executiveGood morning, everyone, and thank you for making time to join our conference call today. Chief Financial Officer Tim Manners is with me, as he usually is. I know we informed the market that this morning we would provide an update on our mine plan. I'm disappointed to report that we won't be doing so. The plain reason is that we currently have a great many mine schedules along with active mine studies at differing stages of completion that we are assembling, and regrettably we just aren't able to release anything at this point. A highly risk-averse community of mining and construction contractors at the moment has made the process more difficult, and that has produced some notable variations and outcomes that we are still working through. That ties in closely with the mining studies we have underway, and a lot of you will have noticed signs of it in the recent update covering each producer and developer. It's fair to say the plan has involved a great deal of solid work by now, including some meaningful expansions at existing operations and encouraging headway in new mining areas—developments I'm eager to bring to the market before long, though not on this call. All right, then. On that note, I'll begin with a summary of the June quarter and our production guidance for FY '22. After that, Tim will go through the quarterly figures in greater depth. Following that, we'll open things up for questions. The company turned in another robust operational showing during the quarter ending June 2021, generating solid gold output of 61,840 ounces with an all-in sustaining cost of $1,394 per ounce — though this fell just shy of our guidance. For the full year, however, production reached a company record of 272,109 ounces at an all-in sustaining cost of AUD 1,317. That represents 18% production growth compared with FY '20, achieved at a very competitive all-in sustaining cost. Once again, Mt Magnet was the standout producer, turning out 35,208 ounces. Edna May added 26,632 ounces, most of which came from the Greenfinch open pit. Mt Magnet, meanwhile, kept its focus on the Eridanus open pit. We've nearly dug the Stage 2 pit's waste removal down to where the floor originally sat, so ore output is climbing as a result. Shannon's underground operations kept performing well and delivered high-grade material. During the quarter, Edna May contributed underground production, and ranked by tonnage, the mill's feed sources were Greenfinch first, then Marda, then Edna May underground, followed by legacy low-grade oxide stockpiles. You'll find additional detail about exploration work across the company's various projects — among them the Hesperus pit at Mt Magnet, which looks very promising — inside the full report, available for you to read whenever convenient. Peter Ruzicka has now been our GM of exploration for three months, and we're beginning to see straightforward gains from some seismic exploration methods that will be used at Mt Magnet before long. Ideally, this technique helps us uncover additional Shannons and Eridanuses. Tim will provide more detail on the financials shortly. Suffice it to say that the balance sheet remains strong and cash reserves increased quarter-over-quarter, despite a somewhat lower realized stock price and after the most recent debt repayment on our finance facility. Regarding project development, our two key growth projects, Tampia and Penny, are both progressing well. Once the Tampia farmland purchase closed, open pit mining contractors moved in and site setup has progressed substantially. Excavation in the North pit kicked off late in April, ore was first extracted in June, and on July 1 the initial ore was hauled through the Edna May mill, matching the plan. At Penny, every major approval was secured over the quarter. Camp building commenced during that period, and agreements were signed for open pit mining services as well as catering. We expect open pit mining to kick off this quarter, and the tender process for the underground mining contract is likewise scheduled for the September 2021 quarter. For FY '22, we've given extensive guidance pointing to another record year, with a midpoint of 280,000 ounces and even contributions coming from both production centers, and also split evenly by half. You could call it not symmetry — looking at FY '22, we've returned to half year reporting — but we'll note that the first quarter is anticipated to come in somewhat weaker than the second quarter, owing to the production mix and short pauses in the schedule. For fiscal 2022, our all-in sustaining costs sit above those of fiscal 2021, consistent with what last year's mine plans indicated, although they have come in a touch higher still because of COVID-related factors. The figure will land in a range of AUD 1,425 to AUD 1,525 per ounce. While we clearly cannot go into the detail, we anticipate all-in sustaining costs falling across the fiscal 2023 to 2025 period once the high-grade Penny project achieves full production. Exploration has again received a strong commitment from us in fiscal 2022, with $32.1 million budgeted across the portfolio for the year. Lastly, the mine plan contains updates on the various mining studies, and everything will be disclosed as soon as we are in a position to do so. Having said that, I'll now pass things to Tim, who will cover the quarter's financial side.
