statewide averages where we operate. In Rhode Island, we come in around 16% under the remainder of New England, and we anticipate that pattern will hold, even once the results of our recent rate case outcomes are factored in. Just as important, we are ensuring that growth itself covers the cost of growth, which eases the pressure on the customers we already serve. Our large load tariffs—the first ones from investor-owned utilities in Pennsylvania and Kentucky—make data centers pay for the cost of serving them, so existing customers don't carry that burden. We want to extend those protections even further. In September, PPL Electric submitted a proposed Customer Protection Transmission Rider, or CPTR, aimed at strengthening our safeguards around large load growth. Benefits from additional load will show up annually across the coming five years, and that gives our existing customers measurable affordability value. With the full 11.4 GW currently under ESAs, we estimate our customer protection framework could lower the average residential customer's yearly transmission costs by $300. For our CPTR filing, we anticipate the commission will reach a decision during summer 2027, with implementation aimed at the first quarter of 2028. In addition, cost discipline remains a priority for us. Part of that means keeping O&M growth at roughly 0.5% compounded annually through 2030. But we don't plan to stop there. We still view AI as a transformative force for the utility sector—one that ought to deliver considerable cost reductions. Widespread AI deployment sits at the heart of our Utility of the Future strategy, though our planning has remained conservative, and we have not built significant AI-related savings into this updated plan. We view that as a sizable opportunity that could boost system reliability and improve the customer experience while lowering costs, which would reinforce our affordability strategy. Moving to slide nine. Data center work in Pennsylvania keeps moving forward. For the 11th straight quarter, projects at advanced stages grew, reaching 35.3 GW, which is 3.5 GW above the second quarter. Projects inside that pipeline are also steadily advancing. Load converting to signed ESAs rose by 300 MW versus the second quarter, reaching roughly 11.4 GW. Within that data center load, about 8.5 GW is now under construction, a gain of 2 GW from last quarter. Two data centers are already connected, and so far we have energized 300 MW of that contracted load, which will eventually ramp to about 2 GW; this pipeline progression matters a great deal. As projects graduate from initial agreements to ESAs and then to construction, our visibility improves into the infrastructure and generation ultimately required to serve this load. Pennsylvania's ongoing data center interest also bolsters new generation opportunities at Invitium. Moving to slide 10; Kentucky shows comparable momentum, with another quarter of robust economic development growth and rising conversion of pipeline projects. Our overall economic development pipeline grew by another gigawatt since the second quarter, reaching 14.7 GW of potential load growth through 2032. Data center load is now at 12.8 GW, and non-data center load remains around 2 GW. Importantly, we're also making considerable progress turning that pipeline into projects that are more firmly committed: 2.3 GW of load is now under reimbursement agreements, compared with 1.3 GW when the second quarter ended. In addition, projects with a success probability of 50% or higher now account for 4 GW of added peak demand, and across those projects the average probability is nearly 85%. The generation investments in the updated plan I referenced earlier back about 2.4 GW of that demand. The other 1.6 GW calls for more generation, which means $3.5 billion-$4.5 billion in investment needs through 2030. Bottom line, we still see a major opportunity in Kentucky to back economic development and invest in the generation required to serve that growth. Importantly, large load customers, not our existing customers, are expected to primarily pay for these incremental investments. Our next CPCN filing will happen once a data center ESA is signed, which we currently anticipate in Q1 2027. Such opportunities benefit the state as well as our current customers, and they generate added long-term value for those who own shares in our company. Having said that, I'll now hand things over to Joe, who will provide the financial update.
