Ramelius Resources Limited (RMS) Earnings Call Transcript & Summary

April 27, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 28 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate your holding, and you're welcome to the Ramelius Resources quarterly teleconference. <<operator_script>> A presentation will come first, and a question-and-answer session will follow. <<operator_script>> At this point I would like to pass the conference to Mr. Mark Zeptner, Managing Director. Please proceed.

Mark Zeptner

executive
#2

Good morning, everyone, and thanks for joining Ramelius' March quarterly conference call. With me once more is our Chief Financial Officer, Tim Manners. As usual, I'll walk through the operational highlights for the quarter, referring to the March 2023 quarterly activities report that was released on the platform earlier this morning, before I hand over to Tim to take you through the numbers in more detail. After that, we'll open the line for any questions you may have, and then we'll wrap up with a few brief closing remarks. As you'll have noticed this morning, we reported gold production of 54,244 ounces at an all-in sustaining cost of $18.73 an ounce for the 3 months to 31st of March. Output came in 4% softer than the December quarter, mainly because mining at Vivien concluded and approval for the newly upgraded Penny haul road was delayed. That weighed on output from Mount Magnet, though it was offset to some extent by a 29% improvement at the high-grade Edna May relative to the prior quarter. Because of the delay in Penny haul road approval, we've had to keep running double road trains with a max payload of 50 tonnes on day shift only, rather than moving up to 100 tonne payload quad road trains around the clock, and that has led to the buildup of some 30,000 tonne ore stockpile that currently sits at the mine.

Mark Zeptner

executive
#3

Even so, we're confident Main Road will get the green light for the bigger configuration on or before 10 May. And once that approval arrives, a schedule is already set up that should bring the stockpile down to effectively nothing by the close of June, while also making sure the extra tonnes mined over the quarter get hauled to Mount Magnet, obviously. Our plan for that is to run double the road trains we'd use under normal conditions, which gives us roughly 40,000 tonnes a month of haulage capacity for a stretch of time, rather than the 20,000 tonnes a month we'll need going forward. As for Tampia and Marda, or hauling from Tampia and Marda to the Edna May plant, during the last quarter that stayed comparable with the December quarter, though we did see some decent gains in March and in April month to date, since we've been able to redirect some haulage capacity from Vivien, as I mentioned, where mining has now wrapped up, to those operations further south. The bright spot in the March quarter performance is that we've narrowed our full year guidance to 240,000 to 250,000 ounces, at the top end of the $1,750 to $1,950 an ounce all-in sustaining cost range.

Mark Zeptner

executive
#4

When you work through the numbers, that tells you we're projecting an exceptionally robust close to the year — in fact, our strongest quarter of 2025, with June quarter guidance of 67,500 to 77,500 ounces at an all-in sustaining cost between $1,700 and $1,800 per ounce, driven by a greater share of Penny ore feed to the Mount Magnet plants. So we anticipate the June quarter being outstanding on the cash generation front, since the elevated gold output will be paired with reduced non-sustaining, or growth, capital expenditure from underground projects like Penny and Galaxy, as well as from the Die Hardy open pit at Marda. Turning to exploration: there are several highlights worth noting, among them those from infill drilling at the Galaxy Underground mine, where, if I just — our emphasis on the broader intercepts only has included 3.9 meters at 166.7 grams per tonne, 12 meters at 9.8 grams per tonne, and 3.1 meters at 44.6 grams per tonne. Ore drilling at Galaxy will be getting underway shortly. And from the Rebecca project, where infill and extensional resource drilling has delivered results including 32 meters at 1.68 and 15 meters at 3.34 grams per tonne at the Rebecca deposit itself, plus 25 meters at just over 2 grams per tonne at the nearby Duchess deposits.