Timothy Manners
executiveThanks, Mark, and good morning everyone, and thanks for being with us. While we did have an unusual guidance miss in the June quarter, the financial results remain very pleasing, as I'll quickly take you through now. As Mike said, gold production for the quarter came in at nearly 62,000 ounces at an all-in sustaining cost of $1,394, with the corresponding sales figure just above 64,000 ounces at an average realized price of $2,254 per ounce. That took total year sales to a record 277,450 ounces, giving the business over $633 million in sales revenue, another clear record for the company. During the June quarter, operating cash flow came to $52 million, and most of it was directed toward our two latest projects, Penny and Tampia. Both are moving ahead quickly — in fact, ore from Tampia is now being trucked north to the Edna May mill, where it will be processed this quarter. At Tampia we spent $12.6 million in development capital, and at Penny the figure was approximately $11 million. Although a portion of development funding is still planned for the first half of FY '22, the projects are coming along nicely, especially considering how hard it currently is to secure personnel and how costs keep climbing. Regarding expenses, as mentioned previously, our all-in sustaining cost per ounce measured each quarter is up 12% year over year; however, it's worth pointing out that the average combined grade across both mills fell by the same percentage from September '20 to June '21. As you can imagine, grade is typically among the largest, if not the single largest, factor behind movements in all-in sustaining costs. A decline of 12%, such as the one we saw, will inevitably produce that negative impact. Importantly, although the industry's current cost pressures do affect us too, our underlying all-in sustaining cost in dollars and cents increased just 2.5% over the year. A lot of elements feed into that number, yet the direction was still a positive one. Our underlying cash generation came in at $14.7 million, which helped push net cash and gold at year-end up to $234 million, and we now carry no debt. Even though the debt has been eliminated, the facility is still there, allowing us to keep hedging should we decide to, and it should also make for a smoother—and, we hope, less costly—move with our current syndicate toward a bigger facility that will back future growth exploration. A brief update on the hedge book. In the quarter, we sold a bit more than 39,000 ounces at an average of $2,196, and we layered on 36,000 ounces at an average of $2,329. As of the end of June, the hedge book has fallen to 206,000 ounces at an average of $2,335. I'll turn it back to Darcy so we can take any questions you might have. Thank you.
Mat Collings
analystYou partly addressed the 2, but I want to check whether there's anything further you can share. I suppose starting with FY '22, we're looking at a substantial increase in Mt Magnet ounces relative to the earlier ranges that were published last year in the forward guidance. What's driving that growth? And could you give a bit more detail on the AISC increase next year? And what's behind it, if it's cost pressures across the industry, whether that means higher sustaining capital, just broad categories if you can?
Timothy Manners
executiveMat, this is Tim speaking. I'm glad to take that. I hope I've written the question down properly. The lift in production from Mt Magnet versus what we anticipated, compared with last year, comes mostly from, I suppose, having Vivien for a full year now. Our expectation was that Vivien would wrap up, I believe, in October last year. So a full year of contribution from Vivien will obviously make a difference; we keep getting some very good grades out of Shannon. Beyond that, there isn't really any material change to the Mt Magnet profile, but clearly, 2 — changes at 2 high-grade underground will have that kind of effect. And regarding your question on costs, I think the key reasons are basically, as Mark mentioned, we aren't immune to the pressures the industry is facing right now. We do tend to be conservative. Hopefully, we're being conservative enough. And I think we're — I suppose we're following the trend that others have shown in the marketplace. We always try to beat those costs; but I think from where we stand today, there's plenty of volatility around, though that's, I suppose, our best view on things as of this point.
Mat Collings
analystNot a problem at all. I appreciate that. I'm looking forward to seeing the mine plan once it's finished.