Joe Bergstein
executiveThanks, Vince, and good morning to all of you. Moving to slide 12. For the third quarter, PPL's GAAP earnings came in at $0.49 per share, versus $0.43 per share in Q3 2025; during that quarter we recorded special items totaling $0.05 per share, driven mainly by system and other integration-related costs along with PPL's Rhode Island hold harmless commitment. Once you adjust for those special items, earnings from ongoing operations for the third quarter stood at $0.54 per share, which is an improvement of $0.06 per share over the same period a year ago. Rate case results in each of our three jurisdictions drove base rate recovery that largely powered this increase, along with tracking mechanisms that let us recoup capital investments promptly and stronger sales volumes. Partly countering those positive factors were greater depreciation expense from added plant and service, elevated operating costs, and increased interest expense. For the opening nine months of 2026, ongoing earnings climbed more than 7% compared with the identical stretch of 2025. Entering the year's last quarter, we have tightened our 2026 ongoing earnings guidance to a range of $1.92-$1.96 per share, and we still expect to reach no less than the midpoint of $1.94 per share. We've continued to carry out our capital investment program as well, with $3.6 billion of investments deployed through the end of the third quarter. That represents an increase of more than 20% compared with what we deployed during the first nine months of 2025, and it includes excellent progress on our major generation projects in Kentucky, which are still on time and on budget. Moving to slide 13. Building on the strong momentum we have in 2026, our updated business plan supports robust EPS growth as we move into next year. Looking ahead to 2027, our projected earnings per share fall between $2.06 and $2.14, putting the midpoint at $2.10. That midpoint reflects an 8.2% increase over the midpoint of the ongoing earnings forecast we currently have for 2026. So right from the start of the plan, we land in the upper half of our newly established 7%-9% growth target, and on an annual basis we anticipate staying in that upper half. Several things should fuel 2027 growth: better rate recovery stemming from rate case outcomes that were approved earlier this year, plus increased revenues tied to recovering our ongoing capital investments. Partially offsetting those drivers, we anticipate, will be greater operating costs in Kentucky, along with elevated depreciation and higher financing costs spanning all segments. Now on slide 14, our refreshed base plan gives us strong confidence and backs the higher EPS growth targets we've set. That forecast doesn't rely on any of the upside opportunities we went over this morning. On top of the updated base plan, we're seeing further generation investment opportunities that would serve 1.6 GW of Kentucky demand. Those investments could help deliver an EPS CAGR above 9% through 2030. The upside case includes two additional natural gas combined cycle plants, the 266 MW Lewis Ridge Pumped Storage Project, and 400 MW of added battery storage — together these bridge power to data centers coming online in our territory. In that scenario, we figure earnings could start contributing as soon as 2028, increasing as the units are brought into service. Crucially, the large load customers whose needs are driving this would bear most of these added investments, not our current customer base. We will begin incorporating these opportunities into the formal plan only after agreements are signed with those large load customers. That provides a clear and believable route for extending growth beyond the updated base plan we've laid out. Turning to slide 15, our revised capital plan totals $25 billion in customer-focused investments through 2030, which is about $2 billion more than our previous four-year plan. Looking ahead as the plan extends from 2027 through 2030, the $5.2 billion in capital investments slated for 2026 falls away, and we're adding a projected $5.7 billion in 2030. Comparing 2027 to 2029 on a like-for-like basis, investment comes in $1.5 billion higher, largely driven by the anticipated need for one more natural gas combined cycle unit, with a commercial operation date of 2032. On the generation side, our business plan now covers four NGCCs amounting to more than 2.5 GW, 240 MW of solar projects, and 525 MW of battery storage. You can find further detail on the generation units assumed in the business plan on Slide 25 in the appendix of today's presentation. Vince mentioned earlier that if we keep converting the Kentucky economic development pipeline, that could back another $3.5 billion to $4.5 billion in generation investment through 2030, which could push our EPS CAGR up to 9% or more, as we covered on the previous slide. Now on slide 16, our rate base should climb from roughly $33 billion this year to almost $48 billion by 2030, a 10% compound annual rate. The $25 billion capital plan is what drives that growth, and it's the foundation for our 7% to 9% EPS growth target. This is just the base plan; it doesn't include the Kentucky generation upside we laid out on the earlier slides, which would come on top of it. Let's go to slide 17. The way we've structured our financing is meant to support growth while keeping the balance sheet strong and our credit ratings solid. Our target remains 16%-18% FFO to debt, and we expect that ratio to move toward the middle of that range during the plan period, while keeping holding company debt under 25% of total debt. Through 2030, we see roughly $3 billion in equity needs, on top of the more than $1.5 billion we've already executed on a forward basis. That $3 billion covers the equity left unissued under the prior plan, and the remaining $2 billion backs our updated capital plan, which includes additional AFUDC compared with the prior plan, and supports our current credit ratings. Our ATM program is expected to serve as the main source of funding for this equity, and we'll also look opportunistically at other equity-like structures that provide an appealing cost of capital. In addition, we're targeting annual dividend growth near the bottom of the 4%-6% range, and we anticipate a payout ratio of about 50% by 2030. Together, these moves provide a balanced approach to funding the $25 billion capital plan, maintaining strong credit quality, and supporting stronger, more durable earnings growth. That concludes my prepared remarks. I'll now turn the call back over to Vince.