Mark Zeptner

executive
#5

You can find a fuller breakdown of exploration conductive inside the quarter discussion itself. Work on the Rebecca PFS is moving along nicely and we still expect it to wrap up by the end of June — though, as I think I've said before, should we succeed with the break on the takeover front, that could cause us to revisit that. At Symes, which sits near Edna May, we put out the PFS during the quarter, and the results were positive and largely consistent with the scoping study we'd already released. The Board has approved moving ahead with development of science once every regulatory approval is in hand, and we anticipate having those by mid-calendar year. One last thing before I hand over: on March 20, Ramelius announced a recommended all-scrip takeover of breaker resources. That company owns the Lake Roe Gold project, roughly 100 kilometers <<inaudible>> away and quite close to our own Rebecca project. We've gone over the reasoning for bringing Lake Roe and Rebecca together in detail on earlier calls, so I won't revisit it at length this morning. I'll just note that as of close of business yesterday, we'd secured acceptances of slightly more than 39% from back shareholders after declaring the offer best and final last week.

Mark Zeptner

executive
#6

With that said, Tim, the floor is yours.

Timothy Manners

executive
#7

Thanks, Mark. During the quarter, we sold 52,787 ounces of gold at an average realized price of just under $2,600 per ounce, which brought in revenue of roughly $137 million. Underlying cash flow came to $8.4 million, an improvement over the $21 million outflow we reported in the December quarter. That's an improvement of nearly $30 million, mostly driven by lower expenditure compared with the prior quarter. This positive cash flow result came after the investment in developing our asset portfolio that was mentioned earlier, including $16 million on underground development at Penny and Galaxy, $3.5 million on the Die Hardy pit at Marda, and $4.5 million on exploration. We also made the first and final stand duty payment of $8 million in January for the acquisition of Apollo consolidated, which owned the Rebecca project. That $8 million had been accrued for in the financial statements of 30 June 2022. As a result of all of the above, our cash and bullion position finished the quarter at $154.4 million, slightly ahead of where we stood at the end of December. And we still have the undrawn $100 million debt facility available in case we want to access it for any growth opportunities we identify.

Timothy Manners

executive
#8

For FY '23, the projected nonsustaining CapEx needs have risen, though, to a bit below $71 million, and $12.8 million is now the forecast figure for the June quarter. That CapEx increase is mostly tied to building out the Die Hardy open pit at Marda along with the Galaxy underground at Magnet. I'll briefly cover each. Broadly speaking, though, what we're looking at is purely a matter of timing or reclassification. At Die Hardy, during the March quarter, waste material was shifted ahead of ore mining. Edna May saw no effect on itself or on its gold output, since stockpile levels were enough to keep haulage running without interruption. So basically, what happened there is we pulled waste removal costs forward, while the pit's total mining cost stays in line with what we expected. At Galaxy, development gets underway in the June quarter, as Mark mentioned, as we progress toward commercial mining physicals, which lands a bit later than our earlier forecast. The result is that a larger share of capital cost gets classed as nonsustaining rather than sustaining — not a material shift overall, more a matter of moving from one category into the other. Turning to hedging and the gold price, we capitalized on the robust $8 gold price in the quarter, which, despite today's spot level, averaged $2,770 an ounce for the quarter — which feels like a world ago.

Timothy Manners

executive
#9

The forward curve's contango let us land an average price for new contracts during the quarter of $2,911 per ounce, and the top contract came in above $3,200 an ounce. As the quarter closed, our forward gold sales stood at 222,000 ounces, averaging $2,702 an ounce across the April 23 to September 25 stretch. Then, because we're focused on managing margins and not merely the top line, we've begun a fairly modest diesel price fixing program. Diesel is among the few input costs that can genuinely be hedged. So we've dipped a toe in the water there. As you'll have noticed, we've locked in prices on just a very small quantity of the fees we anticipate using. But importantly, we hold the facilities to scale that up should we see fit. With that, Darcy, please could you open the line for questions.

Operator

operator
#10

<<operator_script>> Our initial question is from Alex Barkley at RBC.