Timothy Manners
executiveThank you, Mat.
Mark Zeptner
executiveThank you, Matthew.
Andrew Hines
analystCongratulations on a record year. I have one more question about FY '22 costs. I see you have them higher during the first half and lower during the second half. Could you walk us through what occurs in the second half that lowers the cost? Also, on costs, I believe in earlier discussions there was a possibility Penny would enter production near the end of FY '22, which might have provided some cost benefit; and in the production plan I can see you have only a small amount from Penny open pit, so have you now ruled out any larger production at Penny in FY '22?
Timothy Manners
executiveAndrew, this is Tim. At this point, regarding Penny, working back from what you said, I suppose Penny is performing very well in our longer schedule. Hopefully we can update you soon. You will see it arriving early in FY '23. There is always a possibility; but realistically, I think what we now have in the schedule for FY '22 concerning Penny is probably all there is; we would like to be proven wrong; but at this point, that is where we stand. And on the cost decrease, as you know, there are several moving parts in the business. Essentially, though, we have slightly more Marda, and we have slightly more Tampia. Both are fairly inexpensive ore sources compared with some of the others, especially Edna May underground, and they are also cheaper than sources such as Greenfinch; so there is a bit of reshuffling among all sources, as you know, which we do experience occasionally. Beyond that, there is no real reason those costs have come down, simply more cheaper ore sources, so to speak.
Andrew Hines
analystOkay. Great; and perhaps one for Mark; we've heard you mention many times that you're eager to bring another 100,000 ounce hub into the portfolio; and I assume you've been searching and searching and searching for different opportunities. Right now you're sitting there with, still, plenty of cash. You have no debt. Just — I know obviously you won't discuss specifics, but just regarding the wider strategy on acquisitions and what you're seeing in the market out there, is anything at all remotely on the horizon? Or are valuations simply still too difficult at the moment?
Mark Zeptner
executiveWe keep working on it, Andrew, and working through the options. My sense is that valuations have become somewhat more grounded compared with where they stood 6 to 12 months back. Even so, we continue to apply a pretty rigorous process. We're reasonably optimistic that over the coming 6 to 12 months we can get that done. During the most recent period, we pulled our existing projects together and moved them into production, and that has likely been beneficial given that we haven't closed a meaningful acquisition while working to stand up our new projects; and I believe the timing should line up well for us provided we can secure the right acquisition. The crucial element, in our view, is that these be the appropriate 100,000 ounces—ones that suit our portfolio—rather than merely any 100,000 ounces, and our team and culture feel fairly confident we need to achieve that.
Andrew Hines
analystCongratulations once more on a record quarter — and a record year. Nicely done.
Timothy Manners
executiveThank you.
Mark Zeptner
executiveThanks, Andrew.
Henry Renshaw
analystI’ve just got one question about the Life of Mine plan that’s coming up. I understand you’re not able to discuss specifics, but perhaps you could give some high-level comments. Obviously, we have or expect to see updated studies and metrics for Edna May Stage 3 and Eridanus underground. Were there any other areas you think you could point to as potentially adding to that Life of Mine plan?
Mark Zeptner
executiveNo, we’ve already mentioned one; Vivien has, sort of, at least another year’s new Life of Mine, if you like, which is great because that’s been a really good project for us since 2015. The other area we probably haven’t talked about, but if you look at the mining study table, there is work we had flagged at Mt Magnet and the Galaxy area; and given that we have access to the Mars and the Galaxy, so the Mars segment, which sort of forms part of the Galaxy complex, if you like, without waiting for an open pit to be complete such as you have at Eridanus; we’ve done some more work there, probably a bit ahead of schedule. So I’d probably keep an eye out for some further work at Galaxy; and then, further to that, there’ll be some stuff coming out on a revised mining plan — sorry, mining study plan on the deeper stuff at Hill 60 and Morningstar as well. So in the background, there’s been a lot of work done. Disappointing, we can’t get into the details, as I said, but there’s a lot of power work being done by the team and you’ll really start to see over the remainder of this financial year, a lot of that come to fruition, I believe.