Vince Sorgi
executiveThanks, Joe. To wrap up, I'll recap the investment case we've laid out today. A stronger base business sits at the heart of it. With our $25 billion capital plan, we support 10% annual rate base growth and yearly EPS growth of 7%-9% through at least 2030, and starting in 2027 we expect results in the top half of that range; disciplined financing and a strong balance sheet underpin that growth. We're also still targeting yearly dividend growth at the low end of our 4%-6% range, retaining capital to help fund all of this growth. Equally important, we deliver that growth while keeping customers at the center of our strategy. Our investments support safe and reliable service, and our cost discipline and rate case strategies help maintain affordability. You can see this in the portion of the bills we control running about 10% below our state and regional averages. Looking ahead, our large load tariff protections are designed to ensure that growth pays for growth, which further supports customer affordability. Taken together, these elements support a compelling 10%-13% total return proposition from the base plan. Beyond that base plan, we have meaningful potential upside. Continued conversion of the Kentucky economic development pipeline could drive further regulated generation investment and support our EPS CAGR to over 9% through 2030. Invitium offers another source of potentially significant value, starting with the QTS collaboration we announced today. In short, we have a stronger base plan, a disciplined customer-focused approach to funding growth, and significant opportunities to outperform the commitments we made today. We're confident in our ability to execute this plan and are excited about the long-term value these opportunities can create for both our customers and our share owners. With that, operator, let's open the line for questions.
Shar Pourreza
analystHey, guys. Good morning.
Vince Sorgi
executiveGood morning, Shar.
Shar Pourreza
analystMorning, Vince. First off, clearly there's that $2 billion bump in the base plan, and that's what's pushing the CAGR higher. So I suppose my question is, what makes you confident enough to put that in the plan absent the CPCN? And at that stage, why not go for the extra $3.5 billion-$4.5 billion? If those upsides materialize, do you stay with 9%+, or would you shift to an entirely new range? Thanks.
Joe Bergstein
executiveYeah. Well, let me begin with the confidence behind the plan and what we've included in it. I think the addition of the extra combined cycle unit is really — we did that grounded in what we're seeing on economic development and the pipeline we have there. I think it's prudent for us to put some of the needed generation into our updated plan. If you look at that pipeline, what's in the plan from a generation standpoint can serve the load from what we'd regard as very high probability load, meaning load with over a 90% probability of coming online; and then, obviously, we discussed at length in our prepared remarks that we believe we'll have an even greater need than even what's in there in this base plan, which obviously drives the upside to the capital and the earnings over 9% that you referenced. When we do make the regulatory filings, we fully expect to have a load forecast supporting at least the level of generation in this plan, if not some of that upside.
Shar Pourreza
analystUnderstood. Joe, are you still going with the 9%? My apologies. Yeah, sorry about that.
Joe Bergstein
executiveWell, that nine-plus figure has stood for roughly an hour at this point, so we'll keep evaluating it as time goes on and determine whether we turn it into a range or retain the plus.
Shar Pourreza
analystUnderstood. All right, that's great. Vince, congratulations on the first gas deal, at least within PJM. Regarding the 2 GW Invitium deal — yes, obviously this is a major announcement. Plenty of folks have been anticipating it. Just on that 2 GW deal, you've got a term sheet and you've got a CRA. So I suppose the question is, what remains before you reach a full-form ESSA? Do you have something beyond a standard term sheet that gets you to this level of comfort? There isn't much left out there to be done, so you're feeling good. Then I just want to get a sense of the risks there, since we've seen announcements of this kind before, and market reactions to them have varied. What makes you confident about this one? Thanks.