Alex Barkley

analyst
#11

I have a few questions about that Penny trucking. I believe you said earlier there was an upgrade to triple road chain. So what's the reason for switching to Quad — and what precisely caused the permit delay? Does that have anything to do with the quad trains you're considering? And after the permit comes through, how are things looking on the fleet side and with properly ticketed operators? Is everything ready to go once that permit is in hand?

Mark Zeptner

executive
#12

I'll take that one, Tim. Thanks, Alex. Regarding the first question on triples versus quads, I'd say there's not much difference. Both carry roughly 100 tonnes. One option is the PBS triple, which lets you haul a bit more per trailer compared with a more conventional quad. The reason we're discussing quads now ties to the contract we plan to use for the Penny haulage — they have quads available, and PBS triples, which are special order in a sense, and we use those on the Marda and Tampia haulage routes. So really it comes down to availability. It's largely the same category of haul road approval — without going into the specifics, since main roads use quite a few network categories, less — at the end of the day there's no tonnage difference, and we're matching that with what's available. That probably covers your third question too. The contractor we've given that work to has trucks finishing another job and ready to go, and clearly has the people as well. So from a timing standpoint we're in a pretty good position for that. On the delays, I think it's a process we've been through a number of times before.

Mark Zeptner

executive
#13

Sadly, this has likely been the most drawn-out process I can recall. I'd attribute it to a few factors, probably. We had to work with new contacts on 2 jobs, Sandstone and Magnet. Sandstone was a first for us. So it was new people, and new faces even at Mount Magnet Shire, plus new people at our mines, with the Vivien team shifting over to Penny for the time being. And I think more broadly, local government shires are simply slower at finalizing usage agreements and are requesting more, and like most approvals processes, they tend to run a bit longer. There are some lessons for us from this. Our previous approach wasn't as effective this time. Ideally, we'd catch up by 30 June and it all gets "forgiven." But yes, it hasn't been ideal and has taken longer than we'd have preferred.

Alex Barkley

analyst
#14

All right, so why are you confident about that May 10th date — that's a pretty precise date you've put out there.

Timothy Manners

executive
#15

I've really had to study the processes in detail so that I could understand them and feel some confidence about them. The last stage of that process comes when Main Roads loads the relevant information onto its system — its heavy vehicle mapping system. As soon as it's been loaded onto that, which is essentially an online system, you're good to go. That happens each Wednesday on their side. We actually have a site inspection scheduled for tomorrow covering the stretch of road that requires upgrading. Roughly 27 kilometers have been upgraded and Main Roads needs to inspect that section — after which there's a step of entering the data and refreshing the mapping tool. And from speaking with Main Roads in Perth, there's a chance it might happen slightly sooner, but I'll aim for the 10th of May, which is the Wednesday that finally allows sufficient time for the inspection and for the information to reach Main Roads so they can upload it.

Alex Barkley

analyst
#16

All right, that comes through loud and clear.

Operator

operator
#17

Paul Kaner of Ord Minnett is up next with a question.

Paul Kaner

analyst
#18

Turning to the higher capex guidance for a moment. You said that at Die Hardy you've been prioritizing waste mining. So does that suggest growth CapEx will come in somewhat lower in FY '24 at the end of May hub?

Timothy Manners

executive
#19

Paul, it's Tim here. The shuffling costs, if you will, have eased somewhat from the quarter we just finished, and they'll ease a bit from the quarter we're entering now as well as the one after that. So it isn't as though some specific period or month has all at once dropped by $5 million. It's simply that — as is our habit — we review and refresh our schedules every month. And with the volume of stockpiles we have on hand, the best way to move dirt during the quarter was to send it to waste. That's what we did. The upshot will be that we move less in later quarters. But look, it won't be that July, say, is suddenly $5 million lower. It'll be spread over a 3-, 4-month time frame.

Paul Kaner

analyst
#20

Yes. No, I get it. And maybe just to follow on from that point. How should we really be thinking about group growth CapEx in FY '24 compared with FY '23?