Henry Renshaw
analystGreat. Just a follow-up; regarding that plant upgrade at Mt Magnet that you're looking at, would that still come as a later study to this Life of Mine plan?
Mark Zeptner
executiveYes, I think so. If all of our Mt Magnet-related studies, especially the underground one, come together as we hope, then I think that will really give us the impetus to dust off the work we've done on the mill; it's not something we do first. I think we do it as a consequence rather than expand the mill and then look for the ore. We're very much systematic in that process; so it will still be on the list, but it will be reliant on success on those other studies that now we're confident of achieving.
Michael Scantlebury
analystI'd like to ask briefly about the FY '22 CapEx and exploration guidance. From what I understand, the guidance you previously gave the market was $55 million to $70 million, and this morning it's showing $104 million. I realize exploration expense is going up by $10 million. What I'm curious about is the difference, that remaining increase. Could you shed some light on it? I'd appreciate that.
Mark Zeptner
executiveYes. Sorry, Michael. We're just — we need to respond to that one. Yes, we've increased our exploration; and if you look at our mix, there aren't extensive differences in the projects we have in there. We have Penny and Tampia, which are essentially as planned. So there could be extra expenses tied to Marda, and those stem from the Die Hardy project, located roughly 30 kilometers to the north of Marda Central. That project calls for road improvements and, you could say, its own separate CapEx. As a result, we'll pick up additional assets from it. My sense is that this contributes around $10 million to $11 million, and I believe that accounts for most of the gap. We're not seeing — well, costs have risen relative to a regional feasibility study at Penny, specifically for camp construction and for site establishment work, and that connects back to the construction mining contractor volatility I mentioned. My view right now is that soliciting quotes from contractors is something you'd want to avoid. The figures coming back are quite unstable, and occasionally you'll see frightening jumps that, in certain situations — well, with the market as it stands, you're left with little option except to go along with them. So...
Timothy Manners
executiveMichael, I think the other point is that when we put the plan together last year, we did it, I guess, based on what we knew about Penny at that time. At this stage we've obviously got essentially full staffing from an RMS standpoint out there. We now have more detailed schedules and plans. And although you would have heard the answer to the earlier question, I don't believe we can bring any underground material into FY '22. But certainly, underground development is set to begin. And I'd need to go back and verify this, but I think there's more development capital from Penny, especially in the second half of next year, than we had previously anticipated spending. So any of that extra CapEx, generally speaking, is intended to either enhance or accelerate ounces.
Mark Zeptner
executiveApologies, and Michael, there's something else too — some work tied to getting into the Penny West ore body along with the exploration decline, so to speak. That means extra spending in that area so we can reach the upper levels of the Penny North decline and actually gain entry to Penny West, where we know high grade sits beneath it historically. What this really does is give us a platform for drilling and then for going in and reaching that ore, and all of that will be part of the detail, which 12 months ago would not have been included.
Michael Scantlebury
analystOkay, and yeah, I'm eager for a <<inaudible>> FY '22 production.
Mark Zeptner
executiveThank you, Michael.
Matt Greene
analystGood job on the year. I have a single question regarding Edna May, where milling did well. You've had several weeks now of hauling Tampia ore, and as I understand it, you plan to derate the mill's front end to handle the finer grind — I think that's 2.1 million tonnes annualized. Could you shed some light on how the mill has handled that? In other words, how has it performed since that ore was incorporated? And does your guidance rest on that 2.1 million run rate? Is there any upside on those mining rates?