Vince Sorgi
executiveYeah. Thanks, Shar. Look, the fact that we chose to announce today really reflects how robust the negotiations between the parties — Invitium and QTS — were. As I mentioned, every key commercial term has been agreed to in the term sheet. Again, there was significant negotiation involved in arriving at those terms. I'd also say it reflects the commitment both parties bring to this project, and our shared confidence that both sides can satisfy the CPs contained in the documents, which I'd describe as very customary CPs for a transaction of this kind. And then, looking at the CRA, the cost reimbursement agreement, that simply brings an entirely additional layer of confidence to pushing this project ahead. QTS would potentially be exposed to material dollars, and they wouldn't have signed that CRA unless they felt confident in the project overall. Then, naturally, QTS has an outstanding track record, correct? They rank among the biggest data center developers in the world. Certainly, from what we've experienced with them, we believe they consistently build data centers the right way; we've said plenty about what doing this stuff the right way involves, and they do it, including how effectively they engage with local communities; in fact, a lot in PA cites, specifically, this Salem Township project as the right way to go about data center development. Given how extensive the negotiations were and how confident all the parties are about moving the project ahead, we saw no reason to hold off on an announcement until the formal ESSA was reached.
Shar Pourreza
analystUnderstood. That's great. Thanks for the disclosures, and congratulations to the team. I'll see you in a day or two. Goodbye.
Vince Sorgi
executiveThanks.
Michael Lonegan
analystHello there, and good morning. I appreciate you taking the time to answer my question.
Vince Sorgi
executiveYes indeed, good morning to you, Mike.
Michael Lonegan
analystMorning. You mentioned that the data center agreement carries a utility-type risk profile. Could you share anything about what returns you anticipate on this project, and also whether it's a Phase 1, and if there's room for expansion? I recall you said you expected one or more data center announcements before year-end. That was the expectation you set out last quarter. Is that still what we should look for, or is it more likely sometime in 2027?
Vince Sorgi
executiveSure. There are a few different questions in there. As you'd expect, Mike, we won't disclose the specific returns, for competitive reasons, but I can say that for Invitium overall, and especially with this project, we aimed for attractive risk-adjusted returns; they sit above utility returns and below pure IPP returns, given the contracted nature. Still, we're quite confident that the return profile in this contract matches the risk profile we're accepting. On your second question, I believe it was whether this is Phase 1 or whether there could be more — I'd say the agreements announced today really reflect QTS's current vision for the Salem Township site. We can't comment on whether they're weighing upsizing the project, or, if they do, whether that would create additional generation needs for Invitium. That said, our relationship with QTS keeps getting stronger. If they develop further data center projects in PA, at this site or elsewhere, I'd fully expect Invitium to have the chance to supply the generation required. Again, I'm not saying it's guaranteed, but I'd certainly expect the opportunity to be part of that discussion. Was there a third point?
Michael Lonegan
analystOh, sorry. I believe earlier you mentioned that you anticipated one or more announcements before year-end. Does that remain the expectation?
Vince Sorgi
executiveOh, yeah. Like I said, we're having active talks with several counterparties, so there's definitely a chance we could make another announcement before year-end, but we're really not setting a timeline for it; this announcement was among those we had in mind when I made that comment about the second quarter.
Michael Lonegan
analystThanks. That capital investment opportunity leaves out the bridge solutions, fuel cells, and storage. I was hoping you might give us some insight into what that investment opportunity set looks like.
Vince Sorgi
executiveYes. There are a few components here, correct? Let's distinguish the wider $6 billion-$9 billion figure we're discussing — the overall upside opportunity from Invitium — from the QTS announcement, right? That one simply covers the 5 GW of executed CCGTs at $2,500-$3,500. The $2.5 billion-$3.5 billion figure we're referring to, which is our share tied to Invitium, spans all three technologies — so the CCGTs plus some combination of batteries and fuel cells. That combination is still being finalized regarding how much would come from batteries versus how much from fuel cells. I believe it's fair to say it will be a mix of those two, on top of the two CCGTs. That falls within the $2.5 billion-$3.5 billion.
Michael Lonegan
analystGreat. Thanks for taking my question.
Vince Sorgi
executiveSure.
Vince Sorgi
executiveHi there, Jeremy.
Diana Niles
analystMorning — actually, Diana Niles here, joining the call on behalf of Jeremy Tonet. Thanks for making time for us today and for fielding our questions.
Vince Sorgi
executiveOf course.
Diana Niles
analystTurning to the Invitium LOI, going forward, what's the right way for us to think about the cash flow assumptions under the payment structure as it currently stands? And could you also address how we should consider the implications for financing that aren't baked into today's plan?
Joe Bergstein
executiveSure. So from a financing standpoint, as we've discussed, at least through the construction phase, our expectation would be to use construction-period structures of the kind that are typical for deals like this one; those will be largely off-balance sheet. The precise financing structure for when the units come online will be determined as we work through the full contracting terms and hold broader discussions with the rating agencies, now that we have a deal to talk to. I think there's more to come on the financing front.