Timothy Manners

executive
#21

Looking at things as they stand right now, we'd anticipate that figure coming in lower. Clearly, we've gotten past the hardest part, I'd say, particularly at sites such as Penny and the Galaxy mine. Not much development remains at the Edna May underground. With Mount Magnet, you can never tell — there are always spots that need development as we progress. So, assuming nothing else changes...

Mark Zeptner

executive
#22

On the Hub side at the end of May specifically, Paul, we have the Symes project. That piece isn't significant, in my view — under $5 million. So you're moving into some genuinely <<inaudible>> territory. And on the whole, I'd anticipate that figure coming in lower.

Timothy Manners

executive
#23

My guess is that the next major item will probably be something along the lines of Rebecca, or perhaps another of the possible projects located in the Mount Magnet area.

Paul Kaner

analyst
#24

Yeah. No, that's perfectly clear.

Mark Zeptner

executive
#25

Appreciate it, Paul.

Operator

operator
#26

<<operator_script>> Our following question is from Richard Hart, a Private Investor.

Richard Hart

unknown
#27

Thank you so much. Morning to you, Mark and Tim. Appreciate once more the effort you put into your presentation. From a production standpoint, a cash standpoint, and a takeover standpoint, it appears to be a thrilling quarter. So my best wishes to you, and I'm certain you're buried in work, but good luck with everything. One question regarding the report came to mind — the Galaxy underground drill results. Often in the past, these would have been called Bonanza, which is something a shareholder likes because it immediately moves the share price. I'm just curious about the criteria — you seldom put out drill results. I'm wondering what other criteria you apply when deciding if drill results ought to be independently notified or simply included in a quarterly like this one.

Mark Zeptner

executive
#28

Thanks, Richard. That's a fair question. At Mount Magnet, you can sometimes see figures that, taken at face value, appear to warrant a standalone report. Whether you're looking at processes or at material, we believe this is fairly typical of what Mount Magnet delivers — a blend of higher grades and lower grades. So when the GOs felt this warranted separate reporting, we went along with that approach. That said, we're pretty pleased with those figures, and we're eager to get into those ore drives at Galaxy. You'll find some sections that are really strong, and you'll also find some sections that are somewhat weaker. But that's just how Mount Magnet is. I think experience has shown us not to get too excited about the occasional outlier result, however much shareholders might want us to.

Speaker

unknown
#29

Yeah, that's pretty much the response I had in mind. It's really all that background, I guess, instead of — again — simply being selfish as an investor, since any time Bonanza comes up, it does have a positive effect, but I get your point. So thank you for all of it.

Operator

operator
#30

Ashley Chan, a private investor, has the next question.

Speaker

unknown
#31

Appreciate the update and the report. I just have a question about whether you can give us some color or an update on the hedging strategy going forward. If you look at Page 22 of the quarterly report, it seems that the other strategy previously involved hedging half of production 2 years ahead. So for the coming quarter, you've hedged 34,000 ounces, if I'm reading that correctly, at $2,568, which would have been done a couple of years ago by hedging half of your forecast production. I'd just like some comment on whether you're keeping track of the cost of this, because if you multiply the current spot price by the hedging price, you come out to something like $15 million a quarter of forgone revenue, and whether you have any comment on how that relates to how much you'll be hedging going forward, given that you're also focusing on hedging to try to fix your costs as well?

Timothy Manners

executive
#32

Sure, this is Tim, and I’m glad to take that. On volume, our policy is basically that we cover about a year’s output within a maximum of 3 years. Our approach gives more weight to the near term than the longer term—or, rather, to ounces—sorry, to the short term over the long term. As I said on my call, it’s simple to point out that today’s price is $3,000 an ounce. For the quarter that just ended, the average was roughly $160 an ounce above the level we realized. So yes, some dollars are being given up. In the quarter just past, that’s around $7 million to $8 million, if I’ve done the mental math correctly. It does move around. We’d expect that to shrink over time as the price in our hedge book rises. Right now, though, we value the certainty contracts provide. As you noted, there are some legacy contracts in our book. Some of the shorter-dated positions from here were put on months—even years—ago. When prices surpassed $2,000 an ounce, it was seen as, if you like, a bold new world, and locking in margins at those levels struck us as quite prudent, and we stand by that.