Mark Zeptner
executiveApologies — just to clear that up, I think we'd earlier issued a number of 2.1 million. As a matter of fact, it's nearer to 2.2 million, 2.25 million in our flow rate. What we've actually used from Champions of Edna May so far has mostly been oxide. I think you'll see, in the video from our earlier presentation, some footage showing a bit of that, along with some material being loaded, and it's very much oxide material. Right now we are operating the mill, since we can still process that material through the grind at the elevated throughput of 2.06 million; and we are glad to report that our recoveries have not been impacted, and head grades are behaving as you would anticipate from that material blended with Marda. So it is early days, and we have not yet reached the fresh rock material, which will require the finer grind, meaning a 3.25 million run rate going forward. So what we are hearing in the report is that head grade has risen. At a mine running at greater throughput, recoveries look strong—though that stems from the ore sitting offline instead of newly mined rock, which carries a partially refractory character. We have not moved to that as of yet.
Matt Greene
analystAnd could you maybe give us a sense of when you might anticipate that new material reaching the mill?
Mark Zeptner
executiveI had assumed it was largely just rock coming straight out of the ground. Yet looking at what has been coming out during this period, there is considerably more oxide than I had expected. I would say yes, likely in the second quarter, I would anticipate seeing some of that. It sits fairly near the surface; we are probably getting just a modest benefit in the first quarter solely from mining.
Alex Barkley
analystEdna May, I'm simply attempting to grasp why the guidance differs — a step down from what came before to 140,000. Is that mainly because of possibly delayed ore out of Tampia, or gains at the new Marda pits? Or could it be something more lasting, maybe in the mine grade that you're observing, or similar? That's my first question.
Timothy Manners
executiveAlex, this is Tim speaking. The detail isn't in front of me right now. Still, you're correct that roughly a 30,000 ounce drop exists versus what we believed would be there at this point last year. My feeling is that a number of minor factors feed into that. Now that we've clearly moved into Tampia and have it fully scheduled out, I think you would find there's slightly less Tampia in FY '22 than we previously thought. It's nothing beyond a timing issue, though.
Mark Zeptner
executiveAnd slightly lower tonnage out of the lower grade out of the underground.
Timothy Manners
executiveYes, and the underground grade is a fraction below earlier figures. All the other <<inaudible>> are extremely small. I would be glad to talk with you offline and give you a more detailed rig, but there is definitely nothing there that worries us; and hopefully, once the full plan is released, you will be able to see that Edna May is still performing very healthily.
Alex Barkley
analystYes. All right, certainly. And I do realize the Life of Mine plan isn't out yet, but you brought up the Vivien extension, and it seemed like there was some solid drilling and results at Hill 60 too. What sort of mine life extension might you be considering pushing into FY '23, and probably that would be a net benefit for production in that year as well, I'd imagine?
Timothy Manners
executiveIt might be wise if you...
Mark Zeptner
executiveWell, I'd say the wisest course is to keep our comments on that fairly limited. We recognize that the ultimate objective is mine life, and whenever possible we intend to present an extended mine life plan. Still, plainly I'm not able to discuss specifics unless the market has been fully informed on the matter. My apologies, Alex. And returning to Tampia for a moment. This year, I'd note, Tampia's production, which feeds into Edna May for FY '22. We've likewise taken a somewhat more cautious view regarding the tonnage we're able to truck from there to Edna May, since our haulage runs essentially around or alongside the town of Narembeen. I believe the number we're using is roughly 700,000 tonnes per annum. There's potential for more than that since we're on sealed roads, but we're clearly taking a cautious approach with the local community, as this is the first mining operation right on their doorstep. So hopefully there's upside there. But again, we're being conservative on that figure and perhaps a bit conservative — more conservative — on our recovery, given the different ore bodies we're drilling with Tampia compared to the rest of the portfolio.
Analyst
analystThanks for another strong year. As you likely know, I got pretty involved with the explore and takeover, so I usually keep an eye on how Tampia is going. You brought up the trucking issue at Marda. Has the weather hit Tampia too? Or is everything running as normal?
Mark Zeptner
executiveSome of the mining close to the pit has been affected. It's true — it isn't in the middle of the wheatbelt, but it may as well be, and July has been really wet; down there they're set for a record year. So some pit mining has been affected by pretty slippery conditions, obviously. Luckily, we've managed to haul at a rate that goes some way toward making up for the downtime we've had at Marda. So having that flexibility with sealed roads all the way to Edna May is great. But we're looking forward to autumn, and then — sorry, spring and then summer, that's certain given how wet it's been; but mining at the Westgold mine is interesting, as I said before, so watch out for the video.