Diana Niles
analystLet's stick to cash flow. Could you perhaps discuss the difference between this and, let's say, a regulated utility?
Joe Bergstein
executiveYeah, absolutely. Regarding cash flow and how this is financed, yeah, I mean, it differs from a regulated utility. What I'd say is that rate base math doesn't always apply to deals of this kind. The economics hinge on the contractual terms of each project, its structure, the financing timing, and really the escalation of the fixed payments. Although the risk profile is regulated-like, this isn't a utility that falls under utility accounting. As I mentioned, rate base math doesn't really apply here. As you're aware, with a traditional utility, an asset reaches its peak value and earnings when it's placed in service, and from that point it declines. Because of the escalation clause in the contract we have here, it's effectively the reverse of that, with revenues, earnings, and cash flows rising over the contract term; we'll ultimately provide all the relevant financial guidance at the appropriate time, once these elements are finalized. From your cash flow perspective, I'd simply keep in mind that those will grow as we progress through the contract period.
Diana Niles
analystUnderstood. Many thanks. Could I be wrong in thinking that during the previous quarter there might have been a bit of an uplift from solar for Kentucky Generation? If it wasn't shown in today's slides, is that simply because resource preferences have shifted, or would that still count as potential upside, assuming I'm right?
Vince Sorgi
executiveYes, we'll keep evaluating solar in Kentucky. An RFP is underway for it as we prepare our next CPCN filing. As you're aware, solar functions more as an energy resource rather than one delivering both energy and capacity. Naturally, we have the battery strategy in place that can be paired with solar; we're examining that right now, Diana, so thanks for the comment. I'd say that were we to take that path, it could represent potential upside. Once more, we treat that as an energy-only product and would consider it in that light during the CPCN process.
Diana Niles
analystGot it. Thanks for that response.
Vince Sorgi
executiveNo problem. Thanks.
Julien Dumoulin-Smith
analystMorning, everyone. Great job. I’ve got to give you all credit.
Vince Sorgi
executiveHi, Julien.
Julien Dumoulin-Smith
analystMaybe just to follow —
Joe Bergstein
executiveThanks, Julien.
Julien Dumoulin-Smith
analystHey, good morning. Vince, and Joe, perhaps just to build on that last question—actually, to pick up where it left off. Could you discuss what the earnings and cash flow profile might look like potentially on the earlier side of this contract, given that, as you say, it isn't tied to rate base math. So in concept, you could be getting earnings before those assets are in service. Then, if I could add to that as well, you alluded in the slides to what might be a fuel cell-based interim kind of solution. I'm not certain what the earnings profile from that could look like, given that it could come online as early as 2029. So that could lift your—it's not only the nine plus, but the timing of when you accelerate earnings here matters critically too.
Joe Bergstein
executiveYeah, sure, Julien. I wouldn't anticipate any earnings prior to the units coming online; that isn't what I was—or cash flows. That isn't what I was implying there; but when you consider the bridge solutions we outlined today, I'd say it's possible they could deliver accretion in the back part of the plan. We still need to finalize some details around those. But really, as we've been saying, that wouldn't be material, since the material accretion and value really comes from the CCGTs coming online.
Julien Dumoulin-Smith
analystYeah. All right, I certainly accept that point, and it comes through loud and clear. If I might press you a bit further regarding the scope of expansion, one part of that could be this: what's your thinking on the Salem site at this stage? I mean, can it truly handle more? I mean, 2 GW seems quite large right from the outset. Any views on that? And then, on a separate note, regarding the expansion piece, how much Invitium Energy, et cetera, how are you thinking about timing for any of it? I don't want to run too far ahead of myself, but just if you could address how those conversations are progressing, et cetera. I mean, a number of these IRS items and so on have expired by now. How are you positioned when it comes to pushing a large number of opportunities ahead?
Vince Sorgi
executiveYeah, so regarding the site itself, I'd rather not speak on QTS's behalf while they're right in the middle of securing their approvals for this phase of the project. So I'd say that question is probably better directed to them. As I mentioned in response to the previous question, what we announced today truly reflects their original vision for the Salem site. It's a big site, but as I noted, they operate properly and ensure sufficient setbacks, factoring in local community stakeholder engagement and feedback while designing their data center campuses and determining how much they want to place on a particular site. To address your comment, if they chose to expand or do more at that location—incidentally, Julien, they could pursue other sites as well. They are not confined solely to the Salem site. We're prepared to support whatever further generation requirements they might have, whether at this location or somewhere else.