Timothy Manners

executive
#33

We're going to keep an eye on the policy at all times. That policy comes from the Board. Once we put it in place, it gets reviewed and tested every quarter at minimum — often more often than that. Still, if you're looking for some kind of guide on what to expect down the road, I'd be operating largely on those same assumptions I mentioned: roughly 1 years' worth of production — so 240 to 250 right now — spread across no more than 3 years, tilted toward short-dated positions instead of longer-dated ones.

Speaker

unknown
#34

We really appreciate that.

Timothy Manners

executive
#35

That's not a problem at all.

Operator

operator
#36

Josh Chiat of Stockhead has the next question.

Josh Chiat

analyst
#37

Mark, I want to pick up on that point somewhat, though in a broader way. Gold equities have been rising, as we've observed. You mentioned a hedge contract at $3,200 per ounce that you hold. In your view, is sentiment and investor interest in the gold sector starting to turn a corner?

Mark Zeptner

executive
#38

Thanks, Josh. No, it's definitely gotten better lately. For gold, 2022 was a fairly unremarkable year. Other things appeared to draw more interest. But it shifts fast, Josh. Right now, though, yes, it's definitely a nicer spot to be in. And with the gold price sitting near 3,000, the gold price has done some catching up relative to the cost increases we've all witnessed. So there's likely some levelling out, with margins having steadied. And clearly, with Ramelius, given our declining cost profile, they've actually begun to widen once more, which we're eager to see.

Josh Chiat

analyst
#39

And regarding the cost side, you've obviously talked a fair amount about Penny and what difference it makes to have higher-grade ore coming through. But are you noticing any softening in some of the broader industry costs, labor shortages, availability, and factors like that which make you confident the margin can hold up right now?

Timothy Manners

executive
#40

Josh, this is Tim, and I'll jump in on that point. We are clearly observing some modest easing in certain input costs — diesel being one example. Regarding the pressure we've experienced in the labor market, the short answer, I suppose, is that I don't know. From what we can observe, though, things appear to have largely stabilized. It definitely isn't heading back down, and I believe some time will be required for that to occur. Hopefully the worst is behind us now, though I dislike saying it. Even so, we continue to have stretches when vacancies appear, and they tend to arrive in waves. Right now, however, we're in a much better position than was the case 12 or 18 months ago, without question. On costs, labor represents a major component — including our own employees as well as people working for our contractors. That's therefore something we must keep very much in mind and monitor closely, since roughly 60% of our underlying costs are people, along with the ancillary expenses that arise from people too. So yes, hopefully that provides you with some sense of what we're seeing.

Operator

operator
#41

That brings us to the end of the question-and-answer session. I'll return the floor to Mr. Zeptner now for his closing comments.

Mark Zeptner

executive
#42

Thanks, Darcy. So, to close things out, I want to highlight three points if I may. It was a decent quarter — even without any meaningful contribution from Penny, we still produced more than $8 million in free cash flow, and that figure comes before the stamp duty payment tied to last year's Apollo transaction. The June quarter is shaping up as extremely strong for the company: more ounces, reduced costs across both OpEx and CapEx, which should drive considerable cash generation in the expectations, both internally and, until externally, for Breaker to take over. The Breaker takeover is moving along nicely toward 50.1%, after which the offer will be declared unconditional, and from that point on we expect it to build further momentum in the process. Thanks for tuning in today. Enjoy the rest of your day.

Operator

operator
#43

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ramelius Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Ramelius Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research