Analyst
analystYeah, yes, I will. And on top of that question — so you figure you're able to use 100-tonne garbage, you're able to run 100-tonne lanes at one time?
Mark Zeptner
executiveYes. There's a system known as PPS, which technically gives us 99 tonnes, I believe, Richard, but it's a triple <<inaudible>>, and it's been running pretty well. And of course, staying in close touch with the local community, since we don't — we do go past town, as I said. So far, so good; we had several intersections to upgrade, among them the intersection of the Great Eastern Highway near Merredin. We sealed some gravel road close to the mine, which, considering how much water there's been, has held up fairly well, and we'll put another coat on it in 12 months' time. So look, we've managed to haul load every day, 2,500 tonnes out of that mine; and that's great, because it means we have a stockpile of 30,000 tonnes at the mine instead of the 300-odd thousand we've got at Marda, since we've been able to secure our approvals for haulage much more simultaneously with mining than we can with Marda.
Analyst
analystYeah. I noticed the Marda stockpile — 360,000 or thereabouts. Will that come to roughly 11.9, is that in the same ballpark <<inaudible>>, so around $40 million or $50 million ready to be carried? Does it work out that way?
Mark Zeptner
executiveYes, yes. If we could rain it down, Richard, we'd get it down there. At 60,000 tonnes a month we can truck that; but in July, for instance, we'll likely truck half of that given the rain impacts — it's rained nearly every day this year, and it's gone considerably further inland than I appreciated, anyway, having worked historically in the Gulf area and the <<inaudible>>. But we'll keep trucking it as hard and fast as we can, though a bit of weather wouldn't hurt.
Analyst
analystI'm certain you will, though I'd like to ask one final question. Clearly, you've pushed some of that upside through the mill, as you mentioned, from Tampia. How are your grades performing? Are they where you want them to be? Have your estimates proven pretty accurate so far?
Mark Zeptner
executiveAs I noted earlier, we've observed an increase in grades at the mill, which is exactly what we hope for when feeding higher grade material. So — and we've managed to keep throughput at a high rate with no effect on recovery; so it's early days yet, but thus far, so good.
Analyst
analystThis is Rodney <<inaudible>>. That's fine. I'm a <<inaudible>> shareholder of yours, and I respect the work you do, the way you think, and the insight you bring to these mines, because it's a logistics operation — the way you run it, you have to juggle everything, yet it's well planned. And based on what I hear about what's going on and all the comments made earlier, I have a lot of confidence in your style, your management style. I'm confident in your talk as well; so that's how I see it, I mean. I just want to put one question to you, Mark, and I don't believe it's out of line. I think you'll have a good year. Is there any chance of — usually, I get the dividend around October, don't I? Usually.
Mark Zeptner
executiveUsually, yes.
Analyst
analystIs there any discussion about the timing of that announcement, or...
Mark Zeptner
executiveWe will stay watchful. Appreciate the boost there, Rodney; payment is going to arrive afterward as well. Any dividend announcements are something I would expect together with our full year financial results, which falls a bit later in August, around the back end of August. And my understanding is payments land late September, October, though you will have to hold on a little while and I will be watching for that one, Rodney.
Analyst
analystRight then. Just to pick up on that point, thank you. You're doing a good job. And I like the upbeat tone across this whole meeting, which makes me very happy. So well done, mate. And I reckon you're going to kick some goals. I know that. So good luck.
Mark Zeptner
executiveThank you. We'll do our best, Rodney.
Timothy Manners
executiveThank you, Rodney.
Analyst
analystA wonderful job, mate.
Operator
operatorThat’s all the questions we have right now. Today’s conference is now finished. We appreciate your participation. You’re welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ramelius Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Ramelius Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ramelius Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.