Julien Dumoulin-Smith
analystYeah, right. Are there any other sites that are up and running or ready that a person ought to be — if those are public or whatever — whether that's in Pennsylvania or maybe even Kentucky?
Vince Sorgi
executiveAre you referring to QTS?
Julien Dumoulin-Smith
analystYeah, presumably. I'm not sure whether you were attempting to get us to say something there. Yeah.
Vince Sorgi
executiveNo, no. I was only saying that, considering how our relationship with QTS keeps growing and getting stronger, if they decide to expand that Salem site and/or build out a separate site, my expectation would be that we'd be involved in that process; that's the only thing I meant.
Julien Dumoulin-Smith
analystYes. Great work, Vince. Thanks, everybody. Best of luck. Well handled.
Vince Sorgi
executiveThank you, Julien. We'll be seeing you shortly.
Steve Fleishman
analystYeah. Hi, good morning. Appreciate you making the time. Apologies for bringing up the Invitium announcement once more, but with these kinds of deals the terms and conditions usually end up mattering. I realize you've got the commercial terms sorted out, but on the other non-commercial items, which ones remain unfinalized, and roughly what's the timing for reaching a binding agreement?
Vince Sorgi
executiveYeah. I mean, we've agreed to the overwhelming majority of the terms. Steve, I'd say the thorough way we negotiated the term sheet and the CRA will make it possible — and the teams are now at work on what we refer to as the long-form ESSA. Essentially, every major provision destined for the ESSA has already been negotiated within the term sheet. This term sheet is quite robust; it addresses financial terms along with non-financial ones, as you point out — whether that's availability, requirements, and so on. Operating parameters too. All of that has been negotiated; the negotiation has been thorough and extensive. As for how fast we can reach the ESSA, I won't give a specific timeframe beyond saying the teams will be actively working on it. We're confident we can finalize an ESSA with QTS, again, given their track record, the set of CPs will kind of carry us through to the ESSA, what both sides must do for that, and our shared confidence in getting it done. We have no concerns about reaching the ESSA. Again, those terms — financial and non-financial — have already been negotiated.
Steve Fleishman
analystOkay. So then, when we consider it — say you've got the ESSA and it reaches that full run rate in 2032, 2033 — do you think at that point you might want to push the growth rate out over a longer horizon to capture that, similar to what NiSource did? Or will you wait to see what falls inside your window? Is that something you finalize when you fold it into your growth rate plan?
Joe Bergstein
executiveYes, I believe that's correct, Steve. Once we finalize all those terms and everything is locked down, that's the point at which we can give more financial guidance on this, and then clearly extend the forecast out to Horizon, so you understand what that means in terms of the impact on PPL Corporation overall.
Vince Sorgi
executiveSure, Steve — I'd say that's probably tied more to the final notice to proceed, the FNTP, and to reach FNTP we'd need the ESSA signed. That's the point where our equipment contracts are locked down and the EPC contracts are locked down. It's also where we true up the project cost, based on those contracts having been executed. Obviously, executing the ESSA is a key step so that we can then obtain the financing, all of which is needed to reach FNTP. That's when we kind of lock everything down. After that, we're completing development and construction of the project.
Steve Fleishman
analystUnderstood. Sorry, one more question on a different subject; the elections just happened, and I believe the Pennsylvania Senate flipped to a Democrat majority. Do you have any sense of whether the Governor will reinstate the grid plan law? Just how should we think about possible legislation next year?
Vince Sorgi
executiveYeah. Well, to start, I'd say I don't really have concerns, at least regarding the data center side and the pipeline we have. Actually, I think the national election results could end up supporting the pipelines we have in both Pennsylvania and Kentucky. It's not only Governor Shapiro — both of our governors signed executive orders for developing data centers and doing it the right way; those EOs are actually similar when it comes to requirements like stakeholder engagement at the local level. No harm to power and water customers, et cetera. So neither has imposed a moratorium on data center development, so I don't see that really happening because of the election results. I say that because I think both EOs really protect our existing customers and the communities, especially when combined with the large load tariffs we have in both states; so I do think some of the election results could, in some other states, potentially have a chilling effect, which could push some of those projects or future development projects toward both Pennsylvania and Kentucky, where we have pretty significant pipelines and have demonstrated the ability to work them. So, at least on that side, no major concerns. On general legislative agendas, particularly in PA, which I think is what you were getting at, again, we just have a long history of working with both Democrats and Republicans in Pennsylvania. I fully expect that will continue after the results. I would expect affordability and energy policy to remain important issues here in PA, but I think there are policy and legislative areas where we actually have mutual agreement. We've discussed a lot of ideas, some of which we've expressed on these earnings calls about how we could improve affordability in the state of PA, and we believe the new legislative session may actually provide a more receptive environment to advance some of those ideas. Again, we're open to working with whoever holds power in our states, and we share a lot of the same goals and look forward to engaging with them to achieve what's in the best interest of our states, our customers, and our communities. No overarching concerns, Steve.
Steve Fleishman
analystGreat. Thanks so much.
Vince Sorgi
executiveSure.
Richard Sunderland
analystHi there. Morning to you. Am I coming through okay?
Vince Sorgi
executiveHi, Rich. Yes, morning to you as well.
Richard Sunderland
analystGreat, thanks. Thanks a lot. Picking up on a few of those points you raised at the end about affordability, quite a bit has been happening on the PJM front. I'm just wondering what you're watching closely at the moment, in terms of progress or the lack of it over these last few months, both as it looks from PPL Electric and also regarding the competitive landscape from Invitium's standpoint.
Vince Sorgi
executiveYeah. Well, look, I believe the announcement we made today shows we're backing up our words with action when it comes to easing the affordability worries in PJM, and ultimately getting generation constructed not only in PJM but also in Pennsylvania. I think our governor, our commission, and ultimately the legislature view that quite favorably. Again, Invitium fits right in, I think, with the push for additional generation to strengthen that supply-demand balance we've discussed at length in PJM. On the PPL Electric side, again, I'd say PPL Electric has been out front on affordability — the affordability agenda in Pennsylvania — again, through the large load tariff. We discussed the CPTR filing, which will elevate that even further by delivering added bill support to our customers. Again, backing utility-owned generation in the state to help balance supply and demand. Again, I think PPL Electric keeps playing a leadership role; we've got the PUC working group on rate-making. I anticipate we'll be active participants there. Again, I believe we're a trusted source in the state. We've earned that standing, and I'd expect us to have a part in that too. In fact, we're eager to do so, because again, I think we hold the same objectives when it comes to delivering reliable service to our customers, making sure it stays affordable, while at the same time ensuring the utilities remain financially strong enough to invest in the grids that deliver all those services for our customers. We're eager to bring all of that into the conversation with the PUC working group. Again, a wider affordability agenda that we've concentrated on has sat at the core of our strategy, not only in P.A. but throughout all of our jurisdictions. I'd even mention the hold harmless settlement, which served as a means of helping affordability up in Rhode Island following the rate case increases. So, we're eager to engage in affordability discussions across all of our states, because I think we lead on that subject in each of our jurisdictions.
Richard Sunderland
analystUnderstood. Appreciate the full walkthrough. So let me pivot to Kentucky — the 1.6 GW figure and the $3.5 billion to $4.5 billion of upside — is that what we should be anchoring on when the CPCN gets filed next quarter? I suppose I'm attempting to interpret the signals from the data center and economic development pipeline as a whole versus what actually gets you onto the 9%+ portion of the EPS growth range.
Vince Sorgi
executiveRight, I'd say it's premature to say with certainty what will go into that CPCN filing. There's 4 GW of load we've referenced that carries a 50% or higher probability. In fact, the probability across those projects overall sits near 85%. So we'll work through that to figure out how comfortable we are including some or all of it in the upcoming CPCN. Naturally, we'll include a portion. The plan contains 2 to 2.5, which is 90% or above within that set of projects. So we feel quite confident about what the plan holds. Beyond that, look, my own view is that we'll be constructing generation for the foreseeable future in Kentucky, simply based on the quarter-over-quarter movement we're seeing in the pipeline — even inside the pipeline, projects advancing into more mature stages — and just knowing what else is underway in the state that isn't part of the 14.7 GW of total pipeline. I simply believe we'll be building gen in Kentucky for a long time. Given supply chain constraints and cost pressures, the earlier we lock in those prices and get that generation constructed, the better off our customers will be, and the less they'll pay for those assets. We saw this with the original CPCN we filed; not everything got approved. The second one came in roughly $1 billion above the first. We want to try to head that off. Sure, the commission will be diligent in reviewing all of it, but conservatism isn't cost-free. At times, being overly conservative in regulatory outcomes winds up costing our customers, and that's happened before. I clearly want to head that off in this next CPCN. We might wind up including more rather than less, but we're still working through it.
Richard Sunderland
analystThat's very clear. Thank you.
Vince Sorgi
executiveOf course. Appreciate the question.
Vince Sorgi
executiveDavid.
David Arcaro
analystOh, hey there. Hey, thank you. Good morning. Most of what I had has already been covered. I suppose I just wanted to ask about how O&M grows over time. I mean, holding it at half a percent all the way through 2030 is really low, really impressive given the inflationary environment. I was wondering whether you could share some color on your confidence in pulling that off and on any further gains beyond that which you're pursuing.
Joe Bergstein
executiveYeah, absolutely, David. This is Joe. Look, cost discipline is a thing the team here has concentrated on for quite a while, and it has genuinely turned into part of how we operate the business every day; as you know, we've worked hard across the past several years to locate efficiencies throughout the organization, and I believe that work is now visible in the results. What I'd say is that it's really that nonstop push to bring operating costs down, become more efficient, and help keep things affordable for customers. Inflation, like you said, is definitely something we're watching, and we've aimed to be realistic about it when planning; but I think, with the path we're on, or the focus the whole organization has had, and the success across the past several years in taking costs out of the business, this approach can be sustained. Naturally, we'll keep balancing cost management against reliability and service for our customers. Past the half a percent included here, I think there's additional opportunity, as we said in the prepared remarks, coming from AI deployment, though nothing material on that front is baked into the plan, but I think that's one more opportunity, and one where the whole organization is focused on how AI can help us drive better results, become more efficient, and operate at a lower cost.
Vince Sorgi
executiveYes, David, I’d simply add this: the grid hardening and grid automation portions of the capital plan—which are major within the T&D side of that plan—serve to strengthen the grid, which cuts how many customers lose service during each storm event, means fewer truck rolls, lower O&M, and so on. So the capital plan by itself keeps taking O&M cost out of the business, especially through those grid hardening and automation components.
David Arcaro
analystYeah, no, that's a fair point. Appreciate it. That's everything from me. I'll stop there.
Vince Sorgi
executiveGreat. Thank you.
Nicolas Woods
analystMorning, and thanks for taking my questions. Good morning. Regarding that additional Kentucky generation, you said earnings might start in 2028. Through 2030, how much of the contribution would be AFUDC versus earnings from the units coming into service?
Joe Bergstein
executiveYeah, looking at it incrementally, relative to the prior plan, it would be AFUDC, since those units don't come online during the plan period.
Nicolas Woods
analystUnderstood. For my follow-up, regarding that illustration of a 9%+ EPS CAGR for Kentucky, does it factor in any financing expenses and equity dilution tied to that plan? And if it does, could you broadly outline the split among cash flow, debt, and equity?
Joe Bergstein
executiveYes, that 9%+ certainly presumes those assets are fully financed. I mean, look, when it comes to financing overall, we'd keep our credit metrics in mind while doing so and make sure we remain within that 16%-18% range. This is traditional utility CapEx, so expect roughly a 30%-40% equity to support capital programs. I don't really think it would be any different. Obviously, ultimately we'd need to see the mix of the units when they come online and when they produce cash flows, but that's generally how I think about it today.
Nicolas Woods
analystUnderstood — that covers everything I wanted to ask. Thanks very much.
Joe Bergstein
executiveWonderful. Thank you.
Nicolas Woods
analystGreat, thank you.
Vince Sorgi
executiveThanks for being with us, everyone. We're genuinely thrilled about the update we shared today, including the Invitium announcement with QTS. I believe that marks the beginning of, once again, considerable momentum inside the Invitium business, and we're eager to build on it. I'm looking forward to seeing all of you in a couple of days at the EEI Conference. See you soon.
Operator
operatorThis conference is now over. We appreciate your participation in today’s presentation, and you’re free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PPL Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PPL Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PPL Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.